US543592A - Electrical railway signaling system - Google Patents

Electrical railway signaling system Download PDF

Info

Publication number
US543592A
US543592A US543592DA US543592A US 543592 A US543592 A US 543592A US 543592D A US543592D A US 543592DA US 543592 A US543592 A US 543592A
Authority
US
United States
Prior art keywords
signal
block
circuit
track
battery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
Publication date
Application granted granted Critical
Publication of US543592A publication Critical patent/US543592A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L23/00Control, warning, or like safety means along the route or between vehicles or vehicle trains
    • B61L23/22Control, warning, or like safety means along the route or between vehicles or vehicle trains for controlling traffic in two directions over the same pair of rails

Definitions

  • Figure 1 shows the simplest form of my system, and comprises a block with suitable signals and circuits therefor, the signals being arranged to beoperated manually.
  • Fig. 2 shows two adjacent blocks with suitable signals and circuits therefor, the signals being arranged to be operated automatically.
  • Fig. 3 shows an arrangement of signals and circuits for a situation where two side tracks communicate with the main track at points in close proximity to each other.
  • Fig. 4 shows an interlocking device which may be used to regulate the trafficon sidings at a situation similar to that shown in Fig. 3.
  • each line of rails in the block is in contact electrically, but the two lines of rails constituting the track are insulated one from the other in any suitable and customary manner, and the rails of each block are insulated from the railsof the adjacent blocks.
  • At the entrance of each block is placed one or more signals controlling the admission of trains to that block. These signals are represented in the drawings by electo the track, and the signals are to be understood to face in the direction of the open or polar ends of tho electromagnets.
  • FIG. 1 illustrates the simplest form of the circuits, being arranged solely for manual operation
  • a B is a block of a single-track railway, A and B being blockstations.
  • S and S are the signals at the ends of the block,governing the entrance of trains thereto.
  • 0 and c are two-point switches, and a and a are batteries for operating the signals, and, as will be seen when the circuits are traced, each signal is operated by the current from the battery at the opposite end of the block.
  • the switches are shown in their normal position.
  • the two track-rails form portions of the circuit of battery a.
  • the battery is short-circuited through the wheels and axles of this car, so that current from battery to no longer passes through the signal, which must therefore go to danger, and it is impossible to set this signal to safety again while a car of the train remains upon the block.
  • the operator when it is desired to admit a train to the block at station E, the operator there moves the lever e of switch a into contact with contactpoint d, thereby cutting out battery a and diverting the current of battery a through signal S, provided the circuit of battery 0.
  • Fig. 1 The circuits of Fig. 1 are arranged for manual operation. My system is equally capable of automatic operation, and in Fig. 2 I have shown circuits arranged for automatic operation.
  • This figure shows two consecutive blocks with the devices adopted for making impossible the clearing of the signals in rear of a train until the train has passed well into the block in front.
  • a siding with signal arrangements therefor.
  • the siding-rails and the additional wires necessitated by the siding are shown in dotted lines.
  • C, D, and E are block-signal stations, and, as shown in the drawings, 0 and E are terminal stations beyond which traflic governed by D is an intermediate station.
  • S to S inclusive are block-signals, S and S being caution or distant signals, while the others are absolute danger-sign als Stands are the danger or home signals, corresponding respectively to distant or caution signals S and S.
  • S and S?- are sidingsignals governing the, movement of a train on the siding and are not heeded by trains on the main track.
  • N and N are hand circuit-breakers, and K and K are keys,similar to the ordinary Morse telegraph keys, except that they have both upper and lower contact-points which are electrically connected;
  • the signal-circuit of block C D is as follows: Starting at the positive pole of battery a the circuit goes through the lower contact;
  • relay R if that contact is complete, and through wire 15 to the left-hand rail of the track-section H, which isthe main section of track forming the block 0 D, and through that rail to station D, thence through wire 50, the contact-points of key K, and wire 32 to battery a thence throughthe lower contact of relay R if that contact be closed,.
  • branch circuits for signals S and 5 which terminate in the upper contact-points of relays R and R respectively, and these branch circuits are that at station D the circuit of signal S likewise passes through signal S", which is its corresponding distant or caution signal, so that these two signals are in series, and must always correspond in indications.
  • the relay R is controlled by a local circuit formed by wires 16, 17, and 18, which passes through the coils of the relay and is connected to the rails of the insulated track-section H.
  • the battery for this circuit is a When a car is on this 'section H the circuit of battery 01. is completed through the wheels and axles of the car and the armature of the relay R is raised.
  • circuits of block D E correspond to those of block 0 D.
  • the effect of the raisingof the armature of relay R is to break the circuit of battery a at station D and to divert the current of battery 01, at station E vthrough signals S and S provided, of course, this batterya is not short-circuited through the presence of a train in the block D E and pro videdthe circuit of battery a is notbroken for corresponding to that of section H and passing through the coils of relay R When a car of a train enters section H this battery a is short-circuited, so that no current flows through the coils of relay R The armature of this relay therefore falls, completing a circuit of battery 0.
  • battery a is out of the linecircuit. It, therefore, a train should pass upon track-section H, signal S cannot go to safety and the train on H cannot pass into the block 0 D. The block 0 D is still closed to trains desiring to enter at 0, therefore.
  • the function of the cautionary signals S and S is to insure that no train shall run by the corresponding danger-signals through lack of timely warning. From station 0 will enter the track-section H at full speed. If the block D E is clear and if no train be upon the track-section H the si nal S and the corres ondin home-si nal S as well should go to safety when the train enters this section 11 through the raising of the armatures of relays R and R If, therefore, this signal S does not go at once to safety, the engineer of the advancing train is warned that the block D E is not clear, and he will then bring his train under control and stop it at the danger-signal S, which he will not pass until it has gone to safety.
  • Signals S and S are signals controlling the passage of trains from the side track at station D onto the main track, and are not regarded by trains passing on the main track.
  • the circuits are so arranged that a train on the side track cannot pass out onto the main line if a train is already Within the block which this train on the side track desires to enter. What is said herein of one signal and Ordinarily a train of its circuits applies likewise to the other signals and circuits, so that but one need be mentioned.
  • the ends of the siding may be insulated from the main portion thereof and may be connected electrically with the rails of the main track. The manner of making these connections is well known, and for the sake of simplicity I have not shown it in the drawings of this application.
  • the function of the hand-switch N is to make it possible, when necessary, to prevent the cutting-out of battery a when a train is on the track-section 11
  • the switch N is opened, thus breaking the circuit of battery a and cansing the armature of relay R to drop to normal position, thus cutting out of circuit signals S and S and completing the circuit of battery of, so that the presence of the train on the track-section H causes signal-S to go to safety.
  • Switches similar to Nand N may, of course, be placed at the other signal-stations for a similar purpose; but in general such switches will be needed only where there are side tracks.
  • short insulated sections of track on the siding may be vprovided with batteries and circuits operating relays whichrwill take the place of keys K and K, so that signals S and S may be operatedautomatically.
  • Fig. 3 I have illustrated such an arrangenient for the sidings, there shown.
  • Fig. 3 illustrates a track provided with two sidings, Which join the main track at points very near together. These sidings are supposed to be located at station D of Fig. 2 insection It.
  • D. .H and H? are the'sidings, and h and h are the short insulated siding track-sections just referred to.
  • S is the signal and r the relay corresponding to siding H while S is 4 the signal and 'r' the --relay corresponding to sidingH".
  • a car standing on track-section h short-circuits the battery of relay '1", thus causing the armature of this relay tordrop, breaking the circuit of the main-line signals, which are not shown in this figure, but would be connected to Wire 32 extended, and placing signal S in circuit with-the batterywhich supplies current to the rails of the track-section H, this battery not being shown in this figure, but being battery a? of Fig. 2.
  • Signal S is thus placed to safety, while signal S remains at danger.
  • Signal S is operated in the same manner by a car standing on rail- Should two trains stand on the two track-sections h and h at the same time, so that relays r and r are operated, signal S alone will be setto safety, since, as will be seen from the diagram, the circuit of signal S passes over wires 49' and 50 and through the upper contact of relay 0", and
  • asecond train on siding 1 H should enter track-section h on that sid-' ing. Signal S1 would then go to safety and signal S would return to the danger position, although the train on siding H might already be partly on the main track. If there were three sidings communicating with the main track a similar confusion would .exist, a train on the first siding having the right of way over trains on the second and third sidings and a train on the second siding having the right of way over the train on the third siding.
  • Fig. 41 have illustrated a simple interlocking device for preventing any-such confusion.
  • - (1 is a disk revolubly mounted and arranged to be rotated by the handle k.
  • the relays r r, &c. controlling the sidingsignals, their armatures being toward the circumference of the disk and in close proximity thereto when attracted to the poles of their magnets.
  • s is a notch in the disk of a size suitable to receive one of these armatures.
  • the passage of a train onto any of the sidingtrack-sections may be caused to move the armature of an electromagnet, and the motion of this armature may be caused to rotate the disk until the armature of the relay corresponding to the siding track-section falls into the notch s, when the disk will be locked and the corresponding signal set to safety.
  • the magnet of the relay When thetrain has passed off from the siding track-section, the magnet of the relay will be energized, so that the armature is drawn outof the notch s, and the disk the conhbinatiomwith twoinsulated blocks or sections of track, an electrically controlled signal for each block controlling the entrance of trains thereto, a signal circuit for each block controlling the signal of that block and passing through the rails of said block, a signal battery for each signal circuit, means for throwing the signal battery of each block into or out of its signal circuit, thereby setting to safety orto danger the signal of that block,
  • .train can take a conflicting route until the and a circuit controller operated from theentrance of the second block and controlling the signal circuit of the first block, and arranged to set to danger or to hold at danger the signal of the first block when atrain is entering the second block, substantially as described.
  • nal battery for each signal circuit, means for throwing each of said signals into and out of its signal circuit, and a circuit controller operated from the entrance of the second block and controlling the signal circuit of the first block, and arranged to break the signal circuit of the first block when a train is entering the second block, substantially as described.
  • an electrically controlled signal at each end of each block controlling the entrance of trains to said block, a signal battery at each end of each block, a line conductor for each block, and a circuit controller for each end of each block connected to the signal and battery at that end of that block and to the line conductor, and adapted to connect either said signal or said battery to the line conductor, and means for setting to danger or for holding at danger the signals of the first block when the signal of the second block situated at the station nearest the first block is at safety, substantially as described.
  • an electrically controlled signal at each end of each block controlling the entrance of trains to said block, a signal battery at each end of each block, a line conductor for each block, and a circuit controller for eachend of each block connected to the signal and battery at that end of. that block and to the line conductor, and. adapted to connect either said signal or said battery to the line conductor, and means for breaking the line circuit of the first block when the.
  • the combination with two or more blocks or sections of track, and a signal for each end of each block controlling the entrance of trains thereto, of a signal battery for each end of each block, an electrically operated circuit controller or switch for each end of each block connected to the signal circuit of the block and to the signal and signal battery of its end of the block, and adapted to connect either said signal or said battery to the signal circuit, and an insulated track section for each end of each block and a local circuit and battery therefor, controlling the circuit controller of that end of theblock and connected to the rails of said insulated track section, the said insulated track section of each block being placed between the corresponding insulated track section of the adjoining block and the main track section of the adjoining block, substantially as described.
  • an electrical railway signaling system the combination, with two adjacent blocks or sections of track, 0 D and D E, and signals S and S controlling the entrance of trains to said blocks, of an insulated track section 11 an electrically operated circuit controller R and a battery and circuit operating said circuit controller and adapted to cause the armature thereof to fall when wheels are on said track section H an insulated track section II, an electricallyoperated circuit controller R and a battery and circuit for operating said circuit controller adapted to cause the ar' mature thereof to rise when wheels are on said track section H a battery and circuit controlled by circuit controlling devices operated by the armature of circuit controller R and adapted to operate signal S when wheels are on track section H abattery and circuit for operating signal 8*, and circuit controlling devices operated by the movement of the armature of circuit controllers R and R controlling the circuit of signal 8 and adapted to prevent the operation of said signal when wheels are on either of said track sections II or H", substantially as described.
  • the combination with a block or section of track 0 D, having a siding at D, a line conductor extending throughout the block, signals S and S controlling the entrance of trains into the block at the ends 0 and D respectively and a signal S controlling the entrance of trains into the block from the siding, said signals being electrically operated and arranged to indicate danger when no current is flowing through them,and signal batteries a and a at the ends 0 and D of said block respectively, of circuit controllers or switches R and R at the ends 0 and D of said block, respectively, each connected to the signal and battery at its end of the block, and to the line conductor, and adapted to place either said signal or said battery in circuit with the line conductor, and a circuit controller or switch K, connected to circuit controller R signal S and the line conductor, and adapted when operated to out said circuit controller R out of circuit with the line conductor, thereby maintaining said signal S at danger, and to place signal S in circuit with the line conductor, substantially as described.
  • the combination with two adjacent blocks or sections of track, 0 D and DE, a line conductor for each block extending throughout the block, electrically controlled signals, S and S at the ends 0 and D of block 0 D respect ively, and S and S at the ends D and E of block D E respectively, signal batteries a and a at the ends of block 0 D, signal batteries a and a -at the ends of block D E, and circuit controllers or switches R, R and R corresponding respectively to signals S S and S each circuit controller being connected to its corresponding signal and battery and to the line circuit of its block, and being adapted to place either said signal or said battery in circuit with that line circuit,'of an electrically track section and controlling said circuit controller R, and adapted to cause the armature thereof to fall when wheels are on said track section H a battery a and local circuit for operating circuit controller R controlled by circuit controller R and arranged to cause signal S to be placed in circuit with the line circuit of block D E when circuit controller R is operated through the presence

Description

(No Model.) a sneets -sneet 1 T. B. DIXON. ELEGTRIGAL RAILWAY'SIGNALING SYSTEM.
(No Model.) 3 Sheets-Sheet 2.
-T. B. DIXON. ELECTRIGAL RAILWAY SIGNALING sYsTEMi No. 543,592. "PatentedJuly' 30, 1895.
NMMMA w 'wfo Z- x 5 (M (MW/M (No Model.) 3 She'etaSheet 3.
. T. B. DIXON. 'ELEGTRI-GAL RAILWAY SIGNALING SYSTEM.
Patented July 30, 1895.
Fig. 5.
w ITN asses:
.Urrrrno STATE PATENT; FFICE.
. THOMAS BULLITT DIXON, OF HENDERSON, KENTUCKY.
ELECTRICAL RAILWAY SIGNALING SYSTEM.
SPECIFICATION forming part of Letters Patent No. 543,592, dated July 30, 1895. Application filed October 5, 1893. Serial No. 487,209- (No model.)
To aZZ whom it may concern:
Be it known that I, THOMAS BULLITT DIXON, a citizen of the United States, and a resident of Henderson, in the county of Henderson and State of Kentucky, have invented certain new and useful Improvements in Electrical Railsingle track, whether moving in the same or opposite directions; second, to provide a system of signals which may be capable of manual operation at points where attendants may be stationed for that purpose, suitable devices being employed to make it impossible for any attendant to clear the signal at either end of the block so long as a train is within that block, and to so arrangethis system that it may be arranged to operate automatically at points Where no attendants are stationed; third, to provide a'sigualing system in which the safety factor'is as high as possible, all of the apparatus being so arranged that the failure of any part will cause the signals aifected thereby to remain at danger, if at danger, or to go to danger if at safety;fourth, to provide means for setting to danger the signals of a block, when a train is within thatblock, independent of the condition of the instruments which operate the signal-circuit of that block; fifth, to provide a system which shall be simple and as inexpensive in construction as possible, certain in action, not liable to derangement, and economical in use of battery power. These objects are attained in the system'herein described, and illustrated in the drawings which accompany and form a part of this application, in which the same reference lettersand numerals indicate the same or corresponding-parts, and in which Figure 1 shows the simplest form of my system, and comprises a block with suitable signals and circuits therefor, the signals being arranged to beoperated manually. Fig. 2 shows two adjacent blocks with suitable signals and circuits therefor, the signals being arranged to be operated automatically. There is likewise shown a side track with suitable signals and circuits governing traffic thereon. Fig. 3 shows an arrangement of signals and circuits for a situation where two side tracks communicate with the main track at points in close proximity to each other. Fig. 4 shows an interlocking device which may be used to regulate the trafficon sidings at a situation similar to that shown in Fig. 3.
In my system I divide the railway-track into blocks, in each of which only one train is to be allowed at a time. Each line of rails in the block is in contact electrically, but the two lines of rails constituting the track are insulated one from the other in any suitable and customary manner, and the rails of each block are insulated from the railsof the adjacent blocks. At the entrance of each block is placed one or more signals controlling the admission of trains to that block. These signals are represented in the drawings by electo the track, and the signals are to be understood to face in the direction of the open or polar ends of tho electromagnets.
I do not confine myself to the use of any particular type of signal, but may use any signal capable of being controlled by an electromagnet, though the signal itself may be operated by electric, pneumatic, or hydraulic power, or by weights. is
The electromagnets shown in the drawings as representing the signals themselves may be understood to be the controlling-magnets of such signals. It is to be understood, however, that the signal, of whatever class, is so controlled by its electromagnetthat the signal is at danger when there is no current flowing through the coils of its controllingelectromagnet and is at safety when current is flowing through the coils of that magnet. The reverse might indeed be true, but I consider the above arrangement preferable and have arranged the'electric circuits with that-end in view.
8o tromagnets placed close beside and parallel In my system the normal position of all signals is danger, and the signal at the entrance of a block must be set to safety through the operationof a switch or relay by which the signal-circuit passing through that signal is completed. After the train has entered the block this signal can and should be returned todanger through the reverse operation of this switch 'or relay, thus breaking the circuit through the signal; but I provide means for automatically returning said signal to the danger position in any case.
Referring now to the drawings, and considering first Fig. 1, which illustrates the simplest form of the circuits, being arranged solely for manual operation, A B is a block of a single-track railway, A and B being blockstations. S and S are the signals at the ends of the block,governing the entrance of trains thereto. 0 and c are two-point switches, and a and a are batteries for operating the signals, and, as will be seen when the circuits are traced, each signal is operated by the current from the battery at the opposite end of the block. The switchesare shown in their normal position. Tracing now the circuits of the diagram, and beginning at the positive pole of battery a at station A, the circuit goes to the contact-point b of switch 0, thence, if the circuit is complete at that switch, through the switch-lever e and through the wire 1 to the left-hand rail, thence through the rail to station B, through wires 9 and 7 and through battery a to contact-point d of switch 0', through the switch-lever e and through wire 6 to the right-hand rail, thence through the rail to station A, and thence through wires t and 2 to the negative pole of battery (1. At station A there is a branch circuit formed by wires 3 and 5, which passes through signal S and terminates in the contact-point b of switch 0. At station B there is a similar branch circuit formed by wires 8 and 10, which passes through signal S and terminates in contact-point d of switch 0'.
It will be seen that normally the circuit of batteries a and a is complete through the switches c and c and that the signals are normally out of circuit, and therefore, since there is no current flowing through them, are at danger.
'lo admit a train to the block at station A the signal-operator there moves the lever e of the switch 0 so as to break contact with contact-point b and make contact with contactpoint I). The eifect of this is to break the circuit of battery a and to divert the current of battery a through signal S. Signal Sis thus set to safety, so that the train may enter the block. \Vhen the first cars of the train have entered the block the operator may return the switch-lever to its former position in contact with contact-point I), thus cutting out signal S again; but, independent of the operation of the switch-lever, other and separate means are provided for returning signal S to danger immediately upon the entranceof the train into the block. As before described, the two track-rails form portions of the circuit of battery a. When therefore the wheels of a car are upon these rails the battery is short-circuited through the wheels and axles of this car, so that current from battery to no longer passes through the signal, which must therefore go to danger, and it is impossible to set this signal to safety again while a car of the train remains upon the block. In the same way, when it is desired to admit a train to the block at station E, the operator there moves the lever e of switch a into contact with contactpoint d, thereby cutting out battery a and diverting the current of battery a through signal S, provided the circuit of battery 0. is complete at switch a and provided there are no carsalready u pon the block, for it the circuit of battery a is not complete at switch c-that is,if the operator at A has already moved that switch to set signal S to safety --then the moving of the lever e from its normal position not only cannot complete a circuit through signal S, but it breaks the circuit of battery a and therefore returns signal S to danger, and neither signal can be set to safety until one of the operators returns his switch to normal; and it there is a caralready upon the block A B, then both batteries will be short-circuited through the wheels and axles of this car and no current can flow through either signal. It will be seen, therefore, that while an operator at; either blockstation may admit a train to the block at his own end thereof, provided the block is clear and the switch at the other end of the block is in normal position, no movement of his switch can set his signal to safety it there is a car already on the block or it the oper ator at the other end of the block has already set his signal to safety to admit a train to the block from that end, and if both operators endeavor to set their signals to safety at the same time both batteries are cut out and neither signal is moved from the danger position. Thus all conditions required for the safe management of a train within the block are complied with and it is impossible that two trains should be in the same block at the same time, unless the indications of the signals are neglected.
The circuits of Fig. 1 are arranged for manual operation. My system is equally capable of automatic operation, and in Fig. 2 I have shown circuits arranged for automatic operation. This figure shows two consecutive blocks with the devices adopted for making impossible the clearing of the signals in rear of a train until the train has passed well into the block in front. There is likewise shown a siding with signal arrangements therefor. The siding-rails and the additional wires necessitated by the siding are shown in dotted lines.
C, D, and E are block-signal stations, and, as shown in the drawings, 0 and E are terminal stations beyond which traflic governed by D is an intermediate station.
v for the additional local circuits required for the automatic operation of the signals. The double-point switches of Fig. 1 are replaced by double-point relays, which control the signal-circuits in a similar manner, and these relays are operated by local circuits connected to short insulatedsections of track placed in termediate between the insulated sections of the main'blocks. .W-hen a car ison one of these insulated sections of track, the local battery of that track-section is short-circuited and the relayis operated. These relays and insulated sections of track, with their circuits, correspond to track-instruments, and, indeed, track-instruments might be used in place thereof; but I believe the arrangement here shown to be preferable to any track-instrument, as it is simpler, less expensive, andless liable to derangement. o
The sections of track forming the blocks are insulated, as described for Fig. 1. S to S inclusive, are block-signals, S and S being caution or distant signals, while the others are absolute danger-sign als Stands are the danger or home signals, corresponding respectively to distant or caution signals S and S. S and S?- are sidingsignals governing the, movement of a train on the siding and are not heeded by trains on the main track. N and N are hand circuit-breakers, and K and K are keys,similar to the ordinary Morse telegraph keys, except that they have both upper and lower contact-points which are electrically connected; These circuit -breakers and keys are used principally in the operation of the siding and need not be considered in precisely the same as thoseof Fig. 1, except the discussion of the operation of the main track signals and circuits.
The signal-circuit of block C D is as follows: Starting at the positive pole of battery a the circuit goes through the lower contact;
or relay R, if that contact is complete, and through wire 15 to the left-hand rail of the track-section H, which isthe main section of track forming the block 0 D, and through that rail to station D, thence through wire 50, the contact-points of key K, and wire 32 to battery a thence throughthe lower contact of relay R if that contact be closed,.
through wire 19, the upper contact of relay R, if that contact be closed, and through wire 2l to the right-hand rail of section H,
through the rail to station 0, andthence throughwire 11 to thenegative pole of bat tery a As in Fig. 1, there are. branch circuits for signals S and 5 which terminate in the upper contact-points of relays R and R respectively, and these branch circuits are that at station D the circuit of signal S likewise passes through signal S", which is its corresponding distant or caution signal, so that these two signals are in series, and must always correspond in indications.
The relay R is controlled by a local circuit formed by wires 16, 17, and 18, which passes through the coils of the relay and is connected to the rails of the insulated track-section H. The battery for this circuit is a When a car is on this 'section H the circuit of battery 01. is completed through the wheels and axles of the car and the armature of the relay R is raised.
The circuits of block D E correspond to those of block 0 D.
To the rails at one end of the insulated section of track H are connected the poles of a battery a. To the rails of this insulated section, at the other end, are connected wires 22 and 23,,which, together with the rails, form a circuit from battery a which passes through the magnet-coils of relay B. This circuit is normally complete; but when a car enters this insulated section the current of the battery is short-circuited through the wheels and axles of this car, so that no current passes throughthe coils of relay B. This causes the armature of this relay to fall, thus completing a circuit frombattery a through the lower contact of relay R, thereby through wires 25 and24, key N, and the coils of relay R and raising the armatureof relay R and likewise breaking the circuit of battery a so that even after the passage of the last car of the train out of the section H it is not possible for a train on section H to set signal S to safety. The effect of the raisingof the armature of relay R is to break the circuit of battery a at station D and to divert the current of battery 01, at station E vthrough signals S and S provided, of course, this batterya is not short-circuited through the presence of a train in the block D E and pro videdthe circuit of battery a is notbroken for corresponding to that of section H and passing through the coils of relay R When a car of a train enters section H this battery a is short-circuited, so that no current flows through the coils of relay R The armature of this relay therefore falls, completing a circuit of battery 0. through the coils of vrelay R wires 37 and 55, and key n, thereby causing the armature of relay R to rise and breaking the circuit of battery a? at station When the rear of the train passes off from section l-lithe armature of relayR' is raised, thuscornpletingthe line-circuit of block 0 D.
The-armature of relay R now being up, as
above described, battery a is out of the linecircuit. It, therefore, a train should pass upon track-section H, signal S cannot go to safety and the train on H cannot pass into the block 0 D. The block 0 D is still closed to trains desiring to enter at 0, therefore. If no train is upon the track-section I-I, then when the rear of the first train has passed onto track-section H and off from section II the completion of the line-circuit of block C D will cause the current from battery (t to set to safety signals S and S sothat the train may again enter the block 0 D by backing; but the moment that a train enters track-section I-I, battery a is cut out of the linecircuit and signals S and S are set to danger and the train on section H will be warned not to enter the block 0 D.
The breaking of the circuit of battery a owing to the rise of the armature of relay R returns signals S and S to danger, thereby protecting the rear of the train on tracksection 11 after it shall have passed off from that section and into the main portion of the block D E. The raising of the armature of relay R,which occurred when the last car of the train passed off from section H restored battery a, to the line-circuit of block D E.
hen the last car of the train has passed off from section II the armature of relay R rises and the armature of relay R falls. Signals S and S are thus returned to danger and the circuit of battery a is completed, so'that a train upon the insulated track-section H will now cause signal S to go to safety. The block 0 D is therefore completely clear as soon as the last car of the train at D has left track-section H The circuits of station E are the same as those of station 0 and need no description.
The function of the cautionary signals S and S is to insure that no train shall run by the corresponding danger-signals through lack of timely warning. from station 0 will enter the track-section H at full speed. If the block D E is clear and if no train be upon the track-section H the si nal S and the corres ondin home-si nal S as well should go to safety when the train enters this section 11 through the raising of the armatures of relays R and R If, therefore, this signal S does not go at once to safety, the engineer of the advancing train is warned that the block D E is not clear, and he will then bring his train under control and stop it at the danger-signal S, which he will not pass until it has gone to safety.
Signals S and S are signals controlling the passage of trains from the side track at station D onto the main track, and are not regarded by trains passing on the main track. The circuits are so arranged that a train on the side track cannot pass out onto the main line if a train is already Within the block which this train on the side track desires to enter. What is said herein of one signal and Ordinarily a train of its circuits applies likewise to the other signals and circuits, so that but one need be mentioned.
Signal S is by its circuits electrically intel-locked with signals S and S and battery a so that when the key K is depressed signals S and S and battery a are cut out of circuit, while signal S is cut into circuit with battery a at station 0 through wires 48, 49, and 50, provided block 0 D is clear and provided there is no train on track-section II. If, however, there is a train already within section II, the battery a is short-circuited, and if there is-a train on track-section H the circuit of battery a is broken at relay R, while if there is a train on track-section II the circuit of battery ct is broken at relay R, so that the signal S cannot be set to safety unless block 0 D and track-section II are clear.
The method of operation of these signals is as follows: Supposing that a train on the siding is desirous of entering the block 0 D, a person qualified to do so presses key K, thus breaking the upper contact and closing the lower contact of the key. The circuitof battery a and of signals S and S is thereby broken and the circuit of battery (1 is diverted through signal S provided block 0 D and track-section H are clear, and the sig nal is thus set to safety.
When a train passes from the main to the side track, it may not be regarded as having passed off from the main track until its rear car has passed the fouling-point, even though no wheels of this car are upon the railsof the main track, To prevent signals from being cleared until the train shall have completely cleared the main track, the ends of the siding may be insulated from the main portion thereof and may be connected electrically with the rails of the main track. The manner of making these connections is well known, and for the sake of simplicity I have not shown it in the drawings of this application.
The function of the hand-switch N is to make it possible, when necessary, to prevent the cutting-out of battery a when a train is on the track-section 11 Thus, if a train is on section H and itis desiredin spite of that fact to permit another train to enter the block D E at E, the switch N is opened, thus breaking the circuit of battery a and cansing the armature of relay R to drop to normal position, thus cutting out of circuit signals S and S and completing the circuit of battery of, so that the presence of the train on the track-section H causes signal-S to go to safety. Signals S and S now being at danger, and being kept at danger through the breaking of the circuit of battery at at relay R it is not possible for the train on traek-section H to pass onward into block D E, and it is equally impossible for the train in the block D E'to pass beyond signal S into section H for so long as the first train is on section H the circuit of battery a thebattery which operates signals S and S is the train is on section H and no other battery can afiect signal S In any case, there fore, a train isfully protected at its rear.
Switches similar to Nand N may, of course, be placed at the other signal-stations for a similar purpose; but in general such switches will be needed only where there are side tracks. I
If desired, short insulated sections of track on the siding may be vprovided with batteries and circuits operating relays whichrwill take the place of keys K and K, so that signals S and S may be operatedautomatically. In
Fig. 3 I have illustrated such an arrangenient for the sidings, there shown.
Fig. 3 illustrates a track provided with two sidings, Which join the main track at points very near together. These sidings are supposed to be located at station D of Fig. 2 insection It.
stead of the single siding there. shown, and
. the wires and rail-sections are therefore numbered to correspond with numbers at station,
D. .H and H? are the'sidings, and h and h are the short insulated siding track-sections just referred to. S is the signal and r the relay corresponding to siding H while S is 4 the signal and 'r' the --relay corresponding to sidingH". A car standing on track-section h short-circuits the battery of relay '1", thus causing the armature of this relay tordrop, breaking the circuit of the main-line signals, which are not shown in this figure, but would be connected to Wire 32 extended, and placing signal S in circuit with-the batterywhich supplies current to the rails of the track-section H, this battery not being shown in this figure, but being battery a? of Fig. 2. Signal S is thus placed to safety, while signal S remains at danger. Signal S is operated in the same manner by a car standing on rail- Should two trains stand on the two track-sections h and h at the same time, so that relays r and r are operated, signal S alone will be setto safety, since, as will be seen from the diagram, the circuit of signal S passes over wires 49' and 50 and through the upper contact of relay 0", and
,this. contact is broken when the circuit of signal 8 is closed. ,A train on sidingH therefore always has the right of way with this arrangement of circuits. This might, under some circumstances, lead to confu- .rsionas, for instance, if, after a train on siding 11? had entered track-section h and set There is, there-.
to safety signal S, asecond train on siding 1 H should enter track-section h on that sid-' ing. Signal S1 would then go to safety and signal S would return to the danger position, although the train on siding H might already be partly on the main track. If there were three sidings communicating with the main track a similar confusion would .exist, a train on the first siding having the right of way over trains on the second and third sidings and a train on the second siding having the right of way over the train on the third siding. In Fig. 41 have illustrated a simple interlocking device for preventing any-such confusion.- (1 is a disk revolubly mounted and arranged to be rotated by the handle k. About the circumference of this disk are arranged the relays r r, &c., controlling the sidingsignals, their armatures being toward the circumference of the disk and in close proximity thereto when attracted to the poles of their magnets. s is a notch in the disk of a size suitable to receive one of these armatures.
No armature can fall unless the notch s is in line with it, and when an armature has entered this notch s the disk cannot be turned. Since there is but one notch it is then impos sible for a second armature to fall back far enough to make or break contact withits contact-points until the first armature has returned to normal. Hence only one relay may be operated at once and only one signal vcan be set to safety at any one time, so that all confusion is avoided and it-is insured that when one train has taken a route no'other first train has cleared the maintrack. It is not necessary thatthis disk should be turned by hand. The passage of a train onto any of the sidingtrack-sections may be caused to move the armature of an electromagnet, and the motion of this armature may be caused to rotate the disk until the armature of the relay corresponding to the siding track-section falls into the notch s, when the disk will be locked and the corresponding signal set to safety. When thetrain has passed off from the siding track-section, the magnet of the relay will be energized, so that the armature is drawn outof the notch s, and the disk the conhbinatiomwith twoinsulated blocks or sections of track, an electrically controlled signal for each block controlling the entrance of trains thereto, a signal circuit for each block controlling the signal of that block and passing through the rails of said block, a signal battery for each signal circuit, means for throwing the signal battery of each block into or out of its signal circuit, thereby setting to safety orto danger the signal of that block,
.train can take a conflicting route until the and a circuit controller operated from theentrance of the second block and controlling the signal circuit of the first block, and arranged to set to danger or to hold at danger the signal of the first block when atrain is entering the second block, substantially as described.
2. In an electrical railway signaling system,
passing through the rails of said block, a sig-.
nal battery for each signal circuit, means for throwing each of said signals into and out of its signal circuit, and a circuit controller operated from the entrance of the second block and controlling the signal circuit of the first block, and arranged to break the signal circuit of the first block when a train is entering the second block, substantially as described.
3. In an electrical railway signaling system, the combination, with two insulated blocks or sections of track, an electrically controlled signal at each end of each block controlling the entrance of trains to said block, a signal battery at each end of each block, a line conductor for each block, and a circuit controller for each end of each block connected to the signal and battery at that end of that block and to the line conductor, and adapted to connect either said signal or said battery to the line conductor, and means for setting to danger or for holding at danger the signals of the first block when the signal of the second block situated at the station nearest the first block is at safety, substantially as described.
4. In an electrical railway signaling system, the combination, with two insulated blocks or sections of track, an electrically controlled signal at each end of each block controlling the entrance of trains to said block, a signal battery at each end of each block, a line conductor for each block, and a circuit controller for eachend of each block connected to the signal and battery at that end of. that block and to the line conductor, and. adapted to connect either said signal or said battery to the line conductor, and means for breaking the line circuit of the first block when the.
signal of the second block situated at the station nearest the first block is in the line circuit of the second block, substantially as described.
5. In an electrical railway signaling system, the combination, with two or more blocks or sections of track, and a signal for each end of each block controlling the entrance of trains thereto, of a signal battery for each end of each block, an electrically operated circuit controller or switch for each end of each block connected to the signal circuit of the block and to the signal and signal battery of its end of the block, and adapted to connect either said signal or said battery to the signal circuit, and an insulated track section for each end of each block and a local circuit and battery therefor, controlling the circuit controller of that end of theblock and connected to the rails of said insulated track section, the said insulated track section of each block being placed between the corresponding insulated track section of the adjoining block and the main track section of the adjoining block, substantially as described. I
6. In an electrical railway signaling system, the combination, with two adjacent blocks or sections of track, 0 D and D E, and signals S and S controlling the entrance of trains to said blocks, of an insulated track section 11 an electrically operated circuit controller R and a battery and circuit operating said circuit controller and adapted to cause the armature thereof to fall when wheels are on said track section H an insulated track section II, an electricallyoperated circuit controller R and a battery and circuit for operating said circuit controller adapted to cause the ar' mature thereof to rise when wheels are on said track section H a battery and circuit controlled by circuit controlling devices operated by the armature of circuit controller R and adapted to operate signal S when wheels are on track section H abattery and circuit for operating signal 8*, and circuit controlling devices operated by the movement of the armature of circuit controllers R and R controlling the circuit of signal 8 and adapted to prevent the operation of said signal when wheels are on either of said track sections II or H", substantially as described.
7. In an electrical railway signaling system, the combination, with a block or section of track 0 D, having a siding at D, a line conductor extending throughout the block, signals S and S controlling the entrance of trains into the block at the ends 0 and D respectively and a signal S controlling the entrance of trains into the block from the siding, said signals being electrically operated and arranged to indicate danger when no current is flowing through them,and signal batteries a and a at the ends 0 and D of said block respectively, of circuit controllers or switches R and R at the ends 0 and D of said block, respectively, each connected to the signal and battery at its end of the block, and to the line conductor, and adapted to place either said signal or said battery in circuit with the line conductor, and a circuit controller or switch K, connected to circuit controller R signal S and the line conductor, and adapted when operated to out said circuit controller R out of circuit with the line conductor, thereby maintaining said signal S at danger, and to place signal S in circuit with the line conductor, substantially as described.
8. In an electrical railwaysignaling system, the combination, with a block or section of track 0 D having two or more sidings at D, a line conductor extending throughout the block, signals S and S controlling the entrance of trains into the block at the ends 0 and D respectively and signals S S, &c.,
controlling the entrance of trains into the block from the sidings, said signals being electrically operated and arranged to indicate danger when no current is flowing of circuit controllers or switches R and R at the ends G and D of said block, respectively, each connected to the signal and battery at its'end of the block, and to the line conductor, and adapted to place either said signal or said battery in circuit with the line conductor, electrically operated circuit controllers or switches 7", r, &c., corresponding to signals S S, &c., respectively,-each connected to the circuit controller R to the line conductor, and to its corresponding signal, and adapted when operated to out said circuit controller R out of circuit-with the line conduc tor, thereby maintaining signal S at danger, and to place its corresponding signal in circuit with the line conductor,.local batteries and circuits for each siding arranged to operate the circuit controller corresponding to said siding when a train passes from the siding to the main track, and an interlocking device controlling said siding I signals and adapted to prevent one of said siding signals from being set to safety when another has already been set to safety, substantially as described.
9. In an electrical railway signaling system, the combination, with two adjacent blocks or sections of track, 0 D and DE, a line conductor for each block extending throughout the block, electrically controlled signals, S and S at the ends 0 and D of block 0 D respect ively, and S and S at the ends D and E of block D E respectively, signal batteries a and a at the ends of block 0 D, signal batteries a and a -at the ends of block D E, and circuit controllers or switches R, R and R corresponding respectively to signals S S and S each circuit controller being connected to its corresponding signal and battery and to the line circuit of its block, and being adapted to place either said signal or said battery in circuit with that line circuit,'of an electrically track section and controlling said circuit controller R, and adapted to cause the armature thereof to fall when wheels are on said track section H a battery a and local circuit for operating circuit controller R controlled by circuit controller R and arranged to cause signal S to be placed in circuit with the line circuit of block D E when circuit controller R is operated through the presence of wheels upon said track section H aswitch N adapted when operated to prevent the operation of circuit controller R and the placing of signal S in the line circuit, and conductors forming part of the line conductor of block CD and connected to circuit controllers R and R and arranged to prevent the operation of the line circuit of that block when the armature of circuit controller R is down or when the circuit controller R is operated to place signal S in circuit with the line circuit of block D E, substantially as described.
10. In an electrical railway signaling system, the combination, with two or more interfering tracks, electrically controlled signals for controlling traflic on said tracks, and signal circuits and batteries for operating said signals, of circuit controlling switches or.re-
lays for operating said signal circuits, having operating levers arranged about a revolubly mounted disk which is provided with a notch in its periphery adapted to receive each of said levers when opposite the same, said circuit controlling devices being adapted each to operate its signal circuit when its operat: ing or switch lever is within said notch, substantially as described.
11. In an electrical railway signaling system, the combination, with two orinore interfering tracks, H and H electrically controlled sig'nals S and S controlling traffic on said tracks, and signal circuits and batteries for operating said signals, of circuit controlling switches or relays r and'r for operating said signal circuits, having operating levers arranged about a revolubly mounted disk d which is provided with a notch sin its periphery adapted to receive each of said levers when opposite the same, and contact points operated by the movement of the operating lever of each switch, and controlling the circuit of the signal corresponding to said switch, substantially as described.
THOMAS BULLITT DIXON.
US543592D Electrical railway signaling system Expired - Lifetime US543592A (en)

Publications (1)

Publication Number Publication Date
US543592A true US543592A (en) 1895-07-30

Family

ID=2612341

Family Applications (1)

Application Number Title Priority Date Filing Date
US543592D Expired - Lifetime US543592A (en) Electrical railway signaling system

Country Status (1)

Country Link
US (1) US543592A (en)

Similar Documents

Publication Publication Date Title
US543592A (en) Electrical railway signaling system
US763420A (en) Automatic signaling system for railways.
US552316A (en) Electrical railway signaling system
US1294736A (en) Absolute permissive block-signal system.
US840428A (en) Electrical signaling system.
US1971950A (en) Automatic train control
US619890A (en) Railway signal system
US737094A (en) Controlling system for railway-signals.
US1294855A (en) Overlap signaling means.
US840095A (en) Automatic signal.
US543591A (en) Railway signaling system
US562318A (en) Railway-signal
US788513A (en) Railway signal system.
US920654A (en) Railway signaling system.
US791574A (en) Automatic railroad signaling.
US585733A (en) Railway signaling system
US543596A (en) Electrical railway signaling system
US780885A (en) Railway electric signal.
US143529A (en) Improvement in electric circuits and devices for railway-signals
US1292965A (en) Absolute permissive automatic block-signal system.
US802583A (en) Electric railway-signal.
US787393A (en) Signal system and apparatus therefor.
US2088768A (en) Automatic train control
US1011602A (en) Automatic block-signal system.
US898221A (en) Railway electric signaling system.