WO2005100747A2 - Dynamic logging speed - Google Patents
Dynamic logging speed Download PDFInfo
- Publication number
- WO2005100747A2 WO2005100747A2 PCT/US2005/011713 US2005011713W WO2005100747A2 WO 2005100747 A2 WO2005100747 A2 WO 2005100747A2 US 2005011713 W US2005011713 W US 2005011713W WO 2005100747 A2 WO2005100747 A2 WO 2005100747A2
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- sensors
- processor
- sensor
- logging
- logging speed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V11/00—Prospecting or detecting by methods combining techniques covered by two or more of main groups G01V1/00 - G01V9/00
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V2210/00—Details of seismic processing or analysis
- G01V2210/60—Analysis
- G01V2210/61—Analysis by combining or comparing a seismic data set with other data
- G01V2210/616—Data from specific type of measurement
- G01V2210/6163—Electromagnetic
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V2210/00—Details of seismic processing or analysis
- G01V2210/60—Analysis
- G01V2210/61—Analysis by combining or comparing a seismic data set with other data
- G01V2210/616—Data from specific type of measurement
- G01V2210/6167—Nuclear
Definitions
- This invention relates generally to methods of improved logging using 5 oilfield borehole tools and more particularly to dynamic adjustment of the logging speed based on the quality of the acquired data and the formations being evaluated.
- Oil or gas wells are often surveyed to determine one or more geological, petrophysical, geophysical, and well production properties ("parameters of interest") using electronic measuring instruments conveyed into the borehole by an umbilical such as a cable, a wireline, slickline, drill pipe or coiled tubing.
- umbilical such as a cable, a wireline, slickline, drill pipe or coiled tubing.
- Tools adapted to perform such surveys are commonly referred to as formation 5 evaluation tools. These tools use electrical, acoustical, nuclear and/or magnetic energy to stimulate the formations and fluids within the borehole and measure the response of the formations and fluids.
- the measurements made by downhole instruments are transmitted back to the surface. In many instances, multiple trips or logging runs are needed to collect the necessary data. Additionally, the loggingO speed is usually a predetermined fixed quantity.
- FOCUSTM is a high efficiency premium open hole5 logging systems. (Note the grammatical error. Also, FOCUS should not be called a "premium" system, because it does not have our standard temperature and pressure rating). All of the downhole instruments have been redesigned, incorporating advanced downhole sensor technology, into shorter, lighter, more reliable logging instruments, capable of providing formation evaluationO measurements with the same precision and accuracy as the industry's highest quality sensors, at much higher logging speeds. Logging speeds are up to twice the speed of conventional triple-combo and quad combo logging tool strings. Speeds of upto 3600 ft/hr (1080 m/min) are possible.
- the logging system may include four standard major open hole measurements (resistivity, density, neutron, acoustic) plus auxiliary services.
- the resolution and accuracy of logging measurements is determined by the type of measurement and the type of formation being logged.
- the measurement may be tailored to the type of formation.
- US Patent 5,309,098 to Coates et al. teaches a method and apparatus in which a variable time-window ⁇ echo-recording system is used to obtain significant improvements in signal q ⁇ ality and logging speed.
- An initial test is performed to provide an assessment of the relaxation qualities of the sample. If the test reveals that the sample is a slow- relaxation rock, then the full time is allocated to measuring echoes. However., if the test reveals that the sample is a fast decay rock, then the echo acquisition time window is reduced. This provides increased efficiency since the system is able to maximize the number of measurements made by optimizing the individual sampling intervals to the particular geologic structure being tested.
- the present invention is a method of, and an apparatus for conducting logging operations of a borehole in an earth.
- a string of formation evaluation (FE) sensors are conveyed on a conveyance device such as a wireline or a slickline into the borehole.
- the conveyance device is operated at a logging speed while making measurements with said FE sensors.
- the measurements mad& by said FE sensors are analyzed, and based on the analysis, a signal for alteration of the logging speed may be provided.
- the FE sensors are selected from the giroup consisting of (i) a resistivity sensor, (ii) a natural gamma ray sensor, (iii) a porosity sensor, (iv) a density sensor, (v) a nuclear magnetic resonance sensor, and, (vi) an acoustic sensor.
- the signal may be for either an increase or a decrease in logging speed. Based on the signal, the logging speed may be increased or decreased.
- the logging speed is increased if all the FE sensors provide a valid indication that the logging speed may be increased while maintaining acceptable data quality.
- the logging speed is decreased if one or more of the FE sensoxs provide a valid indication that data quality is not acceptable at the current lodging speed.
- the processing of the measurements may be carried out by a downhole processor, a surface processor, or in part by both a downhole processor and a surface processor.
- Fig. 1 is a schematic illustration of a wireline logging system including a plurality of sensors.
- Fig. 2 (prior art) is an embodiment of a system using a radially adjustable module adapted for use in logging operations;
- Fig. 3 illustrates a sectional view of one embodiment of a positio-ning device made in accordance with the present invention
- Fig. 4 is a schematic elevation view of radially adjustable module positioned in an open hole portion of a borehole;
- Fig. 5 is a schematic illustration of steps involved in the method of the present invention.
- FIG. 1 A typical configuration of the logging system is shown in Fig. 1. This is a modification of an arrangement from US Patent 4,953,399 to Fertl et al. having the same assignee as the present invention and the contents of which are incorporated herein by reference. Shown in Fig. 1 is a suite of logging instruments 10, disposed within a borehole 11 penetrating an earth formation 13, illustrated in vertical section, and coupled to equipment at the earth's surface in accordance with the method and apparatus for determining characteristics of clay- bearing formations of the present invention. Logging instrument suite 10 may include a resistivity device 12, a natural gamma ray device 14, and two porosity- determining devices, such as a neutron device 16 and a density device 18.
- Resistivity device 12 may be one of a number of different types of instruments known to the art for measuring the electrical resistivity of formations surrounding a borehole so long as such device has a relatively deep depth of investigation.
- a HDIL (High Definition Induction Logging) device such as that described in US Patent 5,452,761 to Beard et al. having the same assignee as the present invention and the contents of which are fully incorporated herein by reference may be used.
- Natural gamma ray device 14 may be of a type including a scintillation detector including a scintillation crystal cooperatively coupled to a photomultiplier tube such that when the crystal is impinged by gamma rays a succession of electrical pulses is generated, such pulses having a magnitude proportional to the energy of the impinging gamma rays.
- Neutron device 16 may be one of several types known to the art for using the response characteristics of the formation to neutron radiation to determine formation porosity. Such a device is essentially responsive to the neutron moderating properties of the formation.
- Density device 18 may be a conventional gamma-gamma density instrument such as that described in US Patent 3,321,625 to Wahl, used to determine the bulk density of the formation.
- a downhole processor may be provided at a suitable location as part of the instrument suite.
- Instrument suite 10 is conveyed within borehole 11 by a cable 20 containing electrical conductors (not illustrated) for communicating electrical signals between instrument suite 10 and the surface electronics, indicated generally at 22, located at the earth's surface.
- Logging devices 12, 14, 16 and 18 within instrument suite 10 are cooperatively coupled such that electrical signals may be communicated between each device 12, 14, 16 and 18 and surface electronics 22.
- Cable 20 is attached to a drum 24 at the earth's surface in a manner familiar to the art.
- Instrument suite 10 is caused to traverse borehole 11 by spooling cable 20 on to or off of drum 24, also in a manner familiar to the art.
- Surface electronics 22 may include such electronic circuitry as is necessary to operate devices 12, 14, 16 and 18 within instrument suite 10 and to process the data therefrom. Some of the processing may be done downhole. In particular, the processing needed for making decisions on speeding up (discussed below) for slowing down the logging speed is preferably down downhole. If such processing is done downhole, then telemetry of instructions to speed up or slow down the logging could be carried out substantially in real time. This avoids potential delays that could occur if large quantities of data were to be telemetered uphole for the processing needed to make the decisions to alter the logging speed. It should be noted that with sufficiently fast communication rates, it makes no difference where the decision making is carried out.
- Control circuitry 26 contains such power supplies as are required for operation of the chosen embodiments of logging devices within instrument suite 10 and further contains such electronic circuitry as is necessary to process and normalize the signals from such devices 12, 14, 16 and 18 in a conventional manner to yield generally continuous records, or logs, of data pertaining to the formations surrounding borehole 11. These logs may then be electronically stored in data storage 32 prior to further processing.
- the processor 28 includes the ability, such as that described in US Patent 4,271,356 to Groeschel et al, for separating radiation measurements from natural gamma ray device 14 into individual energy bands centered about energy peaks of selected elemental sources of radiation, preferably the energy peaks of potassium, uranium and thorium. This processing of the natural gamma ray device could also be done by the downhole processor.
- Surface electronics 22 may also include such equipment as will facilitate machine implementation of the method of the present invention.
- Processor 28 may be of various forms but preferably is an appropriate digital computer programmed to process data from logging devices 12, 14, 16 and 18.
- Memory unit 30 and data storage unit 32 are each of a type to cooperatively interface with processor 28 and/or control circuitry 26.
- Depth controller 34 determines the longitudinal movement of instrument suite 20 with borehole 11 and communicates a signal representative of such movement to processor 28.
- the logging speed is altered in accordance with speedup or slowdown signals that may be communicated from the downhole processor, or provided by the surface processor, as discussed below. This is done by altering the rotation speed of the drum 24.
- Offsite communication may be provided, for example by a satellite link, by the telemetry unit 36.
- FIG. 2 there is shown a rig 10 on the surface that is positioned over a subterranean formation of interest.
- the rig 10 can be a part of a land or offshore a well production/construction facility.
- a borehole formed below the rig 10 includes a cased portion 42 and an open hole portion 11.
- a logging operation is conducted to collect information relating to the formation and the borehole.
- a tool system 100 is conveyed downhole via a wireline 20 to measure one or more parameters of interest relating to the borehole and/or the formation 13.
- the term "wireline” as used hereinafter includes a cable, a wireline, as well as a slickline.
- the tool system 100 can include an instrument suite comprising one or more modules 102 a,b, each of which has a tool or a plurality of tools 104 a,b, adapted to perform one or more downhole tasks.
- module should be understood to be a device such as a sonde or sub that is suited to enclose, house, or otherwise support a device that is to be deployed into a borehole. While two proximally positioned modules 102 a,b and two associated tools 104 a,b, are shown, it should be understood that a greater or fewer number may be used.
- the tool 104a is a formation evaluation sensor adapted to measure one or more parameters of interest relating to the formation or borehole.
- formation evaluation sensor encompasses measurement devices, sensors, and other like devices that, actively or passively, collect data about the various characteristics of the formation, directional sensors for providing information about the tool orientation and direction of movement, formation testing sensors for providing information about the characteristics of the reservoir fluid and for evaluating the reservoir conditions.
- the formation evaluation sensors may include resistivity sensors for determining the formation resistivity, dielectric constant and the presence or absence of hydrocarbons, acoustic sensors for determining the acoustic porosity of the formation and the bed boundary in formation, nuclear sensors for determining the formation density, nuclear porosity and certain rock characteristics, nuclear magnetic resonance sensors for determining the porosity and other petrophysical characteristics of the formation.
- the direction and position sensors preferably include a combination of one or more accelerometers and one or more gyroscopes or magnetometers.
- the accelerometers preferably provide measurements along three axes.
- the formation testing sensors collect formation fluid samples and determine the properties of the formation fluid, which include physical properties and chemical properties. Pressure measurements of the formation provide information about the reservoir characteristics.
- the tool system 100 can include telemetry equipment 150, a local or downhole controller 152 and a downhole power supply 154.
- the telemetry equipment 150 provides two-way communication for exchanging data signals between a surface controller 112 and the tool system 100 as well as for transmitting control signals from the surface processor 112 to the tool system 100.
- a first module 102a includes a tool 104a configured to measure a first parameter of interest and a second module 102b includes a tool 104b that is configured to measure a second parameter of interest that is either the same as or different from the first parameter of interest.
- tools 104a and 104b may need to be in different positions.
- the positions can be with reference to an object such as a borehole, borehole wall, and or other proximally positioned tooling.
- the term "position" is meant to encompass a radial position, inclination, and azimuthal orientation.
- borehole axis the longitudinal axis of the borehole
- tool 104a can be adapted to execute a selected task based on one or more selected factors. These factors can include, but not limited to, depth, time, changes in formation characteristics, and the changes in tasks of other tools.
- Modules 102a and 102b may each be provided with positioning devices
- the positioning device 140 is configured to maintain a module 102 at a selected radial position relative to a reference position (e.g., borehole axis).
- the position device 140 also adjusts the radial position of module 102 upon receiving a surface command signal and/or automatically in a closed- loop type manner.
- This selected radial position is maintained or adjusted independently of the radial position(s) of an adjacent downhole device (e.g., measurement tools, sonde, module, sub, or other like equipment).
- An articulated member, such a flexible joint 156 which couples the module 102 to the tool system 100 provides a degree of bending or pivoting to accommodate the radial positioning differences between adjacent modules and/or other equipment (for example a processor sonde or other equipment).
- one or more of the positioning devices has fixed positioning members.
- the positioning device 140 may include a body 142 having a plurality of positioning members 144 (a,b,c) circumferentially disposed in a space-apart relation around the body 142.
- the members 144 (a,b,c) are adapted to independently move between an extended position and a retracted position.
- the extended position can be either a fixed distance or an adjustable distance.
- Suitable positioning members 144 (a,b,c) include ribs, pads, pistons, cams, inflatable bladders or other devices adapted to engage a surface such as a borehole wall or casing interior.
- the positioning members 144 (a,b,c) can be configured to temporarily lock or anchor the tool in a fixed position relative to the borehole and/or allow the tool to move along the borehole.
- Drive assemblies 146 (a,b,c) are used to move the members 144 (a,b,c).
- Exemplary embodiments of drive assemblies 146 (a,b,c) include an electromechanical system (e.g., an electric motor coupled to a mechanical linkage), a hydraulically-driven system (e.g., a piston-cylinder arrangement fed with pressurized fluid), or other suitable system for moving the members 144 (a,b,c) between the extended and retracted positions.
- the drive assemblies 146 (a,b,c) and the members 144 (a,b,c) can be configured to provide a fixed or adjustable amount of force against the borehole wall.
- actuation of the drive assemblies 146 can position the tool in a selected radial alignment or position.
- the force applied to the borehole wall is not so great as to prevent the tool from being moved along the borehole.
- actuation of the drive assembly 146 (a,b,c) can produce a sufficiently high frictional force between the members 144 (a,b,c) and the borehole wall as to prevent substantial relative movement.
- a biasing member (not shown) can be used to maintain the positioning members 144 (a,b,c) in a pre-determined reference position.
- the biasing member maintains the positioning member 144 (a,b,c) in the extended position, which would provide centralized positioning for the module.
- energizing the drive assembly overcomes the biasing force of the biasing member and moves one or more of the positioning members into a specified radial position, which would provide decentralized positioning for the module.
- the biasing member can maintain the positioning members in a retracted state within the housing of the positioning device. It will be seen that such an arrangement will reduce the cross sectional profile of the module and, for example, lower the risk that the module gets stuck in a restriction in the borehole.
- the positioning device 140 and drive assembly 146 can be energized by a downhole power supply (e.g. , a battery or closed-loop hydraulic fluid supply) or a surface power source that transmits an energy stream (e.g., electricity or pressurized fluid) via a suitable conduit, such as the umbilical 120.
- a downhole power supply e.g. , a battery or closed-loop hydraulic fluid supply
- a surface power source that transmits an energy stream (e.g., electricity or pressurized fluid) via a suitable conduit, such as the umbilical 120.
- one drive assembly e.g., drive assembly 146 a
- one positioning member 144 e.g., position member 144 a
- other embodiments can use one drive assembly to move two or more positioning members.
- FIG. 4 there is shown an exemplary formation evaluation tool system 200 disposed in an open hole section 11.
- the tool system 200 includes a plurality of modules or subs for measuring parameters of interest.
- An exemplary module 202 is shown coupled to an upper tool section 204 and a lower tool section 206 by a flexible member 156.
- the module 202 supports an NMR tool 208.
- the NMR tool may be operated in either a centralized manner or in an eccentric manner.
- the acoustic tool 208 may be set in a decentralized position (i.e., radially eccentric position) by actuating the positioning members 140a and 140b.
- This decentralized or radially offset position is substantially independent of the radial positions of the downhole device (e.g., measurement devices and sensors) along or in the upper/lower tool string section 204 and 206. That is, the upper or tool string section 204 and 206 can have formation evaluation sensors and measurement devices that are in a radial position that is different from that of the module 202.
- the NMR tool can be used to gather data in large diameter boreholes. In a small diameter borehole, the NMR tool may be operated in a central position of the borehole. It should be appreciated that such motion can be accomplished by sequentially varying the distance of extension/retraction of the positioning members.
- a flow chart generally illustrating the method of the present invention is shown.
- the downhole tool system is operating at an initial logging speed 301.
- the initial logging speed may be determined based on prior knowledge of the expected geologic formations and fluids. Measurements are made with a plurality of formation evaluation sensors. To simplify the illustration, only two such FE sensors depicted by 303 and 305 are shown. In actual practice, there may be more than two FE sensors in the logging system.
- the signals measured by the sensor 305 are analyzed by a processor, preferably the downhole processor, to see if the data quality are good enough to permit a speedup 323 of logging.
- the processing may also be done by a surface processor, or by both a surface processor and a downhole processor.
- the signals measured by sensor 303 are analyzed by a processor to see if the data quality are good enough to permit a speedup 333 of logging. The specific nature of the check is discussed below with reference to individual sensor types. Similarly, the measurements of sensor 303 are checked to see if a speedup is warranted 333. If all the sensors provide a speedup signal 329, a speedup signal is provided 321. Not shown in Fig. 4 is a check to make sure that all the speedup signals are valid. Possible situations in which a speedup signal may not be valid are discussed below.
- the decision as to whether to speed up or slow down the logging may be based on a comparison measurements made over several time intervals.
- a typical sampling rate is 10 ms.
- 100 samples are obtained every second, which corresponds to a distance of four inches. If the average andor the variance of measurements over say 1 second is substantially the same as the average of measurements over 2 seconds, it is an indication that logging speed may be increased without loss of resolution of loss of precision.
- transmitter and receiver coils are configured to operate with different depths of investigation by operating at several frequencies and/or by using data from several transmitter- receiver spacings. There is a high degree of redundancy in the data. Again, by comparing averages over different time intervals, an indication can be obtained as to whether logging speed may be increased, or, conversely, whether logging speed should be decreased.
- spine and rib correction This is called the "spine and rib" correction.
- the individual sensor measurements may pass the tests described above regarding the count rate and the statistical fluctuations. Nevertheless, a corrected density measurements may still be invalid due to the large washout. This is an example of the requirement that the speedup or slowdown indicator (discussed above) be a valid one.
- An acoustic sensor may also be part of the instrument suite. This is generally used at least for measurements of compressional (P- wave) velocities of earth formations.
- P- wave compressional
- the transmitter(s) and receivers that comprise the acoustic sensor are operated in a monopole mode. Energy generated by the transmitter travels through the formation as a refracted P- wave and from traveltime measurements at the array of receivers, the P-wave velocity can be determined.
- the semblance of the received signal is an indication of the quality of the data, and if the semblance is sufficiently high, then it is possible to increase the logging speed without detriment. It should be noted that if the formation shear wave (S- wave) velocity is greater than the velocity of sound in the drilling mud, it is possible to determine formation S- velocities using a monopole excitation.
- S- wave formation shear wave
- the acoustic tool may also be operated in a dipole mode in which shear waves (S-waves) are excited in the formation. Again, the semblance of the received signals may be used as an indicator for possible speedup of logging speed. It should be noted that acoustic measurements take several milliseconds to make, compared to the few microseconds needed for nuclear and resistivity measurements.
- the acoustic tool may also be operated in the so-called cross- dipole mode wherein the transmitter is activated in a first dipole mode and then activated in a second dipole mode orthogonal to the first dipole mode.
- the cross- dipole mode is useful in determining azimuthal anisotropy in the earth formation, an indication of possible fracturing. It should be clear that with respect to the acoustic tool, the speedup or slowdown indicator is based on all of the modes of acquisition that are desired.
- a multicomponent resistivity sensor may be included in the instrument suite. Service with such a sensor is provided by Baker Hughes Incorporated under the mark 3DEX SM and a tool suitable for the purpose is disclosed in US Patent 6,147,496 to Strack et al. Using such a device, it is possible to determine resistivity anisotropy in the earth formation that is a better indication of reservoir quality than the HDIL measurements (that are sensitive only to horizontal resistivity). In anisotropic reservoirs, it may also be desirable to operate the acoustic sensor in the dipole mode.
- the natural gamma ray sensors do not necessarily have the resolution to be able to identify laminations at the scale at which resistivty and/or acoustic anisotropy may occur. Consequently, it may be desirable to include a high resolution resistivity sensor, such as a microlaterolog, as part of the instrument suite. Signals from such a sensor could be used to start acquisition with the 3DEX device and/or to switch the acoustic sensor to joint monopole/dipole operation.
- a high resolution resistivity sensor such as a microlaterolog
- wireline logging operations are typically conducted with the instrument suite being pulled up the borehole. This is preferable to logging with the instrument suite being lowered into the borehole since in the latter situation, there may be sticking of the instrument suite into the borehole with the result that the logging depth as determined at the surface location may not correspond to the actual depth of the instruments. With the variations in logging speed that are possible during practice of the present invention, due to the elasticity of the wireline, there may be "yo-yoing" of the instrument suite at the bottom of the wireline.
- the present invention has been described in the context of a wirel ie device.
- the method of the present invention is equally applicable on slick-line conveyed device wherein a downhole processor is used for providing a signal to speed up or slow down the speed.
- the slickline may optionally be conveyed inside a drilling tubular.
- the FE sensor measurements are stored in a downhole memory for subsequent retrieval.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Engineering & Computer Science (AREA)
- Geophysics (AREA)
- General Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics And Detection Of Objects (AREA)
- Paper (AREA)
- Regulation And Control Of Combustion (AREA)
- Force Measurement Appropriate To Specific Purposes (AREA)
- Earth Drilling (AREA)
- Disintegrating Or Milling (AREA)
- Testing Or Calibration Of Command Recording Devices (AREA)
- Other Investigation Or Analysis Of Materials By Electrical Means (AREA)
Abstract
Description
Claims
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EA200601858A EA011518B1 (en) | 2004-04-07 | 2005-04-06 | Method of conducting logging operations |
| CA2562086A CA2562086C (en) | 2004-04-07 | 2005-04-06 | Dynamic logging speed |
| GB0619839A GB2427231B (en) | 2004-04-07 | 2005-04-06 | Dynamic logging speed |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US10/819,665 US7117733B2 (en) | 2004-04-07 | 2004-04-07 | Dynamic logging speed |
| US10/819,665 | 2004-04-07 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| WO2005100747A2 true WO2005100747A2 (en) | 2005-10-27 |
| WO2005100747A3 WO2005100747A3 (en) | 2006-01-26 |
Family
ID=35059166
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/US2005/011713 Ceased WO2005100747A2 (en) | 2004-04-07 | 2005-04-06 | Dynamic logging speed |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US7117733B2 (en) |
| CA (1) | CA2562086C (en) |
| EA (1) | EA011518B1 (en) |
| GB (1) | GB2427231B (en) |
| WO (1) | WO2005100747A2 (en) |
Families Citing this family (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7301338B2 (en) * | 2001-08-13 | 2007-11-27 | Baker Hughes Incorporated | Automatic adjustment of NMR pulse sequence to optimize SNR based on real time analysis |
| US20080314582A1 (en) * | 2007-06-21 | 2008-12-25 | Schlumberger Technology Corporation | Targeted measurements for formation evaluation and reservoir characterization |
| US20110093199A1 (en) * | 2009-09-29 | 2011-04-21 | Kittridge Mark Gerard | Characterization of logging tool performance |
| EP2576978A1 (en) * | 2010-05-25 | 2013-04-10 | Imdex Technology Australia Pty Ltd | Sensor device for a down hole surveying tool |
| CN103154667A (en) | 2010-05-25 | 2013-06-12 | 澳大利亚伊戴斯科技有限公司 | Down hole surveying tool |
| US8860412B2 (en) | 2010-08-31 | 2014-10-14 | Schlumberger Technology Corporation | Methods and systems for measuring NMR characteristics in production logging |
| CA2916015C (en) | 2013-08-30 | 2018-03-20 | Halliburton Energy Services, Inc. | Lwd resistivity imaging tool with adjustable sensor pads |
| CA2996693C (en) * | 2015-10-02 | 2021-07-27 | Halliburton Energy Services, Inc. | Logging-while-drilling tool with interleaved instruments |
| US10119343B2 (en) | 2016-06-06 | 2018-11-06 | Sanvean Technologies Llc | Inductive coupling |
| US10641919B2 (en) * | 2016-12-14 | 2020-05-05 | Rock Visualization Technology, Llc | Passive cased well image logging |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3801816A (en) * | 1971-05-25 | 1974-04-02 | Texaco Inc | Well logging system and method |
| US3781545A (en) * | 1971-05-26 | 1973-12-25 | Texaco Inc | Well logging comprising detecting unstable radioactive isotopes of aluminum |
| US4953399A (en) * | 1982-09-13 | 1990-09-04 | Western Atlas International, Inc. | Method and apparatus for determining characteristics of clay-bearing formations |
| US5309098A (en) * | 1991-05-16 | 1994-05-03 | Numar Corporation | Nuclear magnetic resonance detection of geologic structures |
| US6154704A (en) * | 1998-11-17 | 2000-11-28 | Baker Hughes Incorporated | Method for correcting well log data for effects of changes in instrument velocity cable yo-yo |
| US6618675B2 (en) * | 2001-02-27 | 2003-09-09 | Halliburton Energy Services, Inc. | Speed correction using cable tension |
-
2004
- 2004-04-07 US US10/819,665 patent/US7117733B2/en not_active Expired - Lifetime
-
2005
- 2005-04-06 CA CA2562086A patent/CA2562086C/en not_active Expired - Fee Related
- 2005-04-06 WO PCT/US2005/011713 patent/WO2005100747A2/en not_active Ceased
- 2005-04-06 EA EA200601858A patent/EA011518B1/en not_active IP Right Cessation
- 2005-04-06 GB GB0619839A patent/GB2427231B/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| WO2005100747A3 (en) | 2006-01-26 |
| GB2427231B (en) | 2009-01-07 |
| CA2562086C (en) | 2014-05-27 |
| US20050223790A1 (en) | 2005-10-13 |
| GB2427231A (en) | 2006-12-20 |
| GB0619839D0 (en) | 2006-11-15 |
| CA2562086A1 (en) | 2005-10-27 |
| EA200601858A1 (en) | 2007-04-27 |
| EA011518B1 (en) | 2009-04-28 |
| US7117733B2 (en) | 2006-10-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7301338B2 (en) | Automatic adjustment of NMR pulse sequence to optimize SNR based on real time analysis | |
| US6930616B2 (en) | Method and apparatus for LWD shear velocity measurement | |
| US7193414B2 (en) | Downhole NMR processing | |
| CA2450653C (en) | Use of axial accelerometer for estimation of instantaneous rop downhole for lwd and wireline applications | |
| US8964503B2 (en) | Petrophysics-guided processing of LWD acoustic data | |
| CA2336655C (en) | Semblance processing for an acoustic measurement-while-drilling system for imaging of formation boundaries | |
| US7770663B2 (en) | Apparatus for making quality control measurements while drilling | |
| US20060287201A1 (en) | Pore-scale geometric models for interpretation of downhole formation evaluation data | |
| US20060276969A1 (en) | Pore-scale geometric models for interpretation of downhole formation evaluation data | |
| WO2009126609A2 (en) | A method for petrophysical evaluation of shale gas reservoirs | |
| CA2562086C (en) | Dynamic logging speed | |
| WO2007149522A2 (en) | Using statistics of a fitting function for data driven dispersion slowness processing | |
| WO2009062040A2 (en) | Vsp pattern recognition in absolute time | |
| US8857254B2 (en) | Methods and systems for acquiring acceleration waveforms in a borehole | |
| EP1581825B1 (en) | Method and apparatus for lwd shear velocity measurement | |
| Donald et al. | Positive Tool Orientation Significantly Improves Data Quality and Enables Gravity Descents of Wireline Toolstrings to Near-Horizontal Deviations in the Middle East for Array Sonic and Borehole Image Data |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AK | Designated states |
Kind code of ref document: A2 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BW BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE EG ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KM KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NA NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SM SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW |
|
| AL | Designated countries for regional patents |
Kind code of ref document: A2 Designated state(s): BW GH GM KE LS MW MZ NA SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LT LU MC NL PL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG |
|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
| WWE | Wipo information: entry into national phase |
Ref document number: 2562086 Country of ref document: CA |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 0619839.4 Country of ref document: GB Ref document number: 5809/DELNP/2006 Country of ref document: IN Ref document number: 0619839 Country of ref document: GB |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| WWW | Wipo information: withdrawn in national office |
Ref document number: DE |
|
| DPE1 | Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101) | ||
| WWE | Wipo information: entry into national phase |
Ref document number: 200601858 Country of ref document: EA |
|
| 122 | Ep: pct application non-entry in european phase | ||
| DPE1 | Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101) |