US2970645A - Producing multiple fractures in a well - Google Patents

Producing multiple fractures in a well Download PDF

Info

Publication number
US2970645A
US2970645A US644369A US64436957A US2970645A US 2970645 A US2970645 A US 2970645A US 644369 A US644369 A US 644369A US 64436957 A US64436957 A US 64436957A US 2970645 A US2970645 A US 2970645A
Authority
US
United States
Prior art keywords
well
formation
fracture
undercut
fracturing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US644369A
Inventor
Eugene D Glass
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pan American Petroleum Corp
Original Assignee
Pan American Petroleum Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pan American Petroleum Corp filed Critical Pan American Petroleum Corp
Priority to US644369A priority Critical patent/US2970645A/en
Application granted granted Critical
Publication of US2970645A publication Critical patent/US2970645A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/261Separate steps of (1) cementing, plugging or consolidating and (2) fracturing or attacking the formation

Definitions

  • an object of this invention to provide an improved method of producing multiple fractures in a formation penetrated by a well including the production of such fractures at previously selected elevations in the well. Specifically, it is an object of this invention to produce fractures hydraulically at a multiplicity of selected e'evations in a well by first weakening the formation at the elevations where each fracture is desired and then producing the fractures.
  • Figure 1 is a cross-sectional view of a well and the surrounding formations showing one of the first steps in the process of this invention.
  • FIGS 2, 3, 4 and 5 are similar views showing typical consecutive steps in said process.
  • This invention in brief, may be described as a method for producing fractures hydraulically at a multiplicity of selected positions in a formation penetrated by a well including the steps of undercutting or otherwise weakening the formation at the positions where fractures are desired, the formation being weakened to varying degrees so that fractures can be produced selectively by first fracturing the weakest section, plugging that fracture, and then again fracturing the formation and plugging the fractures consecutively at the next weakest section.
  • well 9 has an upper section lined by a casing 10 and beow the cased section and the 'casing shoe 11 an open hole section 12 within the producing formation 13 in which it is desired to produce multiple fractures.
  • a tubing head 14 with a fluid inlet 1S is located at the surface of the upper end of the well atent casing. The tubing head permits lowering a tubing string into the well and is adapted to provide a seal around and to support the tubing, as well-known.
  • the formation 4 is undercut at those elevations.
  • the formation may be undercut laterally from the well by any of a'number of means including, for example, lowering a mechanical under-reamer into the well on a string of tubing, and reciprocating or, in the preferred embodiment, rotating the under-reamer at the lower elevation 17 until the desired depth of undercut 18, having an area indicated by A", is obtained.
  • the mechanical under-reamer is then raised to upper elevation 16 and again rotated until the desired depth of undercut 19, having an area indicated by A', is obtained.
  • Areas A and A" are desirably substantially different, A" being substantially greater than A', so that when fracturing fluid is subsequently injected into the well and pressure is applied, the opposite vertical forces produced on the bottom and top of the undercut area are substantially greater in the lower undercut 18 than in the upper undercut 19. Even if fluid is injected down the hole with no means to isolate the seected zone, these greater initial forces cause the formation to be fractured first at the lower elevation 17.
  • Alternate means of undercutting the formation include, for example, jetting an abrasive-laden fluid or acid into the formation as the jet is rotated around the well at different depths or the discharge of annular or jet-shaped explosive charges with the jets directed radialy against the walls of the well.
  • the undercuts in the producing formation 13 may be produced even though the well has been cased through the formation by merely milling, burning or abrading away the casing at the elevations where the undercuts are desired.
  • the undercuts, preferably al of the undercuts which are desired, are first produced, each undercut having a dif ferent area in a plane perpendicular to the axis of the well.
  • the area of the minimum undercut should be at lease 10 percent and preferably about 25 percent or more greater than the area of the well.
  • the larger undercut or undercuts should be at least l0 percent and preferab'y 25 percent or more greater than the area ofthe next smaller undercut so that the normal variations in the strength of the rocks will not override the effect of the undercuts.
  • the undercutter may then be removed from the well or, in some cases particularly where the undercutter is run on the tubing, the tubing and undercutter may be left in the well so the tubing is available for later use.
  • Fracturing fluid is then injected into the well, preferably down the hole, so that all of the permeable producing formation 13 penetrated by the well 9 is exposed to or contacted by fracturing fluid.
  • This fracturing fluid may comprise any of the well-known fracturing fluids, for example water or oil, preferably gelled or thickened to produce initially a low penetrating flui'd having a low filtrate rate and to be capable of removal from a formation by producing the well.
  • pressure is applied and when the pressure of the fluid acting on the upper and lower surfaces of undercut 18 is great enough to initiate a fracture annularly at the.
  • the effective overburden above the lower elevation 17 is raised permitting the fracturing fluid to enter the initiated fracture.
  • Injection of the fracturing fluid at high rate and high pressure then causes a lower fracture 21, as indicated in Figure 2, to be extended radially into the forma tion 13 to any desired depth depending upon the amount and physical characteristics of the fluid injected.
  • Formation propping agents such as sand lparticles 22 may be carried with the fracturing fluid into the fracture to support the effective overburden and maintain a high permeability channel from the lower part of formation 13 into the well.
  • the concentration of this sand may be increased to as much as -15 or more pounds per gallon of the fracturing fiuid so that the fracture and the bottom of the hole become filled with sand to plug the bottom fracture 21 as indicated in Figure 3.
  • injection of the fracturing fluid containing thesand or other propping agent may be discontinued and sand or other plugging materials may be injected into the well, preferably at low pressure and in a thin slurry of oil or water or other fluid, or the sand may be merely dumped into the Well with a bailer or the like to produce one type of bottom plug in the well.
  • the well is filled with a plug 24 to an elevation 23 which is two or more feet above the elevation of the lower fracture 21. While.
  • this plug may comprise any plugging material such as sand as indicated, other plugging materials such as oil soluble solids, eg., granulatedl napthalene or the like, may be substituted.
  • a bridging plug may be set at or the well may be filled to the intermediate elevation 23 above the lower fracture 21 and below the upper undercut i9 with cement or other settable materials such as sulfur so that the lower fracture is protected and cannot be further extended when fracturing liuid is again injected into the well.
  • Sand or other propping agent 22 may be incorporated in the second quantity of fracturing iiuid to Support the effective overburden at the upper elevation and produce a highly permeable flow channel in an upper horizon from the producing formation 13 into the well.
  • This channel or fracture like the lower channel, is probably, but-not necessarily, a fiat, annular and subsymmetrical horizontally about well 9.
  • any number of such fractures may be produced at higher elevations by first plugging the well as by filling it with a plugging agent to an elevation above the elevation of the last-produced fracture and then injecting another quantity of fracturing uid into the well, applying pressure to initiate and extend a fracture, plugging the well again to prevent access to the last-produced fracture, etc.
  • the plugging material 24 is desirably removed so that the well is open to the lower fracture 2l as shown in Figure 5.
  • both the lower fracture 21 and the upper fracture 25 are exposed to and in fluid communication with the well so that fluids iiow freely into the well, thus substantially increasing the productivity of various zones in the fractured formation 13.
  • the formation is desirably fractured a multiplicity of times with the first fracture near the bottom of the formation and subsequent fractures at progressively higher elevations in the formation.
  • the areas of the undercuts progressively decrease from the bottom of the well upward so that a fracture is produced preferentially at the lowest undercut in the formation above the top of the plug.
  • a method of hydraulically fracturing a formation penetrated by a well at a multiplicity of selected elevations comprising in sequence undercutting said formation at the iowest of said selected elevations for a substantial distance around said well to produce an undercut having an area A in a plane substantially perpendicular to the axis of said well, undercutting said formation at at least one of said selected elevations above said lowest elevation for a substantial distance around said well to produce an undercut having an area A in a piane substantially perpendicular to the axis of said well, said area A" being substantially greater than said area A', injecting a rst quantity of fracturing uid into said well and into said undercuts in said formation, simultaneously applying sufficient pressure to said fracturing fiuid in said undercuts to produce and extend a first fracture at said area A into said formation, temporarily sealing said first fracture to an extent sufficient to withstand subsequent fracturing pressures in said well, injecting a second quantity of fracturing fluid into said well
  • a method of hydraulically fracturing an oil producing formation penetrated by a well at a multiplicity of selected elevations comprising under-roaming said formation at one of said selected elevations to produce a first undercut having an area A", under-roaming said formation at at least one other of saidselected elevations above said first undercut to produce a second undercut having an area A', said area A" being substantially greater than said area A', injecting a first quantity of fracturing iiuid into said well and into a multiplicity of said undercuts, applying pressure to said fracturing fluid to produce an axial force across each of said undercuts, said pressure being great enough to initiate a first fracture in said formation at said area A, injecting fracturing fiuid into said first fracture to extend said first fracture into said formation, temporarily sealing said first fracture to an extent sufficient to withstand subsequent fracturing pressures in said well with an oil-soluble sealing agent, injecting a second quantity of fracturing fluid into ,said well
  • a method of sequentially hydraulically producing a multiplicity of fractures in a formation penetrated by a well at selected positions comprising rst undercuttiug said formation at said selected positions, each undercut thus produced in said formation having a substantially different cross-sectional area laterally of said well from any other undercut in said formation, said cross-sectional area varying directly with the depth of said well, whereby the formation at a given undercut is weakened to a degree different from that of the other of said undercuts, depositing a first quantity of fracturing uid in said well at the elevation of said selected positions, applying sufficient pressure to said fracturing fluid simultaneously at said selected positions to produce a first fracture in said formation at the lowermost undercut, temporarily sealing said rst fracture to an extent suicient to withstand subsequent fracturing pressures in said well, repeating the above cycle whereby a fracture is produced at the undercut immediately above said rst fracture, remov ing said seals, and producing said well.

Description

Feb. 7, 1961 E. D. GLAss PRoDucING MULTIPLE FRAcTuREs 1N A WELL Filed March 6, 195'? www/@MMM INVENTOR. EUGENE D. GLASS United States 2,970,645 PRODUCINGiMULTIPLE FRACTURES IN A WELL Okla., assigner to Pan American Eugene D. Glass,Tulsa,
Okla., a corporation of Petroleum Corporation, Tulsa, Delaware Filed Mar. 6, 1951, ser. No. 644,369
s claims. (ci. 16s-42) pressure to a well, the subsequent sealing or plugging of 2 that fracture and then the injection of additional fracturing uid to produce another fracture at another location in the well. One difficulty with the previously proposed methods is that there has been no way to control the n position of these fractures.
It is, therefore, an object of this invention to provide an improved method of producing multiple fractures in a formation penetrated by a well including the production of such fractures at previously selected elevations in the well. Specifically, it is an object of this invention to produce fractures hydraulically at a multiplicity of selected e'evations in a well by first weakening the formation at the elevations where each fracture is desired and then producing the fractures. Other objects of this invention will be apparent from the following description. In this description reference will be made to the accompanying drawings in which:
Figure 1 is a cross-sectional view of a well and the surrounding formations showing one of the first steps in the process of this invention; and
Figures 2, 3, 4 and 5 are similar views showing typical consecutive steps in said process.
This invention, in brief, may be described as a method for producing fractures hydraulically at a multiplicity of selected positions in a formation penetrated by a well including the steps of undercutting or otherwise weakening the formation at the positions where fractures are desired, the formation being weakened to varying degrees so that fractures can be produced selectively by first fracturing the weakest section, plugging that fracture, and then again fracturing the formation and plugging the fractures consecutively at the next weakest section.
Referring now to Figure l for a more detailed description of this invention, well 9 has an upper section lined by a casing 10 and beow the cased section and the 'casing shoe 11 an open hole section 12 within the producing formation 13 in which it is desired to produce multiple fractures. A tubing head 14 with a fluid inlet 1S is located at the surface of the upper end of the well atent casing. The tubing head permits lowering a tubing string into the well and is adapted to provide a seal around and to support the tubing, as well-known. Generally, after a well is drilled into the producing formation 13 and the elevations 16 and 17 at which fractures are to be produced in the formation have been determined, the formation 4is undercut at those elevations. The formation may be undercut laterally from the well by any of a'number of means including, for example, lowering a mechanical under-reamer into the well on a string of tubing, and reciprocating or, in the preferred embodiment, rotating the under-reamer at the lower elevation 17 until the desired depth of undercut 18, having an area indicated by A", is obtained. The mechanical under-reamer is then raised to upper elevation 16 and again rotated until the desired depth of undercut 19, having an area indicated by A', is obtained. Areas A and A" are desirably substantially different, A" being substantially greater than A', so that when fracturing fluid is subsequently injected into the well and pressure is applied, the opposite vertical forces produced on the bottom and top of the undercut area are substantially greater in the lower undercut 18 than in the upper undercut 19. Even if fluid is injected down the hole with no means to isolate the seected zone, these greater initial forces cause the formation to be fractured first at the lower elevation 17. Alternate means of undercutting the formation include, for example, jetting an abrasive-laden fluid or acid into the formation as the jet is rotated around the well at different depths or the discharge of annular or jet-shaped explosive charges with the jets directed radialy against the walls of the well. Obviously in some cases the undercuts in the producing formation 13 may be produced even though the well has been cased through the formation by merely milling, burning or abrading away the casing at the elevations where the undercuts are desired. In either case the undercuts, preferably al of the undercuts which are desired, are first produced, each undercut having a dif ferent area in a plane perpendicular to the axis of the well. The area of the minimum undercut should be at lease 10 percent and preferably about 25 percent or more greater than the area of the well. Similarly, the larger undercut or undercuts should be at least l0 percent and preferab'y 25 percent or more greater than the area ofthe next smaller undercut so that the normal variations in the strength of the rocks will not override the effect of the undercuts. The undercutter may then be removed from the well or, in some cases particularly where the undercutter is run on the tubing, the tubing and undercutter may be left in the well so the tubing is available for later use.
Fracturing fluid is then injected into the well, preferably down the hole, so that all of the permeable producing formation 13 penetrated by the well 9 is exposed to or contacted by fracturing fluid. This fracturing fluid may comprise any of the well-known fracturing fluids, for example water or oil, preferably gelled or thickened to produce initially a low penetrating flui'd having a low filtrate rate and to be capable of removal from a formation by producing the well. After the well has been filled with this fracturing fluid, pressure is applied and when the pressure of the fluid acting on the upper and lower surfaces of undercut 18 is great enough to initiate a fracture annularly at the. vertex of the undercut, the effective overburden above the lower elevation 17 is raised permitting the fracturing fluid to enter the initiated fracture. Injection of the fracturing fluid at high rate and high pressure then causes a lower fracture 21, as indicated in Figure 2, to be extended radially into the forma tion 13 to any desired depth depending upon the amount and physical characteristics of the fluid injected. Formation propping agents such as sand lparticles 22 may be carried with the fracturing fluid into the fracture to support the effective overburden and maintain a high permeability channel from the lower part of formation 13 into the well. i
Since fractures in a formation, once initiated, tend to be extended in preference to the initiation of other frac tures, the lower fracture will continue to take fracturing uid as long as `that fluid is injected unless the. fracture stantially circular` sand bar formation. Where the :produced by the fractured formation, as for example becomes plugged as by the wells being lsanded up to prevent access to the lower fracture. The quantity of sand which is typically injected as a propping agent varies from about one-half pound of 20-40 mesh U.S. sieve to about twovor more pounds per gallon ofthe fracturing fluid, A very high concentration of sand, particularly in thin fracturing fluids tends to deposit sand in the well. When it is desired to plug or sand out a fracture, particularly a fracture at the bottom of a well, the concentration of this sand may be increased to as much as -15 or more pounds per gallon of the fracturing fiuid so that the fracture and the bottom of the hole become filled with sand to plug the bottom fracture 21 as indicated in Figure 3. Alternatively, instead of placing sand in the fracturing fluid at a concentration suiiciently high to cause it to sand out, injection of the fracturing fluid containing thesand or other propping agent may be discontinued and sand or other plugging materials may be injected into the well, preferably at low pressure and in a thin slurry of oil or water or other fluid, or the sand may be merely dumped into the Well with a bailer or the like to produce one type of bottom plug in the well. Preferably, the well is filled with a plug 24 to an elevation 23 which is two or more feet above the elevation of the lower fracture 21. While. this plug may comprise any plugging material such as sand as indicated, other plugging materials such as oil soluble solids, eg., granulatedl napthalene or the like, may be substituted. Similarly, a bridging plug may be set at or the well may be filled to the intermediate elevation 23 above the lower fracture 21 and below the upper undercut i9 with cement or other settable materials such as sulfur so that the lower fracture is protected and cannot be further extended when fracturing liuid is again injected into the well.
With the lower'fracture 21 thus protected by the plug 24 in the lower part of well 9, another quantity of fracturing fluid is injected into the well and pressure is applied. As pressure is built up on this second quantity of fracturing Huid, opposite forces which tend to fracture formation 13 selectively at upper elevation 16 are exerted on the upper and lower surfaces of the upper undercut 19. These forces first initiate a fracture at the vertex of the undercut and then, with the fracturing fluid following the initiated fracture, an upper fracture 25 as shown in Figure 4 is extended into the formation to any desired distance. Sand or other propping agent 22 may be incorporated in the second quantity of fracturing iiuid to Support the effective overburden at the upper elevation and produce a highly permeable flow channel in an upper horizon from the producing formation 13 into the well. This channel or fracture, like the lower channel, is probably, but-not necessarily, a fiat, annular and subsymmetrical horizontally about well 9.
While only two formation fractures may thus be nroduced at select elevations in a well, it will be apparent that any number of such fractures may be produced at higher elevations by first plugging the well as by filling it with a plugging agent to an elevation above the elevation of the last-produced fracture and then injecting another quantity of fracturing uid into the well, applying pressure to initiate and extend a fracture, plugging the well again to prevent access to the last-produced fracture, etc. After the desired number of fractures have been produced in formation 13, the plugging material 24 is desirably removed so that the well is open to the lower fracture 2l as shown in Figure 5. In the case of a well plug, e.g., a plastic or a coal tar derivative, which is soluble in the liuid, e.g., oil, produced by the fractured formation 13, the well plug will obviously be automatical- -ly removed by merely flowing the well or otherwise causing fluid to enter the well from the surrounding plug is not soluble in the fluids where the plugging materialirs sand, it may be removed by bailing, by circulation, or the like. Similarly, when the plug is insoluble and isset in the well, as for example a hydraulic cement plug, such a plug may be removed by redrilling the well to bottom or to below the bottom fracture.
After the plugging material has been removed from the well, both the lower fracture 21 and the upper fracture 25 are exposed to and in fluid communication with the well so that fluids iiow freely into the well, thus substantially increasing the productivity of various zones in the fractured formation 13.
In the preferred embodiment as described above, the formation is desirably fractured a multiplicity of times with the first fracture near the bottom of the formation and subsequent fractures at progressively higher elevations in the formation. This permits the previously pro` duced fractures to be plugged more readily by merely depositing plugging material in the bottom of the Well to the desired elevation. In this instance, as indicated, the areas of the undercuts progressively decrease from the bottom of the well upward so that a fracture is produced preferentially at the lowest undercut in the formation above the top of the plug.
I claim:
1. A method of hydraulically fracturing a formation penetrated by a well at a multiplicity of selected elevations comprising in sequence undercutting said formation at the iowest of said selected elevations for a substantial distance around said well to produce an undercut having an area A in a plane substantially perpendicular to the axis of said well, undercutting said formation at at least one of said selected elevations above said lowest elevation for a substantial distance around said well to produce an undercut having an area A in a piane substantially perpendicular to the axis of said well, said area A" being substantially greater than said area A', injecting a rst quantity of fracturing uid into said well and into said undercuts in said formation, simultaneously applying sufficient pressure to said fracturing fiuid in said undercuts to produce and extend a first fracture at said area A into said formation, temporarily sealing said first fracture to an extent sufficient to withstand subsequent fracturing pressures in said well, injecting a second quantity of fracturing fluid into said well and into said formation under sufiicient pressure to produce and extend a 'second fracture at said area A', and producing said well.
2. A method according to claim l wherein said seal is insoluble in the fluids produced by said formation which includes the step of redrilling said well to said lowest elevation to remove said seal from said well.
3g. A method of hydraulically fracturing an oil producing formation penetrated by a well at a multiplicity of selected elevations comprising under-roaming said formation at one of said selected elevations to produce a first undercut having an area A", under-roaming said formation at at least one other of saidselected elevations above said first undercut to produce a second undercut having an area A', said area A" being substantially greater than said area A', injecting a first quantity of fracturing iiuid into said well and into a multiplicity of said undercuts, applying pressure to said fracturing fluid to produce an axial force across each of said undercuts, said pressure being great enough to initiate a first fracture in said formation at said area A, injecting fracturing fiuid into said first fracture to extend said first fracture into said formation, temporarily sealing said first fracture to an extent sufficient to withstand subsequent fracturing pressures in said well with an oil-soluble sealing agent, injecting a second quantity of fracturing fluid into ,said well and into said second undercut to produce an axial force across said second undercut great enough to initiate a second fracture in said formation at said area A', removing the temporary seals from said fractures yand producing said well.
4. A method according to claim 3 wherein said rst undercut is sealed by filling said well with said oilsoluble sealing agent to an elevation above the elevation of said rst undercut and below said second undercut.
5. A method of sequentially hydraulically producing a multiplicity of fractures in a formation penetrated by a well at selected positions, comprising rst undercuttiug said formation at said selected positions, each undercut thus produced in said formation having a substantially different cross-sectional area laterally of said well from any other undercut in said formation, said cross-sectional area varying directly with the depth of said well, whereby the formation at a given undercut is weakened to a degree different from that of the other of said undercuts, depositing a first quantity of fracturing uid in said well at the elevation of said selected positions, applying sufficient pressure to said fracturing fluid simultaneously at said selected positions to produce a first fracture in said formation at the lowermost undercut, temporarily sealing said rst fracture to an extent suicient to withstand subsequent fracturing pressures in said well, repeating the above cycle whereby a fracture is produced at the undercut immediately above said rst fracture, remov ing said seals, and producing said well.
References Cited in thev le of this patent UNITED STATES PATENTS Desbrow Aug. 14, 1-` 956
US644369A 1957-03-06 1957-03-06 Producing multiple fractures in a well Expired - Lifetime US2970645A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US644369A US2970645A (en) 1957-03-06 1957-03-06 Producing multiple fractures in a well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US644369A US2970645A (en) 1957-03-06 1957-03-06 Producing multiple fractures in a well

Publications (1)

Publication Number Publication Date
US2970645A true US2970645A (en) 1961-02-07

Family

ID=24584607

Family Applications (1)

Application Number Title Priority Date Filing Date
US644369A Expired - Lifetime US2970645A (en) 1957-03-06 1957-03-06 Producing multiple fractures in a well

Country Status (1)

Country Link
US (1) US2970645A (en)

Cited By (36)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3028914A (en) * 1958-09-29 1962-04-10 Pan American Petroleum Corp Producing multiple fractures in a cased well
US3151678A (en) * 1958-09-02 1964-10-06 Dow Chemical Co Method of fracturing formations
US3161235A (en) * 1960-10-14 1964-12-15 Charles E Carr Method for preventing channeling in hydraulic fracturing of oil wells
US3313348A (en) * 1963-12-27 1967-04-11 Gulf Research Development Co Process of forming vertical well bore fractures by use of circumferential notching
US3835928A (en) * 1973-08-20 1974-09-17 Mobil Oil Corp Method of creating a plurality of fractures from a deviated well
US4634187A (en) * 1984-11-21 1987-01-06 Isl Ventures, Inc. Method of in-situ leaching of ores
US4750562A (en) * 1985-08-30 1988-06-14 Mobil Oil Corporation Method to divert fractures induced by high impulse fracturing
US5161618A (en) * 1991-08-16 1992-11-10 Mobil Oil Corporation Multiple fractures from a single workstring
US5377756A (en) * 1993-10-28 1995-01-03 Mobil Oil Corporation Method for producing low permeability reservoirs using a single well
US20090242202A1 (en) * 2008-03-27 2009-10-01 Rispler Keith A Method of Perforating for Effective Sand Plug Placement in Horizontal Wells
US7644761B1 (en) 2008-07-14 2010-01-12 Schlumberger Technology Corporation Fracturing method for subterranean reservoirs
US9523267B2 (en) 2015-04-28 2016-12-20 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US9551204B2 (en) 2015-04-28 2017-01-24 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US9567824B2 (en) 2015-04-28 2017-02-14 Thru Tubing Solutions, Inc. Fibrous barriers and deployment in subterranean wells
US9567826B2 (en) 2015-04-28 2017-02-14 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US9567825B2 (en) 2015-04-28 2017-02-14 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US9708883B2 (en) 2015-04-28 2017-07-18 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US9745820B2 (en) 2015-04-28 2017-08-29 Thru Tubing Solutions, Inc. Plugging device deployment in subterranean wells
US9810051B2 (en) 2014-11-20 2017-11-07 Thru Tubing Solutions, Inc. Well completion
US9816341B2 (en) 2015-04-28 2017-11-14 Thru Tubing Solutions, Inc. Plugging devices and deployment in subterranean wells
US9920589B2 (en) 2016-04-06 2018-03-20 Thru Tubing Solutions, Inc. Methods of completing a well and apparatus therefor
US10012064B2 (en) 2015-04-09 2018-07-03 Highlands Natural Resources, Plc Gas diverter for well and reservoir stimulation
US10233719B2 (en) * 2015-04-28 2019-03-19 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US10344204B2 (en) 2015-04-09 2019-07-09 Diversion Technologies, LLC Gas diverter for well and reservoir stimulation
US10422207B2 (en) 2016-03-07 2019-09-24 Schlumberger Technology Corporation Methods for creating multiple hydraulic fractures in oil and gas wells
US10513653B2 (en) 2015-04-28 2019-12-24 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US10641057B2 (en) 2015-04-28 2020-05-05 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US10753174B2 (en) 2015-07-21 2020-08-25 Thru Tubing Solutions, Inc. Plugging device deployment
US10774612B2 (en) 2015-04-28 2020-09-15 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US10851615B2 (en) 2015-04-28 2020-12-01 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US10927639B2 (en) 2016-12-13 2021-02-23 Thru Tubing Solutions, Inc. Methods of completing a well and apparatus therefor
US10982520B2 (en) 2016-04-27 2021-04-20 Highland Natural Resources, PLC Gas diverter for well and reservoir stimulation
US11022248B2 (en) 2017-04-25 2021-06-01 Thru Tubing Solutions, Inc. Plugging undesired openings in fluid vessels
US11293578B2 (en) 2017-04-25 2022-04-05 Thru Tubing Solutions, Inc. Plugging undesired openings in fluid conduits
US11761295B2 (en) 2015-07-21 2023-09-19 Thru Tubing Solutions, Inc. Plugging device deployment
US11851611B2 (en) 2015-04-28 2023-12-26 Thru Tubing Solutions, Inc. Flow control in subterranean wells

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2368424A (en) * 1939-04-15 1945-01-30 Standard Oil Dev Co Producing oil
US2693854A (en) * 1952-04-16 1954-11-09 Standard Oil Dev Co Formation of zones of high permeability in low permeability formations
US2734861A (en) * 1956-02-14 Composition and process for plugging
US2758653A (en) * 1954-12-16 1956-08-14 Floyd H Desbrow Apparatus for penetrating and hydraulically eracturing well formations

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2734861A (en) * 1956-02-14 Composition and process for plugging
US2368424A (en) * 1939-04-15 1945-01-30 Standard Oil Dev Co Producing oil
US2693854A (en) * 1952-04-16 1954-11-09 Standard Oil Dev Co Formation of zones of high permeability in low permeability formations
US2758653A (en) * 1954-12-16 1956-08-14 Floyd H Desbrow Apparatus for penetrating and hydraulically eracturing well formations

Cited By (62)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3151678A (en) * 1958-09-02 1964-10-06 Dow Chemical Co Method of fracturing formations
US3028914A (en) * 1958-09-29 1962-04-10 Pan American Petroleum Corp Producing multiple fractures in a cased well
US3161235A (en) * 1960-10-14 1964-12-15 Charles E Carr Method for preventing channeling in hydraulic fracturing of oil wells
US3313348A (en) * 1963-12-27 1967-04-11 Gulf Research Development Co Process of forming vertical well bore fractures by use of circumferential notching
US3835928A (en) * 1973-08-20 1974-09-17 Mobil Oil Corp Method of creating a plurality of fractures from a deviated well
US4634187A (en) * 1984-11-21 1987-01-06 Isl Ventures, Inc. Method of in-situ leaching of ores
US4750562A (en) * 1985-08-30 1988-06-14 Mobil Oil Corporation Method to divert fractures induced by high impulse fracturing
WO1993004268A1 (en) * 1991-08-16 1993-03-04 Mobil Oil Corporation Method for producing multiple fractures in a wellbore
GB2273308A (en) * 1991-08-16 1994-06-15 Mobil Oil Corp Method for producing multiple fractures in a wellbore
GB2273308B (en) * 1991-08-16 1995-06-28 Mobil Oil Corp Method for producing multiple fractures in a wellbore
US5161618A (en) * 1991-08-16 1992-11-10 Mobil Oil Corporation Multiple fractures from a single workstring
US5377756A (en) * 1993-10-28 1995-01-03 Mobil Oil Corporation Method for producing low permeability reservoirs using a single well
US20090242202A1 (en) * 2008-03-27 2009-10-01 Rispler Keith A Method of Perforating for Effective Sand Plug Placement in Horizontal Wells
US8096358B2 (en) * 2008-03-27 2012-01-17 Halliburton Energy Services, Inc. Method of perforating for effective sand plug placement in horizontal wells
US7644761B1 (en) 2008-07-14 2010-01-12 Schlumberger Technology Corporation Fracturing method for subterranean reservoirs
US20100006293A1 (en) * 2008-07-14 2010-01-14 Schlumberger Technology Corporation Fracturing method for subterranean reservoirs
US9810051B2 (en) 2014-11-20 2017-11-07 Thru Tubing Solutions, Inc. Well completion
US10989032B2 (en) 2014-11-20 2021-04-27 Thru Tubing Solutions, Inc. Well completion
US10385257B2 (en) 2015-04-09 2019-08-20 Highands Natural Resources, PLC Gas diverter for well and reservoir stimulation
US10012064B2 (en) 2015-04-09 2018-07-03 Highlands Natural Resources, Plc Gas diverter for well and reservoir stimulation
US10385258B2 (en) 2015-04-09 2019-08-20 Highlands Natural Resources, Plc Gas diverter for well and reservoir stimulation
US10344204B2 (en) 2015-04-09 2019-07-09 Diversion Technologies, LLC Gas diverter for well and reservoir stimulation
US10641070B2 (en) 2015-04-28 2020-05-05 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US9523267B2 (en) 2015-04-28 2016-12-20 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US9816341B2 (en) 2015-04-28 2017-11-14 Thru Tubing Solutions, Inc. Plugging devices and deployment in subterranean wells
US11851611B2 (en) 2015-04-28 2023-12-26 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US9745820B2 (en) 2015-04-28 2017-08-29 Thru Tubing Solutions, Inc. Plugging device deployment in subterranean wells
US10233719B2 (en) * 2015-04-28 2019-03-19 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US10655427B2 (en) 2015-04-28 2020-05-19 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US9708883B2 (en) 2015-04-28 2017-07-18 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US9551204B2 (en) 2015-04-28 2017-01-24 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US9567825B2 (en) 2015-04-28 2017-02-14 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US10641069B2 (en) 2015-04-28 2020-05-05 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US10513653B2 (en) 2015-04-28 2019-12-24 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US10513902B2 (en) 2015-04-28 2019-12-24 Thru Tubing Solutions, Inc. Plugging devices and deployment in subterranean wells
US11242727B2 (en) 2015-04-28 2022-02-08 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US11002106B2 (en) 2015-04-28 2021-05-11 Thru Tubing Solutions, Inc. Plugging device deployment in subterranean wells
US9567824B2 (en) 2015-04-28 2017-02-14 Thru Tubing Solutions, Inc. Fibrous barriers and deployment in subterranean wells
US20190136662A1 (en) * 2015-04-28 2019-05-09 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US9567826B2 (en) 2015-04-28 2017-02-14 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US10738564B2 (en) 2015-04-28 2020-08-11 Thru Tubing Solutions, Inc. Fibrous barriers and deployment in subterranean wells
US10738565B2 (en) 2015-04-28 2020-08-11 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US10738566B2 (en) 2015-04-28 2020-08-11 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US10641057B2 (en) 2015-04-28 2020-05-05 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US10767442B2 (en) * 2015-04-28 2020-09-08 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US10774612B2 (en) 2015-04-28 2020-09-15 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US10851615B2 (en) 2015-04-28 2020-12-01 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US10900312B2 (en) 2015-04-28 2021-01-26 Thru Tubing Solutions, Inc. Plugging devices and deployment in subterranean wells
US10907430B2 (en) 2015-04-28 2021-02-02 Thru Tubing Solutions, Inc. Plugging devices and deployment in subterranean wells
US11427751B2 (en) 2015-04-28 2022-08-30 Thru Tubing Solutions, Inc. Flow control in subterranean wells
US11761295B2 (en) 2015-07-21 2023-09-19 Thru Tubing Solutions, Inc. Plugging device deployment
US10753174B2 (en) 2015-07-21 2020-08-25 Thru Tubing Solutions, Inc. Plugging device deployment
US11377926B2 (en) 2015-07-21 2022-07-05 Thru Tubing Solutions, Inc. Plugging device deployment
US10422207B2 (en) 2016-03-07 2019-09-24 Schlumberger Technology Corporation Methods for creating multiple hydraulic fractures in oil and gas wells
US10655426B2 (en) 2016-04-06 2020-05-19 Thru Tubing Solutions, Inc. Methods of completing a well and apparatus therefor
US9920589B2 (en) 2016-04-06 2018-03-20 Thru Tubing Solutions, Inc. Methods of completing a well and apparatus therefor
US10982520B2 (en) 2016-04-27 2021-04-20 Highland Natural Resources, PLC Gas diverter for well and reservoir stimulation
US11333000B2 (en) 2016-12-13 2022-05-17 Thru Tubing Solutions, Inc. Methods of completing a well and apparatus therefor
US10927639B2 (en) 2016-12-13 2021-02-23 Thru Tubing Solutions, Inc. Methods of completing a well and apparatus therefor
US11939834B2 (en) 2016-12-13 2024-03-26 Thru Tubing Solutions, Inc. Methods of completing a well and apparatus therefor
US11293578B2 (en) 2017-04-25 2022-04-05 Thru Tubing Solutions, Inc. Plugging undesired openings in fluid conduits
US11022248B2 (en) 2017-04-25 2021-06-01 Thru Tubing Solutions, Inc. Plugging undesired openings in fluid vessels

Similar Documents

Publication Publication Date Title
US2970645A (en) Producing multiple fractures in a well
US5547023A (en) Sand control well completion methods for poorly consolidated formations
CA2226928C (en) Multiple zone well completion method and apparatus
US3393736A (en) Well completion method
US3028914A (en) Producing multiple fractures in a cased well
US2952449A (en) Method of forming underground communication between boreholes
US5105886A (en) Method for the control of solids accompanying hydrocarbon production from subterranean formations
US3587743A (en) Explosively fracturing formations in wells
US4817717A (en) Hydraulic fracturing with a refractory proppant for sand control
US5058676A (en) Method for setting well casing using a resin coated particulate
US4869322A (en) Sequential hydraulic fracturing of a subsurface formation
US4549608A (en) Hydraulic fracturing method employing special sand control technique
US4005750A (en) Method for selectively orienting induced fractures in subterranean earth formations
CA1246438A (en) Hydraulic fracturing and gravel packing method employing special sand control technique
US5226749A (en) Waste disposal in hydraulically fractured earth formations
US2676662A (en) Method of increasing the productivity of wells
US3224506A (en) Subsurface formation fracturing method
US3814187A (en) Subsurface formation plugging
US3118501A (en) Means for perforating and fracturing earth formations
CN101835953B (en) Well construction using small laterals
US2693854A (en) Formation of zones of high permeability in low permeability formations
CA2181208C (en) Method for vertically extending a well
US2784787A (en) Method of suppressing water and gas coning in oil wells
US4917188A (en) Method for setting well casing using a resin coated particulate
US3387888A (en) Fracturing method in solution mining