Scaffold Download PDFInfo
- Publication number
- US20160177584A1 US20160177584A1 US14/909,989 US201414909989A US2016177584A1 US 20160177584 A1 US20160177584 A1 US 20160177584A1 US 201414909989 A US201414909989 A US 201414909989A US 2016177584 A1 US2016177584 A1 US 2016177584A1
- Authority
- US
- United States
- Prior art keywords
- holes
- unit according
- scaffolding unit
- scaffolding
- vertical arm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000009826 distribution Methods 0.000 description 6
- 238000009415 formwork Methods 0.000 description 6
- 238000009434 installation Methods 0.000 description 5
- 238000005266 casting Methods 0.000 description 4
- 239000000463 material Substances 0.000 description 2
- 238000004026 adhesive bonding Methods 0.000 description 1
- 239000011230 binding agent Substances 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000009749 continuous casting Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/24—Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/10—Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
- E01D19/106—Movable inspection or maintenance platforms, e.g. travelling scaffolding or vehicles specially designed to provide access to the undersides of bridges
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/34—Mobile scaffolds; Scaffolds with mobile platforms characterised by supporting structures provided on the roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/001—Safety or protective measures against falling down relating to scaffoldings
- E04G5/002—Protections or covers for scaffolding connections
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/007—Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G7/00—Connections between parts of the scaffold
- E04G7/30—Scaffolding bars or members with non-detachably fixed coupling elements
- E04G7/302—Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members
- E04G7/303—Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are only fixed at one of the bars or members to connect
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G7/00—Connections between parts of the scaffold
- E04G7/30—Scaffolding bars or members with non-detachably fixed coupling elements
- E04G7/34—Scaffolding bars or members with non-detachably fixed coupling elements with coupling elements using positive engagement, e.g. hooks or pins
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/06—Consoles; Brackets
- E04G5/064—Consoles; Brackets specially adapted for attachment to building floors
Definitions
- the present invention relates to scaffolding unit intended to form working stages and the support structures required in work for use in connection with repair, installation, and maintenance work on bridges and other structures with a deck.
- the invention relates to the creation of repair scaffolding for bridges.
- WO 2008132277 discloses one scaffolding arrangement suitable for repair work on a bridge deck.
- the arrangement consists of a number of scaffolding supports to be installed on the deck of the bridge, which are supported from the bridge by bolting the support to the upper surface of the deck of the bridge and then carrying the support on rotatable support elements on the undersurface of the deck.
- Publication WO 2012062968 discloses an attachment element for attaching a scaffolding support to the deck of a bridge.
- the scaffolding support to be attached is arranged to be carried on two support points to the upper side of the deck of the bridge. At least one of the support points is arranged to take the compressive force of the attachment elements attached to the deck of the bridge and at least one is arranged to take the tensile force.
- the attachment element is arranged to be detachably attached to the deck of the bridge with at least two attachment means and comprises at least one attachment means for attaching the attachment element to the support point taking the tensile force of the scaffolding support.
- scaffolding supports must be able to carry quite a large load of repair tools, repair workers, and possibly casting formwork and similar, the supports easily become quite massive. Thus, lifting means are needed to handle them and heavy vehicles to transport them. In addition, the installation of the supports usually requires several people. All these factors increase the repair costs.
- the scaffolding also requires special attachment devices, such as bolts running through the bridge deck and possibly a flat surface in the deck for attachment.
- the formwork required for repairing and casting the edge of the bridge must be moved with jacks and continuous casting in the longitudinal direction of the bridge or deck is not possible. Work is also hindered by the support required by the scaffolding against the undersurface of the bridge.
- the present invention is intended to create a solution, in which the position of the support level formed by the scaffolding can be easily altered in the height direction.
- the invention is also intended to create a solution, in which adjustment of the height direction does not alter the lateral positioning.
- inventions embodiments are intended to create scaffolding, which can, when desired, be transported in parts and assembled at the point of use.
- inventions embodiments are intended to create scaffolding, the structure of which is simple and easily manufactured.
- the invention's embodiments are also intended to permit the adjustment within wide limits of the location of the scaffolding's work stages, formwork, and other structures at least in the height direction of the bridge deck, preferably also in the transverse direction relative to the longitudinal direction of the deck level.
- the invention's embodiments are also intended to permit adjustment of the scaffolding's height-direction position relative to the deck of the bridge or other level at least partly from the top of the deck of the bridge or similar, most preferably from the side of the attachment frame of the scaffolding opposite to the edge of the deck.
- the invention is based on the attachment elements connecting the scaffolding to the bridge deck being attached to the set of carrier arms by means of a pivoted rectangle, preferably a pivoted parallelogram.
- the scaffolding can be dismantled into parts and assembled at the point of use.
- one scaffolding unit comprises only one operating device for altering the vertical position of the set of carrier arms.
- the structure of the scaffolding unit according to the invention is light, but can nevertheless be dimensioned to carry a large load, which is required for carrying the devices and materials to be used in bridge repair work.
- the scaffolding unit can be easily dismantled into parts for transportation and assembled at the point of use. Heavy lifting devices are not needed to move the parts and installation of the scaffolding can be done even by one workman.
- One of the most important advantages of the invention is that the location of the carrier level formed with the aid of the scaffolding, relative to the undersurface of the bridge, can be easily altered within a large adjustment range without the angle of the carrier level or the distance from the edge of the deck essentially changing.
- the components of the scaffolding are plate and beam structures, so that it is cheap to manufacture. In principle, the assembly of the scaffolding unit requires only the pivot pins to be set in place, so that installation work is easy and special tools are not required.
- FIG. 1 shows a side view of the scaffolding unit according to the invention.
- FIG. 2 is an exploded view of the scaffolding unit of FIG. 1 .
- FIG. 3 shows the scaffolding unit of FIGS. 1 and 2 in a first adjustment position.
- FIG. 4 shows the scaffolding unit of FIGS. 1 and 2 in a second adjustment position.
- FIG. 5 shows a second embodiment of the invention.
- the downward direction is the direction from on top of the deck structure pointing towards its upper surface and the direction pointing upwards is the direction opposite to that.
- the scaffolding unit consists of a set of carrier arms 2 for forming work levels and for carrying the work machines and formwork required in the work and connecting the set of arms of the attachment frame 1 to the upper surface of the bridge or other deck structure 15 and for adjusting the attitude and location of the scaffolding.
- the set of arms 2 comprises a vertical arm 4 , at the lower end of which is a transverse carrier beam 5 , which forms a T-shaped structure at the end of the vertical arm.
- a second branch of the T is installed to point towards the bridge deck 15 , so that the opposite branch points away from the deck. Walkways for the workers and the installations required for the work machines and formwork on the deck side of the bridge can be set on these branches.
- the upper beam 11 of which is a straight box-section beam and is attached at its end to the end of the vertical arm 4 at the pivot point 16 and extends from it in the direction of the attachment unit.
- a lower parallel beam 3 Under the upper beam 11 is situated a lower parallel beam 3 .
- the lower beam 3 is a triangular beam or one that is otherwise reinforced at the location of the jack, which, when triangular, comprises a straight lower beam and a triangle formed on top of the lower beam, which consists of two sloping beams and a vertical support connecting the point of the triangle and the lower beam.
- the advantage of this beam construction is lightness and a good load-bearing capacity.
- the upper and lower beams 3 , 11 are attached to the attachment frame 1 by means of pivot pins 6 to pivot point 12 and 17 located at a distance from each other vertically, in such a way that the upper beam 11 is attached to pivot point 12 in the upper part of the attachment frame 1 and the lower beam 3 to pivot point 17 beneath it in the lower part of the attachment frame 1 .
- the pivot points 12 and 17 of the attachment frame are on the same vertical straight line, but by altering the locations of the pivot points the paths of motion of the set of arms can, if necessary, be altered.
- the upper and lower beam 3 , 11 are attached by pivot pins 6 to lugs 13 in the end of the vertical arm 4 , in which are also formed on top of each other on the same straight line in the vertical direction the pivot points 16 , 18 to the upper beam 11 and the lower beam 3 .
- the pivot points 12 , 16 , 17 , and 18 form, together with the upper and lower beams 3 , 11 a pivoted parallelogram, with the aid of which the vertical arm 4 and the transverse carrier beam 5 at its lower end can be moved vertically.
- the transverse carrier beam 5 is attached by pivot pins 6 to lugs 14 at the lower end of the vertical arm 14 . In this attachment method, the transverse carrier beam 5 is locked to the horizontal attitude and the pin attachment is intended to create an easily assembled joint.
- the attachment frame 1 can comprise attachment plates, which form a stand arrangement, which preferably includes attachment bolts that can be adjusted vertically, to attach the scaffolding to the bridge deck.
- the attachment bolts can be fitted into holes drilled in the bridge deck and secured with a chemical binding agent, thus making the attachment strong and reliable.
- the operating device is a jack 9 , which is installed on top of the attachment frame 1 between the attachment frame 1 and the pivoted parallelogram's triangularly shaped lower beam 3 .
- the jack 9 is located at the vertical support under the point of the beam triangle, so that a strong working point is obtained for the jack 9 .
- the jack 9 can be a simple screw jack, a hydraulic jack, or some similar lifting device. Because continuous adjustment of the vertical position is not needed, the jack can be a simple and strong device.
- the scaffolding is in the upper position and in FIG. 4 in the lower position.
- the vertical arm 4 of the scaffolding remains precisely vertical and the carrier beam 5 horizontal.
- the margin of movement of the height adjustment is quite large. This is an extremely important advantage compared to previously known solutions, because in these the adjustment margins have been quite limited and the adjustments difficult to make.
- the scaffolding of FIG. 5 differs slightly from that described above.
- the scaffolding's lower beam 3 is unified, not necessarily straight, and continues to the opposite side of the pivot point between the attachment frame 1 and the lower beam 3 relative to the vertical arm 4 .
- the lower beam 3 thus forms a lever extending to both sides of the lower pivot point 17 of the attachment frame 1 .
- a hydraulic jack 21 and a screw jack 22 is fitted to the end of this lever, also on the opposite side of the pivot point between the attachment frame 1 and the lower beam 3 , relative to the vertical arm 4 .
- the shafts of the jacks 21 , 22 are supported on the stand 20 of the attachment frame 1 .
- Both jacks can be used independently to adjust the position of the vertical arm 4 and the carrier beam 5 with the arm of the lever formed by the lower beam 3 , but the adjustment is preferably made with the aid of the hydraulic jack while the position of the scaffolding is locked with the screw jack 22 .
- the terms hydraulic jack and screw jack refer to any hydraulic or screw-operated operating device whatever, by changing the length of which compression, or tractive force, or locking in position are achieved.
- the adjustment of position and locking can be done with only a screw jack if desired, but a hydraulic jack can be used as an aid in adjusting the height, or in parallel with the screw jack. Other operating devices or power tools are not required here.
- the adjustment can be made easily and safely on the opposite side of the attachment frame to the bridge deck.
- the lever can also be formed in a corresponding manner in the upper beam 11 or in both beams 3 , 11 . It is then possible to optionally fit either of the jacks to the upper beam and the other to the lower beam or both in connection with either the lower beam or upper beam.
- the scaffolding unit (attachment frame 1 ) is preferably attached to the deck of the bridge or other structure with the aid of screwed bolts 23 from the stand 20 . Attachment to the deck takes place by gluing or casting the bolts into blind holes made in the deck.
- the attachment is made from two stands 20 at a distance from each other and with the aid of the screwed bolts the scaffolding can be raised from the deck, so that a gap 24 forms between the scaffolding and the deck.
- the deck surface can then be worked on and the surface cast with the scaffolding attached.
- the positioning of the scaffolding unit in the height direction relative to the deck of the bridge or other structure takes place by altering, in addition to the pivoted parallelogram, the locations of the attachment points (pivot points) 16 and 18 between the vertical arm 4 and the pivoted parallelogram 12 , 16 , 17 , 18 .
- the vertical arm 4 there are attachment holes 25 on top of each other, which have a predefined distance between them.
- lugs 26 At the ends of the upper and lower beams 11 , 3 there are lugs 26 , which are arranged on both sides of the vertical arm and in which there are also attachment holes 27 on top of each other, which have a predefined distance between them.
- the distances between the vertical arm's attachment holes 25 are greater than the distances between the lugs' 26 attachment holes 27 . In this way, a large adjustment margin is obtained with the aid of the vertical arm's 4 attachment holes 25 and a smaller adjustment margin with the aid of the lugs' 26 attachment holes 27 .
- this manner of adjustment is combined with the adjustment taking place with the aid of the pivoted parallelogram, the position of the scaffolding unit can be set precisely as desired within quite large limits. This permits, among other things, easy and accurate placing of the bridge's edge casting 19 .
- the adjustment of the position of the carrier beam 5 relative to the edge of the bridge deck or other structure can be carried out with a corresponding hole distribution.
- FIG. 5 shows a dense hole distribution in the carrier beam 5 and four holes in the attachment lugs of the vertical arm. This hole distribution is also flexible and the number and distribution of the holes can be altered to create an adequate adjustment precision. Though a dense hole distribution can also be made in the long load-bearing components such as the vertical arm or the carrier beam, in these it is preferable to use a larger hole distribution, to minimize the number of holes and preserve strength.
- a pivoted parallelogram is preferably used, but the lengths of the sides and the location of the pivots can be altered as required, making it a pivoted rectangle.
- the scaffolding there can be integrated working stages and these can include rails or attachments for formwork, tools such as abrasive water jets, or handrails.
- the scaffolding can be attached to a rail in the bridge deck, so that it can be moved as work progresses parallel to the deck.
- the attachment components there can be toolboxes for the safe storage of tools and other materials and lifting hooks or similar can be installed in the scaffolding so that it can be moved as an entire system.
- the scaffolding unit according to the invention can be transported to the work site ready assembled or dismantled into its principal components. Assembly of the scaffolding unit takes place simply by installing the pivot pins 6 in place and locking them with cotters. Thus in principle, the assembly of the scaffolding unit requires no tools at all.
- the scaffolding unit is easily dismantled into relatively light parts and can be moved to a new location after use. Because several scaffolding units are required for a bridge deck or similar work site, significant advantages are achieved with the aid of easy assembly, disassembly, and transportation. In place of pivot pins and cotters it is possible, of course, to use other corresponding attachment elements such as bolts and nuts.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Bridges Or Land Bridges (AREA)
- Movable Scaffolding (AREA)
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FI20135815 | 2013-08-06 | ||
FI20135815A FI20135815L (fi) | 2013-08-06 | 2013-08-06 | Teline |
PCT/FI2014/050610 WO2015018979A1 (en) | 2013-08-06 | 2014-08-06 | Scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
US20160177584A1 true US20160177584A1 (en) | 2016-06-23 |
Family
ID=52460714
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/909,989 Abandoned US20160177584A1 (en) | 2013-08-06 | 2014-08-06 | Scaffold |
Country Status (14)
Country | Link |
---|---|
US (1) | US20160177584A1 (ru) |
EP (1) | EP3030719B1 (ru) |
JP (1) | JP6470285B2 (ru) |
CN (1) | CN105705701B (ru) |
AU (1) | AU2014304378B2 (ru) |
BR (1) | BR112016002722B1 (ru) |
CA (1) | CA2920075C (ru) |
ES (1) | ES2714860T3 (ru) |
FI (1) | FI20135815L (ru) |
MX (1) | MX2016001556A (ru) |
PL (1) | PL3030719T3 (ru) |
RU (1) | RU2668608C2 (ru) |
TR (1) | TR201903150T4 (ru) |
WO (1) | WO2015018979A1 (ru) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20170226756A1 (en) * | 2014-08-06 | 2017-08-10 | Fast Beam Oy | Scaffold for supporting a working platform for bridges |
CN108203925A (zh) * | 2017-11-23 | 2018-06-26 | 何振辉 | 一种新型的桥梁用桥面铺设装置 |
CN108221665A (zh) * | 2017-11-23 | 2018-06-29 | 何振辉 | 一种改进型的桥梁用桥面铺设装置 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11834852B2 (en) | 2020-08-07 | 2023-12-05 | Peri Se | Striking tool and method |
Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2598730A (en) * | 1948-03-03 | 1952-06-03 | John L Thompson | Portable dock scaffold |
US3357517A (en) * | 1965-12-27 | 1967-12-12 | Elmer A Wagner | Mobile scaffold |
US4074790A (en) * | 1976-02-27 | 1978-02-21 | Daciano Colbachini | Vehicle-borne inspection and maintenance apparatus |
US4154318A (en) * | 1976-11-09 | 1979-05-15 | Autostrade-Concession Ecostruzioni Autostrade S.p.A. | Retractable suspended scaffolding on a self-propelled truck, particularly adapted for maintenance work on road-bridges and the like |
US4633975A (en) * | 1984-03-19 | 1987-01-06 | The Secretary Of State For Defence In Her Britannic Majesty's Government Of The United Kingdom Of Great Britain And Northern Ireland | Under-bridge access assembly |
US4646875A (en) * | 1985-12-30 | 1987-03-03 | Paxton-Mitchell Company | Articulated boom structure |
US5226776A (en) * | 1988-05-17 | 1993-07-13 | Godtfred Vestergaard | Foldable link rod for carrying an operative platform |
US5253731A (en) * | 1989-09-08 | 1993-10-19 | Alfons Moog | Bridge underview device |
US5435410A (en) * | 1993-07-21 | 1995-07-25 | Langston; Ralph C. | Bridge sidewalk vehicle |
US6024191A (en) * | 1997-01-31 | 2000-02-15 | Kiddie Industries, Inc. | Lift apparatus having an articulated double parallelogram boom assembly |
US6598702B1 (en) * | 2000-07-13 | 2003-07-29 | Mcgillewie, Jr. Garth E. | Under bridge access apparatus with cross-linking member connecting tower with vehicular chassis |
US20080053750A1 (en) * | 2006-08-31 | 2008-03-06 | Chung-En Tseng | Transport equipment |
US20100175205A1 (en) * | 2007-04-27 | 2010-07-15 | Moldtech Oy | Scaffold Arrangement and Method for Repairing the Edge Structure of a Concrete Bridge |
US20120006619A1 (en) * | 2010-07-07 | 2012-01-12 | Aluminum Ladder Company | Cement industry gangway |
US20120204362A1 (en) * | 2010-08-17 | 2012-08-16 | Honeycutt Robert W | Articulating cage |
US8516751B2 (en) * | 2008-05-15 | 2013-08-27 | National Oilwell Varco L.P. | Mobile drilling rig |
US20130313044A1 (en) * | 2012-05-25 | 2013-11-28 | J. Aubrey Stewart | Extension boom apparatus |
US20160214842A1 (en) * | 2015-01-23 | 2016-07-28 | Jeremy Herauf | Unique roadworthy sidewalk boom trailer, having on-site interchangeable boom, on-site interchangeable ladder, and on-site interchangeable catwalk sized to access narrow openings and nooks over and under bridges |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3043395A (en) * | 1961-06-02 | 1962-07-10 | Ellis W Volkel | Mechanized ladder device |
BE786440A (fr) * | 1971-07-20 | 1973-01-19 | Interlake Inc | Verrou de charge |
US4168764A (en) * | 1978-04-24 | 1979-09-25 | Tom Walters | Level step stair walkway |
US4217971A (en) * | 1979-02-16 | 1980-08-19 | Theodore Rivinius | Rotating powered step |
GB2106074B (en) * | 1981-08-13 | 1985-05-30 | Gray Mackenzie Technical Servi | Workplatform |
JPS61113909A (ja) * | 1984-11-08 | 1986-05-31 | 鹿島建設株式会社 | 高架構造物の構築装置 |
JPS626006A (ja) * | 1985-07-01 | 1987-01-13 | 石川島播磨重工業株式会社 | 橋梁の補修用作業車及びその架設方法 |
JP2006132127A (ja) * | 2004-11-04 | 2006-05-25 | Hasegawa Kogyo Co Ltd | 折畳式作業台 |
RU2310033C1 (ru) * | 2006-01-27 | 2007-11-10 | Открытое акционерное общество "Мостотрест" (ОАО "Мостотрест") | Консольные подмости и способ сооружения консольных плит или карнизных блоков железобетонного пролетного строения моста |
CN201460177U (zh) * | 2009-03-20 | 2010-05-12 | 湖南运想重工科技有限公司 | 一种平行四边形折臂机构 |
US8789654B2 (en) * | 2010-08-17 | 2014-07-29 | Jlg Industries, Inc. | Mast lift with screw drive and gas strut |
FI123034B (fi) * | 2010-11-12 | 2012-10-15 | Moldtech Oy | Telineenkiinnitysjärjestely |
-
2013
- 2013-08-06 FI FI20135815A patent/FI20135815L/fi not_active Application Discontinuation
-
2014
- 2014-08-06 BR BR112016002722-1A patent/BR112016002722B1/pt not_active IP Right Cessation
- 2014-08-06 PL PL14835241T patent/PL3030719T3/pl unknown
- 2014-08-06 US US14/909,989 patent/US20160177584A1/en not_active Abandoned
- 2014-08-06 EP EP14835241.2A patent/EP3030719B1/en active Active
- 2014-08-06 TR TR2019/03150T patent/TR201903150T4/tr unknown
- 2014-08-06 ES ES14835241T patent/ES2714860T3/es active Active
- 2014-08-06 CN CN201480044397.2A patent/CN105705701B/zh not_active Expired - Fee Related
- 2014-08-06 WO PCT/FI2014/050610 patent/WO2015018979A1/en active Application Filing
- 2014-08-06 RU RU2016105165A patent/RU2668608C2/ru active
- 2014-08-06 AU AU2014304378A patent/AU2014304378B2/en not_active Ceased
- 2014-08-06 CA CA2920075A patent/CA2920075C/en active Active
- 2014-08-06 JP JP2016532709A patent/JP6470285B2/ja active Active
- 2014-08-06 MX MX2016001556A patent/MX2016001556A/es active IP Right Grant
Patent Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2598730A (en) * | 1948-03-03 | 1952-06-03 | John L Thompson | Portable dock scaffold |
US3357517A (en) * | 1965-12-27 | 1967-12-12 | Elmer A Wagner | Mobile scaffold |
US4074790A (en) * | 1976-02-27 | 1978-02-21 | Daciano Colbachini | Vehicle-borne inspection and maintenance apparatus |
US4154318A (en) * | 1976-11-09 | 1979-05-15 | Autostrade-Concession Ecostruzioni Autostrade S.p.A. | Retractable suspended scaffolding on a self-propelled truck, particularly adapted for maintenance work on road-bridges and the like |
US4633975A (en) * | 1984-03-19 | 1987-01-06 | The Secretary Of State For Defence In Her Britannic Majesty's Government Of The United Kingdom Of Great Britain And Northern Ireland | Under-bridge access assembly |
US4646875A (en) * | 1985-12-30 | 1987-03-03 | Paxton-Mitchell Company | Articulated boom structure |
US5226776A (en) * | 1988-05-17 | 1993-07-13 | Godtfred Vestergaard | Foldable link rod for carrying an operative platform |
US5253731A (en) * | 1989-09-08 | 1993-10-19 | Alfons Moog | Bridge underview device |
US5435410A (en) * | 1993-07-21 | 1995-07-25 | Langston; Ralph C. | Bridge sidewalk vehicle |
US6024191A (en) * | 1997-01-31 | 2000-02-15 | Kiddie Industries, Inc. | Lift apparatus having an articulated double parallelogram boom assembly |
US6598702B1 (en) * | 2000-07-13 | 2003-07-29 | Mcgillewie, Jr. Garth E. | Under bridge access apparatus with cross-linking member connecting tower with vehicular chassis |
US20080053750A1 (en) * | 2006-08-31 | 2008-03-06 | Chung-En Tseng | Transport equipment |
US20100175205A1 (en) * | 2007-04-27 | 2010-07-15 | Moldtech Oy | Scaffold Arrangement and Method for Repairing the Edge Structure of a Concrete Bridge |
US8516751B2 (en) * | 2008-05-15 | 2013-08-27 | National Oilwell Varco L.P. | Mobile drilling rig |
US20120006619A1 (en) * | 2010-07-07 | 2012-01-12 | Aluminum Ladder Company | Cement industry gangway |
US20120204362A1 (en) * | 2010-08-17 | 2012-08-16 | Honeycutt Robert W | Articulating cage |
US20130313044A1 (en) * | 2012-05-25 | 2013-11-28 | J. Aubrey Stewart | Extension boom apparatus |
US20160214842A1 (en) * | 2015-01-23 | 2016-07-28 | Jeremy Herauf | Unique roadworthy sidewalk boom trailer, having on-site interchangeable boom, on-site interchangeable ladder, and on-site interchangeable catwalk sized to access narrow openings and nooks over and under bridges |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20170226756A1 (en) * | 2014-08-06 | 2017-08-10 | Fast Beam Oy | Scaffold for supporting a working platform for bridges |
US10662658B2 (en) * | 2014-08-06 | 2020-05-26 | Fast Beam Oy | Scaffold for supporting a working platform for bridges |
CN108203925A (zh) * | 2017-11-23 | 2018-06-26 | 何振辉 | 一种新型的桥梁用桥面铺设装置 |
CN108221665A (zh) * | 2017-11-23 | 2018-06-29 | 何振辉 | 一种改进型的桥梁用桥面铺设装置 |
Also Published As
Publication number | Publication date |
---|---|
RU2016105165A3 (ru) | 2018-03-29 |
EP3030719A4 (en) | 2017-01-18 |
BR112016002722B1 (pt) | 2022-02-01 |
AU2014304378A1 (en) | 2016-02-25 |
MX2016001556A (es) | 2016-08-03 |
PL3030719T3 (pl) | 2019-06-28 |
CA2920075A1 (en) | 2015-02-12 |
CN105705701A (zh) | 2016-06-22 |
JP6470285B2 (ja) | 2019-02-13 |
FI20135815L (fi) | 2015-02-07 |
CA2920075C (en) | 2021-08-17 |
AU2014304378B2 (en) | 2018-05-17 |
TR201903150T4 (tr) | 2019-03-21 |
BR112016002722A2 (pt) | 2017-08-01 |
CN105705701B (zh) | 2019-10-25 |
JP2016529424A (ja) | 2016-09-23 |
WO2015018979A1 (en) | 2015-02-12 |
RU2668608C2 (ru) | 2018-10-02 |
EP3030719B1 (en) | 2018-12-19 |
RU2016105165A (ru) | 2017-09-14 |
EP3030719A1 (en) | 2016-06-15 |
ES2714860T3 (es) | 2019-05-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10662658B2 (en) | Scaffold for supporting a working platform for bridges | |
AU2015348164B2 (en) | Scaffolding arrangement | |
EP3030719B1 (en) | Scaffold | |
FI123034B (fi) | Telineenkiinnitysjärjestely | |
CN103388310A (zh) | 单点固定可调悬挑三角架 | |
CN204057851U (zh) | 演出舞台大棚用升降机构 | |
CN110901851A (zh) | 一种船舶大型设备舷侧安装装置 | |
CN204662274U (zh) | 斜塔模板系统 | |
CN202592526U (zh) | 预制t梁钢筋定位装置 | |
CN102691412A (zh) | 可调垂直高度的预制框架结构连接支撑模板 | |
CN112681144B (zh) | 钢索塔的自爬式安装方法 | |
CN210766423U (zh) | 一种可调节倾角的斜腹杆托架台车 | |
CN218714961U (zh) | 一种可调节间距整体吊装平台 | |
CN116005557B (zh) | 大跨度飞燕式提篮钢箱拱桥空间异型拱肋结构的安装方法 | |
CN219157303U (zh) | 一种轨道维修装置 | |
CN117365135B (zh) | 一种钢桁架安装的临时支撑架及钢桁架施工方法 | |
CN210286554U (zh) | 一种钢桥专用回转吊机自助找平滑移轨道系统 | |
CN105297624A (zh) | 拱桥检查车轨道装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: FAST BEAM OY, FINLAND Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:HYVOENEN, ANTTI;SILTALA, TIMO;SIGNING DATES FROM 20160316 TO 20160317;REEL/FRAME:038600/0316 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |