US2610217A - Electric enamel furnace - Google Patents

Electric enamel furnace Download PDF

Info

Publication number
US2610217A
US2610217A US183802A US18380250A US2610217A US 2610217 A US2610217 A US 2610217A US 183802 A US183802 A US 183802A US 18380250 A US18380250 A US 18380250A US 2610217 A US2610217 A US 2610217A
Authority
US
United States
Prior art keywords
electrodes
vault
smelter
pair
adjacent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US183802A
Inventor
Robert E Skinner
Glenn H Mcintyre
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Vibrantz Corp
Original Assignee
Ferro Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US91394A external-priority patent/US2559683A/en
Priority claimed from GB3057049A external-priority patent/GB683701A/en
Application filed by Ferro Corp filed Critical Ferro Corp
Priority to US183802A priority Critical patent/US2610217A/en
Application granted granted Critical
Publication of US2610217A publication Critical patent/US2610217A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C03GLASS; MINERAL OR SLAG WOOL
    • C03BMANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
    • C03B5/00Melting in furnaces; Furnaces so far as specially adapted for glass manufacture
    • C03B5/16Special features of the melting process; Auxiliary means specially adapted for glass-melting furnaces
    • C03B5/26Outlets, e.g. drains, siphons; Overflows, e.g. for supplying the float tank, tweels
    • C03B5/265Overflows; Lips; Tweels
    • CCHEMISTRY; METALLURGY
    • C03GLASS; MINERAL OR SLAG WOOL
    • C03BMANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
    • C03B5/00Melting in furnaces; Furnaces so far as specially adapted for glass manufacture
    • C03B5/02Melting in furnaces; Furnaces so far as specially adapted for glass manufacture in electric furnaces, e.g. by dielectric heating
    • C03B5/027Melting in furnaces; Furnaces so far as specially adapted for glass manufacture in electric furnaces, e.g. by dielectric heating by passing an electric current between electrodes immersed in the glass bath, i.e. by direct resistance heating
    • CCHEMISTRY; METALLURGY
    • C03GLASS; MINERAL OR SLAG WOOL
    • C03BMANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
    • C03B5/00Melting in furnaces; Furnaces so far as specially adapted for glass manufacture
    • C03B5/02Melting in furnaces; Furnaces so far as specially adapted for glass manufacture in electric furnaces, e.g. by dielectric heating
    • C03B5/027Melting in furnaces; Furnaces so far as specially adapted for glass manufacture in electric furnaces, e.g. by dielectric heating by passing an electric current between electrodes immersed in the glass bath, i.e. by direct resistance heating
    • C03B5/03Tank furnaces
    • CCHEMISTRY; METALLURGY
    • C03GLASS; MINERAL OR SLAG WOOL
    • C03BMANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
    • C03B5/00Melting in furnaces; Furnaces so far as specially adapted for glass manufacture
    • C03B5/04Melting in furnaces; Furnaces so far as specially adapted for glass manufacture in tank furnaces

Definitions

  • This invention relates as indicated to smelters for'porcelain enamel frit characterized particularly in that the raw batch components from which the frit is eventually produced are melted by passing electric current through the mass so that the batchis heated as a result of its own internal electrical resistance.
  • Porcelain enamel is, however, a very complex mixture of various metallic oxides and the like so that frequently the silica content of the batch is only a minor proportion of the total. It has been the general practice in most electrically heated glass tanks to deposit the raw material centrally of I the tank with electrodes spaced rather uniformly about the space occupied by the batch and to then provide a submerged outlet leading to a fining chamber from which the glass is ultimately discharged. I have found that none of those glass tanks are suitable for the smelting of porcelain enamel frit in the most efiicient manner.
  • Figure 1 is a top plane view of a smelter constructed in accordance with the principles of my invention, but in which the roof structures are shown removed for more clear illustration of the internal structure of the smelter.
  • Figure 2 is a longitudinal vertical section view of the smelter illustrated in Figure 1 taken on the plane substantially indicated by the line 2-2.
  • Figure 3 is a transverse vertical section view of the smelter illustrated in the previous figures taken on the plane substantially indicated by the line 33 inx Figure 2.
  • Figure 4 is a transverse vertical section view of the smelter illustrated in previous figures taken on the plane substantially indicated by the line 4-4 of Figure 2
  • Figure 5 is an enlarged sectional view of a portion of. the smelter as previously more clearly illustrated in Figure 3, but showing the details of construction of one of the electrodes and the adjacent smelter structure.
  • the smelter herein illustrated comprising a substantially rectangular refractory lined vault generally indicated at l which is formed of two vertical side walls 2 and 3 and first and second end walls 4 and 5. These walls extend upwardly from a hearth generally indicated at 6 which is stepped down as at l, 8, 9, and I0 to a low point adjacent the mid-portion of the end wall 5 through which extends a discharge passage generally indicated at H.
  • the discharge passage H is substantially rectangular in form, the lower elevation of which is on the line with the bottom of the step Ill, and the upper edge of which is slightly below elevation of the step 8.
  • the wall 5 in the area just above the passage II is provided with a recess which contains a hollow metal insert l2 through which a cooling medium such as water may be circulated by means of the pipe [3.
  • each of the side walls of the vault are likewise provided with inserts I2A, IZB, and I20 constructed similarly to insert 12 and through which cooling water is adapted to be circulated by means of the pipes shown. Cooling of the side walls in the manner indicated is essential in order to reduce the corrosion and particularly erosion effect of the melted ingredients on the refractory material with which the vault is lined.
  • a roof, generally indicated at 23 completes the enclosure of the fining chamber.
  • Walls are similar to the walls of the smelting vault provided with metallic inserts such as 24A,”24B, and 24C through which water may be circulated for the purpose of cooling such walls.
  • the floor of the fining chamber is arranged at.
  • a passage 21 on the longitudinal axis of the smelter In the Wall 22 of the. fining chamber there .is provided a passage 21 on the longitudinal axis of the smelter, the lower edge of the opening 21 comprising wier 28 over WhlCh'th finished material 'is discharged over .a trough-like extension 29 in which'there is provided a vertically directed passage 30 which permits the fined material to drop vertically. either into a water bath or into the space between'paralle1 quenching rolls.
  • the entire body of the smelter is preferably formed of refractory material usually used'in the construction of equipment of this kind. It is wellknown, of course, that in such construction the body of the structure ismade of appropriate refractory blocks and the surfaces such 'as the tack" from the material produced by the smelter.
  • the line 22 on Figure 1 represents the longitudinal axis of the smelter and also indicates the lin of flow of the'material previously admixed and blended to a substantial homogeneous mass is introduced through the opening [8, and after being thoroughly smelted and fined it is distributed at the opposite end of the wier 28.
  • the raw material is reduced to finished form by being heated electrically by its own internal resistance.
  • This is accomplished by the arrangement in the smelter of a plurality of pairs of electrodes which are arranged in successive downstream relation with reference to the axial floor line 22 of Figure 1.
  • the first pair of such electrodes comprises those indicated at A and A which are substantially rectangular plates supported on either side of the smelting 'vault by being secured to the inner ends of rods 3
  • the latter rods projecting outward- 1y through openings provided therefore in the walls of the vault
  • the openings through which the supporting rods thuspass are Well above the bath line in the smelter as determined bythe elevation of the wier 28 so that it is not necessary to provide a seal through which the electrodes supporting rods pass.
  • the electrodes themselves are substantially rectangular plates which are pref erably supported by brackets such as 33, most clearly illustrated in Figure 5 and arranged at a slight angle to the vertical with the upper edges of such plates closer together than their bottom edges' This arrangement of the electrodes has been found to give best results since the resistance per unit of lineal distance between the upper edges of the bath between the electrodes is generally somewhat less than the electrical resistance of a corresponding unit of the lineal distance between-the lower edges of the electrode.
  • first pair of electrodes are just down-stream from the first step in the hearth of the vault.
  • the second pair of electrodes generally indicat ed at B and B is arranged downstream from the first pair of electrodes and preferably just downstream of the third step 9 in the hearth bottom.
  • this pair of electrodes are preferably spaced apart by distances slightly greater than the correspondingspace' between the first pair of electrodes AA'.
  • the arrangement of the electrodes has been found to be important in order to insure proper current disposition in the bath as the the material flows from the feed end to the discharge end in the smelter.
  • the third set of electrodes generally indicated at C and C' is located downstream just below the passage H through which the preliminarily smelted material is fed to the fining'chamber. It will be noted that these electrodes are very closely adjacent to the passage II in order to maintain the bath at this point in a highly fluid state and also to insure that the preliminarily smelted material in passing from the smelting vault to the fining chamber must necessarily fiow directly through the space lying between the opposed faces of electrodes C and C. This will insure that any material which may not have been fully smelted be physically carried along by the stream of the material which has been dimensions of the throat H through which the partially smelted material must pass is such that 5 the condition just described is insured. In this connection the relative proportions of the parts as'shown in Figure 2 has been carefully drawn to scale in order to illustrate the'preferred relationship in size between these critical portions of the structure. 1
  • the fourth pair of electrodes generally indicated at D and D arearranged just upstream of'the wier 28 over which the fully smelted and fined material is discharged. This location. of the last pair of electrodes is important likewise, not only from the standpoint of'insuring that the materials to be discharged are of the proper fluidity but also to prevent the occurrence of a dead area in the fining bath just upstream of the wier faces.
  • the disturbance created in the bath by the passage therethrough of the electrodes B and B maintains the bath in this area in a highly mobile condition soas to prevent the occurrence of the dead areas just referred to.
  • Each of the electrodes B-B, (3-0, and D-D' are supported on rods passing through the side walls of the smelter. It will be noted that the electrodes C'C', and DD are carried by rods which pass directly through the sides of the smelter below the batch level. This is practical since'it has been found that these electrodes will require very little of any adjustment during the normal operation of the smelter whereas it may be desirable to occasionally adjust the lateral spacing between the first two pairs of electrodes which are positioned in the smelting vault.
  • each of the electrodes AA' and Bl3' is preferably supported by mechanism like that illustrated in this figure in which the rod such as 3! by which the electrode A is ultimately supported is carriedfby angularly related brackets 34 and 35 which are secured together as by welding as at 3B and pivotally connected by means of a pin such as 31 to a bracket 38.
  • the permanent side wall of the smelter vault is provided with an opening which is normally closed by a door 39 and the lower edge of the door opening as most clearly illustrated in Figure 2, each of such door openingshas a recess generally indicated at Ml.
  • the ready adjustability of the electrodes is of the utmost importance in the electric smelting of porcelain enamels.
  • porcelain enamels each containing ,a different amount of volatile components. It is the volatile components of the porcelain enamel formulae which determines the amount of boiling action in the smelting vault of the smelter, and the amount of boiling in turn determines the amount of formation of a crust on the top of the melting raw batch.
  • the crust is formed by the escaping volatiles. Since the raw batch is heated from the bottom up and there is a minimum of heat at the extreme top of the raw batch, the escaping volatiles tend to solidify at the top forming a crust. The crust formed at the top prevents incoming raw materials from reaching the lower hot zone of the smelting chamber.
  • a further and important feature of our con-- struction is the arrangement of the flue or stack passages.
  • the main stack outlet is centrally in the roof of the smelting vault. It is preferable tov provide a stack height as compared with the other critical factors so that the stack just above the roof of the smelter has at least a slight negative pressure. Since the smelting operation is performed bythe passage of current through the mass, there is very little loss of raw material as by decomposition, which must be carried away by the stack.
  • a smelter for porcelain enamel frit comprising a substantially rectangular refractory-lined? tion is had with said vault, said weir being at an elevation substantially above the floor of said vault, the vertical wall of said vault adjacent said low point provided with a discharge opening arranged on the longitudinal axial line of the smelter which passesv through the port of com-' munication between said vault and fining chamber and said weir, said axial line extending along the line of fiow of the material through the: smelter, said vault provided with a material charging opening'arranged on said axialline, a
  • first and second pairs of electrodes each having vertically inclined current receiving and discharging faces intersected by a horizontal plane which includes the lower edge of the opening of said weir, and the active faces of said third and fourth pairs of electrodes lying substantially below said plane.
  • a smelter for porcelain enamel frit comprising a substantially rectangular refractory-lined vault, the bottom of which is stepped down longitudinally from one end wall to a low point adjacent the opposite end wall of said vault, a, fining chamber adjacent to and down-stream from said vault and being in communication with the interior thereof at said low point and in a separate area above said low point, a discharge weir in the wall of said fining chamber which is opposite to the wall thereof through which communication is had with said vault, said weir being at an elevation substantially above the floor of said vault, the vertical wall of said vault, adjacent said low point provided with a discharge opening arranged on the longitudinal axial line of the smelter which passes through the port of communication between said vault and fining chamber and said weir, said axial line extending along the line of flow of the material through the smelter, said vault provided with a material charging opening arranged on said axial line, a plurality of pairs of electrodes respectively arranged on opposite sides of said axial line and arranged in successive down-stream
  • a smelter for porcelain enamel frit comprising a substantially rectangular refractorylined vault, the bottom of which is stepped down longitudinally from one end wall to a low point adjacent the opposite end wall of said vault, a fining chamber adjacent to and down-stream from said vault and being in communication with the interior thereof at said low point and in a separate area above said low point, a discharge weir in the wall of said fining chamber which is opposite to the wall thereof through which communication is had with said vault, said weir being at an elevation substantially above the fioor of said vault, the vertical wall of said vault adjacent said low point provided with a discharging opening arranged on the longitudinal axial line of the smelter which passes through the port of communication between said vault and fining chamber and said weir, said axial line extending along the line of flow of the material through the smelter, said vault provided with a material charging opening arranged on said axial line, a plurality of pairs of electrodes respectively arranged on opposite sides of said axial line and arranged in successive down-

Description

R E SKINNER ETAL 2,610,217
ELECTRIC ENAMEL FURNACE 4 Sheet s-Sheet l INVENTORD Teaser 5. Shaw/51 2+ y GLENA/ H. UNA/TYRE & Q 2 0K ATTOre/WEXs.
sept. 9, 1952 F i le d Sept. 8, 195d Sept. 9, 1952 R. E. SKINNER ETAL 2,610,217
ELECTRIC ENAMEL FURNACE Filed Sept. 8, 1950 4 Sheets-Sheet 2 INVENTORS m JWAQZ ATTORNEYS p 1952 R. E. SKINNER ET AL 2,610,217
ELECTRIC ENAMEL FURNACE Filed Sept. 8. 1950 4 Sheets-Sheet 3 INVENTORS 720 13512 T E. S/(M/MEEI' BY cLE/v/v b. HUNT/kt.
GMQWM ATTORNEY Sept. 9, 1952 R. E. SKINNER ETAL 2,610,217
ELECTRIC ENAMEL FURNACE Filed Sept. 8, 1950 4 Sheets-Sheet 4 I N VEN TOR5 2055/27 15. SK/NA/Lf'fl By Cum/v H m/rye:
mam
A TTO/ZA/E XS Patented Sept. 9, 1952 ELECTRIC ENAMEL FURNACE Robert E. Skinner, Fairvi McIntyre, Cleveland to Ferro Corporation,
evv Park, and Glenn H.
Heights, Ohio, assignors corporation of Ohio Application September 8, 1950, Serial No. 183,802
5 Claims. 1
This invention relates as indicated to smelters for'porcelain enamel frit characterized particularly in that the raw batch components from which the frit is eventually produced are melted by passing electric current through the mass so that the batchis heated as a result of its own internal electrical resistance.
The use of electric smelters for the purpose of reducing various types of raw materials to a molten state is quite old, and to a minor degree that type of heating has been employed for the production of conventional glass.
Porcelain enamel is, however, a very complex mixture of various metallic oxides and the like so that frequently the silica content of the batch is only a minor proportion of the total. It has been the general practice in most electrically heated glass tanks to deposit the raw material centrally of I the tank with electrodes spaced rather uniformly about the space occupied by the batch and to then provide a submerged outlet leading to a fining chamber from which the glass is ultimately discharged. I have found that none of those glass tanks are suitable for the smelting of porcelain enamel frit in the most efiicient manner. Whereas these previously used glass tanks have been patterned largely afterthe general principle of construction of electric furnaces employed, for example, in the smelting of metals, it has been necessary to deviate sharply from that general type of construction in providing a smelter which could be used successfully for the production of porcelain enamel.
It is a principal object of our invention to provide a smelter of the character described which not only produces a porcelain enamel frit of the desired degree of homogeneity but which is also economical. not only from the standpoint of its cost of operation, but also from the standpoint of loss of raw material. I
Other objects of the invention will appear as the description proceeds.
'Io-the accomplishment of the foregoing and related ends, said invention then comprises the features hereinafter fully described and particularly pointed out in the claims, the following description and the annexed drawings setting forth indetail certain illustrative embodiments of the invention, these being indicative, however, of but a few of the various ways in which the principle of the invention may be employed.
In said annexed drawings:
Figure 1 is a top plane view of a smelter constructed in accordance with the principles of my invention, but in which the roof structures are shown removed for more clear illustration of the internal structure of the smelter. Figure 2 is a longitudinal vertical section view of the smelter illustrated in Figure 1 taken on the plane substantially indicated by the line 2-2. Figure 3 is a transverse vertical section view of the smelter illustrated in the previous figures taken on the plane substantially indicated by the line 33 inxFigure 2. Figure 4 is a transverse vertical section view of the smelter illustrated in previous figures taken on the plane substantially indicated by the line 4-4 of Figure 2, and Figure 5 is an enlarged sectional view of a portion of. the smelter as previously more clearly illustrated in Figure 3, but showing the details of construction of one of the electrodes and the adjacent smelter structure.
Referring more specifically to the drawings and more especially to Figure 1, the smelter herein illustrated comprising a substantially rectangular refractory lined vault generally indicated at l which is formed of two vertical side walls 2 and 3 and first and second end walls 4 and 5. These walls extend upwardly from a hearth generally indicated at 6 which is stepped down as at l, 8, 9, and I0 to a low point adjacent the mid-portion of the end wall 5 through which extends a discharge passage generally indicated at H. The discharge passage H is substantially rectangular in form, the lower elevation of which is on the line with the bottom of the step Ill, and the upper edge of which is slightly below elevation of the step 8. The wall 5 in the area just above the passage II is provided with a recess which contains a hollow metal insert l2 through which a cooling medium such as water may be circulated by means of the pipe [3.
As most clearly illustrated in Figure 1, each of the side walls of the vault are likewise provided with inserts I2A, IZB, and I20 constructed similarly to insert 12 and through which cooling water is adapted to be circulated by means of the pipes shown. Cooling of the side walls in the manner indicated is essential in order to reduce the corrosion and particularly erosion effect of the melted ingredients on the refractory material with which the vault is lined.
Extending laterally through the wall 2 as most clearly illustrated in Figure l is a passage l4 leading to a discharge spout I 5 and through which the contents of the smelter may be drawn oil in preparation for a shutdown of the smelter.
Supported on the side walls 25 inclusive is an arched roof It provided with a stack opening I! centrally thereof.
A roof, generally indicated at 23 completes the enclosure of the fining chamber. Walls are similar to the walls of the smelting vault provided with metallic inserts such as 24A,"24B, and 24C through which water may be circulated for the purpose of cooling such walls.
The floor of the fining chamber is arranged at.
an elevation indicated at 25 which is higher than the elevation of any portion of the bottom of the smelting vault. The edge of the fioor of the fining chamber adjacent the discharge opening H throughwhich the preliminarily smelted material is received by the'fining chamber from the smelting vault is relieved as at 26 in order to reduce floor resistance. 1
In the Wall 22 of the. fining chamber there .is provided a passage 21 on the longitudinal axis of the smelter, the lower edge of the opening 21 comprising wier 28 over WhlCh'th finished material 'is discharged over .a trough-like extension 29 in which'there is provided a vertically directed passage 30 which permits the fined material to drop vertically. either into a water bath or into the space between'paralle1 quenching rolls. The entire body of the smelter is preferably formed of refractory material usually used'in the construction of equipment of this kind. It is wellknown, of course, that in such construction the body of the structure ismade of appropriate refractory blocks and the surfaces such 'as the tack" from the material produced by the smelter.
The details of such construction which is indicated as conventional inthe art has not been shown.
From the foregoing description of the entire smelter which includes the smelting vault and fining chamber, it will be noted that the line 22 on Figure 1 represents the longitudinal axis of the smelter and also indicates the lin of flow of the'material previously admixed and blended to a substantial homogeneous mass is introduced through the opening [8, and after being thoroughly smelted and fined it is distributed at the opposite end of the wier 28.
The raw material is reduced to finished form by being heated electrically by its own internal resistance. This is accomplished by the arrangement in the smelter of a plurality of pairs of electrodes which are arranged in successive downstream relation with reference to the axial floor line 22 of Figure 1. The first pair of such electrodes comprises those indicated at A and A which are substantially rectangular plates supported on either side of the smelting 'vault by being secured to the inner ends of rods 3| and 32 respectively. The latter rods projecting outward- 1y through openings provided therefore in the walls of the vault The openings through which the supporting rods thuspass are Well above the bath line in the smelter as determined bythe elevation of the wier 28 so that it is not necessary to provide a seal through which the electrodes supporting rods pass. The electrodes themselves are substantially rectangular plates which are pref erably supported by brackets such as 33, most clearly illustrated in Figure 5 and arranged at a slight angle to the vertical with the upper edges of such plates closer together than their bottom edges' This arrangement of the electrodes has been found to give best results since the resistance per unit of lineal distance between the upper edges of the bath between the electrodes is generally somewhat less than the electrical resistance of a corresponding unit of the lineal distance between-the lower edges of the electrode.
The furtherspacing of the lower edges as compared with the upper edges also tends to produce a current disposition through the bath which has been found to have a desirable effect. It is i .1- portant to note that in my smelter as illustrated in the drawings, the first pair of electrodes between which flows the first current to which the bath is subjected are placed dcwn-stream fro'm the point of entry of the raw material. More over, in the preferred embodiment of my invention asillustrated most clearly in Figure 2, the
first pair of electrodes are just down-stream from the first step in the hearth of the vault. This mechanical turbulence imparted to the material' passing downwardly over the hearth in addition to the turbulence which naturally results from:
the passage of the current through the bath.
The second pair of electrodes generally indicat ed at B and B is arranged downstream from the first pair of electrodes and preferably just downstream of the third step 9 in the hearth bottom. In addition to this relationship of this pair of,
electrodes to the hearth bottom and the stream of material flowing through the smelter, it is important to note that in the preferred embodiment of my invention this pair of electrodes are preferably spaced apart by distances slightly greater than the correspondingspace' between the first pair of electrodes AA'. Here again the arrangement of the electrodes has been found to be important in order to insure proper current disposition in the bath as the the material flows from the feed end to the discharge end in the smelter. i
The third set of electrodes generally indicated at C and C' is located downstream just below the passage H through which the preliminarily smelted material is fed to the fining'chamber. It will be noted that these electrodes are very closely adjacent to the passage II in order to maintain the bath at this point in a highly fluid state and also to insure that the preliminarily smelted material in passing from the smelting vault to the fining chamber must necessarily fiow directly through the space lying between the opposed faces of electrodes C and C. This will insure that any material which may not have been fully smelted be physically carried along by the stream of the material which has been dimensions of the throat H through which the partially smelted material must pass is such that 5 the condition just described is insured. In this connection the relative proportions of the parts as'shown in Figure 2 has been carefully drawn to scale in order to illustrate the'preferred relationship in size between these critical portions of the structure. 1
The fourth pair of electrodes generally indicated at D and D arearranged just upstream of'the wier 28 over which the fully smelted and fined material is discharged. This location. of the last pair of electrodes is important likewise, not only from the standpoint of'insuring that the materials to be discharged are of the proper fluidity but also to prevent the occurrence of a dead area in the fining bath just upstream of the wier faces. The disturbance created in the bath by the passage therethrough of the electrodes B and B maintains the bath in this area in a highly mobile condition soas to prevent the occurrence of the dead areas just referred to.
Each of the electrodes B-B, (3-0, and D-D' are supported on rods passing through the side walls of the smelter. It will be noted that the electrodes C'C', and DD are carried by rods which pass directly through the sides of the smelter below the batch level. This is practical since'it has been found that these electrodes will require very little of any adjustment during the normal operation of the smelter whereas it may be desirable to occasionally adjust the lateral spacing between the first two pairs of electrodes which are positioned in the smelting vault. This need for adjustment may be occasioned by changes in composition of the raw material being smelted, and this adjustability of the space between the electrodes of each pair is an important feature of my construction which makes possible the adaptation of the smelter for the most efficient operation on individual raw base compositions. By having specific reference to Figure 5, it will be noted that each of the electrodes AA' and Bl3' is preferably supported by mechanism like that illustrated in this figure in which the rod such as 3! by which the electrode A is ultimately supported is carriedfby angularly related brackets 34 and 35 which are secured together as by welding as at 3B and pivotally connected by means of a pin such as 31 to a bracket 38. The permanent side wall of the smelter vault is provided with an opening which is normally closed by a door 39 and the lower edge of the door opening as most clearly illustrated in Figure 2, each of such door openingshas a recess generally indicated at Ml.
4| out of the slot 40 and then rotate the elec-' trode holder clockwise as shown in'Figure 5 until the electrode A has passed out through the opening normally closed by the door '39.
This construction just described makes possible also ready vertical adjustment of the electrode iii) within the smelting vault. It has been found.
in Figure 5 of the electrode holder not only raises and lowers the electrode in the bath. but slightly changes the angular relation of the electrode face with respect to the verticaluln general, best results will be secured by having the electrode face at an angle of about 10 in respect to the vertical and with the upper edge of the electrode face in the horizontal plane which includes the upper edge of the discharge wier 28.
The ready adjustability of the electrodes is of the utmost importance in the electric smelting of porcelain enamels. There are many different kinds of porcelain enamels each containing ,a different amount of volatile components. It is the volatile components of the porcelain enamel formulae which determines the amount of boiling action in the smelting vault of the smelter, and the amount of boiling in turn determines the amount of formation of a crust on the top of the melting raw batch. The crust is formed by the escaping volatiles. Since the raw batch is heated from the bottom up and there is a minimum of heat at the extreme top of the raw batch, the escaping volatiles tend to solidify at the top forming a crust. The crust formed at the top prevents incoming raw materials from reaching the lower hot zone of the smelting chamber. However, with an arrangement of electrodes as previously described it is now possible to bring the electrodes closer to the top, or to lower the electrodes as needed thus controlling the undesirable crust formation. From the foregoing. it can now be seen that the adjustment of electrodes is vital, since every different porcelain enamel needs a readjustment of the electrodes.
A further and important feature of our con-- struction is the arrangement of the flue or stack passages. In this connection it will be observed that the main stack outlet is centrally in the roof of the smelting vault. It is preferable tov provide a stack height as compared with the other critical factors so that the stack just above the roof of the smelter has at least a slight negative pressure. Since the smelting operation is performed bythe passage of current through the mass, there is very little loss of raw material as by decomposition, which must be carried away by the stack. In this connection it is a notable feature of my invention that by heating the raw material by the passage of current therethrough there is very considerably less loss of raw materials due to decomposition than in the other types of conventional smelting wherein the mass is heated smelted by means of a flame. It has been shown b actual analysis that only about /3 as much fluorine is lost when operating my electric smelter as occurs when smelting the same raw batch mix ture by means of a flame.
The principal gases the smelter through its openings and which become heated and then rise upwardly throughthe stack. In this connection it should be noted that care should be exercised to prevent air in-, gress through the materal feed opening l8 so that the ingress of air to the smelter is through the discharge opening at the end of the fining chamber. The air thus entering the fining chamber passes through the opening 42 which is.
formed on the axial line of the smelter directly which pass upwardly through the stack are the air streams which enter above the passage l I through which the partially smelted material flows from the smelter vault to the fining chamber. It will thus be observed that the flow of gases or' rath'er-he'ated air is substantially counter-current to the fiow of'the solid material. This is an important feature since this sweep of 'air precludes anyunsmelted finely divided material finding its way into the fining chamber. I
In the selection of the material from which the electrodes are to be made care should'be exercised in order to prevent their reduction by the material being smelted. It has been found that the material from which are made those portions of the electrodes which are actually in contact with the material being smelted should be lower in the electromotive series than the materials which are present in the raw batch in the form of oxides. Thus, for example, when smelting a frit batch containing substantial amounts of zirconium, it is desirable to use an electrode made of molybdenum. While graphite electrodes can be used, especially when smelting certain types of porcelain enamel such as ground coat enamels containing substantial amounts of cobalt and nickel oxides, best results will be secured by the use of metallic electrodes selected in the manner described. v I
Other modes of applying the principle of the invention maybe employed, change being made as regards the details described, provided the features stated in any of the following claims or the equivalent of such be employed.
This application is related to copending applications Serial No. 198,790, filed December 2, 1950, Serial No; 81,478, filed March 15, 1949, and Serial No. 91,394, filed May 4 1949 now Patent 2,559,683, all having the same assignee as the present application.
We therefore particularly point out and dis' tinctly claim as our invention:
1. A smelter for porcelain enamel frit comfining. chamber adjacent to and down-stream from said vault and being in communication withthe interior thereof at said low point and in a separate area above said low point, a discharge weir in the wall of said fining chamber which is opposite to-the wall thereof through which communication is had with said vault, said weir-being at an elevation substantially abovethe fioor of said vault, the vertical wall of said vault adjacent said low point provided with a discharge opening arranged on the longitudinal' axial line of the smelter which passes through the'part of communication between said vault and said fining chamber and said weir, said axial-line extending along the line of flow of-the material through the smelter, said vault provided with a material charging opening arranged on said axial line, a plurality of pairs of electrodes respectively arranged on opposite sides of said'axial line and arranged in successive down-stream arrangement, the first pair of such electrodes being in said vault adjacent and downstream from said charging opening, the second pair of such electrodes in said vault and downstream from, said first pair, a third pair of electrodes arranged down-stream from said second pair and adjacent the port of communication between saidvault and fining chamber, and a fourth pair of electrodes arranged down-stream from said third pair and adjacent said wen. u; 2. A smelter for porcelain enamel frit compris= ing a' substantially rectangular 'refractoryelined vault, the bottom of which is stepped down' longitudinally from one end wall to .a low point ad.- jacent the opposite end wall of said vault, a fining chamber adjacent to and down stream from said vault and being in communication with :the interior'thereof at saidlow point and in a separate area above said low point, a discharge'weir in the wall of said fining chamber which is opposite to the wall thereof through which communication is had with said vault, said .weir'being at an elevation substantially above the fioor of said vault, the vertical wall of said vault adjacent said low point provided with a discharge opening arranged on the longitudinal axial line of the smelter which passes through the port of communication between said vault and fining chamber and said Weir, said axial line extending along the line of fiow of the material through the smelter, said vault provided. with a material charging opening arranged on said axial line, a plurality of pairs of electrodes respectively arranged on opposite'sides of said axial line and arranged insuccessive down-stream arrangement, the first pair of such electrodes being in said vault adjacent and downstream from said charging opening, the second pair of such electrodes insaid vault and'down-stream from said charging opening, the second pair oi' such electrodes in said vault and down-stream from'said first pair, a third pair of electrodes arranged down-stream from said second pair and-adjacent the port of communication between said-vault and fining chamber, and a fourthgpair of'electrodes arranged down-stream from said thirdpair and adjacent said weir, said first and second pairs of electrodes each having vertically inclined current receiving anddischarging faces intersected by a'horizontal plane which includes the lower edge of the opening of said weir."
3. A smelter for porcelain enamel frit comprising a substantially rectangular refractory-lined? tion is had with said vault, said weir being at an elevation substantially above the floor of said vault, the vertical wall of said vault adjacent said low point provided with a discharge opening arranged on the longitudinal axial line of the smelter which passesv through the port of com-' munication between said vault and fining chamber and said weir, said axial line extending along the line of fiow of the material through the: smelter, said vault provided with a material charging opening'arranged on said axialline, a
plurality of pairs of electrodes respectively 'arranged on opposite sides of said axial line and arrangedin successive down-stream arrangement, the first pair of such electrodes being in said vault adjacent and down-stream from said charging opening, the second pair of such electrodes arranged downstream from said first pair, a third pair of electrodes arranged down-stream from said second pair and adjacent the port of communication between said vault and fining chamber, and a fourth pair of electrodes arranged downstream from said third pair and adjacent said weir, said first and second pairs of electrodes each having vertically inclined current receiving and discharging faces intersected by a horizontal plane which includes the lower edge of the opening of said weir, and the active faces of said third and fourth pairs of electrodes lying substantially below said plane.
4. A smelter for porcelain enamel frit comprising a substantially rectangular refractory-lined vault, the bottom of which is stepped down longitudinally from one end wall to a low point adjacent the opposite end wall of said vault, a, fining chamber adjacent to and down-stream from said vault and being in communication with the interior thereof at said low point and in a separate area above said low point, a discharge weir in the wall of said fining chamber which is opposite to the wall thereof through which communication is had with said vault, said weir being at an elevation substantially above the floor of said vault, the vertical wall of said vault, adjacent said low point provided with a discharge opening arranged on the longitudinal axial line of the smelter which passes through the port of communication between said vault and fining chamber and said weir, said axial line extending along the line of flow of the material through the smelter, said vault provided with a material charging opening arranged on said axial line, a plurality of pairs of electrodes respectively arranged on opposite sides of said axial line and arranged in successive down-stream arrangement, the first pair of such electrodes being in said vault adjacent and down stream from said charging opening, the second pair of such electrodes arranged down-stream from said first pair and having a materially greater distance therebetween than said first pair, a third pair of electrodes arranged downstream from said second pair and adjacent the port of communication between said vault and said vault and fining chamber, and a fourth pair of electrodes arranged down-stream from said third pair and adjacent said weir, said first and second pairs of eletctrodes each having vertically inclined current receiving and discharging faces intersected by a horizontal plane which includes the lower edge of the opening of said weir, and active faces of said third and fourth pairs of electrodes lying substantially below said plane.
5. A smelter for porcelain enamel frit comprising a substantially rectangular refractorylined vault, the bottom of which is stepped down longitudinally from one end wall to a low point adjacent the opposite end wall of said vault, a fining chamber adjacent to and down-stream from said vault and being in communication with the interior thereof at said low point and in a separate area above said low point, a discharge weir in the wall of said fining chamber which is opposite to the wall thereof through which communication is had with said vault, said weir being at an elevation substantially above the fioor of said vault, the vertical wall of said vault adjacent said low point provided with a discharging opening arranged on the longitudinal axial line of the smelter which passes through the port of communication between said vault and fining chamber and said weir, said axial line extending along the line of flow of the material through the smelter, said vault provided with a material charging opening arranged on said axial line, a plurality of pairs of electrodes respectively arranged on opposite sides of said axial line and arranged in successive down-stream arrangement, the first pair of such electrodes being in said vault adjacent and down-stream from said charging opening, the second pair of such electrodes arranged down-stream from said first pair and having a materially greater distance therebetween than said first pair, a third pair of electrodes arranged down-stream from said second pair and adjacent the port of communication between said vault and fining chamber, the distance between said third pair being substantially less than the distance between said second pair, and a fourth pair of electrodes arranged downstream frcm said third pair and adjacent said Weir, said first and second pairs of electrodes each having vertically inclined current receiving and discharging faces intersected by a horizontal plane which includes the lower edge of the opening of said weir, and the active faces of said third and fourth pair of electrodes lying substantially below said plane.
RGBERT E. SKINNER. GLENN H. McINTYRE.
REFERENCES CITED The following references are of record in the file of this patent:
UNITED STATES PATENTS Number Name Date 798,258 Benjamin Aug. 29, 1905 1,815,977 Hitner July 28, 1931 1,820,248 Raeder Aug. 25, 1931 1,944,855 Wadman Jan. 23, 1934 2,071,707 Regenstreif et a1. Feb. 23, 1937 2,512,761 Arbeit June 27, 1950
US183802A 1949-03-15 1950-09-08 Electric enamel furnace Expired - Lifetime US2610217A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US183802A US2610217A (en) 1949-03-15 1950-09-08 Electric enamel furnace

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US8147849A 1949-03-15 1949-03-15
US91394A US2559683A (en) 1949-03-15 1949-05-04 Electric enamel furnace
GB3057049A GB683701A (en) 1949-11-29 1949-11-29 An electric smelter for producing porcelain
US183802A US2610217A (en) 1949-03-15 1950-09-08 Electric enamel furnace

Publications (1)

Publication Number Publication Date
US2610217A true US2610217A (en) 1952-09-09

Family

ID=32234282

Family Applications (1)

Application Number Title Priority Date Filing Date
US183802A Expired - Lifetime US2610217A (en) 1949-03-15 1950-09-08 Electric enamel furnace

Country Status (1)

Country Link
US (1) US2610217A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2640859A (en) * 1950-12-02 1953-06-02 Ferro Corp Apparatus for producing porcelain enamel
US2680772A (en) * 1950-12-02 1954-06-08 Ferro Corp Method for producing porcelain enamel
US3420937A (en) * 1967-02-20 1969-01-07 Norman W Upton Apparatus and process for the manufacture of chemical reaction products
EP0003019A1 (en) * 1977-11-30 1979-07-25 Bayer Ag Method and apparatus for the direct electrical resistance melting of anorganic oxidic material to be used as frits for coating purposes

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US798258A (en) * 1903-04-25 1905-08-29 George Hillard Benjamin Metallurgical furnace.
US1815977A (en) * 1927-05-23 1931-07-28 Pittsburgh Plate Glass Co Apparatus for making glass
US1820248A (en) * 1928-05-19 1931-08-25 Hartford Empire Co Glass making furnace and method
US1944855A (en) * 1932-07-28 1934-01-23 Hartford Empire Co Method of and apparatus for making glass
US2071707A (en) * 1934-03-02 1937-02-23 Patent Treuhand Ges Fuer Elektrische Gluehlampen Mbh Electric furnace for melting glass
US2512761A (en) * 1946-01-16 1950-06-27 Saint Gobain Electric glass furnace

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US798258A (en) * 1903-04-25 1905-08-29 George Hillard Benjamin Metallurgical furnace.
US1815977A (en) * 1927-05-23 1931-07-28 Pittsburgh Plate Glass Co Apparatus for making glass
US1820248A (en) * 1928-05-19 1931-08-25 Hartford Empire Co Glass making furnace and method
US1944855A (en) * 1932-07-28 1934-01-23 Hartford Empire Co Method of and apparatus for making glass
US2071707A (en) * 1934-03-02 1937-02-23 Patent Treuhand Ges Fuer Elektrische Gluehlampen Mbh Electric furnace for melting glass
US2512761A (en) * 1946-01-16 1950-06-27 Saint Gobain Electric glass furnace

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2640859A (en) * 1950-12-02 1953-06-02 Ferro Corp Apparatus for producing porcelain enamel
US2680772A (en) * 1950-12-02 1954-06-08 Ferro Corp Method for producing porcelain enamel
US3420937A (en) * 1967-02-20 1969-01-07 Norman W Upton Apparatus and process for the manufacture of chemical reaction products
EP0003019A1 (en) * 1977-11-30 1979-07-25 Bayer Ag Method and apparatus for the direct electrical resistance melting of anorganic oxidic material to be used as frits for coating purposes

Similar Documents

Publication Publication Date Title
US3498779A (en) Apparatus for melting highly corrosive glass compositions
US3944713A (en) Method and apparatus for pre-heating vitrifiable batch
US2593197A (en) Inclined melter furnace and method of melting glass
US2122469A (en) Apparatus for making glass
US2159361A (en) Electric furnace
US2658094A (en) Combined electrode and skimmer for electric glass melting furnaces
CN106746497A (en) Platinum channel agitator and platinum channel stirring barrel
US2597585A (en) Glass melting method and apparatus
US3420653A (en) Glass melting furnace
DE1226751B (en) Process and furnace for melting glass or similar products
US3583861A (en) Method and apparatus for refining fusible material
US2610217A (en) Electric enamel furnace
US4294603A (en) Glass forehearth construction
US2527144A (en) Smelter and method of smelting frit
US5062118A (en) Electric melting furnace for vitrifying waste
US3463627A (en) Method for producing colored glass
US3495966A (en) Apparatus for producing molten glass with bath material cooling means
CN108911481A (en) A kind of top heating device of platinum channel stirred tank
US2564783A (en) Glass melting furnace and method
US2078795A (en) Method and apparatus for melting
US3510116A (en) Metal dispensing furnace
US2680772A (en) Method for producing porcelain enamel
US2137930A (en) Process of smelting enamel
US3359090A (en) Homogenisation of molten glass with a flow separator
US3231357A (en) Discharge apparatus for refining molten glass