US20170314232A1 - Method of controlling machines at a worksite - Google Patents
Method of controlling machines at a worksite Download PDFInfo
- Publication number
- US20170314232A1 US20170314232A1 US15/143,985 US201615143985A US2017314232A1 US 20170314232 A1 US20170314232 A1 US 20170314232A1 US 201615143985 A US201615143985 A US 201615143985A US 2017314232 A1 US2017314232 A1 US 2017314232A1
- Authority
- US
- United States
- Prior art keywords
- data
- worksite
- machines
- operations
- constraints
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/2025—Particular purposes of control systems not otherwise provided for
- E02F9/2054—Fleet management
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/26—Indicating devices
- E02F9/261—Surveying the work-site to be treated
- E02F9/262—Surveying the work-site to be treated with follow-up actions to control the work tool, e.g. controller
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B15/00—Systems controlled by a computer
- G05B15/02—Systems controlled by a computer electric
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/24—Querying
- G06F16/245—Query processing
- G06F16/2455—Query execution
-
- G06F17/30477—
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/01—Input arrangements or combined input and output arrangements for interaction between user and computer
- G06F3/048—Interaction techniques based on graphical user interfaces [GUI]
- G06F3/0484—Interaction techniques based on graphical user interfaces [GUI] for the control of specific functions or operations, e.g. selecting or manipulating an object, an image or a displayed text element, setting a parameter value or selecting a range
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Definitions
- the present disclosure relates to machines and more particularly to a method of controlling operations of the machines at a worksite.
- earthmoving work at a worksite is carried out based on a planned profile prepared prior to execution of the construction work at the worksite.
- a site profile of the construction work may be generated by monitoring the worksite using un-manned aerial systems.
- the site profile is subtracted from the planned profile to analyze the construction work at the worksite.
- the planned profile may be prepared based on the amount of material to be transferred at the worksite, routes of the machine involved in the construction works and the distance to be travelled by the machine, which may not be helpful in anticipating desired cost, productivity, and a turn-around time associated with the construction work.
- U.S. Patent Publication Number 2013/0035978 hereinafter referred to as '978 publication discloses a computer implemented route determination system.
- the computer implemented route determination system includes a route generator, a cost scenario generator, and a report generator.
- the route generator is configured to define a plurality of routes on which move a material between a construction site and a destination site of a plurality of possible destination sites.
- the cost scenario generator is configured to determine cost scenarios associated with the plurality of routes.
- the report generator is configured to generate a report which identifies the routes and the cost scenarios for the destination site.
- the '978 publication does not disclose a method of controlling construction work at the worksite.
- a method of controlling machines for performing operations at a worksite comprises receiving pre-construction terrain data, design terrain data, and resource data associated with the worksite.
- the method defines a plurality of constraints associated with the operations based on the data, simulates operations of the machines at the worksite based on the data, and estimates process variables associated with the operations. Real time data is then collected from the machines and process variables are updated. Then instructions are provided to the machines to execute the scheduled tasks.
- FIG. 1 is a diagrammatic view showing a worksite and one or more machines operating at the worksite, according to an embodiment of the present disclosure
- FIG. 2 is a schematic block diagram of a control system 16 for controlling one or more machines for performing one or more operations at the worksite of FIG. 1 ;
- FIG. 3 is a graphical representation showing scheduling of one or more tasks of the one or more machines for an exemplary earth moving operation at the worksite;
- FIG. 4 is a 3D graphical representation of a pre-construction terrain model and a design terrain model
- FIG. 5 is an exemplary table representing process variables associated with the one or more operations.
- FIG. 6 is a flow chart of a method of controlling the one or more machines for performing the one or more operations at the worksite.
- FIG. 1 is a diagrammatic view showing an exemplary worksite 10 .
- the worksite 10 may be a construction site and/or a mining site.
- the worksite 10 includes one or more machines.
- the machines 12 may include mining trucks, haul trucks, on-highway trucks, off-highway trucks, articulated trucks, and any other machines used for performing earth moving operations at the worksite 10 .
- the machines 12 may be deployed in the worksite 10 for performing one or more operations such as, transportation of material from one location to another location (i.e., hauling).
- the machines 12 also include loading machines, such as, conveyors, excavators, wheel loaders, track-type loaders, shovels, draglines, and any other machine used for performing excavation operation at the worksite 10 .
- the one or more machines also include scrapers, track-type tractors, compactors, and motor graders to perform additional work site operations including dumping, spreading, compacting, site maintenance and upkeep, grading, etc. Therefore, the machines 12 can perform operations such as loading, hauling, dumping, filling, cutting, excavating, spreading, compacting, grading etc.
- the machines 12 deployed at the worksite 10 may be communicated to each other and various systems via a communication medium 14 .
- the communication medium 14 may include, but are not limited to, a Wide Area Network (WAN), a Local Area Network (LAN), an internet, an intranet, a cellular network, a satellite network, or any other known network for transmitting and receiving data.
- the communication medium 14 may include a combination of two or more of the aforementioned networks and/or other types of networks known in the art. Further, the communication medium 14 may be implemented as a wired network, a wireless network, or a combination thereof.
- data transmission may take place over the communication medium 14 with a network protocol such that the data transmission may be in an encrypted format or any other secure format, or in any of wide varieties of known manners.
- the one or more operations of the machines 12 are monitored using an unmanned aerial system (UAS) 140 (shown in FIG. 4 ).
- the UAS 140 may be controlled by a remote control unit (not shown).
- the unmanned aerial system collects data of the machines 12 deployed at the worksite 10 .
- the machines 12 are connected to a control system 16 via the communication medium 14 and the unmanned aerial system.
- the control system 16 could be located on any of the machines 12 at the worksite 10 .
- the control system 16 is configured to perform earthmoving operations control and guidance.
- the control system 16 controls the one or more operations performed by the machines 12 at the worksite 10 .
- the machines 12 may include hardware components and/or software components that enable sending informational and operational control data between the machines 12 and the control system 16 , and between the machines 12 .
- the control system 16 is implemented in the planning phase and the execution phase.
- planning phase the one or more operations to be performed at the worksite 10 are planned by the control system 16 .
- the planning performed at the planning phase may be modified by a site supervisor or work director, and is updated by the control system 16 .
- the hardware components and/or software components on board the machine may enhance task execution with additional application specific controls to improve operation.
- Constraints 160 may be weighted based on customer preferences inputted via a user interface module 150 .
- the user interface module 150 may be a terminal, tablet, smart phone, touch display, and computer that is connected to portions of the control system 16 as is known in the art. For instance, one customer may prioritize cost while another customer may prioritize time.
- the control system 16 is explained in detail along with the planning and execution phase with reference to FIG. 2 .
- the control system 16 is communicably coupled to various databases and the user interface module 150 .
- the control system 16 receives data from the databases and the user interface module 150 .
- the data received by the control system 16 includes a pre-construction terrain data 100 .
- the control system 16 receives the pre-construction terrain data 100 at a block 18 .
- the data is related to the worksite 10 .
- the pre-construction terrain data 100 may be collected via a worksite survey.
- the pre-construction terrain data 100 may include two or three-dimensional surface and sub-surface data.
- the pre-construction terrain data 100 may be received from a database and/or the user interface module 150 connected to the control system 16 .
- the user interface module 150 may have the Graphical User Interphase (GUI) for enabling the operator interaction with the user interface module 150 .
- GUI Graphical User Interphase
- FIG. 4 is a graphical representation of three dimensional pre-construction terrain data 100 juxtaposed with three dimensional design terrain data 110 .
- the three dimensional pre-construction terrain data 100 and the three dimensional design terrain data 110 are hereinafter referred to as the pre-construction terrain data 100 and the design terrain data 110 , respectively.
- the pre-construction terrain data 100 may be collected via a worksite survey from the UAS 140 , satellite, or other aircraft.
- the difference between the pre-construction terrain data 100 and the design terrain data 110 defines a volume of material 180 to be moved at the worksite 10 .
- the pre-construction terrain data 100 also includes material information.
- the material information include, but is not limited to, information related to soil at the worksite 10 , type of materials involved in the one or more operation, and a cost of materials involved in the one or more operation.
- the information related to the soil may include a proprietary soil data, a test methodology used to test soil, compaction of the soil, swell/shrink factors of the soil, and data from a public soil database.
- the pre-construction terrain data 100 may also include a location of the worksite 10 , off-site locations for source and waste material, and predicted or historical weather data of the worksite 10 .
- the pre-construction terrain data 100 can also include information regarding underground utilities, overhead utilities, structures, easements, and bodies of water.
- the control system 16 receives the design terrain data 110 .
- the design terrain data 110 includes a three dimensional or two dimensional model of a design profile to be formed at the worksite 10 , list of one or more operations to be performed at the worksite 10 to accomplish the design profile, impacts of the one or more operations to be performed at the worksite 10 , schedule data (restrictions on hours of operation, and schedule deadlines and late completions cost penalties).
- the design terrain data 110 could include a final road surface, a superstructure, footings, or any other build infrastructure to be included at the worksite 10 .
- the control system 16 receives resource data 120 .
- the resource data 120 may include information associated with the machines 12 .
- the resources data 120 could include the machines 12 or skilled labor 130 , the UAS 140 , or other robots.
- the resource data 120 may also include data regarding the cost of the skilled labor 130 and their associated skill level.
- the skilled labor 130 could include machine operators, laborers, inspectors, or surveyors.
- the resource data 120 may also include external materials that are added to the worksite 10 such as fill material, stabilizers, aggregate, etc.
- the information associated with the machines 12 may include information of a fleet of the machines 12 available at the worksite 10 for performing the one or more operations.
- the information of the fleet of the machines 12 includes the number of machines 12 available at the worksite 10 and the type of the machines 12 available at the worksite 10 .
- the information associated with the fleet may be received from the user interface module 150 in communication with the control system 16 .
- the information associated with the fleet may be received from the database connected to the control system 16 .
- the resource data 120 further includes resource performance data.
- the resource performance data may include productivity and efficiency data associated with each of the machines 12 available in the fleet.
- the resource performance data may be collected from a manufacturer performance handbook or a database.
- the resource performance data may be collected from multiple productivity field tests conducted for each of the machines 12 or from historical operational data taken from previous work sites. Examples of information included in the resource data 120 are fuel consumption, payload, productivity, travel speed, cycle time, pass matching (how many times it takes a load operation to fill a hauling machine), dig depth, machine geometry, machine transport costs, generated noise, etc.
- the control system 16 is implemented in the planning phase of one or more operations.
- the control system 16 simulates the one or more operations to be performed at the worksite 10 at a block 22 .
- the control system 16 defines the constraints 160 associated with the worksite 10 .
- the constraints 160 are defined based on the pre-construction terrain data 100 , the design terrain data 110 , and the resource data 120 .
- the constraints 160 may include project budget, project schedule, and available resources (such as available machines 12 or skilled labor 130 ).
- control system 16 simulates the one or more operations performed by the machines 12 at the worksite 10 .
- a simulation is performed based on the pre-construction terrain data 100 , the design terrain data 110 , and the resource data 120 .
- the simulation may consider information such as machine specific data, accurate terrain information of the worksite 10 , and an order of the one or more operations of the machines 12 to be performed at the worksite 10 .
- the simulation may be performed regarding the operations of the machines 12 required to move the volume of material 180 .
- the order of the one or more operations may be defined using an earthwork planner as is known in the art, without limiting the scope of present disclosure.
- the control system 16 estimates process variables 170 associated with the one or more operations.
- the process variables 170 are estimated based on the simulation of the one or more operations and the plurality of constraints 160 .
- the control system 16 implements methods known in the art, such as linear and mixed integer linear programming, discrete event simulation, agent-based modeling, along with proprietary simulation techniques, for estimating the process variables 170 based on the constraints 160 .
- the process variables 170 include tasks to be performed by the machines 12 , the order in which they are to be performed, (i.e. task schedule), and the types and number of resources required to perform the tasks.
- the control system 16 schedules one or more tasks to be performed by the machines 12 at the worksite 10 .
- the one or more tasks are scheduled based on the simulation of the one or more operations.
- information such as, but is not limited to, the task to be implemented at the worksite 10 , and a set of subsequent tasks to be performed.
- the simulation of the one or more operations generates a set of instructions for controlling the machines 12 deployed at the worksite 10 .
- additional tasks are received from the user interface module 150 .
- Tasks may be at an operational level (move to a location, perform a cut, dump at a location, establish a certain grade, etc.) or may be more detailed instructions for the machine 12 to execute (engine fueling to 40%, lift implement to a certain height, shift to a specific gear, follow a specific path, etc.).
- the task schedule is a list or collection of tasks that is sorted in the order in which they are to be performed.
- the task schedule may include types of resources (such as machines) and a scheduled time for the task to be performed.
- the process variables 170 may also include the types of machines needed to perform the simulated operations at the worksite 10 .
- an output of the simulation may indicate that three excavators, eight hauling units, two track-type tractors, two wheel-tractor scrapers, two motor graders, and forty units of skilled labor will be required to perform the required operations at the worksite 10 .
- the types of resource may also be broken down to specific types of model (i.e. eight 320 excavators, one each of D5k and D6N track-type tractors, etc.).
- the one or more operations may include cutting operation and filling operation.
- the control system 16 may simulate the cutting operation and the filling operation based on the pre-construction terrain data 100 and the resource data 120 .
- the control system 16 may receive the pre- construction terrain data 100 and the resource data 120 corresponding to the cutting operation and the filling operations from the databases and the user interface module 150 .
- the control system 16 estimates the process variables 170 and the schedule of one or more tasks. Further, the simulation also generates information required to coordinate the machines 12 such as the excavators, wheel loaders, the track-type loaders, and the shovels with the mining trucks, the haul trucks, the on-highway trucks for performing the cutting operation, and the filling operation.
- the machines 12 deployed in the worksite 10 are enabled to determine the location of each other for completing the one or more operations.
- the machines 12 may be equipped with a location tracking device such as a GPS or GNSS device.
- An operator of the machine 12 may control the movement of the machine based on the determined locations. For instance, for completing the cutting operation and the filling operation, the truck communicates with digging machines to identify the GPS co-ordinates of the digging machines to determine the location of the digging machines. Further, the truck receives a new load and travels to a dump location via a hauling route.
- the machines 12 may include hardware components and/or software components that determine and use locations of each other to coordinate operations and to control machine tasks.
- the machine 12 may configured to be operated from a remote location by the operator. Control commands may be issued over communication medium 14 or any other suitable communication network as is known in the art. Further, the machine 12 may be configured to operate autonomously according to a set of instructions. The set of instructions may be located on a controller onboard the machine 12 , a neighboring machine 12 , or may be issued by the control system 16 over the communication medium 14 .
- the control system 16 is also implemented at the execution phase of the one or more operations at the worksite 10 . During the execution phase, the control system 16 monitors a progress of the one or more operations at the worksite 10 . At a block 26 , the control system 16 collects real time data from the worksite 10 during the execution phase.
- the real time data collected from the worksite 10 may include, but is not limited to, an amount of material transferred at the worksite 10 , performance details of each of the machines 12 deployed at the worksite 10 , operator inputs, information on productivity of the skilled labor 130 , and data obtained from a worksite survey.
- the control system 16 may collect the real time data via the communication medium 14 .
- the real time data may be used to define a current terrain model 124 .
- control system 16 may collect data directly from the machines 12 deployed at the worksite 10 via the communication medium 14 .
- the machines 12 deployed at the worksite 10 may be communicated to multiple source systems (not shown) such as terrain management system and fleet management system.
- the source systems may collect the data of the machines 12 and store in a data warehouse (not shown).
- the data warehouse is in communication with the source systems.
- the control system 16 may collect the real time data of the machines 12 from the data warehouse.
- the control system 16 collects operator inputs via the user interface module 150 connected to the control system 16 .
- An operator of the machines 12 may be enabled to provide the real time data of the worksite 10 to the control system 16 using the GUI of the user interface module 150 .
- Data preparation could include, but is not limited to; data cleansing to improve data accuracy and correct data discrepancies, data conversion to transform the real time data to be compatible in form and content with the original worksite and the resource data 120 and to provide improved site-specific data for the simulation in the execution phase.
- Data analytics and pre-simulation models may be used to cleanse and convert the real time data in the data warehouse.
- the one or more operations at the worksite 10 are simulated by the control system 16 upon receiving the real time data, at the block 22 .
- the simulation of the one or more operations during the execution phase is performed based on the real time data received at the block 26 , the pre-construction terrain data 100 received at the block 18 , the design terrain data 110 received at the block 19 , and the resource data 120 received at the block 20 .
- the control system 16 updates the process variables 170 associated with the one or more operations estimated during the planning phase based on the real time data.
- the control system 16 updates the process variables 170 based on the simulation of the one or more operations at the execution phase.
- the updated process variables 170 may include, but is not limited to, a revised cost of the one or more operations, a revised time required for the one or more operations, and revised type and number of the machines 12 required for performing the one or more operations.
- the control system 16 also updates the identified and scheduled one or more tasks of the machines 12 based on the simulation of the one or more operations performed at the block 26 .
- the control system 16 also generates a progress report of the one or more operations performed at the worksite 10 based on the real time data and the simulation of the one or more operations.
- the control system 16 may also generate a three dimensional model of the worksite 10 based on the real time data received from the worksite 10 via the user interface module 150 .
- the three dimensional model of the worksite 10 may be a built model of a building to be constructed at the construction site.
- the task and schedule updates generated by the simulation may be reviewed and modified by a site supervisor or work director and input using the user interface module 150 . These modifications are used as new input data for the off-board system to update the simulation tasks and schedule.
- the updated process variables 170 are provided to the user interface module 150 for assessment.
- a difference between the estimated process variables 170 at the execution phase and estimated process variables 170 at the planning phase are computed.
- the computed difference is added to the estimated process variables 170 to determine the updated process variables 170 .
- the control system 16 is exemplary and should not limit the scope of the present disclosure. The functionality of the control system 16 described herein is also exemplary. The control system 16 may additionally include other components and capabilities not described herein. The worksite 10 may additionally include any number of the control system 16 . The machines 12 may include a portion the control system 16 to coordinate work tasks for their portion of the site operations. Further, architecture and capabilities of the control system 16 may vary without any limitation.
- FIG. 3 is a graphical representation 30 showing scheduling of the one or more tasks of the machines 12 for an exemplary earth moving operation at the worksite 10 .
- the earth moving operation shown in the graphical representation 30 includes the cutting operation and the filling operation.
- a length of the worksite 10 in meters (m) and a volume of material 180 to be cut and filled at the worksite 10 in m 3 are plotted along an X-axis and a Y-axis, respectively.
- the worksite 10 includes multiple cut locations and multiple fill locations.
- a required level of the worksite 10 may be indicated at “0” in the Y axis. Material from a cut location ‘C 1 ’ may be removed and filled at a fill location ‘F 1 ’.
- Material from a cut location ‘C 2 ’ is removed and filled at fill locations ‘F 1 ’ and ‘F 2 ’.
- material from a cut location ‘C 3 ’ is removed and filled at fill locations ‘F 2 ’ and ‘F 3 ’.
- Material from a cut location ‘C 4 ’ is removed and filled at the fill location ‘F 3 ’.
- the control system 16 selects an optimum operating path for multiple trucks employed at the worksite 10 for performing the cut operation and the fill operation as indicated in the graphical representation 30 .
- FIG. 5 is an exemplary table 32 representing process variables 170 associated with the one or one or more operations.
- the process variables 170 are estimated and tabulated for an exemplary cut and fill operation by the control system 16 .
- the process variables 170 may include, but is not limited to, the operation path of the machines 12 at the worksite 10 named as route name, a source station, a destination station, multiple machine specifications, a hauling distance, volume of material 180 , a unit cost associated with the operating path between the source station and the destination station, a hourly productivity, total working hours, and fuel usage.
- the source station may be a station number 27 and the destination station may be a station number 22 .
- the hauling distance corresponding to the operating path 27 - 22 may be 100 meters.
- the volume of material 180 transferred at the operating path 27 - 22 may be 1330 cubic meters.
- the hourly productivity of the operating path 27 - 22 may be 336.61.
- the fuel usage of the machines 12 for the operating path 27 - 22 may be 69.65 Gallons.
- the machines 12 deployed on the worksites 10 may also include autonomous machines (not shown) and/or semi-autonomous machines (not shown).
- the control system 16 may be implemented in the planning phase and the execution phase of the one or more operations to be performed at the worksite 10 as explained earlier.
- the autonomous machines may be in communication with the control system 16 .
- the autonomous machines may include hardware components and/or software components that enable sending of data between the autonomous machines and the control system 16 .
- the autonomous machines receive instructions from the control system 16 . These instructions may include specific machine command and control software applications to be downloaded to the machine prior to or during the execution phase.
- the movement and/or operation of the autonomous machines may also be regulated based on instructions from the control system 16 during the execution phase.
- the control system 16 described in the present disclosure may be implemented in the planning phase and the execution phase of the one or more operations such as, but is not limited to, cutting operation, filling operation, construction works, quarrying, and mining operations performed at the worksite 10 .
- the control system 16 identifies and schedules the one or more task to be performed by the machines 12 .
- the scheduling of the one or more task of the machines 12 enables efficient implementation of the one or more operations at the worksite 10 .
- the control system 16 is in real time communication with the machines 12 deployed at the worksite 10 . This enables the control system 16 to retrieve real time data from the machines 12 .
- the real time data allows monitoring of a progress of the one or more operations at the worksite 10 efficiently.
- the real time data is used for updating the process variables 170 and scheduling the one or more tasks of the machines 12 .
- the turn around time of the one or more operations is reduced when the process variables 170 and the one or more tasks are updated in real time.
- FIG. 6 is a flow chart of a method 34 of controlling the machines 12 for performing the one or more operations at the worksite 10 .
- the control system 16 receives the data associated with the worksite 10 .
- the control system 16 receives the resource data 120 associated with the machines 12 .
- the control system 16 defines the plurality of constraints 160 associated with the one or more operations based on the data and the resource data 120 .
- the control system 16 simulates the one or more operations of the machines 12 at the worksite 10 based on the data and the resource data 120 . Based on the simulation and the plurality of constraints 160 , the control system 16 estimates the process variables 170 associated with the one or more operations at step 44 .
- the control system 16 also schedules one or more tasks to be performed by the machines 12 at the worksite 10 , based on the simulation of the one or more operations at step 46 .
- the control system 16 collects the real time data associated with the one or more operations performed at the worksite 10 using the communication medium 14 .
- the control system 16 updates the estimated process variables 170 associated with the one or more operations and the scheduled one or more tasks of the machines 12 based on the collected real time data.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- Human Computer Interaction (AREA)
- Automation & Control Theory (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Databases & Information Systems (AREA)
- Data Mining & Analysis (AREA)
- Computational Linguistics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Operation Control Of Excavators (AREA)
Abstract
Description
- The present disclosure relates to machines and more particularly to a method of controlling operations of the machines at a worksite.
- Generally, earthmoving work at a worksite is carried out based on a planned profile prepared prior to execution of the construction work at the worksite. Further, during the execution of the construction work, a site profile of the construction work may be generated by monitoring the worksite using un-manned aerial systems. In conventional method, the site profile is subtracted from the planned profile to analyze the construction work at the worksite. The planned profile may be prepared based on the amount of material to be transferred at the worksite, routes of the machine involved in the construction works and the distance to be travelled by the machine, which may not be helpful in anticipating desired cost, productivity, and a turn-around time associated with the construction work.
- U.S. Patent Publication Number 2013/0035978, hereinafter referred to as '978 publication discloses a computer implemented route determination system. The computer implemented route determination system includes a route generator, a cost scenario generator, and a report generator. The route generator is configured to define a plurality of routes on which move a material between a construction site and a destination site of a plurality of possible destination sites. The cost scenario generator is configured to determine cost scenarios associated with the plurality of routes. The report generator is configured to generate a report which identifies the routes and the cost scenarios for the destination site. However, the '978 publication does not disclose a method of controlling construction work at the worksite.
- A method of controlling machines for performing operations at a worksite is disclosed. The method comprises receiving pre-construction terrain data, design terrain data, and resource data associated with the worksite. The method defines a plurality of constraints associated with the operations based on the data, simulates operations of the machines at the worksite based on the data, and estimates process variables associated with the operations. Real time data is then collected from the machines and process variables are updated. Then instructions are provided to the machines to execute the scheduled tasks.
-
FIG. 1 is a diagrammatic view showing a worksite and one or more machines operating at the worksite, according to an embodiment of the present disclosure; -
FIG. 2 is a schematic block diagram of acontrol system 16 for controlling one or more machines for performing one or more operations at the worksite ofFIG. 1 ; -
FIG. 3 is a graphical representation showing scheduling of one or more tasks of the one or more machines for an exemplary earth moving operation at the worksite; -
FIG. 4 is a 3D graphical representation of a pre-construction terrain model and a design terrain model; -
FIG. 5 is an exemplary table representing process variables associated with the one or more operations; and -
FIG. 6 is a flow chart of a method of controlling the one or more machines for performing the one or more operations at the worksite. - Wherever possible, the same reference numbers will be used throughout the drawings to refer to the same or the like parts.
FIG. 1 is a diagrammatic view showing anexemplary worksite 10. Theworksite 10 may be a construction site and/or a mining site. Theworksite 10 includes one or more machines. Themachines 12 may include mining trucks, haul trucks, on-highway trucks, off-highway trucks, articulated trucks, and any other machines used for performing earth moving operations at theworksite 10. Themachines 12 may be deployed in theworksite 10 for performing one or more operations such as, transportation of material from one location to another location (i.e., hauling). Themachines 12 also include loading machines, such as, conveyors, excavators, wheel loaders, track-type loaders, shovels, draglines, and any other machine used for performing excavation operation at theworksite 10. The one or more machines also include scrapers, track-type tractors, compactors, and motor graders to perform additional work site operations including dumping, spreading, compacting, site maintenance and upkeep, grading, etc. Therefore, themachines 12 can perform operations such as loading, hauling, dumping, filling, cutting, excavating, spreading, compacting, grading etc. - The
machines 12 deployed at theworksite 10 may be communicated to each other and various systems via acommunication medium 14. Examples of thecommunication medium 14 may include, but are not limited to, a Wide Area Network (WAN), a Local Area Network (LAN), an internet, an intranet, a cellular network, a satellite network, or any other known network for transmitting and receiving data. In various examples, thecommunication medium 14 may include a combination of two or more of the aforementioned networks and/or other types of networks known in the art. Further, thecommunication medium 14 may be implemented as a wired network, a wireless network, or a combination thereof. Further, data transmission may take place over thecommunication medium 14 with a network protocol such that the data transmission may be in an encrypted format or any other secure format, or in any of wide varieties of known manners. In one example, the one or more operations of themachines 12 are monitored using an unmanned aerial system (UAS) 140 (shown inFIG. 4 ). The UAS 140 may be controlled by a remote control unit (not shown). The unmanned aerial system collects data of themachines 12 deployed at theworksite 10. - The
machines 12 are connected to acontrol system 16 via thecommunication medium 14 and the unmanned aerial system. Thecontrol system 16 could be located on any of themachines 12 at theworksite 10. Thecontrol system 16 is configured to perform earthmoving operations control and guidance. Thecontrol system 16 controls the one or more operations performed by themachines 12 at theworksite 10. Themachines 12 may include hardware components and/or software components that enable sending informational and operational control data between themachines 12 and thecontrol system 16, and between themachines 12. Moreover, an operator of themachine 12 controls one or more operation tasks performed by themachine 12 using the hardware components and/or software components for manned and remote control operation. Completion of one or more operations at theworksite 10 includes a planning phase and an execution phase of the one or more operations. - The
control system 16 is implemented in the planning phase and the execution phase. In planning phase, the one or more operations to be performed at theworksite 10 are planned by thecontrol system 16. In the execution phase, the planning performed at the planning phase may be modified by a site supervisor or work director, and is updated by thecontrol system 16. The hardware components and/or software components on board the machine may enhance task execution with additional application specific controls to improve operation. Constraints 160 may be weighted based on customer preferences inputted via auser interface module 150. Theuser interface module 150 may be a terminal, tablet, smart phone, touch display, and computer that is connected to portions of thecontrol system 16 as is known in the art. For instance, one customer may prioritize cost while another customer may prioritize time. Thecontrol system 16 is explained in detail along with the planning and execution phase with reference toFIG. 2 . - Referring to
FIG. 2 , a schematic block diagram of thecontrol system 16 is disclosed. Thecontrol system 16 is communicably coupled to various databases and theuser interface module 150. Thecontrol system 16 receives data from the databases and theuser interface module 150. The data received by thecontrol system 16 includes apre-construction terrain data 100. Thecontrol system 16 receives thepre-construction terrain data 100 at ablock 18. The data is related to theworksite 10. For example, thepre-construction terrain data 100 may be collected via a worksite survey. Thepre-construction terrain data 100 may include two or three-dimensional surface and sub-surface data. Thepre-construction terrain data 100 may be received from a database and/or theuser interface module 150 connected to thecontrol system 16. Theuser interface module 150 may have the Graphical User Interphase (GUI) for enabling the operator interaction with theuser interface module 150. -
FIG. 4 is a graphical representation of three dimensionalpre-construction terrain data 100 juxtaposed with three dimensionaldesign terrain data 110. The three dimensionalpre-construction terrain data 100 and the three dimensionaldesign terrain data 110 are hereinafter referred to as thepre-construction terrain data 100 and thedesign terrain data 110, respectively. Thepre-construction terrain data 100 may be collected via a worksite survey from theUAS 140, satellite, or other aircraft. The difference between thepre-construction terrain data 100 and thedesign terrain data 110 defines a volume of material 180 to be moved at theworksite 10. - The
pre-construction terrain data 100 also includes material information. The material information include, but is not limited to, information related to soil at theworksite 10, type of materials involved in the one or more operation, and a cost of materials involved in the one or more operation. In one example, the information related to the soil may include a proprietary soil data, a test methodology used to test soil, compaction of the soil, swell/shrink factors of the soil, and data from a public soil database. Thepre-construction terrain data 100 may also include a location of theworksite 10, off-site locations for source and waste material, and predicted or historical weather data of theworksite 10. Thepre-construction terrain data 100 can also include information regarding underground utilities, overhead utilities, structures, easements, and bodies of water. - At
block 19, thecontrol system 16 receives thedesign terrain data 110. Thedesign terrain data 110 includes a three dimensional or two dimensional model of a design profile to be formed at theworksite 10, list of one or more operations to be performed at theworksite 10 to accomplish the design profile, impacts of the one or more operations to be performed at theworksite 10, schedule data (restrictions on hours of operation, and schedule deadlines and late completions cost penalties). In another aspect of the current disclosure, thedesign terrain data 110 could include a final road surface, a superstructure, footings, or any other build infrastructure to be included at theworksite 10. - At a
block 20, thecontrol system 16 receives resource data 120. The resource data 120 may include information associated with themachines 12. The resources data 120 could include themachines 12 orskilled labor 130, theUAS 140, or other robots. The resource data 120 may also include data regarding the cost of theskilled labor 130 and their associated skill level. Theskilled labor 130 could include machine operators, laborers, inspectors, or surveyors. The resource data 120 may also include external materials that are added to theworksite 10 such as fill material, stabilizers, aggregate, etc. - The information associated with the
machines 12 may include information of a fleet of themachines 12 available at theworksite 10 for performing the one or more operations. In one example, the information of the fleet of themachines 12 includes the number ofmachines 12 available at theworksite 10 and the type of themachines 12 available at theworksite 10. The information associated with the fleet may be received from theuser interface module 150 in communication with thecontrol system 16. In another example, the information associated with the fleet may be received from the database connected to thecontrol system 16. - The resource data 120 further includes resource performance data. The resource performance data may include productivity and efficiency data associated with each of the
machines 12 available in the fleet. The resource performance data may be collected from a manufacturer performance handbook or a database. In another example, the resource performance data may be collected from multiple productivity field tests conducted for each of themachines 12 or from historical operational data taken from previous work sites. Examples of information included in the resource data 120 are fuel consumption, payload, productivity, travel speed, cycle time, pass matching (how many times it takes a load operation to fill a hauling machine), dig depth, machine geometry, machine transport costs, generated noise, etc. - The
control system 16 is implemented in the planning phase of one or more operations. At the planning phase, thecontrol system 16 simulates the one or more operations to be performed at theworksite 10 at ablock 22. In order to simulate the one or more operations, thecontrol system 16 defines the constraints 160 associated with theworksite 10. The constraints 160 are defined based on thepre-construction terrain data 100, thedesign terrain data 110, and the resource data 120. In one example, the constraints 160 may include project budget, project schedule, and available resources (such asavailable machines 12 or skilled labor 130). - Further, the
control system 16 simulates the one or more operations performed by themachines 12 at theworksite 10. A simulation is performed based on thepre-construction terrain data 100, thedesign terrain data 110, and the resource data 120. In one example, the simulation may consider information such as machine specific data, accurate terrain information of theworksite 10, and an order of the one or more operations of themachines 12 to be performed at theworksite 10. The simulation may be performed regarding the operations of themachines 12 required to move the volume of material 180. The order of the one or more operations may be defined using an earthwork planner as is known in the art, without limiting the scope of present disclosure. - At a
block 24, thecontrol system 16 estimates process variables 170 associated with the one or more operations. The process variables 170 are estimated based on the simulation of the one or more operations and the plurality of constraints 160. Thecontrol system 16 implements methods known in the art, such as linear and mixed integer linear programming, discrete event simulation, agent-based modeling, along with proprietary simulation techniques, for estimating the process variables 170 based on the constraints 160. The process variables 170 include tasks to be performed by themachines 12, the order in which they are to be performed, (i.e. task schedule), and the types and number of resources required to perform the tasks. - At the
block 24, thecontrol system 16 schedules one or more tasks to be performed by themachines 12 at theworksite 10. The one or more tasks are scheduled based on the simulation of the one or more operations. Moreover, information such as, but is not limited to, the task to be implemented at theworksite 10, and a set of subsequent tasks to be performed. In one example, the simulation of the one or more operations generates a set of instructions for controlling themachines 12 deployed at theworksite 10. In one example, additional tasks are received from theuser interface module 150. Tasks may be at an operational level (move to a location, perform a cut, dump at a location, establish a certain grade, etc.) or may be more detailed instructions for themachine 12 to execute (engine fueling to 40%, lift implement to a certain height, shift to a specific gear, follow a specific path, etc.). - The task schedule is a list or collection of tasks that is sorted in the order in which they are to be performed. The task schedule may include types of resources (such as machines) and a scheduled time for the task to be performed. The process variables 170 may also include the types of machines needed to perform the simulated operations at the
worksite 10. For example, an output of the simulation may indicate that three excavators, eight hauling units, two track-type tractors, two wheel-tractor scrapers, two motor graders, and forty units of skilled labor will be required to perform the required operations at theworksite 10. The types of resource may also be broken down to specific types of model (i.e. eight 320 excavators, one each of D5k and D6N track-type tractors, etc.). - In the
exemplary worksite 10, the one or more operations may include cutting operation and filling operation. Thecontrol system 16 may simulate the cutting operation and the filling operation based on thepre-construction terrain data 100 and the resource data 120. Thecontrol system 16 may receive the pre-construction terrain data 100 and the resource data 120 corresponding to the cutting operation and the filling operations from the databases and theuser interface module 150. Based on the simulation, thecontrol system 16 estimates the process variables 170 and the schedule of one or more tasks. Further, the simulation also generates information required to coordinate themachines 12 such as the excavators, wheel loaders, the track-type loaders, and the shovels with the mining trucks, the haul trucks, the on-highway trucks for performing the cutting operation, and the filling operation. - The
machines 12 deployed in theworksite 10 are enabled to determine the location of each other for completing the one or more operations. Themachines 12 may be equipped with a location tracking device such as a GPS or GNSS device. An operator of themachine 12 may control the movement of the machine based on the determined locations. For instance, for completing the cutting operation and the filling operation, the truck communicates with digging machines to identify the GPS co-ordinates of the digging machines to determine the location of the digging machines. Further, the truck receives a new load and travels to a dump location via a hauling route. - The
machines 12 may include hardware components and/or software components that determine and use locations of each other to coordinate operations and to control machine tasks. In another aspect of the current disclosure, themachine 12 may configured to be operated from a remote location by the operator. Control commands may be issued overcommunication medium 14 or any other suitable communication network as is known in the art. Further, themachine 12 may be configured to operate autonomously according to a set of instructions. The set of instructions may be located on a controller onboard themachine 12, a neighboringmachine 12, or may be issued by thecontrol system 16 over thecommunication medium 14. - The
control system 16 is also implemented at the execution phase of the one or more operations at theworksite 10. During the execution phase, thecontrol system 16 monitors a progress of the one or more operations at theworksite 10. At ablock 26, thecontrol system 16 collects real time data from theworksite 10 during the execution phase. The real time data collected from theworksite 10 may include, but is not limited to, an amount of material transferred at theworksite 10, performance details of each of themachines 12 deployed at theworksite 10, operator inputs, information on productivity of theskilled labor 130, and data obtained from a worksite survey. Thecontrol system 16 may collect the real time data via thecommunication medium 14. The real time data may be used to define a current terrain model 124. - In one example, the
control system 16 may collect data directly from themachines 12 deployed at theworksite 10 via thecommunication medium 14. In another example, themachines 12 deployed at theworksite 10 may be communicated to multiple source systems (not shown) such as terrain management system and fleet management system. The source systems may collect the data of themachines 12 and store in a data warehouse (not shown). The data warehouse is in communication with the source systems. Thecontrol system 16 may collect the real time data of themachines 12 from the data warehouse. Thecontrol system 16 collects operator inputs via theuser interface module 150 connected to thecontrol system 16. An operator of themachines 12 may be enabled to provide the real time data of theworksite 10 to thecontrol system 16 using the GUI of theuser interface module 150. - Some of the real time data collected in the data warehouse may need preparation to be utilized by the simulation in the execution phase. Data preparation could include, but is not limited to; data cleansing to improve data accuracy and correct data discrepancies, data conversion to transform the real time data to be compatible in form and content with the original worksite and the resource data 120 and to provide improved site-specific data for the simulation in the execution phase. Data analytics and pre-simulation models may be used to cleanse and convert the real time data in the data warehouse.
- In execution phase, the one or more operations at the
worksite 10 are simulated by thecontrol system 16 upon receiving the real time data, at theblock 22. The simulation of the one or more operations during the execution phase is performed based on the real time data received at theblock 26, thepre-construction terrain data 100 received at theblock 18, thedesign terrain data 110 received at theblock 19, and the resource data 120 received at theblock 20. - At a
block 28, thecontrol system 16 updates the process variables 170 associated with the one or more operations estimated during the planning phase based on the real time data. Thecontrol system 16 updates the process variables 170 based on the simulation of the one or more operations at the execution phase. The updated process variables 170 may include, but is not limited to, a revised cost of the one or more operations, a revised time required for the one or more operations, and revised type and number of themachines 12 required for performing the one or more operations. Thecontrol system 16 also updates the identified and scheduled one or more tasks of themachines 12 based on the simulation of the one or more operations performed at theblock 26. Thecontrol system 16 also generates a progress report of the one or more operations performed at theworksite 10 based on the real time data and the simulation of the one or more operations. Thecontrol system 16 may also generate a three dimensional model of theworksite 10 based on the real time data received from theworksite 10 via theuser interface module 150. For example, if themachines 12 are deployed in a construction site, then the three dimensional model of theworksite 10 may be a built model of a building to be constructed at the construction site. The task and schedule updates generated by the simulation may be reviewed and modified by a site supervisor or work director and input using theuser interface module 150. These modifications are used as new input data for the off-board system to update the simulation tasks and schedule. The updated process variables 170 are provided to theuser interface module 150 for assessment. - In one example, based on the simulation of the one or more operations during the execution phase, a difference between the estimated process variables 170 at the execution phase and estimated process variables 170 at the planning phase are computed. The computed difference is added to the estimated process variables 170 to determine the updated process variables 170.
- The
control system 16 is exemplary and should not limit the scope of the present disclosure. The functionality of thecontrol system 16 described herein is also exemplary. Thecontrol system 16 may additionally include other components and capabilities not described herein. Theworksite 10 may additionally include any number of thecontrol system 16. Themachines 12 may include a portion thecontrol system 16 to coordinate work tasks for their portion of the site operations. Further, architecture and capabilities of thecontrol system 16 may vary without any limitation. -
FIG. 3 is agraphical representation 30 showing scheduling of the one or more tasks of themachines 12 for an exemplary earth moving operation at theworksite 10. The earth moving operation shown in thegraphical representation 30 includes the cutting operation and the filling operation. A length of theworksite 10 in meters (m) and a volume of material 180 to be cut and filled at theworksite 10 in m3 are plotted along an X-axis and a Y-axis, respectively. As illustrated in theFIG. 3 , theworksite 10 includes multiple cut locations and multiple fill locations. A required level of theworksite 10 may be indicated at “0” in the Y axis. Material from a cut location ‘C1’ may be removed and filled at a fill location ‘F1’. Material from a cut location ‘C2’ is removed and filled at fill locations ‘F1’ and ‘F2’. Similarly, material from a cut location ‘C3’ is removed and filled at fill locations ‘F2’ and ‘F3’. Material from a cut location ‘C4’ is removed and filled at the fill location ‘F3’. Thecontrol system 16 selects an optimum operating path for multiple trucks employed at theworksite 10 for performing the cut operation and the fill operation as indicated in thegraphical representation 30. -
FIG. 5 is an exemplary table 32 representing process variables 170 associated with the one or one or more operations. The process variables 170 are estimated and tabulated for an exemplary cut and fill operation by thecontrol system 16. The process variables 170 may include, but is not limited to, the operation path of themachines 12 at theworksite 10 named as route name, a source station, a destination station, multiple machine specifications, a hauling distance, volume of material 180, a unit cost associated with the operating path between the source station and the destination station, a hourly productivity, total working hours, and fuel usage. In one example, for a selected operating path 27-22, the source station may be astation number 27 and the destination station may be astation number 22. The hauling distance corresponding to the operating path 27-22 may be 100 meters. The volume of material 180 transferred at the operating path 27-22 may be 1330 cubic meters. The hourly productivity of the operating path 27-22 may be 336.61. The fuel usage of themachines 12 for the operating path 27-22 may be 69.65 Gallons. - In another embodiment, the
machines 12 deployed on theworksites 10 may also include autonomous machines (not shown) and/or semi-autonomous machines (not shown). In such scenarios, thecontrol system 16 may be implemented in the planning phase and the execution phase of the one or more operations to be performed at theworksite 10 as explained earlier. The autonomous machines may be in communication with thecontrol system 16. The autonomous machines may include hardware components and/or software components that enable sending of data between the autonomous machines and thecontrol system 16. The autonomous machines receive instructions from thecontrol system 16. These instructions may include specific machine command and control software applications to be downloaded to the machine prior to or during the execution phase. The movement and/or operation of the autonomous machines may also be regulated based on instructions from thecontrol system 16 during the execution phase. - The
control system 16 described in the present disclosure may be implemented in the planning phase and the execution phase of the one or more operations such as, but is not limited to, cutting operation, filling operation, construction works, quarrying, and mining operations performed at theworksite 10. Thecontrol system 16 identifies and schedules the one or more task to be performed by themachines 12. The scheduling of the one or more task of themachines 12 enables efficient implementation of the one or more operations at theworksite 10. Further, during the execution phase of the one or operations at theworksite 10, thecontrol system 16 is in real time communication with themachines 12 deployed at theworksite 10. This enables thecontrol system 16 to retrieve real time data from themachines 12. The real time data allows monitoring of a progress of the one or more operations at theworksite 10 efficiently. Further, the real time data is used for updating the process variables 170 and scheduling the one or more tasks of themachines 12. The turn around time of the one or more operations is reduced when the process variables 170 and the one or more tasks are updated in real time. -
FIG. 6 is a flow chart of amethod 34 of controlling themachines 12 for performing the one or more operations at theworksite 10. Atstep 36, thecontrol system 16 receives the data associated with theworksite 10. Atstep 38, thecontrol system 16 receives the resource data 120 associated with themachines 12. Atstep 40, thecontrol system 16 defines the plurality of constraints 160 associated with the one or more operations based on the data and the resource data 120. Atstep 42, thecontrol system 16 simulates the one or more operations of themachines 12 at theworksite 10 based on the data and the resource data 120. Based on the simulation and the plurality of constraints 160, thecontrol system 16 estimates the process variables 170 associated with the one or more operations atstep 44. Thecontrol system 16 also schedules one or more tasks to be performed by themachines 12 at theworksite 10, based on the simulation of the one or more operations atstep 46. Atstep 48, thecontrol system 16 collects the real time data associated with the one or more operations performed at theworksite 10 using thecommunication medium 14. Further, atstep 50, thecontrol system 16 updates the estimated process variables 170 associated with the one or more operations and the scheduled one or more tasks of themachines 12 based on the collected real time data.
Claims (20)
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US15/143,985 US9822509B1 (en) | 2016-05-02 | 2016-05-02 | Method of controlling machines at a worksite |
| US15/722,414 US10364548B2 (en) | 2016-05-02 | 2017-10-02 | Method of optimizing performance of machines at a worksite |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US15/143,985 US9822509B1 (en) | 2016-05-02 | 2016-05-02 | Method of controlling machines at a worksite |
Related Child Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US15/722,414 Continuation-In-Part US10364548B2 (en) | 2016-05-02 | 2017-10-02 | Method of optimizing performance of machines at a worksite |
| US15/722,414 Continuation US10364548B2 (en) | 2016-05-02 | 2017-10-02 | Method of optimizing performance of machines at a worksite |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| US20170314232A1 true US20170314232A1 (en) | 2017-11-02 |
| US9822509B1 US9822509B1 (en) | 2017-11-21 |
Family
ID=60157504
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US15/143,985 Active US9822509B1 (en) | 2016-05-02 | 2016-05-02 | Method of controlling machines at a worksite |
| US15/722,414 Active 2036-07-12 US10364548B2 (en) | 2016-05-02 | 2017-10-02 | Method of optimizing performance of machines at a worksite |
Family Applications After (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US15/722,414 Active 2036-07-12 US10364548B2 (en) | 2016-05-02 | 2017-10-02 | Method of optimizing performance of machines at a worksite |
Country Status (1)
| Country | Link |
|---|---|
| US (2) | US9822509B1 (en) |
Cited By (19)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109034551A (en) * | 2018-07-04 | 2018-12-18 | 成都希盟泰克科技发展有限公司 | Equilibrium of stock method for construction plan establishment |
| US10196791B1 (en) | 2017-11-27 | 2019-02-05 | Caterpillar Paving Products Inc. | Compacting machine and method of monitoring compacting member of compacting machine |
| US20200193342A1 (en) * | 2018-12-13 | 2020-06-18 | Caterpillar Inc. | Managing site productivity using telemetry data |
| CN111382175A (en) * | 2018-12-30 | 2020-07-07 | 贝壳技术有限公司 | House information acquisition method and device |
| US10860016B1 (en) * | 2016-09-07 | 2020-12-08 | Robo Industries, Inc. | Automated site based mission planning system |
| CN112218987A (en) * | 2018-06-05 | 2021-01-12 | 卡特彼勒公司 | Managing material handling productivity |
| WO2021081473A1 (en) * | 2019-10-25 | 2021-04-29 | Caterpillar Inc. | System and method for validating availability of machine at worksite |
| US20220170240A1 (en) * | 2020-11-27 | 2022-06-02 | Caterpillar Inc. | Systems and methods for electronically assessing operator performance when operating a machine based on machine-related data associated with the machine |
| CN114626221A (en) * | 2022-03-17 | 2022-06-14 | 北京易控智驾科技有限公司 | Mine unmanned driving full-process-oriented simulation method and distributed simulation system |
| US11499295B2 (en) * | 2019-05-30 | 2022-11-15 | Deere & Company | Mission planning system and method |
| US20220366334A1 (en) * | 2021-05-17 | 2022-11-17 | Caterpillar Inc. | Methods and systems for effective utilization of autonomous machines |
| US20230014610A1 (en) * | 2016-08-26 | 2023-01-19 | Apple Inc. | Systems With Adjustable Windows |
| US20230067916A1 (en) * | 2021-08-25 | 2023-03-02 | Zachary Liollio | Methods and systems for construction implement management |
| US20230153734A1 (en) * | 2021-11-12 | 2023-05-18 | Starbucks Corporation | System for configuring an environment based on modifications to simulated virtual environments |
| WO2023188132A1 (en) * | 2022-03-30 | 2023-10-05 | 日立建機株式会社 | Control system for work machine |
| CN118761135A (en) * | 2024-07-19 | 2024-10-11 | 中海福陆重工有限公司 | A smart construction site monitoring method and system based on TEKLA modeling of jacket |
| US20250181077A1 (en) * | 2023-11-30 | 2025-06-05 | Caterpillar Inc. | Methods and systems for jobsite creation |
| US12486647B2 (en) | 2022-11-29 | 2025-12-02 | Novatron Oy | Method for determining location specific as-built performance value in earthworks construction site |
| US12493292B2 (en) | 2022-10-28 | 2025-12-09 | Volvo Truck Corporation | Network system, a user device and methods therein for enabling management of a mass excavation project |
Families Citing this family (22)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| AU2016283735A1 (en) * | 2015-06-23 | 2017-12-21 | Komatsu Ltd. | Construction management system and construction management method |
| US9822509B1 (en) * | 2016-05-02 | 2017-11-21 | Caterpillar Inc. | Method of controlling machines at a worksite |
| US10801177B2 (en) | 2017-01-23 | 2020-10-13 | Built Robotics Inc. | Excavating earth from a dig site using an excavation vehicle |
| US10802503B2 (en) * | 2017-03-31 | 2020-10-13 | Komatsu Ltd. | Control system of transporter vehicle, transporter vehicle, and control method of transporter vehicle |
| US10761544B2 (en) * | 2017-10-13 | 2020-09-01 | Deere & Company | Unmanned aerial vehicle (UAV)-assisted worksite operations |
| US11308735B2 (en) | 2017-10-13 | 2022-04-19 | Deere & Company | Unmanned aerial vehicle (UAV)-assisted worksite data acquisition |
| EP3533934B1 (en) * | 2018-03-01 | 2020-07-15 | BAUER Spezialtiefbau GmbH | Construction method |
| US11761173B2 (en) | 2018-06-26 | 2023-09-19 | Caterpillar Inc. | Systems and methods for building a pad |
| EP3864593B1 (en) * | 2018-11-01 | 2025-10-15 | Finning International Inc. | Project management systems and methods incorporating proximity-based association |
| US11644843B2 (en) | 2018-11-12 | 2023-05-09 | Robotic Research Opco, Llc | Learning mechanism for autonomous trucks for mining and construction applications |
| US11656626B2 (en) * | 2018-11-12 | 2023-05-23 | Robotic Research Opco, Llc | Autonomous truck loading for mining and construction applications |
| US11353865B2 (en) | 2018-11-13 | 2022-06-07 | Robotic Research Opco, Llc | Coordination of mining and construction vehicles via scripting control |
| US11650595B2 (en) | 2019-07-30 | 2023-05-16 | Caterpillar Inc. | Worksite plan execution |
| US11337360B2 (en) * | 2019-10-24 | 2022-05-24 | Deere & Company | Methods and systems for reducing soil compaction using worksite treatment based on determined soil properties |
| US11236492B1 (en) * | 2020-08-25 | 2022-02-01 | Built Robotics Inc. | Graphical user interface for real-time management of an earth shaping vehicle |
| JP7693328B2 (en) * | 2021-02-24 | 2025-06-17 | 株式会社小松製作所 | Unmanned vehicle management system and unmanned vehicle management method |
| US12447631B2 (en) * | 2021-09-13 | 2025-10-21 | Osaro | Automated robotic tool selection |
| US20230267390A1 (en) * | 2022-02-23 | 2023-08-24 | The Texas A&M University System | Systems and methods for optimizing the management of worksites |
| EP4303787A1 (en) * | 2022-07-04 | 2024-01-10 | Volvo Truck Corporation | System and method for handling an objective associated with performance at a production site |
| DE102022211952A1 (en) * | 2022-11-11 | 2024-05-16 | Robert Bosch Gesellschaft mit beschränkter Haftung | Method for the coordinated movement of a fleet of mobile work machines, device and work machine |
| US12421695B2 (en) | 2023-08-23 | 2025-09-23 | Deere & Company | Scraper control method having variable operating modes corresponding to operator experience levels |
| US20250198129A1 (en) * | 2023-12-14 | 2025-06-19 | Caterpillar Inc. | Keep-Out Systems, Methods, and Controllers for a Surface-Engaging Implement of a Mobile Machine |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20070078336A1 (en) * | 2002-04-16 | 2007-04-05 | Toth Thomas L | Method and apparatus of multi-energy imaging |
| US20070179640A1 (en) * | 2006-01-31 | 2007-08-02 | Caterpillar Inc. | Environmental monitoring system for a machine environment |
| US20100110071A1 (en) * | 2008-09-28 | 2010-05-06 | Rdv Systems, Ltd. | Pseudo-realistic rendering of bim data responsive to positional indicator |
| US20100211512A1 (en) * | 2006-01-30 | 2010-08-19 | Detwiler Michael W | Computer-Implemented Land Planning System and Method |
| US20120066019A1 (en) * | 2010-07-07 | 2012-03-15 | Dunmow Systems Corporation | Construction control system |
| US8494816B2 (en) * | 2004-07-28 | 2013-07-23 | Blueridge Analytics, Inc. | Computer-implemented land planning system and method designed to generate at least one conceptual fit solution to a user-defined land development problem |
Family Cites Families (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2001290866A (en) * | 2000-04-05 | 2001-10-19 | Iida Sangyo:Kk | Management and inquiry system for construction progress state |
| US20050171790A1 (en) | 2004-01-30 | 2005-08-04 | Theodore Thomas Blackmon | Construction project management system and method |
| US8306836B2 (en) | 2008-12-01 | 2012-11-06 | Trimble Navigation Limited | Management of materials on a construction site |
| US20130035978A1 (en) | 2008-12-01 | 2013-02-07 | Trimble Navigation Limited | Management of materials on a construction site |
| US20100217640A1 (en) | 2009-02-20 | 2010-08-26 | Mark Nichols | Method and system for adaptive construction sequencing |
| JP5222328B2 (en) | 2010-08-04 | 2013-06-26 | 日立Geニュークリア・エナジー株式会社 | Work plan creation method and apparatus |
| US20150379457A1 (en) | 2014-06-27 | 2015-12-31 | Topcon Positioning Systems, Inc. | Method and Apparatus for Task Driven Operations for Construction Machines |
| JP6496182B2 (en) | 2015-04-28 | 2019-04-03 | 株式会社小松製作所 | Construction planning system |
| US9822509B1 (en) * | 2016-05-02 | 2017-11-21 | Caterpillar Inc. | Method of controlling machines at a worksite |
| US9851719B2 (en) * | 2016-05-31 | 2017-12-26 | Caterpillar Inc. | System and method for executing a project plan at worksite |
| US10119244B2 (en) * | 2017-03-10 | 2018-11-06 | Cnh Industrial America Llc | System and method for controlling a work machine |
-
2016
- 2016-05-02 US US15/143,985 patent/US9822509B1/en active Active
-
2017
- 2017-10-02 US US15/722,414 patent/US10364548B2/en active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20070078336A1 (en) * | 2002-04-16 | 2007-04-05 | Toth Thomas L | Method and apparatus of multi-energy imaging |
| US8494816B2 (en) * | 2004-07-28 | 2013-07-23 | Blueridge Analytics, Inc. | Computer-implemented land planning system and method designed to generate at least one conceptual fit solution to a user-defined land development problem |
| US20100211512A1 (en) * | 2006-01-30 | 2010-08-19 | Detwiler Michael W | Computer-Implemented Land Planning System and Method |
| US20070179640A1 (en) * | 2006-01-31 | 2007-08-02 | Caterpillar Inc. | Environmental monitoring system for a machine environment |
| US20100110071A1 (en) * | 2008-09-28 | 2010-05-06 | Rdv Systems, Ltd. | Pseudo-realistic rendering of bim data responsive to positional indicator |
| US20120066019A1 (en) * | 2010-07-07 | 2012-03-15 | Dunmow Systems Corporation | Construction control system |
Cited By (34)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20230014610A1 (en) * | 2016-08-26 | 2023-01-19 | Apple Inc. | Systems With Adjustable Windows |
| US10860016B1 (en) * | 2016-09-07 | 2020-12-08 | Robo Industries, Inc. | Automated site based mission planning system |
| US10196791B1 (en) | 2017-11-27 | 2019-02-05 | Caterpillar Paving Products Inc. | Compacting machine and method of monitoring compacting member of compacting machine |
| CN112218987A (en) * | 2018-06-05 | 2021-01-12 | 卡特彼勒公司 | Managing material handling productivity |
| CN109034551A (en) * | 2018-07-04 | 2018-12-18 | 成都希盟泰克科技发展有限公司 | Equilibrium of stock method for construction plan establishment |
| CN111324092A (en) * | 2018-12-13 | 2020-06-23 | 卡特彼勒公司 | Managing field productivity using telemetry data |
| US10872302B2 (en) * | 2018-12-13 | 2020-12-22 | Caterpillar Inc. | Automatically determining construction worksite operational zones based on received construction equipment telemetry data |
| US20200193342A1 (en) * | 2018-12-13 | 2020-06-18 | Caterpillar Inc. | Managing site productivity using telemetry data |
| CN111382175A (en) * | 2018-12-30 | 2020-07-07 | 贝壳技术有限公司 | House information acquisition method and device |
| US11674288B2 (en) | 2019-05-30 | 2023-06-13 | Deere & Company | System and method for obscurant mitigation |
| US11499295B2 (en) * | 2019-05-30 | 2022-11-15 | Deere & Company | Mission planning system and method |
| AU2020372502B2 (en) * | 2019-10-25 | 2025-10-23 | Caterpillar Inc. | System and method for validating availability of machine at worksite |
| JP2022554182A (en) * | 2019-10-25 | 2022-12-28 | キャタピラー インコーポレイテッド | System and method for verifying machine availability on the job site |
| WO2021081473A1 (en) * | 2019-10-25 | 2021-04-29 | Caterpillar Inc. | System and method for validating availability of machine at worksite |
| US11928624B2 (en) | 2019-10-25 | 2024-03-12 | Caterpillar Inc. | System and method for validating availability of machine at worksite |
| JP7581348B2 (en) | 2019-10-25 | 2024-11-12 | キャタピラー インコーポレイテッド | System and method for verifying availability of machines at a work site - Patents.com |
| CN114599840A (en) * | 2019-10-25 | 2022-06-07 | 卡特彼勒公司 | System and method for confirming availability of machines at a job site |
| US20220170240A1 (en) * | 2020-11-27 | 2022-06-02 | Caterpillar Inc. | Systems and methods for electronically assessing operator performance when operating a machine based on machine-related data associated with the machine |
| US11746498B2 (en) * | 2020-11-27 | 2023-09-05 | Caterpillar Inc. | Systems and methods for electronically assessing operator performance when operating a machine based on machine-related data associated with the machine |
| US20220366334A1 (en) * | 2021-05-17 | 2022-11-17 | Caterpillar Inc. | Methods and systems for effective utilization of autonomous machines |
| US20230067916A1 (en) * | 2021-08-25 | 2023-03-02 | Zachary Liollio | Methods and systems for construction implement management |
| US20230153734A1 (en) * | 2021-11-12 | 2023-05-18 | Starbucks Corporation | System for configuring an environment based on modifications to simulated virtual environments |
| US12468998B2 (en) * | 2021-11-12 | 2025-11-11 | Starbucks Corporation | System for configuring an environment based on modifications to simulated virtual environments |
| CN114626221A (en) * | 2022-03-17 | 2022-06-14 | 北京易控智驾科技有限公司 | Mine unmanned driving full-process-oriented simulation method and distributed simulation system |
| WO2023188132A1 (en) * | 2022-03-30 | 2023-10-05 | 日立建機株式会社 | Control system for work machine |
| CN117795167A (en) * | 2022-03-30 | 2024-03-29 | 日立建机株式会社 | Work machinery control system |
| US12497757B2 (en) | 2022-03-30 | 2025-12-16 | Hitachi Construction Machinery Co., Ltd. | Control system for work machine |
| JP7573136B2 (en) | 2022-03-30 | 2024-10-24 | 日立建機株式会社 | Control system for work machines |
| JPWO2023188132A1 (en) * | 2022-03-30 | 2023-10-05 | ||
| US12493292B2 (en) | 2022-10-28 | 2025-12-09 | Volvo Truck Corporation | Network system, a user device and methods therein for enabling management of a mass excavation project |
| US12486647B2 (en) | 2022-11-29 | 2025-12-02 | Novatron Oy | Method for determining location specific as-built performance value in earthworks construction site |
| US20250181077A1 (en) * | 2023-11-30 | 2025-06-05 | Caterpillar Inc. | Methods and systems for jobsite creation |
| US12613534B2 (en) * | 2023-11-30 | 2026-04-28 | Caterpillar Inc. | Methods and systems for jobsite creation |
| CN118761135A (en) * | 2024-07-19 | 2024-10-11 | 中海福陆重工有限公司 | A smart construction site monitoring method and system based on TEKLA modeling of jacket |
Also Published As
| Publication number | Publication date |
|---|---|
| US9822509B1 (en) | 2017-11-21 |
| US10364548B2 (en) | 2019-07-30 |
| US20180044888A1 (en) | 2018-02-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9822509B1 (en) | Method of controlling machines at a worksite | |
| AU2016201912B2 (en) | Automated material tagging system | |
| AU2022287567B2 (en) | Autonomous control of on-site movement of powered earth-moving construction or mining vehicles | |
| US11157849B2 (en) | Construction management method based on a current landform and a design landform of a construction site | |
| US20210034058A1 (en) | Worksite plan execution | |
| Kim et al. | Framework for an intelligent earthwork system: Part I. System architecture | |
| US20180218301A1 (en) | Construction management system and construction management method | |
| AU2020372502B2 (en) | System and method for validating availability of machine at worksite | |
| AU2020357828B2 (en) | Determination of a unifying production metric | |
| Shah | A new approach for automation of location-based earthwork scheduling in road construction projects | |
| CN101751615A (en) | Method and system for managing raw materials on construction site | |
| Kim et al. | Intelligent navigation strategies for an automated earthwork system | |
| CN112218987A (en) | Managing material handling productivity | |
| US20210097458A1 (en) | Determination of a lift count metric | |
| EP3754157A1 (en) | Underground worksite passage and model generation for path planning | |
| Maltese et al. | Construction sites’ sustainability enhancement through earthworks optimization using Building Information Modelling | |
| Golosinski | Advances in automation and robotization of open pit mining | |
| US20250370463A1 (en) | Perception-Based Worksite Control System | |
| Portocarrero Rodriguez et al. | A review of Obayashi’s fleet management system using a Robotics Evaluation Framework | |
| Shehata et al. | Simulation analysis for productivity and unit cost by implementing GPS machine guidance in road construction operation in Egypt | |
| Kim | Toward a framework for an intelligent earthwork system (IES) | |
| Morley | New quantitative methods for planning earthwork operations | |
| Yi | Temporary Haul Road Design and Earthmoving Operation Planning on Rough Grading Projects: Integrated Optimization Approach |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: CATERPILLAR INC., ILLINOIS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:CHI, LIQUN;TALMAKI, SANAT A.;CORCORAN, PAUL T.;AND OTHERS;SIGNING DATES FROM 20160421 TO 20160426;REEL/FRAME:038435/0766 |
|
| AS | Assignment |
Owner name: CATERPILLAR INC., ILLINOIS Free format text: CORRECTIVE ASSIGNMENT TO ADD INVENTOR'S JAMES: MARK W. WHITING AND ALLEN J. DECLERK DATA PREVIOUSLY RECORDED ON REEL 038435 FRAME 0766. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT;ASSIGNORS:CHI, LIQUN;TALMAKI, SANAT A.;CORCORAN, PAUL T.;AND OTHERS;SIGNING DATES FROM 20160421 TO 20170721;REEL/FRAME:043458/0320 |
|
| STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
| MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1551); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Year of fee payment: 4 |
|
| MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1552); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Year of fee payment: 8 |