WO2007081167A1 - Method for repairing conduit line and repair material - Google Patents

Method for repairing conduit line and repair material Download PDF

Info

Publication number
WO2007081167A1
WO2007081167A1 PCT/KR2007/000204 KR2007000204W WO2007081167A1 WO 2007081167 A1 WO2007081167 A1 WO 2007081167A1 KR 2007000204 W KR2007000204 W KR 2007000204W WO 2007081167 A1 WO2007081167 A1 WO 2007081167A1
Authority
WO
WIPO (PCT)
Prior art keywords
repair
conduit
repairing
members
reinforcing filler
Prior art date
Application number
PCT/KR2007/000204
Other languages
French (fr)
Inventor
Je Geun Lee
Original Assignee
Han Gang Co., Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Han Gang Co., Ltd. filed Critical Han Gang Co., Ltd.
Publication of WO2007081167A1 publication Critical patent/WO2007081167A1/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders
    • F16L55/162Devices for covering leaks in pipes or hoses, e.g. hose-menders from inside the pipe
    • F16L55/165Devices for covering leaks in pipes or hoses, e.g. hose-menders from inside the pipe a pipe or flexible liner being inserted in the damaged section
    • F16L55/1657Devices for covering leaks in pipes or hoses, e.g. hose-menders from inside the pipe a pipe or flexible liner being inserted in the damaged section lengths of rigid pipe being inserted
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders
    • F16L55/162Devices for covering leaks in pipes or hoses, e.g. hose-menders from inside the pipe
    • F16L55/164Devices for covering leaks in pipes or hoses, e.g. hose-menders from inside the pipe a sealing fluid being introduced in the pipe

Definitions

  • the present invention relates to a method for repairing conduit line, and more specifically to a method for repairing conduit line and repair material, by which when conduit line buried underground as well as sewage conduit line is damaged by deterioration or corrosion, it is repaired easily without replacing for continued use.
  • conduit line buried underground as well as sewage conduit line is deteriorated when a certain period has passed or damaged because part of it is corroded by oxidized substances. Since the content flows out through the damaged portion to cause problems such as soil contamination or groundwater pollution, it is necessary to repair the conduit line having such a problem.
  • One of the repairing methods is to replace the damaged conduit. Namely, the place where the conduit is buried is excavated and the deteriorated conduit is separated and a new conduit is buried. But such a repairing method has problems that it takes a lot of work time and also work efficiency is low because the conduit has to be replaced after excavating the place where the damaged conduit is buried. Especially, in case of working in a bustling urban center, it causes traffic congestion.
  • a cylindrical body having an outer diameter smaller than the inner diameter of conduit is formed in the conduit, and the interval between cylindrical body and conduit inner wall is filled with grout material, which is hardened.
  • This method is characterized by that an inflatable-deflatable tube-shaped pressure bag is placed lengthwise in the conduit in the interval between the cylindrical body and conduit inner wall, and fluid is filled in the pressure bag to inflate the pressure bag, and the cylindrical body is supported by the inflated pressure bag. It is also characterized by that a triangular edge shaped support is introduced into the cylindrical body and this support supports three points of the top portion on the inside of the cylindrical body and of the left and right on the inside.
  • the present invention is to solve such aforementioned problems with an object to provide a conduit repairing method, by which a plurality of repair members can be installed inside the conduit very easily and stably and the conduit can be repaired easily by injecting and coagulating reinforcing filler into the interval between them.
  • Another object of the present invention is to provide a conduit repairing method, by which a plurality of repair members are connected to each other and are configured in such a way that the angle made by two adjacent repair members is easily adjustable, so that the repair members can be installed by bending them easily according to the shape of conduit.
  • Still another object of the present invention is to provide repair material to be used in such a conduit repairing method.
  • a method for repairing conduit line comprising: a first process in which support members shaped in such a way that the protrusions and grooves are alternately formed on one side are fixed and installed on the ceiling, floor and both sides of the conduit inside, and these support members are successively installed at a predetermined interval lengthwise of the conduit; a second process in which after one repair member that has a latch portion formed at one end widthwise and a catch portion corresponding to the latch portion is formed on the other end is adhered and fixed to the repair member, with the latch portion of another repair member inserted into and connected with the catch portion of the previously fixed repair member, another repair member is fixed by being pushed lengthwise to thrust the latch portion in the catch portion; a third process in which reinforcing filler material is injected and filled through a filler hole formed in said repair member into the interval formed between the repair member and conduit; and a fourth process in which when injection of said reinforcing filler material is completed the filler hole is sealed, and
  • FIG. 1 is a sectional view showing one portion of conduit repaired by the method for repairing conduit line according to the present invention
  • Fig. 2 is a sectional view taken along line A-A of Fig. 1
  • Fig. 3 is a sectional view shown by enlarging one portion of Fig. 2;
  • FIG. 4 is an exploded perspective view showing repair materials used in the method for repairing conduit line according to the present invention.
  • FIG. 5 is a sectional view showing another embodiment of repair member used in the present invention.
  • conduit 10 support member
  • FIG. 1 is a sectional view showing one portion of conduit repaired by the method for repairing conduit line according to the present invention
  • Fig. 2 is a sectional view taken along line A-A of Fig. 1
  • Fig. 3 is a sectional view shown by enlarging one portion of Fig. 2
  • Fig. 4 is an exploded perspective view showing repair materials used in the method for repairing conduit line according to the present invention
  • Fig. 5 is a sectional view showing another embodiment of repair member used in the present invention.
  • the repair material used in the present invention is composed of a plurality of support members 10 and repair members 20.
  • a support member 10 has a predetermined width, and one side of it is formed so as to be adhered to the inside of conduit, and the other side has shape which has protrusions 12 and grooves 14 formed alternately. And the groove 14 has a fastening hole 16 through-formed for a bolt to be fastened. And, inside the support member 10 is buried at least one steel skeleton 18 extended lengthways along the lengthwise direction to reinforce the strength. And, in the direction perpendicular to the lengthwise direction, that is, in the width direction, is through-formed an insert hole 19 into which at least one cable housing pipe 30 is inserted.
  • the cable housing pipe 30 refers to a pipe for housing various cables and wires.
  • the repair member 20 has a latch portion 22 formed at one end widthwise, and a catch portion 24 formed at the other end corresponding to the latch portion 22 for the latch portion 22 of another adjacent repair member 20 to be inserted and connected.
  • the latch portion 22 and the catch portion 24 have a shape of partly opened circular ring shape so as to freely adjust the angle made by adjacent two repair members 20 within a given range when the latch portion 22 and the catch portion 24 are connected to each other.
  • these portions are not limited to ring shape, and as shown in Fig. 5, but they can have a variety of shapes such as a roughly rectangular, hexagonal, octagonal shape, etc.
  • a filler hole 26 which can be opened or closed selectively via a plug 28.
  • the filler hole 26 can be formed limitedly in only part of repair members 20, or in all of repair members 20.
  • a screw method may instead be adopted, but any method can be applied as long as the filler hole 26 can be selectively sealed.
  • the support member 10 and repair member 20 may be preferably made of synthetic resin to have its unit price reduced, but it may instead be made of a different material.
  • support members 10 are adhered to the ceiling and floor and both sides of conduit 1, and then bolts B are fastened in fastening holes 16 to fix support members 10 on the inner wall of conduit 1. And, installation work of these support members 10 is carried out successively at a predetermined interval lengthwise of conduit 1. At this time, the support members 10 installed on the ceiling, floor and both sides may be installed on the same line, or in zigzag.
  • At least one cable housing pipe 30 is installed in the insert hole 19.
  • the cable housing pipe 30 is installed for the purpose of installing various cables and wires in the housing pipe of the conduit as necessary. For reference, in case it is not necessary to install a cable housing pipe 30, just proceed to the next process.
  • any one of repair members 20 is fixed by fastening screws S while adhered to the protrusion 12 of the corresponding support member 10.
  • the latch portion 22 of another repair member 20 inserted into and connected with the catch portion 24 of the previously fixed repair member 20
  • the repair member 20 is fixed to the support member 10 by screws S.
  • reinforcing filler material M such as mortar is injected to fill the interval formed between repair members 20 and conduit 1 through filler holes 26 formed on repair members 20. Namely, a predetermined interval is formed by support members 10 between repair members 20 and conduit 1, and reinforcing filler material M is filled in this interval.
  • hot air may be supplied using hot air blower. At this time, hot air can be supplied by using the art in public domain, so the detailed description is omitted.
  • both the work of installing support members and the work of installing repair members are very easy, so the whole conduit repair work time is reduced and word work efficiency is improved.

Abstract

The present invention relates to a method for repairing conduit line, more specifically, it comprises a first process for successively installing support members lengthwise in conduit at a predetermined interval; a second process for installing a plurality of repair members so as to envelop the inside of the conduit through the support members at a predetermined interval with the conduit; a third process for injecting reinforcing filler material into the interval formed between the repair member and conduit; and a fourth process for sealing the filler hole when injection of reinforcing filler material is completed and coagulating the reinforcing filler material. Thus, according to the method for repairing conduit line according to the present invention, it is very easy to install support members or repair members, so it has effects of overall reduction of conduit repair work time and improvement of work efficiency.

Description

Description
METHOD FOR REPAIRING CONDUIT LINE AND REPAIR
MATERIAL
Technical Field
[1] The present invention relates to a method for repairing conduit line, and more specifically to a method for repairing conduit line and repair material, by which when conduit line buried underground as well as sewage conduit line is damaged by deterioration or corrosion, it is repaired easily without replacing for continued use.
[2]
Background Art
[3] In general, conduit line buried underground as well as sewage conduit line is deteriorated when a certain period has passed or damaged because part of it is corroded by oxidized substances. Since the content flows out through the damaged portion to cause problems such as soil contamination or groundwater pollution, it is necessary to repair the conduit line having such a problem. One of the repairing methods is to replace the damaged conduit. Namely, the place where the conduit is buried is excavated and the deteriorated conduit is separated and a new conduit is buried. But such a repairing method has problems that it takes a lot of work time and also work efficiency is low because the conduit has to be replaced after excavating the place where the damaged conduit is buried. Especially, in case of working in a bustling urban center, it causes traffic congestion.
[4]
[5] So, a recent trend is that various methods of repairing without replacing deteriorated conduit are being developed and carried out. An example of such a method is repairing the damaged portion of conduit by pasting with mortar. If the extent of damage is light, it is possible to repair it by pasting the surface partially with mortar; but if the damaged portion of conduit is extensive, partial repair work is inefficient. Therefore, in such a case, repairing the whole conduit should be more effective.
[6]
[7] As an example of repairing conduit on the whole, there is a conduit repairing method disclosed in Korean Patent Laid-Open No. 2004-10353.
[8] In this conduit repairing method, a cylindrical body having an outer diameter smaller than the inner diameter of conduit is formed in the conduit, and the interval between cylindrical body and conduit inner wall is filled with grout material, which is hardened. This method is characterized by that an inflatable-deflatable tube-shaped pressure bag is placed lengthwise in the conduit in the interval between the cylindrical body and conduit inner wall, and fluid is filled in the pressure bag to inflate the pressure bag, and the cylindrical body is supported by the inflated pressure bag. It is also characterized by that a triangular edge shaped support is introduced into the cylindrical body and this support supports three points of the top portion on the inside of the cylindrical body and of the left and right on the inside.
[9]
[10] However, such a conventional conduit repairing method has a problem that it is very inconvenient and complicated, thereby lowering work efficiency, because a cylindrical body is formed in the conduit and a pressure bag is installed between conduit and cylindrical body to support the cylindrical body. Moreover, it has another problem that the work of installing a triangular edge shaped support inside the cylindrical body for more stable support is also very inconvenient and bothersome, and takes a lot of time, thereby lowering work efficiency.
[H]
Disclosure of Invention Technical Problem
[12] The present invention is to solve such aforementioned problems with an object to provide a conduit repairing method, by which a plurality of repair members can be installed inside the conduit very easily and stably and the conduit can be repaired easily by injecting and coagulating reinforcing filler into the interval between them.
[13]
[14] Another object of the present invention is to provide a conduit repairing method, by which a plurality of repair members are connected to each other and are configured in such a way that the angle made by two adjacent repair members is easily adjustable, so that the repair members can be installed by bending them easily according to the shape of conduit.
[15]
[16] Still another object of the present invention is to provide repair material to be used in such a conduit repairing method.
[17]
Technical Solution
[18] In accordance with the present invention, there is provided a method for repairing conduit line comprising: a first process in which support members shaped in such a way that the protrusions and grooves are alternately formed on one side are fixed and installed on the ceiling, floor and both sides of the conduit inside, and these support members are successively installed at a predetermined interval lengthwise of the conduit; a second process in which after one repair member that has a latch portion formed at one end widthwise and a catch portion corresponding to the latch portion is formed on the other end is adhered and fixed to the repair member, with the latch portion of another repair member inserted into and connected with the catch portion of the previously fixed repair member, another repair member is fixed by being pushed lengthwise to thrust the latch portion in the catch portion; a third process in which reinforcing filler material is injected and filled through a filler hole formed in said repair member into the interval formed between the repair member and conduit; and a fourth process in which when injection of said reinforcing filler material is completed the filler hole is sealed, and when a given time has passed the injected reinforcing filler material is coagulated.
Advantageous Effects
[19] In the method for repairing conduit line according to the present invention, both the work of installing support members and the work of installing repair members are very easy, so the whole conduit repair work time is reduced and work efficiency is improved. [20] [21] Also, by the present invention, it is possible not only to reduce execution cost due to reduced work time, but also to reduce the manufacturing cost because the composition of support members and repair members are simple, thereby resulting in reduction of the whole execution cost. [22] [23] Moreover, since in the present invention a plurality of repair members are configured so as to be easily bent even if connected to each other, installation work of repair members can be carried out very easily even in repairing an angular edge portion of conduit. [24] [25] Furthermore, since the present invention has a cable housing pipe formed inside, it is possible to bury and install various cables and wires in the housing pipe of conduit as necessary. [26]
Brief Description of the Drawings [27] These and other features, aspects, and advantages of preferred embodiments of the present invention will be more fully described in the following detailed description, taken accompanying drawings. In the drawings: [28] Fig. 1 is a sectional view showing one portion of conduit repaired by the method for repairing conduit line according to the present invention; [29] Fig. 2 is a sectional view taken along line A-A of Fig. 1 ; [30] Fig. 3 is a sectional view shown by enlarging one portion of Fig. 2;
[31] Fig. 4 is an exploded perspective view showing repair materials used in the method for repairing conduit line according to the present invention; and
[32] Fig. 5 is a sectional view showing another embodiment of repair member used in the present invention.
[33]
[34] [Description of numerals of major parts of the drawing]
[35] 1: conduit 10: support member
[36] 12: protrusion 14: groove
[37] 16: fastening hole 18: steel skeleton
[38] 19: insert hole 20: repair member
[39] 22: latch portion 24: catch portion
[40] 26: inlet hole 28: plug
[41] 30: cable housing pipe B: bolt
[42] M: reinforcing filler material S: screw
[43]
Best Mode for Carrying Out the Invention
[44] Below will be described in detail the present invention with reference to the accompanying drawings.
[45] Fig. 1 is a sectional view showing one portion of conduit repaired by the method for repairing conduit line according to the present invention; Fig. 2 is a sectional view taken along line A-A of Fig. 1 ; Fig. 3 is a sectional view shown by enlarging one portion of Fig. 2; Fig. 4 is an exploded perspective view showing repair materials used in the method for repairing conduit line according to the present invention; and Fig. 5 is a sectional view showing another embodiment of repair member used in the present invention.
[46]
[47] First, referring to Fig. 4, the repair material used in the present invention is composed of a plurality of support members 10 and repair members 20.
[48] A support member 10 has a predetermined width, and one side of it is formed so as to be adhered to the inside of conduit, and the other side has shape which has protrusions 12 and grooves 14 formed alternately. And the groove 14 has a fastening hole 16 through-formed for a bolt to be fastened. And, inside the support member 10 is buried at least one steel skeleton 18 extended lengthways along the lengthwise direction to reinforce the strength. And, in the direction perpendicular to the lengthwise direction, that is, in the width direction, is through-formed an insert hole 19 into which at least one cable housing pipe 30 is inserted. Here, the cable housing pipe 30 refers to a pipe for housing various cables and wires.
[49] The repair member 20 has a latch portion 22 formed at one end widthwise, and a catch portion 24 formed at the other end corresponding to the latch portion 22 for the latch portion 22 of another adjacent repair member 20 to be inserted and connected. Here, it is preferable that the latch portion 22 and the catch portion 24 have a shape of partly opened circular ring shape so as to freely adjust the angle made by adjacent two repair members 20 within a given range when the latch portion 22 and the catch portion 24 are connected to each other. However, these portions are not limited to ring shape, and as shown in Fig. 5, but they can have a variety of shapes such as a roughly rectangular, hexagonal, octagonal shape, etc. Also, in one part of the repair member 20 is through-formed a filler hole 26, which can be opened or closed selectively via a plug 28. Here, the filler hole 26 can be formed limitedly in only part of repair members 20, or in all of repair members 20. And, as for the plug 28, a screw method may instead be adopted, but any method can be applied as long as the filler hole 26 can be selectively sealed.
[50] Meanwhile, the support member 10 and repair member 20 may be preferably made of synthetic resin to have its unit price reduced, but it may instead be made of a different material.
[51]
[52] Now, referring to Figs. 1 to 3, the method for repairing conduit line by the aforementioned repair material will be described.
[53] First, support members 10 are adhered to the ceiling and floor and both sides of conduit 1, and then bolts B are fastened in fastening holes 16 to fix support members 10 on the inner wall of conduit 1. And, installation work of these support members 10 is carried out successively at a predetermined interval lengthwise of conduit 1. At this time, the support members 10 installed on the ceiling, floor and both sides may be installed on the same line, or in zigzag.
[54] When installation of support members 10 is completed, at least one cable housing pipe 30 is installed in the insert hole 19. Here, the cable housing pipe 30 is installed for the purpose of installing various cables and wires in the housing pipe of the conduit as necessary. For reference, in case it is not necessary to install a cable housing pipe 30, just proceed to the next process.
[55] When installation of the cable housing pipe 30 is completed, any one of repair members 20 is fixed by fastening screws S while adhered to the protrusion 12 of the corresponding support member 10. Next, with the latch portion 22 of another repair member 20 inserted into and connected with the catch portion 24 of the previously fixed repair member 20, push another repair member 20 lengthwise continuously to have the latch portion 22 inserted into the catch portion 24. After that, the repair member 20 is fixed to the support member 10 by screws S. By connecting and installing a plurality of repair members 20 continuously in this manner, the inside of conduit 1 is enveloped. At this time, since it is possible by the present invention to freely adjust the angle made by adjacent two repair members within a given range, even with a plurality of repair members 20 connected, it is possible to install repair members by easily bending them according to the shape of conduit 1.
[56] When installation of repair members 20 is completed, reinforcing filler material M such as mortar is injected to fill the interval formed between repair members 20 and conduit 1 through filler holes 26 formed on repair members 20. Namely, a predetermined interval is formed by support members 10 between repair members 20 and conduit 1, and reinforcing filler material M is filled in this interval.
[57] When injection of reinforcing filler material M is completed, plugs 28 are inserted into filler holes 26 to seal them, and when the injected reinforcing filler material M is coagulated after a given time period has passed, conduit repair work is completed.
[58] Of course, in order to reduce the coagulation time of reinforcing filler material M, hot air may be supplied using hot air blower. At this time, hot air can be supplied by using the art in public domain, so the detailed description is omitted.
[59] Although the present invention has been described in connection with the exemplary embodiments illustrated in the drawings, it is only illustrative. It will be understood by those skilled in the art that various modifications and equivalents can be made to the present invention. Therefore, the true technical scope of the present invention should be defined by the appended claims.
[60]
Industrial Applicability
[61] In accordance with the present invention, both the work of installing support members and the work of installing repair members are very easy, so the whole conduit repair work time is reduced and word work efficiency is improved.

Claims

Claims
[1] A method for repairing conduit line comprising: a first process in which support members shaped in such a way that the protrusions and grooves are alternately formed on one side are fixed and installed on the ceiling, floor and both sides of the conduit inside, and these support members are successively installed at a predetermined interval lengthwise of the conduit; a second process in which after one repair member that has a latch portion formed at one end widthwise and a catch portion corresponding to the latch portion is formed on the other end is adhered and fixed to the repair member, with the latch portion of another repair member inserted into and connected with the catch portion of the previously fixed repair member, another repair member is fixed by being pushed lengthwise to thrust the latch portion in the catch portion; a third process in which reinforcing filler material is injected and filled through a filler hole formed in said repair member into the interval formed between the repair member and conduit; and a fourth process in which when injection of said reinforcing filler material is completed the filler hole is sealed, and when a given time has passed the injected reinforcing filler material is coagulated.
[2] The method for repairing conduit line of claim 1, further comprising a process in which at least one cable housing pipe is installed in the insert hole formed in the support member before injecting said reinforcing filler material.
[3] The method for repairing conduit line of claim 1, further comprising a process in which a hot air blower is used to supply hot air in order to reduce the coagulation time of said reinforcing filler material.
[4] Repair material for repairing conduit comprising: support members having a shape in which one side is adhered to the inside of conduit and the protruding portions and grooves are alternately formed on the other side, and fastening holes are through-formed in grooves for bolts to be fastened therethrough, and repair members having latch portions formed on one end widthwise and catch portions corresponding to the latch portions formed on the other end, wherein the latch portion of one repair member is inserted in the catch portion of another adjacently placed repair member to be connected to each other.
[5] The repair material for repairing conduit of claim 4, said support member has at least one steel skeleton buried inside along its lengthwise direction for reinforcement of strength, and at least one insert hole is formed along its widthwise direction for installing a cable housing pipe.
[6] The repair material for repairing conduit of claim 4, wherein the latch portions and catch portions of said repair material have a partly opened circular ring shape so as to freely adjust the angle made by adjacent two repair members, with the latch portions and catch portions of said repair material connected to each other.
[7] The repair material for repairing conduit of claim 4 or claim 6, wherein a filler hole is through-formed in one part of said repair member and the filler hole is selectively opened or closed by a plug.
PCT/KR2007/000204 2006-01-16 2007-01-11 Method for repairing conduit line and repair material WO2007081167A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020060004529A KR100735063B1 (en) 2006-01-16 2006-01-16 Method of repairing pipe and material for repairing
KR10-2006-0004529 2006-01-16

Publications (1)

Publication Number Publication Date
WO2007081167A1 true WO2007081167A1 (en) 2007-07-19

Family

ID=38256527

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2007/000204 WO2007081167A1 (en) 2006-01-16 2007-01-11 Method for repairing conduit line and repair material

Country Status (2)

Country Link
KR (1) KR100735063B1 (en)
WO (1) WO2007081167A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014070435A (en) * 2012-09-28 2014-04-21 Ashimori Ind Co Ltd Method for repairing pipe conduit

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09132930A (en) * 1995-09-05 1997-05-20 Kurimoto Ltd Repairing method for existing water channel and repairing unit using therefor
JP2001021092A (en) * 1999-07-09 2001-01-26 Shonan Gosei Jushi Seisakusho:Kk Construction method for repairing passage facility
JP2002310378A (en) * 2001-04-06 2002-10-23 Ashimori Ind Co Ltd Lining structure of pipeline
JP2003314197A (en) * 2002-04-26 2003-11-06 Iida Kensetsu Kk Conduit repairing method and conduit interior repairing structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09132930A (en) * 1995-09-05 1997-05-20 Kurimoto Ltd Repairing method for existing water channel and repairing unit using therefor
JP2001021092A (en) * 1999-07-09 2001-01-26 Shonan Gosei Jushi Seisakusho:Kk Construction method for repairing passage facility
JP2002310378A (en) * 2001-04-06 2002-10-23 Ashimori Ind Co Ltd Lining structure of pipeline
JP2003314197A (en) * 2002-04-26 2003-11-06 Iida Kensetsu Kk Conduit repairing method and conduit interior repairing structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014070435A (en) * 2012-09-28 2014-04-21 Ashimori Ind Co Ltd Method for repairing pipe conduit

Also Published As

Publication number Publication date
KR100735063B1 (en) 2007-07-03

Similar Documents

Publication Publication Date Title
US7056064B2 (en) Block unit for repairing flow passage facilities and method of repairing flow passage facilities
TWI617762B (en) Pipe repair section and pipe repair method
KR20060046606A (en) Rehabilitating pipe and method for laying a rehabilitating pipe
JP2001311387A (en) Repairing method for existing conduit, repairing material used for it and repaired conduit
EP2600047B1 (en) Pipeline regeneration pipe
KR20060069419A (en) This install structure and carrying out method with the watertight and flexible of the precast reinforced concrete box culverts
KR20140046373A (en) Segment for rehabilitation pipe and pipe rehabilitation method
WO2007081167A1 (en) Method for repairing conduit line and repair material
JP2006307989A (en) Regenerated pipe of underground embedded pipe and its method
KR101066899B1 (en) Pipe module and water pipe using the same
AU2003221369C1 (en) Block unit for repairing flow passage facilities and method of repairing flow passage facilities
JP2004353446A (en) Block for repair of channel and channel repair method using the same
KR200392200Y1 (en) Nailing Fixing Device For Reinforcing Rod Of The Surfacereinforcement
JPS61126223A (en) Method for repairing and reproducing underground buried piping
KR101047895B1 (en) Prefabricated waterway module for waterway for leak prevention and assembly convenience
JP2006161329A (en) Reclamation method for manhole
JP4938407B2 (en) Existing pipe repair method
KR200403692Y1 (en) Two-Way Nailing Fixing Device For Reinforcing Rod Of The Surface reinforcement
KR200342265Y1 (en) Hume concrete pipe connection structure
KR930001321Y1 (en) Joint of connecting pipe line
JP2002089191A (en) Segment for tunnel
KR20160104488A (en) Assembly type hole repair system
JP4776117B2 (en) Pipe connection repair method
JP2002364775A (en) Correction application method for tunnel
KR200392537Y1 (en) Strip liner for strip-lining construction

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application
NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 07700937

Country of ref document: EP

Kind code of ref document: A1