US20150354201A1 - Method and system for using an industrial site - Google Patents

Method and system for using an industrial site Download PDF

Info

Publication number
US20150354201A1
US20150354201A1 US14/763,401 US201414763401A US2015354201A1 US 20150354201 A1 US20150354201 A1 US 20150354201A1 US 201414763401 A US201414763401 A US 201414763401A US 2015354201 A1 US2015354201 A1 US 2015354201A1
Authority
US
United States
Prior art keywords
building
functional units
bays
section
functional
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US14/763,401
Inventor
Hans-Dieter GRUETERING
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Evonik Operations GmbH
Original Assignee
Evonik Degussa GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Evonik Degussa GmbH filed Critical Evonik Degussa GmbH
Assigned to EVONIK DEGUSSA GMBH reassignment EVONIK DEGUSSA GMBH ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: GRUETERING, HANS-DIETER
Publication of US20150354201A1 publication Critical patent/US20150354201A1/en
Assigned to EVONIK OPERATIONS GMBH reassignment EVONIK OPERATIONS GMBH CHANGE OF NAME (SEE DOCUMENT FOR DETAILS). Assignors: EVONIK DEGUSSA GMBH
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34336Structures movable as a whole, e.g. mobile home structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/06Office buildings; Banks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/02Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H2001/1283Small buildings of the ISO containers type

Definitions

  • the invention relates to a method for using an industrial site and to an associated system for using industrial sites. It furthermore relates to the use of the system to carry out the method.
  • laboratory and pilot-plant units are currently constructed as static units in the form of buildings, the compartments are dependent on the structure of the building and cannot be disassembled and relocated as a whole. Consequently, laboratory and pilot-plant units that are tied to a particular building have the following disadvantages: fitting out laboratory and pilot-plant units with equipment and infrastructure means that, whenever there is a changeover between two trials, the disassembly and assembly time required before the new experimental plant is available is added. The resulting speed of conversion is relatively low and no longer matches the present pace of innovation. Moreover, assuming that the effort involved in conversion is to be avoided and that the costs of conversion are to be reduced, further use of a building in the case of a change of use is always restricted to the original purpose. Thus, it is not possible—at acceptable cost—to convert an office building that is no longer in use to a laboratory facility, for example.
  • the invention relates to a method for using an industrial site, comprising the following steps:
  • the building is connected to the surrounding infrastructure, by means of which the building is supplied with energy and/or materials and/or data, in an equally permanent and fixed manner.
  • the production and/or operating devices for a specific purpose which are essential for the specific use of the building are combined into mobile functional units independently thereof.
  • the functional units are intended to be inserted into the bays of the building and to be connected to at least some of the infrastructure grid of the building.
  • each functional unit is, in turn, subdivided into a pallet, which is essentially neutral as regards the use thereof, and into production and/or operating devices, with which the pallets are equipped and which define the purpose of the functional units.
  • the functional units assembled in this way outside the building can then be transported to the site and inserted there into the building. Setup times within the building are thereby considerably reduced. Equipment mounting outside the building also makes it possible to use low-priced areas.
  • pallets can be used for several generations if the service life of the operating and/or production devices mounted on the pallet is exceeded.
  • the pallets can also be stored for later use.
  • the system according to the invention and the method carried out by means of the system thus have significantly higher flexibility than was previously known in the prior art and therefore offers better utilization of the resources used, namely materials, time and space.
  • the output of the technical equipment of the building is more effectively scalable by virtue of its modular construction, thereby avoiding over- and underdimensioning of the plants. Ultimately, the effect is that unnecessary energy consumption is avoided.
  • At least some of the functional units of the first generation are transported, after each replacement, to a second building remote from the site, and are inserted and used in said building.
  • the underlying concept behind this development is that the system is used not just at one location but also across locations.
  • a pilot-plant unit used in a building on a first integrated site to be removed from there at the end of the project phase and used again in a second building at a location B for the same or a different purpose.
  • this reequipment of the pallets can take place at one or more locations remote from the site to be used, ensuring that these setup times are not included in the conversion times. Moreover, reequipment or storage can take place at low-cost locations. The reusability of a pallet which has already been used also contributes to the sustainability of the system according to the invention.
  • the operating and/or production devices which are inserted into the building as functional units can be subdivided into two functional groups.
  • the first functional group comprises chemical, biological, physical or nutritional production plants, laboratory or pilot plants or offices.
  • the devices of the second functional group comprise technical building equipment, heating systems, air-conditioning systems, fire extinguishing systems, storage rooms, compressed air supply systems, water supply systems, power supply systems, sewage systems, systems for providing starting materials, systems for providing process energy, such as especially heat or cold, exhaust treatment systems, such as especially thermal afterburners, activated carbon adsorption or exhaust gas scrubbing, sanitary systems or staff rooms.
  • the first functional group comprises those operating and/or production devices which are designed very specifically for the respective use of the functional unit and which, accordingly, have a very short service life.
  • the devices in the second functional group are general purpose devices and, accordingly, can remain in the building for several generations of use.
  • a functional unit carrying the heating system can therefore be installed as part of the initial equipment of the building and can remain therein for as long as there are laboratory facilities and offices in the building, for example.
  • a compressed air supply system is only required while there is a pilot plant in the building. If the pilot plant is removed at some stage, the compressed air supply system can also be removed and used again at some other location. Instead of the compressed air supply system, this bay of the building can now be occupied by a staff room, for instance if the pilot plant has been replaced by an office and the increased number of workers in the building requires the setting up of a staff room.
  • a preferred development of the invention therefore envisages that, in situations in which functional units of both functional groups have been installed in the building, at least some of the functional units of the second functional group remain in the building when functional units of the first generation are replaced.
  • the invention also relates to a system for using industrial sites
  • the building can be embodied in a manner known per se to accommodate functional units. Suitable designs of building are known from DE 3036468 A1 and DE 202011108631 U1, for example.
  • a preferred development of the invention envisages that the bays of the building and the pallets of the functional unit are designed so as to correspond to one another in such a way that they form a standardized interface within the system.
  • the standardized interface signifies first of all that fundamentally any pallet with any functional unit can be inserted into any bay. This increases flexibility.
  • the interface is preferably formed by a linear guide assigned to the bay and by a carriage arranged on the pallet, which can be inserted into the linear guide. This makes it possible to insert the functional unit with the carriage into the linear guide of the bay and thus to push the functional unit into the building.
  • the carriage does not have to receive sliding guidance in the linear guide: it is also conceivable to provide the carriage with rollers.
  • the pallets and/or the functional units constructed thereon are dimensioned in such a way that they correspond to a standardized container format such as that for sea containers according to ISO 668.
  • a standardized container format such as that for sea containers according to ISO 668.
  • the system according to the invention preferably comprises a plurality of buildings which are provided with corresponding standardized bays for receiving the functional units. This makes it possible to use the same functional unit initially at one location and then in the second building at a different location.
  • At least one building of the system is subdivided into at least three sections, namely a first section, which comprises a multiplicity of bays for functional units, a second section, which likewise comprises bays for receiving functional units, wherein the number of bays in the second section corresponds to the number of bays in the first section, and a third section without bays, wherein the third section is situated between the first and second sections and wherein in each case one bay in the first section is assigned to one bay in the second section, and the respectively assigned bays in the first and second sections are arranged in alignment with one another on each side of the third section.
  • This building concept allows particularly short paths between the two mutually assigned functional units.
  • the bays should each be individually accessible from the outside for the insertion of functional units, and the third section should comprise a floor region, from which all the bays can be accessed from the inside.
  • a building configured in this way has particularly advantageous usage of space and allows short paths between the inserted functional units.
  • a preferred development of the invention envisages that there is a path which extends along the linear guide of the bay and from which an installed functional unit can be accessed from the side without barriers. This improves access to the individual functional units. It is namely advantageous that the functional unit extends in the direction of the linear guide, for which reason access to the functional unit from the side is more agreeable than access by the end, e.g. through the loading aperture of a container. As already mentioned, the walls and the roof of the functional unit can be removed in the installed state, further improving access to the production and/or operating devices arranged on the pallet.
  • the invention also relates to the use of the system to carry out the method according to the invention, such that a system is used in which the building contains three sections in the manner described, and that functional units of the first functional group are installed in the first section of the building, and functional units of the second functional group are installed in the second section of the building, wherein at least some of the technical building equipment is embodied as functional units of the second functional group and said units remain in the building when functional units of the first functional group are replaced.
  • This preferred embodiment of the invention is based on the concept of arranging primarily those functional units of the second functional group which are used for a longer time in the second section of the building and, in this case, accommodating particularly the technical building equipment here.
  • those functional units in the first group which have to be exchanged frequently are accommodated in the first section of the building. Consequently, rapid exchange between the generations takes place in the first section, while the functional units used over the longer term largely remain in the second section.
  • the outlay on conversion thus generally pertains only to the first section, while the second section remains untouched over the longer term.
  • FIG. 1 the basic concept of use
  • FIG. 2 a pallet neutral as regards use
  • FIG. 3 a functional unit consisting of a pallet with equipment
  • FIG. 4 a first embodiment of a building with two sections
  • FIG. 5 an external view of a second embodiment of the building with three sections;
  • FIG. 6 a plan view of the second embodiment of the building.
  • FIG. 1 The basic concept of the invention is illustrated schematically in FIG. 1 . It is the use of an industrial site A, preferably situated on an integrated site for the chemical industry, which is of interest. Two further locations B and C, which can be situated on some other integrated site or, alternatively, on the same site, are at a distance therefrom. Of particular interest is the use of site A, e.g. because it has a particularly good infrastructure grid 1 .
  • a permanent building 2 is erected, which has a conventional building shell 3 which protects the interior of the building 2 from the effects of weather.
  • the building shell 3 comprises a façade, a roof and a floor. Everything is of conventional construction with appropriate sealing, insulation and light apertures.
  • the building 2 comprises a building core (not shown specifically here), which provides static support and the function of which is to support the building shell 3 and the internal fittings of the building 2 .
  • the building core can be a steel skeleton, for example.
  • Those components of the building 2 which have been described hitherto are of permanent design, i.e. they have the usual life of structures or parts of structures (20-100 years).
  • the technical building equipment 4 is not fixedly installed in the building 2 but is embodied as interchangeable functional units F 2 .
  • the technical building equipment 4 belongs to a second group of functional units F 2 , which in principle remain for longer in the building 2 .
  • Functional units of a first functional group F 1 which can comprise chemical production plants, laboratories or even office facilities for example, remain for a shorter time in the building 2 .
  • These functional units F 1 of the first functional group are assembled outside the building 2 at a remote location C, preferably in a workshop. This is achieved by equipping a pallet 5 which is essentially neutral as regards the use thereof with production and/or operating devices 7 for a specific purpose on an installation wall 6 extending vertically on the pallet 5 . This is illustrated in greater detail by means of FIGS. 2 and 3 .
  • the fully assembled functional units F 1.0 are transported to the industrial site A, where they are inserted into the building 2 and connected to the infrastructure grid 1 thereof.
  • the building receives initial equipment (first generation) comprising functional units F 1 and F 2 .
  • the functional units F 1.1 which are no longer required on the site A can be removed from the building 2 again and moved to a different location, such as a second industrial site B, for secondary use. There, the functional unit F 1.1 can continue to be used for the same purpose as at location A, e.g. by installation in another building.
  • Functional units F 1.2 for which there is no possibility of direct continued use are transported back to the workshop at location C for disassembly. There, the operating and production units which are no longer required are removed from the functional unit F 1.2 , leaving the pallet 5 , which is neutral as regards the use thereof.
  • This pallet is then reequipped immediately or subsequently after storage, giving a new functional unit F 1.3 , which is reinserted into the building 2 with the next generation of functional units.
  • the functional units F 1.1 which are no longer required at location B can be reprocessed in the same workshop at location C and sent out for a new use.
  • FIG. 2 shows a pallet 5 of the kind used to construct the functional units, which is essentially neutral as regards the use thereof.
  • the pallet 5 has essentially the configuration and dimensions of a sea container according to ISO 668, although the side walls and the roof can be removed to improve access.
  • an installation wall 6 which is intended to receive various operating devices.
  • the carriage 8 is part of a standardized interface for mechanical and infrastructural connection of the pallet 5 to the building.
  • the interface also includes standardized connections 9 for the transfer of energy, materials and data from the infrastructure grid of the building to the pallet 5 .
  • the pallet 5 which is essentially neutral as regards the use thereof, is dedicated to a particular use by equipping it with the desired operating devices 7 .
  • the operating devices 7 required for the desired purpose such as apparatus, reactors, analytical equipment or workshop equipment, are fastened on the installation wall 6 and connected to one another and to the standardized connections 9 .
  • the precise construction of the operating devices 7 depends solely on the desired purpose of the functional unit F 1 .
  • the pallet 5 fully equipped with the operating devices 7 forms a functional unit F 1 for a specific purpose; cf. FIG. 3 .
  • FIG. 4 shows schematically how the functional units F can be introduced into a building 2 .
  • the building 2 has a multiplicity of bays S, which are each designed to receive one functional unit F.
  • the building 2 shown in FIG. 4 is assigned a fixed logistics and floor region 10 , which allows access to the functional units F from this region 10 .
  • FIG. 5 shows a development of the building 2 , which is divided into three sections 11 , 12 , 13 .
  • the first section 11 comprises a multiplicity of substantially box-shaped bays S, which are intended to receive functional units F 1 of the first functional group.
  • the bays S are dimensioned in such a way that a functional unit F 1 of the size of a 40′-container can be pushed in.
  • a gate 14 which closes the bay S with respect to the outside is opened, and the functional unit F 1 is inserted by means of its carriage 8 arranged on the pallet 5 into a linear guide 15 .
  • the functional unit F 1 can be pushed along the linear guide 15 into the bay S by means of the carriage 8 .
  • the side walls of the pallet 5 which are no longer required, are then removed, and the gate 14 is closed.
  • the functional unit F 1 is connected to the infrastructure grid 1 of the building via the standardized connections 9 . It is also possible to interlink a plurality of functional units within the building.
  • the construction of the building 2 will be seen in greater detail in the plan view shown in FIG. 6 .
  • the building has two sections 11 and 13 , which are each provided with a multiplicity of bays S for receiving the functional units F 1 , F 2 .
  • the first section 11 serves to receive functional units F 1 from the first functional group
  • the second section is intended to receive functional units F 2 from the second functional group.
  • the bays in the second section 12 are shorter than those in the first section 11 and are suitable only for receiving pallets 5 of shorter length than those in the first section 11 .
  • the functional units F 2 of the second functional group are 15 m long, for example, while the bays in the second section are 7 m long, for example.
  • Both bays are 5 m wide, for example, and arranged on each side of a section 13 situated between the first section 11 and the second section 12 .
  • a bay in the first section 11 and a bay in the second section 12 are in each case arranged directly in alignment with one another and are directly accessible via the floor region formed by section 13 .
  • a heating system 17 arranged in section 12 will remain for longer in the building 2 than a pilot-plant module 18 , which will subsequently be replaced by an office module 19 .
  • a logistics unit 20 which can only be used in conjunction with the pilot-plant module 18 will likewise leave the building when the pilot plant is replaced and will be replaced by a sanitary system 20 , which becomes necessary when the pilot plant 18 is replaced by another office module 19 .
  • a path 16 which can be reached from the floor of the third section 13 , extends along the linear guide 15 of the respective bays 16 .
  • the path 16 is arranged on the opposite side of the installation wall 6 of the pallet 5 .
  • the pallet 5 can furthermore be accessed without barriers from the path 16 , allowing the operating devices 7 on the installation wall 6 to be reached easily on foot and with industrial trucks.
  • the functional units are connected to the building infrastructure via the standardized connections 9 , which are designed for the transfer of operating media requiring pipes, for supplying power, for metrological connection and evaluation (e.g. process management systems), connecting air-conditioning systems, supplying starting materials and processing products.
  • These connections are provided in each bay S, and therefore in principle any functional unit F 1 can be inserted into any bay S in the first section 11 .
  • the building 2 must meet all the requirements as regards statics and heat. In addition, measures to prevent fire must be installed in the building 2 and must be available at every interface S. Thus, fire protection is always ensured, irrespective of the functional units inserted. Finally, a special room concept must apply to the whole building and to all the bays S, according to which the individual bays S are provided with forced ventilation and with explosion protection sensors and toxic gas sensors in accordance with the risk assessment.
  • the changing and making ready of test plants for carrying out technical trials can be significantly accelerated.
  • the fitting and removal of the individual functional units can take place independently in terms of time and location.
  • the total volume within the building with pilot plants and laboratory units is reduced. This means that the required converted volume of such a building is smaller.
  • the volume of the building can be used as required by virtue of the modular configuration of the bays for the functional units. It is particularly important that an office module can also be used as an alternative to a technical functional unit.
  • a particular flexibility of the concept under consideration is provided by the fact that the technical building equipment, such as heating, ventilation, air conditioning, gas supply and supply of operating media is of modular construction.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a method for using an industrial site, an associated system, and the use of the system to carry out the method. The method facilitates the use of the available area of the industrial site in an effective way so that conversion times and costs are reduced and a great freedom of choice regarding subsequent possibilities for use of existing buildings is achieved. The method subdivides the individual functions of a fully equipped building integrated into the infrastructure of the industrial site regarding the duration of use of the technical devices and, with a decreasing time in use, provides increasing modularization of these functions. The permanent functions of the fully equipped building are permanently installed, while the devices which are subject to use for a shorter time based on their purpose are embodied in a correspondingly modular and interchangeable manner.

Description

  • The invention relates to a method for using an industrial site and to an associated system for using industrial sites. It furthermore relates to the use of the system to carry out the method.
  • High-quality industrial sites are a rarity. This applies especially to the chemical industry, which has to satisfy strict environmental legislation when establishing new sites and setting up chemical plants. However, this is not the decisive reason for the fact that setting up new industrial chemistry plants on “green field sites” is a relatively unusual occurrence. It is rather that chemical plants make significantly greater demands on the infrastructure grid of the site than other plants since the chemical industry is more reliant on a reliable supply of raw materials and energy than other branches of production.
  • In addition, there is the fact that most chemical processes are made economically viable only if the individual plant is operated in combination with a large number of other plants, with materials and energy being exchanged between the plants. Thus, large chemical concerns in Germany operate “integrated sites”, whose success depends on operating a large number of individual plants in a relatively dense concentration at one location and exchanging energy and materials intensively between the individual plants. Other advantages of integrated sites are the exploitation of synergies in the provision of process energy, transportation logistics and personnel. The result is that new chemical plants are almost exclusively located within existing integrated sites, at least in highly industrialized countries.
  • Since the area of integrated sites is limited, despite their often considerable size, it is important to make effective use of the available plots within the integrated site. This is achieved not only by building in a space-saving way but also by converting buildings and plants that are no longer needed to new uses or demolishing and rebuilding them.
  • Converting existing industrial property is especially worth considering in the case of laboratory or pilot-plant operations or production plants for specialty chemicals. This is because plants of this kind are used for only a relatively short time in comparison with “large” production plants for basic chemicals. As soon as the respective research and development project is finished, conversion of the building is in prospect. The same applies when batch production of specialty chemicals is complete.
  • The constant shortening of innovation cycles is increasingly presenting operators of integrated sites with the task of reducing conversion times and conversion costs for such buildings.
  • Since laboratory and pilot-plant units are currently constructed as static units in the form of buildings, the compartments are dependent on the structure of the building and cannot be disassembled and relocated as a whole. Consequently, laboratory and pilot-plant units that are tied to a particular building have the following disadvantages: fitting out laboratory and pilot-plant units with equipment and infrastructure means that, whenever there is a changeover between two trials, the disassembly and assembly time required before the new experimental plant is available is added. The resulting speed of conversion is relatively low and no longer matches the present pace of innovation. Moreover, assuming that the effort involved in conversion is to be avoided and that the costs of conversion are to be reduced, further use of a building in the case of a change of use is always restricted to the original purpose. Thus, it is not possible—at acceptable cost—to convert an office building that is no longer in use to a laboratory facility, for example.
  • In order to avoid these intrinsic disadvantages of static laboratory, pilot-plant or production units in the form of buildings, container-based laboratory and pilot-plant facilities are already being used as stand-alone units in isolated cases. One example of such a concept is described in WO 2010/028869 A1. The universal infrastructure shown there for chemical processes is container-based and can be set up at any desired location and transported backward and forward between the locations as required. One particular advantage of this concept is that scaling up of the chemical process can be achieved simply by increasing the number of containers, and therefore problems with similarity are hardly to be expected.
  • The disadvantages of container-based production and/or operating facilities are well known to those who have already lived or worked in a container: even given the good insulation, air-conditioning and heating that is nowadays possible, containers cannot be compared with the sense of space of a permanent building. Prolonged occupation for an entire working day and over several weeks and months reduces the motivation of the workers employed therein. However, such container solutions also have technical disadvantages, especially as regards their connectivity to permanently installed infrastructure. Ultimately, they are always a provisional solution.
  • There is no difference if a modular laboratory is constructed using a multiplicity of standardized containers, as shown in DE 10361621 A1 or in WO 2011/075625 A1 or in DE 102006001977 B3.
  • An improvement in the quality of accommodation in a container-based operating facility of modular construction can be achieved by inserting container-based functional units into a static building. This concept is described in DD 87156 A1, relating to telecommunications, and in EP 0572814 B1 for plants in the chemical and pharmaceutical industry. However, the modularity taught in said documents is limited, and therefore the flexibility with which the developed site can be used and the speed of conversion required to use the building for a different purpose is limited.
  • In light of the above prior art, it is the underlying object of the invention to specify a method for using an industrial site in which the available area of the site is used in a particularly effective way by virtue of the fact that conversion times and costs are reduced and a greater freedom of choice as regards the subsequent use of existing buildings is achieved.
  • These objects are achieved by a method having the features of claim 1.
  • Consequently, the invention relates to a method for using an industrial site, comprising the following steps:
      • a) Erecting a permanent building on the site, wherein the building has a multiplicity of bays for receiving interchangeable functional units, a building shell to protect the functional units received from the effects of weather, technical building equipment and an infrastructure grid for energy and/or materials and/or data;
      • b) Providing a multiplicity of pallets, which are neutral as regards the use thereof, are standardized as regards the dimensions thereof and are designed to be received by the bays of the building;
      • c) Equipping pallets with production and/or operating devices at one or more locations remote from the site to give a first generation of functional units for a specific purpose;
      • d) Transportation of the functional units to the site;
      • e) Installation of the first generation of functional units in the building by inserting the functional units in the bays;
  • f) Connecting the functional units to at least some of the infrastructure grid;
  • g) Using the first generation of functional units within the building in accordance with the purpose of the respective functional unit;
      • h) Equipping pallets with production and/or operating devices at one or more locations remote from the site to give a second generation of functional units for a specific purpose, which differ at least partially from the functional units of the first generation as regards the respective purpose thereof;
      • i) Replacing the first generation of functional units with the second generation of functional units;
      • j) Using the second generation of functional units within the building in accordance with the purpose of the respective functional unit.
  • It is a basic concept of the present method to subdivide the individual functions of a fully equipped building integrated into the infrastructure of an industrial site as regards the duration of use of the technical devices and, with a decreasing time in use, to provide increasing modularization of these functions. The permanent functions of the fully equipped building are accordingly permanently installed, while the devices which are subject to use for a shorter time on the basis of their purpose are embodied in a correspondingly modular and interchangeable manner.
  • More specifically, this means that the building shell of the building is erected in an unchangeable and permanent manner on the industrial site. The building is connected to the surrounding infrastructure, by means of which the building is supplied with energy and/or materials and/or data, in an equally permanent and fixed manner. The production and/or operating devices for a specific purpose which are essential for the specific use of the building are combined into mobile functional units independently thereof. The functional units are intended to be inserted into the bays of the building and to be connected to at least some of the infrastructure grid of the building.
  • According to the invention, each functional unit is, in turn, subdivided into a pallet, which is essentially neutral as regards the use thereof, and into production and/or operating devices, with which the pallets are equipped and which define the purpose of the functional units. This creates the advantage that the pallets can be equipped with the production and/or operating devices at a remote location—i.e. off the site to be used—e.g. in a workshop. The functional units assembled in this way outside the building can then be transported to the site and inserted there into the building. Setup times within the building are thereby considerably reduced. Equipment mounting outside the building also makes it possible to use low-priced areas.
  • Another advantage of the pallet system is that the pallets can be used for several generations if the service life of the operating and/or production devices mounted on the pallet is exceeded. The pallets can also be stored for later use.
  • The system according to the invention and the method carried out by means of the system thus have significantly higher flexibility than was previously known in the prior art and therefore offers better utilization of the resources used, namely materials, time and space.
  • Moreover, the output of the technical equipment of the building is more effectively scalable by virtue of its modular construction, thereby avoiding over- and underdimensioning of the plants. Ultimately, the effect is that unnecessary energy consumption is avoided.
  • In a preferred development of the method according to the invention, at least some of the functional units of the first generation are transported, after each replacement, to a second building remote from the site, and are inserted and used in said building. The underlying concept behind this development is that the system is used not just at one location but also across locations. Thus, it is conceivable for a pilot-plant unit used in a building on a first integrated site to be removed from there at the end of the project phase and used again in a second building at a location B for the same or a different purpose.
  • If a replaced functional unit cannot be reused, it is recommended that the operating and/or production devices which define its function be removed from the pallet, leaving a pallet which is neutral as regards the function thereof, which can be reequipped or stored for subsequent use. According to the invention, this reequipment of the pallets can take place at one or more locations remote from the site to be used, ensuring that these setup times are not included in the conversion times. Moreover, reequipment or storage can take place at low-cost locations. The reusability of a pallet which has already been used also contributes to the sustainability of the system according to the invention.
  • In a very particularly preferred development of the invention, the operating and/or production devices which are inserted into the building as functional units can be subdivided into two functional groups. The first functional group comprises chemical, biological, physical or nutritional production plants, laboratory or pilot plants or offices. In contrast, the devices of the second functional group comprise technical building equipment, heating systems, air-conditioning systems, fire extinguishing systems, storage rooms, compressed air supply systems, water supply systems, power supply systems, sewage systems, systems for providing starting materials, systems for providing process energy, such as especially heat or cold, exhaust treatment systems, such as especially thermal afterburners, activated carbon adsorption or exhaust gas scrubbing, sanitary systems or staff rooms.
  • The first functional group comprises those operating and/or production devices which are designed very specifically for the respective use of the functional unit and which, accordingly, have a very short service life. The devices in the second functional group, in contrast, are general purpose devices and, accordingly, can remain in the building for several generations of use. Thus, for example, a heating system will always be required when personnel are in the building for a relatively long time. A functional unit carrying the heating system can therefore be installed as part of the initial equipment of the building and can remain therein for as long as there are laboratory facilities and offices in the building, for example. A compressed air supply system, on the other hand, is only required while there is a pilot plant in the building. If the pilot plant is removed at some stage, the compressed air supply system can also be removed and used again at some other location. Instead of the compressed air supply system, this bay of the building can now be occupied by a staff room, for instance if the pilot plant has been replaced by an office and the increased number of workers in the building requires the setting up of a staff room.
  • A preferred development of the invention therefore envisages that, in situations in which functional units of both functional groups have been installed in the building, at least some of the functional units of the second functional group remain in the building when functional units of the first generation are replaced.
  • The high degree of modularity of the present concept, in which even the technical building equipment is embodied in interchangeable functional units, shows its flexibility particularly when production and/or laboratory facilities are replaced by offices or vice versa. This aspect has not previously been taken into account in the reusage concepts for modular production plants previously described in the prior art.
  • The invention also relates to a system for using industrial sites
      • having at least one permanent building, which has a multiplicity of bays for receiving interchangeable functional units, a building shell to protect the functional units received from the effects of weather, technical building equipment and an infrastructure grid for energy and/or materials and/or data;
      • and having a multiplicity of functional units, wherein each functional unit comprises a pallet, which is essentially neutral as regards the use thereof and is equipped with production and/or operating devices in order to define the purpose of the functional unit.
  • In this case, the building can be embodied in a manner known per se to accommodate functional units. Suitable designs of building are known from DE 3036468 A1 and DE 202011108631 U1, for example.
  • A preferred development of the invention envisages that the bays of the building and the pallets of the functional unit are designed so as to correspond to one another in such a way that they form a standardized interface within the system. The standardized interface signifies first of all that fundamentally any pallet with any functional unit can be inserted into any bay. This increases flexibility.
  • The interface is preferably formed by a linear guide assigned to the bay and by a carriage arranged on the pallet, which can be inserted into the linear guide. This makes it possible to insert the functional unit with the carriage into the linear guide of the bay and thus to push the functional unit into the building. The carriage does not have to receive sliding guidance in the linear guide: it is also conceivable to provide the carriage with rollers.
  • In a particularly preferred embodiment of the system, the pallets and/or the functional units constructed thereon are dimensioned in such a way that they correspond to a standardized container format such as that for sea containers according to ISO 668. This makes it possible to transport the functional units using existing transportation logistics between the plots or buildings to be used. The side walls and the roof of the container are not required while in use since the functional unit is, of course, protected by the building shell from the effects of weather. It is therefore conceivable to fasten the walls and the roof on the functional unit only for transportation and to remove them again during installation in the building.
  • The system according to the invention preferably comprises a plurality of buildings which are provided with corresponding standardized bays for receiving the functional units. This makes it possible to use the same functional unit initially at one location and then in the second building at a different location.
  • In a very particularly preferred embodiment of the invention, at least one building of the system is subdivided into at least three sections, namely a first section, which comprises a multiplicity of bays for functional units, a second section, which likewise comprises bays for receiving functional units, wherein the number of bays in the second section corresponds to the number of bays in the first section, and a third section without bays, wherein the third section is situated between the first and second sections and wherein in each case one bay in the first section is assigned to one bay in the second section, and the respectively assigned bays in the first and second sections are arranged in alignment with one another on each side of the third section. This building concept allows particularly short paths between the two mutually assigned functional units.
  • In such a building concept, the bays should each be individually accessible from the outside for the insertion of functional units, and the third section should comprise a floor region, from which all the bays can be accessed from the inside. A building configured in this way has particularly advantageous usage of space and allows short paths between the inserted functional units.
  • A preferred development of the invention envisages that there is a path which extends along the linear guide of the bay and from which an installed functional unit can be accessed from the side without barriers. This improves access to the individual functional units. It is namely advantageous that the functional unit extends in the direction of the linear guide, for which reason access to the functional unit from the side is more agreeable than access by the end, e.g. through the loading aperture of a container. As already mentioned, the walls and the roof of the functional unit can be removed in the installed state, further improving access to the production and/or operating devices arranged on the pallet.
  • The invention also relates to the use of the system to carry out the method according to the invention, such that a system is used in which the building contains three sections in the manner described, and that functional units of the first functional group are installed in the first section of the building, and functional units of the second functional group are installed in the second section of the building, wherein at least some of the technical building equipment is embodied as functional units of the second functional group and said units remain in the building when functional units of the first functional group are replaced.
  • This preferred embodiment of the invention is based on the concept of arranging primarily those functional units of the second functional group which are used for a longer time in the second section of the building and, in this case, accommodating particularly the technical building equipment here. On the other hand, those functional units in the first group which have to be exchanged frequently are accommodated in the first section of the building. Consequently, rapid exchange between the generations takes place in the first section, while the functional units used over the longer term largely remain in the second section. The outlay on conversion thus generally pertains only to the first section, while the second section remains untouched over the longer term.
  • Further preferred embodiments of the invention will be found in the description now given of illustrative embodiments. The figures show:
  • FIG. 1: the basic concept of use;
  • FIG. 2: a pallet neutral as regards use;
  • FIG. 3: a functional unit consisting of a pallet with equipment;
  • FIG. 4: a first embodiment of a building with two sections;
  • FIG. 5: an external view of a second embodiment of the building with three sections;
  • FIG. 6: a plan view of the second embodiment of the building.
  • The basic concept of the invention is illustrated schematically in FIG. 1. It is the use of an industrial site A, preferably situated on an integrated site for the chemical industry, which is of interest. Two further locations B and C, which can be situated on some other integrated site or, alternatively, on the same site, are at a distance therefrom. Of particular interest is the use of site A, e.g. because it has a particularly good infrastructure grid 1.
  • On this high-quality industrial site A, a permanent building 2 is erected, which has a conventional building shell 3 which protects the interior of the building 2 from the effects of weather. The building shell 3 comprises a façade, a roof and a floor. Everything is of conventional construction with appropriate sealing, insulation and light apertures. Moreover, the building 2 comprises a building core (not shown specifically here), which provides static support and the function of which is to support the building shell 3 and the internal fittings of the building 2. The building core can be a steel skeleton, for example. Those components of the building 2 which have been described hitherto are of permanent design, i.e. they have the usual life of structures or parts of structures (20-100 years).
  • Even the technical building equipment 4 is not fixedly installed in the building 2 but is embodied as interchangeable functional units F2. The technical building equipment 4 belongs to a second group of functional units F2, which in principle remain for longer in the building 2.
  • Functional units of a first functional group F1, which can comprise chemical production plants, laboratories or even office facilities for example, remain for a shorter time in the building 2.
  • These functional units F1 of the first functional group are assembled outside the building 2 at a remote location C, preferably in a workshop. This is achieved by equipping a pallet 5 which is essentially neutral as regards the use thereof with production and/or operating devices 7 for a specific purpose on an installation wall 6 extending vertically on the pallet 5. This is illustrated in greater detail by means of FIGS. 2 and 3. The fully assembled functional units F1.0 are transported to the industrial site A, where they are inserted into the building 2 and connected to the infrastructure grid 1 thereof. Thus, the building receives initial equipment (first generation) comprising functional units F1 and F2.
  • When the service life of the functional units has expired in accordance with their purpose, the functional units F1.1 which are no longer required on the site A can be removed from the building 2 again and moved to a different location, such as a second industrial site B, for secondary use. There, the functional unit F1.1 can continue to be used for the same purpose as at location A, e.g. by installation in another building. Functional units F1.2 for which there is no possibility of direct continued use are transported back to the workshop at location C for disassembly. There, the operating and production units which are no longer required are removed from the functional unit F1.2, leaving the pallet 5, which is neutral as regards the use thereof. This pallet is then reequipped immediately or subsequently after storage, giving a new functional unit F1.3, which is reinserted into the building 2 with the next generation of functional units. The functional units F1.1 which are no longer required at location B can be reprocessed in the same workshop at location C and sent out for a new use.
  • FIG. 2 shows a pallet 5 of the kind used to construct the functional units, which is essentially neutral as regards the use thereof. The pallet 5 has essentially the configuration and dimensions of a sea container according to ISO 668, although the side walls and the roof can be removed to improve access. Along a long side there is an installation wall 6, which is intended to receive various operating devices. On the bottom of the pallet 5 there is a carriage 8. The carriage 8 is part of a standardized interface for mechanical and infrastructural connection of the pallet 5 to the building. The interface also includes standardized connections 9 for the transfer of energy, materials and data from the infrastructure grid of the building to the pallet 5.
  • The pallet 5, which is essentially neutral as regards the use thereof, is dedicated to a particular use by equipping it with the desired operating devices 7. For this purpose, the operating devices 7 required for the desired purpose, such as apparatus, reactors, analytical equipment or workshop equipment, are fastened on the installation wall 6 and connected to one another and to the standardized connections 9. The precise construction of the operating devices 7 depends solely on the desired purpose of the functional unit F1.
  • The pallet 5 fully equipped with the operating devices 7 forms a functional unit F1 for a specific purpose; cf. FIG. 3.
  • FIG. 4 shows schematically how the functional units F can be introduced into a building 2. For this purpose, the building 2 has a multiplicity of bays S, which are each designed to receive one functional unit F. The building 2 shown in FIG. 4 is assigned a fixed logistics and floor region 10, which allows access to the functional units F from this region 10.
  • FIG. 5 shows a development of the building 2, which is divided into three sections 11, 12, 13. The first section 11 comprises a multiplicity of substantially box-shaped bays S, which are intended to receive functional units F1 of the first functional group. The bays S are dimensioned in such a way that a functional unit F1 of the size of a 40′-container can be pushed in. In order to insert a functional unit F1 of this kind into the bay S, a gate 14 which closes the bay S with respect to the outside is opened, and the functional unit F1 is inserted by means of its carriage 8 arranged on the pallet 5 into a linear guide 15. The functional unit F1 can be pushed along the linear guide 15 into the bay S by means of the carriage 8. The side walls of the pallet 5, which are no longer required, are then removed, and the gate 14 is closed. The functional unit F1 is connected to the infrastructure grid 1 of the building via the standardized connections 9. It is also possible to interlink a plurality of functional units within the building.
  • The construction of the building 2 will be seen in greater detail in the plan view shown in FIG. 6. The building has two sections 11 and 13, which are each provided with a multiplicity of bays S for receiving the functional units F1, F2. Here, the first section 11 serves to receive functional units F1 from the first functional group, while the second section is intended to receive functional units F2 from the second functional group. As can be seen from the plan view, the bays in the second section 12 are shorter than those in the first section 11 and are suitable only for receiving pallets 5 of shorter length than those in the first section 11. Thus, it is conceivable to embody the functional units F2 of the second functional group with the size of a 20′-container, while the functional units F1 of the first functional group are embodied with the size of a 40′-container. Accordingly, the bays in the first section are 15 m long, for example, while the bays in the second section are 7 m long, for example. Both bays are 5 m wide, for example, and arranged on each side of a section 13 situated between the first section 11 and the second section 12. In this way, a bay in the first section 11 and a bay in the second section 12 are in each case arranged directly in alignment with one another and are directly accessible via the floor region formed by section 13.
  • It is primarily the functional units F1 of the first functional group, which have to be exchanged more frequently, which are arranged in the first section 11. It is primarily functional groups F2 which can remain for longer in the building 2, e.g. the technical building equipment or logistics regions, which are situated in the second section 12.
  • Thus, for example, a heating system 17 arranged in section 12 will remain for longer in the building 2 than a pilot-plant module 18, which will subsequently be replaced by an office module 19. However, a logistics unit 20 which can only be used in conjunction with the pilot-plant module 18 will likewise leave the building when the pilot plant is replaced and will be replaced by a sanitary system 20, which becomes necessary when the pilot plant 18 is replaced by another office module 19.
  • A path 16, which can be reached from the floor of the third section 13, extends along the linear guide 15 of the respective bays 16. The path 16 is arranged on the opposite side of the installation wall 6 of the pallet 5. The pallet 5 can furthermore be accessed without barriers from the path 16, allowing the operating devices 7 on the installation wall 6 to be reached easily on foot and with industrial trucks.
  • The functional units are connected to the building infrastructure via the standardized connections 9, which are designed for the transfer of operating media requiring pipes, for supplying power, for metrological connection and evaluation (e.g. process management systems), connecting air-conditioning systems, supplying starting materials and processing products. These connections are provided in each bay S, and therefore in principle any functional unit F1 can be inserted into any bay S in the first section 11.
  • Overall, the combination of the standardized connections 9 for connecting the functional units to the infrastructure 1 and the combination comprising linear guide 15 and carriage 8 form a standardized interface within the system.
  • The building 2 must meet all the requirements as regards statics and heat. In addition, measures to prevent fire must be installed in the building 2 and must be available at every interface S. Thus, fire protection is always ensured, irrespective of the functional units inserted. Finally, a special room concept must apply to the whole building and to all the bays S, according to which the individual bays S are provided with forced ventilation and with explosion protection sensors and toxic gas sensors in accordance with the risk assessment.
  • It is also possible to arrange the functional modules F2 of the second functional group in the upper region of the buildings and to insert essentially the technical building equipment there. The bays situated at a higher level are namely more difficult to reach, and therefore said bays S should only be occupied by functional units F2 which do not have to be replaced as frequently.
  • The advantages of the use according to the invention of industrial sites will be summarized once more:
  • The changing and making ready of test plants for carrying out technical trials can be significantly accelerated. The fitting and removal of the individual functional units can take place independently in terms of time and location. The total volume within the building with pilot plants and laboratory units is reduced. This means that the required converted volume of such a building is smaller. Moreover, the volume of the building can be used as required by virtue of the modular configuration of the bays for the functional units. It is particularly important that an office module can also be used as an alternative to a technical functional unit. A particular flexibility of the concept under consideration is provided by the fact that the technical building equipment, such as heating, ventilation, air conditioning, gas supply and supply of operating media is of modular construction.
  • LIST OF REFERENCE NUMERALS
    • A first industrial site
    • B second industrial site at a first remote location
    • C second remote location
    • 1 infrastructure grid
    • 2 building
    • 3 building shell
    • 4 technical building equipment
    • F1 functional unit of the first functional group
    • F2 functional unit of the second functional group
    • 5 pallet
    • 6 installation wall
    • 7 operating devices
    • 8 carriage
    • 9 connections
    • 10 floor and logistics region
    • 11 first section
    • 12 second section
    • 13 third section
    • S bay
    • 14 gate
    • 15 linear guide
    • 16 path
    • 17 heating system
    • 18 pilot-plant unit
    • 19 office module
    • 20 sanitary system

Claims (16)

1. A method for exploiting an industrial site, the method comprising:
a) erecting a permanent building on the site, wherein the building comprises a multiplicity of bays for receiving interchangeable functional units, a building shell to protect the functional units received from effects of weather, technical building equipment and an infrastructure grid for energy and/or materials and/or data;
b) providing a multiplicity of pallets, which are neutral as regards a utilization thereof, are standardized as regards dimensions thereof and are designed to be received by the bays of the building;
c) equipping the pallets with production and/or operating devices at one or more locations remote from the site to give a first generation of functional units for a specific purpose;
d) transporting the functional units to the site;
e) installing the first generation of functional units in the building by inserting the functional units in the bays;
connecting the functional units to at least some of the infrastructure grid;
g) utilizing the first generation of functional units within the building in accordance with the purpose of the respective first generation functional unit;
h) equipping the pallets with production and/or operating devices at one or more locations remote from the site to give a second generation of functional units for a specific purpose, which differ at least partially from the purpose of the functional units of the first generation;
i) replacing the first generation of functional units with the second generation of functional units;
j) utilizing the second generation of functional units within the building in accordance with the purpose of the respective second generation functional unit.
2. The method of claim 1,
wherein at least some of the functional units of the first generation are transported, after being replaced, to a second building remote from the site, and are inserted and utilized in the second building.
3. The method of claim 2,
wherein the operating and/or production devices are removed from at least some of the replaced functional units at one or more locations remote from the site, and the pallets thereby obtained, which are neutral as regards the utilization thereof, are reequipped or stored.
4. The method of claim 3,
wherein the operating and/or production devices are
a first functional group comprising: chemical, biological, physical or nutritional production, laboratory or pilot plants and offices,
and/or
a second functional group comprising: technical building equipment, heating systems, air-conditioning systems, ventilation systems, fire extinguishing systems, storage rooms, product handling facilities, electronic control systems, process management equipment, compressed air supply systems, water supply systems, power supply systems, sewage systems, systems for providing starting materials, systems for providing process energy, such as especially heat or cold, exhaust treatment systems, such as especially thermal afterburners, activated carbon adsorption, exhaust gas scrubbing, sanitary systems and staff rooms.
5. The method of claim 4,
wherein
the functional units from both the first and the second functional groups are installed in the building, and
at least some of the functional units of the second functional group remain in the building when the functional units of the first generation are replaced.
6. The method of claim 5,
wherein
the operating and/or production devices are the chemical production and/or laboratory facilities, which are optionally replaced by the offices, or
the operating and/or production devices are the offices, which are optionally replaced by the chemical production and/or laboratory facilities.
7. A system for exploiting industrial sites, the system comprising
a permanent building, which comprises a multiplicity of bays for receiving interchangeable functional units, a building shell to protect the functional units received from effects of weather, technical building equipment and an infrastructure grid for energy and/or materials and/or data; and
a multiplicity of functional units, wherein each functional unit comprises a pallet, which is neutral as regards a utilization thereof and is equipped with production and/or operating devices in order to define a purpose of the functional unit.
8. The system of claim 7,
wherein the bays of the building and the pallets of the functional units are designed so as to correspond to one another in such a way that the bays and the pallets form a standardized interface within the system.
9. The system of claim 8,
wherein the interface is formed by a linear guide assigned to the bay and by a carriage arranged on the pallet, which is optionally inserted into the linear guide.
10. The system of claim 9,
wherein the pallets and/or the functional units constructed thereon correspond to a standardized container format.
11. The system of claim 10,
comprising
at least two buildings which are provided with bays and are situated at a distance from one another.
12. The system of claim 10,
wherein
the building is subdivided into at least three sections, a first section comprising the multiplicity of bays, a second section comprising a number of bays corresponding to the number of bays in the first section, and a third section without bays,
one bay in the first section is assigned to one bay in the second section, and
the respectively assigned bays in the first and second sections are arranged in alignment with one another on each side of the third section.
13. The system of claim 12,
wherein
each bay is individually accessible from outside for insertion of the functional units, and
the third section comprises a floor region, from which all the bays are optionally accessed from inside.
14. The system of claim 13,
wherein at least one bay comprises a path which extends along the linear guide and from which an installed functional unit is optionally accessed from side without barriers.
15. (canceled)
16. A process for carrying out the method of claim 5, the process comprising:
employing a system in the process,
wherein the system comprises a building comprising
the multiplicity of bays for receiving interchangeable functional units, the building shell to protect the functional units received from effects of weather, the technical building equipment and the infrastructure grid for energy and/or materials and/or data, and
a multiplicity of functional units, each of which comprising a pallet, which is neutral as regards a utilization thereof and is equipped with production and/or operating devices in order to define a purpose of the functional unit;
the bays of the building and the pallets of the functional units are designed so as to correspond to one another in such a way that a linear guide assigned to the bay and a carriage arranged on the pallet, which is optionally inserted into the linear guide, form a standardized interface within the system;
the pallets and/or the functional units constructed thereon correspond to a standardized container format;
the building is subdivided into at least three sections, a first section comprising the multiplicity of bays, a second section comprising a number of bays corresponding to the number of bays in the first section, and a third section without bays;
one bay in the first section is assigned to one bay in the second section; and
the respectively assigned bays in the first and second sections are arranged in alignment with one another on each side of the third section; and
wherein the operating and/or production devices are from the first functional group and the second functional group, the functional units of the first functional group are installed in the first section of the building, the functional units of the second functional group are installed in the second section of the building, at least some of the technical building equipment is embodied as the functional units of the second functional group, which remain in the building when the functional units of the first functional group are replaced.
US14/763,401 2013-01-24 2014-01-16 Method and system for using an industrial site Abandoned US20150354201A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE102013201171.7 2013-01-24
DE102013201171.7A DE102013201171A1 (en) 2013-01-24 2013-01-24 Method and system for using an industrial property
PCT/EP2014/050818 WO2014114558A1 (en) 2013-01-24 2014-01-16 Method and system for using an industrial site

Publications (1)

Publication Number Publication Date
US20150354201A1 true US20150354201A1 (en) 2015-12-10

Family

ID=49989764

Family Applications (1)

Application Number Title Priority Date Filing Date
US14/763,401 Abandoned US20150354201A1 (en) 2013-01-24 2014-01-16 Method and system for using an industrial site

Country Status (5)

Country Link
US (1) US20150354201A1 (en)
EP (1) EP2948598A1 (en)
DE (1) DE102013201171A1 (en)
SG (1) SG11201505684TA (en)
WO (1) WO2014114558A1 (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150135636A1 (en) * 2013-11-18 2015-05-21 Red Flint Group, LLC Modular batch plant for granular products
US20160273271A1 (en) * 2014-07-14 2016-09-22 Halliburton Energy Services, Inc. Mobile oilfield tool service center
US20170260763A1 (en) * 2016-03-10 2017-09-14 Lonza Ltd Customizable facility
US10011982B1 (en) 2015-09-23 2018-07-03 Theodore W. Baker School spaces retrofitted for alternative uses and related technology
US10036172B1 (en) 2016-08-17 2018-07-31 Theodore W. Baker Commercial storefront spaces retrofitted for alternative uses and related technology
US10043227B1 (en) 2016-03-18 2018-08-07 Theodore W. Baker Commercial loading, storage, parking and vehicle-servicing spaces retrofitted for alternative uses and related technology
US10402759B2 (en) * 2015-01-22 2019-09-03 Visier Solutions, Inc. Systems and methods of adding and reconciling dimension members
IT201800004086A1 (en) * 2018-03-29 2019-09-29 Fca Italy Spa PROCEDURE FOR THE COMMISSIONING AND / OR RECONFIGURATION OF AN INDUSTRIAL PLANT, IN PARTICULAR FOR THE PRODUCTION OF MOTOR VEHICLES OR THEIR SUB-GROUPS
US10529038B2 (en) 2015-04-29 2020-01-07 Spacement Inc. Dynamic interstitial hotels and related technology
US10662662B2 (en) 2015-04-29 2020-05-26 Spacement Inc. Retrofitted real estate and related technology
US10689873B2 (en) 2016-03-10 2020-06-23 Lonza Ltd Customizable facility
US20220049516A1 (en) * 2020-08-17 2022-02-17 Terrapower, Llc Modular manufacture, delivery, and assembly of nuclear reactor building systems
US11636408B2 (en) 2015-01-22 2023-04-25 Visier Solutions, Inc. Techniques for manipulating and rearranging presentation of workforce data in accordance with different data-prediction scenarios available within a graphical user interface (GUI) of a computer system, and an apparatus and hardware memory implementing the techniques

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2499498A (en) * 1947-04-29 1950-03-07 Jr John Hays Hammond Mobile housing unit
US3721056A (en) * 1970-09-03 1973-03-20 Warner Vertical modular construction having insertable units

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1643489A (en) * 1924-09-30 1927-09-27 Benjamin F Fitch Apparatus for handling freight
DD87156A2 (en) 1970-12-21 1972-01-12 Transportable room line
DE3036468A1 (en) 1980-09-24 1982-05-06 Günter 1000 Berlin Krause industrialised cell and frame assembled building - has completely prefab. room cell units inserted in prefab. frame
DE4218615C1 (en) 1992-06-05 1993-07-15 Nukem Gmbh, 8755 Alzenau, De
JP2000345724A (en) * 1999-06-03 2000-12-12 Masafumi Miyamoto Amusement facility, container for amusement facility and method for installting amusement facility
DE10361621A1 (en) 2003-12-30 2005-07-28 Volker Dr. Krieger Modular laboratory, has container modules in which building service components e.g. switchgear cabinet, and firm laboratory equipments e.g. laboratory bench, are installed during prefabrication of building site
GB0414227D0 (en) * 2004-06-25 2004-07-28 Hourihan Kevin J Improvements in or relating to buildings
DE102006001977B3 (en) 2006-01-13 2007-05-10 Avl Deutschland Gmbh A transportable test station has a modular construction comprising interconnected test and supply modules whose dimensions make for a compact assembly
DE102008041950A1 (en) 2008-09-10 2010-03-11 Evonik Degussa Gmbh System for providing a universal infrastructure for chemical processes
DE102009041088A1 (en) * 2009-09-10 2011-03-24 Manfred Langen Logistic center, has coupling and supply- and removal lines provided at and/or in front of front side of base module of modular system, where supply- and waste removal lines are coupled with connections of partial module
CA2724938C (en) 2009-12-18 2017-01-24 Fluor Technologies Corporation Modular processing facility
DE202011108631U1 (en) 2011-12-02 2012-02-28 Thomas Atzenhofer Novel construction within a Skellet building by the introduction of space-forming precast concrete elements

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2499498A (en) * 1947-04-29 1950-03-07 Jr John Hays Hammond Mobile housing unit
US3721056A (en) * 1970-09-03 1973-03-20 Warner Vertical modular construction having insertable units

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10155251B2 (en) * 2013-11-18 2018-12-18 Red Flint Group, LLC Modular batch plant for granular products
US10005106B2 (en) 2013-11-18 2018-06-26 Red Flint Group, LLC Modular batch plant for granular products
US9427782B2 (en) * 2013-11-18 2016-08-30 Red Flint Group, LLC Modular batch plant for granular products
US20150135636A1 (en) * 2013-11-18 2015-05-21 Red Flint Group, LLC Modular batch plant for granular products
US20160273271A1 (en) * 2014-07-14 2016-09-22 Halliburton Energy Services, Inc. Mobile oilfield tool service center
US10407989B2 (en) * 2014-07-14 2019-09-10 Halliburton Energy Services, Inc. Mobile oilfield tool service center
US10402759B2 (en) * 2015-01-22 2019-09-03 Visier Solutions, Inc. Systems and methods of adding and reconciling dimension members
US11636408B2 (en) 2015-01-22 2023-04-25 Visier Solutions, Inc. Techniques for manipulating and rearranging presentation of workforce data in accordance with different data-prediction scenarios available within a graphical user interface (GUI) of a computer system, and an apparatus and hardware memory implementing the techniques
US10529038B2 (en) 2015-04-29 2020-01-07 Spacement Inc. Dynamic interstitial hotels and related technology
US10662662B2 (en) 2015-04-29 2020-05-26 Spacement Inc. Retrofitted real estate and related technology
US10011982B1 (en) 2015-09-23 2018-07-03 Theodore W. Baker School spaces retrofitted for alternative uses and related technology
US11613900B2 (en) 2016-03-10 2023-03-28 Lonza Ltd Customizable facility
US20170260763A1 (en) * 2016-03-10 2017-09-14 Lonza Ltd Customizable facility
US11859403B2 (en) 2016-03-10 2024-01-02 Lonza Ltd Customizable facility
US10689873B2 (en) 2016-03-10 2020-06-23 Lonza Ltd Customizable facility
US11236520B2 (en) * 2016-03-10 2022-02-01 Lonza Ltd Customizable facility
US11377865B2 (en) 2016-03-10 2022-07-05 Lonza Ltd Customizable facility
US10043227B1 (en) 2016-03-18 2018-08-07 Theodore W. Baker Commercial loading, storage, parking and vehicle-servicing spaces retrofitted for alternative uses and related technology
US10036172B1 (en) 2016-08-17 2018-07-31 Theodore W. Baker Commercial storefront spaces retrofitted for alternative uses and related technology
US11550302B2 (en) 2018-03-29 2023-01-10 Fca Italy S.P.A. Method for the setup and/or the reconfiguration of an industrial plant, particularly for the manufacturing of motor vehicles or subassemblies thereof
EP3546677A1 (en) * 2018-03-29 2019-10-02 FCA Italy S.p.A. A method for the setup and/or the reconfiguration of an industrial plant, particularly for the manufacturing of motor vehicles or sub-assemblies thereof
IT201800004086A1 (en) * 2018-03-29 2019-09-29 Fca Italy Spa PROCEDURE FOR THE COMMISSIONING AND / OR RECONFIGURATION OF AN INDUSTRIAL PLANT, IN PARTICULAR FOR THE PRODUCTION OF MOTOR VEHICLES OR THEIR SUB-GROUPS
US20220049516A1 (en) * 2020-08-17 2022-02-17 Terrapower, Llc Modular manufacture, delivery, and assembly of nuclear reactor building systems
US11746550B2 (en) * 2020-08-17 2023-09-05 Terrapower, Llc Modular manufacture, delivery, and assembly of nuclear reactor building systems

Also Published As

Publication number Publication date
SG11201505684TA (en) 2015-09-29
WO2014114558A1 (en) 2014-07-31
EP2948598A1 (en) 2015-12-02
DE102013201171A1 (en) 2014-07-24

Similar Documents

Publication Publication Date Title
US20150354201A1 (en) Method and system for using an industrial site
US20110163462A1 (en) Universal Infrastructure for Chemical Processes
US8789269B2 (en) Modular manufacturing facility and method
WO2005113920A3 (en) Lng containment system and method of assembling lng containment system
US20090077904A1 (en) Modular Testing Plant
EP3366903A1 (en) Improvements to structural modules for assembling modular power stations
US20170121990A1 (en) System, method for conversion of intermodal shipping containers to universal building modules
Boccaccini et al. The EU TBM systems: design and development programme
EA028241B1 (en) Solvent extraction settler comprising a foundation
RU2693722C2 (en) Satellite-constructor, training-demonstration model
WO2017025847A1 (en) Convertible shipping container and building fixture apparatus
CN202767578U (en) Modular data center
US20230295940A1 (en) Modular integrated system modules
CN107963346B (en) Method for transporting an assembly formed by a first enclosure and at least one panel
Bridges et al. Modular laboratories—cost-effective and sustainable infrastructure for resource-limited settings
CN102808454B (en) For a corner fittings device for cellular building, cellular building thing and building method
Baudis et al. Snowmass 2021 Underground Facilities and Infrastructure Overview Topical Report
RU2750660C1 (en) Flexible production system
KR102451449B1 (en) Module unit assembly of prefabricated building
ES2397171B1 (en) MODULAR CONSTRUCTION SYSTEM OF BUILDINGS FROM PREFABRICATED ELEMENTS.
WO2014089601A1 (en) Movable or re-locatable container plant
Asuar et al. ITER hot cell
JP2016156214A (en) Collective housing, housing unit, and housing unit with roof
JP6510305B2 (en) Container type data center
DE10342955A1 (en) Construction of international freight containers has internal modular facility for inclusion of lighting and refrigeration system

Legal Events

Date Code Title Description
AS Assignment

Owner name: EVONIK DEGUSSA GMBH, GERMANY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:GRUETERING, HANS-DIETER;REEL/FRAME:036173/0201

Effective date: 20150615

STCV Information on status: appeal procedure

Free format text: ON APPEAL -- AWAITING DECISION BY THE BOARD OF APPEALS

STCV Information on status: appeal procedure

Free format text: BOARD OF APPEALS DECISION RENDERED

AS Assignment

Owner name: EVONIK OPERATIONS GMBH, GERMANY

Free format text: CHANGE OF NAME;ASSIGNOR:EVONIK DEGUSSA GMBH;REEL/FRAME:051765/0166

Effective date: 20191002

STPP Information on status: patent application and granting procedure in general

Free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO PAY ISSUE FEE