US5863852A - Regeneration of adsorbent beds - Google Patents

Regeneration of adsorbent beds Download PDF

Info

Publication number
US5863852A
US5863852A US08/728,118 US72811896A US5863852A US 5863852 A US5863852 A US 5863852A US 72811896 A US72811896 A US 72811896A US 5863852 A US5863852 A US 5863852A
Authority
US
United States
Prior art keywords
adsorbent
bed
nitrogen
hydrogen
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
US08/728,118
Inventor
Thomas Hsiao-Ling Hsiung
John Bruce Wallace, Jr.
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Air Products and Chemicals Inc
Original Assignee
Air Products and Chemicals Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Assigned to AIR PRODUCTS AND CHEMICALS, INC. reassignment AIR PRODUCTS AND CHEMICALS, INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: HSIUNG, THOMAS HSIAO-LING, WALLACE, JOHN BRUCE JR.
Application filed by Air Products and Chemicals Inc filed Critical Air Products and Chemicals Inc
Priority to US08/728,118 priority Critical patent/US5863852A/en
Priority to EP97307831A priority patent/EP0835687B1/en
Priority to DE69713979T priority patent/DE69713979D1/en
Priority to CA002217272A priority patent/CA2217272C/en
Priority to TW086114539A priority patent/TW353037B/en
Priority to KR1019970051515A priority patent/KR100230858B1/en
Priority to JP9277381A priority patent/JPH10202115A/en
Publication of US5863852A publication Critical patent/US5863852A/en
Application granted granted Critical
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J38/00Regeneration or reactivation of catalysts, in general
    • B01J38/02Heat treatment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J23/00Catalysts comprising metals or metal oxides or hydroxides, not provided for in group B01J21/00
    • B01J23/90Regeneration or reactivation
    • B01J23/94Regeneration or reactivation of catalysts comprising metals, oxides or hydroxides of the iron group metals or copper
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J38/00Regeneration or reactivation of catalysts, in general
    • B01J38/04Gas or vapour treating; Treating by using liquids vaporisable upon contacting spent catalyst

Definitions

  • the present invention pertains to regenerating catalyst adsorbent beds used to remove trace impurities from cryogenically produced nitrogen.
  • UHP nitrogen gas as an inerting medium during various semiconductor processing steps. It is not uncommon for large semiconductor fabrication houses (FABS) to require in excess of 100,000 standard cubic feet per hour (SCFH) of UHP nitrogen.
  • FBS semiconductor fabrication houses
  • SCFH standard cubic feet per hour
  • the UHP nitrogen is produced by separating the nitrogen from atmospheric air using well-known cryogenic technologies. The cryogenically separated nitrogen is then further treated to remove trace quantities of hydrogen, carbon monoxide, oxygen, carbon dioxide and water.
  • One particularly effective method for removing the unwanted species is by passing the nitrogen gas through a bed of a nickel-based catalytic adsorbent.
  • the known adsorbents are capable of removing parts-per-million (ppm) levels of oxygen, carbon monoxide, hydrogen, carbon dioxide and water from cryogenically produced nitrogen to below parts-per-billion (ppb) levels.
  • the capability of the adsorbent decreases with time-on-stream or time-in-use.
  • the adsorbent In order to rejuvenate the ability of the nickel-based catalytic adsorbent to remove the unwanted species, the adsorbent must be regenerated periodically.
  • the present invention pertains to regeneration of nickel-based catalytic adsorbent beds using a process wherein, depending upon the geometry of the adsorbent bed, at least one periodic regeneration of the adsorbent by the well-known hydrogen reduction technique can be replaced with a process wherein the adsorbent bed is heated to a temperature of at least about 300° F. (149° C.) followed by flowing nitrogen having a purity of at least 99.9999% N 2 through said bed while maintaining said bed at a temperature of at least about 300° F. (149° C.) for a period of time to remove a major portion of the adsorbed species from said adsorbent bed followed by cooling said adsorbent bed to a temperature no higher than 120° F. (49° C.).
  • FIG. 1 is a plot of breakthrough time in hours against bed height when using the process of the invention to regenerate a commercial nickel-based catalyst.
  • FIG. 2 is a plot of breakthrough time in hours against bed height when using the process of the present invention to regenerate another commercial nickel-based catalyst.
  • cryogenically produced nitrogen which normally contains parts-per-million levels of oxygen, carbon monoxide, hydrogen, carbon dioxide and water (hereinafter referred to as the unwanted species) in the nitrogen.
  • the unwanted species can be effectively removed or reduced to below parts-per-billion levels by passing the cryogenically produced nitrogen through a bed of a nickel-based catalytic adsorbent.
  • the nickel-based catalytic adsorbent has the least capacity for carbon dioxide and the highest capacity for oxygen.
  • the carbon dioxide is usually the first species to break out of a nickel-based purifier bed.
  • the adsorbent bed is taken off-stream and is regenerated using a reduction gas, such as a dilute (1 to 2%) hydrogen in nitrogen mixture.
  • a reduction gas such as a dilute (1 to 2%) hydrogen in nitrogen mixture.
  • the use of the hydrogen/nitrogen mixture requires a nitrogen purge after the unwanted species are desorbed or removed from the nickel-based catalytic adsorbent. Purging results in a long time interval before the catalytic bed can be put back in service because of the residual hydrogen from the regeneration step. The long purge also increases the cost for producing UHP nitrogen by this method.
  • the catalyst bed is taken out of service and subjected to a step wherein it is heated to a temperature of at least 300° F. (149° C.) and preferably within a range of 300° F. (149° C.) to 572° F. (300° C.).
  • 149° C. a temperature of at least 300° F.
  • 149° C. a temperature of at least 300° F.
  • 572° F. 300° C.
  • the bed is cooled to a temperature of no greater than 120° F. (49° C.) and at that time is ready to be placed in service.
  • a temperature of no greater than 120° F. (49° C.) Normally, two or more beds would be available to permit the continuous purification of the cryogenically produced nitrogen by having one bed on-stream effecting removal of unwanted species from the cryogenically produced nitrogen while the other bed or beds are being regenerated, or have been regenerated and are idled waiting for reengagement in the process.
  • the regeneration flow was 0.28 scfm nitrogen. Three successive cycles were performed. The results are summarized in FIG. 1 where the CO 2 breakthrough time (defined at 10 ppb CO 2 in the stream) is plotted against bed height. As shown in FIG. 1, at 18" of bed height, the breakthrough time reduced slightly from 12 hours to 10.3 hours and then to 9.2 hours with successive regenerations. In all cases, no CO 2 breakthrough at the exit (45") of the bed was observed for the 24-hour cycle operation. The original capacity can be recovered with a conventional regeneration with hydrogen.
  • Example 1 A similar experiment was conducted with a commercial Nickel-Kieselguhr catalyst, Catalyst B.
  • a reactor of the same dimension as in Example 1 was loaded with 6.84 lbs. of Catalyst B and activated with a conventional reduction procedure.
  • the purifier was operated at 80° F. and 80 psig inlet pressure, challenged with 2.4 ppm Co. And 3.6 ppm O 2 in a nitrogen gas flow of 3.5 scfm.
  • Four consecutive breakthrough runs were made with three interim regenerations without using hydrogen. The interim regeneration procedure was the same as described in Example 1.
  • This invention makes it possible to use several interim regenerations before a conventional regeneration is needed.
  • the interim regenerations while replacing conventional regenerations, maintain the same cycle time, and require no hydrogen.
  • Operational savings can be realized by alleviating the reduction step and shortening the purge step.
  • Applying the regeneration method of the present invention results in the elimination of the reduction step.
  • the duration of the hot purge step can be significantly reduced.
  • the idle step is needed to maintain the 72-hour cycle. With the interim regeneration, no hydrogen is required and the nitrogen consumption is greatly reduced.
  • the present invention has been discussed and illustrated in relation to the production of ultra-pure nitrogen.
  • any gas purification process that uses similar catalytic adsorbent techniques, can use the process of the present invention with similar results.
  • similar purifiers are used in the production of ultra-high purity argon and helium so the process is applicable to these gases also.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Separation Of Gases By Adsorption (AREA)
  • Solid-Sorbent Or Filter-Aiding Compositions (AREA)
  • Catalysts (AREA)

Abstract

A method for regenerating a nickel-based catalytic adsorbent without using hydrogen in each cycle. Depending upon the configuration of the adsorbent bed, one or more interim regenerations, comprising the steps of heating the bed, flowing ultra-high purity nitrogen without hydrogen through the bed to remove adsorbed species, followed by cooling the bed, can be used to prepare the adsorbent bed for removal of unwanted species contained in cyrogenically produced nitrogen in order to make UHP nitrogen.

Description

FIELD OF THE INVENTION
The present invention pertains to regenerating catalyst adsorbent beds used to remove trace impurities from cryogenically produced nitrogen.
BACKGROUND OF THE INVENTION
The manufacture of semiconductor devices, and in particular advanced semiconductor devices with very small feature sizes, higher device density and larger chip sizes requires the use of ultra-high purity (UHP) nitrogen gas as an inerting medium during various semiconductor processing steps. It is not uncommon for large semiconductor fabrication houses (FABS) to require in excess of 100,000 standard cubic feet per hour (SCFH) of UHP nitrogen. The UHP nitrogen is produced by separating the nitrogen from atmospheric air using well-known cryogenic technologies. The cryogenically separated nitrogen is then further treated to remove trace quantities of hydrogen, carbon monoxide, oxygen, carbon dioxide and water.
A number of techniques for removing these unwanted species (hydrogen, carbon monoxide, oxygen, carbon dioxide and water) from nitrogen are known. Several techniques are discussed in the specification of U.S. Pat. No. 4,869,883 which is incorporated herein by reference.
One particularly effective method for removing the unwanted species is by passing the nitrogen gas through a bed of a nickel-based catalytic adsorbent. The known adsorbents are capable of removing parts-per-million (ppm) levels of oxygen, carbon monoxide, hydrogen, carbon dioxide and water from cryogenically produced nitrogen to below parts-per-billion (ppb) levels. The capability of the adsorbent decreases with time-on-stream or time-in-use. In order to rejuvenate the ability of the nickel-based catalytic adsorbent to remove the unwanted species, the adsorbent must be regenerated periodically. It is known to use hydrogen diluted with nitrogen to reactivate the adsorbent each time the capacity of the adsorbent to remove the unwanted species has reached the end of its cycle time. After the hydrogen reduction step, wherein the adsorbed unwanted species are removed from the catalytic adsorbent, a purge step is necessary to remove the residual hydrogen from the adsorbent bed. The use of a cycle of hydrogen reduction followed by a purging cycle creates an inefficiency in the production of UHP nitrogen because of the time required to purge the bed of hydrogen. In addition, the costs of operating such a regeneration scheme on a continuing basis are significant.
SUMMARY OF THE INVENTION
The present invention pertains to regeneration of nickel-based catalytic adsorbent beds using a process wherein, depending upon the geometry of the adsorbent bed, at least one periodic regeneration of the adsorbent by the well-known hydrogen reduction technique can be replaced with a process wherein the adsorbent bed is heated to a temperature of at least about 300° F. (149° C.) followed by flowing nitrogen having a purity of at least 99.9999% N2 through said bed while maintaining said bed at a temperature of at least about 300° F. (149° C.) for a period of time to remove a major portion of the adsorbed species from said adsorbent bed followed by cooling said adsorbent bed to a temperature no higher than 120° F. (49° C.).
BRIEF DESCRIPTION OF THE DRAWING
FIG. 1 is a plot of breakthrough time in hours against bed height when using the process of the invention to regenerate a commercial nickel-based catalyst.
FIG. 2 is a plot of breakthrough time in hours against bed height when using the process of the present invention to regenerate another commercial nickel-based catalyst.
DETAILED DESCRIPTION OF THE INVENTION
In the production of UHP nitrogen, it is conventional to start with cryogenically produced nitrogen which normally contains parts-per-million levels of oxygen, carbon monoxide, hydrogen, carbon dioxide and water (hereinafter referred to as the unwanted species) in the nitrogen. The unwanted species can be effectively removed or reduced to below parts-per-billion levels by passing the cryogenically produced nitrogen through a bed of a nickel-based catalytic adsorbent. Among the unwanted species set forth above, the nickel-based catalytic adsorbent has the least capacity for carbon dioxide and the highest capacity for oxygen. During a normal purification cycle, the carbon dioxide is usually the first species to break out of a nickel-based purifier bed. According to current practice, as soon as the carbon dioxide breakthrough occurs, the adsorbent bed is taken off-stream and is regenerated using a reduction gas, such as a dilute (1 to 2%) hydrogen in nitrogen mixture. The use of the hydrogen/nitrogen mixture requires a nitrogen purge after the unwanted species are desorbed or removed from the nickel-based catalytic adsorbent. Purging results in a long time interval before the catalytic bed can be put back in service because of the residual hydrogen from the regeneration step. The long purge also increases the cost for producing UHP nitrogen by this method.
It has been discovered that with the conventional nickel-based catalyst adsorbent systems, depending upon the geometry of adsorbent bed, one or more interim regenerations using UHP nitrogen can be employed before it is necessary to use a hydrogen/nitrogen mixture reduction regeneration.
According to the present invention, once the detection of carbon dioxide breakthrough occurs, the catalyst bed is taken out of service and subjected to a step wherein it is heated to a temperature of at least 300° F. (149° C.) and preferably within a range of 300° F. (149° C.) to 572° F. (300° C.). This is followed by flowing UHP nitrogen, without addition of hydrogen, through the catalytic adsorbent bed while maintaining a temperature in the bed of at least 300° F. (149° C.) and preferably within the range of 300° F. (149° C.) to 572° F. (300° C.) for a period of time to desorb or remove the unwanted species from the catalytic adsorbent bed. Thereafter, the bed is cooled to a temperature of no greater than 120° F. (49° C.) and at that time is ready to be placed in service. Normally, two or more beds would be available to permit the continuous purification of the cryogenically produced nitrogen by having one bed on-stream effecting removal of unwanted species from the cryogenically produced nitrogen while the other bed or beds are being regenerated, or have been regenerated and are idled waiting for reengagement in the process.
The following examples illustrate the present invention.
EXAMPLE 1
After a conventional regeneration with hydrogen, a purifier packed with 3.66 lbs of a commercial Nickel-Alumina (Ni/Al2 O3) catalyst, Catalyst A, was challenged with 2.4 ppm CO and 3.6 ppm O2 in a nitrogen gas flow of 3.5 scfm. The purifier was operated at 80° F. and 80 psig inlet pressure. The packed bed height was 48 inches. Since CO2, a product from the chemical reaction between CO and O2, is the first impurity to break out of the catalytic adsorber, the purifier has to be regenerated once CO2 breaks through the packed bed. A 24-hour regeneration procedure without hydrogen according to the following scheme was tested:
______________________________________
                      Time Duration, hrs.
______________________________________
1.    Heat up to 204.4° C. (400° F.)
                            1
2.    Hot Purge with UHP Nitrogen (no H.sub.2)
      at 204.4° C. (400° F.)
                            16
3.    Cooling under UHP Nitrogen to
      21° C. (80° F.)
                            7
      Total hours =         24
______________________________________
The regeneration flow was 0.28 scfm nitrogen. Three successive cycles were performed. The results are summarized in FIG. 1 where the CO2 breakthrough time (defined at 10 ppb CO2 in the stream) is plotted against bed height. As shown in FIG. 1, at 18" of bed height, the breakthrough time reduced slightly from 12 hours to 10.3 hours and then to 9.2 hours with successive regenerations. In all cases, no CO2 breakthrough at the exit (45") of the bed was observed for the 24-hour cycle operation. The original capacity can be recovered with a conventional regeneration with hydrogen.
EXAMPLE 2
A similar experiment was conducted with a commercial Nickel-Kieselguhr catalyst, Catalyst B. A reactor of the same dimension as in Example 1, was loaded with 6.84 lbs. of Catalyst B and activated with a conventional reduction procedure. As with Example 1 the purifier was operated at 80° F. and 80 psig inlet pressure, challenged with 2.4 ppm Co. And 3.6 ppm O2 in a nitrogen gas flow of 3.5 scfm. Four consecutive breakthrough runs were made with three interim regenerations without using hydrogen. The interim regeneration procedure was the same as described in Example 1.
The results are depicted in FIG. 2. Again, the CO2 capacity, which is indicated by the breakthrough time, decreases slightly with successive regenerations without hydrogen. However, the purifier effectively removes the impurities as no CO2 breakthrough is observed at the exit of the purifier.
Normally, a conventional regeneration procedure requires four steps. For a 72-hour operating cycle, the following regeneration is typical:
______________________________________
                      Time Duration, hrs.
______________________________________
1.  Heat up to 204.4° C. (400° F.)
                            4
2.  Reduction (with an H.sub.2 containing gas) at
    temperature (204.4° C.)
                            8
3.  Hot Purge with UHP Nitrogen at temperature
    (204.4° C.)      48
4.  Cooling under UHP Nitrogen to 21 ° C.
                            12
    (80° F.)
    Total hours =           72
______________________________________
During the entire regeneration process, a flow of high purity nitrogen at a rate of 4 to 8% of treated gas flowrate is normally required.
This invention makes it possible to use several interim regenerations before a conventional regeneration is needed. The interim regenerations, while replacing conventional regenerations, maintain the same cycle time, and require no hydrogen. Operational savings can be realized by alleviating the reduction step and shortening the purge step. Applying the regeneration method of the present invention results in the elimination of the reduction step. In addition, the duration of the hot purge step can be significantly reduced.
An interim regeneration procedure for a typical 72-hour cycle can be as follows:
______________________________________
                      Time Duration, hrs
______________________________________
1.  Heat up to 204.4° C. (400° F.)
                            4
2.  Hot Purge with UHP Nitrogen (no H.sub.2) at
    temperature (204.4° C.)
                            24
3.  Cooling under UHP Nitrogen to 21 ° C.
                            12
    (80° F.)
4.  Idle                    32
    Total hours =           72
______________________________________
The idle step is needed to maintain the 72-hour cycle. With the interim regeneration, no hydrogen is required and the nitrogen consumption is greatly reduced.
Using the process of the present invention wherein one or more interim regeneration is effected without the use of hydrogen can result in significant savings to the operator of a facility producing UHP nitrogen from cryogenically produced nitrogen. For example, assuming a conventional regeneration is required after five interim regenerations, 37% nitrogen and 83% of the hydrogen used in the conventional regeneration scheme can be saved. Thus for a typical 50,000 SCFH nitrogen purification process which uses 8% of the flow during regeneration, the savings in gas consumption are:
UHP N2 saved every 6 cycles (432 hours)=8,000,000 scf
UHP H2 saved every 6 cycles (432 hours)=20,000 scf.
Therefore, this translates to a yearly saving of 160 MMSCF nitrogen and 400 MSCF hydrogen.
The present invention has been discussed and illustrated in relation to the production of ultra-pure nitrogen. However, any gas purification process that uses similar catalytic adsorbent techniques, can use the process of the present invention with similar results. For example, similar purifiers are used in the production of ultra-high purity argon and helium so the process is applicable to these gases also.
Having thus described our invention, what is desired to be secured by Letters Patent of the United States is set forth in the appended claims.

Claims (10)

What is claimed:
1. In a process for regenerating a nickel-based catalytic adsorbent bed used to remove parts-per-million quantities of unwanted species compulsing carbon monoxide, oxygen, hydrogen, carbon dioxide and/or water from a cryogenically produced nitrogen gas stream by regeneration using hydrogen reduction; the improvement comprising, after a regeneration using hydrogen and subsequently passing said cryogenically produced nitrogen gas stream through said nickel-based catalytic adsorbent bed to remove said unwanted species, regenerating said bed at least once prior to further passing said cryogenically produced nitrogen gas stream through said nickel-based catalytic adsorbent bed to remove said unwanted species and prior to a subsequent hydrogen regeneration by:
(a) heating said adsorbent bed to a temperature of at least about 300° F. (149° C.);
(b) flowing nitrogen having a purity of at least 99.9999% N2 through said bed while maintaining said bed at a temperature of at least about 300° F. (149° C.) for a period of time to remove a major portion of the adsorbed species from said adsorbent bed;
(c) cooling said adsorbent bed to a temperature of no higher than 120° F. (49° C.) wherein steps a), b) and c) are performed without the addition of hydrogen.
2. A process according to claim 1 wherein said adsorbent bed is heated to a temperature of from 300° F. (149° C.) to 572° F. (300° C.).
3. A process according to claim 1 wherein said nitrogen is flowed through said bed at a rate of at least 4% of the rate of flow of the nitrogen gas stream being subject to removal of unwanted species.
4. A process according to claim 1 wherein said bed is maintained at a temperature of from 300° F. (149° C.) to 572° F. (300° C.) during said time said nitrogen is flowing through said bed.
5. A process according to claim 1 including the step of holding said adsorbent bed in an atmosphere of ultra-high purity nitrogen after said cooling step.
6. A process for minimizing the number of cycles using hydrogen to regenerate a nickel-based catalytic adsorbent used to remove unwanted species from a cryogenically produced nitrogen gas stream by using at least one interim regeneration comprising the steps of
heating said adsorbent to a temperature of at least about 300° F. (149° C.);
flowing nitrogen having a purity of at least 99.9999% N2 through said adsorbent while maintaining said adsorbent at a temperature of at least about 300° F. (149° C.) for a period of time to remove a major portion of the adsorbed species from said adsorbent; and
cooling said adsorbent to a temperature of no higher than 120° F. (49° C.) wherein said steps are performed without the addition of hydrogen.
7. A process according to claim 1 wherein said adsorbent is heated to a temperature of from 300° F. (149° C.) to 572° F. (300° C.).
8. A process according to claim 1 wherein said nitrogen is flowed through said adsorbent at a rate of at least 4% of the rate of flow of the nitrogen gas stream being subject to removal of unwanted species.
9. A process according to claim 8 wherein said adsorbent is maintained at a temperature of from 300° F. (149° C.) to 572° F. (300° C.) during said time said nitrogen is flowing through said bed.
10. A process according to claim 6 including the step of holding said adsorbent in an atmosphere of ultra-high purity nitrogen after said cooling step.
US08/728,118 1996-10-10 1996-10-10 Regeneration of adsorbent beds Expired - Fee Related US5863852A (en)

Priority Applications (7)

Application Number Priority Date Filing Date Title
US08/728,118 US5863852A (en) 1996-10-10 1996-10-10 Regeneration of adsorbent beds
EP97307831A EP0835687B1 (en) 1996-10-10 1997-10-03 Regeneration of adsorbent beds
DE69713979T DE69713979D1 (en) 1996-10-10 1997-10-03 Regeneration of adsorption beds
CA002217272A CA2217272C (en) 1996-10-10 1997-10-03 Regeneration of adsorbent beds
TW086114539A TW353037B (en) 1996-10-10 1997-10-04 Regeneration of adsorbent beds
KR1019970051515A KR100230858B1 (en) 1996-10-10 1997-10-08 Regeneration of absorbent beds
JP9277381A JPH10202115A (en) 1996-10-10 1997-10-09 Regenerating method for catalytic adsorbent bed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US08/728,118 US5863852A (en) 1996-10-10 1996-10-10 Regeneration of adsorbent beds

Publications (1)

Publication Number Publication Date
US5863852A true US5863852A (en) 1999-01-26

Family

ID=24925495

Family Applications (1)

Application Number Title Priority Date Filing Date
US08/728,118 Expired - Fee Related US5863852A (en) 1996-10-10 1996-10-10 Regeneration of adsorbent beds

Country Status (7)

Country Link
US (1) US5863852A (en)
EP (1) EP0835687B1 (en)
JP (1) JPH10202115A (en)
KR (1) KR100230858B1 (en)
CA (1) CA2217272C (en)
DE (1) DE69713979D1 (en)
TW (1) TW353037B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2299761C2 (en) * 2005-08-18 2007-05-27 Общество с ограниченной ответственностью "Суперкритические технологии" Method of regeneration of the active charcoal and the system for its realization
CN108114566A (en) * 2018-02-09 2018-06-05 大连华邦化学有限公司 Gas purifier with quick regeneration function

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2003239922A1 (en) 2002-05-31 2003-12-19 Praxair Technology, Inc. Production of high purity and ultra-high purity gas
WO2024206832A2 (en) * 2023-03-30 2024-10-03 Basf Corporation Dechlorination of liquid and gas streams from plastics pyrolysis processes with nickel-based adsorbent
KR20250171011A (en) * 2024-05-29 2025-12-08 포스코홀딩스 주식회사 Hydrogen purification system and method for purifying hydrogen

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4713224A (en) * 1986-03-31 1987-12-15 The Boc Group, Inc. One-step process for purifying an inert gas
US4869883A (en) * 1988-06-24 1989-09-26 Air Products And Chemicals, Inc. Inert gas purifier for bulk nitrogen without the use of hydrogen or other reducing gases

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2796731B2 (en) * 1989-06-08 1998-09-10 日本酸素株式会社 Purification method of inert gas

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4713224A (en) * 1986-03-31 1987-12-15 The Boc Group, Inc. One-step process for purifying an inert gas
US4869883A (en) * 1988-06-24 1989-09-26 Air Products And Chemicals, Inc. Inert gas purifier for bulk nitrogen without the use of hydrogen or other reducing gases

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2299761C2 (en) * 2005-08-18 2007-05-27 Общество с ограниченной ответственностью "Суперкритические технологии" Method of regeneration of the active charcoal and the system for its realization
CN108114566A (en) * 2018-02-09 2018-06-05 大连华邦化学有限公司 Gas purifier with quick regeneration function
CN108114566B (en) * 2018-02-09 2024-03-15 大连华邦化学有限公司 Gas purifier with rapid regeneration

Also Published As

Publication number Publication date
TW353037B (en) 1999-02-21
JPH10202115A (en) 1998-08-04
EP0835687A3 (en) 1999-05-12
DE69713979D1 (en) 2002-08-22
KR19980032636A (en) 1998-07-25
CA2217272C (en) 2001-05-01
EP0835687B1 (en) 2002-07-17
CA2217272A1 (en) 1998-04-10
KR100230858B1 (en) 1999-11-15
EP0835687A2 (en) 1998-04-15

Similar Documents

Publication Publication Date Title
KR0172121B1 (en) Apparatus for low temperature purification of gases
JP3351815B2 (en) Purification method of inert gas
US5202096A (en) Apparatus for low temperature purification of gases
US4579723A (en) Methods for purifying inert gas streams
US6048509A (en) Gas purifying process and gas purifying apparatus
US6838066B2 (en) Process for recovery, purification, and recycle of argon
JPS62269728A (en) One process method for purifying inert gas
US5902561A (en) Low temperature inert gas purifier
JPH10113502A (en) Method and apparatus for producing low temperature fluid in high purity liquid
WO1997011768A9 (en) Low temperature inert gas purifier
JPH11100203A (en) Treatment of gas flow and device therefor
US5863852A (en) Regeneration of adsorbent beds
US5833738A (en) Specialty gas purification system
US5626033A (en) Process for the recovery of perfluorinated compounds
JPH0422848B2 (en)
JPH04265104A (en) Pressure swing type adsorbing method
EP1060774A1 (en) Purification of gases
US5737941A (en) Method and apparatus for removing trace quantities of impurities from liquified bulk gases
JP2000211904A (en) Purification of gas
JP3201923B2 (en) Method and apparatus for producing high-purity nitrogen gas
CN117241874A (en) Methods for regenerating prepurification vessels
US5993760A (en) Bulk nitrogen purification process that requires no hydrogen in the regeneration
JP3213851B2 (en) Removal method of carbon monoxide in inert gas
JPS60155520A (en) Process for purifying carbon monoxide from mixed gas containing carbon monoxide gas by adsorption process
US8551436B2 (en) Method for purifying an input mixture comprising carbon dioxide (CO2) and carbon monoxide (CO), to eliminate the carbon monoxide contained in said mixture

Legal Events

Date Code Title Description
AS Assignment

Owner name: AIR PRODUCTS AND CHEMICALS, INC., PENNSYLVANIA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:HSIUNG, THOMAS HSIAO-LING;WALLACE, JOHN BRUCE JR.;REEL/FRAME:008386/0471

Effective date: 19961010

FEPP Fee payment procedure

Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

FPAY Fee payment

Year of fee payment: 4

REMI Maintenance fee reminder mailed
LAPS Lapse for failure to pay maintenance fees
STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362

FP Lapsed due to failure to pay maintenance fee

Effective date: 20070126