US4334861A - Method and apparatus for generating a hot air blast - Google Patents
Method and apparatus for generating a hot air blast Download PDFInfo
- Publication number
- US4334861A US4334861A US06/240,281 US24028181A US4334861A US 4334861 A US4334861 A US 4334861A US 24028181 A US24028181 A US 24028181A US 4334861 A US4334861 A US 4334861A
- Authority
- US
- United States
- Prior art keywords
- blast
- horizontal
- combustion
- air
- hot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B9/00—Stoves for heating the blast in blast furnaces
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
- F24H7/00—Storage heaters, i.e. heaters in which the energy is stored as heat in masses for subsequent release
- F24H7/02—Storage heaters, i.e. heaters in which the energy is stored as heat in masses for subsequent release the released heat being conveyed to a transfer fluid
- F24H7/04—Storage heaters, i.e. heaters in which the energy is stored as heat in masses for subsequent release the released heat being conveyed to a transfer fluid with forced circulation of the transfer fluid
- F24H7/045—Storage heaters, i.e. heaters in which the energy is stored as heat in masses for subsequent release the released heat being conveyed to a transfer fluid with forced circulation of the transfer fluid using fluid fuel
- F24H7/0458—Storage heaters, i.e. heaters in which the energy is stored as heat in masses for subsequent release the released heat being conveyed to a transfer fluid with forced circulation of the transfer fluid using fluid fuel the transfer fluid being air
Definitions
- This invention relates to a novel interrelationship of recuperators and regenerators to provide a hot air blast with, if desired, a higher temperature but more importantly in a more economical manner to improve the operation of a blast furnace or the like.
- the use of a hot air blast in a blast furnace is a necessary and accepted practice for increasing the iron-making capacity while reducing the amount of coke required per ton of iron produced.
- usually three or four blast furnace stoves are used alternately to preheat an air blast before delivery through a hot blast main, bustle pipe and tuyeres into the bottom part of a blast furnace.
- Heating of the air blast not only intensifies and speeds up the burning of coke at the tuyeres but also reduces the amount of coke required for the smelting operation in the blast furnace.
- the temperature of the air blast has increased throughout the history of the blast furnace by increasing the capacity, e.g., size of the traditional blast furnace stoves, or increased heating rate, or checker design.
- the efficiency of the antiquated stove design is rapidly becoming unacceptable due to increased costs and decreasing supplies of energy.
- the blast furnace stoves used today embody the same basic design as originally developed more than 100 years ago.
- the size of each stove is approximately 25 feet in diameter and 120 feet high, although more recently-built stoves are each about 30 feet in diameter and 150 feet high.
- the blast furnace stoves have a brick lining enclosed in a circular steel shell with a flat bottom and a dome-shaped top.
- In each stove there is a vertical passageway forming a combustion chamber wherein clean blast furnace gas is burned.
- the combustion chamber extends from a point near the bottom of the stove to the bottom portion of the dome where hot products of combustion pass across a breast wall into a larger vertical regenerator chamber which is substantially filled with superimposed courses of checkerbricks.
- the checkerwork contains a multiplicity of vertical passageways to conduct the hot products of combustion which move downwardly through the regenerator section.
- the temperature of the exit gases is a measure of the efficiency of the stove.
- the heavy weight of modern checkerwork requires metallic supports, typically a metallic grid, in the bottom of the regenerator chamber of the stove to support the checkerwork.
- the temperature to which the grid can be heated is limited to about 650° F. because of the high loading on the grid and the grid material. A slightly higher temperature limit is possible with properly suited alloy steel.
- Each layer or course of refractory checkerbrick supports the layer or course above it and, therefore, the height of the stove is a determining factor for the total load that must be sustained by the refractory at the bottom of the regenerator chamber as well as the metallic grid. Because of this stove design, any attempt to increase the temperature of the hot blast requires either a higher dome temperature or a higher checker temperature or both.
- the refractories now used in the dome and the upper section of the stove are limited to a working temperature of about 2400° F. More expensive and generally less stable refractories must be used to achieve a significant temperature increase.
- the combustion chamber location and refractory lining are the source of another major problem in blast furnace stoves.
- the breast wall of the combustion chamber within the burner area must operate at a temperature at or above 2500° F. on the burner side while at the grid side, the gas exit temperature cannot exceed approximately 650° F.
- This extreme temperature differential on opposite sides of the same breast wall area causes very high thermal stresses in the refractory with the attending result of high maintenance cost.
- the high temperature thermal cycling in this area increases maintenance and frequently results in thermally-caused cracks in the wall, permitting short-circuiting of the hot products of combustion.
- the efficiency of the blast furnace stoves can be increased by reducing the temperature of waste gases delivered from the stove.
- the waste gases of combustion are discharged at a temperature of approximately 650° F. and sometimes even 750° F.
- An overall increase in the thermal efficiency can be significantly achieved by reducing the temperature of waste gases to, for example, approximately 300° F.
- the hot blast system includes the combination of a recuperator for heating a cold blast with heat from a separate countercurrent flow of waste products of combustion, means to deliver a cold air blast to the recuperator for providing a substantially continuous preheated air blast, a plurality of horizontal regenerators each having heat storage refractory forming horizontal passageways between opposite end portions for heat exchange with media while flowing in either of opposite directions at different times along the refractory, burner means to feed combustion media into a first end portion of each horizontal regenerator for generating hot products of combustion to heat the refractory therein, first conduit means including a header and flow controllers for providing a substantially continuous supply of hot waste products of combustion to the recuperator from the second end portion of alternate preselected ones of the horizontal regenerators, second conduit means including a header and flow controllers for delivering the preheated air blast from the recuperators to the second end portion of a preselected one of the horizontal regenerators, and third conduit means including a hot blast main coupled to deliver a hot air blast from the
- the method of the present invention provides for generating a hot air blast by the steps including feeding media for combustion into one end of a first of a plurality of horizontal regenerators to generate hot products of combustion, passing the hot products of combustion along horizontal surfaces of regenerative heat storage refractory within the first horizontal regenerator to heat the refractory to a desired temperature, discharging waste products of combustion into a recuperator from the opposite and second end of the first horizontal regenerator, using the recuperator to preheat an air blast, passing the preheated air blast along highly heated horizontal surfaces of the regenerator heat storage refractory within a second horizontal regenerator to further heat the air blast to a temperature above a minimum desired temperature, terminating the flow of the preheated air blast to the second horizontal regenerator when the minimum desired air blast temperature is no longer attainable, terminating the supply of combustion media to the first horizontal regenerator when the heat storage refractory therein is highly heated, passing the preheated air blast along the highly heated horizontal surfaces of the regenerative heat storage refractory within the first horizontal regenerator
- the heat storage refractories preferably have passageways to permit a lateral as well as a longitudinal flow of combustion products.
- FIG. 1 is a plan view, partly in section, of an apparatus of a system to supply high temperature blast air embodying the features of the present invention and to carry out the method thereof;
- FIG. 2 is a sectional view taken along line II--II of FIG. 1;
- FIG. 3 is a side elevational view taken along line III--III of FIG. 1;
- FIG. 4 is a partial side elevational view taken along line IV--IV of FIG. 1.
- FIGS. 1-4 there are illustrated three horizontally-arranged and mutually spaced-apart regenerators 10, 11 and 12 each resting for support on the curved upper surfaces of upstanding foundation pedestals 13.
- Platforms 14 are accessible by flights of steps to various elevations above the ground level.
- the platforms extend along the ends of the regenerators which have burner assemblies 15 connected thereto.
- Each regenerator takes the form of a vessel which includes an outer metal shell 16 and an inner lining of refractory material 17.
- the ends of each shell are closed by dome-like end walls 18 and 19 also made of metal and supporting an inner lining of refractory material.
- the end wall at the burner end of the regenerator is identified by reference numeral 18 and the dome at the hot gas discharge end is identified by reference numeral 19.
- the end wall 18 has an enlarged cavity 21 having a wall section to support the burner assembly 15.
- Coolant rings 22 protect the burner assembly against the high temperature that is generated by the combustion gases in the regenerator.
- the burner assembly is connected to a gas supply header 23 by a distribution pipe 24 for delivery of a gas such as blast furnace gas to the burner.
- Valves 25 in pipe 24 control the flow of gas to the burner.
- Motor-driven blowers 26 (FIG. 3) grouped at the extreme end of the complex supply air to the air supply header 28.
- Air valves 20 are utilized in distribution pipes 29 to control the flow of air to burner 15.
- a chamber 31 is formed in the regenerator between the end wall 18 and a body of heat storage refractory such as checkerbricks 32 having horizontal passageways through and, if desired, between surfaces of the refractory. Typically, the passageways are formed by aligned openings through the checkerbrick. Confronting end walls of the checkerbrick are preferably spaced apart to permit a lateral flow of hot products of combustion as well as a longitudinal flow along the regenerator.
- one or more, but not all, of the regenerators is "on gas" when fuel and air are delivered to the burner for combustion in space 31.
- Heat is generated by the hot products of combustion which are passed, usually near atmospheric pressure, through the passageways in a horizontal direction and a lateral cross flow along the refractory material formed by courses of bricks 32.
- the hot products of combustion after passing through the checkerbrick are delivered into a collection chamber 38 and then through a refractory-lined conduit 39 having a water-cooled control valve 40 therein for discharge into a header 41.
- the header 41 is coupled to each of the regenerators 10, 11 and 12 by a conduit 39 for discharge of waste products of combustion therefrom by a selected one or more of vertically-extending feed pipes 42, 43 and 44.
- feed pipes 42, 43 and 44 deliver the hot products of combustion from any two of the regenerators to any two or more of the recuperators 46, 47 and 48.
- Water-cooled isolation valves 45 permit isolation of any recuperator desired.
- Each recuperator is essentially a gas-to-air heat exchanger and takes the form of a vessel with another metal shell 49 wherein a multitude of heat exchange tubes 51 is supported to extend along between tube plates 52 and 53.
- the hot products of combustion flow within the flow space of the heat exchange tubes 51 in a generally horizontal direction for discharge into a chamber 54 and thence through a flue pipe 55 having a chimney valve 56.
- Valve 56 is operated by linkage 57 coupled to an actuator, not shown.
- the flow space between the tube sheets 52 and 53 about the outer surfaces of the tubes 51 is subdivided by baffle plates 58 to cause an incoming blast of cold air to flow countercurrent with the flow of hot gases in the tubes along their reversing paths of travel.
- the supply of cold air is delivered through a valve 59 from a feed pipe 61 coupled to cold air blast header 62.
- the system to supply high temperature air is operated to produce a hot air blast at a temperature of at least 2000° F.
- a cold blast of air delivered by pipe 61 is heated in two or more of the recuperators 46, 47 and 48 to about a temperature of 1000° F.
- the preheated air is directed by a delivery pipe 63 beyond an isolation valve 64 to an intermediate hot blast header 65.
- Header 65 is coupled by feed pipes 66, 67 and 68 each having an isolation valve 69 for directing the flow of preheated air into a chamber 38 of one of the regenerators 10, 11 or 12.
- the regenerator which is selected to receive the preheated blast of air has highly heated refractory surfaces along the horizontal passageway of the refractory bricks 32. It is to be understood that the flow of gas for combustion to the selected regenerator is terminated prior to the introduction of preheated air.
- the flow of the preheated air from chamber 38 through the flow spaces in the refractory material is carried out at blast pressure used in present-day furnaces.
- the air blast is heated to a temperature of 2000° F. or greater for delivery from chamber 31 through a hot blast delivery pipe 70, 71 and 72 beyond a flow control valve 73 into a hot blast main 74.
- the discharge temperature of the gases will typically be substantially above 2000° F. whereby it is usually desirable to temper the hot air blast with a cold air supply introduced to chamber 31 by a delivery pipe 75 having tempering mixer valves 76 therein to control the flow of cold air from a branch pipeline coupled to cold blast header 62.
- air for tempering the hot air blast may be introduced at burner 15.
- the cold blast of air supplied by header 62 is typically at approximately 220° F.
- the system to supply high temperature blast air is preferably designed to permit 100% of the blast airflow which is necessary to provide the hot air blast through about two-thirds of the system whereby part of the system can be taken out of service for maintenance without interrupting the flow of air to the blast furnace. When part of the system is out of service, the temperature of the hot air blast will usually be reduced.
- the waste gases of combustion are discharged from the recuperator at a temperature of approximately 300° F. which offers a significant improvement over present-day systems where the waste gases of combustion are discharged in the temperature range of between 600° F. and 750° F.
- the lowering of the temperature of the waste products of combustion increases the overall thermal efficiency of the hot blast system.
- the use of at least three regenerators permits two regenerators to be heated while one is used to heat the preheated air blast to the desired temperature for use in the blast furnace. A temperature of about 1700° F.
- the regenerators of the present invention can be manufactured in accordance with pressure vessel codes which are presently required in most instances since blast furnace systems operate at a pressure usually within 20 to 50 psi. It is difficult, if not impossible, to construct blast furnace stove vessels of known present-day designs in accordance with the existing code requirements.
- the present invention permits a reduction to the maximum variation in the temperature of the refractory therein from cycle-to-cycle by the selection of a desired number of heaters in accordance with the desired blast temperature.
- Thermal cycling of the refractory is significantly reduced as compared with the thermal cycling encountered in existing blast furnace stoves.
- the average hot blast temperature can be increased by increasing the number of regenerators in the system. It is to be understood, however, that since the present invention is applicable to existing blast furnaces, the hot blast temperatures are subject to limitations of the existing installation. Without limitations of the existing hot blast system downstream from the regenerators, the hot blast temperature can, in most instances, be increased to 2400° F. Given, for example, that the average hot blast temperature by an existing stove system is about 1700° F., then for each 100° F.
- chamber 21 for each of the various regenerators in the system of the present invention is independent of the regenerative heat storage refractory, the burner and burner chamber can be removed for maintenance without interrupting the regenerator and checker chamber. Moreover, an improved refractory life of the regenerator chamber is achieved by eliminating the high temperature differential that normally exists in known forms of blast furnace stoves between the heat storage regenerator chamber and the combustion chamber.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Physics & Mathematics (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Manufacturing & Machinery (AREA)
- Thermal Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Air Supply (AREA)
- Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
Abstract
Description
Claims (10)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US06/240,281 US4334861A (en) | 1980-09-26 | 1981-03-04 | Method and apparatus for generating a hot air blast |
JP3250482A JPS57158310A (en) | 1981-03-04 | 1982-03-03 | High temperature air blast forming method and device |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US19114180A | 1980-09-26 | 1980-09-26 | |
US06/240,281 US4334861A (en) | 1980-09-26 | 1981-03-04 | Method and apparatus for generating a hot air blast |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US19114180A Continuation-In-Part | 1980-09-26 | 1980-09-26 |
Publications (1)
Publication Number | Publication Date |
---|---|
US4334861A true US4334861A (en) | 1982-06-15 |
Family
ID=26886796
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US06/240,281 Expired - Lifetime US4334861A (en) | 1980-09-26 | 1981-03-04 | Method and apparatus for generating a hot air blast |
Country Status (1)
Country | Link |
---|---|
US (1) | US4334861A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4434004A (en) | 1979-12-22 | 1984-02-28 | Mannesmann Demag Ag | Method for recovery and recycling of heat from hot gases in metallurigical processing |
US6068874A (en) * | 1993-02-16 | 2000-05-30 | Dehydration Technologies, Inc. | Process of dehydrating biological products |
US6268012B1 (en) | 1996-06-07 | 2001-07-31 | Dtl S.A. | Dried product and a drying process |
US8961169B2 (en) | 2011-03-29 | 2015-02-24 | Fives North American Combustion, Inc. | High uniformity heating |
CN105202755A (en) * | 2015-11-13 | 2015-12-30 | 佛山市绿威生物科技有限公司 | Boiling type gasification hot-blast stove |
CN107488771A (en) * | 2017-09-29 | 2017-12-19 | 四川德胜集团钒钛有限公司 | A kind of blast-furnace hot-air furnace system |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1316086A (en) * | 1919-09-16 | Heat-recuperating process and apparatus for blast-furnaces | ||
US1880229A (en) * | 1928-03-22 | 1932-10-04 | Brassert & Co | Air heating |
US1978191A (en) * | 1934-02-26 | 1934-10-23 | H L Dixon Company | Regenerative furnace |
US3124337A (en) * | 1964-03-10 | Fritz | ||
US3150865A (en) * | 1961-10-28 | 1964-09-29 | Koppers Gmbh Heinrich | Fluid heating process and apparatus |
US3175816A (en) * | 1963-04-08 | 1965-03-30 | Koppers Co Inc | Hot blast stove and blast furnace arrangement |
US3627014A (en) * | 1969-02-20 | 1971-12-14 | Mitsubishi Heavy Ind Ltd | Heat-exchanger system |
-
1981
- 1981-03-04 US US06/240,281 patent/US4334861A/en not_active Expired - Lifetime
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1316086A (en) * | 1919-09-16 | Heat-recuperating process and apparatus for blast-furnaces | ||
US3124337A (en) * | 1964-03-10 | Fritz | ||
US1880229A (en) * | 1928-03-22 | 1932-10-04 | Brassert & Co | Air heating |
US1978191A (en) * | 1934-02-26 | 1934-10-23 | H L Dixon Company | Regenerative furnace |
US3150865A (en) * | 1961-10-28 | 1964-09-29 | Koppers Gmbh Heinrich | Fluid heating process and apparatus |
US3175816A (en) * | 1963-04-08 | 1965-03-30 | Koppers Co Inc | Hot blast stove and blast furnace arrangement |
US3627014A (en) * | 1969-02-20 | 1971-12-14 | Mitsubishi Heavy Ind Ltd | Heat-exchanger system |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4434004A (en) | 1979-12-22 | 1984-02-28 | Mannesmann Demag Ag | Method for recovery and recycling of heat from hot gases in metallurigical processing |
US6068874A (en) * | 1993-02-16 | 2000-05-30 | Dehydration Technologies, Inc. | Process of dehydrating biological products |
US6268012B1 (en) | 1996-06-07 | 2001-07-31 | Dtl S.A. | Dried product and a drying process |
US8961169B2 (en) | 2011-03-29 | 2015-02-24 | Fives North American Combustion, Inc. | High uniformity heating |
CN105202755A (en) * | 2015-11-13 | 2015-12-30 | 佛山市绿威生物科技有限公司 | Boiling type gasification hot-blast stove |
CN105202755B (en) * | 2015-11-13 | 2018-12-25 | 佛山市绿威生物科技有限公司 | Boiling type gasification hot-air stove |
CN107488771A (en) * | 2017-09-29 | 2017-12-19 | 四川德胜集团钒钛有限公司 | A kind of blast-furnace hot-air furnace system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100510004C (en) | Coke oven flue gas sharing | |
US5052918A (en) | Method and a regenerator for heating gases | |
US2360855A (en) | Metallurgical furnace | |
US4334861A (en) | Method and apparatus for generating a hot air blast | |
CN101875985A (en) | Energy-saving emission-reducing intensive blast furnace technology | |
US1948696A (en) | Vertical shaft furnace | |
US1940371A (en) | Apparatus for heating gases | |
US3284070A (en) | Hot blast stove having one common combustion chamber | |
CA1168443A (en) | Method and apparatus for generating a hot air blast | |
RU2299244C2 (en) | Modular furnace | |
CN101748230A (en) | High-temperature low-oxygen external combustion stove | |
US2126095A (en) | Soaking pit and like heating furnace | |
US2571749A (en) | Fluid heating | |
US3642262A (en) | Method for operating a regenerative gas heater, and a gas heater for use in this method | |
US3690636A (en) | Recuperative furnaces | |
US3061292A (en) | Blast heating system for blast furnaces and method of operating the same | |
CA1161637A (en) | Installation and process for the production of hot air | |
US3454267A (en) | High performance blast furnace stoves | |
US3061194A (en) | Two-stage system for preheating combustion air | |
US2771285A (en) | Regenerator | |
CN100529109C (en) | Direct smelting plant and process | |
US2069196A (en) | Method of and apparatus for making open hearth steel | |
US759171A (en) | Hot-blast apparatus for mettallurgical furnaces. | |
CN1052334A (en) | The hot air smelting method of lead blast furnace and wind jacket in furnace thereof | |
US3175816A (en) | Hot blast stove and blast furnace arrangement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: BRICMONT & ASSOCIATES, INC., MCMURRAY, PA. 15317 A Free format text: ASSIGNMENT OF ASSIGNORS INTEREST.;ASSIGNOR:BRICMONT, FRANCIS H.;REEL/FRAME:003958/0805 Effective date: 19810228 |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
FEPP | Fee payment procedure |
Free format text: MAINTENANCE FEE REMINDER MAILED (ORIGINAL EVENT CODE: REM.); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY |
|
FEPP | Fee payment procedure |
Free format text: SURCHARGE FOR LATE PAYMENT, PL 96-517 (ORIGINAL EVENT CODE: M176); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, PL 96-517 (ORIGINAL EVENT CODE: M170); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY Year of fee payment: 4 |
|
FEPP | Fee payment procedure |
Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY |
|
FEPP | Fee payment procedure |
Free format text: MAINTENANCE FEE REMINDER MAILED (ORIGINAL EVENT CODE: REM.); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY |
|
FEPP | Fee payment procedure |
Free format text: SURCHARGE FOR LATE PAYMENT, PL 96-517 (ORIGINAL EVENT CODE: M176); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YEAR, PL 96-517 (ORIGINAL EVENT CODE: M171); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY Year of fee payment: 8 |
|
FEPP | Fee payment procedure |
Free format text: PAT HOLDER CLAIMS SMALL ENTITY STATUS - INDIV INVENTOR (ORIGINAL EVENT CODE: SM01); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY |
|
FEPP | Fee payment procedure |
Free format text: SURCHARGE FOR LATE PAYMENT, SMALL ENTITY (ORIGINAL EVENT CODE: M286); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 12TH YR, SMALL ENTITY (ORIGINAL EVENT CODE: M285); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY Year of fee payment: 12 |
|
FEPP | Fee payment procedure |
Free format text: MAINTENANCE FEE REMINDER MAILED (ORIGINAL EVENT CODE: REM.); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY |
|
FEPP | Fee payment procedure |
Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY Free format text: PAYER NUMBER DE-ASSIGNED (ORIGINAL EVENT CODE: RMPN); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY |
|
AS | Assignment |
Owner name: BRICMONT, INC., PENNSYLVANIA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:BRICMONT & ASSOCIATES, INC.;REEL/FRAME:008296/0543 Effective date: 19960221 |