Method and product of fly ash benefication by carbon burnout in a dry bubbling fluid bed Download PDFInfo
- Publication number
- US5160539A US5160539A US07/680,900 US68090091A US5160539A US 5160539 A US5160539 A US 5160539A US 68090091 A US68090091 A US 68090091A US 5160539 A US5160539 A US 5160539A
- Authority
- US
- United States
- Prior art keywords
- air
- fly ash
- bed
- fluid bed
- ash
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B18/00—Use of agglomerated or waste materials or refuse as fillers for mortars, concrete or artificial stone; Treatment of agglomerated or waste materials or refuse, specially adapted to enhance their filling properties in mortars, concrete or artificial stone
- C04B18/04—Waste materials; Refuse
- C04B18/06—Combustion residues, e.g. purification products of smoke, fumes or exhaust gases
- C04B18/08—Flue dust, i.e. fly ash
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27B—FURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27B15/00—Fluidised-bed furnaces; Other furnaces using or treating finely-divided materials in dispersion
- F27B15/02—Details, accessories, or equipment peculiar to furnaces of these types
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27B—FURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27B15/00—Fluidised-bed furnaces; Other furnaces using or treating finely-divided materials in dispersion
- F27B15/02—Details, accessories, or equipment peculiar to furnaces of these types
- F27B15/10—Arrangements of air or gas supply devices
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23G—CREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
- F23G2209/00—Specific waste
- F23G2209/30—Solid combustion residues, e.g. bottom or flyash
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W30/00—Technologies for solid waste management
- Y02W30/50—Reuse, recycling or recovery technologies
- Y02W30/91—Use of waste materials as fillers for mortars or concrete
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10S—TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10S106/00—Compositions: coating or plastic
- Y10S106/01—Fly ash
Definitions
- This invention relates to a method and apparatus for producing enhanced pozzolan by fly ash remediation by burning carbon from fine particles of fly ash in a dry bubbling fluid bed of those same particles and for recovering the otherwise wasted energy associated with this carbon.
- fly ash Various uses for fly ash are well-known in the construction (and particularly concrete) industry. Uses include production of aggregates (by various processes) for use in concrete products, raw feed to cement production processes, and direct replacement of a portion of the cement used in concrete products. This invention addresses the partial direct replacement of cement.
- fly ash properties are known to limit its usefulness to replace cement. Chief among these are high carbon content and large particle size. Other undesirable properties include excess magnetic iron compounds, excess cenospheres, and low pozzolanity.
- Known processes have been applied to improve some of these characteristics with various economic results. For example, particle size may be reduced by pulverization, sieving or classification. Likewise, excess magnetic iron may be removed by magnetic separation and excess cenospheres by flotation. Although low pozzolanity may be improved by these methods, it is sometimes associated with peculiarities in the fly ash chemistry and not subject to improvement by known processes.
- This invention deals with reduction of carbon in the fly ash. This has been accomplished in the past by several methods. However, the coal-fired furnace modifications, classification by particle size, and electrostatic separation methods as well as the wet flotation method in U.S. Pat. No. 4,121,945 accomplish carbon reduction by processes clearly different from those of this invention. Only this invention and the processes taught in U.S. Pat. No. 3,979,168, a report from Vliegasunie B. V. (Dutch Fly Ash Corporation, undated report, page 6, paragraph 3.3, published in the mid 1980's) and U.S. Pat. No. 4,705,409 reduce ash carbon content by oxidizing the carbon.
- Burning of carbon is known. However, when the carbon is highly diluted by inert compounds and is not accompanied by volatile compounds as in fly ash the combustion becomes very difficult. The critical factors in obtaining such combustion are residence time, reaction temperature, and oxygen availability. Minimum ignition temperature and oxygen requirements are relatively well understood. A proper combination of operating conditions for dry fluid bed oxidation and particularly minimum residence time were previously unknown for carbon in fly ash.
- transport reactor In early work, two types of transport reactors were tested with residence times on the order of 1 to 15 seconds.
- transport reactor is meant a reactor in which all of the reactants travel together at more or less the same speed.
- the large volume of air necessary to provide sufficient oxygen for carbon burnout was used to transport the reacting fly ash from inlet to discharge points. No substantial carbon burnout was detected.
- Fluid bed reactors are well-known for, among other things, their ability to provide extended residence time for certain reactions
- Fluid beds are loosely divided into bubbling bed and circulating bed types.
- bubbling bed the solid material stays substantially in place in the bed while the gaseous (or sometimes liquid) material travels upward through it
- velocity of the fluid is greatly increased so that the bed becomes very dilute and most or all of the solid material is repeatedly ejected from the bed, separated from the fluid and reinjected into the bed.
- Circulating fluid beds are known to be undesirable for very fine solids (such as fly ash) due to the economic difficulty of repeatedly separating fine solids from the fluid stream.
- This invention has overcome the problems of prior art processing methods by discovering how to economically use a dry bubbling fluid bed reactor.
- dry is meant the fluid bed is substantially free of any liquid.
- the expected allowable velocity would be on the order of 0.01 ft/sec, the single particle terminal settling velocity expected for the fine fly ash particles to prevent excess transport of material from the bubbling bed.
- a reactor using this velocity would have a huge plan area to pass the required air quantity and would be clearly uneconomic. It has now been discovered that bed velocity can be increased approximately two orders of magnitude without departing significantly from the bubbling bed regime, even for non-catalytic bubbling fluid beds using the fine fly ash particles as the bed of particles.
- Use of the high bed velocity allows reduction of bed plan area by a factor of approximately 100 with obvious economic benefits.
- this invention is the method of reducing carbon content of fine particles of fly ash containing carbon, comprising (a) introducing the fly ash fine particles containing carbon to a dry bubbling fluid bed of the particles, and (b) oxidizing the carbon in the fly ash particles with air by intimately mixing the particles in the bed at a temperature of between about 1300° and about 1800° F.
- the oxidation use excess oxygen of between about 5 and about 15%.
- excess oxygen is meant that oxygen greater than required for an equi-molar oxidation of carbon.
- Preferred bed temperatures are between about 1400° and about 1700°, and even more preferred is between about 1500° and about 1600° F.
- the velocity of the air is preferred between about 1 and about 1.25 ft./sec.
- Preferred air to fly ash volume ratio is between about 1200 and about 1300, most preferred is 1250.
- the preferred residence time is between about 10 and 80 minutes and even more preferred is between about 30 and about 50 minutes. It is preferred that the particles of the fluidized bed, namely the fly ash, have an average particle size of about 100 microns or less.
- Another embodiment of this invention is enhanced pozzolan produced from fly ash particles having carbon content reduced by the method described above.
- the beneficiated pozzolan is useful as a direct partial replacement for Portland cement in cementitious mixtures comprising fly ash conditioned in the bubbling fluid bed burnout process (oxidizing) described above.
- direct is meant the beneficiated pozzolan is useful to replace a portion of cement in concrete without further processing.
- the enhanced pozzolan has less than 4% carbon and a size such that at least 66% thereof passes a 325 mesh screen by wet analysis.
- the final embodiment of this invention is an apparatus for reducing carbon content of fly ash particles containing carbon, comprising in combination (a) means for introducing the carbon containing fly ash particles into (b) a dry bubbling fluid bed reactor, the fluid bed consisting essentially of the previously introduced fly ash particles, and the reactor having (c) means for introducing air into the reactor, (d) means for removing the particles from the reactor, (e) means for removing heat from the reactor, (f) means for removing the air and resulting combustion products from the reactor; and (g) the bubbling fluid bed reactor having a cross-sectional area transverse to the flow of the particles which is at least 10 times smaller than that area of a similar reactor designed based on a theoretical limiting factor of the terminal settling velocity of a single particle.
- FIG. 1 is a schematic conceptual flow diagram of the fly ash carbon burnout plant preferred embodiment and best mode of this invention. Operating conditions for the best mode are the preferred conditions given in the Summary of the Invention.
- FIG. 2 is a schematic showing the fluid bed carbon burnout test module used for the testing described in the examples herein.
- feed fly ash from silo 1121 will be transported to a fly ash surge bin 1220 atop the fluid bed combustor (FBC) 2110. From this surge bin 1220 fly ash will be fed to the bubbling fluid bed in combustor 2110 at the required rate.
- FBC fluid bed combustor
- the fluid bed combustor 2110 will generally be divided into sections or stages (typically three). Fly ash will leave the combustor either as carryover (with the exhaust gas in line 2001) or by overflowing a weir 2114 at the end opposite the feed.
- the hot fly ash which flows over the weir 2114 will fall into the air preheater 3120.
- the air preheater 3120 will be a high temperature indirect heat exchanger.
- the dual functions of the air preheater 3120 are to cool the fly ash for subsequent handling and recover the heat.
- the recovered heat will raise the temperature of air from the force draft fan 3110 to between 600° F. and 1000° F. Most of this air will become fluid bed combustion air.
- the remaining hot air, carrying its recovered heat, will be diverted to the power plant through lines 3114 and 3116.
- a particle size classifier 4110 will remove foreign materials, sintered lumps, etc. from the cooled fly ash prior to transport of the product ash to silo 6141. Oversize material will be disposed of through line 4121.
- the properly sized, low carbon fly ash will be transported to product ash silo 6141 for storage.
- This silo 6141 will be equipped for load out into pressure differential trucks.
- a substantial quantity of the fluid bed material will leave the bed with the exhaust gas line 2001 as carryover.
- This material will be collected in the electrostatic precipitator (ESP) 8110 and fed by gravity into the recycle ash surge bin 5210. Atmospheric air from line 8161 will dilute the ESP 8110 feed stream and maintain the overall stream temperature at levels tolerable to the ESP 8110.
- the cleaned exhaust gas and dilution air mix will be drawn from the ESP 8110 and forwarded (with the recovered heat) through lines 8111 and 3116 to the power plant by the induced draft fan 8150.
- the hot gas stream in line 3116 to the power plant will consist of excess hot forced draft air from line 3114 from the air preheater 3120 and the cleaned fluid bed exhaust gas/dilution air mixture from line 8111.
- This hot gas stream will be injected into the forced draft duct (not shown) downstream of the power plant air heater (not shown). The result of this will be a slight decrease in the power plant's forced draft air flow and a slight increase in the power plant's combustion air temperature. This will result in the use of less coal and an improvement in unit heat rate.
- the ash deposited in the recycle ash surge bin 5210 by the dust collector ESP 8110 will have been cooled substantially by exposure to the dilution air admitted through damper 8160. This ash will be reinjected into the fluid bed combustor 2110 where it will act as a heat sink to control fluid bed temperature. For most operating conditions, the dust collector (ESP 8110) discharge stream will not be sufficient to fully control fluid bed temperature. Therefore, additional cool ash from the air preheater 3120 discharge will be transported to the recycle ash surge bin 5210 as needed through line 5111.
- Individual feeders 5140, 5150 and 5160 will discharge recycle ash into each of the three fluid bed sections as required to maintain set point temperature in that section.
- the recycle ash surge bin 5210 will be atop the fluid bed combustor 2110 along side the feed ash surge bin 1220.
- Fly ash from the feed ash silo 1121 will be discharged through the silo's aerated bottom assembly 1122.
- An isolation valve (not shown) will be provided.
- the ash will flow into the feed ash transporter 1110.
- Transport air will be supplied by feed ash transport blower 1120.
- the blower 1120 will run continuously during carbon burnout plant operations.
- the control system will cycle the transporter 1110 as required to maintain set point level in the fly ash surge bin 1220.
- the fly ash surge bin 1220 will be located above the fluid bed combustor 2110. Bolt on load cells (not shown) will provide the primary level indication for the fly ash surge bin 1220.
- the fly ash surge bin aeration blower 1140 will provide air to the fly ash surge bin aerating discharger 1150 to maintain surge bin 1220 contents in a fluid state. Aeration air as well as transport air will be cleaned and released through a fly ash surge bin vent filter 1130.
- the fluid bed fly ash rotary feeder 1160 will discharge ash from the fly ash surge bin 1220 through the feed ash impact scale 1170. Using feedback from the impact scale 1170, the control system will vary the fluid bed fly ash feeder 1160 speed to maintain fluid bed feed rate at set point.
- the basic component of the fluid bed combustor 2110 will be a refractory lined steel box. Its dimensions are chosen to provide the required residence time, gas velocity and bed depth.
- Feed ash will flow by gravity from the feed ash impact scale 1170 into the feed end of the fluid bed combustor 2110. During processing, the ash will migrate down the length of the fluid bed combustor 2110 and exit at the opposite end. Weirs 2112, 2113 and 2114 at intermediate points in the bed will divide the fluid bed into three stages.
- Optional bed maintenance recirculators could recirculate bed material from the second FBC 2110 stage to the first and from the third to the second (respectively) during start-up to help even out the bed temperature. Compressed air would provide the motive force. Additionally, dump valves may be added to the bottom of the recirculators to remove agglomerates which will tend to collect there.
- Air flow to each stage will be measured by a mass flow meter (not shown).
- the control system will modulate the combustion control dampers 2120, 2130 and 2140 to keep each flow rate at its set point.
- the set point for each stage will be calculated to provide the desired fluidizing velocity and excess air.
- Relatively cool ash from the three recycle ash rotary feeders 5140, 5150, and 5160 will be gravity fed into each of the three fluid bed combustor stages.
- the flow rate of each recycle ash feeder 5140, 5150 and 5160 will be varied by the control system to maintain the set point bed temperature in the affected stage.
- FBC 2110 start-up duct burner 2150 and FBC 2110 startup burners A and B 2160 and 2170 will be used for this purpose.
- the duct burner 2150 will fire into the combustion air plenum while the other burners will fire into the FBC 2110 chamber just above bed level in the first stage.
- the forced draft fan 3110 will provide motive force to push ambient air into the heat recovery portion of the air preheater 3120.
- the air preheater 3120 will be a countercurrent, solid to gas, heat exchanger which will transfer heat from the hot product exiting the fluid bed combustor 2110 to the cooler forced draft stream.
- the resulting hot forced draft air will be divided into two streams.
- the primary stream will flow into the fluid bed combustor air plenum 2115 to provide oxygen for the carbon burnout reaction.
- the other stream will flow through line 3114 into the hot gas duct 3116 to the power plant. This stream will transport the recovered heat (which exceeds the quantity the combustion air could absorb) to the power plant for use.
- the forced draft fan 3110 will be equipped with inlet dampers (not shown).
- the control system will modulate the inlet dampers to maintain the hot forced draft air temperature leaving the air preheater 3120 at its set point (between 600° F. and 1000°).
- Hot forced air flow to the fluid bed combustor 2110 will be controlled by combustion control dampers A, B and C 2120, 2130 and 2140, respectively. Excess hot forced draft air will flow through the heat recovery air damper 3115 and through line 3116, which is the hot gas duct to the power plant. The control system will modulate this damper to maintain sufficient pressure for proper operation of the fluidized bed combustor 2110.
- the air preheater 3120 will consist of a refractory lined steel box containing a number of stainless steel forced draft air ducts. Air from the forced draft fan 3110 will flow upwardly through these ducts while hot ash from the fluid bed combustor 2110 flows downwardly around the ducts. Fluidity of the fly ash product will be maintained by passing air from the air preheater aeration blower 3130 through the air preheater aerating discharger 3140.
- the small quantity of aerating air and any ash entrained in it will be ducted through FBC 2110 exhaust gas line 2001 to the electrostatic precipitator (ESP) 8110 for cleaning and product recovery.
- ESP electrostatic precipitator
- a suitably sized grizzly (not shown) near the top of the air preheater 3120 will prevent lumps large enough to plug the space between heat transfer ducts from entering that area. This feature is intended for protection against unusual upset conditions. If such conditions occur, the grizzly will require manual cleaning through a clean-out opening above.
- Bolt on load cells (not shown) will provide the primary indication of ash level in the air preheater 3120.
- the control system will vary the speed of the air preheater 3120 product rotary feeder 3150 to maintain set point level in the air preheater 3120.
- Cooled fly ash product exiting the air preheater 3120 through the air preheater product rotary feeder 3150 will flow by gravity into the particle size classifier 4110.
- the particle size classifier 4110 will consist of a sealed, gyrating screen mechanism which will separate oversize from product at approximately 16 mesh.
- the oversize stream will consist primarily of oversize material which entered with the feed ash (power plant air heater basket pieces, boiler refractory pieces, agglomerates from the power plant electrostatic precipitator, etc.). In addition, any lumps formed due to sintering in the fluid bed combustor 2110 will be rejected as oversize.
- Product from the particle size classifier 4110 will flow by gravity through line 4111 to the inlet of the product belt bucket elevator 6110. Oversize material will flow by gravity through line 4121 onto the oversize transfer belt conveyor 4120. This belt conveyor 4120 will transport the oversize material outside the plant building and elevate it sufficiently for dumping into the oversize discharge surge hopper 4210. The first several feet of the belt will be hooded. A dust pickup ducted from the belt hood to the product surge bin 6210 will collect any dust discharged with the oversize material from the particle size classifier 4110.
- the oversize material will normally flow by gravity through the oversize discharge surge hopper 4210 into the plant dump truck 9140 stationed below.
- the surge hopper 4210 will be equipped with a clamshell discharge gate (not shown) and will accommodate a 1 cubic yard surge flow. This feature will be used during the short periods when the truck is transporting the oversize material to the disposal area.
- Cooled product ash from the air preheater 3120 will flow by gravity through line 5112 into the recycle ash transporter 5110.
- the transporter inlet valve (not shown) will open and shut to control flow to the transporter 5110 in accordance with the transporter's operating cycle.
- Ash from the transporter 5110 discharge will be lifted pneumatically to the recycle ash surge bin 5210.
- the recycle ash transport blower 5120 will provide the motive air to transport the recycle ash.
- the recycle transporter 5110 will be vented into the air preheater 3120 above the product ash level through a small pipe (not shown).
- the recycle ash surge bin 5210 will consist of an insulated silo. Carryover ash will flow by gravity from the electrostatic precipitator discharge airlocks 8120 and 8130 into the recycle ash surge bin 5210. In addition, the surge bin 5210 will receive cooled product from the recycle ash transporter 5110 through line 5111, pneumatically.
- Bolt on load cells (not shown) will provide a continuous indication of the recycle ash surge bin's 5210 weight.
- the control system will cycle the recycle ash transporter 5110 as required to maintain this weight at the set point value.
- the recycle ash transport blower 5120 will run continuously during plant operation.
- the recycle ash aeration blower 5130 will provide air to the recycle ash aerating discharger 5135 to maintain ash in the recycle ash surge bin in a fluidized state. Both aeration air and pneumatic transport air will be vented from the recycle ash surge bin into the dust collector inlet line 8162 through line 5211.
- Recycle ash dischargers A, B, and C 5140, 5150 and 5160, respectively will discharge recycle ash into the three fluid bed combustor 2110 stages.
- the control system will vary the speed of each of these dischargers as required to maintain set point temperature in the related fluid bed stage.
- Product from the particle size classifier 4110 will flow by gravity through line 4111 into the boot of the product belt bucket elevator 6111.
- the product belt bucket elevator 6110 will consist of a sealed, centrifugal elevator using standard belt to carry nylon buckets. The function of this elevator will be to lift the product ash being continuously discharged from the particle size classifier 4110 into the product surge bin 6210.
- the product surge bin 6210 will continuously receive product ash from the product belt bucket elevator 6110 and discharge it batchwise into the product transporter 6130.
- the product surge bin 6210 will be quite small.
- the product surge bin 6210 vent filter 6120 and product surge bin vent filter fan 6125 will be mounted atop the product surge bin 6210. Through appropriate ducting (not shown), these items will maintain the casing of the product belt bucket elevator 6110, particle size classifier 4110, and oversize transfer belt conveyor 4120 at a slightly negative pressure. This will prevent dust emissions from these devices.
- the product transporter 6130 will vent into the product surge bin 6120 through a small pipe (not shown). Like the air from the other pick-up points, the vent air will be cleaned by the product surge bin vent filter 6120 prior to release.
- Product ash will flow by gravity from the product surge bin 6210 into the product transporter 6130.
- the product surge bin 6210 will be designed for mass flow to ensure uninterrupted feed.
- the product transporter inlet valve (not shown) will control the flow in accordance with transporter design requirements.
- the control system will cycle the product transporter 6130 as needed to maintain the product surge bin 6210 level at set point.
- the product transport blower 6140 will provide motive air to transport the product ash to the top of the product ash silo 6141. This blower 6140 will run continuously during plant operations.
- Exhaust gas from the fluid bed combustor 2110 will be drawn into the electrostatic precipitator (ESP) 8110 by the induced draft fan 8150 through lines 2001 and 8162. Atmospheric air will be drawn through a modulating dilution air damper 8160 and duct 8161 into the electrostatic precipitator 8110 inlet duct line 8162 to moderate electrostatic precipitator 8110 inlet temperature.
- the combined exhaust gas and dilution air stream, after cleaning, will be forwarded through line 8111 by the I.D. fan 8150 to the "hot gas to power plant" duct 3116.
- This gas stream (at approximately 600° F.) will join the excess hot forced draft air stream from line 3114 (at between 600° F. and 1000° F.) in the duct.
- the combined hot gas stream (at between 600° F. and 700° F.) will transport the recovered heat to the power plant forced draft duct just upstream of the burner plenum.
- Aeration air from the air preheater 3120 and recycle ash surge bin 5210 will be vented through lines 2001 and 5211 into the electrostatic precipitator 8110 inlet duct line 8162. Other minor vent streams may also be routed to this duct.
- the control system will modulate the dilution air damper 8160 to control the electrostatic precipitator 8110 inlet temperature at its set point (approximately 600° F.).
- Dust collected by the electrostatic precipitator 8110 will discharge by gravity through the electrostatic precipitator discharge airlocks 8120 and 8130 into the recycle ash surge bin 5210.
- the induced draft fan 8150 will be equipped with a modulating inlet damper (not shown). The control system will adjust this damper to maintain a slightly negative pressure (approximately -1 inWC) at the fluid bed combustor 2110 exhaust flange. The induced draft fan 8150 will be required to discharge against a fairly high static head (approximately 10 to 15 inWC) to push the cleaned gas stream to the power plant forced draft duct.
- the test module in FIG. 2 is a simple batch device in which a fly ash sample 31 is heated to test temperature in an inert (low-oxygen) atmosphere and then fluidized with hot air which initiates the carbon burnout reaction.
- the test module consists primarily of air heating unit 20 and fluid bed unit 30 and their auxiliaries.
- the fluid bed unit 30 consists of fluid bed box 29 which contains the fly ash sample 31, aeration stone 34 (used for distribution of fluidizing air) and bed cooling coils 33 (used to control temperature rise during the burnout reaction).
- the fluid bed box 29 is, in turn, enclosed within an insulated steel box 28 which serves to contain the combustion gases from LPG burner 2 close to the fluid bed box 29 for heating the sample to test temperature. These gases are vented through LPG burner stack 32.
- the air heating unit 20 is similar in construction.
- the inner box 21 holds a thermal storage mass 3 consisting of gravel which is used as a heat storage and heat transfer medium.
- the outer insulated box 27 contains the hot combustion gases from LPG burner 1 close to inner box 21. The gasses from LPG burner 1 are vented through LPG burner stack 22.
- bed cooling coils 33 and sample fluid bed 31 are inserted into fluid bed box 29.
- a metal plate (not shown) is used to cover fluid bed exhaust 40.
- LPG burners 1 and 2 are fired to raise the temperature of the thermal storage mass 3 and sample fluid bed 31 respectively. Temperatures of the two units are monitored by thermocouples 18, 19, 38, and 39 as shown.
- argon is admitted through valve 16 and measured by flow indicator 17 to line 24 which routes the gas through the thermal storage mass 3, pipe 25, union 35, and aeration stone 34 into the sample fluid bed 31. This prevents significant carbon burnout from occurring prior to introduction of fluidizing air (lab tests have shown that this reaction will not occur to any significant extent below 1000° F.).
- the argon flow is maintained at a value sufficient to maintain a low-oxygen content in fluid bed box 29 but insufficient to transport a measurable quantity of fly ash out of the fluid bed exhaust 40.
- the combustion gases exit the fluid bed exhaust 40 producing a visual ash plume 41.
- the incoming air flow rate measured by flow indicator 15 is adjusted by valve 12 to provide the desired superficial fluid bed velocity to fluidize the particles of fly ash in sample 31 fluid bed in fluid bed box 29. This flow is maintained until the desired quantity of air (depending upon the desired ratio of oxygen to carbon) has passed through the sample fluid bed 31.
- bed cooling coils 33 are used to maintain sample fluid bed 31 temperatures (as measured by thermocouples 38 and 39) in the desired range. Cooling water is admitted through valve 44 and pipe 43 to bed cooling coils 33. Heated cooling water is discharged through pipe 42.
- sample fluid bed 31 After the proper quantity of air has passed through sample fluid bed 31, air valve 12 is closed, argon valve 16 is opened, LPG burners 1 and 2 are shut off, a steel plate (not shown) is used to cover fluid bed exhaust 40 and cooling water valve 44 is fully opened. After the test units have cooled sufficiently, bed cooling coils 33 are removed from fluid bed box 29. Union 35 is broken and the entire fluid bed box 2 is removed from the insulted steel box 28 for recovery of the remaining sample fluid bed 31 and inspection. Beginning and ending samples from the sample fluid bed 31, as well as any samples dipped from the bed during the test, are submitted to a laboratory for carbon content analysis.
- LOI reductions in the six runs ranged from 49.6% to 87.3%. In general, LOI reductions were better during the later tests when bed fluidization and lumping problems (see below) had been resolved.
- Loss of material from the bed was fairly constant for a given air flow. That is, the mass ratio of material lost to air flow did not change greatly from test to test. Similarly, the ratio of mass of bed material lost to volume of air supplied did not vary greatly.
- Fluidization within the bed was found to be strongly dependent on bed depth. Fluidization was very poor at a bed depth of 6 inches. It improved dramatically at 12 inches. Complete fluidization was reached at a 24 inch bed depth.
- Bed depth is linked closely to residence time. For the one foot per second test design bed velocity, a 24 inch bed resulted in a 40 minute residence time for low carbon content fly ash and 80 minute residence time for high carbon content fly ash. Long residence times are good for carbon burn-out and do not affect unit throughput (unit throughput for the fluid bed carbon burn-out concept is determined exclusively by the bed area and bed velocity). However longer retention times will be associated with higher overall bed losses.
- the heat removed from the fluid bed may be recovered at a high temperature (on the order of 1000° F.) by use of suitable heat transfer surface. This should make the recovered heat valuable for reuse in the power plant or sale to an outside user.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Dispersion Chemistry (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Materials Engineering (AREA)
- Civil Engineering (AREA)
- Combustion & Propulsion (AREA)
- Structural Engineering (AREA)
- Organic Chemistry (AREA)
- Processing Of Solid Wastes (AREA)
- Gasification And Melting Of Waste (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Devices And Processes Conducted In The Presence Of Fluids And Solid Particles (AREA)
- Fluidized-Bed Combustion And Resonant Combustion (AREA)
Abstract
Description
TABLE I __________________________________________________________________________ FLUID BED CARBON BURNOUT TEST SUMMARY RUN NUMBERS 1 2 3 4 5 6 __________________________________________________________________________ AIR FLOW CORRECTED AIR FLOW (SCFM) 6.2 5.7 5.7 5.7 5.6 5.7 AIR FLOW DURATION (MIN) 10.00 10.00 20.00 20.00 40.00 80.00 TOTAL AIR MASS (LB) 4.71 4.36 8.74 8.65 17.13 34.66 AVG ASH BED TEMP (DEG F) 1406.00 1886.00 1308.00 1478.00 1375.00 1407.00 ACTUAL AIR FLOW (ACFM) 22.14 25.75 19.44 21.10 19.78 20.36 ACTUAL AIR VELOCITY (FT/SEC) 1.11 1.29 0.97 1.06 0.99 1.02 ASH CALCS ASH FEED WEIGHT (LB) 6.70 6.70 6.70 13.00 26.80 26.80 RECOVERED PRODUCT (LB) N/A 5.10 3.80 9.40 12.20 5.80 LOSS (LB) N/A 1.60 2.90 3.60 14.60 21.00 (%) N/A 23.88 43.28 27.69 54.48 78.36 AIR LOSS TO AIR FLOW (LB/MIN) N/A 0.16 0.15 0.18 0.37 0.26 (%/MIN) N/A 2.39 2.16 1.38 1.36 0.98 (LB/LB) N/A 0.37 0.33 0.42 0.85 0.61 (LB/ACF) N/A 0.01 0.01 0.01 0.02 0.01 CARBON CALCS FEED CARBON (%) 6.00 4.92 11.79 5.97 5.57 11.67 PRODUCT CARBON (%) 1.99 1.00 5.94 1.42 0.71 3.01 CARBON BURNED (LB) 0.27 0.26 0.39 0.59 1.30 2.32 (%) 4.01 3.92 5.85 4.55 4.86 8.66 REDUCTION (%) 66.83 79.67 49.62 76.21 87.25 74.21 OXYGEN CALCS STOICHIOMETRIC 02 (LB) 1.07 0.88 2.11 2.07 3.99 8.35 ACTUAL 02 CONSUMED (LB) 0.72 0.70 1.05 1.58 3.48 6.20 OXYGEN IN AIR MASS (LB) N/A 1.01 2.03 2.01 3.97 8.04 DESIRED EXCESS 02 % N/A 10.00 10.00 10.00 10.00 10.00 ACTUAL EXCESS 02 % N/A 14.92 -3.91 -3.15 -0.31 -3.70 __________________________________________________________________________ NOTE: % CARBON ASSUMED EQUAL TO % LOI FEED VALUES FROM COLD FEED SAMPLE PRODUCT VALUES ARE MASS AVERAGES OF COLD PRODUCT FRACTIONS BASED ON MASS FRACTION ESTIMATES LOST MATERIAL ASSUMED BURNED OUT TO SAME DEGREE AS RETAINED MATERIAL
Claims (10)
Priority Applications (9)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US07/680,900 US5160539A (en) | 1991-04-05 | 1991-04-05 | Method and product of fly ash benefication by carbon burnout in a dry bubbling fluid bed |
PCT/US1991/005824 WO1992017415A1 (en) | 1991-04-05 | 1991-08-22 | Fly ash benefication by carbon burnout in a dry bubbling fluid bed |
DE69133138T DE69133138T2 (en) | 1991-04-05 | 1991-08-22 | TREATMENT OF FLYING BAGS BY CARBON BURNING OUT IN A DRY SPIRLED BULB |
AU11527/92A AU1152792A (en) | 1991-04-05 | 1991-08-22 | Fly ash benefication by carbon burnout in a dry bubbling fluid bed |
CA 2107571 CA2107571C (en) | 1991-04-05 | 1991-08-22 | Fly ash benefication by carbon burnout in a dry bubbling fluid bed |
EP19920903947 EP0578641B1 (en) | 1991-04-05 | 1991-08-22 | Fly ash benefication by carbon burnout in a dry bubbling fluid bed |
JP50425392A JP3364684B2 (en) | 1991-04-05 | 1991-08-22 | Sorting fly ash by carbon combustion in a dry boiling fluidized bed |
ES92903947T ES2180533T3 (en) | 1991-04-05 | 1991-08-22 | BENEFIT OF FLYING ASHES BY CARBON COMBUSTION IN A DRY BUBBLING FLUID BED. |
AT92903947T ATE226563T1 (en) | 1991-04-05 | 1991-08-22 | TREATMENT OF FLY ASH BY BURNING OUT CARBON IN A DRY BUBBLE FLUIDIZED BED |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US07/680,900 US5160539A (en) | 1991-04-05 | 1991-04-05 | Method and product of fly ash benefication by carbon burnout in a dry bubbling fluid bed |
Publications (1)
Publication Number | Publication Date |
---|---|
US5160539A true US5160539A (en) | 1992-11-03 |
Family
ID=24732986
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US07/680,900 Expired - Lifetime US5160539A (en) | 1991-04-05 | 1991-04-05 | Method and product of fly ash benefication by carbon burnout in a dry bubbling fluid bed |
Country Status (9)
Country | Link |
---|---|
US (1) | US5160539A (en) |
EP (1) | EP0578641B1 (en) |
JP (1) | JP3364684B2 (en) |
AT (1) | ATE226563T1 (en) |
AU (1) | AU1152792A (en) |
CA (1) | CA2107571C (en) |
DE (1) | DE69133138T2 (en) |
ES (1) | ES2180533T3 (en) |
WO (1) | WO1992017415A1 (en) |
Cited By (41)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5299692A (en) * | 1993-02-03 | 1994-04-05 | Jtm Industries, Inc. | Method and apparatus for reducing carbon content in particulate mixtures |
US5399194A (en) * | 1994-02-23 | 1995-03-21 | Electric Power Research Institute | Method of fly ash beneficiation and apparatus for same |
US5484476A (en) * | 1994-01-11 | 1996-01-16 | Electric Power Research Institute, Inc. | Method for preheating fly ash |
WO1996029546A1 (en) | 1995-03-20 | 1996-09-26 | U.S. Scientific, L.L.C. | Apparatus and process for carbon removal from fly ash |
US5887724A (en) * | 1996-05-09 | 1999-03-30 | Pittsburgh Mineral & Environmental Technology | Methods of treating bi-modal fly ash to remove carbon |
US5992336A (en) * | 1996-12-31 | 1999-11-30 | Wisconsin Electric Power Company | Reburning of coal ash |
US6038987A (en) * | 1999-01-11 | 2000-03-21 | Pittsburgh Mineral And Environmental Technology, Inc. | Method and apparatus for reducing the carbon content of combustion ash and related products |
US6136089A (en) * | 1998-08-31 | 2000-10-24 | Brown University Research Foundation | Apparatus and method for deactivating carbon in fly ash |
US6139960A (en) * | 1999-02-17 | 2000-10-31 | Mineral Resource Technologies, Llc | Method of making a mineral filler from fly ash |
WO2001033140A1 (en) | 1999-11-02 | 2001-05-10 | Consolidated Engineering Company, Inc. | Method and apparatus for combustion of residual carbon in fly ash |
WO2002097330A1 (en) | 2001-06-01 | 2002-12-05 | Emr Microwave Technology Corporation | A method of reducing carbon levels in fly ash |
US20030089642A1 (en) * | 2001-10-22 | 2003-05-15 | Bradley William S. | Process for converting wet fly ash into a useful product |
US20040033184A1 (en) * | 2002-08-15 | 2004-02-19 | Ernest Greer | Removing carbon from fly ash |
US6695902B2 (en) | 2000-11-14 | 2004-02-24 | Boral Material Technologies, Inc. | Asphalt composites including fly ash fillers or filler blends, methods of making same, and methods for selecting or modifying a fly ash filler for use in asphalt composites |
US20040069186A1 (en) * | 2002-10-15 | 2004-04-15 | Zacarias Philip Souza | Carbon removal through partial carbon burn-out from coal ash used in concrete |
US20040111958A1 (en) * | 2002-12-16 | 2004-06-17 | Oates David Bridson | Fuel from ash |
US20040123786A1 (en) * | 1999-11-02 | 2004-07-01 | Crafton Paul M. | Method and apparatus for combustion of residual carbon in fly ash |
US20040231566A1 (en) * | 2003-05-20 | 2004-11-25 | Cemex Inc. | Process for Fly Ash Beneficiation |
US20050075236A1 (en) * | 1999-08-17 | 2005-04-07 | Ramme Bruce W. | Mercury removal from activated carbon and/or fly ash |
US6916863B2 (en) | 2000-11-14 | 2005-07-12 | Boral Material Technologies, Inc. | Filler comprising fly ash for use in polymer composites |
US20060090468A1 (en) * | 2004-11-02 | 2006-05-04 | Counterman Wayne S | Efficiency improvement for a utility steam generator with a regenerative air preheater |
US20060283355A1 (en) * | 2005-06-17 | 2006-12-21 | Knowles Jimmy C | Method and apparatus for turbulent combustion of fly ash |
US20070045299A1 (en) * | 2003-01-23 | 2007-03-01 | Tranquilla James M | Method of reducing unburned carbon levels in coal ash |
US7223375B1 (en) | 2006-06-26 | 2007-05-29 | Progress Materials, Inc. | Emission control systems and methods thereof |
US20070193476A1 (en) * | 2006-02-21 | 2007-08-23 | Progress Materials, Inc. | Fly ash beneficiation systems with sulfur removal and methods thereof |
WO2007097745A1 (en) * | 2006-02-21 | 2007-08-30 | Progress Materials, Inc. | Fly ash beneficiation systems with sulfur removal and methods thereof |
US20070256601A1 (en) * | 2006-05-03 | 2007-11-08 | Progress Materials, Inc. | System and method for decomposing ammonia from fly ash |
US20080075647A1 (en) * | 2006-09-25 | 2008-03-27 | Progress Materials, Inc. | Coal combustion systems with emissions control and fly ash beneficiation and methods thereof |
WO2008039190A1 (en) * | 2006-09-26 | 2008-04-03 | Progress Materials, Inc. | Coal combustion systems with emissions control and fly ash beneficiation and methods thereof |
US20080173217A1 (en) * | 2007-01-19 | 2008-07-24 | Progress Materials, Inc. | Methods for reclaiming and beneficiating fly ash particles and systems thereof |
US20080314242A1 (en) * | 2007-06-19 | 2008-12-25 | Progress Materials, Inc. | Mercury removal systems using beneficiated fly ash particles and methods thereof |
WO2011003428A1 (en) * | 2009-07-08 | 2011-01-13 | Cemex Research Group Ag | A method and installation for beneficiation of fly ash particles by flash combustion |
US20110067601A1 (en) * | 2009-09-24 | 2011-03-24 | Ash Improvement Technology, Inc. | Production of cement additives from combustion products of hydrocarbon fuels and strength enhancing metal oxides |
CN101318189B (en) * | 2007-06-06 | 2011-10-26 | 天津壹生环保科技有限公司 | Method for microwave heating detoxication for flying ash from incineration of refuse |
US20130068138A1 (en) * | 2010-06-01 | 2013-03-21 | Outotec Oyj | Process and plant for lowering the residual carbon content of ash |
US8440015B1 (en) * | 2002-01-22 | 2013-05-14 | Waynesburg University | Fly ash carbon passivation |
US8518176B2 (en) | 2008-12-23 | 2013-08-27 | W. R. Grace & Co.-Conn. | Suppression of antagonistic hydration reactions in blended cements |
US8961684B2 (en) | 2009-09-24 | 2015-02-24 | Ash Improvement Technology Inc. | Production of coal combustion products for use in cementitious materials |
US9365451B2 (en) | 2009-09-24 | 2016-06-14 | Ash Improvement Technology Inc. | Cement additives produced by combustion of coal with clay and slag |
US9932457B2 (en) | 2013-04-12 | 2018-04-03 | Boral Ip Holdings (Australia) Pty Limited | Composites formed from an absorptive filler and a polyurethane |
WO2019002692A1 (en) * | 2017-06-28 | 2019-01-03 | Upm-Kymmene Corporation | A method and an apparatus for processing an industrial side stream material |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2536669A4 (en) * | 2010-02-17 | 2013-01-23 | Sybre Ltd | Modification of pozzolanic chemistry at production plant |
US9067824B1 (en) | 2010-02-17 | 2015-06-30 | Roman Cement, Llc | Modification of pozzolanic chemistry through blending |
US9272953B2 (en) | 2010-11-30 | 2016-03-01 | Roman Cement, Llc | High early strength cement-SCM blends |
PE20142096A1 (en) | 2011-10-20 | 2014-12-06 | Roman Cement Llc | CEMENT-SCM MIXTURES OF PACKAGED PARTICLES |
TR201801747T1 (en) * | 2015-08-07 | 2018-05-21 | Thermax Ltd | A SYSTEM FOR REDUCING THE INCREASED CARBON CONTENT IN ASH PARTICULARS |
US11168029B2 (en) | 2017-01-10 | 2021-11-09 | Roman Cement, Llc | Use of mineral fines to reduce clinker content of cementitious compositions |
US10737980B2 (en) | 2017-01-10 | 2020-08-11 | Roman Cement, Llc | Use of mineral fines to reduce clinker content of cementitious compositions |
US10730805B2 (en) | 2017-01-10 | 2020-08-04 | Roman Cement, Llc | Use of quarry fines and/or limestone powder to reduce clinker content of cementitious compositions |
US10131575B2 (en) | 2017-01-10 | 2018-11-20 | Roman Cement, Llc | Use of quarry fines and/or limestone powder to reduce clinker content of cementitious compositions |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3328180A (en) * | 1964-06-24 | 1967-06-27 | Mcdowell Wellman Eng Co | Method of making light-weight aggregate from fly ash |
US3979168A (en) * | 1970-07-10 | 1976-09-07 | Charbonnages De France | Apparatus for the manufacture of light granulates |
US4043831A (en) * | 1975-07-07 | 1977-08-23 | Cogas Development Co. | Densification of coal fly ash |
US4121945A (en) * | 1976-04-16 | 1978-10-24 | Amax Resource Recovery Systems, Inc. | Fly ash benificiation process |
SU734162A1 (en) * | 1978-05-31 | 1980-05-15 | Опытный Завод Зольного Гравия | Method of producing light filter |
US4304659A (en) * | 1976-06-30 | 1981-12-08 | Texaco, Inc. | Method for controlling regenerator temperature in a fluidized catalytic cracking process |
US4325833A (en) * | 1980-06-27 | 1982-04-20 | Chevron Research Company | Three-stage catalyst regeneration |
US4341623A (en) * | 1974-03-04 | 1982-07-27 | Standard Oil Company (Indiana) | Catalytic cracking using a mixture of cracking catalyst particles with particles of platinum group metal or rhenium on inert substrates regenerated to up to about 0.1% coke |
US4705409A (en) * | 1985-03-21 | 1987-11-10 | Trerice Douglas N | Method and apparatus for measurement of carbon content in fly ash |
US4959334A (en) * | 1987-12-21 | 1990-09-25 | C. Compagnie de Raffinage et de Distribution | Fluidized-bed catalyst regeneration |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2546570A (en) * | 1948-11-15 | 1951-03-27 | Phillips Petroleum Co | Fluidizied bed reactor |
US3799747A (en) * | 1968-04-27 | 1974-03-26 | Metallgesellschaft Ag | Fuel burner system for a fluidized bed |
US3825501A (en) * | 1969-11-26 | 1974-07-23 | Texaco Inc | Exothermic reaction process |
DE2611213C3 (en) * | 1976-03-17 | 1979-11-08 | Steag Ag, 4300 Essen | Method and plant for the production of bricks, in particular clinker bricks, from a mixture in which an airborne dust, in particular from hard coal-fired power stations, is used |
DE3673362D1 (en) * | 1985-12-27 | 1990-09-13 | Shell Int Research | OXYDATION OF FLYING BAG. |
US5066627A (en) * | 1990-06-08 | 1991-11-19 | Mobil Oil Corporation | Process for simultaneous heating and cooling a fast fluidized bed catalyst regenerator |
-
1991
- 1991-04-05 US US07/680,900 patent/US5160539A/en not_active Expired - Lifetime
- 1991-08-22 WO PCT/US1991/005824 patent/WO1992017415A1/en active IP Right Grant
- 1991-08-22 CA CA 2107571 patent/CA2107571C/en not_active Expired - Lifetime
- 1991-08-22 DE DE69133138T patent/DE69133138T2/en not_active Expired - Lifetime
- 1991-08-22 JP JP50425392A patent/JP3364684B2/en not_active Expired - Lifetime
- 1991-08-22 AT AT92903947T patent/ATE226563T1/en not_active IP Right Cessation
- 1991-08-22 ES ES92903947T patent/ES2180533T3/en not_active Expired - Lifetime
- 1991-08-22 AU AU11527/92A patent/AU1152792A/en not_active Abandoned
- 1991-08-22 EP EP19920903947 patent/EP0578641B1/en not_active Expired - Lifetime
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3328180A (en) * | 1964-06-24 | 1967-06-27 | Mcdowell Wellman Eng Co | Method of making light-weight aggregate from fly ash |
US3979168A (en) * | 1970-07-10 | 1976-09-07 | Charbonnages De France | Apparatus for the manufacture of light granulates |
US4341623A (en) * | 1974-03-04 | 1982-07-27 | Standard Oil Company (Indiana) | Catalytic cracking using a mixture of cracking catalyst particles with particles of platinum group metal or rhenium on inert substrates regenerated to up to about 0.1% coke |
US4043831A (en) * | 1975-07-07 | 1977-08-23 | Cogas Development Co. | Densification of coal fly ash |
US4121945A (en) * | 1976-04-16 | 1978-10-24 | Amax Resource Recovery Systems, Inc. | Fly ash benificiation process |
US4304659A (en) * | 1976-06-30 | 1981-12-08 | Texaco, Inc. | Method for controlling regenerator temperature in a fluidized catalytic cracking process |
SU734162A1 (en) * | 1978-05-31 | 1980-05-15 | Опытный Завод Зольного Гравия | Method of producing light filter |
US4325833A (en) * | 1980-06-27 | 1982-04-20 | Chevron Research Company | Three-stage catalyst regeneration |
US4705409A (en) * | 1985-03-21 | 1987-11-10 | Trerice Douglas N | Method and apparatus for measurement of carbon content in fly ash |
US4959334A (en) * | 1987-12-21 | 1990-09-25 | C. Compagnie de Raffinage et de Distribution | Fluidized-bed catalyst regeneration |
Cited By (77)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5299692A (en) * | 1993-02-03 | 1994-04-05 | Jtm Industries, Inc. | Method and apparatus for reducing carbon content in particulate mixtures |
US5484476A (en) * | 1994-01-11 | 1996-01-16 | Electric Power Research Institute, Inc. | Method for preheating fly ash |
US5399194A (en) * | 1994-02-23 | 1995-03-21 | Electric Power Research Institute | Method of fly ash beneficiation and apparatus for same |
US6202573B1 (en) * | 1995-03-20 | 2001-03-20 | U.S. Scientific, L.L.C. | Apparatus and process for carbon removal from fly ash |
WO1996029546A1 (en) | 1995-03-20 | 1996-09-26 | U.S. Scientific, L.L.C. | Apparatus and process for carbon removal from fly ash |
US5749308A (en) * | 1995-03-20 | 1998-05-12 | U.S. Scientific, L.L.C. | Apparatus and process for carbon removal from fly ash |
US5868084A (en) * | 1995-03-20 | 1999-02-09 | U.S. Scientific, L.L.C. | Apparatus and process for carbon removal from fly ash |
US5887724A (en) * | 1996-05-09 | 1999-03-30 | Pittsburgh Mineral & Environmental Technology | Methods of treating bi-modal fly ash to remove carbon |
US5992336A (en) * | 1996-12-31 | 1999-11-30 | Wisconsin Electric Power Company | Reburning of coal ash |
US6136089A (en) * | 1998-08-31 | 2000-10-24 | Brown University Research Foundation | Apparatus and method for deactivating carbon in fly ash |
US6038987A (en) * | 1999-01-11 | 2000-03-21 | Pittsburgh Mineral And Environmental Technology, Inc. | Method and apparatus for reducing the carbon content of combustion ash and related products |
US6139960A (en) * | 1999-02-17 | 2000-10-31 | Mineral Resource Technologies, Llc | Method of making a mineral filler from fly ash |
US20050075236A1 (en) * | 1999-08-17 | 2005-04-07 | Ramme Bruce W. | Mercury removal from activated carbon and/or fly ash |
US7217401B2 (en) | 1999-08-17 | 2007-05-15 | Wisconsin Electric Power Company | Mercury removal from activated carbon and/or fly ash |
US20040123786A1 (en) * | 1999-11-02 | 2004-07-01 | Crafton Paul M. | Method and apparatus for combustion of residual carbon in fly ash |
US7047894B2 (en) | 1999-11-02 | 2006-05-23 | Consolidated Engineering Company, Inc. | Method and apparatus for combustion of residual carbon in fly ash |
US7273015B2 (en) | 1999-11-02 | 2007-09-25 | Consolidated Engineering Company, Inc. | Method and apparatus for combustion of residual carbon in fly ash |
US6457425B1 (en) | 1999-11-02 | 2002-10-01 | Consolidated Engineering Company, Inc. | Method and apparatus for combustion of residual carbon in fly ash |
WO2001033140A1 (en) | 1999-11-02 | 2001-05-10 | Consolidated Engineering Company, Inc. | Method and apparatus for combustion of residual carbon in fly ash |
US20060180060A1 (en) * | 1999-11-02 | 2006-08-17 | Crafton Paul M | Method and apparatus for combustion of residual carbon in fly ash |
US20080114112A1 (en) * | 2000-11-14 | 2008-05-15 | Boral Material Technologies, Inc. | Filler Comprising Fly Ash For Use In Polymer Composites |
US7879144B2 (en) | 2000-11-14 | 2011-02-01 | Boral Material Technologies Inc. | Filler comprising fly ash for use in polymer composites |
US6695902B2 (en) | 2000-11-14 | 2004-02-24 | Boral Material Technologies, Inc. | Asphalt composites including fly ash fillers or filler blends, methods of making same, and methods for selecting or modifying a fly ash filler for use in asphalt composites |
US7241818B2 (en) | 2000-11-14 | 2007-07-10 | Boral Material Technologies, Inc. | Filler comprising fly ash for use in composites |
US6916863B2 (en) | 2000-11-14 | 2005-07-12 | Boral Material Technologies, Inc. | Filler comprising fly ash for use in polymer composites |
US20050171243A1 (en) * | 2000-11-14 | 2005-08-04 | Boral Material Technologies, Inc. | Filler comprising fly ash for use in polymer composites |
WO2002097330A1 (en) | 2001-06-01 | 2002-12-05 | Emr Microwave Technology Corporation | A method of reducing carbon levels in fly ash |
US6907994B2 (en) | 2001-10-22 | 2005-06-21 | C.A.S.T. Minerals, Inc. | Process for converting wet fly ash into dry useful industrial products |
US20030089642A1 (en) * | 2001-10-22 | 2003-05-15 | Bradley William S. | Process for converting wet fly ash into a useful product |
US8440015B1 (en) * | 2002-01-22 | 2013-05-14 | Waynesburg University | Fly ash carbon passivation |
US20040033184A1 (en) * | 2002-08-15 | 2004-02-19 | Ernest Greer | Removing carbon from fly ash |
US20040069186A1 (en) * | 2002-10-15 | 2004-04-15 | Zacarias Philip Souza | Carbon removal through partial carbon burn-out from coal ash used in concrete |
US6783585B2 (en) * | 2002-10-15 | 2004-08-31 | Lafarge Canada Inc. | Carbon removal through partial carbon burn-out from coal ash used in concrete |
US20040111958A1 (en) * | 2002-12-16 | 2004-06-17 | Oates David Bridson | Fuel from ash |
US20070045299A1 (en) * | 2003-01-23 | 2007-03-01 | Tranquilla James M | Method of reducing unburned carbon levels in coal ash |
US20040231566A1 (en) * | 2003-05-20 | 2004-11-25 | Cemex Inc. | Process for Fly Ash Beneficiation |
US7475544B2 (en) * | 2004-11-02 | 2009-01-13 | Counterman Wayne S | Efficiency improvement for a utility steam generator with a regenerative air preheater |
US20060090468A1 (en) * | 2004-11-02 | 2006-05-04 | Counterman Wayne S | Efficiency improvement for a utility steam generator with a regenerative air preheater |
US20060283355A1 (en) * | 2005-06-17 | 2006-12-21 | Knowles Jimmy C | Method and apparatus for turbulent combustion of fly ash |
US8960107B2 (en) | 2005-06-17 | 2015-02-24 | The SEFA Group Inc. | Apparatus for turbulent combustion of fly ash |
US8234986B2 (en) | 2005-06-17 | 2012-08-07 | The Sefa Group, Inc. | Method and apparatus for turbulent combustion of fly ash |
US20080282947A1 (en) * | 2005-06-17 | 2008-11-20 | Jimmy Clements Knowles | Method and Apparatus for Turbulent Combustion of Fly Ash |
WO2007097745A1 (en) * | 2006-02-21 | 2007-08-30 | Progress Materials, Inc. | Fly ash beneficiation systems with sulfur removal and methods thereof |
EP2007695A1 (en) * | 2006-02-21 | 2008-12-31 | PMI ASH Technologies, LLC | Fly ash beneficiation systems with sulfur removal and methods thereof |
CN101024142B (en) * | 2006-02-21 | 2010-04-14 | 改进材料公司 | Fly ash beneficiation systems with sulfur removal and methods thereof |
US7641878B2 (en) | 2006-02-21 | 2010-01-05 | Pmi Ash Technologies, Llc | Fly ash beneficiation systems with sulfur removal and methods thereof |
EP2007695A4 (en) * | 2006-02-21 | 2011-09-14 | Pmi Ash Technologies Llc | Fly ash beneficiation systems with sulfur removal and methods thereof |
US20070193476A1 (en) * | 2006-02-21 | 2007-08-23 | Progress Materials, Inc. | Fly ash beneficiation systems with sulfur removal and methods thereof |
US20070256601A1 (en) * | 2006-05-03 | 2007-11-08 | Progress Materials, Inc. | System and method for decomposing ammonia from fly ash |
US7462235B2 (en) * | 2006-05-03 | 2008-12-09 | Progress Materials, Inc. | System and method for decomposing ammonia from fly ash |
US20070269351A1 (en) * | 2006-05-03 | 2007-11-22 | Progress Materials, Inc. | System and method for recomposing ammonia from fly ash |
US7703403B2 (en) * | 2006-05-03 | 2010-04-27 | Pmi Ash Technologies, Llc | System and method for recomposing ammonia from fly ash |
US7223375B1 (en) | 2006-06-26 | 2007-05-29 | Progress Materials, Inc. | Emission control systems and methods thereof |
US20070297963A1 (en) * | 2006-06-26 | 2007-12-27 | Progress Materials, Inc. | Emission control systems and methods thereof |
US7867462B2 (en) | 2006-09-25 | 2011-01-11 | Pmi Ash Technologies, Llc | Coal combustion systems with emissions control and fly ash beneficiation and methods thereof |
US20080075647A1 (en) * | 2006-09-25 | 2008-03-27 | Progress Materials, Inc. | Coal combustion systems with emissions control and fly ash beneficiation and methods thereof |
WO2008039190A1 (en) * | 2006-09-26 | 2008-04-03 | Progress Materials, Inc. | Coal combustion systems with emissions control and fly ash beneficiation and methods thereof |
US20080173217A1 (en) * | 2007-01-19 | 2008-07-24 | Progress Materials, Inc. | Methods for reclaiming and beneficiating fly ash particles and systems thereof |
US7670424B2 (en) * | 2007-01-19 | 2010-03-02 | Pmi Ash Technologies, Llc | Methods for reclaiming and beneficiating fly ash particles and systems thereof |
WO2008088564A1 (en) * | 2007-01-19 | 2008-07-24 | Progress Materials, Inc. | Methods for reclaiming and beneficiating fly ash particles and systems thereof |
CN101318189B (en) * | 2007-06-06 | 2011-10-26 | 天津壹生环保科技有限公司 | Method for microwave heating detoxication for flying ash from incineration of refuse |
US8545598B2 (en) | 2007-06-19 | 2013-10-01 | Pmi Ash Technologies, Llc | Mercury removal systems using beneficiated fly ash particles and methods thereof |
US20080314242A1 (en) * | 2007-06-19 | 2008-12-25 | Progress Materials, Inc. | Mercury removal systems using beneficiated fly ash particles and methods thereof |
US8518176B2 (en) | 2008-12-23 | 2013-08-27 | W. R. Grace & Co.-Conn. | Suppression of antagonistic hydration reactions in blended cements |
EA022252B1 (en) * | 2009-07-08 | 2015-11-30 | Семекс Рисерч Груп Аг | A method and installation for beneficiation of fly ash particles by flash combustion |
WO2011003428A1 (en) * | 2009-07-08 | 2011-01-13 | Cemex Research Group Ag | A method and installation for beneficiation of fly ash particles by flash combustion |
US20120174825A1 (en) * | 2009-07-08 | 2012-07-12 | Javier Vazquez Favela | Method and installation for beneficiation of fly ash particles by flash combustion |
US8936677B2 (en) * | 2009-07-08 | 2015-01-20 | Cemex Research Group Ag | Method and installation for beneficiation of fly ash particles by flash combustion |
US8961684B2 (en) | 2009-09-24 | 2015-02-24 | Ash Improvement Technology Inc. | Production of coal combustion products for use in cementitious materials |
US8741054B2 (en) | 2009-09-24 | 2014-06-03 | Ash Improvement Technology, Inc. | Production of cement additives from combustion products of hydrocarbon fuels and strength enhancing metal oxides |
US20110067601A1 (en) * | 2009-09-24 | 2011-03-24 | Ash Improvement Technology, Inc. | Production of cement additives from combustion products of hydrocarbon fuels and strength enhancing metal oxides |
US9365451B2 (en) | 2009-09-24 | 2016-06-14 | Ash Improvement Technology Inc. | Cement additives produced by combustion of coal with clay and slag |
US8876969B2 (en) * | 2010-06-01 | 2014-11-04 | Outotec Oyj | Process and plant for lowering the residual carbon content of ash |
US20130068138A1 (en) * | 2010-06-01 | 2013-03-21 | Outotec Oyj | Process and plant for lowering the residual carbon content of ash |
US9932457B2 (en) | 2013-04-12 | 2018-04-03 | Boral Ip Holdings (Australia) Pty Limited | Composites formed from an absorptive filler and a polyurethane |
US10324978B2 (en) | 2013-04-12 | 2019-06-18 | Boral Ip Holdings (Australia) Pty Limited | Composites formed from an absorptive filler and a polyurethane |
WO2019002692A1 (en) * | 2017-06-28 | 2019-01-03 | Upm-Kymmene Corporation | A method and an apparatus for processing an industrial side stream material |
Also Published As
Publication number | Publication date |
---|---|
ATE226563T1 (en) | 2002-11-15 |
CA2107571A1 (en) | 1992-10-06 |
JP3364684B2 (en) | 2003-01-08 |
CA2107571C (en) | 2001-08-21 |
DE69133138T2 (en) | 2003-03-13 |
ES2180533T3 (en) | 2003-02-16 |
EP0578641B1 (en) | 2002-10-23 |
AU1152792A (en) | 1992-11-02 |
EP0578641A4 (en) | 1996-12-27 |
EP0578641A1 (en) | 1994-01-19 |
WO1992017415A1 (en) | 1992-10-15 |
JPH06509051A (en) | 1994-10-13 |
DE69133138D1 (en) | 2002-11-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5160539A (en) | Method and product of fly ash benefication by carbon burnout in a dry bubbling fluid bed | |
AU721215B2 (en) | Apparatus and process for carbon removal from fly ash | |
US5882190A (en) | Control of cement clinker production by analysis of sulfur in the end product | |
US4324544A (en) | Process and system for drying coal in a fluidized bed by partial combustion | |
AU2006201957B2 (en) | Process and plant for producing char and fuel gas | |
US6050813A (en) | Control of cement clinker production by analysis of sulfur in the end product | |
US4047884A (en) | Means and method for processing cement raw materials containing fuel of high volatile content | |
MX2007004788A (en) | Calcining plant and method. | |
KR102405860B1 (en) | Sludge treatment method and cement manufacturing system | |
US7878156B2 (en) | Method and plant for the conveyance of fine-grained solids | |
US6383283B1 (en) | Control of cement clinker production by analysis of sulfur in the end product | |
CZ285991B6 (en) | Heat treatment process of waste material and apparatus for making the same | |
JPH10338513A (en) | Device for producing charcoal and activated carbon | |
US4345914A (en) | Method of heating fine-grained solids | |
US20040111958A1 (en) | Fuel from ash | |
US4354439A (en) | Method of and a device for feeding solid fuel in a fluidized bed hearth | |
TW434202B (en) | Plant for manufacturing cement clinker | |
WO2008077462A2 (en) | Process and plant for the thermal treatment of particulate solids, in particular for producing metal oxide from metal hydroxide | |
US2833055A (en) | Apparatus and method of fluidized drying of carbonaceous fuels | |
SU883182A1 (en) | Method of heating furnace with stepwise suspended layer | |
MXPA00005421A (en) | Control of cement clinker production by analysis of sulfur content in the endproduct |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: PROGRESS MATERIALS, INC., A CORP. OF FLORIDA, FLOR Free format text: ASSIGNMENT OF ASSIGNORS INTEREST.;ASSIGNOR:COCHRAN, JOSEPH W.;REEL/FRAME:005741/0448 Effective date: 19910612 |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
FPAY | Fee payment |
Year of fee payment: 4 |
|
FEPP | Fee payment procedure |
Free format text: PAYER NUMBER DE-ASSIGNED (ORIGINAL EVENT CODE: RMPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
FPAY | Fee payment |
Year of fee payment: 8 |
|
FPAY | Fee payment |
Year of fee payment: 12 |
|
AS | Assignment |
Owner name: PROGRESS FUELS CORPORATION, NORTH CAROLINA Free format text: SECURITY AGREEMENT;ASSIGNOR:PMI ASH TECHNOLOGIES, LLC;REEL/FRAME:020092/0176 Effective date: 20071105 |
|
AS | Assignment |
Owner name: WACHOVIA BANK, NATIONAL ASSOCIATION, NORTH CAROLIN Free format text: DOCUMENT PREVIOUSLY RECORDED ON REEL 020106 FRAME 0638 CONTAINED ERRORS IN PROPERTY NUMBER 05/160539 AND 07/7223375. DOCUMENT RERECORDED TO CORRECT ERRORS ON STATED REEL.;ASSIGNOR:PMI ASH TECHNOLOGIES, LLC;REEL/FRAME:020166/0884 Effective date: 20071105 |
|
AS | Assignment |
Owner name: PMI TARGET, LLC, DELAWARE Free format text: CHANGE OF NAME;ASSIGNOR:PROGRESS MATERIALS, INC.;REEL/FRAME:021050/0887 Effective date: 20071031 Owner name: PMI TARGET, LLC,DELAWARE Free format text: CHANGE OF NAME;ASSIGNOR:PROGRESS MATERIALS, INC.;REEL/FRAME:021050/0887 Effective date: 20071031 |
|
AS | Assignment |
Owner name: PMI ASH TECHNOLOGIES, LLC, NORTH CAROLINA Free format text: MERGER;ASSIGNOR:PMI TARGET, LLC;REEL/FRAME:021253/0132 Effective date: 20071105 Owner name: PMI ASH TECHNOLOGIES, LLC,NORTH CAROLINA Free format text: MERGER;ASSIGNOR:PMI TARGET, LLC;REEL/FRAME:021253/0132 Effective date: 20071105 |
|
AS | Assignment |
Owner name: WACHOVIA BANK, NATIONAL ASSOCIATION, NORTH CAROLIN Free format text: SECURITY AGREEMENT;ASSIGNOR:PMI ASH TECHNOLOGIES, LLC;REEL/FRAME:023768/0442 Effective date: 20071105 Owner name: WACHOVIA BANK, NATIONAL ASSOCIATION,NORTH CAROLINA Free format text: SECURITY AGREEMENT;ASSIGNOR:PMI ASH TECHNOLOGIES, LLC;REEL/FRAME:023768/0442 Effective date: 20071105 |
|
AS | Assignment |
Owner name: PMI ASH TECHNOLOGIES, LLC, NORTH CAROLINA Free format text: TERMINATION AND RELEASE OF INTELLECTUAL PROPERTY SECURITY AGREEMENT;ASSIGNOR:PROGRESS FUELS CORPORATION;REEL/FRAME:028607/0957 Effective date: 20120715 Owner name: PMI ASH TECHNOLOGIES, LLC, NORTH CAROLINA Free format text: TERMINATION AND RELEASE OF INTELLECTUAL PROPERTY SECURITY AGREEMENT;ASSIGNOR:WELLS FARGO BANK, NATIONAL ASSOCIATION;REEL/FRAME:028604/0551 Effective date: 20120629 |