USRE43199E1 - Arrangement and method for regulating bottom hole pressures when drilling deepwater offshore wells - Google Patents
Arrangement and method for regulating bottom hole pressures when drilling deepwater offshore wells Download PDFInfo
- Publication number
- USRE43199E1 USRE43199E1 US12/256,740 US25674004A USRE43199E US RE43199 E1 USRE43199 E1 US RE43199E1 US 25674004 A US25674004 A US 25674004A US RE43199 E USRE43199 E US RE43199E
- Authority
- US
- United States
- Prior art keywords
- drilling
- riser
- pressure
- drilling fluid
- gas
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime, expires
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 245
- 238000000034 method Methods 0.000 title claims abstract description 41
- 230000001105 regulatory effect Effects 0.000 title claims description 11
- 239000007788 liquid Substances 0.000 claims abstract description 31
- 238000005086 pumping Methods 0.000 claims abstract description 22
- 230000000740 bleeding effect Effects 0.000 claims abstract 2
- 239000012530 fluid Substances 0.000 claims description 122
- 239000007789 gas Substances 0.000 claims description 55
- 230000015572 biosynthetic process Effects 0.000 claims description 51
- 230000008859 change Effects 0.000 claims description 23
- 230000000694 effects Effects 0.000 claims description 22
- 230000002706 hydrostatic effect Effects 0.000 claims description 19
- 239000013535 sea water Substances 0.000 claims description 16
- 230000001276 controlling effect Effects 0.000 claims description 11
- 239000002245 particle Substances 0.000 claims description 7
- 230000007423 decrease Effects 0.000 claims description 4
- 238000004891 communication Methods 0.000 claims 6
- 238000012544 monitoring process Methods 0.000 claims 5
- 238000006073 displacement reaction Methods 0.000 claims 1
- 239000011261 inert gas Substances 0.000 claims 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 12
- 239000003643 water by type Substances 0.000 abstract description 4
- 238000005755 formation reaction Methods 0.000 description 50
- 239000003570 air Substances 0.000 description 20
- 229930195733 hydrocarbon Natural products 0.000 description 12
- 150000002430 hydrocarbons Chemical class 0.000 description 12
- 230000008901 benefit Effects 0.000 description 10
- 235000003934 Abelmoschus esculentus Nutrition 0.000 description 9
- 240000004507 Abelmoschus esculentus Species 0.000 description 9
- 239000011148 porous material Substances 0.000 description 9
- 230000008569 process Effects 0.000 description 9
- 239000004215 Carbon black (E152) Substances 0.000 description 8
- 230000002829 reductive effect Effects 0.000 description 8
- 230000004888 barrier function Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 5
- 230000004941 influx Effects 0.000 description 5
- 238000009434 installation Methods 0.000 description 5
- 239000006260 foam Substances 0.000 description 4
- 230000005484 gravity Effects 0.000 description 4
- 238000002347 injection Methods 0.000 description 3
- 239000007924 injection Substances 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 230000036961 partial effect Effects 0.000 description 2
- 238000000518 rheometry Methods 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- 230000003068 static effect Effects 0.000 description 2
- FAPWRFPIFSIZLT-UHFFFAOYSA-M Sodium chloride Chemical compound [Na+].[Cl-] FAPWRFPIFSIZLT-UHFFFAOYSA-M 0.000 description 1
- 239000000654 additive Substances 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 230000002301 combined effect Effects 0.000 description 1
- 238000010924 continuous production Methods 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 230000000670 limiting effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000006386 neutralization reaction Methods 0.000 description 1
- 238000004886 process control Methods 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 238000012552 review Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/01—Arrangements for handling drilling fluids or cuttings outside the borehole, e.g. mud boxes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/001—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor specially adapted for underwater drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
- E21B21/085—Underbalanced techniques, i.e. where borehole fluid pressure is below formation pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/10—Valve arrangements in drilling-fluid circulation systems
Definitions
- the present invention relates to a particular arrangement for use when drilling oil and gas wells from offshore structures that float on the surface of the water in depths typically greater than 500 m above seabed. More particularly, it describes a drilling riser system so arranged that the pressure in the bottom of an underwater borehole can be controlled in a completely novel way, and that the hydrocarbon pressure from the drilled formation can be handled in an equally new and safe fashion in the riser system itself.
- This invention defines a particular novel arrangement, which can reduce drilling costs in deep ocean and greatly improve the safe handling of the hydrocarbon gas or liquids that may escape the subsurface formation below seabed and then pumped from the subsurface formation with the drilling fluid to the drilling installation that floats on the ocean surface.
- This novel arrangement comprises the use of prior known art but arranged so that totally new drilling methods is achieved.
- the invention relates to a deep water drilling system, and more specifically to an arrangement for use in drilling of oil/gas wells, especially for deep water wells, preferably deeper than 500 m water-depth.
- the bottom of the well will observe the combined hydrostatic pressure exerted by the column of fluid from the drilling vessel to the bottom of the well, plus the additional pressures due to circulation.
- a drilling riser that connects the seabed wellhead with the drilling vessel contains this drilling fluid.
- the bottom-hole pressure to overcome the formation pressure is regulated by increasing or decreasing the density of the drilling fluids in conventional drilling until the casing has to be set in order to avoid fracturing the formation.
- the primary barrier will be the drilling fluid in the borehole with sufficient density to control the formation pressure, also necessary in the event that the drilling riser is disconnected from the wellhead. This difference in pressure caused by the difference in density between seawater and the drilling fluid can be substantial in deep water.
- the second barrier will be the blowout preventer BOP (BOP) in case the primary barrier is lost.
- Hydrostatic pressure control is the prime means of bottom hole pressure control in conventional drilling.
- the mud weight will be adjusted so that the well is in an overbalanced condition in the well when no drilling fluid circulation takes place. If needed, the mud weight/density can be changed depending on formation pressures. However, this is a time consuming process and requires adding chemicals and weighting materials to the drilling mud.
- the other method for bottom hole pressure control is friction pressure control. Higher circulating rates generates higher friction pressure and consequently higher pressures in the bore hole. A change in pump rate will result in a rapid change in the bottom hole pressure (BHP).
- BHP bottom hole pressure
- the disadvantage of using frictional pressure control is that control is lost when drilling fluid circulation is stopped. Frictional pressure loss is also limited by the maximum pump rate, the pressure rating of the pump and by the maximum flow through the down hole assembly.
- the above prior art has many disadvantages.
- the object of the present invention is to avoid some or all of the disadvantages of the prior art.
- the present invention in a particular combination gives rise to new, practically feasible and safe methods of drilling deepwater wells from floating structures.
- benefits over the prior art are achieved with improved safety.
- the invention gives instructions on how to control the hydraulic pressure exerted on the formation by the drilling fluid at the bottom of the hole being drilled by varying the liquid level in the drilling riser.
- the invention gives a particular benefit in well controlled situations (kick handling) or for planned drilling of wells with hydrostatic pressure from drilling fluid less that the formation pressure. This can involve continuous production of hydrocarbons from the underground formations that will be circulated to the surface with the drilling fluid. With this novel invention, both kick and handling of hydrocarbon gas can be safely and effectively controlled.
- the riser liquid level will be lowered to a substantial depth below the sea-level with air or gas remaining in the riser above said level.
- an aspect of the present invention uses a single liquid gradient system, preferably drilling fluid (mud and/or completion fluid), with a gas (air) column on top.
- drilling fluid mud and/or completion fluid
- gas air
- the present invention has the combination of both a surface and a subsurface pressure containment (BOP).
- BOP subsurface pressure containment
- the present invention differs in this respect from U.S. Pat. No. 4,063,602 in that it includes the following features: a high pressure riser with a pressure integrity high enough to withstand a pressure equal to the maximum formation pressure expected to be encountered in the sub surface terrain, typically 3000 psi (200 bars) or higher; the riser is terminated in both ends by a high pressure containment system, such as a blow-out preventer; an outlet from the riser to a subsea pump system, typically substantially below the sea level and substantially above the seabed, which contains a back-pressure or non-return check valve; the sub-sea blowout preventer has an equalizing loop (by-pass) that will balance pressure below and above a closed subsea BOP, wherein the equalizing loop connects the subsea well with the riser; the loop has at least one, and preferably two, surface
- the equalizing line can be used in a well control situation when and if a large gas influx has to be circulated out of the well.
- the high pressure riser and a high pressure drilling pipe may be so arranged between the subsea blowout preventer and the surface blowout preventer that they can be used as separate high pressure lines as a substitute for choke line and kill line.
- the present invention incorporates this equalizing loop in combination with a lower than normal air/liquid interface level in the riser for well control purposes.
- This feature may be combined with a particular low level of drilling fluid in the riser.
- the well may not be closed in at the surface BOP while drilling with a low drilling fluid level in the riser, since it can take too long before the large amount of air would compress or the liquid level in the riser might not raise fast enough to prevent a great amount of influx coming into the well if a kick should occur.
- the well is closed in at the subsea BOP.
- the bypass loop is included in order to have the ability to circulate out a large influx past a closed subsea BOP into the high pressure riser. If the influx is gas, this gas can be bled off through the choke line in or under the closed surface BOP while the liquid is being pumped up the low riser return conduit through the low riser return outlet.
- This low riser return conduit and outlet has preferably a “gas-lock” U-tube form below the subsea return pumps, which will prevent the substantial part of the gas from being sucked into the pump system.
- an air/gas compressor is installed in the normal flowline on surface, which will suck air from inside the drilling riser, creating a pressure below that of the atmospheric pressure above the riser.
- the compressor will discharge the air/gas to the burner boom or other safe gas vents on the platform.
- the liquid level (drilling mud) is kept relatively close to the outlet and the gas pressure is close to atmospheric pressure, resulting in a separation of the major part of the gas in the riser.
- the riser will in this aspect of the invention become a gas separation chamber.
- bypass loop in combination with the low riser return outlet will also give rise to many other useful and improved methods of kick, formation testing and contingency procedures. Hence this combination is a unique feature of the invention.
- the bottom hole pressure is regulated without the need of a closed pressure containment element around the drill string anywhere in the system. Pressure containment will only be required in a well control situation or if pre-planned under-balanced drilling is being performed.
- the present invention specifies how the bottom hole pressure can be regulated during normal drilling operation and how the ECD effects can be neutralized.
- the present invention presents the unique combination of a high-pressure riser system and a system with pressure barriers both on surface and on seabed, which coexists with the combination of a low level return system.
- the invention gives the possibility to compensate for both pressure increases (surge) and decreases (swab) effects from running pipe into the well or pulling pipe out of the well, in addition to and at the same time compensate for the dynamic pressures from the circulation process ECD .
- the invention relates in this aspect to how this control will be performed.
- the present invention overcomes many disadvantages of other attempts and meets the present needs by providing methods and arrangements whereby the fluid-level in the high pressure riser can be dropped below sea level and adjusted so that the hydraulic pressure in the bottom of the hole can be controlled by measuring and adjusting the liquid level in the riser in accordance with the dynamic drilling process requirements. Due to the dynamic nature of the drilling process the liquid level will not remain steady at a determined level but will constantly be varied and adjusted by the pumping control system. The liquid level can be anywhere between the normal return level on the drilling vessel above the surface BOP or at the depth of the low riser return section outlet. In this fashion the bottom-hole pressure is controlled with the help of the low riser return system.
- a pressure control system controls the speed of the subsea mud lift pump and actively manipulates the level in the riser so that the pressure in the bottom of the well is controlled as required by the drilling process.
- the arrangements and methods of the present invention represents in still another aspect a new, faster and safer way of regulating and controlling bottom hole pressures when drilling offshore oil and gas wells.
- With the methods described it is possible to regulate the pressure in the bottom of the well without changing the density of the drilling fluid.
- the ability to control pressures in the bottom of the hole and at the same time and with the same equipment being able to contain and safely control the hydrocarbon pressure on surface makes the present invention and riser system completely new and unique. The combination will make the drilling process more versatile and give room for new and improved methods for drilling with bottom hole pressures less than pressure in the formation, as in under-balanced drilling.
- the liquid/air interface level can also be used to compensate for friction forces in the bottom of the well while cementing casing and also compensate for surge and swab effects when running casing and/or drill pipe in or out of the hole while continuously circulating at the same time.
- the level in the annulus will be lower when pumping through the drill pipe and up the annulus than it will be when there is no circulation in the well.
- the level will be higher than static when pulling the drill bit and bottom-hole assembly out of the open hole to compensate for the swabbing effect when pulling out of a tight hole.
- the method of varying the fluid height can also be used to increase the bottom-hole pressure instead of increasing the mud density.
- the pore pressure will also vary.
- the drilling mud density has to be adjusted. This is time-consuming and expensive since additives have to be added to the entire circulating volume.
- the density With the low riser return system (LRRS) the density can remain the same during the entire drilling process, thereby reducing time for the drilling operations and reducing cost.
- LRRS low riser return system
- the level in the riser can be dropped at the same time as mud-weight is increased so as to reduce the pressure in the top of the drilled section while the bottom hole pressure is increased. In this way it is possible to reduce the pressure on weak formations higher up in the hole and compensate for higher pore pressures in the bottom of the hole. Thus it is be possible to rotate the pressure gradient line from the drilling mud around a fixed point, for example the seabed or casing shoe.
- the advantage is that if an unexpected high pressure is encountered deep in the well, and the formation high up at the surface casing shoe cannot support higher riser return level or higher drilling fluid density at present return level, this can be compensated for by dropping the level in the riser further while increasing the mud weight.
- the combined effect will be a reduced pressure at the upper casing shoe while at the same time achieving higher pressure at the bottom of the hole without exceeding the fracture pressure below casing.
- a pore pressure of 0.7 SG (specific gravity) can be neutralized by low liquid level with seawater of 1.03 SG.
- This ability gives rise to great advantages when drilling in depleted fields, since reducing the original formation pressure 1.10 SG to 0.7 SG by production, can also give rise to reduced formation fracture pressure, that can not be drilled with seawater from surface.
- the bottom-hole pressure exerted by the fluid in the well bore can be regulated to substantially below the hydrostatic pressure for water. With the prior art of drilling arrangements this will require special drilling fluid systems with gases, air or foam. With the present invention this can be achieved with simple seawater drilling fluid systems.
- the system can be used for creating under-balanced conditions and to safely drill depleted formations in a safer and more efficient way than by radically adjusting drilling fluid density, as in conventional practice.
- the apparatus In order to achieve this and in order to drill safely and effectively, the apparatus must be designed according to the present invention. The economical savings come from the novel combination according to the present invention.
- the system can be used for conventional drilling with a surface BOP with returns to the vessel or drilling installation as normal with many added benefits in deepwater.
- the sub sea BOP can be greatly simplified compared to prior art where there is a sub sea BOP only.
- the subsea BOP can be made smaller than conventional since fewer casings are needed in the well.
- several functions, such as the annular preventer and at least one pipe ram is moved to the surface BOP on top of the drilling riser above sea-level, the total system is less expensive and will also open the way for new improved well control procedures.
- Another aspect of the present invention is a loop forming a “water/gas-lock” in the circulating system below the subsea mudlift pump, which will prevent large amount of hydrocarbon gases from invading into the pump return system.
- the height of the pump section can easily be adjusted since it can be run on a separate conduit, thereby adjusting the height of the water lock.
- the drilling riser will preferably be kept open to the atmosphere so that any vapour from hydrocarbons from the well will be vented off in the drilling riser.
- An air compressor will suck air/gas from the top of the drilling riser to the burner boom or other safe air vents on the drilling installation, and create a pressure below that of atmospheric pressure in the top of the riser system. Since the pressure in the drilling riser at the low riser return outlet line will be close to that of atmospheric pressure and substantially below the pressure in the pump return line, the majority of the gas will be separated from the liquid.
- the surface BOP will have to be closed and the gas bled off through the chokeline 58 to the choke manifold system (not shown) on the drilling rig.
- a rotating head can be installed on the surface BOP hence the riser system can be used for continuous drilling under-balanced and gas can be handled safely by also having stripper elements arranged in the surface BOP system.
- this system can be used for under-balanced drilling purposes and can also be used for drilling highly depleted zones without having the need for aerated or foamed mud.
- This arrangement will make the riser function as a gas knockout or first stage separator in an under-balanced or near balance drilling situation.
- the well can be controlled immediately with the arrangements and methods of the present invention by simply raising the fluid level in the high pressure riser. Alternately the well can be shut in with the subsea BOP. With the help of the by-pass line in the subsea BOP, the influx can be circulated out of the well and into the high pressure riser under constant bottom-hole pressure equal to the formation pressure. The potential gas that will separate out at the liquid/gas level (close to atmospheric pressure) in the riser will be vented out and controlled with the surface BOP.
- the riser of the arrangements of the present invention preferably has no kill or chokes line, which is contrary to what is normal for most marine risers. Instead the annulus between the drill pipe and the riser becomes the choke line and the drill pipe becomes the kill line when needed when the subsea BOP is closed. This will greatly increase the operator's ability to handle unexpected pressures or other well control situations.
- the arrangements and methods of the present invention will in a specific new way make it possible to control and regulate the hydrostatic pressure exerted by the drilling fluid on the subsurface formations. It will be possible to dynamically regulate the bottom-hole pressure by lowering the level down to a depth below sea level. Bottom-hole pressures can be changed without changing the specific gravity of the drilling fluid. It will now be possible to drill an entire well without changing the density of the drilling fluid even though the formation pore-pressure is changing. It will also be possible to regulate the bottom-hole pressure in such a way that it can compensate for the added pressures due to fluid friction forces acting on the borehole while pumping and circulating drilling mud/fluids through a drill bit, up the annulus between the open hole/casing and the drill pipe.
- the invention is also particularly suitable for use with coiled tubing apparatus and drilling operations with coiled tubing.
- the present invention will also be specifically usable for creating “underbalance” conditions where the hydraulic pressure in the well bore is below that of the formation and below that of the seawater hydrostatic pressure in the formation.
- the drilling riser can be disconnected from a closed subsea BOP, it can be safer to drill under-balanced than from other installations that does not have this combination.
- the reason also is that the gas pressure in the riser is very low and will cause the drill string to be “pipe heavy” at all times, excluding the need for snubbing equipment or “pipe light” inverted slips in the drilling operation. If pressure build up in the gas/air phase cannot be kept low, a reduction in the riser pressure can be achieved by closing the subsea BOP and taking the return through the equalizing loop, thereby reducing the pressure in the riser. This stems from the fact that the friction pressure from fluid flowing in the reduced diameter of the equalizing loop will increase the bottom hole pressure, hence a reduced pressure in the drilling riser will be achieved.
- the present invention specifies a solution that allows process-controlled drilling in a safe and practical manner.
- FIG. 1 a schematic overview of the arrangement.
- FIG. 2 a schematic diagram of and partial detail of the arrangement of FIG. 1 .
- FIG. 3 a schematic diagram of and partial detail of the arrangement of FIG. 2 .
- FIG. 4 in schematic detail the use of a pull-in device to be used together with the arrangement of FIG. 1 .
- FIG. 5 an ECD (or downhole) process control system flow chart.
- FIG. 6 a diagram illustrating the benefits from the improved method of drilling through and producing from depleted formations.
- FIG. 7 a diagram illustrating the benefits the effects of the improved methods of controlling hydraulic pressures in a well being drilled.
- FIG. 1 illustrates a drilling platform 24 .
- the drilling platform 24 can be a floating mobile drilling unit or an anchored or fixed installation. Between the sea floor 25 and the drilling platform 24 is a high-pressure riser 6 extending, a subsea blowout preventer 4 is placed at the lower end of the riser 6 at the seabed 25 , and a surface blowout preventer 5 is connected to the upper end of the high pressure riser 6 above or close to sealevel 59 .
- the surface BOP has surface kill and choke line 58 , 57 , which is connected to the high pressure choke-manifold on the drilling rig (not shown).
- the riser 6 does not require outside kill and choke lines extending from subsea BOP to the surface.
- the subsea BOP 4 has a smaller bypass conduit 50 (typically 1-4′′ ID), which will communicate fluid between the well bore below a closed blowout preventer 4 and the riser 6 .
- the by-pass line (equalizing line) 50 makes it possible to equalize between the well bore and the high pressure riser 6 when the BOP is closed.
- the by-pass line 50 has at least one, preferably two surface-controllable valves 51 , 52
- the blowout preventer 4 is in turn connected to a wellhead 53 on top of a casing 27 , extending down into a well.
- a low riser return system (LRRS) riser section 2 can be placed at any location along the high pressure riser 6 , forming an integral a part of the riser.
- LRRS low riser return system
- a riser shutoff pressure containment element 49 is included, in order to close off the riser and circulate the high pressure riser to clean out any debris, gumbo or gas without changing the bottom-hole pressure in the well. In addition it is also possible to clean the riser 6 after it is disconnected from the subsea BOP 4 without spillage to the ocean.
- a riser tension system is installed between the drilling platform/vessel 24 and the high-pressure riser 6 .
- the high-pressure riser includes a remotely monitored an upper pressure sensor 10 a and a lower pressure sensor 10 b.
- the sensor output signals are transmitted to the vessel 24 by, e.g., a cable 20 , electronically or by fiber optics, or by radio waves or acoustic signals.
- the two sensors 10 a and 10 b measure the pressure in the drilling fluid at two different levels. Since the distance between the sensors 10 a and 10 b is predetermined, the density of the drilling fluid can be calculated.
- a remotely monitored pressure sensor 10 c is also included in the subsea BOP 4 , to supervise the pressure when the subsea BOP 4 is closed.
- the high pressure riser 6 is a single bore high-pressure tubular and in contrary to traditional riser systems there is no requirement for separate circulation lines (kill or choke lines) along the riser, to be used for pressure control in the event oil and gas has unexpectedly entered the borehole 26 .
- High pressure in the context of this invention is high enough to contain the pressures from the subsurface formations, typically, 3000 psi (200 bars) or higher.
- the low riser return section 2 contains a high-pressure valve 38 of equal or greater rating than the riser 6 and which can be controlled through the rotary table on the drilling rig.
- FIG. 1 also shows a drill string 29 with a drill bit 28 installed in the borehole.
- a pressure regulating valve 56 Near the bottom of the drill string 29 inside the string is a pressure regulating valve 56 .
- the valve 56 has the capability to prevent U-tubing of drilling fluid into the riser 6 when the pumping stops.
- This valve 56 is of a type that will open at a pre-set pressure and stay open above this pressure without causing significant pressure loss inside the drill string once opened with a certain flow rate through the valve.
- An air compressor 70 a pump by which a pressure differential is created or maintained by transferring a volume of air from one region to another, is connected to the riser 6 above the surface BOP 6 .
- the compressor 70 is capable of providing a sub-atmospheric pressure inside of the riser 6 . Exhaust air, that may contain some amount of hydrocarbon can be led to the burner boom or other safe vent.
- an injection line 41 which runs back to the vessel/platform 24 .
- This line 41 has a remotely operated valve 40 that can be controlled from the surface.
- the inlet to the riser 6 from the line 41 can be anywhere on the riser 6 .
- the line 41 can extend parallel to the lines of the low riser return pumping system that is to be explained below.
- the LRRS riser section 2 includes a drilling fluid return outlet 42 a comprising at least one or more high-pressure riser outlet valve 38 and a hydraulic connector hub 39 .
- the hydraulic connector hub 39 connects a low riser return pumping system 1 ( FIGS. 2 and 3 ) with the high-pressure riser 6 .
- the low riser return pumping system includes a set of drilling fluid return pumps 7 a and 7 b.
- the pumps are connected to the connector 39 via a gumbo/debris box 8 , an LRRS mandrel 36 and a drilling fluid return suction hose 31 with a controllable non return valve 37 .
- a discharge drilling fluid conduit 15 connects the pumps 7 a and 7 b with the drilling fluid handling systems (not shown) on the platform 24 .
- the top of the drilling fluid return conduit 15 is terminated in a riser suspension assembly 44 where a drilling fluid return outlet 42 interfaces the general drilling fluid handling system on the platform 24 .
- the pump system 1 is shown in greater detail in FIG. 2 .
- the gumbo debris box 8 includes a number of jet nozzles 22 and a jet and flushback line 21 with valves 12 to break down particle size in the box 8 .
- the LRRS mandrel 36 includes a drilling fluid inlet port 16 and a drilling fluid pump outlet port 35 .
- a stress taper joint 3 a is attached to either end of the LRRS mandrel 36 .
- the mud return pumps 7 a, 7 b are powered by power umbilical 19 or by seawater lines of a hydraulic system.
- the fluid path for the drilling fluid return goes from the outlet 42 , though the hose 31 , into the mandrel 36 , out through the drilling fluid inlet port 16 and into the gumbo box 8 .
- the pumps are pumping the fluid from the gumbo box 8 out through the mud pump outlet port 35 and into the drilling fluid conduit 15 and back to the platform 24 .
- a dividing block/valve 33 is installed in the LRRS mandrel 36 acting as a shut-off plug between the mud return pump suction and discharge sides.
- the dividing valve/block 33 can be opened so as to dump debris into the gumbo box 8 to empty the return conduit 15 after prolonged pump stoppage.
- a bypass line 69 with valves 32 can bypass the non-return valves 13 when valve 61 is shut, making it possible to gravity feed drilling mud from the return conduit 15 into the riser 6 for riser fill-up purposes.
- riser fill-up possibilities 1) From the top of the riser 2) through injection line 41 and through bypass line 69 .
- the injection line 41 might also be run alongside the return conduit and connected to the riser at valve 40 with a ROV and /or to the bypass line 69 .
- the LRRS 1 is protected within a set of frame members forming a bumper frame 23 .
- the mud level 30 (the interface between the drilling fluid and the air in the riser 6 ) in the high-pressure riser 6 can be controlled and regulated. As a consequence the pressure in the bottom hole 26 will vary and can thus be controlled.
- FIG. 3 shows in even greater detail the lower part of the pump system 1 .
- the level of gumbo or other debris in the gumbo debris tank 8 is controlled by a set of level sensors 17 a, b connected to a gumbo debris control line 18 running back to the vessel or platform 24 .
- FIG. 4 On the platform or vessel 24 a handling frame 43 for the discharge drilling fluid conduit 15 is installed.
- the LRRS 1 is deployed into the sea by the discharge drilling fluid conduit 15 or on cable until it reaches the approximate depth of the LRRS riser section 2 .
- the system can also be run from an adjacent vessel (not shown) lying alongside the main drilling platform 24 .
- a pull-in assembly will now be described referring to FIG. 4 .
- Attached to the end of the drilling fluid suction hose 31 is a pull-in wire 47 operated by a heave compensated pull-in winch 48 .
- the pull-in wire 47 runs through a suction hose pull-in unit and a sheave 46 .
- the end of the suction hose 31 is pulled towards the hydraulic connector 39 for engagement with the connector 39 by the pull-in assembly 46 , 47 , 48 .
- the drilling fluid suction hose 31 may be made neutrally buoyant by buoyancy elements 45 .
- Controlling bottom hole pressure means controlling these five components.
- ECD Equivalent circulation Density
- the pressure in the annulus can be calculated as follows assuming no wellhead pressure and no surge or swab effect:
- FIG. 5 is an is an illustration of parameters used to calculate the ECD/dynamic pressure and the height (h) of the drilling fluid in the marine drilling riser using the low riser return and lift pump system (LRRS).
- LRRS low riser return and lift pump system
- FIG. 5 shows a flowchart to illustrate the input parameters to the converter indicated above, for control of bottom hole pressure (BBP) using the low return riser and lift pump system (LRRS) described above.
- BBP bottom hole pressure
- LRRS low return riser and lift pump system
- the well and pipe dimensions 101 which are evidently known from the start, but may vary depending on the choice of casing diameter and length as the drilling is proceeding, the mud pump speed 102 , which, e.g., may be measured by a sensor at each pump, pipe and draw-work movement (direction and speed) 103 , which also may be measured by a sensor that, e.g., is placed on the draw-work main winch, and the drilling fluid properties (viscosity, density, yield point, etc.) 104 .
- the mud pump speed 102 which, e.g., may be measured by a sensor at each pump
- pipe and draw-work movement (direction and speed) 103 which also may be measured by a sensor that, e.g., is placed on the draw-work main winch
- the drilling fluid properties viscosity, density, yield point, etc.
- the parameters 101 , 102 , 103 , 104 are entered as values into the converter 100 .
- bottom hole pressure 105 which may be the result of readings from Measurements While Drilling (MWD) systems
- actual mud weight (density) 106 in the drilling riser preferably resulting from calculations based on measurements by the sensors 10 a and 10 b, as explained above, etc.
- hydrostatic head level of interface between drilling fluid and air
- the needed hydrostatic head (h) is input to a comparator/regulator 108
- the fluid level (h′) in the riser is continuously measured and this parameter 107 is compared with the calculated hydrostatic head (h) in the comparator/regulator 108 .
- the difference between these two parameters is used by the comparator/regulator 108 to calculate the needed increase or decrease of pump speed and to generate signals 109 for the pumps to achieve an appropriate flow rate that will result in a hydrostatic head (h).
- the above input and calculations may take place continuously or intermittently to ensure an acceptable hydrostatic head at all times.
- the vertical axis is the depth from sea level, with increasing depth downward in the diagrams.
- the horizontal axis is the pressure. At the left hand side the pressure is atmospheric pressure and increasing to the right.
- the line 303 is the hydrostatic pressure gradient of seawater.
- the line 306 is the estimated pore pressure gradient of the formation.
- the mud weight gradient 305 indicates that a casing 310 have to be set in order to stay in between the expected pore pressure and the formation strength—the formation strength at this point being indicated by reference number 309 —at the bottom of the last casing 315 . If drilling with an arrangement and method according to the present invention, the gradient of the mud can be higher, as indicated by the line 310 , which means that one can drill deeper.
- the pore pressure, indicated by 312 at some point should exceed the expected pressure, indicated by 311 , a kick could occur.
- the level can be dropped further, down to 302 and the mud weight further increased.
- the net result is a pressure decrease at the casing shoe 309 with an increase in pressure near the bottom of the hole, as indicated by 307 , making it possible to drill further before having to set a casing.
- FIG. 6 Another example of the ability of this system is shown in FIG. 6 .
- a severely depleted formation 210 is to be drilled.
- the formation has been depleted from a pressure at 205 at which it was possible to drill using a drilling fluid slightly heavier than seawater (1,03 SG) as drilling fluid, with a pressure gradient shown at 203 .
- the fracture gradient of the depleted formation is now reduced to 211 , which is lower than the pressure gradient of seawater from the surface, as indicated by the line 201 .
- drilling can be done without needing reduce the density of the drilling fluid substantially and having to turn the drilling fluid into gas, foam or other lighter than water drilling systems, as shown by the pressure gradient 214 .
- the upper level of the drilling fluid By introducing an air column in the upper part of the riser the upper level of the drilling fluid can be dropped down to a level 202 .
- a drilling fluid with the same pressure gradient as seawater 201 can be used, but starting at a substantially lower point, as shown by 202 .
- a pore pressured of 0,7 SG can be neutralized by low liquid level with seawater of 1,03 SG as shown by 202 .
- This ability gives rise to great advantages when drilling in depleted fields, since reducing the original formation pressure of 1,10 SG at 205 to 0,7 SG at 210 by production, can also give rise to reduced formation fracture pressure, shown at 211 , that can not be drilled with seawater from surface, as shown by 201 .
- the bottom-hole pressure exerted by the fluid in the well bore can be regulated to substantially below the hydrostatic pressure for water. With the prior art of drilling arrangements this will require special drilling fluid systems with gases, air or foam. With the present invention this can be achieved with a simple seawater drilling fluid system.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Abstract
Description
Pbh=Phyd+Pfric+Pwh+Psup+Pswp
Where:
- Pbh=Bottom hole pressure
- Phyd=Hydrostatic pressure
- Pfric=Frictional pressure
- Pwh=Well head pressure
- Psup=Surge pressure due to lowering the pipe into the well
- Pswp=Swab pressure due to pulling the pipe out of the well
ρE·g·h=Pbh (1)
Where:
-
- ρE=Equivalent Circulation Density (ECD) (kg/m3)
- g=Gravitational constant (m/s2)
- h=Total vertical depth (m)
Where:
- ρm=Density of drilling fluid being used
- η=Viscosity of drilling fluid
- L1=Drillstring length
- Q=Flowrate of drilling fluid
- D0=Diameter of wellbore
- dds=Diameter of drillstring
- g=Gravitational constant
- h=Total vertical depth
- τ0=Yield point of drilling fluid
Claims (17)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/256,740 USRE43199E1 (en) | 2001-09-10 | 2002-09-10 | Arrangement and method for regulating bottom hole pressures when drilling deepwater offshore wells |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US31839101P | 2001-09-10 | 2001-09-10 | |
PCT/NO2002/000317 WO2003023181A1 (en) | 2001-09-10 | 2002-09-10 | Arrangement and method for regulating bottom hole pressures when drilling deepwater offshore wells |
US12/256,740 USRE43199E1 (en) | 2001-09-10 | 2002-09-10 | Arrangement and method for regulating bottom hole pressures when drilling deepwater offshore wells |
US10/489,236 US7264058B2 (en) | 2001-09-10 | 2002-09-10 | Arrangement and method for regulating bottom hole pressures when drilling deepwater offshore wells |
Publications (1)
Publication Number | Publication Date |
---|---|
USRE43199E1 true USRE43199E1 (en) | 2012-02-21 |
Family
ID=33456228
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/256,740 Expired - Lifetime USRE43199E1 (en) | 2001-09-10 | 2002-09-10 | Arrangement and method for regulating bottom hole pressures when drilling deepwater offshore wells |
Country Status (1)
Country | Link |
---|---|
US (1) | USRE43199E1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110253379A1 (en) * | 2008-11-03 | 2011-10-20 | Statoil Petroleum As | Method for modifying an existing subsea arranged oil production well, and a thus modified oil production well |
US20120067590A1 (en) * | 2001-09-10 | 2012-03-22 | Ocean Riser Systems As | Arrangement and method for regulating bottom hole pressures when drilling deepwater offshore wells |
US20140102805A1 (en) * | 2011-06-21 | 2014-04-17 | Agr Subsea, As | Direct Drive Fluid Pump for Subsea Mudlift Pump Drilling Systems |
CN117868729A (en) * | 2023-12-22 | 2024-04-12 | 中煤科工集团沈阳研究院有限公司 | Mining three-phase multistage drilling blowout prevention system and method |
Citations (31)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3465817A (en) * | 1967-06-30 | 1969-09-09 | Pan American Petroleum Corp | Riser pipe |
US3815673A (en) * | 1972-02-16 | 1974-06-11 | Exxon Production Research Co | Method and apparatus for controlling hydrostatic pressure gradient in offshore drilling operations |
US4046191A (en) | 1975-07-07 | 1977-09-06 | Exxon Production Research Company | Subsea hydraulic choke |
US4063602A (en) | 1975-08-13 | 1977-12-20 | Exxon Production Research Company | Drilling fluid diverter system |
US4091881A (en) | 1977-04-11 | 1978-05-30 | Exxon Production Research Company | Artificial lift system for marine drilling riser |
US4099583A (en) | 1977-04-11 | 1978-07-11 | Exxon Production Research Company | Gas lift system for marine drilling riser |
US4210208A (en) * | 1978-12-04 | 1980-07-01 | Sedco, Inc. | Subsea choke and riser pressure equalization system |
US4220207A (en) | 1978-10-31 | 1980-09-02 | Standard Oil Company (Indiana) | Seafloor diverter |
US4291772A (en) | 1980-03-25 | 1981-09-29 | Standard Oil Company (Indiana) | Drilling fluid bypass for marine riser |
US4291722A (en) | 1979-11-02 | 1981-09-29 | Otis Engineering Corporation | Drill string safety and kill valve |
US4414846A (en) * | 1982-02-09 | 1983-11-15 | Jack Schrenkel | Gas well monitoring device |
EP0290250A2 (en) | 1987-05-05 | 1988-11-09 | Conoco Inc. | Method and apparatus for deepwater drilling |
US5006845A (en) * | 1989-06-13 | 1991-04-09 | Honeywell Inc. | Gas kick detector |
US5727640A (en) * | 1994-10-31 | 1998-03-17 | Mercur Subsea Products As | Deep water slim hole drilling system |
US5848656A (en) * | 1995-04-27 | 1998-12-15 | Moeksvold; Harald | Device for controlling underwater pressure |
WO1999018327A1 (en) | 1997-09-19 | 1999-04-15 | Petroleum Geo-Services As | Riser tube for use in great sea depth and method for drilling at such depths |
FR2787827A1 (en) | 1998-12-29 | 2000-06-30 | Elf Exploration Prod | METHOD FOR ADJUSTING TO A OBJECTIVE VALUE OF A LEVEL OF DRILLING LIQUID IN AN EXTENSION TUBE OF A WELLBORE INSTALLATION AND DEVICE FOR CARRYING OUT SAID METHOD |
US6102673A (en) * | 1998-03-27 | 2000-08-15 | Hydril Company | Subsea mud pump with reduced pulsation |
US6263981B1 (en) | 1997-09-25 | 2001-07-24 | Shell Offshore Inc. | Deepwater drill string shut-off valve system and method for controlling mud circulation |
US6276455B1 (en) | 1997-09-25 | 2001-08-21 | Shell Offshore Inc. | Subsea gas separation system and method for offshore drilling |
US6325159B1 (en) * | 1998-03-27 | 2001-12-04 | Hydril Company | Offshore drilling system |
US6328107B1 (en) * | 1999-09-17 | 2001-12-11 | Exxonmobil Upstream Research Company | Method for installing a well casing into a subsea well being drilled with a dual density drilling system |
US6401823B1 (en) * | 2000-02-09 | 2002-06-11 | Shell Oil Company | Deepwater drill string shut-off |
US6415877B1 (en) * | 1998-07-15 | 2002-07-09 | Deep Vision Llc | Subsea wellbore drilling system for reducing bottom hole pressure |
US6457529B2 (en) * | 2000-02-17 | 2002-10-01 | Abb Vetco Gray Inc. | Apparatus and method for returning drilling fluid from a subsea wellbore |
US6474422B2 (en) * | 2000-12-06 | 2002-11-05 | Texas A&M University System | Method for controlling a well in a subsea mudlift drilling system |
US6571873B2 (en) | 2001-02-23 | 2003-06-03 | Exxonmobil Upstream Research Company | Method for controlling bottom-hole pressure during dual-gradient drilling |
US6668943B1 (en) * | 1999-06-03 | 2003-12-30 | Exxonmobil Upstream Research Company | Method and apparatus for controlling pressure and detecting well control problems during drilling of an offshore well using a gas-lifted riser |
US6745857B2 (en) * | 2001-09-21 | 2004-06-08 | National Oilwell Norway As | Method of drilling sub-sea oil and gas production wells |
US6823950B2 (en) * | 2001-12-03 | 2004-11-30 | Shell Oil Company | Method for formation pressure control while drilling |
US7677329B2 (en) | 2003-11-27 | 2010-03-16 | Agr Subsea As | Method and device for controlling drilling fluid pressure |
-
2002
- 2002-09-10 US US12/256,740 patent/USRE43199E1/en not_active Expired - Lifetime
Patent Citations (35)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3465817A (en) * | 1967-06-30 | 1969-09-09 | Pan American Petroleum Corp | Riser pipe |
US3815673A (en) * | 1972-02-16 | 1974-06-11 | Exxon Production Research Co | Method and apparatus for controlling hydrostatic pressure gradient in offshore drilling operations |
US4046191A (en) | 1975-07-07 | 1977-09-06 | Exxon Production Research Company | Subsea hydraulic choke |
US4063602A (en) | 1975-08-13 | 1977-12-20 | Exxon Production Research Company | Drilling fluid diverter system |
US4091881A (en) | 1977-04-11 | 1978-05-30 | Exxon Production Research Company | Artificial lift system for marine drilling riser |
US4099583A (en) | 1977-04-11 | 1978-07-11 | Exxon Production Research Company | Gas lift system for marine drilling riser |
US4220207A (en) | 1978-10-31 | 1980-09-02 | Standard Oil Company (Indiana) | Seafloor diverter |
US4210208A (en) * | 1978-12-04 | 1980-07-01 | Sedco, Inc. | Subsea choke and riser pressure equalization system |
US4291722A (en) | 1979-11-02 | 1981-09-29 | Otis Engineering Corporation | Drill string safety and kill valve |
US4291772A (en) | 1980-03-25 | 1981-09-29 | Standard Oil Company (Indiana) | Drilling fluid bypass for marine riser |
US4414846A (en) * | 1982-02-09 | 1983-11-15 | Jack Schrenkel | Gas well monitoring device |
EP0290250A2 (en) | 1987-05-05 | 1988-11-09 | Conoco Inc. | Method and apparatus for deepwater drilling |
US4813495A (en) * | 1987-05-05 | 1989-03-21 | Conoco Inc. | Method and apparatus for deepwater drilling |
US5006845A (en) * | 1989-06-13 | 1991-04-09 | Honeywell Inc. | Gas kick detector |
US5727640A (en) * | 1994-10-31 | 1998-03-17 | Mercur Subsea Products As | Deep water slim hole drilling system |
US5848656A (en) * | 1995-04-27 | 1998-12-15 | Moeksvold; Harald | Device for controlling underwater pressure |
WO1999018327A1 (en) | 1997-09-19 | 1999-04-15 | Petroleum Geo-Services As | Riser tube for use in great sea depth and method for drilling at such depths |
US6454022B1 (en) | 1997-09-19 | 2002-09-24 | Petroleum Geo-Services As | Riser tube for use in great sea depth and method for drilling at such depths |
US6276455B1 (en) | 1997-09-25 | 2001-08-21 | Shell Offshore Inc. | Subsea gas separation system and method for offshore drilling |
US6263981B1 (en) | 1997-09-25 | 2001-07-24 | Shell Offshore Inc. | Deepwater drill string shut-off valve system and method for controlling mud circulation |
US6325159B1 (en) * | 1998-03-27 | 2001-12-04 | Hydril Company | Offshore drilling system |
US6102673A (en) * | 1998-03-27 | 2000-08-15 | Hydril Company | Subsea mud pump with reduced pulsation |
US6648081B2 (en) | 1998-07-15 | 2003-11-18 | Deep Vision Llp | Subsea wellbore drilling system for reducing bottom hole pressure |
US6854532B2 (en) | 1998-07-15 | 2005-02-15 | Deep Vision Llc | Subsea wellbore drilling system for reducing bottom hole pressure |
US6415877B1 (en) * | 1998-07-15 | 2002-07-09 | Deep Vision Llc | Subsea wellbore drilling system for reducing bottom hole pressure |
FR2787827A1 (en) | 1998-12-29 | 2000-06-30 | Elf Exploration Prod | METHOD FOR ADJUSTING TO A OBJECTIVE VALUE OF A LEVEL OF DRILLING LIQUID IN AN EXTENSION TUBE OF A WELLBORE INSTALLATION AND DEVICE FOR CARRYING OUT SAID METHOD |
US6668943B1 (en) * | 1999-06-03 | 2003-12-30 | Exxonmobil Upstream Research Company | Method and apparatus for controlling pressure and detecting well control problems during drilling of an offshore well using a gas-lifted riser |
US6328107B1 (en) * | 1999-09-17 | 2001-12-11 | Exxonmobil Upstream Research Company | Method for installing a well casing into a subsea well being drilled with a dual density drilling system |
US6401823B1 (en) * | 2000-02-09 | 2002-06-11 | Shell Oil Company | Deepwater drill string shut-off |
US6457529B2 (en) * | 2000-02-17 | 2002-10-01 | Abb Vetco Gray Inc. | Apparatus and method for returning drilling fluid from a subsea wellbore |
US6474422B2 (en) * | 2000-12-06 | 2002-11-05 | Texas A&M University System | Method for controlling a well in a subsea mudlift drilling system |
US6571873B2 (en) | 2001-02-23 | 2003-06-03 | Exxonmobil Upstream Research Company | Method for controlling bottom-hole pressure during dual-gradient drilling |
US6745857B2 (en) * | 2001-09-21 | 2004-06-08 | National Oilwell Norway As | Method of drilling sub-sea oil and gas production wells |
US6823950B2 (en) * | 2001-12-03 | 2004-11-30 | Shell Oil Company | Method for formation pressure control while drilling |
US7677329B2 (en) | 2003-11-27 | 2010-03-16 | Agr Subsea As | Method and device for controlling drilling fluid pressure |
Non-Patent Citations (1)
Title |
---|
NO Search Report dated Feb. 15, 2005 of Patent Application No. PCT/NO02/00317 filed Sep. 10, 2002. |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120067590A1 (en) * | 2001-09-10 | 2012-03-22 | Ocean Riser Systems As | Arrangement and method for regulating bottom hole pressures when drilling deepwater offshore wells |
US8322439B2 (en) * | 2001-09-10 | 2012-12-04 | Ocean Riser Systems As | Arrangement and method for regulating bottom hole pressures when drilling deepwater offshore wells |
US20110253379A1 (en) * | 2008-11-03 | 2011-10-20 | Statoil Petroleum As | Method for modifying an existing subsea arranged oil production well, and a thus modified oil production well |
US9234402B2 (en) * | 2008-11-03 | 2016-01-12 | Statoil Petroleum As | Method for modifying an existing subsea arranged oil production well, and a thus modified oil production well |
US20140102805A1 (en) * | 2011-06-21 | 2014-04-17 | Agr Subsea, As | Direct Drive Fluid Pump for Subsea Mudlift Pump Drilling Systems |
US9322230B2 (en) * | 2011-06-21 | 2016-04-26 | Agr Subsea, As | Direct drive fluid pump for subsea mudlift pump drilling systems |
CN117868729A (en) * | 2023-12-22 | 2024-04-12 | 中煤科工集团沈阳研究院有限公司 | Mining three-phase multistage drilling blowout prevention system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7264058B2 (en) | Arrangement and method for regulating bottom hole pressures when drilling deepwater offshore wells | |
US11085255B2 (en) | System and methods for controlled mud cap drilling | |
EP2281103B1 (en) | Systems and methods for subsea drilling | |
US20070235223A1 (en) | Systems and methods for managing downhole pressure | |
US7677329B2 (en) | Method and device for controlling drilling fluid pressure | |
US7513310B2 (en) | Method and arrangement for performing drilling operations | |
US20130206423A1 (en) | Systems and methods for managing pressure in a wellbore | |
BR112014018184A2 (en) | DOUBLE GRADIENT CONTROLLED PRESSURE DRILLING | |
NO320829B1 (en) | Underwater wellbore drilling system for reducing bottom hole pressure | |
USRE43199E1 (en) | Arrangement and method for regulating bottom hole pressures when drilling deepwater offshore wells | |
CA2803771C (en) | Arrangement and method for regulating bottom hole pressures when drilling deepwater offshore wells |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: OCEAN RISER SYSTEMS AS, NORWAY Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:FOSSLI, BORRE;REEL/FRAME:027298/0244 Effective date: 20040301 |
|
FPAY | Fee payment |
Year of fee payment: 8 |
|
SULP | Surcharge for late payment |
Year of fee payment: 7 |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 12TH YR, SMALL ENTITY (ORIGINAL EVENT CODE: M2553); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY Year of fee payment: 12 |
|
AS | Assignment |
Owner name: ENHANCED DRILLING AS, NORWAY Free format text: MERGER;ASSIGNOR:OCEAN RISER SYSTEMS AS;REEL/FRAME:053433/0892 Effective date: 20141217 |