US956627A - Art of tunnel construction. - Google Patents
Art of tunnel construction. Download PDFInfo
- Publication number
- US956627A US956627A US40177907A US1907401779A US956627A US 956627 A US956627 A US 956627A US 40177907 A US40177907 A US 40177907A US 1907401779 A US1907401779 A US 1907401779A US 956627 A US956627 A US 956627A
- Authority
- US
- United States
- Prior art keywords
- tunnel
- detritus
- tube
- surrounding
- density
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000010276 construction Methods 0.000 title description 3
- 239000000463 material Substances 0.000 description 18
- 210000002445 nipple Anatomy 0.000 description 5
- 230000001105 regulatory effect Effects 0.000 description 5
- 238000005086 pumping Methods 0.000 description 4
- 239000011435 rock Substances 0.000 description 2
- 230000003247 decreasing effect Effects 0.000 description 1
- 238000000151 deposition Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/102—Removable shuttering; Bearing or supporting devices therefor
Definitions
- This invention relates to the art of adjusting tunnel linings, and maintaining them in their theoretical position of center line, grade, and form.
- the tunnel lining is referred to as a tube.
- a tube instead of depending solely upon driving the headings of these tubes through the earth at an estimated elevation suiiiciently above theoretical grade to allow for the tube finally settling to the position of theoretical grade; after the tube is formed and the settlement has progressed sufficient to show the relative settlement of different portions of the tube,- I employ a system of regulating the densities and pressures of the detritus surrounding the tube, so as to gradually bring all parts 0 the tube to theoretical line, grade, and form. This system consists in taking part of the surrounding ground into the tube, or forcing earthy material ground through openings in the wall 0 the tube.
- F igure 1 is a vertical crosssection of a portion of a river and its bed of rock and the detritus above the rock, a longitudinal vertical section of a portion of a tunnel be ing shown extending through the detritus. Inside of this tunnel are shownfour systems, 5, 6, 7 and 8, for regulating the density and pressure of the detritus over and under the tunnel, by means of which the tunnel may be raised or lowered and adjusted vertically to the desired position.
- Fig. 2 is a vertical cross-section of a tunnel in de- I employ the I tritus, showing a distortion of the tube in which the vertical diameter is greater than the horizontal diameter. A system consisting of an arrangement of pumps, Valves and pipes for correcting this distortion are also shown within the tunnel.
- Fig. 1 is a vertical crosssection of a portion of a river and its bed of rock and the detritus above the rock, a longitudinal vertical section of a portion of a tunnel be ing shown extending through the detritus. Inside of this tunnel are
- FIG. 3 is a vertical cross-section of a tunnel in detritus showing a distortion of the tube in which the vertical diameter is less than the horizontal diameter.
- a system consisting ofan arrangement of pumps and valves and pipes for correcting this distortion is also shown within the tunnel
- Fig. 4 is ertical cross- 3 section of atunnel in detritus, showing a l distortion of the tube in which the diagonal diameters are unequal.
- a system consist ing of an arrangement of pump, valves, and pipes for correcting this distortion are also shown within the tunnel.
- System 5 Fig. 1 is located at a point in the tunnel; where the tunnel is too high. It is so arranged that the detritus may-be pumped from undeiz the outside of the tunnel at B, through the pump 9 and the pipe and valve 10 above 1t, and then be dis charged above and around the outside of the tunnel at A. The removal of the denser detritus from under the tunnel at B will cause the tunnel to settle lower at that point and by depositing the removed material above the tunnel at A, the general disturbance of the detritus above the tunnel will be avoided.
- this system consists of an opening through the bottom wall of the tunnel approximately in the center line of the tunnel at B and another similar opening in the top wall of the tunnel approximately diametrically opposite" at' A. These two openings.
- a piping and pumping system extending vertically through the tunnel.
- this line of piping there may be placed one or two gate valves, one 10, close to the top wall of the tunnel at A, and the other 11, when used, should be placed close to the bottom wall of the tunnel at B.
- These valves while not absolutely necessary, are inserted in this system to enable the operator to shut oil the flow of detritus, in case of accident, or in case the system is to be disconnected for any purpose.
- the top valve 10 makes the operation of the system more convenient.
- a suction and force pump 9 is inserted in the line of piping at such elevation as ismost convenient for operating, and this pump performs the functions of the lower yalue ll.
- valves may be allowed to remain for future adjustments which may be required, or they may be removed, and the openings in the wall may be plugged.
- the valves 10 and 11 may moved may be varied to accommodate the character oi the detritus in each case. "peswith internal diameters of one to two inches will answer for ordinary line smooth silt, while coarser umlerial such as sand and heavy gravel "ill require larger pix. ng, even up to four, five, or sir-z inches, or store.
- System 6, Fig. l is located at a point in the tunnel where the tunnel is too low.
- This system (5 is arranged for pumping the detritus C from above the tunnel, into the detritus D under the tunnel, by means of which the density of the detritus I) under the tunnel is increased, and the tunnel is gradually lifted, while at the same time the material C above the tunnel is removed from the path of the vertically upward moving tunnel.
- System 6 Fig. l is constructed e:-;- act-1y the same as system 5 Fig. l, except that the pump 9 is connected up so to force the detritus in the opposite direction, viz: under the tunnel instead of above the tunnel.
- the number of pumping systems employed to raise the tunnel may be governed like those used in lowering the tunnel, by the extent of the error and the distance it covers along the line of the tunnel.
- System 7, Fig. 1 is located at a point where the tunnel is too high.
- his system consists of a vertical opening through the bottom wall of the tunnel, located about in the center line of t ie tunnel at or surrounding this opening is fixed vertically a pipe nipple about a foot long; on top Cl this nipple is fixed a straight sy valve (preferably a gate valve); on p this valve is fixed vertically another nipple aoout a foot long; on top of this nipple is a right angle elbow which looks out about parallel with the bottom of the tunnel, and to this elbow is fixed another nipple about a foot long which extends outward the elbow in a direction parallel with the bottom of the tunnel and forms the outlet for he detritus.
- This system is exactly the same as system 6, except that it is disconnected at some convenient point between the pump 9 and the upper valve 10 in the pipe line.
- the detritus G above the tunnel may be taken-into the tunnel through the opening in the top of the tunnel governed by the valve 10 and be discharged into someconvenient receiver in the tunnel. It may be used again, if desired, by forcing it through. the force pump 9 and under the tunnel at F to increase the density of the detritus there.
- a better ma- 1 l tcrial may be needed. for this purpose, however, and in that case the detritus taken into the tunnel from G would be disposed of in the most convenient manner.
- Horizontal adjustments may be accomplished by the same apparatus set up in a horizontal position and extending diaume of the material surrounding the tunnel need be removed or shifted to produce the desired result, while in rectifylng alinement of grades t sometimes becomes necessary to move thousands of cubic feet of material to secure proper adjustment of the tunnel.
- Adjusting tunnel linings by regulating thedensity and pressure of the ground surrounding the, tunnel, by means of injecting earthy material into the'ground surround- 'ing. thc tunnel'where its-density and pressure is too light, substantially as set forth 3; Adjusting tunnel linings by regulating the density and pressure of the ground sur-- rounding the tunnel by means of removing .part of the surrounding ground from place where its density and. pressure is too great, and injecting earthy material intothe ground surrounding the tunnel where its density and pressure is too light, substantially as set forth.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Description
J. P. GONKLING. ART OF TUNNEL GONSTRUGTION.
APPLICATION IILBD NOV.11, 1907.
\ Patented May 3, 1910.
llui m I WITNESSES:
J DHN P. CONKLING, OF NEW YQRK, N. Y.
ART OF TUNNEL CONSTRUCTION.
assess.
Specification of Letters Patent.
Patented May 3, 1910,
Application filed November 11, 1907. Serial No. 401,779.
To all whom it may concern:
Be it known that I, JOHN P. CONKLING, a citizen of the United States, residing at 1 Manhattan borough, city, county, and State into the snrroundin of New York, have invented new and useful Improvements in the Art of Tunnel Construction, of which the following is a speciiicatiou.
This invention relates to the art of adjusting tunnel linings, and maintaining them in their theoretical position of center line, grade, and form.
it relates more particularly to subaqueous, segmental circular-ring, tube-tunnel linings, surrounded, or partly surrounded by detritus carryingmore or less moisture, and has for its object to assure the usefulness of such tunnels for the purposes designed, when completed, and to render their construction more expeditious and less expensive.
In this specification the tunnel lining is referred to as a tube. Now, instead of depending solely upon driving the headings of these tubes through the earth at an estimated elevation suiiiciently above theoretical grade to allow for the tube finally settling to the position of theoretical grade; after the tube is formed and the settlement has progressed sufficient to show the relative settlement of different portions of the tube,- I employ a system of regulating the densities and pressures of the detritus surrounding the tube, so as to gradually bring all parts 0 the tube to theoretical line, grade, and form. This system consists in taking part of the surrounding ground into the tube, or forcing earthy material ground through openings in the wall 0 the tube. Where the densities and pressures of the material surrounding the tube are too heavy, I take into the tube through openings in the walls of the tube suificient of the material surroundin the tube to reduce the densities and pressures at that place, to the point desired. lVho're the densities and pressures of the materiul surrounding the tube are too light,
I force earthy material from Within the tube "lirmlgh openings in the wall 01'? the into the material surroumling the tube at that place, until the desired densities and pressures at that point are obtained.
By compressing such portions of the detritus surrounding the tube as are not suiticicntlvdeuse to supportthe tube at theoretical grade, and filling the space vacated with denser detritus, I build up foundations and buttresses of denser detritus within the mass of detritus where required to hold the tube in theoretical position. When necessary 1 continue the operation of compressing this light detritus and filling in the space vacated with denser detritus, until the tube has been elevated vertically or shoved horizontally into theoretical position or to the desired location.
While moving the tube vertically or horizontally by means of such pressure exerted from within the tube, and acting against the outside of the tube, I remove obstructions in the path of the tube, by taking the 0bstruotions into the tube through openings in its walls.
To rectify distorted tubes, same methods. there the diameter of the tube is greatest, I force earthy material from within the tube through openings in one or both of its opposite Walls into the material outside of the tube, and I remove the surrounding detritus into the tube through openings in one or both of its op )osite walls where the diameter of the tube is least. Thus, equalizing the pressures, and restoring the distorted sections of the tube to its theoretical form.
My invention may be more fully understood from the detailed description hereinafter presented with reference to the accompanying drawings, inwhich:
F igure 1 is a vertical crosssection of a portion of a river and its bed of rock and the detritus above the rock, a longitudinal vertical section of a portion of a tunnel be ing shown extending through the detritus. Inside of this tunnel are shownfour systems, 5, 6, 7 and 8, for regulating the density and pressure of the detritus over and under the tunnel, by means of which the tunnel may be raised or lowered and adjusted vertically to the desired position. Fig. 2 is a vertical cross-section of a tunnel in de- I employ the I tritus, showing a distortion of the tube in which the vertical diameter is greater than the horizontal diameter. A system consisting of an arrangement of pumps, Valves and pipes for correcting this distortion are also shown within the tunnel. Fig. 3 is a vertical cross-section of a tunnel in detritus showing a distortion of the tube in which the vertical diameter is less than the horizontal diameter. A system consisting ofan arrangement of pumps and valves and pipes for correcting this distortion is also shown within the tunnel, Fig. 4 is ertical cross- 3 section of atunnel in detritus, showing a l distortion of the tube in which the diagonal diameters are unequal. A system consist ing of an arrangement of pump, valves, and pipes for correcting this distortion are also shown within the tunnel.
The valves may be allowed to remain for future adjustments which may be required, or they may be removed, and the openings in the wall may be plugged.
The diameter of the pump and the piping through which the detritus is to be 1 point desired. The valves 10 and 11 may moved may be varied to accommodate the character oi the detritus in each case. "peswith internal diameters of one to two inches will answer for ordinary line smooth silt, while coarser umlerial such as sand and heavy gravel "ill require larger pix. ng, even up to four, five, or sir-z inches, or store. l iherc the tunnel deviates from to a considerable extent in any one dir and this deviation exists for a considerable tance along the tunnel in longitudinal direction, several of these systems similar to 5 may be established, spaced two, tour, or eight feet apart along the center line of the tunnel, or they may be placed in groups as described, and the work of adjustment be greatly facilitated by operating all of the pumping systems at once. T
A ie extent of the error and the amount of the surrounding material to he moved will naturally govern the nun'iber of pumps to be employed.
System 7, Fig. 1, is located at a point where the tunnel is too high. his system consists of a vertical opening through the bottom wall of the tunnel, located about in the center line of t ie tunnel at or surrounding this opening is fixed vertically a pipe nipple about a foot long; on top Cl this nipple is fixed a straight sy valve (preferably a gate valve); on p this valve is fixed vertically another nipple aoout a foot long; on top of this nipple is a right angle elbow which looks out about parallel with the bottom of the tunnel, and to this elbow is fixed another nipple about a foot long which extends outward the elbow in a direction parallel with the bottom of the tunnel and forms the outlet for he detritus. On the bottom of unuel under this outlet is placed a recep as a tub, or box, or car to receive J material discharged from this system, which may be disposed of in the most convenient manner. VYhen the valve 11 in system is opened, the detritus E, propelled by the surrounding outside pressure wvill ooze through the opening in the wall of the tunnel and through this system of piping, and be deposited in the receiver under its discharge opening. The removal of this detritus from under thetunnel at E will decrease the density of the detritus remaining there and the tunnel will gradually settle to a, lower level. As the tunnel settles to a lo eri lever the detritus above the tunnel will slowly follow it. In operating this sys tem the arrangement of the entire body of detritus above the tunnel will be considerably disturbed, and care should be taken to conduct the work slowl Y so as to prevent the distortion of the tunnel, first by a too rapid decrease in the horizontal diameter at this point owing to excessive side pressures, and later by a decrease in the vertical diameter, due to. an excessive weight of detritus on top of the tunnel owing to the arch of the detritus above the tunnel having been broken .when the tunnel was lowered.
This system is exactly the same as system 6, except that it is disconnected at some convenient point between the pump 9 and the upper valve 10 in the pipe line. The detritus G above the tunnel may be taken-into the tunnel through the opening in the top of the tunnel governed by the valve 10 and be discharged into someconvenient receiver in the tunnel. It may be used again, if desired, by forcing it through. the force pump 9 and under the tunnel at F to increase the density of the detritus there. A better ma- 1 l tcrial may be needed. for this purpose, however, and in that case the detritus taken into the tunnel from G would be disposed of in the most convenient manner. The lower portion of system 8, Fig. 1, consists of a force pump t) with some form of hopper 12 for holding and feeding to the pump flthe earthy material to be forced under the tunnel at F by the force pump 0. As the earthy material is forced under the tunnel at F the density of the detritus at this point will be increased which will cause the tunnel to rise. At 'the same time the detritus at G which is in the path of the tunnel is removed into the tunnel through the opening governed by the valve 10 which makes this adjustment possible without distortion of the tube. Horizontal adjustments may be accomplished by the same apparatus set up in a horizontal position and extending diaume of the material surrounding the tunnel need be removed or shifted to produce the desired result, while in rectifylng alinement of grades t sometimes becomes necessary to move thousands of cubic feet of material to secure proper adjustment of the tunnel.
What I claim as new and desire to secure" 'by Letters-Patent, is:
1. Adjusting tunnel linings by regulating the density and pressure of the ground sur.
rounding the tunnel, by means of removing part of the surrounding ground from place where its density and pressure'is too great. substantiallyas set forth.
2. Adjusting tunnel linings by regulating thedensity and pressure of the ground surrounding the, tunnel, by means of injecting earthy material into the'ground surround- 'ing. thc tunnel'where its-density and pressure is too light, substantially as set forth 3; Adjusting tunnel linings by regulating the density and pressure of the ground sur-- rounding the tunnel by means of removing .part of the surrounding ground from place where its density and. pressure is too great, and injecting earthy material intothe ground surrounding the tunnel where its density and pressure is too light, substantially as set forth.
- 4. Adjusting tunnel linings by increasing the pressure on the outside of thatside of the tunnel opposite to the direction in which it is desired to move the tunnel, and decreasing the pressure on the outside of that side of the tunnel opposite, substantially as set forth.
In Adjusting tunnel linings by means of moving part of the ground surrounding the tunnel lining, from the outside of 'onel-side' of the tunnel to the outside of the opposite side of the tunnel, substantially as herein setforlh.
JouNr. ooNKLINo.
Witnesses: 7
Hum) Rosnus'rnlN, J. VALENSI'.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US40177907A US956627A (en) | 1907-11-11 | 1907-11-11 | Art of tunnel construction. |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US40177907A US956627A (en) | 1907-11-11 | 1907-11-11 | Art of tunnel construction. |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US956627A true US956627A (en) | 1910-05-03 |
Family
ID=3025030
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US40177907A Expired - Lifetime US956627A (en) | 1907-11-11 | 1907-11-11 | Art of tunnel construction. |
Country Status (1)
| Country | Link |
|---|---|
| US (1) | US956627A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2656683A (en) * | 1950-02-07 | 1953-10-27 | Louise E Riva | Method of installing underground pipes or ducts |
-
1907
- 1907-11-11 US US40177907A patent/US956627A/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2656683A (en) * | 1950-02-07 | 1953-10-27 | Louise E Riva | Method of installing underground pipes or ducts |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US2434239A (en) | Method of producing oil | |
| US823749A (en) | Method of simultaneously mining and washing clay, kaolin, &c. | |
| US2412239A (en) | Method of producing piling | |
| US2375865A (en) | Apparatus for underground water storage | |
| US2126576A (en) | Apparatus for and method of boring into and treating earth material | |
| US687830A (en) | Submarine dredger and gold-saving machine. | |
| US193686A (en) | Improvement iw stop-cock boxes | |
| US961788A (en) | Sinking shafts or the like. | |
| US996397A (en) | Support for building-walls, &c. | |
| US1642245A (en) | Method of making and maintaining wells | |
| US629135A (en) | Subaqueous tunnel and method of constructing same. | |
| US723986A (en) | Submarine tunneling. | |
| US360959A (en) | Apparatus for excavating tunnels | |
| US3358458A (en) | Methods for installing nondisplacement sand drains | |
| US1129324A (en) | Method of draining land. | |
| US900683A (en) | Process for stopping or sealing off underground flows of water into mine-workings, &c. | |
| US606980A (en) | Art of raising levels of low lands | |
| US1235233A (en) | Method of tunnel construction. | |
| US129246A (en) | Improvement in wells for water-main taps | |
| US896939A (en) | Relief-valve. | |
| US989110A (en) | Sinking deep shafts in water-impregnated ground. | |
| US3604759A (en) | Partial obstruction arrangement for preventing plug formation in a shutdown slurry pipeline | |
| US837566A (en) | Filtration system. | |
| US427149A (en) | Apparatus for submarine exploration | |
| US53767A (en) | Improvement in constructing wells |