US2740333A - Process for making railway sleepers - Google Patents

Process for making railway sleepers Download PDF

Info

Publication number
US2740333A
US2740333A US231527A US23152751A US2740333A US 2740333 A US2740333 A US 2740333A US 231527 A US231527 A US 231527A US 23152751 A US23152751 A US 23152751A US 2740333 A US2740333 A US 2740333A
Authority
US
United States
Prior art keywords
sheets
sleeper
mold
sleepers
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US231527A
Inventor
Mazza Adolfo
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US231527A priority Critical patent/US2740333A/en
Application granted granted Critical
Publication of US2740333A publication Critical patent/US2740333A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/002Producing shaped prefabricated articles from the material assembled from preformed elements

Definitions

  • these sleepers were manufactured by assembling the aforementioned sheets, between which metal reinforcements were embedded, and then compressing the resulting body keeping it under a suitable pressure until sufliciently hardened.
  • the object of the present invention is to provide a process for making sleepers of the kind specified abOve, in which each sleeper is removed from the mold immediately after being compressed, so that the necessity of occupying a great number of expensive molds is eliminated.
  • Another object of the invention is to obtain sleepers of cement-asbestos from which a greater portion of water is eliminated whereby a greater stifiness and strength of said sleepers is obtained.
  • a further object is to provide a quicker process for making such sleepers, so that a greater output can be attained with less labor.
  • the sleeper may be compressed to athickness which is less than the final thickness required, so that by removing the same from the mold immediately and leaving it to season and dry'without keeping in a compressed condition, it partially swells up to the greater final thickness desired, with no danger of cracks being formed in the sleeper.
  • Fig. 1 represents in expanded relation the layers for making a sleeper
  • Fig. 2 represents the finished Sleeper
  • Figs. 3 and 4 and 5 show steps in the preparation of the pile of sheets forming the sleeper
  • Fig. 6 is a longitudinal ection of the pressing machine
  • Figs. 7 and 8 are cross sections of the pressing machine in two different stages of operation
  • Fig. 9 shows a detail of Fig. 7 on a larger scale
  • Fig. 10 is an enlarged perspective view showing the structure of the mold walls
  • Fig. 11 is a modification of Fig. 9.
  • the starting material is the one used for making the well known Eternit sheets, that is a suspension of asbestos or like fibres, Portland cemen and Water in a conventional paper beater.
  • the proportions of the materials are preferably about 1 part by weight of asbestos to 6.5 parts by weight of cement. These proportions may vary, however, within comparatively wide limits.
  • the suspended materials are picked by a moving belt which is passed through the suspension in a suitabletank.
  • the belt is passed against a collecting drum and trans fers thereto, in the form of a thin layer, the material picked up from the suspension,
  • the weight of the drum provides moderate compression on the soft laminae successively applied thereto to compress them into a wet self-sustaining sheet.
  • the sheet is then removed from the drum and straightened out.
  • the water content of this sheet is about 30 per cent.
  • the table 3 is surrounded by a frame 4, provided with hand grips 5, which frame can slide up and down on the sides of the table 3 and can be supported in the elevated position by the tiltable arms 6 as shown in Fig. 4.
  • the frame When the frame is in this latter position, the sheets 1 are laid upon the plate 2, within the frame 4, in the order shown in Fig. l, whilethey are being moderately compressed by h Metal reinforcements and metal anchoring elements are inserted in the proper positions in the pile during this op on h his pre mina m i ope on is completed, the frame 4 is lowered again and the plate 2 w t th haped pi f sh 1 is emove from the table 3 by any suitable means 7 and is transported on the slide support 8 of the pressing machine shown in Fig. 6.
  • the pressing machine shown diagrammatically in Figs. 6 to 10 comprises a frame including hydraulic cylinders 10in which pistons 11 are actuated by a compressed fluid by any suitable means through the duct 12.
  • the pistons 11 sustain a support piece 13 having a plane top surface which, when the support piece 13, is completely lowered on the cylinders 10 is at the same level as the slide support 8 mentioned above.
  • the upper portion of the support13 has the same length and width of the plate 2 and is closely surrounded by an annular'inold 14, the structure of which will be described in detail further on.
  • the annular mold '14 is provided with rods 15 passing through the top member of the frame 9 and connected to'a plate 16 fastened to a piston 17 contained in a hydraulic cylinder 18 provided with an aperture 19 for introducing a compressed fluid therein and discharging it therefrom.
  • the cylinder 18 is rigidly connected to the frame 9 by means of rods 20 loosely passing through holes in the plate 16.
  • the annular mold 14 rests on two pistons 21 contained in two hydraulic cylinders 22 at the ends of the machine (Fig. 6), provided withapertures 23 for a compressed fluid.
  • the top surface of the sides thereof is at a level which is slightly higher than the top surface of the support piece 13, e. g. one centimeter higher.
  • a piece 24, having the same length and width of the support 13 projects downwardly from the top member of the frame 9.
  • a slide support 25 is provided at the opposite end of the machine with respect to the similar support 8.
  • the inner surface of this mold is formed by the faces of a plurality of staves 26; these staves are inserted in dovetail fashion into the body of the mold 14 and each of them has a side face slightly recessed as shown at 27, Fig. 10, whereby the inner face of the mold shows a series of thin slots; behind the staves 26 a cavity 28 is provided in the body of the mold, which is connected'to an outlet conduit 29.
  • the body 13 is made with a recess 31 in which a longitudinal partition 32 of the annular mold 14 penetrates so that two sleepers at a time can be obtained.
  • the plate 2 with the superposed pile of sheets 1 placed on the slide support 8 is pushed forward, or conveyed by any suitable power means, onto the upper surface of the support piece 13; the plate 2 slides on this surface as being guided by the sides of the annular mold 14, slightly projecting over the top of the support piece 13 as explained above (Fig. 7).
  • the time involved for reaching this pressure is about 10 minutes, for allowing most of the water to be expelled to issue from between the compressed layers of the laminated cement-asbestos body.
  • the thicknessof the cement-asbestos body is reduced to about 13.5 cm. and a further quantity of water is squeezed out therefrom.
  • the sleeper is thus extracted from the mold and can be pushed forward, together with the supporting plate 2, onto the slide support 25, by the next following plate carrying another pile of sheets placed on the slide support 8, with the intermediary of a wooden spacer
  • the sleepers thus produced are stored for setting and ageing and during the first period after their compression they slightly swell reaching a thickness of 14 cm.',which is the final thickness desired. .1
  • the loss of water due to the gradual compression is 27 liters compared to 55 liters. initially contained in the fresh sheets, the weight offthe sleeper extracted from the press being 159 kg. jThe weight of the same sleeper after90 days is 154 kgi'
  • the, figures mentioned above, relating to the dimensions of the sleeper, proportion of ingredients, number of layers, pressure and duration of thepr'oc ess, as well as the details of the machine can vary, still remaining within the scope of the invention as defined by the appended claim.
  • a process for making railway sleepers of a predetermined thickness comprising introducing a plurality of separate superimposed sheets of a wet laminated mixture of cement asbestos -in direct contact with one another forming a single body in a suitable mold, compressing said body in a direction perpendicular to said sheets with a pressure gradually increasing through a period of time moving the compressedbody from the mold and leaving out through the slots 27, cavity 28 and outlet conduit 29.
  • said body to season into a hardened sleeper.

Description

Aprii 3, 1956 MAZZA 2;40333 PROCESS FOR MAKING RAIUK AY WEEKS Filed June 14, 1951 SShaetsfihget l I N V EN TOR. Zaa a 77241 52% April 3, 1956 A. M-AZZA PROGESS FOR- EUQKING RAIhWi-Y Filed June 14, 1951 3 Sheets-Sheet 2 INVENTOR.
dab/ 0 777azza s l T April 3, 1956 A. MAZZA PROCESS FOR MAKING RAILWAY SLEEPER-S 3 sheets-sheet 3 Filed June 14, 1951 III,
IN VEN TOR. flc/o a 777azza BY United rates Patent PROCESS FOR MAKING RAILWAY SLEEPERS Adolfo Mazza, Genoa, Italy Application June 14, 1951, Serial No. 231,527
1 Claim. (Cl. 92--54) In my Patent 2,169,704 I have described a railway sleeper which is made with a plurality of superposed sheets of cement-asbestos; said sheets are manufactured from a mixture of cement, asbestos and water with a process similar to the process employed for making cardboard and the resulting material is commonly known by the trade name Eternit.
According to the previous method, these sleepers were manufactured by assembling the aforementioned sheets, between which metal reinforcements were embedded, and then compressing the resulting body keeping it under a suitable pressure until sufliciently hardened.
Such prior practice involved the use of expensive equipment and particularly a considerable number of molds, because the sleepers had to be kept in said molds in a compressed condition for at least 24 hours due to the tendency shown by said laminated cement-asbestos material to swell and even to crack if the pressure were removed when the material was still in the fresh state.
The object of the present invention is to provide a process for making sleepers of the kind specified abOve, in which each sleeper is removed from the mold immediately after being compressed, so that the necessity of occupying a great number of expensive molds is eliminated.
Another object of the invention is to obtain sleepers of cement-asbestos from which a greater portion of water is eliminated whereby a greater stifiness and strength of said sleepers is obtained.
A further object is to provide a quicker process for making such sleepers, so that a greater output can be attained with less labor.
It has been found that when a great number of superposed fresh Eternit sheets are strongly pressed together, the water contained therein cannot find its way out pass? ing through the layers because the latter, when they are compressed beyond a certain stage, act as waterproof walls contrasting the passage of water therethrough.
As a consequence, it was neither possible to exceed a pressure of about 400 kgs. per square cm., nor to relieve such a pressure immediately after compression without the danger of the sleepers cracking due to the excessive pressure of that portion of water which remained enclosed within the cement-asbestos layers. 1
This difliculty has been now overcome by providing an exceedingly rugged mold with perforated or slotted sides in which the layers of the cement-asbestos material are placed one upon the other; and then by exerting a progressively increasing pressure on said layers, the excess water contained in the mixture finds its way between adjacent layers towards said perforated wallsand can flow out through the aforementioned perforations.
It has been found that by this process it is possible -to compress the material at a pressure up to 600 kgs. per
square cm. or even more, whereby almost all of the excess water is pressed out and a more compact and strong sleeper is obtained. A further important feature ice 2 is that the sleeper may be compressed to athickness which is less than the final thickness required, so that by removing the same from the mold immediately and leaving it to season and dry'without keeping in a compressed condition, it partially swells up to the greater final thickness desired, with no danger of cracks being formed in the sleeper.
A particular manner of proceeding for manufacturing sleepers according to my present invention will be here inafter described with reference to the attached drawings, wherein:
Fig. 1 represents in expanded relation the layers for making a sleeper;
Fig. 2 represents the finished Sleeper;
Figs. 3 and 4 and 5 show steps in the preparation of the pile of sheets forming the sleeper;
Fig. 6 is a longitudinal ection of the pressing machine;
Figs. 7 and 8 are cross sections of the pressing machine in two different stages of operation;
Fig. 9 shows a detail of Fig. 7 on a larger scale;
Fig. 10 is an enlarged perspective view showing the structure of the mold walls;
Fig. 11 is a modification of Fig. 9.
For making the sleepers according to my invention, the starting material is the one used for making the well known Eternit sheets, that is a suspension of asbestos or like fibres, Portland cemen and Water in a conventional paper beater. The proportions of the materials are preferably about 1 part by weight of asbestos to 6.5 parts by weight of cement. These proportions may vary, however, within comparatively wide limits.
The suspended materials are picked by a moving belt which is passed through the suspension in a suitabletank.
The belt is passed against a collecting drum and trans fers thereto, in the form of a thin layer, the material picked up from the suspension,
' The process is repeated until the material on the drum forms a sheet of adequate thickness.
The weight of the drum provides moderate compression on the soft laminae successively applied thereto to compress them into a wet self-sustaining sheet. The sheet is then removed from the drum and straightened out. The water content of this sheet is about 30 per cent.
All this first stage of the process is conventional and well known long since in the art, for instance from the U. S. Reissue Patent No. 12,594 to Hat'schek reissued January 15, 1907. The aforesaid sheet, about 6 mm. thick, is cut into pieces 1 (Fig. 1), some of which are about 24 cm. wide and 230 cm. long, the others having the same width and a length varying from to cm. These sheets are superposed to form a pile in the order as shown in Fig. 1 on a supporting plate 2 having an arched middle portion, such plate being placed on the table 3 shown in Fig. 3.
The table 3 is surrounded by a frame 4, provided with hand grips 5, which frame can slide up and down on the sides of the table 3 and can be supported in the elevated position by the tiltable arms 6 as shown in Fig. 4. When the frame is in this latter position, the sheets 1 are laid upon the plate 2, within the frame 4, in the order shown in Fig. l, whilethey are being moderately compressed by h Metal reinforcements and metal anchoring elements are inserted in the proper positions in the pile during this op on h his pre mina m i ope on is completed, the frame 4 is lowered again and the plate 2 w t th haped pi f sh 1 is emove from the table 3 by any suitable means 7 and is transported on the slide support 8 of the pressing machine shown in Fig. 6.
For instance, for making a sleeper 230 cm. long, 24 cm.
wide and 14 cm. thick, 31 sheets are piled up and slightly compressed by hand on the plate 2;'the thickness of each sheet being 6 mm., the total thickness of the resultant pile of sheets is about'l8 cm. The total weight of the fresh material is 186 kgs., the water content being about 55 kgs. This comparatively high contentof water is a consequence of the process of manufacture 'of ,Etcrnit sheets as described above.
The pressing machine shown diagrammatically in Figs. 6 to 10 comprises a frame including hydraulic cylinders 10in which pistons 11 are actuated by a compressed fluid by any suitable means through the duct 12.
' The pistons 11 sustain a support piece 13 having a plane top surface which, when the support piece 13, is completely lowered on the cylinders 10 is at the same level as the slide support 8 mentioned above.
The upper portion of the support13 has the same length and width of the plate 2 and is closely surrounded by an annular'inold 14, the structure of which will be described in detail further on. The annular mold '14 is provided with rods 15 passing through the top member of the frame 9 and connected to'a plate 16 fastened to a piston 17 contained in a hydraulic cylinder 18 provided with an aperture 19 for introducing a compressed fluid therein and discharging it therefrom. The cylinder 18 is rigidly connected to the frame 9 by means of rods 20 loosely passing through holes in the plate 16.
The annular mold 14 rests on two pistons 21 contained in two hydraulic cylinders 22 at the ends of the machine (Fig. 6), provided withapertures 23 for a compressed fluid. When the annular mold 14 is in its lowermost rest position, the top surface of the sides thereof is at a level which is slightly higher than the top surface of the support piece 13, e. g. one centimeter higher.
A piece 24, having the same length and width of the support 13 projects downwardly from the top member of the frame 9.
A slide support 25 is provided at the opposite end of the machine with respect to the similar support 8.
The structure of the annular mold 14 appears from Figs. 9 and 10.
The inner surface of this mold is formed by the faces of a plurality of staves 26; these staves are inserted in dovetail fashion into the body of the mold 14 and each of them has a side face slightly recessed as shown at 27, Fig. 10, whereby the inner face of the mold shows a series of thin slots; behind the staves 26 a cavity 28 is provided in the body of the mold, which is connected'to an outlet conduit 29.
According to the modification shown in Fig. 11, the body 13 is made with a recess 31 in which a longitudinal partition 32 of the annular mold 14 penetrates so that two sleepers at a time can be obtained.
The operation of the machine is the following: 7
The plate 2 with the superposed pile of sheets 1 placed on the slide support 8 is pushed forward, or conveyed by any suitable power means, onto the upper surface of the support piece 13; the plate 2 slides on this surface as being guided by the sides of the annular mold 14, slightly projecting over the top of the support piece 13 as explained above (Fig. 7).
When the plate 2 with the sheets 1 lies entirely on the support piece 13, the annular mold is caused to rise by means of the pistons 21, so as to enclose the pile of sheets 1. At this stage, corresponding to the position shown in Fig. 8, fluid under pressure is gradually fed into the cylinders 10 whereby the pistons 11 are lifted and the support piece 13 gradually compresses the pile of sheets 1 against the top piece 24.
As the compression increases, water is squeezed out through the sides of the pile of sheets 1 and finds its way When a pressure of about 400 kgs. per sq. cm. on the sheets is reached, the pile is reduced to a thickness of 14 cm., which is the thickness required for the finished sleeper; the pressure in the cylinders 10, however, is further increased and brought up to about SOO kgs. per sq. cm;
The time involved for reaching this pressure is about 10 minutes, for allowing most of the water to be expelled to issue from between the compressed layers of the laminated cement-asbestos body.
At the last mentioned pressure the thicknessof the cement-asbestos body is reduced to about 13.5 cm. and a further quantity of water is squeezed out therefrom.
The pressure in the cylinders 10 and 22 is then released andat the same time compressed fluid is introduced in the cylinder 18, whereby the piston 17 forces the annular mold down to the initial position shown at Fig. 7.
The sleeper is thus extracted from the mold and can be pushed forward, together with the supporting plate 2, onto the slide support 25, by the next following plate carrying another pile of sheets placed on the slide support 8, with the intermediary of a wooden spacer The sleepers thus produced, are stored for setting and ageing and during the first period after their compression they slightly swell reaching a thickness of 14 cm.',which is the final thickness desired. .1
The loss of water due to the gradual compression is 27 liters compared to 55 liters. initially contained in the fresh sheets, the weight offthe sleeper extracted from the press being 159 kg. jThe weight of the same sleeper after90 days is 154 kgi' As it is-obvious, the, figures mentioned above, relating to the dimensions of the sleeper, proportion of ingredients, number of layers, pressure and duration of thepr'oc ess, as well as the details of the machine can vary, still remaining within the scope of the invention as defined by the appended claim.
This application is a continuation-in-part of application Ser. No. 786,325, filed November 15, 1947, now abandoned. I 1 I Having now particularly described and ascertained the natureof mysaid invention and in what manner the same is to be performed, I declare that what I claim is:
A process for making railway sleepers of a predetermined thickness comprising introducing a plurality of separate superimposed sheets of a wet laminated mixture of cement asbestos -in direct contact with one another forming a single body in a suitable mold, compressing said body in a direction perpendicular to said sheets with a pressure gradually increasing through a period of time moving the compressedbody from the mold and leaving out through the slots 27, cavity 28 and outlet conduit 29.
said body to season into a hardened sleeper.
References Cited the file of this patent UNITED STATES PATENTS 504,730 Lane Sept. 12, 1893 515,958 Hubbard Mar. 6, 1894 7 698,948 Heyl Apr. 29, 1902 868,996 Kemp Oct. 22, 1907 1,949,472 Hopkinson Mat. 6,1934 2,079,664 'Seigle May 11, 1937 2,080,285 'Maclldow ie May 11, 1937 2,082,399 Isman et al June 1, 1937 2,169,704 Mazza Aug. 15, 1939 2,171,155 Wright Aug. 29, 1939 2,568,023
Perry Sept. 18, 1951
US231527A 1951-06-14 1951-06-14 Process for making railway sleepers Expired - Lifetime US2740333A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US231527A US2740333A (en) 1951-06-14 1951-06-14 Process for making railway sleepers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US231527A US2740333A (en) 1951-06-14 1951-06-14 Process for making railway sleepers

Publications (1)

Publication Number Publication Date
US2740333A true US2740333A (en) 1956-04-03

Family

ID=22869613

Family Applications (1)

Application Number Title Priority Date Filing Date
US231527A Expired - Lifetime US2740333A (en) 1951-06-14 1951-06-14 Process for making railway sleepers

Country Status (1)

Country Link
US (1) US2740333A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US504730A (en) * 1893-09-12 Machine for making paper buckets
US515958A (en) * 1894-03-06 Paper-pail-ivjaking machine
US698948A (en) * 1902-04-29 Albert Don Heyl Apparatus for making pails from pulp.
US868996A (en) * 1907-04-22 1907-10-22 Albert Komp Pulp-shaping machine.
US1949472A (en) * 1930-04-05 1934-03-06 Naugatuck Chem Co Apparatus for making fibrous materials
US2080285A (en) * 1934-09-11 1937-05-11 Johns Manville Flexible wallboard
US2079664A (en) * 1932-07-23 1937-05-11 Johns Manville Method of making lightweight articles
US2082399A (en) * 1933-02-10 1937-06-01 Isman Umberto Railway sleeper
US2169704A (en) * 1936-04-25 1939-08-15 Mazza Adolfo Sleeper for railways, tramways, and the like of cement-asbestos with metallic reinforcements
US2171155A (en) * 1937-04-12 1939-08-29 Patent & Licensing Corp Method of making asbestos-cement shingles
US2568023A (en) * 1946-08-24 1951-09-18 Johns Manville Free filtering asbestos and method of producing same

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US504730A (en) * 1893-09-12 Machine for making paper buckets
US515958A (en) * 1894-03-06 Paper-pail-ivjaking machine
US698948A (en) * 1902-04-29 Albert Don Heyl Apparatus for making pails from pulp.
US868996A (en) * 1907-04-22 1907-10-22 Albert Komp Pulp-shaping machine.
US1949472A (en) * 1930-04-05 1934-03-06 Naugatuck Chem Co Apparatus for making fibrous materials
US2079664A (en) * 1932-07-23 1937-05-11 Johns Manville Method of making lightweight articles
US2082399A (en) * 1933-02-10 1937-06-01 Isman Umberto Railway sleeper
US2080285A (en) * 1934-09-11 1937-05-11 Johns Manville Flexible wallboard
US2169704A (en) * 1936-04-25 1939-08-15 Mazza Adolfo Sleeper for railways, tramways, and the like of cement-asbestos with metallic reinforcements
US2171155A (en) * 1937-04-12 1939-08-29 Patent & Licensing Corp Method of making asbestos-cement shingles
US2568023A (en) * 1946-08-24 1951-09-18 Johns Manville Free filtering asbestos and method of producing same

Similar Documents

Publication Publication Date Title
US2522116A (en) Method of molding lightweight concrete panels
SE410101B (en) AT THE MOLDING OF CONCRETE
EP0309709B1 (en) Process for the production of gypsum fibre board
EP0068741A1 (en) Boards and sheets
JP2509063B2 (en) Method for improved formation of reconsolidated wood products
US2740333A (en) Process for making railway sleepers
US2239860A (en) Method of making plastic products
CN108544637B (en) Preparation method of insulation board
US2859484A (en) Method of manufacturing fiber-cement sheets
US2609733A (en) Method of molding magnesia insulation material
US2080285A (en) Flexible wallboard
US5672310A (en) Method of manufacturing wood-cement board
JPH10180731A (en) Manufacture of molded component, molding press and molded component
US1048616A (en) Method of forming fireproof slabs or boards.
US2326517A (en) Method of manufacturing fibrous insulation
US2285098A (en) Method of making fiber plaster products
SU923828A1 (en) Building product manufacturing method
JP4262395B2 (en) Manufacturing method for ceramics exterior materials
SU668809A1 (en) Method for making gypsum lining slabs
DE2816466A1 (en) Building elements, esp. panels, made of gypsum and fibres - where gypsum in panel is dehydrated in autoclave, followed by pressing and rehydration in moist atmos.
US2239861A (en) Method of making plastic products
JPH0680484A (en) Improved method for producing concrete tile
US3231438A (en) Method of and apparatus for producing laminated elements
SU1588551A1 (en) Method of producing acoustic plates
SU800151A1 (en) Metod of making construction articles