US20160312481A1 - Work platform rail system - Google Patents
Work platform rail system Download PDFInfo
- Publication number
- US20160312481A1 US20160312481A1 US15/139,722 US201615139722A US2016312481A1 US 20160312481 A1 US20160312481 A1 US 20160312481A1 US 201615139722 A US201615139722 A US 201615139722A US 2016312481 A1 US2016312481 A1 US 2016312481A1
- Authority
- US
- United States
- Prior art keywords
- bridge deck
- decking
- segment
- rail
- trolley
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/10—Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
- E01D19/106—Movable inspection or maintenance platforms, e.g. travelling scaffolding or vehicles specially designed to provide access to the undersides of bridges
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/22—Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by roofs or ceilings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/283—Mobile scaffolds; Scaffolds with mobile platforms mobile horizontally
Definitions
- the present disclosure relates generally to a work platform system. More particularly, the present disclosure relates to a work platform and apparatus that installs and moves on a tubular steel rail system below a bridge deck.
- bridges Like any steel that is constantly exposed to the elements, the steel of bridges requires periodic maintenance.
- Some bridges have decks that rest on steel beams and struts.
- Suspension bridges are a type of bridge in which the load-bearing portion called the deck is hung below main suspension cables, which are made from steel rope.
- Maintenance workers use decking to create work platforms that allow the workers to walk freely along and under bridge structures.
- the work platforms additionally capture any debris or stray maintenance materials from falling down, keeping hazardous materials out of bodies of water, off of vehicles and people below.
- decking extends from a first end of a bridge to a second end of bridge, traversing the entire length of the bridge.
- the decking may extend just between a long segment which is supported by two piers of a very long bridge.
- the decking must be fully installed from one end to the other end of the bridge deck before it can be used, which is costly and time-consuming.
- An aspect of an example embodiment in the present disclosure is to provide a system that eliminates the need for constructing decking under the entire length of a bridge deck before beginning work. Accordingly, an aspect of an example embodiment in the present disclosure provides a decking segment that moves under the bridge deck from one end to the other as work progresses and the work area changes.
- Another aspect of an example embodiment in the present disclosure is to provide a system with a decking segment that moves under the bridge deck smoothly. Accordingly, the present disclosure provides a decking segment hanging from a plurality of trolleys that move along at least one rail beneath the bridge deck, operative for moving the decking segment from one end of the bridge deck to another as the work progresses and the work area changes.
- a further aspect of an example embodiment in the present disclosure is to provide an apparatus that smoothly moves beneath the bridge deck, supporting decking segments that partially cover an area under the bridge deck.
- the present disclosure provides a trolley having at least one main wheel that runs on a tubular steel rail connecting to a support on an “I” bean and a plurality of side wheels that maintain the trolley on the tubular rail, the trolley smoothly moving along the tubular rail with platform decking hanging from the trolley below, moving the decking forward or backward to provide protection to a new area under the bridge deck.
- the present disclosure describes a system and apparatus for constructing a work platform under a bridge deck that has a decking segment that moves under the bridge deck from one end to the other as work progresses, eliminating the need for constructing decking under the entire length of a bridge deck.
- the decking segment hangs from a plurality of trolleys that move along a tubular steel rail beneath the bridge deck, the trolleys moving the decking segment from one end of the bridge deck to another.
- the trolley has at least one main wheel that runs on the tubular rail top and a plurality of side wheels that maintain the trolley on the tubular rail, the trolley smoothly moving along the tubular rail.
- FIG. 1 is a perspective view of an example embodiment of a work platform rail system below a bridge deck.
- FIG. 2 is a side elevational view of an example embodiment of an apparatus in the work platform system.
- FIG. 3 is a perspective view of a worker installing a decking segment using the work platform rail system.
- FIG. 4 is a top plan view of the work platform rail system with the bridge deck removed from the figure for illustrative purposes.
- FIG. 5 is a front elevational view of the apparatus in the work platform rail system.
- FIG. 1 illustrates a work platform rail system 10 for providing a work platform for working under a bridge deck 100 .
- the system has an open decking segment 16 and a plurality of apparatuses.
- An apparatus comprises a tubular rail 12 , a trolley 14 and a support 18 .
- the tubular rail 12 is suspended below the bridge deck 100 from a plurality of supports 18 , allowing sufficient clearance for a trolley 14 to move freely on the tubular rail 12 under the bridge deck 100 .
- the tubular rail 12 is hollow, preferably made from steel.
- the tubular rail 12 extends from a first end of the bridge deck 100 E to a second end of the bridge deck.
- the tubular rail 12 can be a unitary piece or connected pieces.
- the supports 18 and rail 12 remain in place and the trolleys 14 mount on the tubular rail 12 and open decking segment 16 hang from the trolleys as needed.
- the decking segment 16 does not extend an entire length of the bridge deck 100 , but is a portion of the length, and is sufficiently large to accommodate a work crew, tools and equipment necessary to perform the task. Workers begin working at the first end of the bridge deck 100 E and the trolleys 14 move the decking segment 16 along the tubular steel rail 12 . As the trolley 14 moves the decking segment 16 towards the second end of the bridge deck, the decking segment 16 is not in contact with the first end of the bridge deck 100 E. By moving the decking segment 16 in conjunction with the work in progress and as a work area changes, the necessity of constructing multiple decking segments the entire length of the bridge deck 100 is eliminated.
- FIG. 2 and FIG. 5 illustrate an apparatus 20 of the system.
- the apparatus 20 comprises the trolley 14 having a group of wheels configured for moving along the tubular rail 12 .
- the apparatus 20 includes a support 18 configured for suspending the tubular rail 12 from a structural support below a bridge deck.
- the trolley 14 moves along the tubular rail 12 , moving the decking segment as a work area under the bridge deck changes.
- the trolley 14 has at least one main wheel 22 , preferably two, configured for moving along a tubular rail 12 top surface.
- the at least one main wheel 22 is a double-flanged wheel, having a flange 22 E on each edge, conforming to the tubular rail 12 top surface.
- the trolley 14 has a pair of side wheels 24 , the side wheels 24 on opposing sides of the tubular rail 12 , the wheels configured for stabilizing the trolley on the tubular rail 12 as the at least one main wheel 22 moves the trolley 14 in a horizontal direction.
- the trolley 14 is motorized, having a motor within the motor housing 26 , powering the at least one main wheel.
- the motor can be, but not limited to, electric, pneumatic, hydraulic or hybrid and the type of motor is not a limitation.
- the number of wheels is not a limitation and a trolley 14 can have a plurality of main wheels and side wheels, depending on the load.
- the trolley 14 has a chain shackle 34 configured for hanging a decking segment.
- the support 18 has flange clamp 30 configured for grasping a pair of bottom flanges 106 of the “I” beam.
- the flange clamp 30 has a pair of adjustable clamp jaws 36 configured for grasping the “I” beam.
- the adjustable clamp jaws 36 are tightened or loosed using an adjustment screw 44 .
- the support has a “Y” shaped support arm 28 extending down and outward from the “I” beam. The tubular rail 12 is supported by the support arm 28 .
- the illustration shows the support configured for grasping an “I” beam, but the support attachment means can be modified to grasp any structural support such as a beam or column used in the construction of bridges and buildings. Use of the apparatus on both vertical and horizontal means are also within the inventive concept.
- the trolley 14 has an opening 42 configured for accommodating the support arm 28 of the support 18 , such that the trolley 14 moves smoothly along the tubular rail 12 past the support 18 .
- FIG. 3 shows a further example embodiment of the system 10 .
- the supports 18 and tubular rails 12 are configured to be assembled as the deck segment 16 moves from one end of the bridge deck to another.
- the tubular rail 12 is in short segments and is hollow.
- the short segments of tubular rail 12 linearly connect by a connecting pin 32 inserted in the hollow ends of the tubular rails, uniting the two pieces of tubular rail 12 .
- the connecting pin 32 connects the tubular rail 12 of a first apparatus to the tubular rail 12 of a second apparatus, connecting the tubular rails thereby extending the work platform system in a direction so the trolleys 14 can move the decking segment in said direction.
- a method of installing the work platform rail system as illustrated in FIGS. 1-3 and 5 comprises the steps of installing the supports 18 on the “I” beam, suspending the tubular rails 12 from the supports, and connecting rails with the connecting pin 32 . Placing the at least one main wheel of a trolley 14 on the linearly connecting rails is followed by shackling the deck segment by a chain shackle 34 .
- the supports 18 and rails 12 are permanently installed.
- the supports are moved along the “I” beam 102 as needed, the supports 18 are moved from the backend 100 B and moved to the frontend 100 F as the decking segment 16 moves under the bridge deck 100 .
- the tubular rails 12 are suspended from the supports 18 , the tubular rail 12 moving from the backend 100 B to the frontend 100 F and connected by a connecting pin 32 .
- the trolleys 14 once installed, move seamlessly and smoothly along the tubular rails 12 , the decking segment 16 hanging from the trolleys 14 .
- the motors of the trolleys 14 are controlled by a master switch, such that all trolleys move at the same time in the same direction. In some example embodiments, the motors are synchronized to operate together by a wireless controller.
- the support 18 includes a flange clamp 30 that attaches the support 18 to the “I” beam bottom flange 106 .
- the support 18 is installed by opening a pair of adjustable clamp jaws 36 configured for grasping a pair of bottom flanges 106 of the “I” beam 102 , closing the clamp jaws 36 tightly using the adjustment screw 44 until the flange clamp 30 is secure.
- the “Y” shaped support arm 28 extends down and outward from flange clamp 30 , the arm configured for supporting the tubular rail 12 . The tubular rail 12 is then suspended from the arm 18 .
- the decking segment 16 is sufficiently open so that workers 104 can walk back and forth along its length, moving freely about.
- the decking segment 16 includes a perimeter safety railing 38 and a safety gate 40 .
- the number of apparatuses 20 is not a limitation and the number of apparatuses depends on the length and width of the decking segment 16 and the anticipated loading on the decking segment.
- FIG. 4 shows the work platform rail system 10 installed under the bridge deck, with the bridge deck not shown to better illustrate the system.
- a first tubular rail 12 F is suspended from a first “I” beam 102 below the bridge deck near a first side of the bridge deck and a second tubular rail 12 S is suspended from a second “I” beam 102 below the bridge deck near a second side of the bridge deck.
- the decking segment 16 hangs from the trolleys 14 .
- the support arms 28 of the supports 18 suspend the tubular rail 12 and the tubular rail 12 S.
- At least one rail 12 C is suspended from “I” beams below the bridge deck towards the bridge deck center. It is understood that a number of apparatuses may be installed on the multiple “I” beams as necessary to support the decking segment 16 , depending upon the width of the bridge deck and the load on the decking segment and the number is not a limitation of the system.
- FIG. 4 shows a plurality of trolleys 14 on each rail 12 and number of trolleys is not a limitation and the number is based on the load and size of the decking segment.
- the work platform rail system 10 for providing decking that moves under a bridge deck as a work area changes may include a group of apparatuses that include a group of rails 12 , each rail suspended from a “I” beam 102 below a bridge deck; a group of trolley 14 , each configured to move along the tubular rails; a decking segment 16 hanging from the trolley 14 , the decking segment 16 moving under the bridge deck as the trolley 14 move along the tubular rails 12 , the decking segment 16 providing a safe work platform as a work area changes.
- a pair of linearly connected tubular rails are placed in parallel and are braced together by struts.
- Other components of the apparatus are modified to accommodate this configuration.
- decking segment 16 is shown in a double “H” configuration. It is understood by those of ordinary skill in the art other decking segments configurations are possible within the inventive concept and that this illustrated configuration is not a limitation.
- any components or materials can be formed from a same, structurally continuous piece or separately fabricated and connected.
- spatially relative terms such as “beneath,” “below,” “lower,” “above,” “upper” and the like, are used herein for ease of description to describe one element or feature's relationship to another element(s) or feature(s) as illustrated in the figures. It is understood that the spatially relative terms are intended to encompass different orientations of the device in use or operation in addition to the orientation depicted in the figures. For example, if the device in the figures is turned over, elements described as “below” or “beneath” other elements or features would then be oriented “above” the other elements or features. Thus, the example term “below” can encompass both an orientation of above and below. The device can be otherwise oriented (rotated 90 degrees or at other orientations) and the spatially relative descriptors used herein interpreted accordingly.
- Example embodiments are described herein with reference to cross section illustrations that are schematic illustrations of idealized embodiments. As such, variations from the shapes of the illustrations as a result, for example, of manufacturing techniques and/or tolerances, are to be expected. Thus, example embodiments described herein should not be construed as limited to the particular shapes of regions as illustrated herein, but are to include deviations in shapes that result, for example, from manufacturing. For example, a region illustrated or described as flat may, typically, have rough and/or nonlinear features. Moreover, sharp angles that are illustrated may be rounded. Thus, the regions illustrated in the figures are schematic in nature and their shapes are not intended to illustrate the precise shape of a region and are not intended to limit the scope of the present claims.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
A system and apparatus for constructing a work platform under a bridge deck that has a decking segment that moves under the bridge deck from one end to the other as work progresses, eliminating the need for constructing decking under the entire length of the bridge deck. The decking segment hangs from a plurality of trolleys that move along a plurality of rails beneath the bridge deck, the trolleys moving the decking segment from one end of the bridge deck to another. The trolley has at least one main wheel that runs on the tubular rail top and a plurality of side wheels that maintain the trolley on the tubular rail, the trolley smoothly moving along the tubular rail.
Description
- This application is a nonprovisional utility application of the provisional patent application Ser. No. 62/153,249 filed in the United States Patent Office on Apr. 27, 2015, and claims the priority thereof and is expressly incorporated herein by reference in its entirety.
- The present disclosure relates generally to a work platform system. More particularly, the present disclosure relates to a work platform and apparatus that installs and moves on a tubular steel rail system below a bridge deck.
- Like any steel that is constantly exposed to the elements, the steel of bridges requires periodic maintenance. Some bridges have decks that rest on steel beams and struts. Suspension bridges are a type of bridge in which the load-bearing portion called the deck is hung below main suspension cables, which are made from steel rope.
- Maintenance workers use decking to create work platforms that allow the workers to walk freely along and under bridge structures. The work platforms additionally capture any debris or stray maintenance materials from falling down, keeping hazardous materials out of bodies of water, off of vehicles and people below.
- Installing the decking to create a work platform is time-consuming and must be done with great care to prevent any accidents caused by the platform collapsing. Workers rely on the work platform to be safe and secure as they perform their maintenance high up over dangerous conditions.
- Generally, decking extends from a first end of a bridge to a second end of bridge, traversing the entire length of the bridge. Depending on the length of the bridge, the decking may extend just between a long segment which is supported by two piers of a very long bridge. The decking must be fully installed from one end to the other end of the bridge deck before it can be used, which is costly and time-consuming.
- While these methods and structures may be suitable for the particular purpose employed, or for general use, they would not be as suitable for the purposes of the present disclosure as disclosed hereafter.
- In the present disclosure, where a document, act or item of knowledge is referred to or discussed, this reference or discussion is not an admission that the document, act or item of knowledge or any combination thereof was at the priority date, publicly available, known to the public, part of common general knowledge or otherwise constitutes prior art under the applicable statutory provisions; or is known to be relevant to an attempt to solve any problem with which the present disclosure is concerned.
- While certain aspects of conventional technologies have been discussed to facilitate the present disclosure, no technical aspects are disclaimed and it is contemplated that the claims may encompass one or more of the conventional technical aspects discussed herein.
- An aspect of an example embodiment in the present disclosure is to provide a system that eliminates the need for constructing decking under the entire length of a bridge deck before beginning work. Accordingly, an aspect of an example embodiment in the present disclosure provides a decking segment that moves under the bridge deck from one end to the other as work progresses and the work area changes.
- Another aspect of an example embodiment in the present disclosure is to provide a system with a decking segment that moves under the bridge deck smoothly. Accordingly, the present disclosure provides a decking segment hanging from a plurality of trolleys that move along at least one rail beneath the bridge deck, operative for moving the decking segment from one end of the bridge deck to another as the work progresses and the work area changes.
- A further aspect of an example embodiment in the present disclosure is to provide an apparatus that smoothly moves beneath the bridge deck, supporting decking segments that partially cover an area under the bridge deck. According, the present disclosure provides a trolley having at least one main wheel that runs on a tubular steel rail connecting to a support on an “I” bean and a plurality of side wheels that maintain the trolley on the tubular rail, the trolley smoothly moving along the tubular rail with platform decking hanging from the trolley below, moving the decking forward or backward to provide protection to a new area under the bridge deck.
- The present disclosure describes a system and apparatus for constructing a work platform under a bridge deck that has a decking segment that moves under the bridge deck from one end to the other as work progresses, eliminating the need for constructing decking under the entire length of a bridge deck. The decking segment hangs from a plurality of trolleys that move along a tubular steel rail beneath the bridge deck, the trolleys moving the decking segment from one end of the bridge deck to another. The trolley has at least one main wheel that runs on the tubular rail top and a plurality of side wheels that maintain the trolley on the tubular rail, the trolley smoothly moving along the tubular rail.
- The present disclosure addresses at least one of the foregoing disadvantages presented hereinabove. However, it is contemplated that the present disclosure may prove useful in addressing other problems and deficiencies in a number of technical areas. Therefore, the claims should not necessarily be construed as limited to addressing any of the particular problems or deficiencies discussed hereinabove. To the accomplishment of the above, this disclosure may be embodied in the form illustrated in the accompanying drawings. Attention is called to the fact, however, that the drawings are illustrative only. Variations are contemplated as being part of the disclosure.
- In the drawings, like elements are depicted by like reference numerals. The drawings are briefly described as follows.
-
FIG. 1 is a perspective view of an example embodiment of a work platform rail system below a bridge deck. -
FIG. 2 is a side elevational view of an example embodiment of an apparatus in the work platform system. -
FIG. 3 is a perspective view of a worker installing a decking segment using the work platform rail system. -
FIG. 4 is a top plan view of the work platform rail system with the bridge deck removed from the figure for illustrative purposes. -
FIG. 5 is a front elevational view of the apparatus in the work platform rail system. - The present disclosure now will be described more fully hereinafter with reference to the accompanying drawings, which show various example embodiments. However, the present disclosure may be embodied in many different forms and should not be construed as limited to the example embodiments set forth herein. Rather, these example embodiments are provided so that the present disclosure is thorough, complete and fully conveys the scope of the present disclosure to those skilled in the art.
-
FIG. 1 illustrates a workplatform rail system 10 for providing a work platform for working under abridge deck 100. The system has anopen decking segment 16 and a plurality of apparatuses. An apparatus comprises atubular rail 12, atrolley 14 and asupport 18. Thetubular rail 12 is suspended below thebridge deck 100 from a plurality ofsupports 18, allowing sufficient clearance for atrolley 14 to move freely on thetubular rail 12 under thebridge deck 100. In one example embodiment thetubular rail 12 is hollow, preferably made from steel. - Installing the work
platform rail system 10 with the decking segment provides great economic advantages. Work on thebridge deck 100 infrastructure can begin almost immediately without waiting for decking to be installed the length of thebridge deck 100. Fewer decking segments are used because only one segment of decking is required. - In one example embodiment, the
tubular rail 12 extends from a first end of the bridge deck 100E to a second end of the bridge deck. Thetubular rail 12 can be a unitary piece or connected pieces. The supports 18 andrail 12 remain in place and thetrolleys 14 mount on thetubular rail 12 andopen decking segment 16 hang from the trolleys as needed. - The
decking segment 16 does not extend an entire length of thebridge deck 100, but is a portion of the length, and is sufficiently large to accommodate a work crew, tools and equipment necessary to perform the task. Workers begin working at the first end of the bridge deck 100E and thetrolleys 14 move thedecking segment 16 along thetubular steel rail 12. As thetrolley 14 moves thedecking segment 16 towards the second end of the bridge deck, thedecking segment 16 is not in contact with the first end of the bridge deck 100E. By moving thedecking segment 16 in conjunction with the work in progress and as a work area changes, the necessity of constructing multiple decking segments the entire length of thebridge deck 100 is eliminated. -
FIG. 2 andFIG. 5 illustrate anapparatus 20 of the system. Theapparatus 20 comprises thetrolley 14 having a group of wheels configured for moving along thetubular rail 12. Theapparatus 20 includes asupport 18 configured for suspending thetubular rail 12 from a structural support below a bridge deck. Thetrolley 14 moves along thetubular rail 12, moving the decking segment as a work area under the bridge deck changes. - The
trolley 14 has at least onemain wheel 22, preferably two, configured for moving along atubular rail 12 top surface. In some example embodiments, the at least onemain wheel 22 is a double-flanged wheel, having aflange 22E on each edge, conforming to thetubular rail 12 top surface. - In some example embodiments, the
trolley 14 has a pair ofside wheels 24, theside wheels 24 on opposing sides of thetubular rail 12, the wheels configured for stabilizing the trolley on thetubular rail 12 as the at least onemain wheel 22 moves thetrolley 14 in a horizontal direction. Thetrolley 14 is motorized, having a motor within themotor housing 26, powering the at least one main wheel. The motor can be, but not limited to, electric, pneumatic, hydraulic or hybrid and the type of motor is not a limitation. - This is just one configuration possible of the wheels, and other configurations are possible. The number of wheels is not a limitation and a
trolley 14 can have a plurality of main wheels and side wheels, depending on the load. - In some example embodiments, the
trolley 14 has achain shackle 34 configured for hanging a decking segment. - In some example embodiments, the
support 18 hasflange clamp 30 configured for grasping a pair ofbottom flanges 106 of the “I” beam. Theflange clamp 30 has a pair ofadjustable clamp jaws 36 configured for grasping the “I” beam. Theadjustable clamp jaws 36 are tightened or loosed using anadjustment screw 44. In some example embodiments, the support has a “Y” shapedsupport arm 28 extending down and outward from the “I” beam. Thetubular rail 12 is supported by thesupport arm 28. - It is understood that the illustration shows the support configured for grasping an “I” beam, but the support attachment means can be modified to grasp any structural support such as a beam or column used in the construction of bridges and buildings. Use of the apparatus on both vertical and horizontal means are also within the inventive concept.
- In some example embodiments, the
trolley 14 has anopening 42 configured for accommodating thesupport arm 28 of thesupport 18, such that thetrolley 14 moves smoothly along thetubular rail 12 past thesupport 18. -
FIG. 3 shows a further example embodiment of thesystem 10. In this example embodiment having multiple apparatuses, thesupports 18 andtubular rails 12 are configured to be assembled as thedeck segment 16 moves from one end of the bridge deck to another. Thetubular rail 12 is in short segments and is hollow. The short segments oftubular rail 12 linearly connect by a connectingpin 32 inserted in the hollow ends of the tubular rails, uniting the two pieces oftubular rail 12. - The connecting
pin 32 connects thetubular rail 12 of a first apparatus to thetubular rail 12 of a second apparatus, connecting the tubular rails thereby extending the work platform system in a direction so thetrolleys 14 can move the decking segment in said direction. - A method of installing the work platform rail system as illustrated in
FIGS. 1-3 and 5 comprises the steps of installing thesupports 18 on the “I” beam, suspending thetubular rails 12 from the supports, and connecting rails with the connectingpin 32. Placing the at least one main wheel of atrolley 14 on the linearly connecting rails is followed by shackling the deck segment by achain shackle 34. - In one example embodiment, the
supports 18 and rails 12 are permanently installed. In another example embodiment, the supports are moved along the “I”beam 102 as needed, thesupports 18 are moved from thebackend 100B and moved to thefrontend 100F as thedecking segment 16 moves under thebridge deck 100. The tubular rails 12 are suspended from thesupports 18, thetubular rail 12 moving from the backend 100B to thefrontend 100F and connected by a connectingpin 32. Thetrolleys 14, once installed, move seamlessly and smoothly along thetubular rails 12, thedecking segment 16 hanging from thetrolleys 14. In one example embodiment, the motors of thetrolleys 14 are controlled by a master switch, such that all trolleys move at the same time in the same direction. In some example embodiments, the motors are synchronized to operate together by a wireless controller. - In one example embodiment of the method, the
support 18 includes aflange clamp 30 that attaches thesupport 18 to the “I” beambottom flange 106. Thesupport 18 is installed by opening a pair ofadjustable clamp jaws 36 configured for grasping a pair ofbottom flanges 106 of the “I”beam 102, closing theclamp jaws 36 tightly using theadjustment screw 44 until theflange clamp 30 is secure. The “Y” shapedsupport arm 28 extends down and outward fromflange clamp 30, the arm configured for supporting thetubular rail 12. Thetubular rail 12 is then suspended from thearm 18. - The
decking segment 16 is sufficiently open so thatworkers 104 can walk back and forth along its length, moving freely about. Thedecking segment 16 includes aperimeter safety railing 38 and asafety gate 40. - The number of
apparatuses 20 is not a limitation and the number of apparatuses depends on the length and width of thedecking segment 16 and the anticipated loading on the decking segment. -
FIG. 4 shows the workplatform rail system 10 installed under the bridge deck, with the bridge deck not shown to better illustrate the system. In some example embodiments as shown inFIG. 4 , a firsttubular rail 12F is suspended from a first “I”beam 102 below the bridge deck near a first side of the bridge deck and a secondtubular rail 12S is suspended from a second “I”beam 102 below the bridge deck near a second side of the bridge deck. Thedecking segment 16 hangs from thetrolleys 14. Thesupport arms 28 of thesupports 18 suspend thetubular rail 12 and thetubular rail 12S. - In some example embodiments, at least one
rail 12C is suspended from “I” beams below the bridge deck towards the bridge deck center. It is understood that a number of apparatuses may be installed on the multiple “I” beams as necessary to support thedecking segment 16, depending upon the width of the bridge deck and the load on the decking segment and the number is not a limitation of the system. -
FIG. 4 shows a plurality oftrolleys 14 on eachrail 12 and number of trolleys is not a limitation and the number is based on the load and size of the decking segment. - The work
platform rail system 10 for providing decking that moves under a bridge deck as a work area changes may include a group of apparatuses that include a group ofrails 12, each rail suspended from a “I”beam 102 below a bridge deck; a group oftrolley 14, each configured to move along the tubular rails; adecking segment 16 hanging from thetrolley 14, thedecking segment 16 moving under the bridge deck as thetrolley 14 move along thetubular rails 12, thedecking segment 16 providing a safe work platform as a work area changes. - Other configurations of the work platform rail system are possible within the inventive concept to accommodate extremely large loads. In some example embodiments, a pair of linearly connected tubular rails are placed in parallel and are braced together by struts. Other components of the apparatus are modified to accommodate this configuration.
- In the illustration, the
decking segment 16 is shown in a double “H” configuration. It is understood by those of ordinary skill in the art other decking segments configurations are possible within the inventive concept and that this illustrated configuration is not a limitation. - It is understood that when an element is referred hereinabove as being “on” another element, it can be directly on the other element or intervening elements may be present therebetween. In contrast, when an element is referred to as being “directly on” another element, there are no intervening elements present.
- Moreover, any components or materials can be formed from a same, structurally continuous piece or separately fabricated and connected.
- It is further understood that, although ordinal terms, such as, “first,” “second,” “third,” are used herein to describe various elements, components, regions, layers and/or sections, these elements, components, regions, layers and/or sections should not be limited by these terms. These terms are only used to distinguish one element, component, region, layer or section from another element, component, region, layer or section. Thus, “a first element,” “component,” “region,” “layer” or “section” discussed below could be termed a second element, component, region, layer or section without departing from the teachings herein.
- Spatially relative terms, such as “beneath,” “below,” “lower,” “above,” “upper” and the like, are used herein for ease of description to describe one element or feature's relationship to another element(s) or feature(s) as illustrated in the figures. It is understood that the spatially relative terms are intended to encompass different orientations of the device in use or operation in addition to the orientation depicted in the figures. For example, if the device in the figures is turned over, elements described as “below” or “beneath” other elements or features would then be oriented “above” the other elements or features. Thus, the example term “below” can encompass both an orientation of above and below. The device can be otherwise oriented (rotated 90 degrees or at other orientations) and the spatially relative descriptors used herein interpreted accordingly.
- Example embodiments are described herein with reference to cross section illustrations that are schematic illustrations of idealized embodiments. As such, variations from the shapes of the illustrations as a result, for example, of manufacturing techniques and/or tolerances, are to be expected. Thus, example embodiments described herein should not be construed as limited to the particular shapes of regions as illustrated herein, but are to include deviations in shapes that result, for example, from manufacturing. For example, a region illustrated or described as flat may, typically, have rough and/or nonlinear features. Moreover, sharp angles that are illustrated may be rounded. Thus, the regions illustrated in the figures are schematic in nature and their shapes are not intended to illustrate the precise shape of a region and are not intended to limit the scope of the present claims.
- In conclusion, herein is presented a work platform rail system. The disclosure is illustrated by example in the drawing figures, and throughout the written description. It should be understood that numerous variations are possible, while adhering to the inventive concept. Such variations are contemplated as being a part of the present disclosure.
Claims (20)
1. An apparatus for hanging and moving a decking segment under a bridge deck as a work area changes, comprising:
a hollow tubular rail;
a trolley having a plurality of wheels configured for moving along said hollow tubular rail; the trolley configured for hanging a decking segment; and
a support configured for suspending said tubular rail from a structural support below a bridge deck, said trolley moving along said hollow tubular rail, moving the decking segment as a work area under the bridge deck changes.
2. The apparatus as described in claim 1 , wherein the trolley has at least one main wheel configured for moving along a tubular rail top surface.
3. The apparatus as described in claim 2 , wherein the at least one main wheel is a double-flanged wheel.
4. The apparatus as described in claim 3 , wherein the trolley has a pair of side wheels, said wheels on opposing sides of said hollow tubular rail, said wheels configured for stabilizing the trolley on said hollow tubular rail.
5. The apparatus as described in claim 4 , wherein the trolley has a chain shackle for hanging a decking segment.
6. The apparatus as described in claim 1 , wherein said support has a flange clamp configured for grasping a pair of bottom flanges of the “I” beam.
7. The apparatus as described in claim 6 , wherein said flange clamp has a pair of adjustable clamp jaws configured for grasping the “I” beam.
8. The apparatus as described in claim 7 , wherein said support has a “Y” shaped arm extending down and outward from the “I” beam.
9. The apparatus as described in claim 8 , wherein the trolley has an opening configured for accommodating said arm of said support.
10. The apparatus as described in claim 1 , wherein a connecting pin connects said hollow tubular rail of a first apparatus to said hollow tubular rail of a second apparatus.
11. A work platform rail system for providing a decking segment that moves under a bridge deck as a work area changes, comprising:
a plurality of apparatuses, each apparatus comprising a plurality of linearly connecting tubular rails suspended from an “I” beam below a bridge deck, said tubular rails suspending from a plurality of supports, a plurality of trolleys, each having a plurality of wheels configured to move along said rails; and
a decking segment hanging from said apparatuses, the decking segment moving under the bridge deck as said apparatuses move along said rails, the decking segment providing a safe work platform, the decking segment moving as a work area changes.
12. The work platform rail system as described in claim 11 , wherein said apparatuses connect linearly by a plurality of connecting pins, a connecting pin connecting said tubular rail of a first apparatus to said tubular rail of a second apparatus, connecting the tubular rails thereby extending the work platform rail system in a direction so said apparatuses can move the decking segment in said direction.
13. The work platform rail system as described in claim 11 , wherein a first apparatus is suspended from a first “I” beam below a bridge deck near a first side of the bridge deck and a second apparatus is suspended from a second “I” beam below the bridge deck near a second side of the bridge deck.
14. The work platform rail system as described in claim 13 , wherein at least one apparatus is suspended from at least one “I” beams below the bridge deck towards the bridge deck center.
15. The work platform rail system as described in claim 11 , wherein said support for suspending said rail from the “I” beam comprises a flange clamp with a pair of adjustable clamp jaws configured for grasping a pair of bottom flanges of the “I” beam, the support a “Y” shaped arm extending down and outward from flange clamp, the arm configured for supporting said rail.
16. The work platform rail system as described in claim 11 , wherein the apparatus has a motorized trolley having at least one main wheel configured for moving along a tubular rail top surface, the trolley having a pair of side wheels, said wheels on opposing sides of said rail, said wheels configured for stabilizing the trolley on said tubular rail.
17. A work platform rail system for providing a decking segment that moves under a bridge deck as a work area changes, comprising:
a plurality of rails, each rail suspended from an “I” beam below a bridge deck;
a plurality of trolleys, each having a plurality of wheels configured to move along said rails; and
a decking segment hanging from said trolleys, the decking segment moving under the bridge deck as said trolleys move along said rails, the decking segment providing a safe work platform, the decking segment moving as a work area changes.
18. The work platform rail system as described in claim 17 , wherein said rails linearly connect to each other by a connecting pin, extending the work platform rail system in a direction so the trolleys can move the decking segment in said direction.
19. The work platform rail system as described in claim 18 , wherein said linearly connected rails are suspended from a first “I” beam below a bridge deck near a first side of the bridge deck and said linearly connected rails are suspended from a second “I” beam below the bridge deck near a second side of the bridge deck.
20. The work platform rail system as described in claim 19 , wherein said linearly connected rails are suspended from “I” beams below the bridge deck towards the bridge deck center.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US15/139,722 US20160312481A1 (en) | 2015-04-27 | 2016-04-27 | Work platform rail system |
US15/420,258 US10119229B1 (en) | 2015-04-27 | 2017-01-31 | Work platform rail system |
US16/163,992 US20190048539A1 (en) | 2015-04-27 | 2018-10-18 | Work platform rail system |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201562153249P | 2015-04-27 | 2015-04-27 | |
US15/139,722 US20160312481A1 (en) | 2015-04-27 | 2016-04-27 | Work platform rail system |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US15/420,258 Continuation US10119229B1 (en) | 2015-04-27 | 2017-01-31 | Work platform rail system |
Publications (1)
Publication Number | Publication Date |
---|---|
US20160312481A1 true US20160312481A1 (en) | 2016-10-27 |
Family
ID=57147458
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US15/139,722 Abandoned US20160312481A1 (en) | 2015-04-27 | 2016-04-27 | Work platform rail system |
US15/420,258 Expired - Fee Related US10119229B1 (en) | 2015-04-27 | 2017-01-31 | Work platform rail system |
US16/163,992 Abandoned US20190048539A1 (en) | 2015-04-27 | 2018-10-18 | Work platform rail system |
Family Applications After (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US15/420,258 Expired - Fee Related US10119229B1 (en) | 2015-04-27 | 2017-01-31 | Work platform rail system |
US16/163,992 Abandoned US20190048539A1 (en) | 2015-04-27 | 2018-10-18 | Work platform rail system |
Country Status (1)
Country | Link |
---|---|
US (3) | US20160312481A1 (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108203924A (en) * | 2016-12-18 | 2018-06-26 | 邬惠林 | The bike lane's special mobile installation vehicle sling under overpass |
JP2018112027A (en) * | 2017-01-13 | 2018-07-19 | 鹿島建設株式会社 | Mobile working vehicle |
US20180345057A1 (en) * | 2017-06-02 | 2018-12-06 | Modular Fall Protection Concepts, Llc | Fall protection modular rigid rail system |
CN109577199A (en) * | 2018-11-07 | 2019-04-05 | 同济大学 | A kind of bridge lateral prestressed stretch-draw rack |
CN109693996A (en) * | 2017-10-23 | 2019-04-30 | 细美事有限公司 | Aisle structure and the method for installing aisle structure |
CN110158934A (en) * | 2019-06-24 | 2019-08-23 | 中信国安建工集团有限公司 | Guard system for suspended operating platform in large space |
CN110173103A (en) * | 2019-06-24 | 2019-08-27 | 北京港源幕墙有限公司 | Adhesion type removable multifunctional aerial work platform |
CN110259096A (en) * | 2019-06-26 | 2019-09-20 | 重庆科技学院 | The certainly mobile operation platform of civil engineering and its application method |
CN110820554A (en) * | 2019-11-26 | 2020-02-21 | 丁西彦 | A outer hanging self-walking crane for bridge detects |
CN111663760A (en) * | 2020-07-02 | 2020-09-15 | 中冶城市投资控股有限公司 | Construction device and construction method for overhanging roof |
WO2021022611A1 (en) * | 2019-08-06 | 2021-02-11 | 山东恒堃机械有限公司 | Broken shaft protection device for front supporting leg of upstroke movable formwork |
CN113374237A (en) * | 2021-06-25 | 2021-09-10 | 五冶集团装饰工程有限公司 | Steel platform suitable for installing suspended ceiling in hotel lobby and suspended ceiling installation method |
CN113846555A (en) * | 2021-09-24 | 2021-12-28 | 上海市基础工程集团有限公司 | Portable bridge outside breast board can stride obstacle and remove construction platform device |
JP7461035B2 (en) | 2020-07-17 | 2024-04-03 | 舩木商事有限会社 | Movable scaffolding installation structure |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109722996B (en) * | 2019-03-05 | 2021-09-28 | 广东恒大路桥建设有限公司 | Suspension device for reinforcing highway bridges and construction method of suspension device |
CN111573577B (en) * | 2020-04-16 | 2021-08-27 | 北京建工路桥集团有限公司 | Hanging construction method for newly added pipeline on side surface of existing bridge |
CN112663927B (en) * | 2020-07-24 | 2021-08-20 | 中国建筑第二工程局有限公司 | Steel structure dome aerial work stepped operation platform and construction method thereof |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4570543A (en) * | 1982-06-30 | 1986-02-18 | Tsubakimoto Chain Co. | Conveying equipment |
US5011710A (en) * | 1988-11-10 | 1991-04-30 | Harrison John F | Bridge maintenance method and equipment |
Family Cites Families (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1320740A (en) * | 1919-11-04 | Overhead carrier | ||
US1090253A (en) | 1912-08-14 | 1914-03-17 | Drew Carrier Company | Elevated-trolley track. |
US1470642A (en) | 1921-03-10 | 1923-10-16 | Nat Company | Clamp support |
US2067344A (en) | 1936-06-13 | 1937-01-12 | William H Ringe | Bridge span inspection and maintenance traveler |
US2744472A (en) | 1953-03-24 | 1956-05-08 | Albina Engine & Machine Works | I-beam roller |
US3601348A (en) | 1969-09-17 | 1971-08-24 | George E Gonsalves | Rail support for overhead conveyors |
US3884153A (en) | 1971-12-23 | 1975-05-20 | Minoru Sugimoto | Monorail structure |
DE2343502A1 (en) * | 1973-08-29 | 1975-04-03 | Demag Ag | CAT MOVING ON A CARRIER |
DE3240104C2 (en) | 1982-10-29 | 1985-05-02 | Mannesmann AG, 4000 Düsseldorf | Suspension for a rail |
US4660680A (en) * | 1985-01-23 | 1987-04-28 | Potin Prosper L | Means and methods for erecting a work platform under the deck of a structure |
US4848516A (en) | 1986-02-17 | 1989-07-18 | Yoneyama Kogyo Kabushiki Kaisha | Movable scaffold |
US5299655A (en) | 1993-05-20 | 1994-04-05 | Nicholas Margaritis | Workplace support and enclosure |
TW294754B (en) | 1994-06-30 | 1997-01-01 | Shinsei Industries Co | |
AU4559896A (en) | 1995-02-21 | 1996-08-29 | Robert J. Wildner | Environmentally safe work platform with buoyancy system |
US5730248A (en) | 1995-07-25 | 1998-03-24 | Paul Kristen, Inc. | Bridge platform |
US6264002B1 (en) | 1995-07-25 | 2001-07-24 | Paul Kristen, Inc. | Scaffolding for bridges and other structures |
US20040020138A1 (en) | 2002-08-02 | 2004-02-05 | Grearson Kenneth R. | Modular platform system |
US6817444B1 (en) | 2002-09-10 | 2004-11-16 | George Shinas | Suspended work platform |
US7779599B2 (en) | 2004-03-31 | 2010-08-24 | Safway Services, Llc | Articulating work platform support system, work platform system, and methods of use thereof |
WO2008124753A1 (en) | 2007-04-10 | 2008-10-16 | Oded Sten | Modular support catch system |
US8123001B1 (en) | 2008-03-18 | 2012-02-28 | Paul Kristen, Inc. | Modular platform/ scaffolding |
EP2298998B1 (en) | 2009-09-18 | 2020-04-29 | Paul Kristen, Inc. | Cable-panel connector for use with bridge platforms and other scaffoldings |
GB201118568D0 (en) | 2011-10-27 | 2011-12-07 | Web Rigging Services Ltd | Deck panel, load platform and tensioner |
WO2013122607A1 (en) | 2012-02-17 | 2013-08-22 | Paul Kristen, Inc. | Modular platform/scaffolding |
-
2016
- 2016-04-27 US US15/139,722 patent/US20160312481A1/en not_active Abandoned
-
2017
- 2017-01-31 US US15/420,258 patent/US10119229B1/en not_active Expired - Fee Related
-
2018
- 2018-10-18 US US16/163,992 patent/US20190048539A1/en not_active Abandoned
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4570543A (en) * | 1982-06-30 | 1986-02-18 | Tsubakimoto Chain Co. | Conveying equipment |
US5011710A (en) * | 1988-11-10 | 1991-04-30 | Harrison John F | Bridge maintenance method and equipment |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108203924A (en) * | 2016-12-18 | 2018-06-26 | 邬惠林 | The bike lane's special mobile installation vehicle sling under overpass |
JP2018112027A (en) * | 2017-01-13 | 2018-07-19 | 鹿島建設株式会社 | Mobile working vehicle |
US10646733B2 (en) * | 2017-06-02 | 2020-05-12 | Modular Fall Protection Concepts, Llc | Fall protection modular rigid rail system |
US20180345057A1 (en) * | 2017-06-02 | 2018-12-06 | Modular Fall Protection Concepts, Llc | Fall protection modular rigid rail system |
CN109693996A (en) * | 2017-10-23 | 2019-04-30 | 细美事有限公司 | Aisle structure and the method for installing aisle structure |
CN109577199A (en) * | 2018-11-07 | 2019-04-05 | 同济大学 | A kind of bridge lateral prestressed stretch-draw rack |
CN110173103A (en) * | 2019-06-24 | 2019-08-27 | 北京港源幕墙有限公司 | Adhesion type removable multifunctional aerial work platform |
CN110158934A (en) * | 2019-06-24 | 2019-08-23 | 中信国安建工集团有限公司 | Guard system for suspended operating platform in large space |
CN110259096A (en) * | 2019-06-26 | 2019-09-20 | 重庆科技学院 | The certainly mobile operation platform of civil engineering and its application method |
WO2021022611A1 (en) * | 2019-08-06 | 2021-02-11 | 山东恒堃机械有限公司 | Broken shaft protection device for front supporting leg of upstroke movable formwork |
CN110820554A (en) * | 2019-11-26 | 2020-02-21 | 丁西彦 | A outer hanging self-walking crane for bridge detects |
CN111663760A (en) * | 2020-07-02 | 2020-09-15 | 中冶城市投资控股有限公司 | Construction device and construction method for overhanging roof |
JP7461035B2 (en) | 2020-07-17 | 2024-04-03 | 舩木商事有限会社 | Movable scaffolding installation structure |
CN113374237A (en) * | 2021-06-25 | 2021-09-10 | 五冶集团装饰工程有限公司 | Steel platform suitable for installing suspended ceiling in hotel lobby and suspended ceiling installation method |
CN113846555A (en) * | 2021-09-24 | 2021-12-28 | 上海市基础工程集团有限公司 | Portable bridge outside breast board can stride obstacle and remove construction platform device |
Also Published As
Publication number | Publication date |
---|---|
US10119229B1 (en) | 2018-11-06 |
US20190048539A1 (en) | 2019-02-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10119229B1 (en) | Work platform rail system | |
CN102493346A (en) | Upper air anti-collision guardrail module transfer hanging bracket and construction method | |
JP2018003526A (en) | Replacement method for main cable of suspension bridge | |
CN101249927A (en) | Mounting and dismounting method for gantry crane | |
JPS63219758A (en) | Horizontal moving apparatus of equipment for high place work | |
KR20110011926U (en) | Shore Gang Way | |
JP2017106288A (en) | Method for installing suspended scaffold on bridge structure and float attached suspended scaffold | |
JP3765096B2 (en) | Bridge construction replacement method | |
CN109573851A (en) | Arcuated roof internode steel truss hangs, fills integrated apparatus and docking hanging method | |
CN103821084B (en) | Operational method at the bottom of implement at the bottom of beam and beam | |
KR101028631B1 (en) | Movable bridge inspection equipment | |
JP4284225B2 (en) | Mobile scaffolding system | |
CN102635066A (en) | Hanger articulated bridge inspection vehicle | |
RU2556777C2 (en) | Hoisting gear for flyover erection | |
CN202543799U (en) | Hanging bracket hinging type bridge maintenance vehicle | |
CN202465213U (en) | Hanging basket system for slope construction | |
JP6172636B2 (en) | Scaffolding system | |
JP2005023623A (en) | Suspension device for suspension scaffold for bridge and suspension scaffold assembling construction method using this device | |
CN103015314B (en) | Bridge maintenance overhead working equipment lifting device | |
JP2010150039A (en) | Crane girder replacing method and crane girder replacing device | |
CN202730646U (en) | Bridge maintenance car with articulated type hanging bracket and capable of avoiding bridge-side barriers | |
JPH0437902B2 (en) | ||
JP6176128B2 (en) | Scaffolding system | |
CN210029713U (en) | Overhead traveling crane hoisting support with adjustable | |
JP2567560B2 (en) | Bridge construction method using precast girders |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |