US20160090827A1 - Two-Piece Plunger with Sleeve and Spear for Plunger Lift System - Google Patents
Two-Piece Plunger with Sleeve and Spear for Plunger Lift System Download PDFInfo
- Publication number
- US20160090827A1 US20160090827A1 US14/502,054 US201414502054A US2016090827A1 US 20160090827 A1 US20160090827 A1 US 20160090827A1 US 201414502054 A US201414502054 A US 201414502054A US 2016090827 A1 US2016090827 A1 US 2016090827A1
- Authority
- US
- United States
- Prior art keywords
- sleeve
- spear
- tubing
- downhole
- passage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 239000012530 fluid Substances 0.000 claims abstract description 27
- 238000004891 communication Methods 0.000 claims description 15
- 238000000034 method Methods 0.000 claims description 13
- 230000004323 axial length Effects 0.000 claims description 8
- 230000013011 mating Effects 0.000 claims description 5
- 230000000087 stabilizing effect Effects 0.000 claims 1
- 239000007788 liquid Substances 0.000 abstract description 28
- 238000004519 manufacturing process Methods 0.000 description 13
- 230000015572 biosynthetic process Effects 0.000 description 7
- 238000013461 design Methods 0.000 description 5
- 230000007704 transition Effects 0.000 description 5
- 239000000463 material Substances 0.000 description 4
- 239000007787 solid Substances 0.000 description 3
- 241000251468 Actinopterygii Species 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 238000007664 blowing Methods 0.000 description 2
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000032683 aging Effects 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000007373 indentation Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000037361 pathway Effects 0.000 description 1
- 230000000246 remedial effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000013022 venting Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
- E21B43/121—Lifting well fluids
- E21B43/122—Gas lift
- E21B43/123—Gas lift valves
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
- E21B43/121—Lifting well fluids
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/10—Slips; Spiders ; Catching devices
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
- E21B34/14—Valve arrangements for boreholes or wells in wells operated by movement of tools, e.g. sleeve valves operated by pistons or wire line tools
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
- E21B43/121—Lifting well fluids
- E21B43/13—Lifting well fluids specially adapted to dewatering of wells of gas producing reservoirs, e.g. methane producing coal beds
Definitions
- Liquid buildup can occur in aging production wells and can reduce the well's productivity.
- operators can use beam lift pumps or other remedial techniques, such as venting or “blowing down” the well.
- venting or “blowing down” the well Unfortunately, these techniques can cause gas losses.
- blowing down the well can produce undesirable methane emissions.
- the plunger lift system can use one of two types of plungers: a conventional plunger and a continuous (bypass) plunger.
- the conventional plunger is typically used to lift built-up fluid at the downhole end of the tubing string.
- a continuous plunger is typically used when the well is still flowing at very high flow rates, above critical velocity, during early intervention of the well.
- the continuous plunger is designed to fall against the flow of the well and uses a valve on the plunger, such as an internal shifting rod. When the plunger lands downhole on the bumper, the valve is closed. Then, when built-up pressure lifts it in the tubing, the continuous plunger is primarily used to sweep accumulated fluids along the tubing wall.
- FIG. 1A a plunger lift system 10 of the prior art is shown in FIG. 1A .
- a plunger 50 A is disposed in production tubing 16 , which is deployed in casing 14 from a wellhead 12 .
- the plunger 50 A moves between a lubricator 30 at the surface and a landing bumper 20 downhole.
- the plunger 50 A shown in FIGS. 1A-1B is a two-piece plunger of the continuous type.
- a conventional plunger 50 B as shown in FIG. 2 has a single body that may be solid or semi-hollow and that has external ribbing or the like for creating a pressure differential.
- the continuous plunger 50 B as in FIG. 2 is used when liquid build-up has become an issue in part because the well is not flowing above critical velocity.
- the two-piece plunger 50 A of FIGS. 1A-1B can be used in a well that is still flowing above critical velocity and liquid build-up has not become a significant issue yet.
- the two-piece plunger 50 A of FIGS. 1A-1B allows both pieces to fall faster downhole than would be possible for such a solid or semi-hollow plunger 50 B of the prior art.
- the two-piece plunger 50 A has a separate sleeve 60 and ball 70 .
- the sleeve 60 has an inner bore 62 that defines a seat 68 .
- the ball 70 can fit against the seat 68 and can seal fluid flow up through the plunger's bore 62 during operation.
- the sleeve's outer surface can have ribbing 64 or the like for creating a pressure differential.
- This type of two-piece plunger 50 A and its use are disclosed in U.S. Pat. No. 6,467,541 and U.S. Pat. No. 6,719,060.
- the sleeve 60 and ball 70 dispose separately in the tubing 16 .
- the ball 70 drops first to land near the bottom of the well.
- the ball 70 falls into any liquid near the bottom of the well and contacts the bumper 20 .
- the sleeve 60 drops after the ball 70 so it can fall to the bumper 20 as well.
- the ball 70 falls in the well first followed by the sleeve 60 against high flow rates. They travel independently of each other. When they reach the bottom of the well, they unite and can then travel back to the surface to de-liquefy the well.
- the sleeve 60 When the sleeve 60 reaches the ball 70 , for example, they unite into a single component. With the plunger 50 A deployed to handle liquid buildup, operators set the well in operation. Gas from the formation enters through casing perforations 18 and travels up the production tubing 16 to the surface, where it is produced through lines 32 / 34 at the lubricator 30 . Liquids may accumulate in the well and can create back pressure that can slow gas production through the lines 32 / 34 . Using sensors and the like, a controller 36 operates a valve 38 at the lubricator 30 to regulate the buildup of pressure in the tubing 16 . Sensing the slowing of gas production due to liquid accumulation, the controller 36 shuts-in the well to increase pressure in the well.
- the plunger 50 essentially acts as a piston between liquid and gas in the tubing 16 .
- Gas entering the production string 16 from the formation through the casing perforations 18 acts against the bottom of the plunger 50 A (mated sleeve and ball 60 / 70 ) and tends to push the plunger 50 A uphole.
- any liquid above the plunger 50 A will be forced uphole to the surface by the plunger 50 A.
- the controller 36 allows gas and accumulated liquids above the plunger 50 A to flow through lines 32 / 34 .
- the plunger 50 A reaches a catcher 40 on the lubricator 30 and a spring (not shown) absorbs the upward movement.
- the catcher 40 captures the plunger's sleeve 60 when it arrives, and the gas that lifted the plunger 50 A flows through the lower line 32 to the sales line.
- a decoupler or striker rod (not shown) inside the lubricator 30 can separate the ball 70 from the sleeve 60 .
- the ball 70 can then immediately fall toward the bottom of the well.
- the catcher 40 holds the sleeve 60 and then releases the sleeve 60 after the ball 70 is already on its way down the tubing 16 .
- the sleeve 60 and ball 70 fall independently inside the production tubing 16 .
- the sleeve 60 with its central passage 62 can have gas flow through it as the sleeve 60 falls in the well.
- flow travels around the outside of the ball 70 as the ball 70 falls in the well.
- the ball 70 tends to fall slower than the sleeve 60 .
- the ball 70 can knock about against the tubing 16 when falling through high gas flow.
- the system 10 must properly time the dropping of the ball 70 and sleeve 60 so that the ball 70 has sufficient time to fall downhole before the sleeve 60 is allowed to fall.
- Solutions for decoupling the ball 70 and for timing the dropping of the ball 70 and the sleeve 60 are disclosed in U.S. Pat. No. 6,467,541 and U.S. Pat. No. 6,719,060, for example. Although such schemes may be effective, what is needed is a more robust approach with less complexity.
- the two-piece plunger as disclosed in U.S. Pat. No. 6,209,637 has an upper sleeve and a lower mandrel.
- the upper sleeve has a tubular body with a central passage.
- the lower mandrel is a body with a robust lower end, two centralizer sections with outward extending arms, a circular plate with slots, and a pin at the top.
- the pin is shorter than the sleeve and nests therein with a sealing member.
- the two-piece plunger as disclosed in U.S. Pat. No. 7,383,878 has an upper sleeve and a fluted lower mandrel. A short head at the top of the mandrel latches in the sleeve.
- FIGS. 3A-3B the two-piece plunger as disclosed in U.S. Pat. No. 8,485,263 is reproduced in FIGS. 3A-3B .
- This plunger 50 C is a multi-sleeve plunger having a main sleeve 80 and an ancillary sleeve 90 that can mate and unmate during operations.
- the main sleeve 80 has a cylindrical body with an internal passage 82 through which flow can pass as the sleeve 80 falls in the well.
- the ancillary sleeve 90 also has a cylindrical body with an internal passage 92 through which flow can pass as the sleeve 90 falls in the well.
- the exterior of the main sleeve 80 can have ribbing 81 or other features for creating a pressure differential across the sleeve 80 when disposed in tubing.
- the sleeve's internal passage 82 can define a fish neck or other profile 86 allowing for retrieval of the sleeve 80 if needed.
- the main sleeve 80 defines a narrow stem 84 on which the ancillary sleeve 90 can fit when mated thereto.
- the distal end of this narrow stem 84 has a nodule 85 and defines ports 88 communicating with the sleeve's internal passage 82 . These ports 88 allow flow through the main sleeve's internal passage 82 as it falls in the well.
- the ancillary sleeve 90 its internal passage 92 can also have a fish neck profile 96 for retrieval.
- the uphole end of the ancillary sleeve 90 is open to fit onto the main sleeve's narrow stem 84 .
- the lower end of the ancillary sleeve 90 is closed except for an orifice 95 through which the nodule 85 of the main sleeve 80 can fit when mated thereto.
- the two sleeves 80 / 90 when uncombined can allow fluid to pass through their passages 82 / 92 as they fall down the tubing. When landed on the bumper downhole, the two sleeves 80 / 90 can combine or mate with one another to close off fluid flow therethrough. When combined, the ancillary sleeve 90 covers the slots 88 in the main sleeve's stem 84 , and the stem's nodule 85 closes off the ancillary sleeve's orifice 95 . The sleeves 80 / 90 remain mated together while disposed on the bumper and when pressure lifts the sleeves 80 / 90 and liquid column to the surface.
- the subject matter of the present disclosure is directed to overcoming, or at least reducing the effects of, one or more of the problems set forth above.
- a plunger lift apparatus for tubing in a well has a sleeve and a spear.
- the sleeve for disposing in the tubing defines a passage therethrough from a first proximal end to a first distal end.
- the spear for disposing in the tubing downhole of the sleeve is elongated, extending from a second proximal end to a second distal end.
- the spear's second distal end is longer than its second proximal end.
- the second distal end of the spear inserts in the passage of the sleeve, and the second proximal end of the spear mates with the first proximal end of the sleeve.
- the spear at least partially closes fluid communication through the passage of the sleeve when mated therewith.
- a plunger lift apparatus for tubing in a well has a sleeve and a spear.
- the sleeve for disposing in the tubing defines a passage therethrough.
- the spear for disposing in the tubing downhole of the sleeve mates with the sleeve downhole and at least partially closes fluid communication through the passage of the sleeve when mated therewith.
- the spear deploys at a faster rate downhole in the tubing than the sleeve.
- a plunger lift apparatus for tubing in a well has a sleeve and a spear.
- the sleeve for disposing in the tubing defines a passage therethrough and has a first ratio of cross-sectional area to weight.
- the spear for disposing in the tubing downhole of the sleeve mates with the sleeve downhole and at least partially closes fluid communication through the passage of the sleeve when mated therewith.
- the spear has a second ratio of cross-sectional area to weight ratio being less than the first ratio of the sleeve.
- the sleeve and the spear mated together move uphole within the tubing by application of a pressure differential.
- the sleeve can have means for producing a pressure differential across the sleeve by using a contoured surface, ribs, brushes, pads, etc.
- a catcher disposed uphole of the tubing can be operable to engage the sleeve when reaching the surface, and a controller operably coupled to the catcher can control engagement of the catcher with the sleeve. Additionally, the controller can operate a valve in fluid communication with the tubing based on a condition in the tubing.
- the spear can deploy at a faster rate downhole in the tubing than the sleeve, although other arrangements are possible.
- the spear has a first weight greater than a second weight of the sleeve, has a first cross-sectional area that is greater than a second cross-sectional area of the sleeve, and has a first axial length greater than a second axial length of the sleeve. More particularly, the spear has a first ratio of cross-sectional area to weight that is less than a second ratio of cross-sectional area to weight of the sleeve.
- the sleeve can define a seat in the passage toward the first proximal end.
- the seat can be configured to engage a portion of the second proximal end of the spear in a metal-to-metal seal, although other types of sealing arrangements can be used.
- the second proximal end of the spear can include a head with a first outer dimension, while the second distal end of the spear can include a stem extending from the head and having a second outer dimension less than the head.
- the head can further define a bullet tip, while the stem can define a sharpened end.
- the head can have one or more landers disposed thereon.
- the spear In a plunger lift method for tubing in a well, the spear is deployed downhole in the tubing.
- the sleeve is deployed downhole in the tubing separate to the spear and allows fluid communication through the passage in the sleeve. Fluid communication is prevented through the passage in sleeve by inserting a distal end of the spear in the passage and mating a proximal end of the spear with the passage.
- Application of a pressure differential can then lift the mated sleeve and spear uphole in the tubing.
- the method can involve catching the sleeve lifted uphole in the tubing and redeploying the sleeve downhole in the tubing by releasing the sleeve manually or automatically.
- the spear can be redeployed downhole in the tubing by unmating the spear from the sleeve lifted uphole in the tubing and permitting the spear to deploy downhole in the tubing before permitting the sleeve to deploy downhole.
- Deploying the spear downhole in the tubing can involve permitting the spear to deploy at a faster rate downhole than the sleeve, although other arrangements are possible.
- the spear can be provided with a first weight greater than a second weight than the sleeve, with a first cross-sectional area that is greater than a second cross-sectional area of the sleeve, and with a first axial length greater than a second axial length of the sleeve. More particularly, to permit the spear to deploy at the faster rate downhole than the sleeve, the spear can be provided with a first ratio of cross-sectional area to weight that is less than a second ratio of cross-sectional area to weight of the sleeve.
- FIG. 1A illustrates a plunger lift system according to the prior art.
- FIG. 1B illustrates a partial cross-section of a two piece plunger according to the prior art.
- FIG. 2 illustrates a partial cross-section of a conventional plunger according to the prior art.
- FIGS. 3A-3B show side and cross-sectional views of a multi-sleeve plunger according to the prior art.
- FIGS. 4A-4B illustrate a plunger lift system having a two-piece plunger according to the present disclosure during stages of operation.
- FIGS. 5A-5B respectively illustrate a perspective view and a cross-sectional view of a sleeve and a spear of the disclosed plunger coupled together.
- FIG. 6A illustrates a cross-sectional view of the sleeve of the disclosed plunger.
- FIG. 6B illustrates a cross-sectional view of the spear of the disclosed plunger.
- FIGS. 7A-7D illustrate cross-sectional views of various configurations of the disclosed plunger.
- FIGS. 8A-8B illustrate a perspective view and an end view of the disclosed plunger having landers.
- FIG. 9 illustrates a detail of a fishneck profile on the sleeve of the disclosed plunger.
- a gas well in FIGS. 4A-4B has a plunger lift system 10 to handle the accumulation of formation liquid in the well.
- a sufficient amount of gas may have been produced to deliver the formation liquids to the surface.
- the plunger lift system 10 may need to handle issues with liquid buildup in the well.
- the plunger lift system 10 can lift oil, condensate, or water from the bottom of the well to the surface.
- the well has production tubing 16 disposed in casing 14 , which extend from a wellhead (not shown). Formation fluids enter the casing 14 via casing perforations 18 . The produced fluids then enter the production tubing 16 and bypass a bottomhole bumper 20 positioned downhole. At the wellhead, a lubricator 30 routes produced fluids to a sales line.
- a two-piece plunger 100 disposes in the tubing 16 and can move between the bumper 20 and the lubricator 30 to lift accumulated liquid to the surface.
- the plunger 100 has a sleeve 110 and a separate spear 150 .
- the sleeve 110 and spear 150 are separate components that are disposed independently in the tubing. However, during aspects of operation, these two components 110 / 150 can fit together to complete the plunger 100 . (Further details of the plunger 100 are provided later.)
- the plunger 100 rests on the bottomhole bumper 20 toward the base of the well.
- the two components 110 / 150 mate together.
- gas is produced through lines 32 / 34 on the lubricator 30 , liquids may accumulate in the wellbore and create back-pressure that can slow gas production.
- a controller 36 operates a valve 38 at the lubricator 30 to regulate the buildup of gas in the tubing 16 . Sensing the slowing of gas production, the controller 36 shuts-in the well to increase pressure in the well as high-pressure gas begins to accumulate.
- the gas pushes against the plunger 100 and eventually pushes the plunger 100 upward from the bumper 20 toward the lubricator 30 as illustrated in FIG. 4A .
- the column of liquid above the moving plunger 100 likewise moves up the tubing 16 so the liquid load can eventually be removed from the well at the surface. In this way, the plunger 100 essentially acts as a piston between liquid and gas in the tubing 16 .
- the controller 36 allows gas and accumulated liquids above the plunger 100 to flow through the outlets 32 / 34 .
- the plunger 100 reaches the lubricator 30 , and a spring 42 absorbs the plunger's impact.
- a catcher 40 on the lubricator 40 can then capture the plunger's sleeve 110 if desired.
- the spear 150 may be struck off from the sleeve 110 using a decoupler or striker rod (not shown) at the lubricator 30 , or the spear 150 may simply be free to decouple on its own from the sleeve 110 in the absence of sufficient gas flow.
- the controller 36 can shut-in the well and releases the sleeve 110 , which drops back downhole to the bumper 20 . Ultimately, the cycle can repeat itself.
- the catcher 40 can hold the sleeve 110 and can control the release of the sleeve 110 to fall downhole after the spear 150 . Yet, in some circumstances, using the catcher 40 to hold the sleeve 110 may not be required during a lift cycle. Instead, the sleeve 110 can be held in the lubricator 30 by the immediate uphole flow of gas during the lift cycle. This may occur for a sufficient amount of time after the spear 150 has descended into the well.
- the spear 150 as shown in FIG. 4B is free to drop off the sleeve 110 when pressure fails to support it thereon.
- the spear 150 can promptly fall off the sleeve 110 and toward the bottom of the well when gas flow cannot support it coupled to the sleeve 110 .
- a particular decoupler or striker rod may not be needed for this implementation to decouple the spear 150 .
- the catcher 40 can have a conventional design when used. As shown in FIG. 4A , for example, the catcher 40 has a biased ball 44 that can latch onto the sleeve 110 and hold it. For example, the ball 44 can engage in grooves or detents of the sleeve's ribbing or in some other suitable profile or shoulder. In one implementation, the catcher 40 can be manually operated. As such, the catcher 40 can catch the sleeve 110 in the lubricator 30 so the sleeve 110 can be released manually by hand or can be retrieved and inspected as needed.
- the catcher 40 can be automated. In such an auto catch assembly, the catcher 40 can automatically catch the plunger's sleeve 110 when it arrives at the surface during a lift cycle. A sensor (not shown) can be used to detect the plunger's arrival if necessary.
- the controller 36 can then indicate when the sleeve 110 is to trip downhole rather than allowing the sleeve 110 to drop when the flow rate momentarily decreases.
- a spring and piston arrangement 46 can bias a ball 44 on the catcher 40 using compressed gas from a source controlled by the controller 36 .
- the pressure can be applied to a spring and piston arrangement 46 using diaphragm top works (not shown) or other device. With pressure applied, the ball 44 forces into the lubricator's pathway so the ball 44 can engage the plunge's sleeve 110 .
- the controller 36 can then release gas pressure from the spring and piston arrangement 46 . At this point, the weight of the sleeve 110 can push the ball 44 out of the way so the sleeve 110 is free to fall into the well.
- the spear 150 drops first into the well either because it is not held by the catcher 40 (if present) and is free to fall with less restriction.
- a striker rod at the lubricator 30 could be used to dislodge the spear 150 using techniques known in the art.
- the spear 150 may fall promptly, it may fall while the well is still flowing.
- the spear 150 has a streamlined configuration allowing it to fall through higher flow rates.
- the spear 150 is elongated and has the form of a rod or stem with weighted bullet or head at its downhole end. With this configuration, the spear 150 can avoid issues encountered by dropped balls or the like and may be able to avoid friction issues and other problems when falling against flow. Nevertheless, the spear 150 is preferably designed to fall faster than the sleeve 110 , although other arrangements are possible. Therefore, timing the dropping of the two components 110 / 150 may not be as much of an issue in the plunger lift system's operation as found in other systems.
- the separate components 110 / 150 When the separate components 110 / 150 reach the bottom of the well, they nest together in preparation for moving upwardly once pressure builds up. For example, the spear 150 falls into any liquid near the bottom and lands on the bumper 20 . The sleeve 110 drops after the spear 150 to the bumper 20 . When the sleeve 110 reaches the spear 150 , they unite into a single component. Any gas entering the tubing 16 from the formation then starts to act against the bottom of the mated component 110 / 150 and can tend to push them together uphole. In this way, any new liquid above the mated components 110 / 150 can be forced uphole to the surface.
- FIGS. 5A-5B respectively illustrate a perspective view and a cross-sectional view of the sleeve 110 and spear 150 of the disclosed plunger 100 coupled together.
- FIG. 6A illustrates a cross-sectional view of the sleeve 110 of the disclosed plunger 100 showing various dimensions
- FIG. 6B illustrates a cross-sectional view of the spear 150 of the disclosed plunger 100 showing various dimensions.
- the sleeve 110 of the plunger 100 has a cylindrical body with an external surface 120 and defines a central passage 112 from a proximal end 114 to a distal end 116 .
- the proximal end 114 is the downhole end oriented downhole from the midpoint, middle, center, etc. of the sleeve 110
- the distal end 116 is the uphole end oriented uphole of the sleeve's midpoint.
- the exterior of the sleeve 110 can have ribbing 120 for creating a pressure differential across the sleeve 110 when disposed in tubing.
- the ribbing 120 may be of any suitable type, including wire windings or a series of grooves or indentations.
- the ribbing 120 creates a turbulent zone between the sleeve 110 and the inside of the producing tubing, which restricts liquid flow on the outside of the sleeve 110 .
- the ribbing 120 can also be used as a catch area for holding the sleeve 110 at the wellhead.
- the sleeve's exterior is shown having ribbing 120 , other features can be used to create a pressure differential across the sleeve 110 when disposed in tubing.
- the sleeve 110 can have fixed brushes, biased T-pads, or other known components for creating the pressure differential.
- the spear 150 of the plunger 100 also has a proximal end 152 and a distal end 154 .
- the proximal end 152 is the downhole end oriented downhole from the midpoint, middle, center, etc. of the spear 150
- the distal end 154 is the uphole end oriented uphole of the spear's midpoint.
- the spear 150 is elongated, including a bullet or head at the proximal end 152 and including a rod or stem 154 extending from the head 152 along the length of the spear 150 to the distal end 154 .
- the spear 150 has a smooth exterior surface.
- the head 152 has a bullet contour 153 to facilitate its passage downhole through gas flow in the tubing.
- the very tip of the head 152 may be flattened where the head 152 engages the components of the downhole bumper (not shown).
- the stem 154 of the spear 140 at least partially installs in the passage 112 of the sleeve 110 .
- the stem 154 with its smaller outer dimension can substantially fit inside the sleeve's passage 112 so that the stem 154 extends at least three-fourths of the length or more of the sleeve's passage 112 .
- the head 152 of the spear 150 which may encompass about one-third or less of the length of the spear 150 , at least partially mates with the proximal end 114 of the sleeve 110 , and the spear 150 at least partially closes fluid communication through the passage 112 of the sleeve 110 when mated therewith.
- the passage 112 of the sleeve 110 defines a seat or restriction 118 toward the sleeve's proximal end 114 .
- the head 152 of the spear 150 defines a transition 158 from a larger diameter (D 5 ) to a narrower diameter (D 4 ) of the stem 154 .
- a sharpened end 155 of the stem 154 at the distal (uphole) end of the spear 150 can facilitate insertion of the stem 154 into the passage 112 .
- the transition 158 mates with the seat 118 to close off fluid flow through the passage 112 .
- the transition 158 is preferably smooth and contoured in accordance with the rest of the spear 150 . This is not strictly necessary since a sharper transition or shoulder could be used.
- the surface areas of the components 110 / 150 against which flow acts, the weight of the components 110 / 150 , their diameters, and other variables can be designed for a particular implementation and can depend on several factors, such as the size of the production tubing, expected gas flow, formation fluid properties, etc. Some exemplary dimensions are provided here for illustrative purposes.
- the overall length (L 1 ) of the sleeve 110 can be 6-in, and the overall diameter (D 1 ) of the sleeve 110 can be 1.9-in.
- the inside diameter (D 2 ) of the bore 112 can be about 1.5-in.
- the bore's seat 118 can have an inside diameter (D 3 ) of about 1.2-in.
- the overall length (L 2 ) of the spear 150 can be 6.5-in.
- the overall diameter (D 4 ) of the spear's rod 154 can be 1.0-in, while the diameter of the head 152 can be 1.2-in at its maximum.
- the rod 154 can encompass about 4.3-in of the spear's length, while the head 152 can make up the remainder of about 2.2-in.
- the spear 150 has a weight of about 1.65-lbs, whereas the sleeve 110 has a weight of about 1.61-lbs.
- the cross-sectional area of the sleeve 110 is about 1.404-in 2
- the cross-sectional area of the spear 150 is about 1.431-in 2 .
- Cross-sectional area as discussed herein refers to the area responsible for generating force under pressure.
- the sleeve 110 has an area-to-weight ratio of about 0.872-in 2 /lb, and the spear 150 has a ratio of about 0.867-in 2 /lb. This makes the sleeve's ratio about 0.5% greater than the spear 150 .
- the above dimensions, weights, ratios, and the like can be scaled for other implementations with different tubing sizes, such as 2 1/16, 27 ⁇ 8, and 31 ⁇ 2-in.
- the above dimensions, weights, ratios, and the like can be adjusted accordingly to accommodate flow rates, fluid content, and other factors of a well.
- the overall length of the sleeve 110 and spear 150 can be adjusted either alone or together to alter the weight, ratios, and dimensions of the plunger 100 for a particular implementation. In this way, even for a given tubing size (e.g., the 23 ⁇ 8-in discussed above), the lengths of the sleeve 110 and spear 150 can be adjusted to produce desired weights and ratios to meet the needs of the particular well, flow rates, and other variables encountered.
- FIGS. 7A-7D show various configurations of the plunger 100 A-D.
- FIGS. 7A-7D show the plunger 100 A-D with longer designs compared to the previous plunger of FIG. 5B .
- the plunger 100 A in FIG. 7A has the sleeve 110 extending 8-in. and has the spear 150 extending about 9.2-in.
- the radial dimensions and cross-sectional areas of the sleeve 110 and spear 150 can be relatively the same as before due to the comparable tubing size, and the same materials can be used.
- the different overall lengths of the sleeve 110 and spear 150 alter the weight of these components.
- the sleeve 110 can weigh about 2.06-Ib, while the spear 150 can weigh about 2.32-lb.
- the area-to-weight ratio for the sleeve 110 can be 0.682-in 2 /lb and can be 0.617-in 2 /lb for the spear 150 . This makes the sleeve's ratio 10.5% greater than the spear 150 .
- the plunger 100 B is shown in an even longer design with the sleeve 110 extending 10-in. and the spear 150 extending about 11.2-in.
- the radial dimensions and cross-sectional areas of the sleeve 110 and spear 150 can be relatively the same as before due to the comparable tubing size, and the same materials can be used.
- the sleeve 110 can weigh about 2.54-Ib, while the spear 150 can weigh about 2.76-lb.
- the area-to-weight ratio for the sleeve 110 can be 0.553-in 2 /lb and can be 0.518-in 2 /lb for the spear 150 . This makes the sleeve's ratio 6.7% greater than the spear 150 .
- the plunger 100 C is shown in an even longer design with the sleeve 110 extending 12-in. and the spear 150 extending about 13.2-in.
- the radial dimensions and cross-sectional areas of the sleeve 110 and spear 150 can be relatively the same as before due to the comparable tubing size, and the same materials can be used.
- the sleeve 110 can weigh about 3.0-Ib, while the spear 150 can weigh about 3.2-lb.
- the area-to-weight ratio for the sleeve 110 can be 0.468-in 2 /lb and can be 0.447-in 2 /lb for the spear 150 . This makes the sleeve's ratio 4.7% greater than the spear 150 .
- the plunger 100 D has the spear 150 extending a greater length through the sleeve 110 .
- the proximal end 152 of the spear 150 extends beyond the proximal end 114 of the sleeve 110
- the distal end 154 of the spear 150 extends beyond the distal end 116 of the sleeve 110 .
- the distal end 154 of the elongated spear 150 engages a strike pad of the lubricator ( 30 ). This knocks the spear 150 free of the sleeve 110 so the spear 150 can start its downward journey.
- This arrangement of the longer spear 150 can be used with any of the various sizes and configurations of the plunger 100 disclosed herein. As shown in this embodiment and as is possible in others, the distal end 154 of the spear 150 can further include a fishneck head or the like to assist with potential retrieval if necessary.
- the stem 154 can substantially fit inside the sleeve's passage 112 so that the stem 154 extends almost the entire length of the sleeve's passage 112 .
- the spear's head 152 may encompass about one-quarter, one-fifth, or less of the length of the spear 150 .
- the stem 154 when the spear 150 mates with the sleeve 110 , the stem 154 mostly completes the sleeve's passage 112 , and the less extensive head 152 at the proximal end of the spear 150 mates with the proximal end 114 of the sleeve 110 .
- the spear 150 and sleeve 110 mate to form a solid type of plunger body with a length comparable to the sleeve 110 . Yet, when unmated, the spear 150 and sleeve 110 are subject to different cross-sectional area to weight ratios that can be beneficially configured for a given implementation.
- landers 156 can be disposed on the head 152 of the spear 150 to stabilize the spear 150 when landed on the bumper ( 20 ). Further details of the landers 156 are shown in FIGS. 8A-8B .
- the landers 156 can be protrusions, fins, tabs, or legs disposed about the head 152 to help hold the spear 150 upright in the tubing ( 16 ) and mate with the sleeve 110 .
- a fishneck profile 115 can be provided inside the distal end of the sleeve 110 . Further details of the fishneck profile 115 are shown in FIG. 9 .
- the fishneck profile 115 can allow the sleeve 110 to be retrieved using standard fishing techniques.
- the spear 150 may need to be retrieved in other ways using a grabbing tool, for example.
- the sleeve 110 and spear 150 of the disclosed plunger 100 have been depicted without seals. Use of a seal may be unnecessary for at least partially closing off fluid communication between the sleeve 110 and the spear 150 when mated together. However, it will be appreciated that one or more seals may be used on the sleeve 110 and spear 150 . For example, one or more seals can be used on the abutting surfaces between the sleeve's seat 118 and the spear's transition 138 so as not to interfere with the free decoupling between the sleeve 110 and spear 150 .
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- General Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Earth Drilling (AREA)
Abstract
A plunger lift system has a plunger with a sleeve and a spear that dispose in tubing. The sleeve and spear can move in the tubing between a bumper and a lubricator. The sleeve has a passage for fluid to pass therethrough, and the spear can insert partially into the sleeve's passage. The sleeve and spear fall independently of one another from the surface to the bumper. When disposed on the bumper, the sleeve and spear mate together. Building gas pressure downhole can then lift the mated sleeve and spear, which can sweep liquid along the tubing and push the liquid along with them to the surface.
Description
- Liquid buildup can occur in aging production wells and can reduce the well's productivity. To handle the buildup, operators can use beam lift pumps or other remedial techniques, such as venting or “blowing down” the well. Unfortunately, these techniques can cause gas losses. Moreover, blowing down the well can produce undesirable methane emissions.
- In contrast to these techniques, operators can use a plunger lift system, which can de-liquefy a gas well, reduce gas losses, and improve well productivity. The plunger lift system can use one of two types of plungers: a conventional plunger and a continuous (bypass) plunger. The conventional plunger is typically used to lift built-up fluid at the downhole end of the tubing string.
- A continuous plunger is typically used when the well is still flowing at very high flow rates, above critical velocity, during early intervention of the well. To do this, the continuous plunger is designed to fall against the flow of the well and uses a valve on the plunger, such as an internal shifting rod. When the plunger lands downhole on the bumper, the valve is closed. Then, when built-up pressure lifts it in the tubing, the continuous plunger is primarily used to sweep accumulated fluids along the tubing wall.
- For example, a plunger lift system 10 of the prior art is shown in
FIG. 1A . In the system 10, a plunger 50A is disposed inproduction tubing 16, which is deployed in casing 14 from awellhead 12. During operation, the plunger 50A moves between alubricator 30 at the surface and alanding bumper 20 downhole. - The plunger 50A shown in
FIGS. 1A-1B is a two-piece plunger of the continuous type. By contrast, a conventional plunger 50B as shown inFIG. 2 has a single body that may be solid or semi-hollow and that has external ribbing or the like for creating a pressure differential. The continuous plunger 50B as inFIG. 2 is used when liquid build-up has become an issue in part because the well is not flowing above critical velocity. The two-piece plunger 50A ofFIGS. 1A-1B , however, can be used in a well that is still flowing above critical velocity and liquid build-up has not become a significant issue yet. - The two-piece plunger 50A of
FIGS. 1A-1B allows both pieces to fall faster downhole than would be possible for such a solid or semi-hollow plunger 50B of the prior art. As best shown inFIG. 1B , the two-piece plunger 50A has aseparate sleeve 60 andball 70. Thesleeve 60 has an inner bore 62 that defines a seat 68. Theball 70 can fit against the seat 68 and can seal fluid flow up through the plunger's bore 62 during operation. The sleeve's outer surface can have ribbing 64 or the like for creating a pressure differential. Particular examples of this type of two-piece plunger 50A and its use are disclosed in U.S. Pat. No. 6,467,541 and U.S. Pat. No. 6,719,060. - When used in the system 10 of
FIG. 1A-1B , thesleeve 60 andball 70 dispose separately in thetubing 16. Theball 70 drops first to land near the bottom of the well. Theball 70 falls into any liquid near the bottom of the well and contacts thebumper 20. Thesleeve 60 drops after theball 70 so it can fall to thebumper 20 as well. Thus, during operations, theball 70 falls in the well first followed by thesleeve 60 against high flow rates. They travel independently of each other. When they reach the bottom of the well, they unite and can then travel back to the surface to de-liquefy the well. - When the
sleeve 60 reaches theball 70, for example, they unite into a single component. With the plunger 50A deployed to handle liquid buildup, operators set the well in operation. Gas from the formation enters through casing perforations 18 and travels up theproduction tubing 16 to the surface, where it is produced through lines 32/34 at thelubricator 30. Liquids may accumulate in the well and can create back pressure that can slow gas production through the lines 32/34. Using sensors and the like, a controller 36 operates avalve 38 at thelubricator 30 to regulate the buildup of pressure in thetubing 16. Sensing the slowing of gas production due to liquid accumulation, the controller 36 shuts-in the well to increase pressure in the well. - As high-pressure gas accumulates, the well reaches a sufficient volume of gas and pressure. Eventually, the gas pressure buildup pushes against the combined
sleeve 60 andball 70 and lifts them together to thelubricator 30 at the surface. The column of liquid accumulated above the plunger 50A likewise moves up thetubing 16 to the surface so that the liquid load can be removed from the well. - In this way, the plunger 50 essentially acts as a piston between liquid and gas in the
tubing 16. Gas entering theproduction string 16 from the formation through the casing perforations 18 acts against the bottom of the plunger 50A (mated sleeve andball 60/70) and tends to push the plunger 50A uphole. At the same time, any liquid above the plunger 50A will be forced uphole to the surface by the plunger 50A. - As the plunger 50A rises, for example, the controller 36 allows gas and accumulated liquids above the plunger 50A to flow through lines 32/34. Eventually, the plunger 50A reaches a catcher 40 on the
lubricator 30 and a spring (not shown) absorbs the upward movement. The catcher 40 captures the plunger'ssleeve 60 when it arrives, and the gas that lifted the plunger 50A flows through the lower line 32 to the sales line. A decoupler or striker rod (not shown) inside thelubricator 30 can separate theball 70 from thesleeve 60. Theball 70 can then immediately fall toward the bottom of the well. In the meantime, the catcher 40 holds thesleeve 60 and then releases thesleeve 60 after theball 70 is already on its way down thetubing 16. - Dropped in this manner, the
sleeve 60 andball 70 fall independently inside theproduction tubing 16. Thesleeve 60 with its central passage 62 can have gas flow through it as thesleeve 60 falls in the well. On the other hand, flow travels around the outside of theball 70 as theball 70 falls in the well. Unfortunately, theball 70 tends to fall slower than thesleeve 60. In fact, theball 70 can knock about against thetubing 16 when falling through high gas flow. - Therefore, the system 10 must properly time the dropping of the
ball 70 and sleeve 60 so that theball 70 has sufficient time to fall downhole before thesleeve 60 is allowed to fall. Solutions for decoupling theball 70 and for timing the dropping of theball 70 and thesleeve 60 are disclosed in U.S. Pat. No. 6,467,541 and U.S. Pat. No. 6,719,060, for example. Although such schemes may be effective, what is needed is a more robust approach with less complexity. - Other two piece plunger designs are disclosed in U.S. Pat. No. 6,148,923; U.S. Pat. No. 6,209,637; U.S. Pat. No. 7,383,878; and U.S. Pat. No. 8,485,263. For example, the two-piece plunger as disclosed in U.S. Pat. No. 6,209,637 has an upper sleeve and a lower mandrel. The upper sleeve has a tubular body with a central passage. The lower mandrel is a body with a robust lower end, two centralizer sections with outward extending arms, a circular plate with slots, and a pin at the top. The pin is shorter than the sleeve and nests therein with a sealing member. In a similar configuration, the two-piece plunger as disclosed in U.S. Pat. No. 7,383,878 has an upper sleeve and a fluted lower mandrel. A short head at the top of the mandrel latches in the sleeve.
- In another example, the two-piece plunger as disclosed in U.S. Pat. No. 8,485,263 is reproduced in
FIGS. 3A-3B . This plunger 50C is a multi-sleeve plunger having a main sleeve 80 and anancillary sleeve 90 that can mate and unmate during operations. The main sleeve 80 has a cylindrical body with aninternal passage 82 through which flow can pass as the sleeve 80 falls in the well. Similarly, theancillary sleeve 90 also has a cylindrical body with an internal passage 92 through which flow can pass as thesleeve 90 falls in the well. - Turning to the main sleeve 80, the exterior of the main sleeve 80 can have
ribbing 81 or other features for creating a pressure differential across the sleeve 80 when disposed in tubing. The sleeve'sinternal passage 82 can define a fish neck orother profile 86 allowing for retrieval of the sleeve 80 if needed. At its distal end, the main sleeve 80 defines anarrow stem 84 on which theancillary sleeve 90 can fit when mated thereto. The distal end of thisnarrow stem 84 has a nodule 85 and definesports 88 communicating with the sleeve'sinternal passage 82. Theseports 88 allow flow through the main sleeve'sinternal passage 82 as it falls in the well. - Turning to the
ancillary sleeve 90, its internal passage 92 can also have afish neck profile 96 for retrieval. The uphole end of theancillary sleeve 90 is open to fit onto the main sleeve'snarrow stem 84. The lower end of theancillary sleeve 90, however, is closed except for anorifice 95 through which the nodule 85 of the main sleeve 80 can fit when mated thereto. - The two sleeves 80/90 when uncombined can allow fluid to pass through their
passages 82/92 as they fall down the tubing. When landed on the bumper downhole, the two sleeves 80/90 can combine or mate with one another to close off fluid flow therethrough. When combined, theancillary sleeve 90 covers theslots 88 in the main sleeve'sstem 84, and the stem's nodule 85 closes off the ancillary sleeve'sorifice 95. The sleeves 80/90 remain mated together while disposed on the bumper and when pressure lifts the sleeves 80/90 and liquid column to the surface. - As the above examples show, there are several ways to implement a plunger lift system. However, operators are continually striving to develop more efficient and effective plunger lift systems to increase the production from a gas well. Systems in the prior art may require longer cycle times for the plunger to fall, for pressure to build-up, and for liquid to then be lifted. The well may need to be shut in for longer periods than desired, and reduced amounts of gas may be produced over time as a result.
- The subject matter of the present disclosure is directed to overcoming, or at least reducing the effects of, one or more of the problems set forth above.
- In one arrangement, a plunger lift apparatus for tubing in a well has a sleeve and a spear. The sleeve for disposing in the tubing defines a passage therethrough from a first proximal end to a first distal end. The spear for disposing in the tubing downhole of the sleeve is elongated, extending from a second proximal end to a second distal end. The spear's second distal end is longer than its second proximal end. The second distal end of the spear inserts in the passage of the sleeve, and the second proximal end of the spear mates with the first proximal end of the sleeve. The spear at least partially closes fluid communication through the passage of the sleeve when mated therewith.
- In another arrangement, a plunger lift apparatus for tubing in a well has a sleeve and a spear. The sleeve for disposing in the tubing defines a passage therethrough. The spear for disposing in the tubing downhole of the sleeve mates with the sleeve downhole and at least partially closes fluid communication through the passage of the sleeve when mated therewith. In some arrangements, the spear deploys at a faster rate downhole in the tubing than the sleeve.
- In yet another arrangement, a plunger lift apparatus for tubing in a well has a sleeve and a spear. The sleeve for disposing in the tubing defines a passage therethrough and has a first ratio of cross-sectional area to weight. The spear for disposing in the tubing downhole of the sleeve mates with the sleeve downhole and at least partially closes fluid communication through the passage of the sleeve when mated therewith. The spear has a second ratio of cross-sectional area to weight ratio being less than the first ratio of the sleeve.
- In the various arrangements, the sleeve and the spear mated together move uphole within the tubing by application of a pressure differential. To facilitate this, the sleeve can have means for producing a pressure differential across the sleeve by using a contoured surface, ribs, brushes, pads, etc.
- A catcher disposed uphole of the tubing can be operable to engage the sleeve when reaching the surface, and a controller operably coupled to the catcher can control engagement of the catcher with the sleeve. Additionally, the controller can operate a valve in fluid communication with the tubing based on a condition in the tubing.
- As noted above, the spear can deploy at a faster rate downhole in the tubing than the sleeve, although other arrangements are possible. Overall, the spear has a first weight greater than a second weight of the sleeve, has a first cross-sectional area that is greater than a second cross-sectional area of the sleeve, and has a first axial length greater than a second axial length of the sleeve. More particularly, the spear has a first ratio of cross-sectional area to weight that is less than a second ratio of cross-sectional area to weight of the sleeve.
- To close off fluid communication when mated, the sleeve can define a seat in the passage toward the first proximal end. The seat can be configured to engage a portion of the second proximal end of the spear in a metal-to-metal seal, although other types of sealing arrangements can be used.
- The second proximal end of the spear can include a head with a first outer dimension, while the second distal end of the spear can include a stem extending from the head and having a second outer dimension less than the head. The head can further define a bullet tip, while the stem can define a sharpened end. To stabilize engagement of the spear on a bumper downhole in the tubing, the head can have one or more landers disposed thereon.
- In a plunger lift method for tubing in a well, the spear is deployed downhole in the tubing. The sleeve is deployed downhole in the tubing separate to the spear and allows fluid communication through the passage in the sleeve. Fluid communication is prevented through the passage in sleeve by inserting a distal end of the spear in the passage and mating a proximal end of the spear with the passage. Application of a pressure differential can then lift the mated sleeve and spear uphole in the tubing.
- The method can involve catching the sleeve lifted uphole in the tubing and redeploying the sleeve downhole in the tubing by releasing the sleeve manually or automatically. The spear can be redeployed downhole in the tubing by unmating the spear from the sleeve lifted uphole in the tubing and permitting the spear to deploy downhole in the tubing before permitting the sleeve to deploy downhole.
- Deploying the spear downhole in the tubing can involve permitting the spear to deploy at a faster rate downhole than the sleeve, although other arrangements are possible. Overall, the spear can be provided with a first weight greater than a second weight than the sleeve, with a first cross-sectional area that is greater than a second cross-sectional area of the sleeve, and with a first axial length greater than a second axial length of the sleeve. More particularly, to permit the spear to deploy at the faster rate downhole than the sleeve, the spear can be provided with a first ratio of cross-sectional area to weight that is less than a second ratio of cross-sectional area to weight of the sleeve.
- The foregoing summary is not intended to summarize each potential embodiment or every aspect of the present disclosure.
-
FIG. 1A illustrates a plunger lift system according to the prior art. -
FIG. 1B illustrates a partial cross-section of a two piece plunger according to the prior art. -
FIG. 2 illustrates a partial cross-section of a conventional plunger according to the prior art. -
FIGS. 3A-3B show side and cross-sectional views of a multi-sleeve plunger according to the prior art. -
FIGS. 4A-4B illustrate a plunger lift system having a two-piece plunger according to the present disclosure during stages of operation. -
FIGS. 5A-5B respectively illustrate a perspective view and a cross-sectional view of a sleeve and a spear of the disclosed plunger coupled together. -
FIG. 6A illustrates a cross-sectional view of the sleeve of the disclosed plunger. -
FIG. 6B illustrates a cross-sectional view of the spear of the disclosed plunger. -
FIGS. 7A-7D illustrate cross-sectional views of various configurations of the disclosed plunger. -
FIGS. 8A-8B illustrate a perspective view and an end view of the disclosed plunger having landers. -
FIG. 9 illustrates a detail of a fishneck profile on the sleeve of the disclosed plunger. - A gas well in
FIGS. 4A-4B has a plunger lift system 10 to handle the accumulation of formation liquid in the well. In an earlier stage of the well's productive life, a sufficient amount of gas may have been produced to deliver the formation liquids to the surface. However, due to the age of the well or other factors, the plunger lift system 10 may need to handle issues with liquid buildup in the well. In general, the plunger lift system 10 can lift oil, condensate, or water from the bottom of the well to the surface. - As shown, the well has
production tubing 16 disposed in casing 14, which extend from a wellhead (not shown). Formation fluids enter the casing 14 via casing perforations 18. The produced fluids then enter theproduction tubing 16 and bypass abottomhole bumper 20 positioned downhole. At the wellhead, a lubricator 30 routes produced fluids to a sales line. - A two-
piece plunger 100 disposes in thetubing 16 and can move between thebumper 20 and thelubricator 30 to lift accumulated liquid to the surface. As shown briefly inFIGS. 4A-4B , theplunger 100 has asleeve 110 and aseparate spear 150. Being two pieces, thesleeve 110 andspear 150 are separate components that are disposed independently in the tubing. However, during aspects of operation, these twocomponents 110/150 can fit together to complete theplunger 100. (Further details of theplunger 100 are provided later.) - Initially, the
plunger 100 rests on thebottomhole bumper 20 toward the base of the well. When disposed at thebumper 20, the twocomponents 110/150 mate together. As gas is produced through lines 32/34 on thelubricator 30, liquids may accumulate in the wellbore and create back-pressure that can slow gas production. Using sensors and the like, a controller 36 operates avalve 38 at thelubricator 30 to regulate the buildup of gas in thetubing 16. Sensing the slowing of gas production, the controller 36 shuts-in the well to increase pressure in the well as high-pressure gas begins to accumulate. - When sufficient gas volume and pressure level are reached, the gas pushes against the
plunger 100 and eventually pushes theplunger 100 upward from thebumper 20 toward thelubricator 30 as illustrated inFIG. 4A . The column of liquid above the movingplunger 100 likewise moves up thetubing 16 so the liquid load can eventually be removed from the well at the surface. In this way, theplunger 100 essentially acts as a piston between liquid and gas in thetubing 16. - As the
plunger 100 rises, the controller 36 allows gas and accumulated liquids above theplunger 100 to flow through the outlets 32/34. Eventually, theplunger 100 reaches thelubricator 30, and aspring 42 absorbs the plunger's impact. A catcher 40 on the lubricator 40 can then capture the plunger'ssleeve 110 if desired. Thespear 150 may be struck off from thesleeve 110 using a decoupler or striker rod (not shown) at thelubricator 30, or thespear 150 may simply be free to decouple on its own from thesleeve 110 in the absence of sufficient gas flow. - Meanwhile, the gas that lifted the
plunger 100 flows through the lower outlet 32 to the sales line. Once the gas flow stabilizes, the controller 36 can shut-in the well and releases thesleeve 110, which drops back downhole to thebumper 20. Ultimately, the cycle can repeat itself. - As noted, the catcher 40 can hold the
sleeve 110 and can control the release of thesleeve 110 to fall downhole after thespear 150. Yet, in some circumstances, using the catcher 40 to hold thesleeve 110 may not be required during a lift cycle. Instead, thesleeve 110 can be held in thelubricator 30 by the immediate uphole flow of gas during the lift cycle. This may occur for a sufficient amount of time after thespear 150 has descended into the well. - For its part, the
spear 150 as shown inFIG. 4B is free to drop off thesleeve 110 when pressure fails to support it thereon. Thus, thespear 150 can promptly fall off thesleeve 110 and toward the bottom of the well when gas flow cannot support it coupled to thesleeve 110. Accordingly, a particular decoupler or striker rod may not be needed for this implementation to decouple thespear 150. - In general, the catcher 40 can have a conventional design when used. As shown in
FIG. 4A , for example, the catcher 40 has a biasedball 44 that can latch onto thesleeve 110 and hold it. For example, theball 44 can engage in grooves or detents of the sleeve's ribbing or in some other suitable profile or shoulder. In one implementation, the catcher 40 can be manually operated. As such, the catcher 40 can catch thesleeve 110 in thelubricator 30 so thesleeve 110 can be released manually by hand or can be retrieved and inspected as needed. - Alternatively, the catcher 40 can be automated. In such an auto catch assembly, the catcher 40 can automatically catch the plunger's
sleeve 110 when it arrives at the surface during a lift cycle. A sensor (not shown) can be used to detect the plunger's arrival if necessary. - The controller 36 can then indicate when the
sleeve 110 is to trip downhole rather than allowing thesleeve 110 to drop when the flow rate momentarily decreases. For such an automated catcher 40, a spring andpiston arrangement 46 can bias aball 44 on the catcher 40 using compressed gas from a source controlled by the controller 36. The pressure can be applied to a spring andpiston arrangement 46 using diaphragm top works (not shown) or other device. With pressure applied, theball 44 forces into the lubricator's pathway so theball 44 can engage the plunge'ssleeve 110. When appropriate, the controller 36 can then release gas pressure from the spring andpiston arrangement 46. At this point, the weight of thesleeve 110 can push theball 44 out of the way so thesleeve 110 is free to fall into the well. - The
spear 150 drops first into the well either because it is not held by the catcher 40 (if present) and is free to fall with less restriction. In an alternative arrangement noted previously, a striker rod at thelubricator 30 could be used to dislodge thespear 150 using techniques known in the art. Once thespear 150 drops, thesleeve 110 follows in due course so thecomponents 110/150 fall separately and independently of one another down thetubing 16. This enables theplunger 100 to fall faster downhole and with less restriction than other types of plungers. Once they reach bottom of the well, they unite and can eventually be lifted up to the surface to de-liquefy the gas well. - Because the
spear 150 may fall promptly, it may fall while the well is still flowing. Thus, thespear 150 has a streamlined configuration allowing it to fall through higher flow rates. In particular, thespear 150 is elongated and has the form of a rod or stem with weighted bullet or head at its downhole end. With this configuration, thespear 150 can avoid issues encountered by dropped balls or the like and may be able to avoid friction issues and other problems when falling against flow. Nevertheless, thespear 150 is preferably designed to fall faster than thesleeve 110, although other arrangements are possible. Therefore, timing the dropping of the twocomponents 110/150 may not be as much of an issue in the plunger lift system's operation as found in other systems. - When the
separate components 110/150 reach the bottom of the well, they nest together in preparation for moving upwardly once pressure builds up. For example, thespear 150 falls into any liquid near the bottom and lands on thebumper 20. Thesleeve 110 drops after thespear 150 to thebumper 20. When thesleeve 110 reaches thespear 150, they unite into a single component. Any gas entering thetubing 16 from the formation then starts to act against the bottom of the matedcomponent 110/150 and can tend to push them together uphole. In this way, any new liquid above the matedcomponents 110/150 can be forced uphole to the surface. -
FIGS. 5A-5B respectively illustrate a perspective view and a cross-sectional view of thesleeve 110 andspear 150 of the disclosedplunger 100 coupled together.FIG. 6A illustrates a cross-sectional view of thesleeve 110 of the disclosedplunger 100 showing various dimensions, andFIG. 6B illustrates a cross-sectional view of thespear 150 of the disclosedplunger 100 showing various dimensions. - The
sleeve 110 of theplunger 100 has a cylindrical body with anexternal surface 120 and defines acentral passage 112 from aproximal end 114 to a distal end 116. (In context, theproximal end 114 is the downhole end oriented downhole from the midpoint, middle, center, etc. of thesleeve 110, while the distal end 116 is the uphole end oriented uphole of the sleeve's midpoint.) The exterior of thesleeve 110 can haveribbing 120 for creating a pressure differential across thesleeve 110 when disposed in tubing. Theribbing 120 may be of any suitable type, including wire windings or a series of grooves or indentations. Theribbing 120 creates a turbulent zone between thesleeve 110 and the inside of the producing tubing, which restricts liquid flow on the outside of thesleeve 110. Theribbing 120 can also be used as a catch area for holding thesleeve 110 at the wellhead. - Although the sleeve's exterior is shown having
ribbing 120, other features can be used to create a pressure differential across thesleeve 110 when disposed in tubing. For example, thesleeve 110 can have fixed brushes, biased T-pads, or other known components for creating the pressure differential. - The
spear 150 of theplunger 100 also has aproximal end 152 and adistal end 154. (In context, theproximal end 152 is the downhole end oriented downhole from the midpoint, middle, center, etc. of thespear 150, while thedistal end 154 is the uphole end oriented uphole of the spear's midpoint.) As already noted, thespear 150 is elongated, including a bullet or head at theproximal end 152 and including a rod or stem 154 extending from thehead 152 along the length of thespear 150 to thedistal end 154. Contrary to the exterior of thesleeve 110, thespear 150 has a smooth exterior surface. Thehead 152 has a bullet contour 153 to facilitate its passage downhole through gas flow in the tubing. The very tip of thehead 152 may be flattened where thehead 152 engages the components of the downhole bumper (not shown). - When the
sleeve 110 andspear 150 are coupled together, thestem 154 of the spear 140 at least partially installs in thepassage 112 of thesleeve 110. (In fact, thestem 154 with its smaller outer dimension can substantially fit inside the sleeve'spassage 112 so that thestem 154 extends at least three-fourths of the length or more of the sleeve'spassage 112.) Thehead 152 of thespear 150, which may encompass about one-third or less of the length of thespear 150, at least partially mates with theproximal end 114 of thesleeve 110, and thespear 150 at least partially closes fluid communication through thepassage 112 of thesleeve 110 when mated therewith. - In particular, the
passage 112 of thesleeve 110 defines a seat orrestriction 118 toward the sleeve'sproximal end 114. Thehead 152 of thespear 150 defines a transition 158 from a larger diameter (D5) to a narrower diameter (D4) of thestem 154. A sharpened end 155 of thestem 154 at the distal (uphole) end of thespear 150 can facilitate insertion of thestem 154 into thepassage 112. When thestem 154 inserts inside the sleeve'spassage 112, the transition 158 mates with theseat 118 to close off fluid flow through thepassage 112. As shown here, the transition 158 is preferably smooth and contoured in accordance with the rest of thespear 150. This is not strictly necessary since a sharper transition or shoulder could be used. - As will be appreciated, the surface areas of the
components 110/150 against which flow acts, the weight of thecomponents 110/150, their diameters, and other variables can be designed for a particular implementation and can depend on several factors, such as the size of the production tubing, expected gas flow, formation fluid properties, etc. Some exemplary dimensions are provided here for illustrative purposes. - When used for 2⅜-in tubing that can have an internal dimension of about 1.995-in, the overall length (L1) of the
sleeve 110 can be 6-in, and the overall diameter (D1) of thesleeve 110 can be 1.9-in. The inside diameter (D2) of thebore 112 can be about 1.5-in., and the bore'sseat 118 can have an inside diameter (D3) of about 1.2-in. - The overall length (L2) of the
spear 150 can be 6.5-in. As will be appreciated, the spear's length (L2) as compared to the diameter of the tubing is sufficient that thespear 150 does not flip over, rotate end-to-end, or lodge during passage along the tubing. The overall diameter (D4) of the spear'srod 154 can be 1.0-in, while the diameter of thehead 152 can be 1.2-in at its maximum. Therod 154 can encompass about 4.3-in of the spear's length, while thehead 152 can make up the remainder of about 2.2-in. When thehead 152 seats against theseat 118 of the sleeve'sbore 112, the engagement can be made roughly at about 1.35-in. in diameter. - With these dimensions and with a standard steel density of about 0.283-lb/in3, the
spear 150 has a weight of about 1.65-lbs, whereas thesleeve 110 has a weight of about 1.61-lbs. The cross-sectional area of thesleeve 110 is about 1.404-in2, while the cross-sectional area of thespear 150 is about 1.431-in2. (Cross-sectional area as discussed herein refers to the area responsible for generating force under pressure.) Thus, the ratio of the cross-section area to the weight for thesleeve 110 is higher than that of thespear 150. In the current example, thesleeve 110 has an area-to-weight ratio of about 0.872-in2/lb, and thespear 150 has a ratio of about 0.867-in2/lb. This makes the sleeve's ratio about 0.5% greater than thespear 150. - As will be appreciated, the above dimensions, weights, ratios, and the like can be scaled for other implementations with different tubing sizes, such as 2 1/16, 2⅞, and 3½-in. Similarly, the above dimensions, weights, ratios, and the like can be adjusted accordingly to accommodate flow rates, fluid content, and other factors of a well.
- In this regard, the overall length of the
sleeve 110 andspear 150 can be adjusted either alone or together to alter the weight, ratios, and dimensions of theplunger 100 for a particular implementation. In this way, even for a given tubing size (e.g., the 2⅜-in discussed above), the lengths of thesleeve 110 andspear 150 can be adjusted to produce desired weights and ratios to meet the needs of the particular well, flow rates, and other variables encountered. - For example,
FIGS. 7A-7D show various configurations of the plunger 100A-D.FIGS. 7A-7D show the plunger 100A-D with longer designs compared to the previous plunger ofFIG. 5B . The plunger 100A inFIG. 7A has thesleeve 110 extending 8-in. and has thespear 150 extending about 9.2-in. The radial dimensions and cross-sectional areas of thesleeve 110 andspear 150 can be relatively the same as before due to the comparable tubing size, and the same materials can be used. The different overall lengths of thesleeve 110 andspear 150, however, alter the weight of these components. Here, thesleeve 110 can weigh about 2.06-Ib, while thespear 150 can weigh about 2.32-lb. Thus, the area-to-weight ratio for thesleeve 110 can be 0.682-in2/lb and can be 0.617-in2/lb for thespear 150. This makes the sleeve's ratio 10.5% greater than thespear 150. - As shown in
FIG. 7B , the plunger 100B is shown in an even longer design with thesleeve 110 extending 10-in. and thespear 150 extending about 11.2-in. The radial dimensions and cross-sectional areas of thesleeve 110 andspear 150 can be relatively the same as before due to the comparable tubing size, and the same materials can be used. Here, thesleeve 110 can weigh about 2.54-Ib, while thespear 150 can weigh about 2.76-lb. Thus, the area-to-weight ratio for thesleeve 110 can be 0.553-in2/lb and can be 0.518-in2/lb for thespear 150. This makes the sleeve's ratio 6.7% greater than thespear 150. - As shown in
FIG. 7C , the plunger 100C is shown in an even longer design with thesleeve 110 extending 12-in. and thespear 150 extending about 13.2-in. The radial dimensions and cross-sectional areas of thesleeve 110 andspear 150 can be relatively the same as before due to the comparable tubing size, and the same materials can be used. Here, thesleeve 110 can weigh about 3.0-Ib, while thespear 150 can weigh about 3.2-lb. Thus, the area-to-weight ratio for thesleeve 110 can be 0.468-in2/lb and can be 0.447-in2/lb for thespear 150. This makes the sleeve's ratio 4.7% greater than thespear 150. - As shown in
FIG. 7D , the plunger 100D has thespear 150 extending a greater length through thesleeve 110. Here, theproximal end 152 of thespear 150 extends beyond theproximal end 114 of thesleeve 110, and thedistal end 154 of thespear 150 extends beyond the distal end 116 of thesleeve 110. In one advantage when the combinedsleeve 110 andspear 150 arrives at top of the lubricator (30), thedistal end 154 of theelongated spear 150 engages a strike pad of the lubricator (30). This knocks thespear 150 free of thesleeve 110 so thespear 150 can start its downward journey. This arrangement of thelonger spear 150 can be used with any of the various sizes and configurations of theplunger 100 disclosed herein. As shown in this embodiment and as is possible in others, thedistal end 154 of thespear 150 can further include a fishneck head or the like to assist with potential retrieval if necessary. - As shown in
FIGS. 7A-7D , thestem 154 can substantially fit inside the sleeve'spassage 112 so that thestem 154 extends almost the entire length of the sleeve'spassage 112. As also shown, the spear'shead 152 may encompass about one-quarter, one-fifth, or less of the length of thespear 150. Thus, when thespear 150 mates with thesleeve 110, thestem 154 mostly completes the sleeve'spassage 112, and the lessextensive head 152 at the proximal end of thespear 150 mates with theproximal end 114 of thesleeve 110. In this sense, thespear 150 andsleeve 110 mate to form a solid type of plunger body with a length comparable to thesleeve 110. Yet, when unmated, thespear 150 andsleeve 110 are subject to different cross-sectional area to weight ratios that can be beneficially configured for a given implementation. - Further alteration of the ratios can be achieved by altering the materials used for the
sleeve 110 and/or thespear 150. Although the above examples show that increased length of one component (e.g., sleeve 110) equates to a comparable increase in length of the other component (e.g., spear 150), this is not strictly necessary. It is possible in other configurations that the length of one component may be disproportionate to the other component. - As previously depicted,
landers 156 can be disposed on thehead 152 of thespear 150 to stabilize thespear 150 when landed on the bumper (20). Further details of thelanders 156 are shown inFIGS. 8A-8B . Thelanders 156 can be protrusions, fins, tabs, or legs disposed about thehead 152 to help hold thespear 150 upright in the tubing (16) and mate with thesleeve 110. - As previously depicted, a
fishneck profile 115 can be provided inside the distal end of thesleeve 110. Further details of thefishneck profile 115 are shown inFIG. 9 . Thefishneck profile 115 can allow thesleeve 110 to be retrieved using standard fishing techniques. Thespear 150 may need to be retrieved in other ways using a grabbing tool, for example. - The
sleeve 110 andspear 150 of the disclosedplunger 100 have been depicted without seals. Use of a seal may be unnecessary for at least partially closing off fluid communication between thesleeve 110 and thespear 150 when mated together. However, it will be appreciated that one or more seals may be used on thesleeve 110 andspear 150. For example, one or more seals can be used on the abutting surfaces between the sleeve'sseat 118 and the spear's transition 138 so as not to interfere with the free decoupling between thesleeve 110 andspear 150. - The foregoing description of preferred and other embodiments is not intended to limit or restrict the scope or applicability of the inventive concepts conceived of by the Applicants. It will be appreciated with the benefit of the present disclosure that features described above in accordance with any embodiment or aspect of the disclosed subject matter can be utilized, either alone or in combination, with any other described feature, in any other embodiment or aspect of the disclosed subject matter.
- In exchange for disclosing the inventive concepts contained herein, the Applicants desire all patent rights afforded by the appended claims. Therefore, it is intended that the appended claims include all modifications and alterations to the full extent that they come within the scope of the following claims or the equivalents thereof.
Claims (29)
1. A plunger lift apparatus for tubing in a well, comprising:
a sleeve for disposing in the tubing, the sleeve defining a passage therethrough from a first proximal end to a first distal end; and
a spear for disposing in the tubing downhole of the sleeve, the spear being elongated and extending from a second proximal end to a second distal end, the second distal end of the spear inserting in the passage of the sleeve, the second proximal end of the spear mating with the first proximal end of the sleeve, the spear at least partially closing fluid communication through the passage of the sleeve when mated therewith.
2. The apparatus of claim 1 , wherein the sleeve comprises means for producing a pressure differential across the sleeve.
3. The apparatus of claim 1 , wherein the sleeve and the spear mated together move uphole within the tubing by application of a pressure differential.
4. The apparatus of claim 1 , wherein the spear deploys at a faster rate downhole in the tubing than the sleeve.
5. The apparatus of claim 1 , wherein the spear comprises a first weight greater than a second weight than the sleeve.
6. The apparatus of claim 1 , wherein the spear comprises a first cross-sectional area that is greater than a second cross-sectional area of the sleeve.
7. The apparatus of claim 1 , wherein the spear comprises a first axial length greater than a second axial length of the sleeve.
8. The apparatus of claim 7 , wherein the second distal end of the spear extends beyond the first distal end of the sleeve and the second proximal end of the spear extends beyond the first proximal end of the sleeve when the spear is mated with the sleeve.
9. The apparatus of claim 1 , wherein the spear comprises a first ratio of cross-sectional area to weight that is less than a second ratio of cross-sectional area to weight of the sleeve.
10. The apparatus of claim 1 , wherein the sleeve defines a seat in the passage toward the first proximal end, the seat configured to engage a portion of the second proximal end of the spear.
11. The apparatus of claim 1 , wherein the second proximal end of the spear comprises a head, and wherein the second distal end of the spear comprises a stem extending from the head.
12. The apparatus of claim 11 , wherein the head defines a bullet tip, and wherein the stem defines a sharpened end.
13. The apparatus of claim 11 , wherein the head comprises one or more landers disposed thereon and stabilizing engagement of the spear downhole in the tubing.
14. The apparatus of claim 11 , wherein the head comprises a first outer dimension being greater than a second outer dimension of the stem, a portion of the first outer dimension of the head being configured to engage a portion of the passage of the sleeve toward the first proximal end.
15. The apparatus of claim 1 ,
wherein the passage of the sleeve has a first proximal opening toward the first proximal end and has a first distal opening toward the first distal end;
wherein the second distal end of the spear installs through the first proximal opening; and
wherein the second proximal end of the spear at least partially mates at the first proximal opening of the passage.
16. The apparatus of claim 1 , further comprising a catcher disposed uphole of the tubing and operable to engage the sleeve.
17. The apparatus of claim 16 , further comprising a controller operably coupled to the catcher and controlling engagement of the catcher with the sleeve.
18. The apparatus of claim 1 , further comprising:
a valve in fluid communication with the tubing; and
a controller operably coupled to the valve and controlling the valve in response to a condition in the tubing.
19. The apparatus of claim 1 , wherein the second distal end of the spear is longer than the second proximal end.
20. A plunger lift apparatus for tubing in a well, comprising:
a sleeve for disposing in the tubing, the sleeve defining a passage therethrough; and
a spear for disposing in the tubing downhole of the sleeve, the spear mating with the sleeve downhole and at least partially closing fluid communication through the passage of the sleeve when mated therewith, the spear deploying at a faster rate downhole in the tubing than the sleeve.
21. A plunger lift apparatus for tubing in a well, comprising:
a sleeve for disposing in the tubing, the sleeve defining a passage therethrough and having a first ratio of cross-sectional area to weight; and
a spear for disposing in the tubing downhole of the sleeve, the spear mating with the sleeve downhole and at least partially closing fluid communication through the passage of the sleeve when mated therewith, the spear having a second ratio of cross-sectional area to weight being less than the first ratio of the sleeve.
22. The apparatus of claim 21 , wherein the cross-sectional area comprises an effective area responsible for force generated under differential pressure.
23. A plunger lift method for tubing in a well, comprising:
deploying a spear with a first ratio of cross-sectional area to weight downhole in the tubing;
deploying a sleeve with a second ratio of cross-sectional area to weight downhole in the tubing separate to the spear by allowing fluid communication through a passage in the sleeve;
preventing fluid communication through the passage in the sleeve by inserting a distal end of the spear in the passage and mating a proximal end of the spear with the passage; and
lifting the mated sleeve and spear uphole in the tubing by application of a pressure differential.
24. The method of claim 23 , further comprising catching the sleeve lifted uphole in the tubing.
25. The method of claim 24 , further comprising redeploying the sleeve downhole in the tubing by releasing the sleeve manually or automatically.
26. The method of claim 23 , further comprising redeploying the spear downhole in the tubing by unmating the spear from the sleeve lifted uphole in the tubing.
27. The method of claim 26 , wherein redeploying the spear comprises permitting the spear to deploy downhole in the tubing before permitting the sleeve to deploy downhole.
28. The method of claim 23 , wherein deploying the spear downhole in the tubing comprises permitting the spear to deploy at a faster rate downhole than the sleeve.
29. The apparatus of claim 28 , wherein permitting the spear to deploy at the faster rate downhole than the sleeve comprises providing the spear with one or more of:
a first weight greater than a second weight than the sleeve;
a first cross-sectional area that is greater than a second cross-sectional area of the sleeve;
a first axial length greater than a second axial length of the sleeve; and
the first ratio of cross-sectional area to weight that is less than the second ratio of cross-sectional area to weight of the sleeve.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US14/502,054 US20160090827A1 (en) | 2014-09-30 | 2014-09-30 | Two-Piece Plunger with Sleeve and Spear for Plunger Lift System |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US14/502,054 US20160090827A1 (en) | 2014-09-30 | 2014-09-30 | Two-Piece Plunger with Sleeve and Spear for Plunger Lift System |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20160090827A1 true US20160090827A1 (en) | 2016-03-31 |
Family
ID=55583867
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US14/502,054 Abandoned US20160090827A1 (en) | 2014-09-30 | 2014-09-30 | Two-Piece Plunger with Sleeve and Spear for Plunger Lift System |
Country Status (1)
| Country | Link |
|---|---|
| US (1) | US20160090827A1 (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP3309354A1 (en) | 2016-10-11 | 2018-04-18 | Weatherford Technology Holdings, LLC | Retrieval of multi-component plunger in well plunger lift system |
| US20240159129A1 (en) * | 2022-11-14 | 2024-05-16 | Flowco Production Solutions, LLC | Catcher assembly for a plunger |
| US20250075600A1 (en) * | 2023-08-30 | 2025-03-06 | Saudi Arabian Oil Company | Multi-stage plunger hydrocarbon lifting |
| US12281754B1 (en) * | 2024-02-29 | 2025-04-22 | Tri-Lift Services, Inc. | Lubricator for bypass plunger |
| US12612846B2 (en) | 2022-11-14 | 2026-04-28 | Flowco Masterco Llc | Catcher assembly for a plunger |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7383878B1 (en) * | 2003-03-18 | 2008-06-10 | Production Control Services, Inc. | Multi-part plunger |
| US20120080198A1 (en) * | 2010-10-04 | 2012-04-05 | Weatherford/Lamb, Inc. | Multi-Sleeve Plunger for Plunger Lift System |
| US20150000761A1 (en) * | 2013-06-28 | 2015-01-01 | Epic Lift Systems Llc | Gas lift plunger |
-
2014
- 2014-09-30 US US14/502,054 patent/US20160090827A1/en not_active Abandoned
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7383878B1 (en) * | 2003-03-18 | 2008-06-10 | Production Control Services, Inc. | Multi-part plunger |
| US20120080198A1 (en) * | 2010-10-04 | 2012-04-05 | Weatherford/Lamb, Inc. | Multi-Sleeve Plunger for Plunger Lift System |
| US20150000761A1 (en) * | 2013-06-28 | 2015-01-01 | Epic Lift Systems Llc | Gas lift plunger |
| US9109424B2 (en) * | 2013-06-28 | 2015-08-18 | Epic Lift Systems Llc | Gas lift plunger |
Cited By (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP3309354A1 (en) | 2016-10-11 | 2018-04-18 | Weatherford Technology Holdings, LLC | Retrieval of multi-component plunger in well plunger lift system |
| EP3594444A1 (en) | 2016-10-11 | 2020-01-15 | Weatherford Technology Holdings, LLC | Retrieval of multi-component plunger in well plunger lift system |
| US10689956B2 (en) | 2016-10-11 | 2020-06-23 | Weatherford Technology Holdings, Llc | Retrieval of multi-component plunger in well plunger lift system |
| US20240159129A1 (en) * | 2022-11-14 | 2024-05-16 | Flowco Production Solutions, LLC | Catcher assembly for a plunger |
| US12071836B2 (en) * | 2022-11-14 | 2024-08-27 | Flowco Production Solutions, LLC | Catcher assembly for a plunger |
| US20240418063A1 (en) * | 2022-11-14 | 2024-12-19 | Flowco Production Solutions, LLC | Catcher assembly for a plunger |
| US12497871B2 (en) * | 2022-11-14 | 2025-12-16 | Flowco Masterco Llc | Catcher assembly for a plunger |
| US12612846B2 (en) | 2022-11-14 | 2026-04-28 | Flowco Masterco Llc | Catcher assembly for a plunger |
| US20250075600A1 (en) * | 2023-08-30 | 2025-03-06 | Saudi Arabian Oil Company | Multi-stage plunger hydrocarbon lifting |
| US12442279B2 (en) * | 2023-08-30 | 2025-10-14 | Saudi Arabian Oil Company | Multi-stage plunger hydrocarbon lifting |
| US12281754B1 (en) * | 2024-02-29 | 2025-04-22 | Tri-Lift Services, Inc. | Lubricator for bypass plunger |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CA2752371C (en) | Multi-sleeve plunger for plunger lift system | |
| US7383878B1 (en) | Multi-part plunger | |
| US8181706B2 (en) | Plunger lift | |
| CA2301791C (en) | Plunger lift with multipart piston | |
| US8627892B2 (en) | Plunger for performing artificial lift of well fluids | |
| US8196663B2 (en) | Dead string completion assembly with injection system and methods | |
| US9109424B2 (en) | Gas lift plunger | |
| CN107542433B (en) | A pressure sliding sleeve controlled gas well continuous drainage gas production plunger | |
| US20160090827A1 (en) | Two-Piece Plunger with Sleeve and Spear for Plunger Lift System | |
| US9890621B2 (en) | Two-piece plunger | |
| CN204327032U (en) | A kind of blanking plug and use the blowout prevention assembly of this blanking plug | |
| CA2933886C (en) | Pad plunger | |
| US11754069B2 (en) | Lubricator for bypass plunger | |
| US20180100381A1 (en) | Retrieval of multi-component plunger in well plunger lift system | |
| CN103573239A (en) | Staged fracturing device and using method thereof | |
| US20170247989A1 (en) | Plunger to Form a Liquid Ring to Seal Against Gas Bypass | |
| US6935427B1 (en) | Plunger conveyed plunger retrieving tool and method of use | |
| US20260009318A1 (en) | Desander assembly for plunger lift system | |
| US11028661B2 (en) | Fishing neck for plunger | |
| RU143019U1 (en) | PACKER | |
| EP2813669A1 (en) | A completion method and a downhole system | |
| US11306567B2 (en) | Ball lift sleeve and retrieval tool for oil and gas wells | |
| CN104499997B (en) | A plunger gas lift downhole buffer device | |
| CN204899860U (en) | Suction valve in pit | |
| CN204899859U (en) | Eccentric suction valve in pit |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: WEATHERFORD TECHNOLOGY HOLDINGS, LLC, TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:AGARWAL, MANISH;JUENKE, MICHAEL S.;REEL/FRAME:033852/0660 Effective date: 20140929 |
|
| STCB | Information on status: application discontinuation |