US745457A - Subaqueous tunnel. - Google Patents

Subaqueous tunnel. Download PDF

Info

Publication number
US745457A
US745457A US17895003A US1903178950A US745457A US 745457 A US745457 A US 745457A US 17895003 A US17895003 A US 17895003A US 1903178950 A US1903178950 A US 1903178950A US 745457 A US745457 A US 745457A
Authority
US
United States
Prior art keywords
tunnel
piles
walls
masonry
chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US17895003A
Inventor
Duncan D Mcbean
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US17895003A priority Critical patent/US745457A/en
Application granted granted Critical
Publication of US745457A publication Critical patent/US745457A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/063Tunnels submerged into, or built in, open water
    • E02D29/077Tunnels at least partially built beneath the water-bed characterised by being made by methods involving disturbance thereof all along the location line, e.g. by cut-and-cover or caisson methods

Definitions

  • Wiin esses am Mmm/@nbr TH wams Ps1-ens co. PHOTO-uma., wAsmNsTm. :1. c.
  • Figure 1 is a crosssectional elevation of the working-chamber before the work of excavation has been commenced.
  • Fig. 2 is a similar view showing the condition after excavation and after the .lay-
  • i 3 is a longitudinal sectional elevation illustratin g the appearance and conditions shown in Figs. l and 2 and also a portion of the tunnel completed and ready for the removal of finished tunnel with the roof ofthe Workingchamber removed and the tunnel ready for4 l occupancy and use.
  • 2 represents the body of by dredgingalong the site of the proposed tunnei, and 4 the temporary bed of the stream 4formed by the covering of the working-chamber A.
  • the dotted lines in this iigure indicate the piles driven on each side of the preliminary excavation, the platforms supported thereon, the guides ⁇ for directing ythe course of the sawed piles or sheeting when driven, and a driver located upon one of the platforms in the position in which it ⁇ stands while driving the sheeting.
  • the chamber A is formed by the walls of sheeting 5vand the roof 6, seated thereon, both substantially impervious to water. In the sheetings are driven down to bed-rock or to the'lowest required depth and are then cut off in a plane beneath the surface of the watersuftlciently above the top of the proposed tunnel structure to admit of convenient access and preliminary working in the chamber.
  • I preferably cover the chamber with earth in the manner shown in Fig. l. t or bulkheads of the chamber I prefer toemploy a double bulkhead, as illustrated in Fig. 3, although asingle wall of sheeting of the same character as the side walls may be employed. With this construction of bulkhead the space between its inner wall 7 andV its outer wall 8 I ll with earth to assist in For the end walls;
  • Fig. 4 is a View similar to those of Figs. l and 2, showing the 'construction of this chamber the several ICO the sealing of the chamber, providing, if desired, a shaft 9 Within the bulkhead for access to the sheeting wall or entrance to the working-chamber. While ⁇ it is not always necessary, I regard it as a provision for safety in the construction of the working-chamber to drive into the bed'of the preliminary channel series of piles 10 to serve, first, as supports for the chamber-roof and for the framework hereinafter described and, finally, as the foundation for the tunnel.
  • piles are cut off at a suitable level, preferably a little below that of the top of the side walls of the chamber, and stayed and strengthened by braces 11 and their tops connected by cross-beams 12.
  • the cross-beams 12 are on a level with the top of the sheeting walls, and these walls and cross-beams receive the beams 13 of the roof 6.
  • the piles 10 also serve as supports for the framework B, which is made up preferably of cross-beams 14, braces 15, and the inner walings 16 and outer Walings 17, interspaced the thickness of the sheeting wall and serving as guides for the sheeting while being driven, the walings being vertically interspaced and supported by studs 18.
  • this framework B is omitted in Fig. 1.
  • the chamber being completed air is forced thereinto under sufficient pressure preferably to counterbalance the weight of the superposed waters and transmit the pressure of the same to the bed of the preliminary excavation, the contained water being pumped out. If quicksand or water is encountered in the excavating, the air-pressure may be increased to counterbalance the water-pressure down to the level of the bed of the excavatiomth us preventing the inflow ofthe quicksand or water.
  • the bed of the channel between the sheeting walls is then excavated, as illustrated in Fig. 3, down tothe level 19 required for the foundation of the tunnel structure, additional bracing-framework, as illustrated by a single cross-beam 20 in Figj2, being added to the original framework B to laterally support the sheeting Walls.
  • a foundation 21 of masonry is then laid in the bottom of the excavation around the piles 10, which are then cut off, as illustrated in Fig. 2, even with the top surface of the tunnel foundation or bed.
  • the iron tubes 22 are then erected upon the foundation and the space around and above the same filled in with masonry, as shown in Figs. 3 and 4.
  • the tubes may be given a lining 24 of masonry of any desired thickness to strengthen the structure and to cover the flanges of the sections of the tube.
  • a subaqueous tunnel structure having foundation and side walls of piles.
  • a subaqueous tunnel structure having foundation and side walls of piles, embedded in or anchored thereto.
  • a subaqueous tunnel structure having .partially-inclosing side walls secured or anchored thereto and seated on bed-rock or penetrating other material to a depth below the tunnel structure.
  • a tunnel or other subaqueous masonry structure having supporting-piles with their tops penetrating orembedded therein and side walls of piles anchored thereto.
  • a subaqueous tunnel comprising a metallic tube, supporting side walls therefor, a pile foundation and a mass of masonry serving as a bed for said tube, said walls and piles being anchored to said masonry.
  • a subaqueous tunnel consisting of masonry Walls surrounding the tunnel-passage, supporting-piles therefor having their tops embedded in or extended into said masonry, and vertical walls adjacent the sides of said tunnel and penetrating the earth below the same.
  • Asubaqneons tunnel structure eo mpris ⁇ ing a mass of masonry, a tunnel-tube seated therein, and series of piles penetrating the earth beneath and extending into and along-V side of said masonry and anchored thereto.

Description

om O 9 .Il L. C. E D D E T N E T A D.. N. A E B 0 M D D. 7. 5 4. 5 4 7 0. N
SUBAQUEOUS TUNNEL.
APPLICATION HLBD 00128, 190s.
3 SHEETS-SHEET 1.
'N0 MODEL.
mi comms mens co.. mas-umn.. WASI-Mmmm. c.
No. 745,457. PATENTED'DEG. l, 1903. D. D. MGBEAN. SUBAQUEOUS TUNNEL.
APPLIQATIDN FILED ooT. 2s, 190s. 3 SHEETS SHEET Z.
WWI/lll q w L mm NO MDEL.
PATBNTED DEG. v1, 1903'. D. D. MGBBAN.
SUBAOUEOUS TUNNEL.
APPLICATION FILED 001.28, 1903.
3 SHEETS-SHEET 3.
N0 MODEL.
J.. l i
Wiin esses am Mmm/@nbr TH: wams Ps1-ens co. PHOTO-uma., wAsmNsTm. :1. c.
Patented December 1, 1903i.V
PATENT Grinch.
DUNCAN D. MonEAmoF'NEw YORK, N. Y.
SUBAQUEOUSTUNNEL.
SPECIFICATION forming part of Letters Patent No. 745,457, dated December 1, 1903.
Application tua Gatter 2s. reos. serai 150.178.950. (no man.)
tures, especially such as are constructed at great depths or under navigable waters and it consists in the features of construction hereinafter set forth. Y Where work of this character has to be done in the bed of a navigable stream or other body of water, the great depth precludes the employment of the usual I 'water, 3 the line of preliminary excavation appliances and methods. It is also yhighly important in view not only of the original cost of construction, but more especially on account of future operating expenses, that such a tunnel be constructed with the least grade or depression possible which will avoid interference with navigation. This requirement oftentimes renders impracticable other and common types of structure because of the lack of adequate foundation-support. In my improved structure lthe desired results are attained at a minimum of cost and av maximum of strength and durability.
The building of my structure involves the use of a' subaqueous working-chamber built` in place over and around the tunnel-site, which working-chamber and the appliances and methods employed in connection therewith are covered by pending patent applications. By employing these improved means and methods I am able to construct a tunnel supported throughout its entire width upon piles penetrating to bed-rock or to any desired depth in other material. It is also supported by Walls of piles, either round or rectangular sawed timbers called sheetingf driven to like depth on each side of the structure and anchored thereto.- With such support it is unnecessary to-carry the tunnel to a greater depth than is requisite to avoid interference with navigation so long as adequate anchorage for the piles is secured in the bed of the body of water.
In the accompanying drawings, forming part of this specification, which illustrate my improved tunnel-structure and the manner in which it is constructed, Figure 1 is a crosssectional elevation of the working-chamber before the work of excavation has been commenced. Fig. 2 is a similar view showing the condition after excavation and after the .lay-
ing of the concrete tunnel-foundation. Fig.
i 3 is a longitudinal sectional elevation illustratin g the appearance and conditions shown in Figs. l and 2 and also a portion of the tunnel completed and ready for the removal of finished tunnel with the roof ofthe Workingchamber removed and the tunnel ready for4 l occupancy and use.
In the drawings, 2 represents the body of by dredgingalong the site of the proposed tunnei, and 4 the temporary bed of the stream 4formed by the covering of the working-chamber A. The dotted lines in this iigure indicate the piles driven on each side of the preliminary excavation, the platforms supported thereon, the guides `for directing ythe course of the sawed piles or sheeting when driven, and a driver located upon one of the platforms in the position in which it `stands while driving the sheeting. These various features are shown, described, and claimed in my other pending applications and need no further illustration herein.
The chamber A is formed by the walls of sheeting 5vand the roof 6, seated thereon, both substantially impervious to water. In the sheetings are driven down to bed-rock or to the'lowest required depth and are then cut off in a plane beneath the surface of the watersuftlciently above the top of the proposed tunnel structure to admit of convenient access and preliminary working in the chamber. After the roof has been seat-ed in place in order to assist in the sealing of the structure against the admission of water I preferably cover the chamber with earth in the manner shown in Fig. l. t or bulkheads of the chamber I prefer toemploy a double bulkhead, as illustrated in Fig. 3, although asingle wall of sheeting of the same character as the side walls may be employed. With this construction of bulkhead the space between its inner wall 7 andV its outer wall 8 I ll with earth to assist in For the end walls;
' thereof of the chamber; and Fig. 4 is a View similar to those of Figs. l and 2, showing the 'construction of this chamber the several ICO the sealing of the chamber, providing, if desired, a shaft 9 Within the bulkhead for access to the sheeting wall or entrance to the working-chamber. While `it is not always necessary, I regard it as a provision for safety in the construction of the working-chamber to drive into the bed'of the preliminary channel series of piles 10 to serve, first, as supports for the chamber-roof and for the framework hereinafter described and, finally, as the foundation for the tunnel. These piles are cut off at a suitable level, preferably a little below that of the top of the side walls of the chamber, and stayed and strengthened by braces 11 and their tops connected by cross-beams 12. The cross-beams 12 are on a level with the top of the sheeting walls, and these walls and cross-beams receive the beams 13 of the roof 6. The piles 10 also serve as supports for the framework B, which is made up preferably of cross-beams 14, braces 15, and the inner walings 16 and outer Walings 17, interspaced the thickness of the sheeting wall and serving as guides for the sheeting while being driven, the walings being vertically interspaced and supported by studs 18. For convenience in understanding the drawings .this framework B is omitted in Fig. 1.
.The chamber being completed, air is forced thereinto under sufficient pressure preferably to counterbalance the weight of the superposed waters and transmit the pressure of the same to the bed of the preliminary excavation, the contained water being pumped out. If quicksand or water is encountered in the excavating, the air-pressure may be increased to counterbalance the water-pressure down to the level of the bed of the excavatiomth us preventing the inflow ofthe quicksand or water. The bed of the channel between the sheeting walls is then excavated, as illustrated in Fig. 3, down tothe level 19 required for the foundation of the tunnel structure, additional bracing-framework, as illustrated by a single cross-beam 20 in Figj2, being added to the original framework B to laterally support the sheeting Walls. A foundation 21 of masonry is then laid in the bottom of the excavation around the piles 10, which are then cut off, as illustrated in Fig. 2, even with the top surface of the tunnel foundation or bed. The iron tubes 22 are then erected upon the foundation and the space around and above the same filled in with masonry, as shown in Figs. 3 and 4. As this work of filling in proceeds I prefer to secure in the sheeting walls inclined-headed bolts or spikes 23, which serve as efiicient anchors in the masonry, as illustrated in Figs. 2, 3, and 4. The tubes may be given a lining 24 of masonry of any desired thickness to strengthen the structure and to cover the flanges of the sections of the tube. As the masonry filling over the tubes is progressing I prefer to strengthen the structure by, means of tie-rods 25, extending through the walings 17 and sheeting walls, as shown in Fig. 4. This work being accomplished, the roof 6 may be removed and the surface of the bed of the stream over the tunnel leveled 0E, as illustrated in Fig. 4. While cylindrical tubes are preferably employed for single-track structures, where there are two or more tracks I prefer to employ, for the sake of strength and economy, tubes having a vertical intermediate wall or diaphragm 26, as shown in Fig. 4, the tubes being otherwise cylindrical. The structure is thus stronger, more compact, and requires much less excavation and masonry filling than if the tubes were independent and separated.
While I have shown the supporting-piles for the tunnel widely interspaced, it is evident that where the character of the soil or other reasons require a more solid support or foundation any desired number` of piles may be driven, even to the filling of the entire space with piles in contact with each other. It is also evident that instead of sawed sheeting for the inclosing walls of the structure series of piles may be used, other means being employed to make the walls of the chamber in which the work of excavation and construction can be carried on practically impervious to water, the finished structure being of the same general character and embodying the idea of my invention as fully as where sheeting walls are employed. It is also evident that it is within the scope of my invention by like methods and appliances to erect other kinds of masonry subaqueous structures.
I claim- 1. A subaqueous tunnel structure, having foundation and side walls of piles.
2. A subaqueous tunnel structure, having foundation and side walls of piles, embedded in or anchored thereto.
3. A subaqueous tunnel structure having .partially-inclosing side walls secured or anchored thereto and seated on bed-rock or penetrating other material to a depth below the tunnel structure.
4. Asubaqueousmasonrystructure,having foundation and side walls of piles embedded therein or anchored thereto.
5. A tunnel or other subaqueous masonry structure, having supporting-piles with their tops penetrating orembedded therein and side walls of piles anchored thereto.
6. A subaqueous tunnel, comprising a metallic tube, supporting side walls therefor, a pile foundation and a mass of masonry serving as a bed for said tube, said walls and piles being anchored to said masonry.
7. A subaqueous tunnel, consisting of masonry Walls surrounding the tunnel-passage, supporting-piles therefor having their tops embedded in or extended into said masonry, and vertical walls adjacent the sides of said tunnel and penetrating the earth below the same.
8. A subaqueous masonry structure formed in place between vertical sectional walls ex- IOU IIO
tending below said structure, and supported upon and embedding the tops of series of piles, and anchoring devices conneeting said Walls with said structure.
9. Asubaqneons tunnel structure, eo mpris` ing a mass of masonry, a tunnel-tube seated therein, and series of piles penetrating the earth beneath and extending into and along-V side of said masonry and anchored thereto.
10. A subaqueous tunnel structure, oo1nprising a mass of masonry ineiosing the tunnel-passage, foundation-piles embedded in said masonry, sheeting side Walls anchored to October, 1903.
DUN GAN D. MCBEAN. In presence of- J. T.`CRANE, T. D. MERWIN.
US17895003A 1903-10-28 1903-10-28 Subaqueous tunnel. Expired - Lifetime US745457A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US17895003A US745457A (en) 1903-10-28 1903-10-28 Subaqueous tunnel.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US17895003A US745457A (en) 1903-10-28 1903-10-28 Subaqueous tunnel.

Publications (1)

Publication Number Publication Date
US745457A true US745457A (en) 1903-12-01

Family

ID=2813953

Family Applications (1)

Application Number Title Priority Date Filing Date
US17895003A Expired - Lifetime US745457A (en) 1903-10-28 1903-10-28 Subaqueous tunnel.

Country Status (1)

Country Link
US (1) US745457A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4648743A (en) * 1984-11-26 1987-03-10 Gerhard Sauer Method of producing a subterranean structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4648743A (en) * 1984-11-26 1987-03-10 Gerhard Sauer Method of producing a subterranean structure

Similar Documents

Publication Publication Date Title
US3226933A (en) Sheeting wall system and method of constructing same
US1060271A (en) Method of building subaqueous tunnels.
US5145291A (en) Method for forming a piling beneath a structure
US745457A (en) Subaqueous tunnel.
US2213169A (en) Construction method for underground structures
US784413A (en) Subaqueous tunnel construction.
US933776A (en) Sinking shafts and the like.
US960940A (en) Art of constructing tunnels in the earth.
US1877351A (en) Trench bracing
US1093262A (en) Method of underpinning buildings.
US693235A (en) Piling.
US576843A (en) Richard s
US838389A (en) Method of constructing masonry structures.
US1129192A (en) Method of underpinning buildings.
US797524A (en) Subaqueous tunnel.
US745456A (en) Subaqueous tunnel.
US1163096A (en) Tunnel construction.
US1221067A (en) Tunnel and method of building same.
US745454A (en) Subaqueous working-chamber.
JPS6117636A (en) Fortification of ground bearing capacity using water-absorptive expandible concrete
US1049432A (en) Pier or wharf.
US745455A (en) Coffer-dam and foundation.
US1151958A (en) Tunnel construction.
US957844A (en) Constructing foundations of buildings.
US175158A (en) Improvement in submarine excavating apparatus