- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related, expires
Links
- 238000012502 risk assessment Methods 0.000 title claims abstract description 34
- 238000000034 method Methods 0.000 title claims abstract description 28
- 239000000356 contaminant Substances 0.000 claims description 24
- 238000004458 analytical method Methods 0.000 claims description 15
- 230000007613 environmental effect Effects 0.000 claims description 13
- 231100000419 toxicity Toxicity 0.000 claims description 13
- 230000001988 toxicity Effects 0.000 claims description 13
- 231100000727 exposure assessment Toxicity 0.000 claims description 12
- 238000004364 calculation method Methods 0.000 claims description 10
- 238000011161 development Methods 0.000 claims description 10
- 238000012512 characterization method Methods 0.000 claims description 7
- 230000036541 health Effects 0.000 claims description 6
- 238000013479 data entry Methods 0.000 claims description 5
- 238000013076 uncertainty analysis Methods 0.000 claims description 5
- 238000013500 data storage Methods 0.000 claims description 4
- 231100000045 chemical toxicity Toxicity 0.000 claims 2
- 230000008569 process Effects 0.000 description 14
- 238000007726 management method Methods 0.000 description 10
- 230000008901 benefit Effects 0.000 description 8
- 238000013459 approach Methods 0.000 description 7
- 230000000694 effects Effects 0.000 description 7
- 238000010276 construction Methods 0.000 description 6
- 230000002411 adverse Effects 0.000 description 4
- 238000004891 communication Methods 0.000 description 4
- 238000011156 evaluation Methods 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 206010028980 Neoplasm Diseases 0.000 description 3
- 230000009471 action Effects 0.000 description 3
- 201000011510 cancer Diseases 0.000 description 3
- 230000004075 alteration Effects 0.000 description 2
- 230000000711 cancerogenic effect Effects 0.000 description 2
- 231100000315 carcinogenic Toxicity 0.000 description 2
- 150000001875 compounds Chemical class 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 231100001223 noncarcinogenic Toxicity 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 241000282412 Homo Species 0.000 description 1
- 241001465754 Metazoa Species 0.000 description 1
- 239000000654 additive Substances 0.000 description 1
- 230000000996 additive effect Effects 0.000 description 1
- 239000003570 air Substances 0.000 description 1
- 230000008485 antagonism Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000001186 cumulative effect Effects 0.000 description 1
- 238000013480 data collection Methods 0.000 description 1
- 238000011157 data evaluation Methods 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 230000037406 food intake Effects 0.000 description 1
- 230000008821 health effect Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 238000013178 mathematical model Methods 0.000 description 1
- 239000003129 oil well Substances 0.000 description 1
- 210000000056 organ Anatomy 0.000 description 1
- 239000003208 petroleum Substances 0.000 description 1
- 238000005067 remediation Methods 0.000 description 1
- 238000005070 sampling Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000005303 weighing Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10S—TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10S707/00—Data processing: database and file management or data structures
- Y10S707/99941—Database schema or data structure
- Y10S707/99944—Object-oriented database structure
- Y10S707/99945—Object-oriented database structure processing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10S—TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10S707/00—Data processing: database and file management or data structures
- Y10S707/99941—Database schema or data structure
- Y10S707/99948—Application of database or data structure, e.g. distributed, multimedia, or image
Definitions
- This invention relates to the field of project management, and more particularly to network-enabled real property project management, and even more particularly to network-enabled risk assessment.
- GIS geographic information system
- GIS extends the functionality of a traditional database by combining spatial features with informational records. For example, a user might view a town map and be able to retrieve information such as street names, building construction dates, etc.
- the purpose of GIS is to use geographical representation for retrieval of underlying information.
- Real property projects have historically suffered from poor project management (i.e. lack of effective and timely communication between involved parties, including regulators, inspectors, company managers and their prime contractors and nested subcontractors) which ultimately results in higher project costs and delays.
- Updated status reports, paper trails, phone calls, and job site meetings are the best available tools currently used to manage real property projects, and are often inadequate to keep all project participants properly informed. For example, during the construction of a site, it is typical to use plumbers, electricians, and other subcontractors. Under the current system of project management it is possible that the project administrator will have ordered alterations to the plans on several occasions; however, these changes may not have been relayed to the subcontractors, and therefore each subcontractor may be operating from a different set of plans.
- the present invention organizes, quantifies, and analyzes this information all in one place.
- the inventive system takes the information from all the steps, analyzes it, and produces the necessary risk assessment documents.
- the current invention will automatically update the reference data/information without any input from the user.
- Risk software is commonly used in the industry. However, there are no examples of network-enabled risk assessment software being used to allow access to continuously up to date reference, or site, information.
- a method for network-enabled risk assessment includes the steps of utilizing a global computer network, providing risk assessment information, the information containing reference information, the reference information being continuously updateable, providing data storage means, providing data entry means for entering the information, providing means for entering exposure assessment data, which includes the steps of providing fate and transport modeling and providing means for entering at least one entity that may be exposed to at least one contaminant, providing means for entering toxicity assessment data, calculating risk characterization, providing target level development and risk assessment, providing means for factoring in uncertainty analysis data, providing controlled access to the information, updating the information, providing a deterministic analysis of risk, and providing a probabilistic analysis of risk.
- a risk assessment system includes a global computer network, risk assessment information, the information containing reference information, the reference information being continuously updateable, means for providing controlled access to the information, data storage means, data entry means for entering the information, means for entering exposure assessment data, the means including fate and transport modeling and means for entering at least one entity that may be exposed to at least one contaminant, means for entering toxicity assessment data, calculating means for calculating risk characterization, means for providing target level development and risk assessment, means for factoring in uncertainty analysis data, updating means for updating the information, means for providing a deterministic analysis of risk, and means for providing a probabilistic analysis of risk.
- the method includes utilizing a computer network, a wide-area computer network, or a global computer network.
- One advantage of the present invention is that numerous projects can be tied together via the computer network.
- Another advantage of the present invention is that the information regarding the projects is easily manageable.
- Yet another advantage of the present invention is that a risk assessment can be carried out over a global computer network.
- Still another advantage of the present invention is that any project participant can access the data, given the appropriate permission.
- Another advantage of the present invention is that all of the data and other information can be stored in one virtual location, which allows quick and easy retrieval and manipulation.
- Still another advantage of the present invention is that the information, and particularly the reference information and modeling programs can be continuously updated.
- Carcinogenic an effect which causes the development of cancer.
- Exposure Assessment determination of what receptors are, or may be, exposed to particular contaminants at particular concentrations. Also includes how much of a contaminant they are, or may be, exposed to in the future.
- Fate and Transport Modeling determines the fate of a contaminant as it is transported between media (intermediary) or within an environmental medium (intramediary).
- Information any quantifiable data, such as physical or exposure (i.e. demographic or time and activity patterns) data. Also included in this definition are algorithms, which include any one or more pieces of the software program, up to, and including, the entire program. This term is intended to have as broad a definition as possible.
- Non-carcinogenic an effect that impacts the development, size, or functioning of the whole body or specific body organs, but does not lead to the development of cancer.
- Real Property Project Management Relating to tasks involved with coordinating and implementing work to be done on a site which relates to the physical condition of the property. Such work may include, but is not limited to, construction, environmental testing and engineering, and consulting services for such projects.
- Risk assessment quantitative process for determining the likelihood of an adverse health effect.
- Target level development Beginning with a target risk and working toward a particular concentration for a particular contaminant or contaminants in one or more media.
- Toxicity Assessment the process of weighing available evidence regarding the potential for particular contaminants to cause adverse effects in exposed receptors and to provide, where possible, an estimate of the relationship between the extent of exposure to a contaminant and the increased likelihood and/or severity of adverse effects.
- Uncertainty Analysis analysis of levels of uncertainty throughout the risk assessment process.
- FIG. 1 is a flow chart of a baseline risk assessment
- FIG. 2 is a flow chart of a standard development
- FIG. 3 is a diagram showing an example of direct exposure to a contaminant
- FIG. 4 is a diagram showing an example of indirect exposure to a contaminant
- FIG. 5 is an exposure scenario evaluation flowchart
- FIG. 6 is risk-based corrective action process flowchart.
- the software allows quick access to all geographic and project specific information.
- Geographic information accessible through GIS components, may include such things as site maps, engineering drawings, topographic maps, sample points, etc.
- Project management information is managed through interactive message boards and scheduling calendars, which record communications relative to the project and show construction, inspection, compliance and reporting deadlines relative to the project.
- Other project data includes analytical results, prepared reports, expense and revenue spreadsheets, etc., and is stored using database tools and electronic filing cabinets.
- the process starts with an account, which can have any number of physical sites.
- the physical sites may include, but are not limited to, property/real estate, construction sites, environmental compliance sites (i.e. sites that require environmental permits or licenses to comply with regulations), environmental investigation and remediation sites, natural resource management sites (i.e. oil wells, water wells, mines, forestry, etc.) This list is intended for illustrative purposes only, and is not intended to limit the invention in any manner.
- the inventive risk assessment method in this embodiment includes the use of a global computer network to provide access to continuously updateable information in order to perform a risk assessment.
- the network component is the Internet (i.e. global computer network).
- the first user interface of the present invention is a log-on screen that requires a user name as well as a password.
- a risk assessment begins with the collection and evaluation of samples from a site. It is to be understood that the risk 30 assessment is not limited to a specific site, but can be a collection of different sites, or simply generic information for a hypothetical site. The collection and analysis of the samples is well known in the art and, for the sake of brevity, will not be described further herein. Once the data collection and evaluation has been completed, that information is then entered into the inventive system. It is to be understood that the raw data collected from the site could be entered directly into the inventive system and evaluated and analyzed on the system.
- the inventive system then performs both an exposure assessment and a toxicity assessment on the information.
- the exposure assessment determines what receptors are, or may be, exposed to the contaminants at the particular concentrations.
- the entities who may be affected can include plants and animals, as well as humans.
- the assessment can also determine how much of the contaminant the entities will, or may be, exposed to in the future.
- the calculations used to determine the exposure assessment are well known in the art and will not be described herein.
- the contaminant, population, route of exposure, and medium all need to be taken into consideration in order to determine the overall risk.
- the contaminant is simply the particular compound, or compounds, found at the site, the population is the entities potentially affected (i.e. adult males, age 30-50, female children, age 5-12, etc.), the route of exposure is the means by which the receptor is exposed to the contaminant (i.e. inhalation, ingestion, etc.), and the medium is the transporter (i.e. soil, water, air, etc.).
- the total site risk is equal to the sum of the risks for each contaminant, for each population, within each route of exposure, and for all media that occur within the same exposure scenario simultaneously. The calculations used in determining each of these is well known in the art, and will not be described herein.
- Fate and transport modeling determines the fate of a contaminant as it is transported between (intermediary) or within (intramediary) an environmental medium.
- An example of intramediary fate and transport modeling would be the determination of concentration from one side of a lake to another as the contaminant travels through the water.
- An example of an intermediary fate and transport modeling would be the determination of concentration from the water of a lake to the sand of a beach.
- the analytical approach is the simplification of complicated real world conditions so that exact solutions can be derived. Examples of this approach include BIOSCREEN® and BIOCHLOR.
- the numeric approach is an attempt to simulate real world conditions in all their complexities using advanced mathematical models that can derive very accurate results. Examples of this approach include MODFLOW and BIOPLUME.
- the toxicity assessment must be performed as well. Many times, the toxicity values have already been predetermined by government agencies such as the USEPA (United States Environmental Protection Agency). If a particular toxicity value is not predetermined than one can be determined when necessary. The determination of toxicity values is well known in the art, and the process will not be described herein. The toxicity assessment and exposure assessment work together to create the risk characterization.
- the risk characterization is determined on both a carcinogenic and a non-carcinogenic basis. For each basis there is a separate algorithm, which will not be described herein.
- the risk characterization for carcinogenic substances is given in terms of a unitless probability (i.e. one excess cancer per hundred thousand people).
- the non-carcinogenic substances are calculated using a unitless hazard index. If the level of hazard exceeds one, than an adverse effect can happen. Since the inventive system is using a computer network, and in this example, a global computer network, the toxicity values can be updated continuously.
- the final step in this process is the inclusion of the uncertainty levels that occur throughout the process.
- the calculations regarding the uncertainty levels are well known in the art and will not be described herein. It is to be understood, however, that quantitative uncertainty analysis is an optional step in the process.
- Example 1 is intended only to illustrate one embodiment of the invention and is not intended to limit the invention in any manner.
- the actual operation of the computer software is well within the knowledge of one ordinarily skilled in the art of software programming.
- the process also works in reverse for target level development. If the target risk for a particular site is already known, then the determination needs to be focused on what concentrations of particular contaminants are needed to meet the target risk. For target level development, the toxicity assessment remains the same. For the exposure assessment, the target risk needs to be incorporated so that the risk assessor can calculate the potential dose of a contaminant that would create a risk at or below the target risk. Again, the calculations used to make these determinations are well known in the art and will not be described herein. The remainder of the process is identical to the risk assessment.
- the assessor can either use a deterministic analysis or a probabilistic analysis.
- a deterministic analysis is a point estimate of the risk, where individual data points are used to determine the risk.
- a probabilistic analysis a distribution is used to determine the risk.
- a distribution is a collection of data points from one particular sampling point. The methods and calculations used in deterministic and probabilistic analyses are well known in the art and will not be described herein.
- the most widely used method for determining the standard or total risk for a site is the cumulative and additive method, where the total risk is each individual risk added together.
- Other possible methods include synergism, which ends up with a total risk that is greater than the sum or the parts, and antagonism, which ends up with a total risk that is less than the sum of the parts.
- Another method is to determine the risk for each contaminant or media separately and ignore any possible effects that they have on one another. Examples of risk assessment procedures are disclosed in ASTM Designation: E 1739-95 “Standard Guide for Risk-based Corrective Action Applied at Petroleum Release Sites” and in ASTM Designation PS 104-98 “Standard Provisional Guide for Risk-Based Corrective Action,” both of which are incorporated herein by reference.
- the risk assessment software can be a stand-alone package.
- the present invention is accessible via a computer network.
- This access to the computer network allows users all over the world to simultaneously and instantaneously access the relevant site information. For example, the entire project management/risk assessment can take place from a laptop computer in a hotel room.
- the user can access all of the relevant information regarding any site, including deadlines and upcoming tests, meetings, constructions, etc., monitor any questions or comments, view maps of the site and the surrounding area, print out and organize the information, all via a computer network.
- All of the relevant site information is linked to a web-centric platform so that the user and/or his subcontractors can perform project management accessing the inventive system using a web browser.
- Posting of information, as well as access to posted information can be restricted to authorized personnel determined and controlled by the administrator.
- the site information will be structured in an individual site database to provide multiple security levels for certain types of data.
- the information can be transferred from the inventive system to the user's system, so that the user can view the information off-line. Again, the storage of electronic information is well known in the art and will not be further described.
- the present invention has been described using both GIS software and a global computer network. However, these are merely particular embodiments of the invention and are not intended to limit the invention in any manner. As stated above, any network can be used as long as chosen using sound engineering judgment. Also, any tool that allows the user to view and/or manipulate the information in a textual or pictorial format may be used, as long as chosen using sound engineering judgment.
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (2)
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US09/660,156 US6718342B1 (en) | 2000-09-01 | 2000-09-11 | Method and apparatus for network-enabled risk assessment |
PCT/US2001/026856 WO2002021310A2 (en) | 2000-09-01 | 2001-08-29 | Method and apparatus for network-enabled risk assessment |
AU2001286864A AU2001286864A1 (en) | 2000-09-01 | 2001-08-29 | Method and apparatus for network-enabled risk assessment |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US23052100P | 2000-09-01 | 2000-09-01 | |
US09/660,156 US6718342B1 (en) | 2000-09-01 | 2000-09-11 | Method and apparatus for network-enabled risk assessment |
Publications (1)
Publication Number | Publication Date |
---|---|
US6718342B1 true US6718342B1 (en) | 2004-04-06 |
Family
ID=26924315
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US09/660,156 Expired - Fee Related US6718342B1 (en) | 2000-09-01 | 2000-09-11 | Method and apparatus for network-enabled risk assessment |
Country Status (3)
Country | Link |
---|---|
US (1) | US6718342B1 (en) |
AU (1) | AU2001286864A1 (en) |
WO (1) | WO2002021310A2 (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020138318A1 (en) * | 2000-10-12 | 2002-09-26 | David Ellis | Integrative risk management system and method |
US20030004954A1 (en) * | 2001-06-27 | 2003-01-02 | Clark Mark A. | Conflict assessment system tool |
US20040064346A1 (en) * | 2002-10-01 | 2004-04-01 | Reto Schneider | Method and system for gathering information relating to risks |
US20060041486A1 (en) * | 2000-10-23 | 2006-02-23 | Harris Timothy M | Method and system for providing analysis data on chemical compounds and for providing chemical compound availability information |
US20080228815A1 (en) * | 2007-03-15 | 2008-09-18 | Senn Kevin J | Methods and systems for managing risk |
US20140100890A1 (en) * | 2012-03-14 | 2014-04-10 | Terrance Luciani | Risk management system and method for protecting virtual assets |
US20140172513A1 (en) * | 2012-12-13 | 2014-06-19 | Stantec Technology International Inc. | Environmental compliance and management system |
US10360525B1 (en) * | 2016-02-16 | 2019-07-23 | Wells Fargo Bank, N.A. | Timely quality improvement of an inventory of elements |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1168259A3 (en) | 2000-06-28 | 2003-12-17 | Hitachi, Ltd. | Data management method and system for IC card |
JP2002109169A (en) * | 2000-09-29 | 2002-04-12 | Hitachi Ltd | Method and system for supporting work and recording medium having work supporting method recorded thereon |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5787429A (en) * | 1996-07-03 | 1998-07-28 | Nikolin, Jr.; Michael A. | Potential hazard and risk-assessment data communication network |
US5978804A (en) * | 1996-04-11 | 1999-11-02 | Dietzman; Gregg R. | Natural products information system |
US6112750A (en) * | 1998-03-24 | 2000-09-05 | International Business Machines Corporation | Method and system for assessing risks and prognoses of a given course of medical treatment |
US6192329B1 (en) * | 1998-08-12 | 2001-02-20 | Risk Analysis & Management | Method and apparatus for assessing risks of injury |
US6256640B1 (en) * | 1998-12-11 | 2001-07-03 | American Management Systems, Inc. | System for managing regulated entities |
US6336096B1 (en) * | 1998-10-09 | 2002-01-01 | Donald V. Jernberg | System and method for evaluating liability |
-
2000
- 2000-09-11 US US09/660,156 patent/US6718342B1/en not_active Expired - Fee Related
-
2001
- 2001-08-29 WO PCT/US2001/026856 patent/WO2002021310A2/en active Application Filing
- 2001-08-29 AU AU2001286864A patent/AU2001286864A1/en not_active Abandoned
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5978804A (en) * | 1996-04-11 | 1999-11-02 | Dietzman; Gregg R. | Natural products information system |
US5787429A (en) * | 1996-07-03 | 1998-07-28 | Nikolin, Jr.; Michael A. | Potential hazard and risk-assessment data communication network |
US6112750A (en) * | 1998-03-24 | 2000-09-05 | International Business Machines Corporation | Method and system for assessing risks and prognoses of a given course of medical treatment |
US6192329B1 (en) * | 1998-08-12 | 2001-02-20 | Risk Analysis & Management | Method and apparatus for assessing risks of injury |
US6336096B1 (en) * | 1998-10-09 | 2002-01-01 | Donald V. Jernberg | System and method for evaluating liability |
US6256640B1 (en) * | 1998-12-11 | 2001-07-03 | American Management Systems, Inc. | System for managing regulated entities |
Non-Patent Citations (8)
Title |
---|
Risk Assessment Guidance for Super fund vol. 1 Human Health Evaluation Manual Part A. |
Risk Assessment Guidance for Superfund vol. 1-Human Health Evaluation Manual (Part B, Development of Risk-based Preliminary Remediation Goals. |
Risk Assessment Guidance for Superfund vol. 1—Human Health Evaluation Manual (Part B, Development of Risk-based Preliminary Remediation Goals. |
Robert Runkel Titled " One Dimentional Transport with Inflow and Storage (OTIS): A Solute transport model for Streams and Rivers" For U S Geological Survey, Water-Resources Investigations Report 98-4018 pp. 52&53.* * |
Robert Runkel Titled " One Dimentional Transport with Inflow and Storage (OTIS): A Solute transport model for Streams and Rivers"0 For U S Geological Survey, Water-Resources Investigations Report 98-4018 pp. 52&53.* * |
Standard Guide for Risk-based Corrective Action Applied at Petroleum Relesease Sites<1>. |
Standard Guide for Risk-based Corrective Action Applied at Petroleum Relesease Sites1. |
Standard Provisional Guide for Risk-Based Corrective Action; Designation PS 104 -98. |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020138318A1 (en) * | 2000-10-12 | 2002-09-26 | David Ellis | Integrative risk management system and method |
US7440905B2 (en) * | 2000-10-12 | 2008-10-21 | Strategic Thought Limited | Integrative risk management system and method |
US20060041486A1 (en) * | 2000-10-23 | 2006-02-23 | Harris Timothy M | Method and system for providing analysis data on chemical compounds and for providing chemical compound availability information |
US20030004954A1 (en) * | 2001-06-27 | 2003-01-02 | Clark Mark A. | Conflict assessment system tool |
US7092927B2 (en) * | 2001-06-27 | 2006-08-15 | The Fund For Peace Corporation | Conflict assessment system tool |
US20040064346A1 (en) * | 2002-10-01 | 2004-04-01 | Reto Schneider | Method and system for gathering information relating to risks |
US20080228815A1 (en) * | 2007-03-15 | 2008-09-18 | Senn Kevin J | Methods and systems for managing risk |
US20140100890A1 (en) * | 2012-03-14 | 2014-04-10 | Terrance Luciani | Risk management system and method for protecting virtual assets |
US20140172513A1 (en) * | 2012-12-13 | 2014-06-19 | Stantec Technology International Inc. | Environmental compliance and management system |
US10360525B1 (en) * | 2016-02-16 | 2019-07-23 | Wells Fargo Bank, N.A. | Timely quality improvement of an inventory of elements |
US10789564B1 (en) * | 2016-02-16 | 2020-09-29 | Wells Fargo Bank, N.A. | Timely quality improvement of an inventory of elements |
Also Published As
Publication number | Publication date |
---|---|
WO2002021310A8 (en) | 2004-01-22 |
AU2001286864A1 (en) | 2002-03-22 |
WO2002021310A2 (en) | 2002-03-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ghodrati et al. | Role of management strategies in improving labor productivity in general construction projects in New Zealand: Managerial perspective | |
US7031838B1 (en) | System and method for a cradle-to-grave solution for investigation and cleanup of hazardous waste impacted property and environmental media | |
Lin et al. | A user-centered information and communication technology (ICT) tool to improve safety inspections | |
Sacer et al. | The Impact of accounting estimates on financial position and business performance–case of non-current intangible and tangible assets | |
Gurmu | Tools for measuring construction materials management practices and predicting labor productivity in multistory building projects | |
Al-Bayati et al. | Reducing damage to underground utilities: Lessons learned from damage data and excavators in North Carolina | |
US6718342B1 (en) | Method and apparatus for network-enabled risk assessment | |
Hardison et al. | Does the format of design information affect hazard recognition performance in construction hazard prevention through design reviews? | |
Haklay et al. | The potential of a GIS-based scoping system: an Israeli proposal and case study | |
Mendis et al. | Contractual obligations analysis for construction waste management in Canada | |
Whitacre et al. | A Comparison of Protocols and Observer Precision for Measuring Physical Stream Attributes 1 | |
Wong et al. | Modeling and forecasting construction labor demand: Multivariate analysis | |
Wu et al. | A sustainability assessment-based methodology for the prioritization of contaminated site risk management options | |
Frantzen | Risk-based analysis for environmental managers | |
Tarekegn Gurmu | Preconstruction Phase Management Practices Enhancing Labor Productivity in Multistory Building Projects | |
Ayob | Strategies to enhance quality data input requirements of life cycle cost (LCC) | |
Fish et al. | Linking New Hampshire’s rock cut management system with a geographic information system | |
Brown et al. | Environment agency framework for groundwater resources conceptual and numerical modelling | |
WO2002019212A2 (en) | Method and apparatus for network-enabled real property project management | |
Martinez | Design management phases in a construction irrigation dam: case study | |
Verhaeghe | Establishment of Rural Road Research Capacity in Myanmar: RDU Business Plan for First Five Years of Operation | |
Membah | Parametric cost estimating and risk analysis of transportation tunneling projects | |
Zamenian et al. | Pre-Contract Project Scoping Processes: Synthesis of Practices | |
Zhai | The relationship between information technology and construction productivity | |
Jans-Singh et al. | Global review of whole life carbon assessments in the built environment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: BJAAM ENVIRONMENTS, INC., OHIO Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:SCHULTZ, TROY L.;DETRANO, MARC C.;KEMPE, JAMES G.;REEL/FRAME:011338/0809 Effective date: 20000908 |
|
AS | Assignment |
Owner name: REAL TIME BOSS, INC., OHIO Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:BJAAM ENVIRONMENTAL, INC.;REEL/FRAME:011984/0572 Effective date: 20010510 |
|
AS | Assignment |
Owner name: REAL TIME BOSS, INC., OHIO Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:BJAAM ENVIRONMENTAL, INC.;REEL/FRAME:014319/0807 Effective date: 20030715 |
|
FPAY | Fee payment |
Year of fee payment: 4 |
|
AS | Assignment |
Owner name: BJAAM ENVIRONMENTAL, INC., OHIO Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:REAL TIME BOSS, INC.;REEL/FRAME:020462/0252 Effective date: 20080115 |
|
REMI | Maintenance fee reminder mailed | ||
LAPS | Lapse for failure to pay maintenance fees | ||
STCH | Information on status: patent discontinuation |
Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362 |
|
FP | Lapsed due to failure to pay maintenance fee |
Effective date: 20120406 |