US7066247B2 - Methods and apparatus for drilling with a multiphase pump - Google Patents

Methods and apparatus for drilling with a multiphase pump Download PDF

Info

Publication number
US7066247B2
US7066247B2 US11/225,466 US22546605A US7066247B2 US 7066247 B2 US7066247 B2 US 7066247B2 US 22546605 A US22546605 A US 22546605A US 7066247 B2 US7066247 B2 US 7066247B2
Authority
US
United States
Prior art keywords
fluid
wellbore
plunger
gas
pumps
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US11/225,466
Other versions
US20060005999A1 (en
Inventor
Bryan V. Butler
Gregory H. Chitty
Darcy Nott
Jeffrey C. Saponja
Peter B. Moyes
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weatherford Technology Holdings LLC
Original Assignee
Weatherford Lamb Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weatherford Lamb Inc filed Critical Weatherford Lamb Inc
Priority to US11/225,466 priority Critical patent/US7066247B2/en
Publication of US20060005999A1 publication Critical patent/US20060005999A1/en
Application granted granted Critical
Publication of US7066247B2 publication Critical patent/US7066247B2/en
Assigned to JPMORGAN CHASE BANK, N.A., AS ADMINISTRATIVE AGENT reassignment JPMORGAN CHASE BANK, N.A., AS ADMINISTRATIVE AGENT SECURITY INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: WEATHERFORD/LAMB, INC.
Assigned to JPMORGAN CHASE BANK, N.A., AS ADMINISTRATIVE AGENT reassignment JPMORGAN CHASE BANK, N.A., AS ADMINISTRATIVE AGENT CONFIRMATORY GRANT OF SECOND LIEN SECURITY INTEREST IN UNITED STATES PATENTS Assignors: WEATHERFORD TECHNOLOGY HOLDINGS, LLC
Assigned to WEATHERFORD/LAMB, INC. reassignment WEATHERFORD/LAMB, INC. TERMINATION AND RELEASE OF SECURITY INTEREST IN UNITED STATES PATENTS Assignors: JPMORGAN CHASE BANK, N.A., AS ADMINISTRATIVE AGENT
Assigned to CITIBANK, N.A. reassignment CITIBANK, N.A. SECURITY INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: WEATHERFORD TECHNOLOGY HOLDINGS, LLC
Assigned to WEATHERFORD TECHNOLOGY HOLDINGS, LLC reassignment WEATHERFORD TECHNOLOGY HOLDINGS, LLC ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: WEATHERFORD/LAMB, INC.
Assigned to WEATHERFORD TECHNOLOGY HOLDINGS, LLC reassignment WEATHERFORD TECHNOLOGY HOLDINGS, LLC TERMINATION AND RELEASE OF SECOND LIEN SECURITY INTEREST IN UNITED STATES PATENTS PREVIOUSLY RECORDED AT REEL/FRAME (049677/0904) Assignors: JPMORGAN CHASE BANK, N.A., AS ADMINISTRATIVE AGENT
Assigned to WEATHERFORD TECHNOLOGY HOLDINGS, LLC reassignment WEATHERFORD TECHNOLOGY HOLDINGS, LLC RELEASE BY SECURED PARTY (SEE DOCUMENT FOR DETAILS). Assignors: CITIBANK, N.A.
Assigned to WELLS FARGO BANK NATIONAL ASSOCIATION AS AGENT reassignment WELLS FARGO BANK NATIONAL ASSOCIATION AS AGENT SECURITY INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: HIGH PRESSURE INTEGRITY INC., PRECISION ENERGY SERVICES INC., PRECISION ENERGY SERVICES ULC, WEATHERFORD CANADA LTD., WEATHERFORD NETHERLANDS B.V., WEATHERFORD NORGE AS, WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH, WEATHERFORD TECHNOLOGY HOLDINGS LLC, WEATHERFORD U.K. LIMITED
Assigned to DEUTSCHE BANK TRUST COMPANY AMERICAS, AS ADMINISTRATIVE AGENT reassignment DEUTSCHE BANK TRUST COMPANY AMERICAS, AS ADMINISTRATIVE AGENT SECURITY INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: HIGH PRESSURE INTEGRITY, INC., PRECISION ENERGY SERVICES ULC, PRECISION ENERGY SERVICES, INC., WEATHERFORD CANADA LTD., WEATHERFORD NETHERLANDS B.V., WEATHERFORD NORGE AS, WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH, WEATHERFORD TECHNOLOGY HOLDINGS, LLC, WEATHERFORD U.K. LIMITED
Assigned to WEATHERFORD NORGE AS, HIGH PRESSURE INTEGRITY, INC., WEATHERFORD CANADA LTD., PRECISION ENERGY SERVICES ULC, WEATHERFORD NETHERLANDS B.V., WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH, WEATHERFORD TECHNOLOGY HOLDINGS, LLC, PRECISION ENERGY SERVICES, INC., WEATHERFORD U.K. LIMITED reassignment WEATHERFORD NORGE AS RELEASE BY SECURED PARTY (SEE DOCUMENT FOR DETAILS). Assignors: WELLS FARGO BANK, NATIONAL ASSOCIATION
Assigned to WELLS FARGO BANK, NATIONAL ASSOCIATION reassignment WELLS FARGO BANK, NATIONAL ASSOCIATION PATENT SECURITY INTEREST ASSIGNMENT AGREEMENT Assignors: DEUTSCHE BANK TRUST COMPANY AMERICAS
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/001Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor specially adapted for underwater drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/06Arrangements for treating drilling fluids outside the borehole
    • E21B21/063Arrangements for treating drilling fluids outside the borehole by separating components
    • E21B21/065Separating solids from drilling fluids
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/06Arrangements for treating drilling fluids outside the borehole
    • E21B21/063Arrangements for treating drilling fluids outside the borehole by separating components
    • E21B21/067Separating gases from drilling fluids
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/08Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
    • E21B21/085Underbalanced techniques, i.e. where borehole fluid pressure is below formation pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/10Valve arrangements in drilling-fluid circulation systems
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/34Arrangements for separating materials produced by the well
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/12Underwater drilling
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B43/00Machines, pumps, or pumping installations having flexible working members
    • F04B43/08Machines, pumps, or pumping installations having flexible working members having tubular flexible members
    • F04B43/10Pumps having fluid drive

Definitions

  • the present invention generally relates to apparatus and methods used to transport hydrocarbons from a wellbore to another location. More particularly, the invention relates to a multiphase pump for removing hydrocarbons and other material from the wellbore.
  • a wellbore is formed in the earth to access hydrocarbon bearing formations.
  • a relatively light weight medium with a gas constituent is circulated through the wellbore to cool the drill bit and remove cuttings from the wellbore.
  • the drilling material, gas, and cuttings which are referred to here as “wellbore fluid” is circulated back to the surface of the wellbore.
  • the wellbore fluid is then transported by a flowline to a separator where it may be separated into gas, liquids, and solids. If the wellbore fluid does not have adequate energy to flow to the separator, it may be pumped by a multiphase pump.
  • the multiphase pumps are capable of moving volumes of the oil, gas, water, solids, and other substances making up the wellbore fluid.
  • the multiphase pumps can be connected to a single or multiple wellheads through the use of a manifold.
  • An exemplary multiphase pump is described in U.S. patent application Ser. No. 10/036,737, filed on Dec. 21, 2001, which is herein incorporated by reference in its entirety.
  • the under-balanced drilling operation requires at least one large separator to be present on location to handle the wellbore fluid during the drilling operation.
  • the gas phase is separated and then usually flared or re-injected into the wellbore while the solid and liquid phases are captured for re-use and/or disposal.
  • the separator does its job effectively, it is costly to rent, transport, and personnel costs on location are high. Additionally, the physical size of the separator occupies valuable well site real estate that could be used for other necessary oilfield equipment.
  • a floating vessel and a riser pipe are used to connect surface drilling equipment to a sub-sea wellhead located at the sea floor.
  • the riser pipe is typically filled with returning drilling fluid resulting in a relatively large hydrostatic pressure due to the length of the riser.
  • This hydrostatic pressure in the riser combined with additional pressure brought about by the circulation friction of the fluid, combines to form an equivalent circulating density “ECD”.
  • ECD equivalent circulating density
  • the ECD can exceed the fracture pressure of the formation adjacent the wellbore permitting drilling fluids to enter the formation. Permanent damage to the formation and loss of expensive drilling fluid is a typical result of fracturing the formation due to the effects of ECD.
  • the oilfield industry has attempted to solve the ECD problem in offshore drilling operations with an operation known as “pump and dump”.
  • the cuttings and mud used to drill the sub-sea wellbore are not returned in a riser but are separated at the sea floor.
  • the mud is returned to the surface of the well via a separate line while the solids are allowed to flow out on to the seabed and remain there.
  • the present invention generally relates to an apparatus and method for removing hydrocarbons and other material from a wellbore.
  • a method of drilling a sub-sea wellbore includes circulating a drilling fluid through a drill string from a surface of the sea to a drill bit in the wellbore.
  • the method further includes pumping the fluid and drill cuttings from the sea floor to the surface with a multiphase pump having at least two plungers operating in a predetermined phase relationship.
  • a fluid separator system having a first and a second plunger assembly.
  • the fluid separator system includes at least one fluid line for removing a fluid portion from the at least one plunger assembly and at least one gas line for removing gas from the at least one plunger assembly.
  • FIG. 1 is a cross-sectional view illustrating a multi-phase pump of this present invention disposed on the sea floor adjacent to a sub-sea wellbore.
  • FIG. 2 is a cross-sectional view illustrating the multiphase pump communicating wellbore fluid to a discharge line during a pump cycle.
  • FIG. 3A is a cross-sectional view illustrating a plunger assembly with a plunger in a retracted position.
  • FIG. 3B is a cross-sectional view illustrating the plunger assembly with the lower chamber filled with wellbore fluid.
  • FIG. 3C illustrates the pressurizing of the gas as the plunger moves toward the retracted position.
  • FIG. 3D illustrates the pressurized gas venting from the lower chamber into a gas line and subsequently into the discharge line.
  • FIG. 3E illustrates fluid venting from the lower chamber through the gas line and the fluid line.
  • FIG. 4 is an alternative embodiment of a gas anti-lock arrangement for use with a plunger assembly.
  • FIG. 5 is a cross-sectional view illustrating an alternative embodiment of a plunger assembly with an internal piston and position control.
  • FIG. 6 is a cross-sectional view illustrating a multi-phase pump disposed on a riser system.
  • FIG. 7 is a cross-sectional view illustrating a multi-phase pump system disposed adjacent a surface wellbore.
  • FIG. 8 is a cross-sectional view taken along line 8 — 8 of FIG. 7 to illustrate an enlarged chamber.
  • FIG. 9 is a cross-sectional view illustrating an alternative embodiment of a multi-phase pump system for use with a surface wellbore.
  • FIG. 10 is a cross-sectional view illustrating an alternative embodiment of a multi-phase pump system.
  • FIG. 11 is a cross-sectional view illustrating an alternative embodiment of a multi-phase pump system.
  • the present invention generally relates to a multi-phase pump for use in forming a wellbore.
  • the multi-phase pump is located on a sea floor to facilitate the removal of circulating fluid and cuttings by returning the fluid and cuttings to a platform or a floating vessel.
  • the multi-phase pump may be employed in an underbalanced drilling operation of an onshore wellbore. In this aspect, the multi-phase pump removes hydrocarbons and separates the gas portion from the liquid portion.
  • FIG. 1 is a cross-sectional view illustrating a multi-phase pump 200 of the present invention disposed on a sea floor 135 adjacent to a sub-sea wellbore 100 .
  • the drilling system in FIG. 1 shows only one multi-phase pump 200 disposed on the sea floor 135 , any number of pumps may be employed in accordance with this present invention.
  • the equipment can be mounted on a standard guide base, or alternately, be mounted integrally to a special riser joint as discussed in a subsequent paragraph.
  • these plunger assemblies 300 , 350 may individually be run into place or individually retrieved.
  • this aspect of the invention will first be described generally with respect to FIG. 1 , thereafter more specifically with FIGS. 2–7 .
  • a rotating control head 115 seals the rotating drill string 105 .
  • other components may be located at the sea floor to protect against a blow out such as a shear (not shown) and a ram (not shown).
  • An annulus 130 is formed between the wellbore 100 and the drill string 105 and provides a passageway for removal of drill cuttings and mud during the formation of the wellbore 100 .
  • An outlet 125 disposed below the rotating control head 115 connects the annulus 130 to a fluid passageway 205 .
  • the fluid passageway 205 provides fluid communication between the annulus 130 and the multi-phase pump 200 .
  • wellbore fluid As the drill cuttings, mud, and other fluid all of which will be referred to as “wellbore fluid” exits the wellbore 100 , they are urged through the fluid passageway 205 by circulation pressure. Thereafter, the wellbore fluid is pumped via the multiphase pump 200 through a discharge line 220 to the floating vessel 120 where the wellbore fluid can be separated, reused, or properly disposed of by means known in the art.
  • a high-pressure power fluid is supplied through a high pressure fluid line 215 to operate the multiphase pump 200 .
  • the power fluid is seawater that is pumped from the floating vessel 120 to the multiphase pump 200 at an initial operating pressure.
  • the seawater increases in pressure due to a pressure gradient force of the seawater.
  • the high pressure seawater is expelled to the sea, eliminating the need to bring it back to the surface.
  • another power fluid with a higher pressure gradient force than seawater may be employed with the multiphase pump 200 .
  • Such an alternative power fluid can increase the efficiency of the system by reducing the required amount of initial operating pressure supplied by the floating vessel 120 .
  • the high pressure fluid line 215 supplies power fluid to either one of the plunger assemblies 300 , 350 during the pumping cycle. For instance, as the first plunger assembly 300 is expelling wellbore fluid into the discharge line 220 , the fluid line 215 will supply power fluid to assembly 300 via a fluid line 225 . Conversely, as the second plunger assembly 350 is expelling wellbore fluid into the discharge line 220 , the fluid line 215 will supply power fluid to second plunger assembly 350 via a fluid line 230 .
  • top hole drilling maintains a required wellbore pressure gradient in a riserless drilling mode, using the rotating control head 115 and the multiphase pump 200 to mitigate various pressure related geotechnical hazards at shallow penetration depths, such as pressured water and gas sands. Additionally, top hole drilling mitigates mud loss and formation fracturing by controlling the pressure on the wellbore 100 using the multiphase pump 200 as a choke and a lift pump to reduce the hydrostatic pressure effect of a mud column. Typically, the top hole drilling operation forms the wellbore 100 to predetermined depth before arriving at the target hydrocarbons. Therefore, the top hole drilling operation requires minimal sub-sea wellbore equipment, such as the rotating control head 115 , to isolate the wellbore 100 from the sea.
  • FIG. 2 is a cross-sectional view illustrating the multiphase pump 200 communicating wellbore fluid to the discharge line 220 during a pump cycle.
  • the multiphase pump 200 contains a first plunger 235 and a second plunger 240 , each movable between an extended position and a retracted position within the plunger assemblies 300 , 350 , respectfully.
  • a first lower valve 265 and a first upper valve 260 controls the movement of the first plunger 235 while the movement of the second plunger 240 is controlled by a second lower valve 275 and a second upper valve 270 .
  • the valves 260 , 265 , 270 , 275 are slide valves and can operate even in the presence of solids.
  • the valves 260 , 265 , 270 , 275 are constructed and arranged to permit solids to pass through the valve while open but will break up solids if necessary to effectively close.
  • the valves 260 , 265 , 270 , 275 are synchronized and typically operated by a sub-sea pilot valve (not shown). During operation, the lower valves 265 , 275 allow wellbore fluid from the fluid passageway 205 to fill and vent the first lower chamber 245 and a second lower chamber 255 , respectfully.
  • the upper valves 260 , 270 allow high pressure power fluid from the fluid lines 225 , 230 to fill and vent a first upper chamber 340 and a second upper chamber 345 , respectfully.
  • the first plunger 235 moves toward the extended position as wellbore fluid and pressure enters through the valve 265 to fill the first lower chamber 245 with fluid from the fluid passageway 205 .
  • the pressurized, circulating drilling fluid is used to urge the plunger 235 upward.
  • power fluid in the first upper chamber 340 vents through an outlet 285 of the upper valve 260 into the surrounding sea.
  • the second plunger 240 moves in an opposite direction toward the retracted position as power fluid from the fluid line 230 flows through valve 270 and fills the upper chamber 345 , thereby expelling the wellbore fluid in the second lower chamber 255 through the lower valve 275 and into the discharge line 220 .
  • the plungers operate as a pair of substantially counter-synchronous fluid pumps. While the described embodiment includes plungers acting in a counter-synchronous manner, it will be understood that so long as they move in a predetermined way relative to one another, a predetermined phase relationship, the plungers can assume any position as they operate.
  • the plungers 235 , 240 move in opposite directions causing continuous flow of fluid from the fluid passageway 205 to the discharge line 220 .
  • the plungers 235 , 240 will slow down, stop, and accelerate in the opposite direction.
  • This pause of the plungers 235 , 240 could introduce undesirable changes in the back pressure on the annulus of the sub-sea wellbore (not shown), since the inlet flow passageway 205 is directly connected to the flow of fluid and solids coming up the wellbore. Therefore, a pulsation control assembly 250 is employed in the multiphase pump 200 to control backpressure due to change of direction of plungers 235 , 240 during the pump cycle.
  • the pulsation control assembly 250 is a gas filled accumulator that is connected to the inlet line of both plunger assemblies 300 , 350 by a pulsation port 385 .
  • the in flow pressure will enter through the port 385 and slightly fill the pulsation control assembly 250 .
  • the flow coming from the wellbore annulus will increase its pressure slightly driving an accumulator piston 355 further up and into pulsation control assembly 250 as it tries to balance pressures across the piston 355 .
  • the opposite plunger 240 begins to increase its intake speed, causing the inlet pressure to drop slightly, which will allow the stored fluid in the pulsation control assembly 250 to come back out through port 385 . This process will repeat itself throughout the pump cycle as each plunger reverses stroke.
  • a single seal assembly 280 is disposed around the plungers 235 , 240 to accommodate fluid and solids as well as seawater.
  • This seal assembly 280 includes a method to constantly scrape and polish the plungers 235 , 240 , and can eliminate solid particles from the seal assembly 280 area thereby insuring its useful life and protecting the sealing elements.
  • the seal assembly 280 includes a plurality of rings 365 that are disposed on either side of a sealant 360 .
  • the sealant 360 is replenished by a mechanism well known in the art.
  • the sealant may also be remotely injected during pump operations to replenish and improve its life expectancy.
  • the multi-phase pump 200 further includes a first gas line 325 and a second gas line 330 disposed on the first plunger assembly 300 and second plunger assembly 350 , respectfully.
  • the gas lines 325 , 330 are used to prevent gas lock of the plungers 235 , 240 during operation of the multi-phase pump 200 .
  • the first gas line 325 connects an auxiliary gas port 370 at the upper end of the lower chamber 245 to the discharge line 220 .
  • the second gas line 330 connects an auxiliary gas port 375 at the upper end of the lower chamber 255 to the discharge line 220 .
  • gas entering the multiphase pump 200 from the fluid passageway 205 will be compressed by the plungers 235 , 240 and thereafter expelled from the lower chambers 245 , 255 through the ports 370 into the discharge line 220 .
  • FIGS. 3A–3E illustrates cross-sectional views of an anti-gas lock arrangement employed in a plunger assembly 400 .
  • the anti-gas lock arrangement will be illustrated on a single plunger assembly 400 .
  • this anti-lock arrangement may apply to any number of plunger assemblies and applies equally to the first plunger assembly 300 and second plunger assembly 350 as discussed in FIGS. 1 and 2 .
  • FIG. 3A is a cross-sectional view illustrating a plunger assembly 400 with a plunger 405 in a retracted position.
  • the plunger 405 moves from the retracted position to the extended position as wellbore fluid from the wellbore line 440 enters through inlet 420 to fill a lower chamber 430 as illustrated in FIG. 3B .
  • the vertical disposition of the plunger assembly 400 disposes the solids and liquids to remain at or near the lower portion of the chamber 430 .
  • plunger 435 descends, it compresses the gas by displacing the liquids around the plunger 435 .
  • FIG. 3C illustrates the pressurizing of the gas as the plunger 405 moves toward the retracted position.
  • a force is applied at the upper end of the plunger 405 causing the plunger 405 to move axially downward.
  • the force may be supplied by the introduction of power fluid into the upper chamber 345 as discussed in a previous paragraph or by any other means well known in the art.
  • the downward movement of the plunger 405 compresses the gas at the upper end of the lower chamber 430 .
  • FIG. 3D illustrates the pressurized gas venting from the lower chamber 430 into a gas line, 415 and subsequently into the discharge line 440 .
  • the plunger 405 compresses the gas until the gas pressure equals the discharge pressure.
  • a valve 445 opens up allowing gas to enter the gas line 415 . Thereafter, the gas flows through the gas line 415 into the discharge line 440 .
  • FIG. 3E illustrates fluid venting from the lower chamber 430 through the gas line 415 and the fluid line 455 .
  • the liquid enters the gas line 415 through the valve 445 causing an increase in the chamber pressure.
  • valve 460 opens allowing any remaining liquid in the lower chamber 430 to enter the discharge line 440 .
  • the plunger 405 reaches the retracted position as shown in FIG. 3A thus completing a pump cycle.
  • FIG. 4 is an alternative embodiment of a gas anti-lock arrangement for use with a plunger assembly 450 .
  • the plunger assembly 450 pressurizes the gas in a lower chamber 485 as a plunger 470 moves toward the retracted position.
  • an internal gas tube 475 is disposed in a plunger chamber 465 to communicate the pressurized gas to a discharge line 480 instead of an external gas line.
  • wellbore fluid and pressure enters the chamber 485 to move a plunger 470 toward the extended position.
  • the vertical disposition of the plunger assembly 450 naturally separates the fluids from the gas by disposing the solids and liquids at or near the lower portion of the chamber 485 while collecting the gas at the upper portion of the plunger chamber 465 .
  • the gas becomes pressurized.
  • the gas pressure equals the discharged pressure
  • the gas is communicated through the tube 475 to the discharge line 480 .
  • the liquid portion flows through the tube 475 to urge any remaining gas in the tube 475 into the discharge line 480 . This sequence of events occurs throughout the pump cycle.
  • FIG. 5 is a cross-sectional view illustrating an alternative embodiment of a plunger assembly 500 .
  • the plunger assembly 500 utilizes a gas tube 525 to communicate gas from a plunger chamber 535 to a discharge line 545 .
  • a hydraulic arrangement is utilized to move a plunger 530 to the extended position instead of relying solely on wellbore fluid as described in the previous embodiments.
  • the hydraulic arrangement includes a hydraulic chamber 515 disposed at the upper end of the plunger 530 .
  • the hydraulic chamber 515 is separated from the gas tube 525 by a seal arrangement 520 .
  • the fluid becomes pressurized, thereby creating a force on the plunger 530 .
  • This fluid force urges the plunger 530 axially upward toward the extended position.
  • wellbore fluid enters and fills the lower chamber 540 .
  • the plunger 530 reverses direction and moves toward the retracted position displacing the fluid in the chamber 515 through the control line 505 .
  • the pressurized gas in the plunger chamber 535 is communicated through a port 555 into the gas tube 525 and subsequently into the discharge line 545 . This sequence of events occurs repeatively as the pump cycles.
  • FIG. 6 is a cross-sectional view illustrating a multi-phase pump 600 disposed on a riser system 650 .
  • the same number designation will be used for the components in the multi-phase pump 600 that are similar to the components in the multi-phase pump 200 as described in FIGS. 1 and 2 .
  • the first plunger 235 is moving toward the extended position as wellbore fluid and pressure enters through the valve 265 to fill the first lower chamber 245 .
  • wellbore fluid enters the multi-phase pump 600 through a fluid outlet 610 formed in a riser pipe 605 .
  • the pressure of the head of drilling fluid in the riser above the fluid outlet 610 is used to urge plunger 235 upward.
  • power fluid in the first upper chamber 340 vents through an outlet 285 of the upper valve 260 into the surrounding sea.
  • the second plunger 240 is moving in an opposite direction toward the retracted position as power fluid from the fluid line 230 flows through valve 270 and fills the upper chamber 345 , thereby expelling the wellbore fluid in the second lower chamber 255 through the lower valve 275 into the discharge line 220 .
  • the second plunger 240 then reaches its retracted position, thereby completing a cycle.
  • the first plunger 235 then moves toward the retracted position as power fluid from the fluid line 225 flows through the valve 260 and fills the upper chamber 340 , thereby expelling the wellbore fluid in the lower chamber 245 into the discharge line 220 , as the second plunger 240 moves toward the extended position filling the second lower chamber 255 with wellbore fluid from the fluid outlet 610 .
  • the plungers 235 , 240 are constantly scraped and polished by a seal assembly 280 to eliminate solid particles thereby insuring the useful life of the multi-phase pump 600 .
  • the multi-phase pump 600 further includes a first gas line 325 and a second gas line 615 disposed on the first plunger assembly 300 and second plunger assembly 350 , respectfully.
  • the gas lines 325 , 615 are used to prevent gas lock of the plungers 235 , 240 during operation of multi-phase pump 600 and represent alternative methods of gas removal.
  • the first gas line 325 connects an auxiliary gas port 370 at the upper end of the lower chamber 245 to the discharge line 220 .
  • the second gas line 615 connects an auxiliary gas port 375 at the upper end of the lower chamber 255 to a riser port 620 formed in the riser pipe 605 .
  • wellbore fluid gas enters the multiphase pump 600 through the fluid outlet 610 .
  • the vertical disposition of the plunger assembly 300 disposes the solids and liquids to remain at or near the lower portion of the chamber 245 while the gas migrates to the upper portion of the chamber 245 .
  • the natural separation of the phases permits the solids and liquids to be discharged first through the lower valve 265 into a discharge line 220 .
  • the plunger 235 compresses the gas until the gas pressure equals the discharge pressure in the discharge line 220 .
  • gas enters the gas line 325 and subsequently into the discharge line 220 .
  • the liquid rises and enters the gas line 325 and the increase in pressure then causes the liquids and solids to discharge through lower valve 275 into the discharge line 220 .
  • the second plunger assembly 350 compresses and vents the gas out of the lower chamber 255 in a similar manner as the first plunger assembly 300 .
  • the gas from the second plunger assembly 350 is directed through a port 620 into the riser pipe 605 instead of the discharge line 220 .
  • a valve member (not shown) is employed between the plunger assembly 350 and the riser pipe 605 to restrict the flow of gas through the gas line 615 until the gas in the lower chamber 255 equals the discharge pressure in the discharge line 220 . At this point, gas enters the gas line 615 and subsequently into the riser pipe 605 .
  • a multi-phase pump may be employed in an under balanced drilling operation of a surface wellbore to separate a gas portion of a wellbore fluid from a liquid portion.
  • FIG. 7 is a cross-sectional view illustrating a multi-phase pump system 700 disposed adjacent a surface wellbore 750 .
  • the multiphase pump system 700 contains a first plunger 705 and a second plunger 715 , each movable between an extended position and a retracted position.
  • a first pair of hydraulic cylinders 710 controls the movement of the first plunger 705
  • a second pair of hydraulic cylinders 720 controls the movement of the second plunger 715 .
  • the multiphase pump system 700 may also be operated by a single cylinder attached to each plunger 705 , 715 .
  • the hydraulic cylinders 710 , 720 are synchronized and operated by an external control (not shown).
  • the first plunger 705 moves toward the extended position, a suction is created by the plunger 705 urging the wellbore fluid from the wellbore line 755 to enter the multi-phase pump system 700 .
  • the wellbore fluid enters through an inlet 725 into an enlarged chamber 805 that is formed on a lower portion of a first plunger chamber 730 .
  • the enlarged chamber 805 is a substantially circular shape and the inlet 725 is constructed and arranged to direct the wellbore fluid tangentially into the enlarged chamber 805 .
  • the wellbore fluid enters the enlarged chamber 805 tangentially resulting in the spinning of the fluid and the creation of a centrifugal force that promotes the separation of the gas portion from the fluid portion of the wellbore fluid.
  • the density differential between the gas and the liquid naturally separates the two phases in the chamber 730 .
  • the second plunger 715 moves in an opposite direction toward a preset retracted position, thereby expelling the wellbore fluid in a second plunger chamber 740 and the enlarged chamber 805 to an outlet 735 .
  • the first plunger 705 reaches its full extended position
  • the second plunger 715 then reaches its preset retracted position, thereby completing a cycle.
  • the first plunger 705 then moves toward the preset retracted position expelling the wellbore fluid into an outlet 825 , as the second plunger 715 moves toward the extended position creating a suction and urging the wellbore fluid to enter an inlet 745 .
  • the plungers 705 , 715 operate as a pair of substantially counter synchronous fluid pumps. While the described embodiment includes plungers acting in a counter-synchronous manner, it will be understood that so long as they move in a predetermined way relative to one another, a predetermined phase relationship, the plungers can assume any position as they operate.
  • the hydraulic pump system 700 further includes a plurality of ports 760 in fluid communication with the plunger chamber 730 and a plurality of ports 775 in fluid communication with the plunger chamber 740 .
  • the ports 760 , 775 act as a passageway to facilitate the removal of the wet gas from the chambers 730 , 740 during the pump cycle.
  • one port 760 on the first plunger chamber 730 is in communication with one port 775 on the second plunger chamber 740 while the remaining ports 760 , 775 are plugged.
  • the percentage of liquid and the percentage of wet gas in the wellbore fluid determines which of the ports 760 , 775 are used and which of the ports 760 , 775 are plugged.
  • the upper ports 760 , 775 are used. Conversely, if the wellbore fluid contains a high percentage of wet gas, then the lower ports 760 , 775 are used.
  • a first check valve 780 is connected to the functioning port 760 in the first plunger chamber 730 and a second check valve 785 is connected to the functioning port 775 in the second plunger chamber 740 .
  • the check valves 780 , 785 are constructed and arranged to open at a predetermined pressure.
  • the check valves 780 , 785 prevent the wet gas from exiting the chambers 730 , 740 until the predetermined pressure is reached. At that time, the wet gas flows through the ports 760 , 775 into a wet gas line 765 .
  • the check valves 780 , 785 prevent the wet gas from returning to the chambers 730 , 740 after it exits through the ports 760 , 775 .
  • the upper ports 760 , 775 are in communication with the wet gas line 765 .
  • the wet gas leaving the multiphase pump system 700 is typically at a low pressure. Therefore, it would be desirable to increase the pressure of the wet gas.
  • the wet gas may include three different phases, namely, solid, liquid, and wet gas. Therefore, a second multiphase pump (not shown) may be connected to the wet gas line 765 to boost the pressure of the wet gas. Even though the wet gas contains three phases, the second multiphase pump may effectively increase the pressure of the wet gas in the wet gas line 765 and then recycle the wet gas back to a well inlet 770 . Further, the second multiphase pump will allow recovery or recycling of low pressure gas.
  • a flare line (not shown) may be connected to the wet gas line 765 .
  • the flare line may be used to discharge excess wet gas in the wet gas line 765 .
  • the flare line may direct the excess wet gas to a flare stack or a collecting unit for other manners of disposal.
  • a fluid line 790 is disposed at the lower end of the hydraulic pump system 700 .
  • a control 795 is connected between the outlets 735 , 825 and the fluid line 790 to control the timing and amount of fluid discharge.
  • the control 795 includes a flow meter or a feed back loop that controls the fluid flow based upon the pressure differential of the fluid. For instance, if the control 795 senses that wet gas from the chambers 730 , 740 is being discharged through the outlets 735 , 825 then the control 795 will close the outlets 735 , 825 to force the wet gas through the ports 760 , 775 and eventually into the wet gas line 765 .
  • control 795 senses that fluid from the chambers 730 , 740 is being discharged through the outlets 735 , 825 then the control 795 will keep the outlets 735 , 825 open so that all the fluid in the multiphase pump system 700 exits into the fluid line 790 .
  • the exiting fluid may be recycled for use during the drilling operation or be sent to a secondary separator (not shown) to separate out any gas remaining in the fluid before delivering it to another fluid supply (not shown).
  • the multi-phase pump system 700 further includes a single seal assembly 810 disposed around the plungers 705 , 715 to accommodate mud and solids as well as liquids.
  • This seal assembly 810 includes a method to constantly scrape and polish the plungers 705 , 715 and can eliminate solid particles from the seal assembly 810 area, thereby insuring its useful life and protecting the sealing elements.
  • the seal assembly 810 includes a plurality of rings 815 that are disposed on either side of a sealant 820 .
  • the rings 815 scrape and polish the plungers 705 , 715 .
  • the sealant 820 is replenished by a mechanism well known in the art.
  • the sealant may also be remotely injected during pump operations to replenish and improve its life expectancy.
  • FIG. 9 is a cross-sectional view illustrating an alternative embodiment of a multi-phase pump system 900 for use with a surface wellbore 750 .
  • the same number designation will be used for the components in the multi-phase pump system 900 that are similar to the components in the multi-phase pump system 700 as described in FIG. 7 .
  • the multi-phase pump system 900 has similar components and operates in a similar manner as the multi-phase system 700 .
  • the multiphase pump system 900 contains a first plunger 705 and a second plunger 715 , each movable between an extended position and a retracted position.
  • the plungers 705 , 715 operate as a pair of substantially counter synchronous fluid pumps.
  • an annulus 905 is created between the outside diameter of the plungers 705 , 715 and the inner diameter of the chambers 730 , 740 . This arrangement permits wet gas to fill the annulus 905 as the plungers 705 , 715 alternately move toward in their extended position.
  • the wet gas in the annulus 905 then becomes pressurized as the plungers 705 , 715 alternately move to their retracted position.
  • the gas in the annulus 905 increases in pressure until the predetermined pressure of the check valve 780 is reached. At that point, the wet gas is permitted to exit through a wet gas outlet 910 and subsequently into the wet gas line 765 .
  • FIG. 10 is a cross-sectional view illustrating an alternative embodiment of a multi-phase pump system 925 .
  • the same number designation will be used for the components in the multi-phase pump system 925 that are similar to the components in the multi-phase pump system 700 as described in FIG. 7 .
  • the multi-phase pump system 925 has similar components and operates in a similar manner as the multi-phase system 700 .
  • the pump system 925 includes a plunger 930 having a tapered end 935 that is constructed and arranged to mate with a tapered removable bottom 940 having a deflector plate 945 attached thereto.
  • a gas hose 960 is operatively attached to a plunger bore 955 .
  • the plunger 930 moves upward, wellbore fluid enters the inlet 725 and contacts the deflector plate 945 . At this point, the solids and liquids migrate toward a lower end of the tapered removable bottom 940 while the gas migrates towards the top of the plunger chamber 730 .
  • a control arrangement closes the flow path through the plunger bore 955 as the solids and liquids are discharged.
  • FIG. 11 is a cross-sectional view illustrating an alternative embodiment of a multi-phase pump system 950 .
  • the same number designation will be used for the components in the multi-phase pump system 950 that are similar to the components in the multi-phase pump system 700 as described in FIG. 7 .
  • the multi-phase pump system 950 has similar components and operates in a similar manner as the multi-phase system 700 . However, in this arrangement, a liquid level 975 is maintained at a predetermined level in the enlarged chamber 805 . The primary reason for maintaining the liquid level 975 is to minimize the amount of gas discharge through the outlet 825 .
  • the plunger 965 includes a tapered end 970 that is constructed and arranged to mate with a tapered profile 980 formed at the lower end of the enlarged chamber 805 . Thereafter, the solids and liquids migrate toward the bottom of the enlarged chamber 805 , while the gas migrates into the plunger chamber 730 .
  • the liquid level 975 is monitored by a control mechanism (not shown), such as a level sensor, valve arrangement, or other means well known in the art. If the control mechanism senses that the liquid level 975 is above the predetermined level, then a liquid outlet 985 opens to permit excess liquid to drain out of the enlarged portion 805 . Conversely, if the control mechanism senses that the liquid level is below the predetermined level, the liquid outlet 960 remains closed to permit additional liquid buildup in the enlarged portion 805 .
  • the plunger 965 compresses the gas in the plunger chamber 730 and displaces it into the liquid in the enlarged portion 805 .
  • the gas will compress further until the valve 780 opens, thereby allowing the gas to exit the plunger chamber 730 into the wet gas line 765 .
  • the liquid will rise in the plunger chamber 730 to a point just below the activated gas port 760 .
  • a check valve opens and allows a slurry comprising of the solids and a portion of the liquid to be discharged through the outlet 825 .
  • the slurry flows into a separator (not shown) to separate the liquids from the solids. At this point, the liquids may be recycled back into the multi-phase pump system 950 to maintain the liquid level 975 .

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Details Of Reciprocating Pumps (AREA)
  • Reciprocating Pumps (AREA)

Abstract

The present invention generally relates to an apparatus and method for removing hydrocarbons and other material from a wellbore. In one aspect, a method of drilling a sub-sea wellbore is provided. The method includes circulating a drilling fluid through a drill string from a surface of the sea to a drill bit in the wellbore. The method further includes pumping the fluid and drill cuttings from the sea floor to the surface with a multiphase pump having at least two plungers operating in a predetermined phase relationship. In another aspect, a fluid separator system having a first and a second plunger assembly is provided. The fluid separator system includes at least one fluid line for removing a fluid portion from the at least one plunger assembly and at least one gas line for removing gas from the first and a second plunger assembly.

Description

CROSS-REFERENCE TO RELATED APPLICATIONS
This application is a divisional of U.S. patent application Ser. No. 10/606,652, filed Jun. 26, 2003 now U.S. Pat. No. 6,966,367, which claims benefit of U.S. patent application Ser. No. 10/156,722, filed May 28, 2002, now U.S. Pat. No. 6,837,313, which claims benefit of U.S. patent application Ser. No. 09/914,338, filed Feb. 25, 2000, now U.S. Pat. No. 6,719,071. Each of the aforementioned related patent applications is herein incorporated by reference.
BACKGROUND OF THE INVENTION
1. Field of the Invention
The present invention generally relates to apparatus and methods used to transport hydrocarbons from a wellbore to another location. More particularly, the invention relates to a multiphase pump for removing hydrocarbons and other material from the wellbore.
2. Description of the Related Art
In a conventional onshore, under-balanced drilling operation, a wellbore is formed in the earth to access hydrocarbon bearing formations. During the drilling operation, a relatively light weight medium with a gas constituent is circulated through the wellbore to cool the drill bit and remove cuttings from the wellbore. The drilling material, gas, and cuttings, which are referred to here as “wellbore fluid” is circulated back to the surface of the wellbore. The wellbore fluid is then transported by a flowline to a separator where it may be separated into gas, liquids, and solids. If the wellbore fluid does not have adequate energy to flow to the separator, it may be pumped by a multiphase pump. These pumps are capable of moving volumes of the oil, gas, water, solids, and other substances making up the wellbore fluid. The multiphase pumps can be connected to a single or multiple wellheads through the use of a manifold. An exemplary multiphase pump is described in U.S. patent application Ser. No. 10/036,737, filed on Dec. 21, 2001, which is herein incorporated by reference in its entirety.
Currently, the under-balanced drilling operation requires at least one large separator to be present on location to handle the wellbore fluid during the drilling operation. The gas phase is separated and then usually flared or re-injected into the wellbore while the solid and liquid phases are captured for re-use and/or disposal. While the separator does its job effectively, it is costly to rent, transport, and personnel costs on location are high. Additionally, the physical size of the separator occupies valuable well site real estate that could be used for other necessary oilfield equipment.
There is a need therefore for more space and a cost efficient method and apparatus to handle gas bearing wellbore fluid.
In a conventional offshore drilling operation, a floating vessel and a riser pipe are used to connect surface drilling equipment to a sub-sea wellhead located at the sea floor. The riser pipe is typically filled with returning drilling fluid resulting in a relatively large hydrostatic pressure due to the length of the riser. This hydrostatic pressure in the riser, combined with additional pressure brought about by the circulation friction of the fluid, combines to form an equivalent circulating density “ECD”. In some instances, the ECD can exceed the fracture pressure of the formation adjacent the wellbore permitting drilling fluids to enter the formation. Permanent damage to the formation and loss of expensive drilling fluid is a typical result of fracturing the formation due to the effects of ECD.
The oilfield industry has attempted to solve the ECD problem in offshore drilling operations with an operation known as “pump and dump”. In this arrangement, the cuttings and mud used to drill the sub-sea wellbore are not returned in a riser but are separated at the sea floor. The mud is returned to the surface of the well via a separate line while the solids are allowed to flow out on to the seabed and remain there.
Recently, another method has been developed to reduce the effects of hydrostatic pressure in an offshore drilling operation. In one such arrangement, described in U.S. Pat. No. 6,505,691, filed by Judge on Aug. 6, 2001, a diaphragm type pump is used on the floor of the sea to transport drilling fluid, including solids to the surface of the sea. While the pump is capable of pumping solids and liquids, its volume is limited by its design requiring a high number of pump cycles to move a typical volume of fluid produced from the wellbore.
There is a need, therefore, for a cost effective method and apparatus to reduce the hydrostatic and ECD related pressures in an offshore drilling operation. There is a further need for a method and an apparatus to effectively return multiphase material to the surface while drilling a sub-sea well. There is yet a further need for a cost effective method and an apparatus for separating a gas portion of wellbore fluid from a liquid portion thereof.
SUMMARY OF THE INVENTION
The present invention generally relates to an apparatus and method for removing hydrocarbons and other material from a wellbore. In one aspect, a method of drilling a sub-sea wellbore is provided. The method includes circulating a drilling fluid through a drill string from a surface of the sea to a drill bit in the wellbore. The method further includes pumping the fluid and drill cuttings from the sea floor to the surface with a multiphase pump having at least two plungers operating in a predetermined phase relationship.
In another aspect, a fluid separator system having a first and a second plunger assembly is provided. The fluid separator system includes at least one fluid line for removing a fluid portion from the at least one plunger assembly and at least one gas line for removing gas from the at least one plunger assembly.
BRIEF DESCRIPTION OF THE DRAWINGS
So that the manner in which the above recited features of the present invention can be understood in detail, a more particular description of the invention, briefly summarized above, may be had by reference to embodiments, some of which are illustrated in the appended drawings. It is to be noted, however, that the appended drawings illustrate only typical embodiments of this invention and are therefore not to be considered limiting of its scope for the invention may admit to other equally effective embodiments.
FIG. 1 is a cross-sectional view illustrating a multi-phase pump of this present invention disposed on the sea floor adjacent to a sub-sea wellbore.
FIG. 2 is a cross-sectional view illustrating the multiphase pump communicating wellbore fluid to a discharge line during a pump cycle.
FIG. 3A is a cross-sectional view illustrating a plunger assembly with a plunger in a retracted position.
FIG. 3B is a cross-sectional view illustrating the plunger assembly with the lower chamber filled with wellbore fluid.
FIG. 3C illustrates the pressurizing of the gas as the plunger moves toward the retracted position.
FIG. 3D illustrates the pressurized gas venting from the lower chamber into a gas line and subsequently into the discharge line.
FIG. 3E illustrates fluid venting from the lower chamber through the gas line and the fluid line.
FIG. 4 is an alternative embodiment of a gas anti-lock arrangement for use with a plunger assembly.
FIG. 5 is a cross-sectional view illustrating an alternative embodiment of a plunger assembly with an internal piston and position control.
FIG. 6 is a cross-sectional view illustrating a multi-phase pump disposed on a riser system.
FIG. 7 is a cross-sectional view illustrating a multi-phase pump system disposed adjacent a surface wellbore.
FIG. 8 is a cross-sectional view taken along line 88 of FIG. 7 to illustrate an enlarged chamber.
FIG. 9 is a cross-sectional view illustrating an alternative embodiment of a multi-phase pump system for use with a surface wellbore.
FIG. 10 is a cross-sectional view illustrating an alternative embodiment of a multi-phase pump system.
FIG. 11 is a cross-sectional view illustrating an alternative embodiment of a multi-phase pump system.
DETAILED DESCRIPTION
The present invention generally relates to a multi-phase pump for use in forming a wellbore. In one aspect, the multi-phase pump is located on a sea floor to facilitate the removal of circulating fluid and cuttings by returning the fluid and cuttings to a platform or a floating vessel. In another aspect of this invention, the multi-phase pump may be employed in an underbalanced drilling operation of an onshore wellbore. In this aspect, the multi-phase pump removes hydrocarbons and separates the gas portion from the liquid portion.
FIG. 1 is a cross-sectional view illustrating a multi-phase pump 200 of the present invention disposed on a sea floor 135 adjacent to a sub-sea wellbore 100. Although the drilling system in FIG. 1 shows only one multi-phase pump 200 disposed on the sea floor 135, any number of pumps may be employed in accordance with this present invention. Additionally, by using vertical plunger assemblies 300, 350 which may be referred to as fluid pumps, the equipment can be mounted on a standard guide base, or alternately, be mounted integrally to a special riser joint as discussed in a subsequent paragraph. Furthermore, by employing vertical stabs, these plunger assemblies 300, 350 may individually be run into place or individually retrieved. For ease of explanation, this aspect of the invention will first be described generally with respect to FIG. 1, thereafter more specifically with FIGS. 2–7.
Also shown in FIG. 1, a drill string 105 with a drill bit 110 at a lower end thereof extending upwards to a floating vessel 120. A rotating control head 115 seals the rotating drill string 105. Additionally, other components may be located at the sea floor to protect against a blow out such as a shear (not shown) and a ram (not shown). An annulus 130 is formed between the wellbore 100 and the drill string 105 and provides a passageway for removal of drill cuttings and mud during the formation of the wellbore 100.
An outlet 125 disposed below the rotating control head 115 connects the annulus 130 to a fluid passageway 205. The fluid passageway 205 provides fluid communication between the annulus 130 and the multi-phase pump 200. As the drill cuttings, mud, and other fluid all of which will be referred to as “wellbore fluid” exits the wellbore 100, they are urged through the fluid passageway 205 by circulation pressure. Thereafter, the wellbore fluid is pumped via the multiphase pump 200 through a discharge line 220 to the floating vessel 120 where the wellbore fluid can be separated, reused, or properly disposed of by means known in the art.
A high-pressure power fluid is supplied through a high pressure fluid line 215 to operate the multiphase pump 200. Typically, the power fluid is seawater that is pumped from the floating vessel 120 to the multiphase pump 200 at an initial operating pressure. As the seawater travels through the line 215, the seawater increases in pressure due to a pressure gradient force of the seawater. After use by the multi-phase pump 200, the high pressure seawater is expelled to the sea, eliminating the need to bring it back to the surface. Alternatively, another power fluid with a higher pressure gradient force than seawater may be employed with the multiphase pump 200. Such an alternative power fluid can increase the efficiency of the system by reducing the required amount of initial operating pressure supplied by the floating vessel 120.
As shown in FIG. 1, the high pressure fluid line 215 supplies power fluid to either one of the plunger assemblies 300, 350 during the pumping cycle. For instance, as the first plunger assembly 300 is expelling wellbore fluid into the discharge line 220, the fluid line 215 will supply power fluid to assembly 300 via a fluid line 225. Conversely, as the second plunger assembly 350 is expelling wellbore fluid into the discharge line 220, the fluid line 215 will supply power fluid to second plunger assembly 350 via a fluid line 230.
The embodiment illustrated in FIG. 1 is arranged for a top hole drilling operation. Generally, top hole drilling maintains a required wellbore pressure gradient in a riserless drilling mode, using the rotating control head 115 and the multiphase pump 200 to mitigate various pressure related geotechnical hazards at shallow penetration depths, such as pressured water and gas sands. Additionally, top hole drilling mitigates mud loss and formation fracturing by controlling the pressure on the wellbore 100 using the multiphase pump 200 as a choke and a lift pump to reduce the hydrostatic pressure effect of a mud column. Typically, the top hole drilling operation forms the wellbore 100 to predetermined depth before arriving at the target hydrocarbons. Therefore, the top hole drilling operation requires minimal sub-sea wellbore equipment, such as the rotating control head 115, to isolate the wellbore 100 from the sea.
FIG. 2 is a cross-sectional view illustrating the multiphase pump 200 communicating wellbore fluid to the discharge line 220 during a pump cycle. The multiphase pump 200 contains a first plunger 235 and a second plunger 240, each movable between an extended position and a retracted position within the plunger assemblies 300, 350, respectfully. A first lower valve 265 and a first upper valve 260 controls the movement of the first plunger 235 while the movement of the second plunger 240 is controlled by a second lower valve 275 and a second upper valve 270. Preferably, the valves 260, 265, 270, 275 are slide valves and can operate even in the presence of solids. In other words, the valves 260, 265, 270, 275 are constructed and arranged to permit solids to pass through the valve while open but will break up solids if necessary to effectively close.
The valves 260, 265, 270, 275 are synchronized and typically operated by a sub-sea pilot valve (not shown). During operation, the lower valves 265, 275 allow wellbore fluid from the fluid passageway 205 to fill and vent the first lower chamber 245 and a second lower chamber 255, respectfully. The upper valves 260, 270 allow high pressure power fluid from the fluid lines 225, 230 to fill and vent a first upper chamber 340 and a second upper chamber 345, respectfully.
As shown in FIG. 2, the first plunger 235 moves toward the extended position as wellbore fluid and pressure enters through the valve 265 to fill the first lower chamber 245 with fluid from the fluid passageway 205. In this embodiment, the pressurized, circulating drilling fluid is used to urge the plunger 235 upward. At the same time, power fluid in the first upper chamber 340 vents through an outlet 285 of the upper valve 260 into the surrounding sea. Simultaneously, the second plunger 240 moves in an opposite direction toward the retracted position as power fluid from the fluid line 230 flows through valve 270 and fills the upper chamber 345, thereby expelling the wellbore fluid in the second lower chamber 255 through the lower valve 275 and into the discharge line 220. As the first plunger 235 reaches its full extended position, the second plunger 240 reaches its full retracted position, thereby completing a cycle. The first plunger 235 then moves toward the retracted position as power fluid from the fluid line 225 flows through the valve 260 and fills the upper chamber 340, thereby expelling the wellbore fluid in the lower chamber 245 into the discharge line 220, as the second plunger 240 moves toward the extended position filling the second lower chamber 255 with wellbore fluid from the passageway 205. In this manner, the plungers operate as a pair of substantially counter-synchronous fluid pumps. While the described embodiment includes plungers acting in a counter-synchronous manner, it will be understood that so long as they move in a predetermined way relative to one another, a predetermined phase relationship, the plungers can assume any position as they operate.
Preferably, the plungers 235, 240 move in opposite directions causing continuous flow of fluid from the fluid passageway 205 to the discharge line 220. However, as the plungers 235, 240 change direction, the plungers 235, 240 will slow down, stop, and accelerate in the opposite direction. This pause of the plungers 235, 240 could introduce undesirable changes in the back pressure on the annulus of the sub-sea wellbore (not shown), since the inlet flow passageway 205 is directly connected to the flow of fluid and solids coming up the wellbore. Therefore, a pulsation control assembly 250 is employed in the multiphase pump 200 to control backpressure due to change of direction of plungers 235, 240 during the pump cycle.
Generally, the pulsation control assembly 250 is a gas filled accumulator that is connected to the inlet line of both plunger assemblies 300, 350 by a pulsation port 385. During normal flow, the in flow pressure will enter through the port 385 and slightly fill the pulsation control assembly 250. As the first plunger 235 starts to slow down near the end of its stroke, the flow coming from the wellbore annulus will increase its pressure slightly driving an accumulator piston 355 further up and into pulsation control assembly 250 as it tries to balance pressures across the piston 355. As the first plunger 235 stops, the opposite plunger 240 begins to increase its intake speed, causing the inlet pressure to drop slightly, which will allow the stored fluid in the pulsation control assembly 250 to come back out through port 385. This process will repeat itself throughout the pump cycle as each plunger reverses stroke.
A single seal assembly 280 is disposed around the plungers 235, 240 to accommodate fluid and solids as well as seawater. This seal assembly 280 includes a method to constantly scrape and polish the plungers 235, 240, and can eliminate solid particles from the seal assembly 280 area thereby insuring its useful life and protecting the sealing elements. Generally, the seal assembly 280 includes a plurality of rings 365 that are disposed on either side of a sealant 360. During the operation of the multi-phase pump 200, the rings 365 scrape and polish the plungers 235, 240. Typically, the sealant 360 is replenished by a mechanism well known in the art. Alternatively, the sealant may also be remotely injected during pump operations to replenish and improve its life expectancy.
The multi-phase pump 200 further includes a first gas line 325 and a second gas line 330 disposed on the first plunger assembly 300 and second plunger assembly 350, respectfully. Generally, the gas lines 325, 330 are used to prevent gas lock of the plungers 235, 240 during operation of the multi-phase pump 200. As shown, the first gas line 325 connects an auxiliary gas port 370 at the upper end of the lower chamber 245 to the discharge line 220. Similarly, the second gas line 330 connects an auxiliary gas port 375 at the upper end of the lower chamber 255 to the discharge line 220. As will be discussed in greater detail in FIGS. 3A–3E, gas entering the multiphase pump 200 from the fluid passageway 205 will be compressed by the plungers 235, 240 and thereafter expelled from the lower chambers 245, 255 through the ports 370 into the discharge line 220.
FIGS. 3A–3E illustrates cross-sectional views of an anti-gas lock arrangement employed in a plunger assembly 400. For clarity, the anti-gas lock arrangement will be illustrated on a single plunger assembly 400. However, it should be noted that this anti-lock arrangement may apply to any number of plunger assemblies and applies equally to the first plunger assembly 300 and second plunger assembly 350 as discussed in FIGS. 1 and 2.
FIG. 3A is a cross-sectional view illustrating a plunger assembly 400 with a plunger 405 in a retracted position. The plunger 405 moves from the retracted position to the extended position as wellbore fluid from the wellbore line 440 enters through inlet 420 to fill a lower chamber 430 as illustrated in FIG. 3B. As wellbore fluid enters the chamber 430, the vertical disposition of the plunger assembly 400 disposes the solids and liquids to remain at or near the lower portion of the chamber 430. As plunger 435 descends, it compresses the gas by displacing the liquids around the plunger 435. Finally the pressure equals the discharge pressure in line 440 and further compression efforts will cause the gas to flow out through line 415 and into line 440. As the plunger 435 continues to descend, the displaced liquid will rise around the plunger 435 to follow the gas through port 410, which will cause a further rise in the chamber pressure. This will open the main port 425, and the remaining liquids and any solids will discharge through port 425 into line 440.
FIG. 3C illustrates the pressurizing of the gas as the plunger 405 moves toward the retracted position. Generally, a force is applied at the upper end of the plunger 405 causing the plunger 405 to move axially downward. The force may be supplied by the introduction of power fluid into the upper chamber 345 as discussed in a previous paragraph or by any other means well known in the art. The downward movement of the plunger 405 compresses the gas at the upper end of the lower chamber 430.
FIG. 3D illustrates the pressurized gas venting from the lower chamber 430 into a gas line, 415 and subsequently into the discharge line 440. The plunger 405 compresses the gas until the gas pressure equals the discharge pressure. At this point, a valve 445 opens up allowing gas to enter the gas line 415. Thereafter, the gas flows through the gas line 415 into the discharge line 440.
FIG. 3E illustrates fluid venting from the lower chamber 430 through the gas line 415 and the fluid line 455. After the gas is vented from the lower chamber 430, the liquid enters the gas line 415 through the valve 445 causing an increase in the chamber pressure. Thereafter, valve 460 opens allowing any remaining liquid in the lower chamber 430 to enter the discharge line 440. Eventually, the plunger 405 reaches the retracted position as shown in FIG. 3A thus completing a pump cycle.
FIG. 4 is an alternative embodiment of a gas anti-lock arrangement for use with a plunger assembly 450. In a similar manner as described in FIGS. 3A–3E, the plunger assembly 450 pressurizes the gas in a lower chamber 485 as a plunger 470 moves toward the retracted position. However in this embodiment, an internal gas tube 475 is disposed in a plunger chamber 465 to communicate the pressurized gas to a discharge line 480 instead of an external gas line. Generally, wellbore fluid and pressure enters the chamber 485 to move a plunger 470 toward the extended position. The vertical disposition of the plunger assembly 450 naturally separates the fluids from the gas by disposing the solids and liquids at or near the lower portion of the chamber 485 while collecting the gas at the upper portion of the plunger chamber 465. As the plunger 470 moves towards the retracted position, the gas becomes pressurized. When the gas pressure equals the discharged pressure, the gas is communicated through the tube 475 to the discharge line 480. Thereafter, the liquid portion flows through the tube 475 to urge any remaining gas in the tube 475 into the discharge line 480. This sequence of events occurs throughout the pump cycle.
FIG. 5 is a cross-sectional view illustrating an alternative embodiment of a plunger assembly 500. In a similar manner as described in FIG. 4, the plunger assembly 500 utilizes a gas tube 525 to communicate gas from a plunger chamber 535 to a discharge line 545. However, a hydraulic arrangement is utilized to move a plunger 530 to the extended position instead of relying solely on wellbore fluid as described in the previous embodiments. The hydraulic arrangement includes a hydraulic chamber 515 disposed at the upper end of the plunger 530. The hydraulic chamber 515 is separated from the gas tube 525 by a seal arrangement 520. Thus, as the hydraulic chamber 515 fills with fluid from a control line 505, the fluid becomes pressurized, thereby creating a force on the plunger 530. This fluid force urges the plunger 530 axially upward toward the extended position. At the same time, wellbore fluid enters and fills the lower chamber 540. After the plunger 530 reaches the extended position, the plunger 530 reverses direction and moves toward the retracted position displacing the fluid in the chamber 515 through the control line 505. Shortly thereafter, the pressurized gas in the plunger chamber 535 is communicated through a port 555 into the gas tube 525 and subsequently into the discharge line 545. This sequence of events occurs repeatively as the pump cycles.
FIG. 6 is a cross-sectional view illustrating a multi-phase pump 600 disposed on a riser system 650. For convenience, the same number designation will be used for the components in the multi-phase pump 600 that are similar to the components in the multi-phase pump 200 as described in FIGS. 1 and 2.
As shown on FIG. 6, the first plunger 235 is moving toward the extended position as wellbore fluid and pressure enters through the valve 265 to fill the first lower chamber 245. Generally, wellbore fluid enters the multi-phase pump 600 through a fluid outlet 610 formed in a riser pipe 605. In this embodiment, the pressure of the head of drilling fluid in the riser above the fluid outlet 610 is used to urge plunger 235 upward. At the same time, power fluid in the first upper chamber 340 vents through an outlet 285 of the upper valve 260 into the surrounding sea. Simultaneously, the second plunger 240 is moving in an opposite direction toward the retracted position as power fluid from the fluid line 230 flows through valve 270 and fills the upper chamber 345, thereby expelling the wellbore fluid in the second lower chamber 255 through the lower valve 275 into the discharge line 220.
As the first plunger 235 reaches its full extended position, the second plunger 240 then reaches its retracted position, thereby completing a cycle. The first plunger 235 then moves toward the retracted position as power fluid from the fluid line 225 flows through the valve 260 and fills the upper chamber 340, thereby expelling the wellbore fluid in the lower chamber 245 into the discharge line 220, as the second plunger 240 moves toward the extended position filling the second lower chamber 255 with wellbore fluid from the fluid outlet 610. During the pump cycle, the plungers 235, 240 are constantly scraped and polished by a seal assembly 280 to eliminate solid particles thereby insuring the useful life of the multi-phase pump 600.
With respect to locating the pump 600 on the riser system 650, the sensitivity to pressure changes diminishes, since these would be absorbed by the drilling fluid head in the riser system 650 caused by split second hesitations in the pumping rate due to the reciprocating actions of the plungers 235, 240. Such changes would be hardly noticeable downhole, hence no need for the pulsation control assembly as described in FIG. 2.
The multi-phase pump 600 further includes a first gas line 325 and a second gas line 615 disposed on the first plunger assembly 300 and second plunger assembly 350, respectfully. Generally, the gas lines 325, 615 are used to prevent gas lock of the plungers 235, 240 during operation of multi-phase pump 600 and represent alternative methods of gas removal. As shown, the first gas line 325 connects an auxiliary gas port 370 at the upper end of the lower chamber 245 to the discharge line 220. Similarly, the second gas line 615 connects an auxiliary gas port 375 at the upper end of the lower chamber 255 to a riser port 620 formed in the riser pipe 605.
In a similar manner as discussed in FIGS. 3A–3F, wellbore fluid gas enters the multiphase pump 600 through the fluid outlet 610. As wellbore fluid enters the chamber 245, the vertical disposition of the plunger assembly 300 disposes the solids and liquids to remain at or near the lower portion of the chamber 245 while the gas migrates to the upper portion of the chamber 245. The natural separation of the phases permits the solids and liquids to be discharged first through the lower valve 265 into a discharge line 220. As the plunger 235 moves toward the retracted position, the plunger 235 compresses the gas until the gas pressure equals the discharge pressure in the discharge line 220. At this point, gas enters the gas line 325 and subsequently into the discharge line 220. After all the gas is vented from the lower chamber 245, the liquid rises and enters the gas line 325 and the increase in pressure then causes the liquids and solids to discharge through lower valve 275 into the discharge line 220.
The second plunger assembly 350 compresses and vents the gas out of the lower chamber 255 in a similar manner as the first plunger assembly 300. However, the gas from the second plunger assembly 350 is directed through a port 620 into the riser pipe 605 instead of the discharge line 220. Typically, a valve member (not shown) is employed between the plunger assembly 350 and the riser pipe 605 to restrict the flow of gas through the gas line 615 until the gas in the lower chamber 255 equals the discharge pressure in the discharge line 220. At this point, gas enters the gas line 615 and subsequently into the riser pipe 605.
In another aspect of the present invention, a multi-phase pump may be employed in an under balanced drilling operation of a surface wellbore to separate a gas portion of a wellbore fluid from a liquid portion.
FIG. 7 is a cross-sectional view illustrating a multi-phase pump system 700 disposed adjacent a surface wellbore 750. The multiphase pump system 700 contains a first plunger 705 and a second plunger 715, each movable between an extended position and a retracted position. A first pair of hydraulic cylinders 710 controls the movement of the first plunger 705, while a second pair of hydraulic cylinders 720 controls the movement of the second plunger 715. The multiphase pump system 700 may also be operated by a single cylinder attached to each plunger 705, 715. Generally, the hydraulic cylinders 710, 720 are synchronized and operated by an external control (not shown). When the first plunger 705 moves toward the extended position, a suction is created by the plunger 705 urging the wellbore fluid from the wellbore line 755 to enter the multi-phase pump system 700. The wellbore fluid enters through an inlet 725 into an enlarged chamber 805 that is formed on a lower portion of a first plunger chamber 730. As shown in FIG. 8, the enlarged chamber 805 is a substantially circular shape and the inlet 725 is constructed and arranged to direct the wellbore fluid tangentially into the enlarged chamber 805. In this respect, the wellbore fluid enters the enlarged chamber 805 tangentially resulting in the spinning of the fluid and the creation of a centrifugal force that promotes the separation of the gas portion from the fluid portion of the wellbore fluid. In addition to the energy created by the centrifugal force, the density differential between the gas and the liquid naturally separates the two phases in the chamber 730.
Referring back to FIG. 7, as the first plunger 705 moves toward the extended position, the second plunger 715 moves in an opposite direction toward a preset retracted position, thereby expelling the wellbore fluid in a second plunger chamber 740 and the enlarged chamber 805 to an outlet 735. As the first plunger 705 reaches its full extended position, the second plunger 715 then reaches its preset retracted position, thereby completing a cycle. The first plunger 705 then moves toward the preset retracted position expelling the wellbore fluid into an outlet 825, as the second plunger 715 moves toward the extended position creating a suction and urging the wellbore fluid to enter an inlet 745. In this manner, the plungers 705, 715 operate as a pair of substantially counter synchronous fluid pumps. While the described embodiment includes plungers acting in a counter-synchronous manner, it will be understood that so long as they move in a predetermined way relative to one another, a predetermined phase relationship, the plungers can assume any position as they operate.
The hydraulic pump system 700 further includes a plurality of ports 760 in fluid communication with the plunger chamber 730 and a plurality of ports 775 in fluid communication with the plunger chamber 740. Generally, the ports 760, 775 act as a passageway to facilitate the removal of the wet gas from the chambers 730, 740 during the pump cycle. Preferably, one port 760 on the first plunger chamber 730 is in communication with one port 775 on the second plunger chamber 740 while the remaining ports 760, 775 are plugged. The percentage of liquid and the percentage of wet gas in the wellbore fluid determines which of the ports 760, 775 are used and which of the ports 760, 775 are plugged. For example, if the wellbore fluid contains a high percentage of liquid, then the upper ports 760, 775 are used. Conversely, if the wellbore fluid contains a high percentage of wet gas, then the lower ports 760, 775 are used.
Optionally, a first check valve 780 is connected to the functioning port 760 in the first plunger chamber 730 and a second check valve 785 is connected to the functioning port 775 in the second plunger chamber 740. The check valves 780, 785 are constructed and arranged to open at a predetermined pressure. In other words, the check valves 780, 785 prevent the wet gas from exiting the chambers 730, 740 until the predetermined pressure is reached. At that time, the wet gas flows through the ports 760, 775 into a wet gas line 765. In addition, the check valves 780, 785 prevent the wet gas from returning to the chambers 730, 740 after it exits through the ports 760, 775.
As shown on FIG. 7, the upper ports 760, 775 are in communication with the wet gas line 765. The wet gas leaving the multiphase pump system 700 is typically at a low pressure. Therefore, it would be desirable to increase the pressure of the wet gas. However, the wet gas may include three different phases, namely, solid, liquid, and wet gas. Therefore, a second multiphase pump (not shown) may be connected to the wet gas line 765 to boost the pressure of the wet gas. Even though the wet gas contains three phases, the second multiphase pump may effectively increase the pressure of the wet gas in the wet gas line 765 and then recycle the wet gas back to a well inlet 770. Further, the second multiphase pump will allow recovery or recycling of low pressure gas. In this manner, valuable wellbore fluid gas such as nitrogen and natural gas may be recycled and/or recaptured. Additionally, a flare line (not shown) may be connected to the wet gas line 765. The flare line may be used to discharge excess wet gas in the wet gas line 765. Alternatively, the flare line may direct the excess wet gas to a flare stack or a collecting unit for other manners of disposal.
Similar to the wet gas line 765, a fluid line 790 is disposed at the lower end of the hydraulic pump system 700. A control 795 is connected between the outlets 735, 825 and the fluid line 790 to control the timing and amount of fluid discharge. Preferably, the control 795 includes a flow meter or a feed back loop that controls the fluid flow based upon the pressure differential of the fluid. For instance, if the control 795 senses that wet gas from the chambers 730, 740 is being discharged through the outlets 735, 825 then the control 795 will close the outlets 735, 825 to force the wet gas through the ports 760, 775 and eventually into the wet gas line 765. On the other hand, if the control 795 senses that fluid from the chambers 730, 740 is being discharged through the outlets 735, 825 then the control 795 will keep the outlets 735, 825 open so that all the fluid in the multiphase pump system 700 exits into the fluid line 790. The exiting fluid may be recycled for use during the drilling operation or be sent to a secondary separator (not shown) to separate out any gas remaining in the fluid before delivering it to another fluid supply (not shown).
The multi-phase pump system 700 further includes a single seal assembly 810 disposed around the plungers 705, 715 to accommodate mud and solids as well as liquids. This seal assembly 810 includes a method to constantly scrape and polish the plungers 705, 715 and can eliminate solid particles from the seal assembly 810 area, thereby insuring its useful life and protecting the sealing elements. Generally, the seal assembly 810 includes a plurality of rings 815 that are disposed on either side of a sealant 820. During the operation of the multi-phase pump system 700, the rings 815 scrape and polish the plungers 705, 715. Typically, the sealant 820 is replenished by a mechanism well known in the art. Alternatively, the sealant may also be remotely injected during pump operations to replenish and improve its life expectancy. As further illustrated in this embodiment, there is minimal tolerance between the outside diameter of the plungers 705, 715 and the inner diameter of the chambers 730, 740. This arrangement permits the plungers 705, 715 to expel the entire amount of wet gas and fluid to their respective outlets 735, 825.
FIG. 9 is a cross-sectional view illustrating an alternative embodiment of a multi-phase pump system 900 for use with a surface wellbore 750. For convenience, the same number designation will be used for the components in the multi-phase pump system 900 that are similar to the components in the multi-phase pump system 700 as described in FIG. 7.
As shown in FIG. 9, the multi-phase pump system 900 has similar components and operates in a similar manner as the multi-phase system 700. The multiphase pump system 900 contains a first plunger 705 and a second plunger 715, each movable between an extended position and a retracted position. In this respect, the plungers 705, 715 operate as a pair of substantially counter synchronous fluid pumps. However in this embodiment, an annulus 905 is created between the outside diameter of the plungers 705, 715 and the inner diameter of the chambers 730, 740. This arrangement permits wet gas to fill the annulus 905 as the plungers 705, 715 alternately move toward in their extended position. The wet gas in the annulus 905 then becomes pressurized as the plungers 705, 715 alternately move to their retracted position. The gas in the annulus 905 increases in pressure until the predetermined pressure of the check valve 780 is reached. At that point, the wet gas is permitted to exit through a wet gas outlet 910 and subsequently into the wet gas line 765.
FIG. 10 is a cross-sectional view illustrating an alternative embodiment of a multi-phase pump system 925. For convenience, the same number designation will be used for the components in the multi-phase pump system 925 that are similar to the components in the multi-phase pump system 700 as described in FIG. 7.
As shown in FIG. 10, the multi-phase pump system 925 has similar components and operates in a similar manner as the multi-phase system 700. However in this arrangement, the pump system 925 includes a plunger 930 having a tapered end 935 that is constructed and arranged to mate with a tapered removable bottom 940 having a deflector plate 945 attached thereto. Additionally, a gas hose 960 is operatively attached to a plunger bore 955. As the plunger 930 moves upward, wellbore fluid enters the inlet 725 and contacts the deflector plate 945. At this point, the solids and liquids migrate toward a lower end of the tapered removable bottom 940 while the gas migrates towards the top of the plunger chamber 730. As the plunger 930 moves downward, the gas exits through the plunger bore 955 into the gas hose 960 while the solids and liquids are discharged through the outlet 825. Preferably, a control arrangement (not shown) closes the flow path through the plunger bore 955 as the solids and liquids are discharged.
FIG. 11 is a cross-sectional view illustrating an alternative embodiment of a multi-phase pump system 950. For convenience, the same number designation will be used for the components in the multi-phase pump system 950 that are similar to the components in the multi-phase pump system 700 as described in FIG. 7.
As shown in FIG. 11, the multi-phase pump system 950 has similar components and operates in a similar manner as the multi-phase system 700. However, in this arrangement, a liquid level 975 is maintained at a predetermined level in the enlarged chamber 805. The primary reason for maintaining the liquid level 975 is to minimize the amount of gas discharge through the outlet 825.
During operation, wellbore fluid enters through the inlet 725 as a plunger 965 moves upward. The plunger 965 includes a tapered end 970 that is constructed and arranged to mate with a tapered profile 980 formed at the lower end of the enlarged chamber 805. Thereafter, the solids and liquids migrate toward the bottom of the enlarged chamber 805, while the gas migrates into the plunger chamber 730. At the same time, the liquid level 975 is monitored by a control mechanism (not shown), such as a level sensor, valve arrangement, or other means well known in the art. If the control mechanism senses that the liquid level 975 is above the predetermined level, then a liquid outlet 985 opens to permit excess liquid to drain out of the enlarged portion 805. Conversely, if the control mechanism senses that the liquid level is below the predetermined level, the liquid outlet 960 remains closed to permit additional liquid buildup in the enlarged portion 805.
As the plunger 965 descends, the plunger 965 compresses the gas in the plunger chamber 730 and displaces it into the liquid in the enlarged portion 805. As the displaced liquid rises in the plunger chamber 730, the gas will compress further until the valve 780 opens, thereby allowing the gas to exit the plunger chamber 730 into the wet gas line 765. Typically, the liquid will rise in the plunger chamber 730 to a point just below the activated gas port 760. Subsequently, a check valve (not shown) opens and allows a slurry comprising of the solids and a portion of the liquid to be discharged through the outlet 825. Preferably, the slurry flows into a separator (not shown) to separate the liquids from the solids. At this point, the liquids may be recycled back into the multi-phase pump system 950 to maintain the liquid level 975.
While the foregoing is directed to embodiments of the present invention, other and further embodiments of the invention may be devised without departing from the basic scope thereof, and the scope thereof is determined by the claims that follow.

Claims (28)

1. A method of drilling a subsea wellbore, comprising: circulating a drilling fluid through a first flow path to a drill bit in the wellbore, the fluid flowing upwards in a second flow path within the wellbore; and pumping the fluid and drill cuttings from the second flow path to a fluid handling system having at least two plungers operating in a predetermined phase relationship.
2. The method of claim 1, wherein the at least two plungers operate substantially counter synchronously.
3. The method of claim 2, wherein the plungers are moved in a first direction by the fluid and in a second direction by power fluid provided from the surface.
4. The method of claim 1, wherein the fluid handling system is disposed at a sea floor.
5. The method of claim 1, wherein the fluid handling system is disposed on a riser at a location between the surface and a sea floor.
6. A method of transporting cuttings from a subsea wellbore, comprising: urging the cuttings in a fluid slurry from an annular area in the wellbore to a pump assembly in fluid communication with the wellbore; utilizing the slurry to operate at least one plunger member of the pump assembly in a first direction; and utilizing a power fluid to operate the at least one plunger in a second direction, thereby pumping the slurry towards the surface of the sea.
7. A method of reducing equivalent circulating density in a subsea wellbore, comprising: pumping a fluid through a drill pipe from a surface of water to a drill bit in a wellbore; circulating the fluid and cuttings to the top of the wellbore; and adding energy to the fluid and cuttings with a multi-phase pump, thereby urging the fluid and cuttings to the surface.
8. The method of claim 7, wherein the multi-phase pump includes at least two plungers operating in a predetermined phase relationship.
9. The method of claim 8, wherein plungers operate substantially counter synchronously.
10. A sub-sea fluid pumping system, comprising: a pair of substantially counter synchronous fluid pumps locatable adjacent a sub-sea wellbore and in fluid communication with an annulus therein; at least one fluid path for communicating wellbore fluid between the annulus and the fluid pumps; and at least one power fluid line for providing power fluid to the fluid pumps.
11. The system of claim 10, wherein the pair of substantially counter synchronous fluid pumps are a pair of plungers, each plunger movable between an extended position and a retracted position.
12. The system of claim 11, wherein the wellbore fluid urges the plunger to the extended position.
13. The system of claim 11, further including a control line for providing a fluid to urge the plunger to the extended position.
14. The system of claim 11, wherein the power fluid urges the plunger to the retracted position.
15. The system of claim 11, further including a seal assembly disposed around each plunger to constantly scrape and polish each plunger as it moves between the extended position and the retracted position.
16. The system of claim 15, wherein the seal assembly includes a plurality of rings disposed on either side of a sealant.
17. The system of claim 16, wherein the sealant is remotely injected during the operation of the fluid pumps.
18. The system of claim 10, further including a pulsation control assembly to control the back pressure in a sub-sea wellbore due to the movement of the pair of substantially counter synchronous fluid pumps.
19. The system of claim 18, wherein the pulsation control assembly includes an accumulator piston disposed in a gas filled accumulator.
20. The system of claim 10, further including a plurality of upper valves to control the amount of power fluid to the pair of fluid pumps.
21. The system of claim 10, further including a plurality of lower valves to control the amount of wellbore fluid entering the pair of fluid pumps and the amount of discharge fluid exiting the pair of fluid pumps.
22. The system of claim 10, wherein the fluid pumps are operatively connected to a guide base.
23. The system of claim 22, wherein the fluid pumps may be individually inserted and retrieved from the guide base.
24. The system of claim 10, further including a gas line for removing gas from the pair of fluid pumps to prevent gas lock during a pump cycle.
25. The system of claim 10, wherein the fluid pumps are operatively connected to a riser pipe.
26. A sub-sea fluid pumping system, comprising: a pair of substantially counter synchronous fluid pumps disposed on a riser pipe at a location between a surface and a sea floor, whereby the fluid pumps are in fluid communication with an annulus of a sub-sea wellbore; at least one fluid path for communicating wellbore fluid between the annulus and the fluid pumps; and at least one power fluid line for providing power fluid to the fluid pumps.
27. The system of claim 26, wherein the pair of substantially counter synchronous fluid pumps are a pair of plungers, each plunger movable between an extended position and a retracted position.
28. The system of claim 26, wherein the fluid pumps may be individually inserted and retrieved from the riser pipe.
US11/225,466 2003-06-26 2005-09-13 Methods and apparatus for drilling with a multiphase pump Expired - Lifetime US7066247B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US11/225,466 US7066247B2 (en) 2003-06-26 2005-09-13 Methods and apparatus for drilling with a multiphase pump

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US10/606,652 US6966367B2 (en) 2002-01-08 2003-06-26 Methods and apparatus for drilling with a multiphase pump
US11/225,466 US7066247B2 (en) 2003-06-26 2005-09-13 Methods and apparatus for drilling with a multiphase pump

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US10/606,652 Division US6966367B2 (en) 2002-01-08 2003-06-26 Methods and apparatus for drilling with a multiphase pump

Publications (2)

Publication Number Publication Date
US20060005999A1 US20060005999A1 (en) 2006-01-12
US7066247B2 true US7066247B2 (en) 2006-06-27

Family

ID=32772277

Family Applications (2)

Application Number Title Priority Date Filing Date
US10/606,652 Expired - Lifetime US6966367B2 (en) 2002-01-08 2003-06-26 Methods and apparatus for drilling with a multiphase pump
US11/225,466 Expired - Lifetime US7066247B2 (en) 2003-06-26 2005-09-13 Methods and apparatus for drilling with a multiphase pump

Family Applications Before (1)

Application Number Title Priority Date Filing Date
US10/606,652 Expired - Lifetime US6966367B2 (en) 2002-01-08 2003-06-26 Methods and apparatus for drilling with a multiphase pump

Country Status (2)

Country Link
US (2) US6966367B2 (en)
GB (2) GB2427662B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060169491A1 (en) * 2003-03-13 2006-08-03 Ocean Riser Systems As Method and arrangement for performing drilling operations
US20080190663A1 (en) * 2004-08-19 2008-08-14 Roger Stave Method and System for Return of Drilling Fluid
US20090151954A1 (en) * 2007-12-18 2009-06-18 Drew Krehbiel Subsea hydraulic and pneumatic power
US20090200037A1 (en) * 2003-03-13 2009-08-13 Ocean Riser Systems As Method and arrangement for removing soils, particles or fluids from the seabed or from great sea depths
US20100230110A1 (en) * 2009-03-10 2010-09-16 Vetco Gray, Inc. Well unloading package
US20110236236A1 (en) * 2008-12-08 2011-09-29 Larsen Andreas Boerre Driving arrangement for a pump or compressor
US20130032396A1 (en) * 2011-08-03 2013-02-07 Roger Sverre Stave Fluid transfer device usable in managed pressure and dual-gradient drilling
US20150240578A1 (en) * 2014-02-21 2015-08-27 Hydril Usa Manufacturing Llc Modular mud lift pump assembly
US9982498B1 (en) * 2015-03-02 2018-05-29 Glenn Shick, Jr. Fluid removal device and method

Families Citing this family (45)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6896075B2 (en) * 2002-10-11 2005-05-24 Weatherford/Lamb, Inc. Apparatus and methods for drilling with casing
EP1352679A1 (en) * 2002-04-08 2003-10-15 Cooper Cameron Corporation Separator
US7178592B2 (en) * 2002-07-10 2007-02-20 Weatherford/Lamb, Inc. Closed loop multiphase underbalanced drilling process
GB0227394D0 (en) * 2002-11-23 2002-12-31 Weatherford Lamb Fluid removal from gas wells
US7063161B2 (en) * 2003-08-26 2006-06-20 Weatherford/Lamb, Inc. Artificial lift with additional gas assist
EP1519002A1 (en) * 2003-09-24 2005-03-30 Cooper Cameron Corporation BOP and separator combination
EP2283905A3 (en) * 2003-09-24 2011-04-13 Cameron International Corporation Subsea well production flow and separation system
US7813935B2 (en) * 2004-01-13 2010-10-12 Weatherford/Lamb, Inc. System for evaluating over and underbalanced drilling operations
GB2416569A (en) * 2004-07-27 2006-02-01 Clarke Uk Ltd Method of and a pump for pumping drill cuttings
NO323342B1 (en) * 2005-02-15 2007-04-02 Well Intervention Solutions As Well intervention system and method in seabed-installed oil and gas wells
US7735563B2 (en) * 2005-03-10 2010-06-15 Hydril Usa Manufacturing Llc Pressure driven pumping system
GB2437526A (en) * 2006-04-27 2007-10-31 Multi Operational Service Tank A sub-sea well intervention vessel and method
NO325931B1 (en) * 2006-07-14 2008-08-18 Agr Subsea As Device and method of flow aid in a pipeline
US7913764B2 (en) * 2007-08-02 2011-03-29 Agr Subsea, Inc. Return line mounted pump for riserless mud return system
US7938190B2 (en) * 2007-11-02 2011-05-10 Agr Subsea, Inc. Anchored riserless mud return systems
WO2009082758A1 (en) * 2007-12-24 2009-07-02 Schlumberger Technology Corporation Compact fluid disposal system and method for surface well testing
US8640778B2 (en) 2008-04-04 2014-02-04 Ocean Riser Systems As Systems and methods for subsea drilling
WO2010017200A2 (en) * 2008-08-04 2010-02-11 Cameron International Corporation Subsea differential-area accumulator
WO2010111726A1 (en) * 2009-04-02 2010-10-07 Ian Gray System for analysing gas from strata being drilled
CN102741504B (en) * 2009-11-19 2016-01-06 伊安·格雷 Analyze the method for subterranean strata release gas and in holing, discharge the equipment of gas
AU2011206923B2 (en) * 2010-01-13 2015-07-16 Santos Ltd Measuring Gas content of unconventional reservoir rocks
US20110232912A1 (en) * 2010-03-25 2011-09-29 Chevron U.S.A. Inc. System and method for hydraulically powering a seafloor pump for delivering produced fluid from a subsea well
US8162063B2 (en) * 2010-09-03 2012-04-24 Stena Drilling Ltd. Dual gradient drilling ship
US8443897B2 (en) * 2011-01-06 2013-05-21 Halliburton Energy Services, Inc. Subsea safety system having a protective frangible liner and method of operating same
US9670755B1 (en) * 2011-06-14 2017-06-06 Trendsetter Engineering, Inc. Pump module systems for preventing or reducing release of hydrocarbons from a subsea formation
GB2493749B (en) * 2011-08-17 2016-04-13 Statoil Petroleum As Improvements relating to subsea compression
US9428975B2 (en) * 2011-08-18 2016-08-30 Enhanced Drilling A.S. Drilling fluid pump module coupled to specially configured riser segment and method for coupling the pump module to the riser
MX344565B (en) 2011-09-15 2016-12-20 Leed Fabrication Services Inc Boundary layer disk turbine systems for controlling pneumatic devices.
MX344566B (en) * 2011-09-15 2016-12-20 Leed Fabrication Services Inc Boundary layer disk turbine systems for hydrocarbon recovery.
GB2502626A (en) * 2012-06-01 2013-12-04 Statoil Petroleum As Controlling the fluid pressure of a borehole during drilling
US20140224498A1 (en) * 2013-02-08 2014-08-14 Oceaneering International, Inc. System and Method to Improve Operation of Hydraulic Pump for Subsea Service
US10702816B2 (en) * 2013-03-07 2020-07-07 M-I L.L.C. Demister for capturing moist fine particulates
WO2015160417A1 (en) * 2014-04-15 2015-10-22 Halliburton Energy Services, Inc. Forming a subsea wellbore
WO2017003406A1 (en) * 2015-06-27 2017-01-05 Enhanced Drilling, Inc. Riser system for coupling selectable modules to the riser
US11320079B2 (en) * 2016-01-27 2022-05-03 Liberty Oilfield Services Llc Modular configurable wellsite surface equipment
US10072675B2 (en) * 2016-04-21 2018-09-11 Energy Recovery, Llc System for using pressure exchanger in dual gradient drilling application
US9810033B1 (en) * 2016-09-02 2017-11-07 Schlumberger Technology Corporation Subsea drilling systems and methods
US9670744B1 (en) * 2016-09-08 2017-06-06 Sjo Drilling As Drilling fluid circulation system
NO344597B1 (en) * 2016-10-31 2020-02-03 Bri Cleanup As Method and apparatus for processing fluid from a well
US11339778B2 (en) 2016-11-14 2022-05-24 I-Jack Technologies Incorporated Gas compressor and system and method for gas compressing
CA3065187A1 (en) * 2017-06-12 2018-12-20 Ameriforge Group Inc. Dual gradient drilling system and method
AU2020207342A1 (en) * 2019-01-09 2021-06-17 Kinetic Pressure Control, Ltd. Managed pressure drilling system and method
CN110714740B (en) * 2019-11-21 2021-11-23 陕西延长石油机械装备制造有限公司 Oil field pumping unit control method and system
CA3074365A1 (en) * 2020-02-28 2021-08-28 I-Jack Technologies Incorporated Multi-phase fluid pump system
CN115341865A (en) * 2021-05-13 2022-11-15 中国石油天然气股份有限公司 Method for controlling solid phase of drilling fluid in petroleum drilling process

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2894585A (en) * 1954-09-01 1959-07-14 Weldon C Erwin Hydrostatic washout tool
US4368787A (en) * 1980-12-01 1983-01-18 Mobil Oil Corporation Arrangement for removing borehole cuttings by reverse circulation with a downhole bit-powered pump
US4479558A (en) * 1981-08-05 1984-10-30 Gill Industries, Inc. Drilling sub
US4630691A (en) * 1983-05-19 1986-12-23 Hooper David W Annulus bypass peripheral nozzle jet pump pressure differential drilling tool and method for well drilling
US4744426A (en) * 1986-06-02 1988-05-17 Reed John A Apparatus for reducing hydro-static pressure at the drill bit
US6102673A (en) 1998-03-27 2000-08-15 Hydril Company Subsea mud pump with reduced pulsation
US20020066596A1 (en) 1998-03-27 2002-06-06 Judge Robert A. Subsea mud pump and control system
GB2389130A (en) 2001-07-09 2003-12-03 Baker Hughes Inc Drilling system and method for controlling equivalent circulating density during drilling of wellbores
GB2393988A (en) 2002-10-11 2004-04-14 Weatherford Lamb Drilling with casing

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1176531A (en) 1967-01-03 1970-01-07 Gils Adrianus Van A Process and an Apparatus for Bringing Under Control an Unexpectedly Producing Well
US5488993A (en) * 1994-08-19 1996-02-06 Hershberger; Michael D. Artificial lift system
DE19542258A1 (en) * 1995-11-13 1997-05-15 Putzmeister Maschf Method and device for controlling a two-cylinder thick matter pump
MY126556A (en) 1997-09-25 2006-10-31 Shell Int Research Subsea drill fluid pumping and treatment system for deepwater drilling
US6837313B2 (en) * 2002-01-08 2005-01-04 Weatherford/Lamb, Inc. Apparatus and method to reduce fluid pressure in a wellbore
GB9904380D0 (en) * 1999-02-25 1999-04-21 Petroline Wellsystems Ltd Drilling method
US6367555B1 (en) * 2000-03-15 2002-04-09 Corley P. Senyard, Sr. Method and apparatus for producing an oil, water, and/or gas well
US6474422B2 (en) * 2000-12-06 2002-11-05 Texas A&M University System Method for controlling a well in a subsea mudlift drilling system
WO2003033865A1 (en) 2001-10-11 2003-04-24 Weatherford/Lamb, Inc. Combination well kick off and gas lift booster unit
US6592334B1 (en) * 2001-12-21 2003-07-15 Weatherford/Lamb, Inc. Hydraulic multiphase pump
US7178592B2 (en) 2002-07-10 2007-02-20 Weatherford/Lamb, Inc. Closed loop multiphase underbalanced drilling process

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2894585A (en) * 1954-09-01 1959-07-14 Weldon C Erwin Hydrostatic washout tool
US4368787A (en) * 1980-12-01 1983-01-18 Mobil Oil Corporation Arrangement for removing borehole cuttings by reverse circulation with a downhole bit-powered pump
US4479558A (en) * 1981-08-05 1984-10-30 Gill Industries, Inc. Drilling sub
US4630691A (en) * 1983-05-19 1986-12-23 Hooper David W Annulus bypass peripheral nozzle jet pump pressure differential drilling tool and method for well drilling
US4744426A (en) * 1986-06-02 1988-05-17 Reed John A Apparatus for reducing hydro-static pressure at the drill bit
US6102673A (en) 1998-03-27 2000-08-15 Hydril Company Subsea mud pump with reduced pulsation
US20020066596A1 (en) 1998-03-27 2002-06-06 Judge Robert A. Subsea mud pump and control system
GB2389130A (en) 2001-07-09 2003-12-03 Baker Hughes Inc Drilling system and method for controlling equivalent circulating density during drilling of wellbores
GB2393988A (en) 2002-10-11 2004-04-14 Weatherford Lamb Drilling with casing

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
GB Examination Report, Application No. GB0413486.2, dated Jan. 5, 2006.

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7950463B2 (en) 2003-03-13 2011-05-31 Ocean Riser Systems As Method and arrangement for removing soils, particles or fluids from the seabed or from great sea depths
US7513310B2 (en) * 2003-03-13 2009-04-07 Ocean Riser Systems As Method and arrangement for performing drilling operations
US20060169491A1 (en) * 2003-03-13 2006-08-03 Ocean Riser Systems As Method and arrangement for performing drilling operations
US20090200037A1 (en) * 2003-03-13 2009-08-13 Ocean Riser Systems As Method and arrangement for removing soils, particles or fluids from the seabed or from great sea depths
US20080190663A1 (en) * 2004-08-19 2008-08-14 Roger Stave Method and System for Return of Drilling Fluid
US7958948B2 (en) * 2004-08-19 2011-06-14 Agr Subsea As Method and system for return of drilling fluid
US7963335B2 (en) * 2007-12-18 2011-06-21 Kellogg Brown & Root Llc Subsea hydraulic and pneumatic power
US20090151954A1 (en) * 2007-12-18 2009-06-18 Drew Krehbiel Subsea hydraulic and pneumatic power
US20110236236A1 (en) * 2008-12-08 2011-09-29 Larsen Andreas Boerre Driving arrangement for a pump or compressor
US8845298B2 (en) 2008-12-08 2014-09-30 Ing. Per Gjerdrum As Driving arrangement for a pump or compressor
US20100230110A1 (en) * 2009-03-10 2010-09-16 Vetco Gray, Inc. Well unloading package
US8322442B2 (en) * 2009-03-10 2012-12-04 Vetco Gray Inc. Well unloading package
US20130032396A1 (en) * 2011-08-03 2013-02-07 Roger Sverre Stave Fluid transfer device usable in managed pressure and dual-gradient drilling
US8783379B2 (en) * 2011-08-03 2014-07-22 Roger Sverre Stave Fluid transfer device usable in managed pressure and dual-gradient drilling
US20150240578A1 (en) * 2014-02-21 2015-08-27 Hydril Usa Manufacturing Llc Modular mud lift pump assembly
US9982498B1 (en) * 2015-03-02 2018-05-29 Glenn Shick, Jr. Fluid removal device and method

Also Published As

Publication number Publication date
US20060005999A1 (en) 2006-01-12
GB0413486D0 (en) 2004-07-21
GB2403747A (en) 2005-01-12
GB0614139D0 (en) 2006-08-23
GB2427662A (en) 2007-01-03
GB2427662B (en) 2007-12-27
US20040031622A1 (en) 2004-02-19
US6966367B2 (en) 2005-11-22
GB2403747B (en) 2007-03-14

Similar Documents

Publication Publication Date Title
US7066247B2 (en) Methods and apparatus for drilling with a multiphase pump
US6325152B1 (en) Method and apparatus for increasing fluid recovery from a subterranean formation
US8322435B2 (en) Pressure driven system
US6173768B1 (en) Method and apparatus for downhole oil/water separation during oil well pumping operations
US6102673A (en) Subsea mud pump with reduced pulsation
EP1071862B1 (en) Rotating subsea diverter
US7134498B2 (en) Well drilling and completions system
US5857519A (en) Downhole disposal of well produced water using pressurized gas
EP1532347B1 (en) Closed loop multiphase underbalanced drilling process
US9435163B2 (en) Method and apparatus for removing liquid from a horizontal well
EP2594731A2 (en) Managed pressure cementing
CN105026679A (en) Drilling method for drilling a subterranean borehole
WO1999049172A1 (en) Offshore drilling system
RU2364708C1 (en) Unit borehole rod pumping with double-acting pump
CA2281083C (en) Method and apparatus for down-hole oil/water separation during oil well pumping operations
CN107250540B (en) Pump, assembly for use in a pump and method for opening an assembly
MXPA00005042A (en) Method and apparatus for increasing fluid recovery from a subterranean formation

Legal Events

Date Code Title Description
STCF Information on status: patent grant

Free format text: PATENTED CASE

FEPP Fee payment procedure

Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

FPAY Fee payment

Year of fee payment: 4

FPAY Fee payment

Year of fee payment: 8

AS Assignment

Owner name: JPMORGAN CHASE BANK, N.A., AS ADMINISTRATIVE AGENT

Free format text: SECURITY INTEREST;ASSIGNOR:WEATHERFORD/LAMB, INC.;REEL/FRAME:038848/0819

Effective date: 20160607

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 12TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1553)

Year of fee payment: 12

AS Assignment

Owner name: JPMORGAN CHASE BANK, N.A., AS ADMINISTRATIVE AGENT

Free format text: CONFIRMATORY GRANT OF SECOND LIEN SECURITY INTEREST IN UNITED STATES PATENTS;ASSIGNOR:WEATHERFORD TECHNOLOGY HOLDINGS, LLC;REEL/FRAME:049677/0904

Effective date: 20190703

Owner name: WEATHERFORD/LAMB, INC., TEXAS

Free format text: TERMINATION AND RELEASE OF SECURITY INTEREST IN UNITED STATES PATENTS;ASSIGNOR:JPMORGAN CHASE BANK, N.A., AS ADMINISTRATIVE AGENT;REEL/FRAME:049679/0095

Effective date: 20190703

AS Assignment

Owner name: CITIBANK, N.A., NEW YORK

Free format text: SECURITY INTEREST;ASSIGNOR:WEATHERFORD TECHNOLOGY HOLDINGS, LLC;REEL/FRAME:049691/0137

Effective date: 20190703

AS Assignment

Owner name: WEATHERFORD TECHNOLOGY HOLDINGS, LLC, TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:WEATHERFORD/LAMB, INC.;REEL/FRAME:049827/0769

Effective date: 20190516

AS Assignment

Owner name: WEATHERFORD TECHNOLOGY HOLDINGS, LLC, TEXAS

Free format text: TERMINATION AND RELEASE OF SECOND LIEN SECURITY INTEREST IN UNITED STATES PATENTS PREVIOUSLY RECORDED AT REEL/FRAME (049677/0904);ASSIGNOR:JPMORGAN CHASE BANK, N.A., AS ADMINISTRATIVE AGENT;REEL/FRAME:051285/0769

Effective date: 20191213

AS Assignment

Owner name: WEATHERFORD TECHNOLOGY HOLDINGS, LLC, TEXAS

Free format text: RELEASE BY SECURED PARTY;ASSIGNOR:CITIBANK, N.A.;REEL/FRAME:051325/0053

Effective date: 20191213

Owner name: WELLS FARGO BANK NATIONAL ASSOCIATION AS AGENT, TEXAS

Free format text: SECURITY INTEREST;ASSIGNORS:WEATHERFORD TECHNOLOGY HOLDINGS LLC;WEATHERFORD NETHERLANDS B.V.;WEATHERFORD NORGE AS;AND OTHERS;REEL/FRAME:051891/0089

Effective date: 20191213

AS Assignment

Owner name: DEUTSCHE BANK TRUST COMPANY AMERICAS, AS ADMINISTR

Free format text: SECURITY INTEREST;ASSIGNORS:WEATHERFORD TECHNOLOGY HOLDINGS, LLC;WEATHERFORD NETHERLANDS B.V.;WEATHERFORD NORGE AS;AND OTHERS;REEL/FRAME:051419/0140

Effective date: 20191213

Owner name: DEUTSCHE BANK TRUST COMPANY AMERICAS, AS ADMINISTRATIVE AGENT, NEW YORK

Free format text: SECURITY INTEREST;ASSIGNORS:WEATHERFORD TECHNOLOGY HOLDINGS, LLC;WEATHERFORD NETHERLANDS B.V.;WEATHERFORD NORGE AS;AND OTHERS;REEL/FRAME:051419/0140

Effective date: 20191213

AS Assignment

Owner name: WEATHERFORD TECHNOLOGY HOLDINGS, LLC, TEXAS

Free format text: RELEASE BY SECURED PARTY;ASSIGNOR:WELLS FARGO BANK, NATIONAL ASSOCIATION;REEL/FRAME:053838/0323

Effective date: 20200828

Owner name: WEATHERFORD CANADA LTD., TEXAS

Free format text: RELEASE BY SECURED PARTY;ASSIGNOR:WELLS FARGO BANK, NATIONAL ASSOCIATION;REEL/FRAME:053838/0323

Effective date: 20200828

Owner name: WEATHERFORD NETHERLANDS B.V., TEXAS

Free format text: RELEASE BY SECURED PARTY;ASSIGNOR:WELLS FARGO BANK, NATIONAL ASSOCIATION;REEL/FRAME:053838/0323

Effective date: 20200828

Owner name: HIGH PRESSURE INTEGRITY, INC., TEXAS

Free format text: RELEASE BY SECURED PARTY;ASSIGNOR:WELLS FARGO BANK, NATIONAL ASSOCIATION;REEL/FRAME:053838/0323

Effective date: 20200828

Owner name: PRECISION ENERGY SERVICES ULC, TEXAS

Free format text: RELEASE BY SECURED PARTY;ASSIGNOR:WELLS FARGO BANK, NATIONAL ASSOCIATION;REEL/FRAME:053838/0323

Effective date: 20200828

Owner name: WEATHERFORD U.K. LIMITED, TEXAS

Free format text: RELEASE BY SECURED PARTY;ASSIGNOR:WELLS FARGO BANK, NATIONAL ASSOCIATION;REEL/FRAME:053838/0323

Effective date: 20200828

Owner name: WEATHERFORD NORGE AS, TEXAS

Free format text: RELEASE BY SECURED PARTY;ASSIGNOR:WELLS FARGO BANK, NATIONAL ASSOCIATION;REEL/FRAME:053838/0323

Effective date: 20200828

Owner name: WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH, TEXAS

Free format text: RELEASE BY SECURED PARTY;ASSIGNOR:WELLS FARGO BANK, NATIONAL ASSOCIATION;REEL/FRAME:053838/0323

Effective date: 20200828

Owner name: PRECISION ENERGY SERVICES, INC., TEXAS

Free format text: RELEASE BY SECURED PARTY;ASSIGNOR:WELLS FARGO BANK, NATIONAL ASSOCIATION;REEL/FRAME:053838/0323

Effective date: 20200828

AS Assignment

Owner name: WELLS FARGO BANK, NATIONAL ASSOCIATION, NORTH CAROLINA

Free format text: PATENT SECURITY INTEREST ASSIGNMENT AGREEMENT;ASSIGNOR:DEUTSCHE BANK TRUST COMPANY AMERICAS;REEL/FRAME:063470/0629

Effective date: 20230131