US2664652A - Method of removing ballast with a vertical boom cribbing machine - Google Patents

Method of removing ballast with a vertical boom cribbing machine Download PDF

Info

Publication number
US2664652A
US2664652A US103676A US10367649A US2664652A US 2664652 A US2664652 A US 2664652A US 103676 A US103676 A US 103676A US 10367649 A US10367649 A US 10367649A US 2664652 A US2664652 A US 2664652A
Authority
US
United States
Prior art keywords
boom
ballast
chain
subframe
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US103676A
Inventor
Henry H Talboys
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nordberg Manufacturing Co
Original Assignee
Nordberg Manufacturing Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nordberg Manufacturing Co filed Critical Nordberg Manufacturing Co
Priority to US103676A priority Critical patent/US2664652A/en
Application granted granted Critical
Publication of US2664652A publication Critical patent/US2664652A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/04Removing the ballast; Machines therefor, whether or not additionally adapted for taking-up ballast

Definitions

  • My invention relates to improvements in railroadtrackworking equipment and methods'and has for one purpose to provide means for quickly and economically removing ballast from a railroad right-of-wayadjacent the ends of the ties.
  • Another purpose is to provide a ballast removing mechanism which can operate in the intertie space between adjacent tracks.
  • Figure 2 is a detail illustrating and 6 Figure 3 is a vertical section illustrating the parts in a different position.
  • the structure herein shown includes three main elements: a main frame or main carriage, which moves along and is supported on the rails of a track; a subframe or subcarriage which moves transversely on the main frame; and a chain guide or boom, which is movably mounted on the subcarriage.
  • I generally indicates the track ties, upon which are mounted any suitable rails 2.
  • 3 generally indicates the ballast between the rails.
  • I employ a base or main frame which may in clude any suitable transversely extending structural members 4, connected by suitable members 5.
  • Flanged rail engaging wheels 6 may be suitably journaled in bearings I, mounted on any suitable bearing supports 8.
  • I may, for example, employtwo pairs of.-wheels ,6, one pair riding on each 61? the rails 2.
  • transversely extending tracks which may be conveniently formed by channel members or structural members 9 and II.
  • Transversely reciprocable on the main frame and along the track members 9 and II is a subframe generally indicated at B, the main frame being generally indicated at A.
  • the details of the subframe do not of themselves form part of the present invention and are illustrated, for example, in copending. application Serial No. 697,307, filed in the United States Patent Oflice on September 16, 1946, Now Patent No. 2,552,649, and assigned to the assignee of the present application.
  • the subframe is provided with any '1 Claim. (01. s7 195)' 2 suitably flanged rollers l3, providing a convenient anti-frictional support for the 'subframe and permitting it to be moved readily transversely across the main frame A and thus across the track.
  • '1 Claim. 01. s7 195
  • rollers l3 suitably flanged rollers l3, providing a convenient anti-frictional support for the 'subframe and permitting it to be moved readily transversely across the main frame A and thus across the track.
  • I mounted on and movable with the sub frame, I illustrate any suitable engine, motoror power plant 25, the details of which do not of themselves form part of the present invention.
  • I provide generally upright plates 29 on which the cylinders are pivot"- ed.
  • a piston 33 with its piston rod 34, the outer end of which is pivoted to members 35, which are anchored in or secured to cross members of the main frame A.
  • the cylinder 28 has its own piston 35 and its piston rod 31, the purpose of which will later appear.
  • the boom structure Movably mounted on the subframe B is the boom structure generally indicated asC. I find it advantageous to pivot the boom structure to the subframe and illustrate it as pivoted thereto concentric with one set of rollers or wheels H.
  • the pivot is indicated at X in Figure l.
  • the boom structure includea'for example, side plates 4! and a transversely extending supporting plate 43, to which may be bolted extension side plates ML. It will be understood that the boom may be stiffened or reinforced'in any suitablemanner, the details not of themselves forming a part of the present invention.
  • an outer boom-portion which, for convenience, I shall call-the nose of the boom, it being indicated at D. 6! indicates outer boom plates or track members having upper and lower edges adapted to receive the rollers of chain, generally indicated at E.
  • the chain is shown as including a plurality of links 10, some of which have secured thereto or formed therewith digging or cutting elements H.
  • the chain passes about drive sprocket 12 which, in turn, is driven by the sprocket 73, the drive chain 74, the intermediate sprocket 75 and the chain 76, all from the driving pinion 11 of the motor assembly.
  • the chain E driven by sprocket 12, passes about a roller 73 at the nose of the boom, and also about a roller 19.
  • Figure 2 illustrates a variant form of the boom nose D, in which the end roller 78a, as contrasted to the end roller 78 of Figure 1, is pivoted for rotation about an axis substantially in line with the vertical travel of the inner bight of the chain.
  • the horizontal component in Figure 2 is lacking.
  • the present structure is particularly useful for clearing ballast from the space just beyond the ends of track ties and from inter-track space.
  • space or width is lacking to use the structure or the above-mentioned copending application Serial No. 697,307, now Patent No. 2,552,649, in which the boom has a substantial elongation.
  • the present application can be used to remove ballast from the tie ends and is not intended to enter an substantial distance between the ties or beneath the track rails.
  • the boom structure C, D may be elevated about its axis X and that the subframe B may be centered on the main frame A.
  • the boom may be lowered toward and eventually into the position which is shown in Figure 1, the subframe B being first positioned in relation to the frame A, so that when the chain E initially engages the surface of the ballast, it is at a proper 7 distance from the tie ends.
  • the chain E removes the ballast and drops it outwardly away from the tie ends.
  • the subframe B may then be traversed somewhat to the right, referring to the position of the parts in Figure 1, until the end portion D of the boom approaches the rail. It will be understood that, since the subframe B is movable relative to the main frame A, it is possible to move the digging end D toward and away from the tie ends. It is also advantageous, however, to set the subframe in any desired relationship and then merely move the base frame slowly along the rails.
  • My structure may be employed to carry out a number of different methods. As above pointed out, it may be used to clean the cribs or intertie spaces beneath the rails, leaving the interrail space for other treatment.
  • the unit is moved, preferably continuously, along the rails, with the parts in the position in which they are shown in Figure 1.
  • the excavating chain is maintained in digging movement and the result of the movement of the chain along the track is the cutting or excavating of a trench located adjacent but beyond the tie ends.
  • the material excavated from the trench is thrown outwardly by the excavating chain E and may be disposed of as desired.
  • the present structure may be used to out an initial trench, thus reducing the initial excavation of the cribbing machine of the earlier application.
  • Another useful application of the present struc ture is to eiravate at the tie ends for the insertion of tie jacks beneath the ties.
  • Such jacks are used, for example, when tamping equipment is used in the inter-tie space.
  • a method of removing ballast and forming a longitudinal trench adjacent but beyond the tie ends of a railway track or the like with an excavator element movable in a plurality of directions which includes the following steps: moving the excavator element along an excavation path which extends initially downwardly, then inwardly a distance less than the desired width of the trench, then downwardly a distance equaling approximately the desired depth of the trench, then outwardly a distance equaling approximately the desired width of the trench, and then upwardly; slowly lowering the excavator element until the inward portion of the path is approximately coincident with the surface of the ballast with the downward digging portion of the path beyond the tie ends while at the same time continuously moving the excavator element through the path longitudinally along the track to thereby excavate a trench of the desired depth adjacent but beyond the tie ends.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Description

Jan. 5, 1954 H. H. TALBOYS 2,664,652
METHOD OF REMOVING BALLAST WITH A VERTICAL BOOM CRIBBING MACHINE Filed July 8. 1949 2 Sheets-Sheet l I ll :C\ l' I I I I l II II Jan. 5, 1954 H H TALBOYS 2,664,652
METHOD OF R EM(3VING BALLAST WITH A VERTICAL BOOM CRIBBING MACHINE Filed July 8. 1949 2 Sheets-Sheet 2 Patented Jan. 5, 1954 METHOD OF REMOVING BALLAST WITH A VERTICAL BOOM CRIBBING MACHINE Henry H. Talboys, Milwaukee, Wis., assignor to N ordberg Manufacturing Company, Milwaukee, Wis., a corporation of Wisconsin Application July 8, 1949, Serial No. 103,676
My invention relates to improvements in railroadtrackworking equipment and methods'and has for one purpose to provide means for quickly and economically removing ballast from a railroad right-of-wayadjacent the ends of the ties.
Another purpose is to provide a ballast removing mechanism which can operate in the intertie space between adjacent tracks.
Other purposes will appear from time to time in the course of the specification and claim.
I illustrate the invention more or less diagrammatically in the accompanying drawings where- Figure l is an end elevation with parts in section;
Figure 2 is a detail illustrating and 6 Figure 3 is a vertical section illustrating the parts in a different position.
Like parts are indicated by like symbols throughout the specification and drawings.
The structure herein shown includes three main elements: a main frame or main carriage, which moves along and is supported on the rails of a track; a subframe or subcarriage which moves transversely on the main frame; and a chain guide or boom, which is movably mounted on the subcarriage.
Considering the specific showing of the drawa variant form;
ing's, I generally indicates the track ties, upon which are mounted any suitable rails 2. 3 generally indicates the ballast between the rails.
I employ a base or main frame which may in clude any suitable transversely extending structural members 4, connected by suitable members 5. Flanged rail engaging wheels 6 may be suitably journaled in bearings I, mounted on any suitable bearing supports 8. I may, for example, employtwo pairs of.-wheels ,6, one pair riding on each 61? the rails 2.
Mounted above the members 4 and 5 are transversely extending tracks, which may be conveniently formed by channel members or structural members 9 and II. Transversely reciprocable on the main frame and along the track members 9 and II is a subframe generally indicated at B, the main frame being generally indicated at A. The details of the subframe do not of themselves form part of the present invention and are illustrated, for example, in copending. application Serial No. 697,307, filed in the United States Patent Oflice on September 16, 1946, Now Patent No. 2,552,649, and assigned to the assignee of the present application.
The subframe, however, is provided with any '1 Claim. (01. s7 195)' 2 suitably flanged rollers l3, providing a convenient anti-frictional support for the 'subframe and permitting it to be moved readily transversely across the main frame A and thus across the track. Mounted on and movable with the sub frame, I illustrate any suitable engine, motoror power plant 25, the details of which do not of themselves form part of the present invention.
I illustrate also a motor-operated hydraulic pump assembly generally indicated at 26, also not indicated in detail. It will be understood,
however, that suitable fluid connections are provided between the pump 26 and the hinged or pivoted pump cylinders 21 and 28 pivotedto the subframe B as at Zia and28a. J T
To form a firm anchorage, I provide generally upright plates 29 on which the cylinders are pivot"- ed. In the cylinder 2! is mounted a piston 33 with its piston rod 34, the outer end of which is pivoted to members 35, which are anchored in or secured to cross members of the main frame A. Thus when the piston 33 and the cylinder 21 move in relation to each other, in response to addition or withdrawal of fluid by the pump 26, the entire subframe or subcarriage structure B is traversed across the track. The cylinder 28 has its own piston 35 and its piston rod 31, the purpose of which will later appear.
Movably mounted on the subframe B is the boom structure generally indicated asC. I find it advantageous to pivot the boom structure to the subframe and illustrate it as pivoted thereto concentric with one set of rollers or wheels H. The pivot is indicated at X in Figure l. The boom structure includea'for example, side plates 4! and a transversely extending supporting plate 43, to which may be bolted extension side plates ML. It will be understood that the boom may be stiffened or reinforced'in any suitablemanner, the details not of themselves forming a part of the present invention.
4? indicates a pair of end plates or chain bearing supporting plates, which are secured to the ends of the plates 44; by suitable bolts 48. Secured to the lower edgesof the plates 41 is. an outer boom-portion which, for convenience, I shall call-the nose of the boom, it being indicated at D. 6! indicates outer boom plates or track members having upper and lower edges adapted to receive the rollers of chain, generally indicated at E. The chain is shown as including a plurality of links 10, some of which have secured thereto or formed therewith digging or cutting elements H. The chain passes about drive sprocket 12 which, in turn, is driven by the sprocket 73, the drive chain 74, the intermediate sprocket 75 and the chain 76, all from the driving pinion 11 of the motor assembly. The chain E, driven by sprocket 12, passes about a roller 73 at the nose of the boom, and also about a roller 19.
It will thus be understood that during the op eration of the device, the chain E is driven at adequate speed and that the path of the individual links or cutting members of the chain conforms to the contour of the boom nose D.
Figure 2 illustrates a variant form of the boom nose D, in which the end roller 78a, as contrasted to the end roller 78 of Figure 1, is pivoted for rotation about an axis substantially in line with the vertical travel of the inner bight of the chain. The result is that, as will be clear from comparison of Figures 1 and 2, whereas in Figure 1 each of the digging or cutting members H passes through a relatively extended horizontal digging path, the horizontal component in Figure 2 is lacking.
It will be realized that whereas I have described and shown a practical and operative device, nevertheless many changes may be made in size, shape, number and disposition of parts without departing from the spirit of my invention. I wish my description and drawings to be taken as, in a broad sense, illustrative or diagrammatic, rather than as limiting me to my specific showing herein.
The use and operation of my invention are as follows:
The present structure is particularly useful for clearing ballast from the space just beyond the ends of track ties and from inter-track space. For example, in closely spaced double tracks, space or width is lacking to use the structure or the above-mentioned copending application Serial No. 697,307, now Patent No. 2,552,649, in which the boom has a substantial elongation. The present application can be used to remove ballast from the tie ends and is not intended to enter an substantial distance between the ties or beneath the track rails.
In the transportation of the device along the rails, it will be understood that the boom structure C, D may be elevated about its axis X and that the subframe B may be centered on the main frame A. When the device is to be used, the boom may be lowered toward and eventually into the position which is shown in Figure 1, the subframe B being first positioned in relation to the frame A, so that when the chain E initially engages the surface of the ballast, it is at a proper 7 distance from the tie ends.
-As the boom is lowered to the fully lowered position of Figure 1, the chain E removes the ballast and drops it outwardly away from the tie ends. After the boom has reached the position of Figure 1, the subframe B may then be traversed somewhat to the right, referring to the position of the parts in Figure 1, until the end portion D of the boom approaches the rail. It will be understood that, since the subframe B is movable relative to the main frame A, it is possible to move the digging end D toward and away from the tie ends. It is also advantageous, however, to set the subframe in any desired relationship and then merely move the base frame slowly along the rails.
My structure may be employed to carry out a number of different methods. As above pointed out, it may be used to clean the cribs or intertie spaces beneath the rails, leaving the interrail space for other treatment.
However, I consider more important its use in a method for removing ballast from along the tie ends. The unit is moved, preferably continuously, along the rails, with the parts in the position in which they are shown in Figure 1. The excavating chain is maintained in digging movement and the result of the movement of the chain along the track is the cutting or excavating of a trench located adjacent but beyond the tie ends. The material excavated from the trench is thrown outwardly by the excavating chain E and may be disposed of as desired.
Under some circumstances it is advantageous to use the present structure in connection with the cribbing machine of the co-pending application Serial No. 697,307, now Patent No. 2,552,649. For example, the present structure may be used to out an initial trench, thus reducing the initial excavation of the cribbing machine of the earlier application.
Another useful application of the present struc ture is to eiravate at the tie ends for the insertion of tie jacks beneath the ties. Such jacks are used, for example, when tamping equipment is used in the inter-tie space.
I claim:
A method of removing ballast and forming a longitudinal trench adjacent but beyond the tie ends of a railway track or the like with an excavator element movable in a plurality of directions which includes the following steps: moving the excavator element along an excavation path which extends initially downwardly, then inwardly a distance less than the desired width of the trench, then downwardly a distance equaling approximately the desired depth of the trench, then outwardly a distance equaling approximately the desired width of the trench, and then upwardly; slowly lowering the excavator element until the inward portion of the path is approximately coincident with the surface of the ballast with the downward digging portion of the path beyond the tie ends while at the same time continuously moving the excavator element through the path longitudinally along the track to thereby excavate a trench of the desired depth adjacent but beyond the tie ends.
HENRY H. TALBOYS.
References Cited in the file of this patent UNITED STATES PATENTS Number Name Date 1,460,762 Miller July 3, 1923 1,557,908 Ursinc Oct. 20, 1925 2,552,649 Protzeller May 15, 1951
US103676A 1949-07-08 1949-07-08 Method of removing ballast with a vertical boom cribbing machine Expired - Lifetime US2664652A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US103676A US2664652A (en) 1949-07-08 1949-07-08 Method of removing ballast with a vertical boom cribbing machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US103676A US2664652A (en) 1949-07-08 1949-07-08 Method of removing ballast with a vertical boom cribbing machine

Publications (1)

Publication Number Publication Date
US2664652A true US2664652A (en) 1954-01-05

Family

ID=22296456

Family Applications (1)

Application Number Title Priority Date Filing Date
US103676A Expired - Lifetime US2664652A (en) 1949-07-08 1949-07-08 Method of removing ballast with a vertical boom cribbing machine

Country Status (1)

Country Link
US (1) US2664652A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3144833A (en) * 1961-02-23 1964-08-18 Mannix Co Ltd Railroad track working equipment
US3436848A (en) * 1966-05-09 1969-04-08 Mannix Intern Inc Apparatus for removing ballast from beneath a railroad track
US4106225A (en) * 1977-03-07 1978-08-15 Schnabel Foundation Company Method and apparatus for excavating underpinning holes
US4967847A (en) * 1990-01-25 1990-11-06 Kershaw Manufacturing Company, Inc. Method and apparatus for cleaning ballast
US20130125775A1 (en) * 2011-11-18 2013-05-23 Racine Railroad Products, Inc. Anchor cribber

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1460762A (en) * 1922-11-21 1923-07-03 Jerome J Miller Railroad ditcher
US1557908A (en) * 1925-03-02 1925-10-20 Ursino Pasquale Railway-track-reballasting apparatus
US2552649A (en) * 1946-09-16 1951-05-15 Nordberg Manufacturing Co Railway ballast cribber

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1460762A (en) * 1922-11-21 1923-07-03 Jerome J Miller Railroad ditcher
US1557908A (en) * 1925-03-02 1925-10-20 Ursino Pasquale Railway-track-reballasting apparatus
US2552649A (en) * 1946-09-16 1951-05-15 Nordberg Manufacturing Co Railway ballast cribber

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3144833A (en) * 1961-02-23 1964-08-18 Mannix Co Ltd Railroad track working equipment
US3436848A (en) * 1966-05-09 1969-04-08 Mannix Intern Inc Apparatus for removing ballast from beneath a railroad track
US4106225A (en) * 1977-03-07 1978-08-15 Schnabel Foundation Company Method and apparatus for excavating underpinning holes
US4967847A (en) * 1990-01-25 1990-11-06 Kershaw Manufacturing Company, Inc. Method and apparatus for cleaning ballast
WO1991011557A1 (en) * 1990-01-25 1991-08-08 Kershaw Manufacturing Company Method and apparatus for cleaning ballast
US20130125775A1 (en) * 2011-11-18 2013-05-23 Racine Railroad Products, Inc. Anchor cribber
US8844445B2 (en) * 2011-11-18 2014-09-30 Racine Railroad Products, Inc. Anchor cribber

Similar Documents

Publication Publication Date Title
EP2554745B1 (en) Machine for reconditioning railway roadbeds
CN112065424A (en) Rear-mounted digging, anchoring and protecting all-in-one machine of anchoring and protecting mechanism
US2886904A (en) Apparatus for removing ballast from beneath railroad tracks
RU2124087C1 (en) Track laying ballast extruding machine
US2664652A (en) Method of removing ballast with a vertical boom cribbing machine
US2552649A (en) Railway ballast cribber
US1732568A (en) Tie removing and replacing machine
RU2119001C1 (en) Track-laying machine for removing ballast material
US1595420A (en) Railroad tamping
CN1100922C (en) Machine for dismantling old track and laying new track
CN110004953B (en) Slope or retaining wall construction trolley
JP2019035300A (en) Roadbed excavator
CN108221513B (en) A kind of railroad turnout steel rail construction Transport Machinery
US4400897A (en) Method and railway train for draining a railway track
CN109837861A (en) Bucket wheeled rail removes sand vehicle
CN204000496U (en) A kind of excavating gear that adapts to the narrow scope of operation operation of railway tunnel
US3054459A (en) Apparatus for cleaning the ballast of a railway track
US2697887A (en) Auger type ballast excavator
KR100581615B1 (en) Railroad working car having changeable wheels
US2855706A (en) Machine for shaping tie beds
EP1348057A1 (en) Ballast removal method and apparatus
CN204000500U (en) The excavating gear that adapts to the flexible bottom girder of band of the narrow scope of operation of railway tunnel
WO2014019021A1 (en) Ballast undercutter
CN212404661U (en) Railway ballast excavator
CN211922108U (en) Switch digs tiny fragments of stone, coal, etc. unit