US20140352909A1 US14/370,965 US201314370965A US2014352909A1 US 20140352909 A1 US20140352909 A1 US 20140352909A1 US 201314370965 A US201314370965 A US 201314370965A US 2014352909 A1 US2014352909 A1 US 2014352909A1
Authority
US
United States
Prior art keywords
chamber
strip casting
induction melting
vacuum
material receiving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US14/370,965
Other versions
US9384889B2 (en
Inventor
Baoyu Sun
Xiaodong Chen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang North Vacum Technology Co Ltd
Original Assignee
Shenyang North Vacum Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang North Vacum Technology Co Ltd filed Critical Shenyang North Vacum Technology Co Ltd
Publication of US20140352909A1 publication Critical patent/US20140352909A1/en
Application granted granted Critical
Publication of US9384889B2 publication Critical patent/US9384889B2/en
Active legal-status Critical Current
Adjusted expiration legal-status Critical

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F41/00Apparatus or processes specially adapted for manufacturing or assembling magnets, inductances or transformers; Apparatus or processes specially adapted for manufacturing materials characterised by their magnetic properties
    • H01F41/02Apparatus or processes specially adapted for manufacturing or assembling magnets, inductances or transformers; Apparatus or processes specially adapted for manufacturing materials characterised by their magnetic properties for manufacturing cores, coils, or magnets
    • H01F41/0253Apparatus or processes specially adapted for manufacturing or assembling magnets, inductances or transformers; Apparatus or processes specially adapted for manufacturing materials characterised by their magnetic properties for manufacturing cores, coils, or magnets for manufacturing permanent magnets
    • H01F41/0266Moulding; Pressing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/06Continuous casting of metals, i.e. casting in indefinite lengths into moulds with travelling walls, e.g. with rolls, plates, belts, caterpillars
    • B22D11/0611Continuous casting of metals, i.e. casting in indefinite lengths into moulds with travelling walls, e.g. with rolls, plates, belts, caterpillars formed by a single casting wheel, e.g. for casting amorphous metal strips or wires
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/12Accessories for subsequent treating or working cast stock in situ
    • B22D11/1213Accessories for subsequent treating or working cast stock in situ for heating or insulating strands
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/12Accessories for subsequent treating or working cast stock in situ
    • B22D11/124Accessories for subsequent treating or working cast stock in situ for cooling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/12Accessories for subsequent treating or working cast stock in situ
    • B22D11/126Accessories for subsequent treating or working cast stock in situ for cutting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D25/00Special casting characterised by the nature of the product
    • B22D25/06Special casting characterised by the nature of the product by its physical properties
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D45/00Equipment for casting, not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D46/00Controlling, supervising, not restricted to casting covered by a single main group, e.g. for safety reasons
    • CCHEMISTRY; METALLURGY
    • C01INORGANIC CHEMISTRY
    • C01BNON-METALLIC ELEMENTS; COMPOUNDS THEREOF; METALLOIDS OR COMPOUNDS THEREOF NOT COVERED BY SUBCLASS C01C
    • C01B3/00Hydrogen; Gaseous mixtures containing hydrogen; Separation of hydrogen from mixtures containing it; Purification of hydrogen
    • C01B3/0005Reversible uptake of hydrogen by an appropriate medium, i.e. based on physical or chemical sorption phenomena or on reversible chemical reactions, e.g. for hydrogen storage purposes ; Reversible gettering of hydrogen; Reversible uptake of hydrogen by electrodes
    • C01B3/001Reversible uptake of hydrogen by an appropriate medium, i.e. based on physical or chemical sorption phenomena or on reversible chemical reactions, e.g. for hydrogen storage purposes ; Reversible gettering of hydrogen; Reversible uptake of hydrogen by electrodes characterised by the uptaking medium; Treatment thereof
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C33/00Making ferrous alloys
    • C22C33/04Making ferrous alloys by melting
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/002Ferrous alloys, e.g. steel alloys containing In, Mg, or other elements not provided for in one single group C22C38/001 - C22C38/60
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/005Ferrous alloys, e.g. steel alloys containing rare earths, i.e. Sc, Y, Lanthanides
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C45/00Amorphous alloys
    • C22C45/02Amorphous alloys with iron as the major constituent
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F1/00Magnets or magnetic bodies characterised by the magnetic materials therefor; Selection of materials for their magnetic properties
    • H01F1/01Magnets or magnetic bodies characterised by the magnetic materials therefor; Selection of materials for their magnetic properties of inorganic materials
    • H01F1/03Magnets or magnetic bodies characterised by the magnetic materials therefor; Selection of materials for their magnetic properties of inorganic materials characterised by their coercivity
    • H01F1/032Magnets or magnetic bodies characterised by the magnetic materials therefor; Selection of materials for their magnetic properties of inorganic materials characterised by their coercivity of hard-magnetic materials
    • H01F1/04Magnets or magnetic bodies characterised by the magnetic materials therefor; Selection of materials for their magnetic properties of inorganic materials characterised by their coercivity of hard-magnetic materials metals or alloys
    • H01F1/047Alloys characterised by their composition
    • H01F1/053Alloys characterised by their composition containing rare earth metals
    • H01F1/055Alloys characterised by their composition containing rare earth metals and magnetic transition metals, e.g. SmCo5
    • H01F1/0551Alloys characterised by their composition containing rare earth metals and magnetic transition metals, e.g. SmCo5 in the form of particles, e.g. rapid quenched powders or ribbon flakes
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F1/00Magnets or magnetic bodies characterised by the magnetic materials therefor; Selection of materials for their magnetic properties
    • H01F1/01Magnets or magnetic bodies characterised by the magnetic materials therefor; Selection of materials for their magnetic properties of inorganic materials
    • H01F1/03Magnets or magnetic bodies characterised by the magnetic materials therefor; Selection of materials for their magnetic properties of inorganic materials characterised by their coercivity
    • H01F1/032Magnets or magnetic bodies characterised by the magnetic materials therefor; Selection of materials for their magnetic properties of inorganic materials characterised by their coercivity of hard-magnetic materials
    • H01F1/04Magnets or magnetic bodies characterised by the magnetic materials therefor; Selection of materials for their magnetic properties of inorganic materials characterised by their coercivity of hard-magnetic materials metals or alloys
    • H01F1/047Alloys characterised by their composition
    • H01F1/053Alloys characterised by their composition containing rare earth metals
    • H01F1/055Alloys characterised by their composition containing rare earth metals and magnetic transition metals, e.g. SmCo5
    • H01F1/057Alloys characterised by their composition containing rare earth metals and magnetic transition metals, e.g. SmCo5 and IIIa elements, e.g. Nd2Fe14B
    • H01F1/0571Alloys characterised by their composition containing rare earth metals and magnetic transition metals, e.g. SmCo5 and IIIa elements, e.g. Nd2Fe14B in the form of particles, e.g. rapid quenched powders or ribbon flakes
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/30Hydrogen technology
    • Y02E60/32Hydrogen storage

Definitions

  • the present invention relates to a vacuum induction melting and strip casting equipment, and more particularly to a vacuum melting and strip casting equipment for melting NdFeB rare earth permanent magnetic alloys and rare earth hydrogen storage alloys.
  • the NdFeB rare earth permanent magnet is widely used to Electronics, electrical appliances, electrical motors and so on, and has a more extensive use.
  • the rare earth hydrogen storage alloy is the negative electrode material of the NiMH battery. It is widely used to electric tools and hybrid electric vehicles and so on, and has a more extensive use.
  • the raw material of the rare earth permanent magnetic alloy or the raw material of the rare earth hydrogen storage alloy is put into the melting crucible of the vacuum melting and strip casting equipment, under vacuum and protective atmosphere, the raw material is heated up and molten to form the molten alloy, and then is casted to the external surface of the copper cooling roller with water-cooling to form the alloy slice via the tundish at the controllable speed, the cooled alloy slice falls on the horizontal rotational water-cooled rotation plate for the second cooling, after the alloy slice being cooled, the furnace door of the vacuum and strip casting equipment is open, and the alloy slice is taken out, and then the alloy slice is installed into the material box of the vacuum heat treatment furnace, and sent to the vacuum heat treatment furnace for vacuum heat treatment.
  • the present invention provides a vacuum induction melting and strip casting equipment for rare earth permanent magnetic alloy which completes the rare earth alloy vacuum and strip casting slice, the thermal process and the cooling in the protective atmosphere of one device, so that the production efficiency is improved, the production performance is high, and the consistence is good.
  • the present invention comprises a vacuum induction melting and strip casting chamber, a material receiving heat preservation treatment chamber, a cooling chamber and an intra-chamber isolation valve, wherein the intra-chamber isolation valve is located between the material receiving heat preservation treatment chamber and the cooling chamber, the vacuum induction melting and strip casting chamber is located above the material receiving heat preservation treatment chamber, an outlet of a material guiding tube of the vacuum induction melting and strip casting chamber is corresponding to the material receiving heat preservation treatment chamber, and water-cooled electrodes, a vacuum pumping device, an inert gas introduction pipeline, a temperature measurement mechanism, a pressure gauge, a vacuum gauge and a safety valve are provided on the vacuum induction melting and strip casting chamber.
  • a furnace body is located within a vacuum chamber with a water-cooled sandwich of the vacuum induction melting and strip casting chamber, the furnace body comprises a crucible, a steel-made framework, heat-resistant bricks and a copper induction coil, wherein the heat-resistant bricks, the copper induction coil and the steel-made framework are located at a periphery of the crucible in turn, the crucible is located at a bottom of the furnace body via the steel-made framework, an outlet of the crucible is a material guiding mouth, the furnace body is fixed within the strip casting chamber via a support frame, a tilting mechanism is connected to the steel-made framework, another end of the tilting mechanism is fixed to an inner wall of the furnace body, a furnace cover is located at an upper portion of the vacuum chamber, and a furnace door is installed at one end of the vacuum chamber.
  • a tundish, a quenching copper roller and the material guiding tube are located within the strip casting chamber, the tundish is located between the material guiding mouth of the crucible and the quenching copper roller and is connected to a three-dimensional adjustment mechanism for adjusting a gap between a nozzle of the tundish and the quenching copper roller, the quenching copper roller is located below the tundish within the strip casting chamber, the material guiding tube is located below the quenching copper roller, a lower portion of the material guiding tube is docked to a material receiving box, a water-cooled tube circles around an outer wall of the material guiding tube, and a crushing roller is located within the material guiding tube.
  • the furnace cover is connected to the vacuum chamber via a hydraulic electric shifting device
  • a track is provided on the furnace cover, one end of the track is connected to a foundation via a shaft, and another end thereof is connected with a hydraulic cylinder
  • the hydraulic cylinder is connected to the strip casting chamber
  • a driver gear and a passive gear, which rolls along the track, are provided at the furnace cover
  • the driver gear is connected with a reducer shaft of a first motor via a sprocket-chain
  • an observation window is provided on the furnace cover
  • an observation window with a camera is provided on the furnace door.
  • a material receiving box, an insulation chamber and a friction roller transmission mechanism are located within the material receiving heat preservation treatment chamber, an insulation board is located at an inner wall of the insulation chamber, a heater is located within the insulation board, the friction roller transmission mechanism comprises a motor reducer, a plurality of transmission sprocket-chains, a plurality of friction rollers arranged in parallel, and a plurality of friction roller shafts thereof, wherein the friction roller shafts are located within the material receiving heat preservation treatment chamber, two ends of each of the friction roller shafts passes through the insulation board for connecting with the sprocket, two sprockets of two adjacent friction roller shafts are connected with each other via the chain, and the sprocket at an end of every friction roller shaft is connected with the motor reducer outside the material receiving heat preservation treatment chamber via a dynamic sealing sprocket shaft.
  • the material receiving box is open, an opening shaped tube penetrating through the material receiving box is welded at a side of the material receiving box, the shaped tube has a hole communicating with the material receiving box, while receiving materials, the material receiving box reciprocates along a friction roller transmitting at a bottom of the material receiving heat preservation treatment chamber.
  • a motor is located at a side wall of the cooling chamber
  • a wind tank is located within the cooling chamber
  • a plurality of diversion ducts are located at a side wall of the wind tank
  • a heat exchanger is located at another side wall of the wind tank, an outlet of the heat exchanger faces a fan which is connected with a shaft of the second motor
  • an arched diversion baffle is located at a periphery side wall of the cooling chamber
  • a vacuum pumping pipeline and an inert gas induction pipeline are connected with an exterior of the cooling chamber
  • the vacuum pumping pipeline is connected with the vacuum pumping device.
  • the rare earth alloy vacuum and strip casting slice, the thermal process and the cooling are completed in the protective atmosphere of one device, so that the production efficiency is improved, the production performance is high, and the consistence is good.
  • the present invention avoids the uneven slice stirring, slow cooling, low efficiency, and high power consumption of the existing single chamber vacuum induction heating and strip casting furnace. It avoids slice adhesion and oxidating the slice during logistics process. Under the premise of energy saving, the production capacity and the consistency of the product are greatly improved, the service life of the equipment is increased and the maintenance time of the equipment is shortened.
  • FIG. 1 is a perspective view of the present invention.
  • FIG. 2 is a perspective view of a cooling device in FIG. 1 .
  • the present invention comprises a vacuum induction melting and strip casting chamber 1 , a material receiving heat preservation treatment chamber 2 , a cooling chamber 3 and an intra-chamber isolation valve 4 , wherein the intra-chamber isolation valve 4 is located between the material receiving heat preservation treatment chamber 2 and the cooling chamber 3 , the vacuum induction melting and strip casting chamber 1 is located above the material receiving heat preservation treatment chamber 2 , an outlet of a material guiding tube 11 of the vacuum induction melting and strip casting chamber 1 is corresponding to the material receiving heat preservation treatment chamber 2 , and the water-cooled electrodes, a vacuum pumping device 18 , an inert gas introduction pipeline, a temperature measurement mechanism, a pressure gauge, a vacuum gauge and a safety valve are provided on the vacuum induction melting and strip casting chamber 1 .
  • the temperature measurement mechanism is the armored thermocouple.
  • a furnace body 118 is located within a vacuum chamber with a water-cooled sandwich 117 of the vacuum induction melting and strip casting chamber 1 .
  • the furnace body 118 comprises a crucible 15 , a steel-made framework 123 , heat-resistant bricks and a copper induction coil 116 , wherein the crucible 15 is located at a bottom of the furnace body 118 via the steel-made framework 123 , an outlet of the crucible 15 is a material guiding mouth, the steel-made framework 123 is connected with a support frame 119 via a first shaft 124 , a tilting mechanism 16 is connected to the steel-made framework 123 , another end of the tilting mechanism 16 is fixed to an inner wall of the furnace body, a furnace door 110 , which is capable of manually flipping opening or closing, is installed at one end of the vacuum chamber, an observation window with a camera 120 is provided on the furnace door 110 , a furnace cover 113 is installed at an upper portion of the vacuum chamber, and the furnace cover 113 has an observation
  • the tilting mechanism 16 has an existing structure, a hydraulic cylinder of the tilting mechanism is connected with the steel-made framework 123 via a second shaft 125 , under the drive of the hydraulic cylinder, the steel-made framework 123 turns around the first shaft 124 and the second shaft 125 to pour the material into a tundish 14 .
  • the furnace cover 113 is connected to the vacuum chamber via a hydraulic electric shifting device.
  • a track 114 is provided on the furnace cover 113 .
  • One end of the track 114 is connected to the foundation via a shaft 115 , and another end thereof is connected with a hydraulic cylinder 111 .
  • the hydraulic cylinder 111 is connected to the strip casting chamber 1 .
  • a driver gear and a passive gear, which rolls along the track 114 are provided at the furnace cover 113 .
  • the driver gear is connected with a reducer shaft of a first motor 112 via a sprocket-chain.
  • the tundish 14 , a quenching copper roller 13 and the material guiding tube 11 are located within the strip casting chamber 1 which is located above the material receiving heat preservation treatment chamber 2 .
  • the tundish 14 is located between the material guiding mouth of the crucible 15 and the quenching copper roller 13 and is connected to a three-dimensional adjustment mechanism for adjusting a gap between a nozzle of the tundish 14 and the quenching copper roller 13 .
  • the three-dimensional adjustment mechanism has an existing structure, wherein three linear slide rail components coordinated with each other are respectively located at three axis directions.
  • the tundish is fixed on a bedplate at one of the three axes, and the bedplate moves along X-axis, Y-axis and Z-axis.
  • the quenching copper roller 13 is located below the tundish 14 within the strip casting chamber, the material guiding tube 11 is located below the quenching copper roller 13 , and a lower portion of the material guiding tube 11 is docked to a material receiving box 21 .
  • a water-cooled tube 121 circles around an outer wall of the material guiding tube 11 , a crushing roller 12 is located within the material guiding tube 11 and a and strip casting slice is changed to a slice with smaller size via the crushing roller 12 and falls into the material receiving box 21 .
  • the material receiving box 21 is a steel-made square box, wherein a sealing board is welded at a bottom surface thereof, the box has an open top surface, an opening shaped tube 22 penetrating through the material receiving box 21 is welded at a side of the material receiving box, the shaped tube 22 has a hole communicating with an inner cavity of the material receiving box 21 , while receiving materials, the material receiving box 21 reciprocates along a friction roller 23 transmitting at a bottom of the material receiving heat preservation treatment chamber 2 .
  • the material receiving box 21 , an insulation chamber 25 and a friction roller transmission mechanism are located within the material receiving heat preservation treatment chamber 2 .
  • An insulation board is located at an inner wall of the insulation chamber 25 , and a heater is located within the insulation board.
  • the friction roller transmission mechanism comprises a motor reducer, a plurality of transmission sprocket-chains, a plurality of friction rollers 23 arranged in parallel, and a plurality of friction roller shafts thereof, wherein the friction roller shafts are located within the material receiving heat preservation treatment chamber 2 , two ends of each of the friction roller shafts passes through the insulation board for connecting with the sprocket, two sprockets of two adjacent friction roller shafts are connected with each other via the chain, and the sprocket at an end of every friction roller shaft is connected with the motor reducer outside the material receiving heat preservation treatment chamber 2 via the dynamic sealing sprocket shaft.
  • a second motor 31 is located at a side wall of the cooling chamber 3
  • a wind tank is located within the cooling chamber
  • a diversion duct 35 is located at a side wall of the wind tank
  • a heat exchanger 33 is located at another side wall of the wind tank
  • an outlet of the heat exchanger 33 faces a fan 32 which is connected with a shaft of the second motor 31
  • a diversion baffle 36 is located at a peripheral side wall of the cooling chamber 3
  • an exterior of the cooling chamber is connected with a vacuum pumping pipeline, the inert gas introduction pipeline, and a safety valve pipeline, and the vacuum pumping pipeline is connected with the vacuum pumping device.
  • the induction coil 116 is electrified by a medium frequency induction power supply 19 located outside the vacuum furnace for heating up the furnace charge in the crucible 15 , after the furnace charge is molten and fully alloyed, the molten furnace charge outflows along the material guiding mouth of the crucible 15 to cast into the tundish 14 below the material guiding mouth of the crucible via the tilting mechanism.
  • a nozzle 122 is provided at a place where the tundish 14 contacts with the quenching copper roller 13 .
  • the molten alloy in the tundish is spray casted to an external surface of the rotating quenching copper roller 13 via the nozzle 122 , and the molten alloy is cooled at the surface of the quenching copper roller 13 to form the alloy slice.
  • the slice falls into the material guiding tube 11 below the quenching copper roller with the rotation of the the quenching copper roller 13 .
  • the crushing roller 12 is located within the material guiding tube 11 , after passing through the crushing roller 12 , the alloy slice is smashed to fine fragments and falls into the material receiving box 21 below the reciprocating material guiding tube 11 . After completing the cast, the material receiving box 21 containing the fragments moves into the insulation chamber 25 for heat preservation.
  • the isolation valve 4 is open, the material receiving box 21 is moved to the cooling chamber 3 , and then the isolation valve 4 is closed (at this time, the second furnace melting begins), the second motor 31 starts cooling for cooling the material receiving box 21 and the fragments therein.
  • the heat exchanger 33 is located between the fan 32 and the material receiving box 21 , the shaped tube 22 is located on the material receiving box 21 , the cooled gas takes away the heat on the fragments by the shaped tube 22 . Under the driving of the fan 32 , the heated gas is cooled by the heat exchanger 33 and blows to the material receiving box 21 by the fan 32 , the diversion baffle 36 and the diversion duct 35 of the wind tank.
  • the furnace door 110 Under the atmospheric pressure, the furnace door 110 is manually open, and the furnace cover 113 is electrically open.
  • the R—Fe—B—M raw material (R is one or more of Nd, Pr, Dy and Tb rare earth elements, and M is one or more of Co, Al, Cu, Zr and Ga) proportioned by material component and weight is installed into the crucible 15 of the vacuum induction melting and strip casting equipment.
  • the furnace door 110 and the furnace cover 113 are closed, the pressure is reduced to a specified pressure (such as lower than 5 Pa) by the vacuum pumping device 18 of two roots pumps connected in series and two slice valve pumps connected in parallel, an inert gas introduction valve is open for charging the inert gas into the furnace, under vacuum and protective atmosphere, the medium frequency induction power supply 19 is started, and the raw material is molten to the molten alloy by induction heating.
  • a specified pressure such as lower than 5 Pa
  • the molten alloy After being fully alloyed (such as refining process for 30 minutes), at the set temperature (such as 1460° C.), the molten alloy outflows along the material guiding mouth of the crucible 15 to cast into the tundish 14 below the material guiding mouth of the crucible by the tilting mechanism 16 .
  • the alloy liquid is spray casted to the external surface of the rotating quenching copper roller 13 for cooling via the nozzle 122 on the tundish 14 .
  • the rotational speed of the quenching copper roller 13 can be set according to technological requirements.
  • the alloy slice cooled by the rotating quenching copper roller 13 falls into the material receiving box 21 below the material guiding tube via the material guiding tube 11 , the crushing roller 12 is located on the material guiding tube 11 , and a water cooled tube 121 is provided at a tube wall of the material guiding tube.
  • the friction roller 23 is located within the material receiving heat preservation treatment chamber 2 , while receiving materials, the material receiving box 21 horizontally reciprocates for avoiding the adhesion of the alloy fragments due to the clockwise accumulation thereof.
  • the materials received by the material receiving box 21 are timely sent to the insulation chamber 25 for heat preservation, the holding temperature is set according to technical requirements (such as 500° C.-900° C.), and the temperature is hold for a period of time (such as more than 30 minutes).
  • the heat preserved alloy slice is sent to the cooling chamber 3 , the second motor 31 is located at the side wall of the cooling chamber 3 , the wind tank 34 is located within the cooling chamber, a plurality of diversion ducts 35 are located at the side wall of the wind tank 34 , the heat exchanger 33 is located at another side wall of the wind tank, the outlet of the heat exchanger 33 faces the fan 32 which is connected with the shaft of the second motor 31 , and the arched diversion baffle 36 is located at the wall of the cooling chamber. While reaching the required tapping temperature (such as 80° C.), the alloy slice is taken out of the cooling chamber.
  • the required tapping temperature such as 80° C.
  • the vacuum isolation valve 4 is located between the insulation chamber 25 and the cooling chamber 3 . After heat preservation, the material receiving box 21 is sent to the cooling chamber 3 for cooling, and the second furnace charge can be molten at this time.
  • the vacuum isolation valve 4 is designed to a board plug valve and is sealed by a cylinder driving a four-linkage bar to tightly press a valve plate gasket.
  • Two chamber doors, which are respectively 1 # chamber door 24 and 2# chamber door 37 are respectively provided between the material receiving heat preservation treatment chamber 2 and the cooling chamber 3 and the atmosphere for discharging materials, repair and maintenance.

Abstract

A vacuum induction melting and strip casting equipment for rare earth permanent magnetic alloy includes a vacuum induction melting and strip casting chamber, a material receiving heat preservation treatment chamber, a cooling chamber and an isolation valve. The isolation valve is located between the material receiving heat preservation treatment chamber and the cooling chamber, the vacuum induction melting and strip casting chamber is located above the material receiving heat preservation treatment chamber, an outlet of a material guiding tube of the vacuum induction melting and strip casting chamber is corresponding to the material receiving heat preservation treatment chamber. Water-cooled electrodes, a vacuum pumping device, an inert gas introduction pipeline, a temperature measurement mechanism, a pressure gauge, a vacuum gauge and a safety valve are provided on the vacuum induction melting and strip casting chamber. The present invention improves the production efficiency and has high production performance and good consistence.

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • This PCT application is based on application No. 201210442609.5 filed in China on Nov. 8, 2012, the contents of which are incorporated hereinto by reference.
  • BACKGROUND OF THE PRESENT INVENTION
  • 1. Field of Invention
  • The present invention relates to a vacuum induction melting and strip casting equipment, and more particularly to a vacuum melting and strip casting equipment for melting NdFeB rare earth permanent magnetic alloys and rare earth hydrogen storage alloys.
  • 2. Description of Related Arts
  • The NdFeB rare earth permanent magnet is widely used to Electronics, electrical appliances, electrical motors and so on, and has a more extensive use. The rare earth hydrogen storage alloy is the negative electrode material of the NiMH battery. It is widely used to electric tools and hybrid electric vehicles and so on, and has a more extensive use.
  • In the existing NdFeB rare earth permanent magnet manufacturing processes and vacuum melting and strip casting equipments, the raw material of the rare earth permanent magnetic alloy or the raw material of the rare earth hydrogen storage alloy is put into the melting crucible of the vacuum melting and strip casting equipment, under vacuum and protective atmosphere, the raw material is heated up and molten to form the molten alloy, and then is casted to the external surface of the copper cooling roller with water-cooling to form the alloy slice via the tundish at the controllable speed, the cooled alloy slice falls on the horizontal rotational water-cooled rotation plate for the second cooling, after the alloy slice being cooled, the furnace door of the vacuum and strip casting equipment is open, and the alloy slice is taken out, and then the alloy slice is installed into the material box of the vacuum heat treatment furnace, and sent to the vacuum heat treatment furnace for vacuum heat treatment.
  • By exploring, it is found that in spite that compared to the prior ingoting process and equipment, the product performance of the currently used vacuum melting and strip casting process and equipment is greatly improved, the product still has a lot of problems. While producing the rare earth permanent magnetic alloy slice, due to the uneven secondary cooling, the metallurgical structure of the product has the uneven grain distributions and meticulous small grains, and α-Fe is often separated out. While producing the rare earth hydrogen storage alloy, there are small amounts of manganese precipitation. These phenomena seriously affect the performance of the product, the alloy slice needs to be vacuum heat treated after this in the vacuum heat treatment furnace for eliminating the manganese precipitation and homogenizing the grains.
  • SUMMARY OF THE PRESENT INVENTION
  • Aiming at the above mentioned technical problems, the present invention provides a vacuum induction melting and strip casting equipment for rare earth permanent magnetic alloy which completes the rare earth alloy vacuum and strip casting slice, the thermal process and the cooling in the protective atmosphere of one device, so that the production efficiency is improved, the production performance is high, and the consistence is good.
  • The present invention comprises a vacuum induction melting and strip casting chamber, a material receiving heat preservation treatment chamber, a cooling chamber and an intra-chamber isolation valve, wherein the intra-chamber isolation valve is located between the material receiving heat preservation treatment chamber and the cooling chamber, the vacuum induction melting and strip casting chamber is located above the material receiving heat preservation treatment chamber, an outlet of a material guiding tube of the vacuum induction melting and strip casting chamber is corresponding to the material receiving heat preservation treatment chamber, and water-cooled electrodes, a vacuum pumping device, an inert gas introduction pipeline, a temperature measurement mechanism, a pressure gauge, a vacuum gauge and a safety valve are provided on the vacuum induction melting and strip casting chamber.
  • Furthermore, a furnace body is located within a vacuum chamber with a water-cooled sandwich of the vacuum induction melting and strip casting chamber, the furnace body comprises a crucible, a steel-made framework, heat-resistant bricks and a copper induction coil, wherein the heat-resistant bricks, the copper induction coil and the steel-made framework are located at a periphery of the crucible in turn, the crucible is located at a bottom of the furnace body via the steel-made framework, an outlet of the crucible is a material guiding mouth, the furnace body is fixed within the strip casting chamber via a support frame, a tilting mechanism is connected to the steel-made framework, another end of the tilting mechanism is fixed to an inner wall of the furnace body, a furnace cover is located at an upper portion of the vacuum chamber, and a furnace door is installed at one end of the vacuum chamber.
  • Furthermore, a tundish, a quenching copper roller and the material guiding tube are located within the strip casting chamber, the tundish is located between the material guiding mouth of the crucible and the quenching copper roller and is connected to a three-dimensional adjustment mechanism for adjusting a gap between a nozzle of the tundish and the quenching copper roller, the quenching copper roller is located below the tundish within the strip casting chamber, the material guiding tube is located below the quenching copper roller, a lower portion of the material guiding tube is docked to a material receiving box, a water-cooled tube circles around an outer wall of the material guiding tube, and a crushing roller is located within the material guiding tube.
  • Furthermore, the furnace cover is connected to the vacuum chamber via a hydraulic electric shifting device, a track is provided on the furnace cover, one end of the track is connected to a foundation via a shaft, and another end thereof is connected with a hydraulic cylinder, the hydraulic cylinder is connected to the strip casting chamber, a driver gear and a passive gear, which rolls along the track, are provided at the furnace cover, the driver gear is connected with a reducer shaft of a first motor via a sprocket-chain, an observation window is provided on the furnace cover, and an observation window with a camera is provided on the furnace door.
  • Furthermore, a material receiving box, an insulation chamber and a friction roller transmission mechanism are located within the material receiving heat preservation treatment chamber, an insulation board is located at an inner wall of the insulation chamber, a heater is located within the insulation board, the friction roller transmission mechanism comprises a motor reducer, a plurality of transmission sprocket-chains, a plurality of friction rollers arranged in parallel, and a plurality of friction roller shafts thereof, wherein the friction roller shafts are located within the material receiving heat preservation treatment chamber, two ends of each of the friction roller shafts passes through the insulation board for connecting with the sprocket, two sprockets of two adjacent friction roller shafts are connected with each other via the chain, and the sprocket at an end of every friction roller shaft is connected with the motor reducer outside the material receiving heat preservation treatment chamber via a dynamic sealing sprocket shaft.
  • Furthermore, the material receiving box is open, an opening shaped tube penetrating through the material receiving box is welded at a side of the material receiving box, the shaped tube has a hole communicating with the material receiving box, while receiving materials, the material receiving box reciprocates along a friction roller transmitting at a bottom of the material receiving heat preservation treatment chamber.
  • Furthermore, a motor is located at a side wall of the cooling chamber, a wind tank is located within the cooling chamber, a plurality of diversion ducts are located at a side wall of the wind tank, a heat exchanger is located at another side wall of the wind tank, an outlet of the heat exchanger faces a fan which is connected with a shaft of the second motor, an arched diversion baffle is located at a periphery side wall of the cooling chamber, a vacuum pumping pipeline and an inert gas induction pipeline are connected with an exterior of the cooling chamber, and the vacuum pumping pipeline is connected with the vacuum pumping device.
  • The beneficial effects of the present invention are as follows:
  • Compared with the existing vacuum induction heating and strip casting furnace, in the present invention, the rare earth alloy vacuum and strip casting slice, the thermal process and the cooling are completed in the protective atmosphere of one device, so that the production efficiency is improved, the production performance is high, and the consistence is good. The present invention avoids the uneven slice stirring, slow cooling, low efficiency, and high power consumption of the existing single chamber vacuum induction heating and strip casting furnace. It avoids slice adhesion and oxidating the slice during logistics process. Under the premise of energy saving, the production capacity and the consistency of the product are greatly improved, the service life of the equipment is increased and the maintenance time of the equipment is shortened.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is a perspective view of the present invention.
  • FIG. 2 is a perspective view of a cooling device in FIG. 1.
  • In the drawings: 1. Strip casting chamber; 11. Material guiding tube; 12. Crushing roller; 13. Quenching copper roller; 14. Tundish; 15. Crucible; 16: Tilting mechanism; 17. Observation window; 18. Vacuum pumping device; 19. Medium frequency induction power supply; 110. Furnace door; 111. Hydraulic cylinder; 112. First motor; 113. Furnace cover; 114. Track; 115. Shaft; 116. Induction coil; 117. Water-cooled sandwich; 118. Furnace body; 119. Support frame; 120. Camera; 121. Water-cooled tube; 122. Nozzle; 123. Steel-made framework; 124. First shaft; 125. Second shaft; 2. Material receiving heat preservation treatment chamber; 21. Material receiving box; 22. Shaped tube; 23. Friction roller; 24. 1# chamber door; 25. Insulation chamber; 3. Cooling chamber; 31. Second motor; 32. Fan; 33. Heat exchanger; 34. wind tank; 35. diversion duct; 36. Diversion baffle; 37. 2# chamber door; 4. Isolation valve.
  • DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT
  • The present invention is further explained in detail with the accompanying drawings and embodiments.
  • Embodiment
  • As shown in FIG. 1, the present invention comprises a vacuum induction melting and strip casting chamber 1, a material receiving heat preservation treatment chamber 2, a cooling chamber 3 and an intra-chamber isolation valve 4, wherein the intra-chamber isolation valve 4 is located between the material receiving heat preservation treatment chamber 2 and the cooling chamber 3, the vacuum induction melting and strip casting chamber 1 is located above the material receiving heat preservation treatment chamber 2, an outlet of a material guiding tube 11 of the vacuum induction melting and strip casting chamber 1 is corresponding to the material receiving heat preservation treatment chamber 2, and the water-cooled electrodes, a vacuum pumping device 18, an inert gas introduction pipeline, a temperature measurement mechanism, a pressure gauge, a vacuum gauge and a safety valve are provided on the vacuum induction melting and strip casting chamber 1. The temperature measurement mechanism is the armored thermocouple.
  • A furnace body 118 is located within a vacuum chamber with a water-cooled sandwich 117 of the vacuum induction melting and strip casting chamber 1. The furnace body 118 comprises a crucible 15, a steel-made framework 123, heat-resistant bricks and a copper induction coil 116, wherein the crucible 15 is located at a bottom of the furnace body 118 via the steel-made framework 123, an outlet of the crucible 15 is a material guiding mouth, the steel-made framework 123 is connected with a support frame 119 via a first shaft 124, a tilting mechanism 16 is connected to the steel-made framework 123, another end of the tilting mechanism 16 is fixed to an inner wall of the furnace body, a furnace door 110, which is capable of manually flipping opening or closing, is installed at one end of the vacuum chamber, an observation window with a camera 120 is provided on the furnace door 110, a furnace cover 113 is installed at an upper portion of the vacuum chamber, and the furnace cover 113 has an observation window 17.
  • The tilting mechanism 16 has an existing structure, a hydraulic cylinder of the tilting mechanism is connected with the steel-made framework 123 via a second shaft 125, under the drive of the hydraulic cylinder, the steel-made framework 123 turns around the first shaft 124 and the second shaft 125 to pour the material into a tundish 14.
  • The furnace cover 113 is connected to the vacuum chamber via a hydraulic electric shifting device. A track 114 is provided on the furnace cover 113. One end of the track 114 is connected to the foundation via a shaft 115, and another end thereof is connected with a hydraulic cylinder 111. The hydraulic cylinder 111 is connected to the strip casting chamber 1. A driver gear and a passive gear, which rolls along the track 114, are provided at the furnace cover 113. The driver gear is connected with a reducer shaft of a first motor 112 via a sprocket-chain.
  • The tundish 14, a quenching copper roller 13 and the material guiding tube 11 are located within the strip casting chamber 1 which is located above the material receiving heat preservation treatment chamber 2. The tundish 14 is located between the material guiding mouth of the crucible 15 and the quenching copper roller 13 and is connected to a three-dimensional adjustment mechanism for adjusting a gap between a nozzle of the tundish 14 and the quenching copper roller 13. The three-dimensional adjustment mechanism has an existing structure, wherein three linear slide rail components coordinated with each other are respectively located at three axis directions. The tundish is fixed on a bedplate at one of the three axes, and the bedplate moves along X-axis, Y-axis and Z-axis. The quenching copper roller 13 is located below the tundish 14 within the strip casting chamber, the material guiding tube 11 is located below the quenching copper roller 13, and a lower portion of the material guiding tube 11 is docked to a material receiving box 21. A water-cooled tube 121 circles around an outer wall of the material guiding tube 11, a crushing roller 12 is located within the material guiding tube 11 and a and strip casting slice is changed to a slice with smaller size via the crushing roller 12 and falls into the material receiving box 21.
  • The material receiving box 21 is a steel-made square box, wherein a sealing board is welded at a bottom surface thereof, the box has an open top surface, an opening shaped tube 22 penetrating through the material receiving box 21 is welded at a side of the material receiving box, the shaped tube 22 has a hole communicating with an inner cavity of the material receiving box 21, while receiving materials, the material receiving box 21 reciprocates along a friction roller 23 transmitting at a bottom of the material receiving heat preservation treatment chamber 2.
  • The material receiving box 21, an insulation chamber 25 and a friction roller transmission mechanism are located within the material receiving heat preservation treatment chamber 2. An insulation board is located at an inner wall of the insulation chamber 25, and a heater is located within the insulation board. The friction roller transmission mechanism comprises a motor reducer, a plurality of transmission sprocket-chains, a plurality of friction rollers 23 arranged in parallel, and a plurality of friction roller shafts thereof, wherein the friction roller shafts are located within the material receiving heat preservation treatment chamber 2, two ends of each of the friction roller shafts passes through the insulation board for connecting with the sprocket, two sprockets of two adjacent friction roller shafts are connected with each other via the chain, and the sprocket at an end of every friction roller shaft is connected with the motor reducer outside the material receiving heat preservation treatment chamber 2 via the dynamic sealing sprocket shaft.
  • As shown in FIG. 2, a second motor 31 is located at a side wall of the cooling chamber 3, a wind tank is located within the cooling chamber, a diversion duct 35 is located at a side wall of the wind tank, a heat exchanger 33 is located at another side wall of the wind tank, an outlet of the heat exchanger 33 faces a fan 32 which is connected with a shaft of the second motor 31, a diversion baffle 36 is located at a peripheral side wall of the cooling chamber 3, an exterior of the cooling chamber is connected with a vacuum pumping pipeline, the inert gas introduction pipeline, and a safety valve pipeline, and the vacuum pumping pipeline is connected with the vacuum pumping device.
  • While working, under vacuum and/or protective atmosphere, the induction coil 116 is electrified by a medium frequency induction power supply 19 located outside the vacuum furnace for heating up the furnace charge in the crucible 15, after the furnace charge is molten and fully alloyed, the molten furnace charge outflows along the material guiding mouth of the crucible 15 to cast into the tundish 14 below the material guiding mouth of the crucible via the tilting mechanism. A nozzle 122 is provided at a place where the tundish 14 contacts with the quenching copper roller 13. The molten alloy in the tundish is spray casted to an external surface of the rotating quenching copper roller 13 via the nozzle 122, and the molten alloy is cooled at the surface of the quenching copper roller 13 to form the alloy slice. The slice falls into the material guiding tube 11 below the quenching copper roller with the rotation of the the quenching copper roller 13. The crushing roller 12 is located within the material guiding tube 11, after passing through the crushing roller 12, the alloy slice is smashed to fine fragments and falls into the material receiving box 21 below the reciprocating material guiding tube 11. After completing the cast, the material receiving box 21 containing the fragments moves into the insulation chamber 25 for heat preservation. After completing the heat preservation, the isolation valve 4 is open, the material receiving box 21 is moved to the cooling chamber 3, and then the isolation valve 4 is closed (at this time, the second furnace melting begins), the second motor 31 starts cooling for cooling the material receiving box 21 and the fragments therein. The heat exchanger 33 is located between the fan 32 and the material receiving box 21, the shaped tube 22 is located on the material receiving box 21, the cooled gas takes away the heat on the fragments by the shaped tube 22. Under the driving of the fan 32, the heated gas is cooled by the heat exchanger 33 and blows to the material receiving box 21 by the fan 32, the diversion baffle 36 and the diversion duct 35 of the wind tank. When the material receiving box 21 reaches a tamping temperature, the second motor 31 is stopped cooling, and then a release valve is open, when a pressure in the cooling chamber is equilibrium with that of the atmosphere, a door 37 of 2# chamber is open, and the material receiving box is moved outside the cooling chamber. Till now, a furnace production is completed.
  • The using process of the present invention is as follows:
  • Under the atmospheric pressure, the furnace door 110 is manually open, and the furnace cover 113 is electrically open. The R—Fe—B—M raw material (R is one or more of Nd, Pr, Dy and Tb rare earth elements, and M is one or more of Co, Al, Cu, Zr and Ga) proportioned by material component and weight is installed into the crucible 15 of the vacuum induction melting and strip casting equipment. The furnace door 110 and the furnace cover 113 are closed, the pressure is reduced to a specified pressure (such as lower than 5 Pa) by the vacuum pumping device 18 of two roots pumps connected in series and two slice valve pumps connected in parallel, an inert gas introduction valve is open for charging the inert gas into the furnace, under vacuum and protective atmosphere, the medium frequency induction power supply 19 is started, and the raw material is molten to the molten alloy by induction heating.
  • After being fully alloyed (such as refining process for 30 minutes), at the set temperature (such as 1460° C.), the molten alloy outflows along the material guiding mouth of the crucible 15 to cast into the tundish 14 below the material guiding mouth of the crucible by the tilting mechanism 16. The alloy liquid is spray casted to the external surface of the rotating quenching copper roller 13 for cooling via the nozzle 122 on the tundish 14. The rotational speed of the quenching copper roller 13 can be set according to technological requirements.
  • The alloy slice cooled by the rotating quenching copper roller 13 falls into the material receiving box 21 below the material guiding tube via the material guiding tube 11, the crushing roller 12 is located on the material guiding tube 11, and a water cooled tube 121 is provided at a tube wall of the material guiding tube.
  • The friction roller 23 is located within the material receiving heat preservation treatment chamber 2, while receiving materials, the material receiving box 21 horizontally reciprocates for avoiding the adhesion of the alloy fragments due to the clockwise accumulation thereof. The materials received by the material receiving box 21 are timely sent to the insulation chamber 25 for heat preservation, the holding temperature is set according to technical requirements (such as 500° C.-900° C.), and the temperature is hold for a period of time (such as more than 30 minutes).
  • The heat preserved alloy slice is sent to the cooling chamber 3, the second motor 31 is located at the side wall of the cooling chamber 3, the wind tank 34 is located within the cooling chamber, a plurality of diversion ducts 35 are located at the side wall of the wind tank 34, the heat exchanger 33 is located at another side wall of the wind tank, the outlet of the heat exchanger 33 faces the fan 32 which is connected with the shaft of the second motor 31, and the arched diversion baffle 36 is located at the wall of the cooling chamber. While reaching the required tapping temperature (such as 80° C.), the alloy slice is taken out of the cooling chamber.
  • To improve efficiency, the vacuum isolation valve 4 is located between the insulation chamber 25 and the cooling chamber 3. After heat preservation, the material receiving box 21 is sent to the cooling chamber 3 for cooling, and the second furnace charge can be molten at this time. The vacuum isolation valve 4 is designed to a board plug valve and is sealed by a cylinder driving a four-linkage bar to tightly press a valve plate gasket. Two chamber doors, which are respectively 1 # chamber door 24 and 2# chamber door 37, are respectively provided between the material receiving heat preservation treatment chamber 2 and the cooling chamber 3 and the atmosphere for discharging materials, repair and maintenance.
  • Ordinary skilled in the profession should be able to understand the essence of the present invention, and recognize that the specific implementation details of the present invention can make a variety of changes within the scope of the claims.

Claims (14)

1-10. (canceled)
11. A vacuum induction melting and strip casting equipment for rare earth permanent magnetic alloy, characterized by comprising a vacuum induction melting and strip casting chamber, a material receiving heat preservation treatment chamber, a cooling chamber and an intra-chamber isolation valve, wherein the intra-chamber isolation valve is located between the material receiving heat preservation treatment chamber and the cooling chamber, the vacuum induction melting and strip casting chamber is located above the material receiving heat preservation treatment chamber, an outlet of a material guiding tube of the vacuum induction melting and strip casting chamber is corresponding to the material receiving heat preservation treatment chamber, and water-cooled electrodes, a vacuum pumping device, an inert gas introduction pipeline, a temperature measurement mechanism, a pressure gauge, a vacuum gauge and a safety valve are provided on the vacuum induction melting and strip casting chamber.
12. The vacuum induction melting and strip casting equipment for rare earth permanent magnetic alloy, as recited in claim 11, characterized in that: a furnace body is located within a vacuum chamber with a water-cooled sandwich of the vacuum induction melting and strip casting chamber, the furnace body comprises a crucible, a steel-made framework, heat-resistant bricks and a copper induction coil, wherein the heat-resistant bricks, the copper induction coil and the steel-made framework are located at a periphery of the crucible in turn, the crucible is located at a bottom of the furnace body via the steel-made framework, an outlet of the crucible is a material guiding mouth, the furnace body is fixed within the strip casting chamber via a support frame, a tilting mechanism is connected to the steel-made framework, another end of the tilting mechanism is fixed to an inner wall of the furnace body, a furnace cover is located at an upper portion of the vacuum chamber, and a furnace door is installed at one end of the vacuum chamber.
13. The vacuum induction melting and strip casting equipment for rare earth permanent magnetic alloy, as recited in claim 11, characterized in that: a tundish, a quenching copper roller and the material guiding tube are located within the strip casting chamber, the tundish is located between the material guiding mouth of the crucible and the quenching copper roller and is connected to a three-dimensional adjustment mechanism for adjusting a gap between a nozzle of the tundish and the quenching copper roller, the quenching copper roller is located below the tundish within the strip casting chamber, the material guiding tube is located below the quenching copper roller, and a lower portion of the material guiding tube is docked to a material receiving box.
14. The vacuum induction melting and strip casting equipment for rare earth permanent magnetic alloy, as recited in claim 12, characterized in that: a tundish, a quenching copper roller and the material guiding tube are located within the strip casting chamber, the tundish is located between the material guiding mouth of the crucible and the quenching copper roller and is connected to a three-dimensional adjustment mechanism for adjusting a gap between a nozzle of the tundish and the quenching copper roller, the quenching copper roller is located below the tundish within the strip casting chamber, the material guiding tube is located below the quenching copper roller, and a lower portion of the material guiding tube is docked to a material receiving box.
15. The vacuum induction melting and strip casting equipment for rare earth permanent magnetic alloy, as recited in claim 13, characterized in that: a water-cooled tube circles around an outer wall of the material guiding tube, and a crushing roller is located within the material guiding tube.
16. The vacuum induction melting and strip casting equipment for rare earth permanent magnetic alloy, as recited in claim 14, characterized in that: a water-cooled tube circles around an outer wall of the material guiding tube, and a crushing roller is located within the material guiding tube.
17. The vacuum induction melting and strip casting equipment for rare earth permanent magnetic alloy, as recited in claim 12, characterized in that: the furnace cover is connected to the vacuum chamber via a hydraulic electric shifting device, a track is provided on the furnace cover, one end of the track is connected to a foundation via a shaft, and another end thereof is connected with a hydraulic cylinder, the hydraulic cylinder is connected to the strip casting chamber, a driver gear and a passive gear, which rolls along the track, are provided at the furnace cover, and the driver gear is connected with a reducer shaft of a first motor via a sprocket-chain.
18. The vacuum induction melting and strip casting equipment for rare earth permanent magnetic alloy, as recited in claim 12, characterized in that: an observation window is provided on the furnace cover.
19. The vacuum induction melting and strip casting equipment for rare earth permanent magnetic alloy, as recited in claim 17, characterized in that: an observation window is provided on the furnace cover.
20. The vacuum induction melting and strip casting equipment for rare earth permanent magnetic alloy, as recited in claim 12, characterized in that: an observation window with a camera is provided on the furnace door.
21. The vacuum induction melting and strip casting equipment for rare earth permanent magnetic alloy, as recited in claim 11, characterized in that: a material receiving box, an insulation chamber and a friction roller transmission mechanism are located within the material receiving heat preservation treatment chamber, an insulation board is located at an inner wall of the insulation chamber, a heater is located within the insulation board, the friction roller transmission mechanism comprises a motor reducer, a plurality of transmission sprocket-chains, a plurality of friction rollers arranged in parallel, and a plurality of friction roller shafts thereof, wherein the friction roller shafts are located within the material receiving heat preservation treatment chamber, two ends of each of the friction roller shafts passes through the insulation board for connecting with the sprocket, two sprockets of two adjacent friction roller shafts are connected with each other via the chain, and the sprocket at an end of every friction roller shaft is connected with the motor reducer outside the material receiving heat preservation treatment chamber via a dynamic sealing sprocket shaft.
22. The vacuum induction melting and strip casting equipment for rare earth permanent magnetic alloy, as recited in claim 21, characterized in that: the material receiving box is open, an opening shaped tube penetrating through the material receiving box is welded at a side of the material receiving box, the shaped tube has a hole communicating with the material receiving box, while receiving materials, the material receiving box reciprocates along a friction roller transmitting at a bottom of the material receiving heat preservation treatment chamber.
23. The vacuum induction melting and strip casting equipment for rare earth permanent magnetic alloy, as recited in claim 11, characterized in that: a second motor is located at a side wall of the cooling chamber, a wind tank is located within the cooling chamber, a plurality of diversion ducts are located at a side wall of the wind tank, a heat exchanger is located at another side wall of the wind tank, an outlet of the heat exchanger faces a fan which is connected with a shaft of the second motor, an arched diversion baffle is located at a periphery side wall of the cooling chamber, a vacuum pumping pipeline and an inert gas induction pipeline are connected with an exterior of the cooling chamber, and the vacuum pumping pipeline is connected with the vacuum pumping device.
US14/370,965 2012-11-08 2013-11-06 Vacuum induction melting and strip casting equipment for rare earth permanent magnetic alloy Active 2034-02-13 US9384889B2 (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
CN201210442609 2012-11-08
CN201210442609.5A CN103805825B (en) 2012-11-08 2012-11-08 RE permanent magnetic alloy vacuum induction melting rapid hardening equipment
CN201210442609.5 2012-11-08
PCT/CN2013/086631 WO2014071843A1 (en) 2012-11-08 2013-11-06 Vacuum-induced smelting and rapid hardening apparatus for rare earth permanent magnetic alloy

Publications (2)

Publication Number Publication Date
US20140352909A1 true US20140352909A1 (en) 2014-12-04
US9384889B2 US9384889B2 (en) 2016-07-05

Family

ID=50684054

Family Applications (1)

Application Number Title Priority Date Filing Date
US14/370,965 Active 2034-02-13 US9384889B2 (en) 2012-11-08 2013-11-06 Vacuum induction melting and strip casting equipment for rare earth permanent magnetic alloy

Country Status (5)

Country Link
US (1) US9384889B2 (en)
EP (1) EP2851447B1 (en)
JP (1) JP5859684B2 (en)
CN (1) CN103805825B (en)
WO (1) WO2014071843A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112071621A (en) * 2020-09-09 2020-12-11 德清鑫晨新材料有限公司 Manufacturing equipment of iron-silicon alloy magnetic powder core material with high direct-current superposition characteristic
CN113718079A (en) * 2021-08-25 2021-11-30 镇江东丰特殊合金有限公司 Special inoculant for silicon-barium cast iron and manufacturing equipment thereof

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104164636A (en) * 2014-06-30 2014-11-26 中磁科技股份有限公司 Thermal processing method of neodymium-iron-boron casting strip and thermal processing device
CN104226941B (en) * 2014-09-12 2016-10-05 沈阳中北真空技术有限公司 With batch can vacuum melting rapid hardening equipment and permanent-magnet alloy and the manufacture method of permanent magnet
CN104226944B (en) * 2014-09-12 2016-06-15 沈阳中北真空技术有限公司 The manufacture method of two roller cooling vacuum melting rapid hardening equipment and permanent-magnet alloy, permanent magnet
CN104226942B (en) * 2014-09-12 2016-04-06 沈阳中北真空技术有限公司 The manufacture method of two crucible vacuum melting rapid hardening equipment and permanent-magnet alloy, permanent magnet
CN104226943B (en) * 2014-09-12 2017-01-11 沈阳中北真空技术有限公司 Vacuum melting rapid hardening equipment as well as manufacturing method of permanent magnet rapid hardening alloy and manufacturing method of permanent magnet
CN105014023A (en) * 2015-06-26 2015-11-04 苏州洲盛非晶科技有限公司 High-vacuum single-roll melt spinning machine for ultra-amorphous ribbon
CN105689660B (en) * 2016-02-26 2017-11-28 沈阳广泰真空科技有限公司 A kind of two-sided cooling multifunctional efficient vacuum rapid hardening furnace
CN107350440B (en) * 2017-08-02 2019-07-09 朗峰新材料(菏泽)有限公司 A kind of totally-enclosed iron-base magnetic amorphous band preparation system
CN107377911A (en) * 2017-08-05 2017-11-24 芜湖君华材料有限公司 A kind of closed amorphous band fast quenching protection gas cyclic utilization system
CN107931548A (en) * 2018-01-04 2018-04-20 深圳市金鼎丰贵金属设备科技有限公司 A kind of ingot, silver ingot automatic production line system
CN108580819B (en) * 2018-05-05 2021-05-11 沈阳中北真空技术有限公司 Vacuum induction melting cast sheet furnace, alloy cast sheet manufacturing method and alloy cast sheet
CN108676962B (en) * 2018-06-11 2020-11-24 江苏集萃先进金属材料研究所有限公司 High-performance alloy ultra-pure purification vacuum induction melting system and use method thereof
CN110736340B (en) * 2019-09-12 2021-05-14 无锡生益新材料制造有限公司 Large vacuum smelting furnace
CN114406216A (en) * 2021-12-30 2022-04-29 河北敬业高品钢科技有限公司 Double-roller thin-strip continuous casting flow distributor transition device and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1260051A (en) * 1968-04-03 1972-01-12 Air Reduction Improvements in or relating to the manufacture of metal products
US4612973A (en) * 1984-08-31 1986-09-23 Northeastern University Cold-hearth melt-spinning apparatus for providing continuous casting of refractory and reactive alloys
US5092392A (en) * 1990-06-22 1992-03-03 Armco, Inc. Pneumatic gap sensor and method
US20100202917A1 (en) * 2007-09-25 2010-08-12 Showa Denko K.K. Apparatus for producing alloy

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5228930A (en) * 1989-07-31 1993-07-20 Mitsubishi Materials Corporation Rare earth permanent magnet power, method for producing same and bonded magnet
US6302939B1 (en) * 1999-02-01 2001-10-16 Magnequench International, Inc. Rare earth permanent magnet and method for making same
JP4408160B2 (en) * 2000-01-14 2010-02-03 株式会社アルバック Vacuum casting heat treatment equipment
JP2001226753A (en) * 2000-02-10 2001-08-21 Sumitomo Special Metals Co Ltd Iron-base alloy soft magnetic material and manufacturing method
US7004228B2 (en) * 2000-10-06 2006-02-28 Santoku Corporation Process for producing, through strip casting, raw alloy for nanocomposite type permanent magnet
CN2497907Y (en) * 2001-04-18 2002-07-03 孙宝玉 Vacuum smelting quick solidizer
WO2003100103A1 (en) * 2002-05-29 2003-12-04 Santoku Corporation System for producing alloy containing rare earth metal
CN1517659A (en) * 2003-01-17 2004-08-04 沈阳中北真空技术有限公司 Vacuum smelting quick condensation furnace
US7958929B2 (en) * 2006-04-07 2011-06-14 Showa Denko K.K. Apparatus for producing alloy and rare earth element alloy
JP5030027B2 (en) * 2008-08-12 2012-09-19 株式会社Ihi Rapid cooling ribbon manufacturing method and equipment
CN102403078B (en) * 2011-11-21 2014-06-11 沈阳中北通磁科技股份有限公司 Preparation method of anisotropic rare earth permanent magnet alloy material and magnetic powder
CN102364617A (en) * 2011-11-25 2012-02-29 中国电子科技集团公司第九研究所 High-uniformity radial orientation neodymium iron boron permanent magnet ring and method for preparing same
CN202945304U (en) * 2012-11-08 2013-05-22 沈阳中北真空磁电科技有限公司 Vacuum-induction smelting and rapid hardening equipment for rare-earth permanent-magnet alloy

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1260051A (en) * 1968-04-03 1972-01-12 Air Reduction Improvements in or relating to the manufacture of metal products
US4612973A (en) * 1984-08-31 1986-09-23 Northeastern University Cold-hearth melt-spinning apparatus for providing continuous casting of refractory and reactive alloys
US5092392A (en) * 1990-06-22 1992-03-03 Armco, Inc. Pneumatic gap sensor and method
US20100202917A1 (en) * 2007-09-25 2010-08-12 Showa Denko K.K. Apparatus for producing alloy

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112071621A (en) * 2020-09-09 2020-12-11 德清鑫晨新材料有限公司 Manufacturing equipment of iron-silicon alloy magnetic powder core material with high direct-current superposition characteristic
CN113718079A (en) * 2021-08-25 2021-11-30 镇江东丰特殊合金有限公司 Special inoculant for silicon-barium cast iron and manufacturing equipment thereof

Also Published As

Publication number Publication date
WO2014071843A1 (en) 2014-05-15
CN103805825A (en) 2014-05-21
JP5859684B2 (en) 2016-02-10
CN103805825B (en) 2016-04-06
US9384889B2 (en) 2016-07-05
EP2851447A1 (en) 2015-03-25
EP2851447A4 (en) 2015-12-23
JP2015513469A (en) 2015-05-14
EP2851447B1 (en) 2018-10-24

Similar Documents

Publication Publication Date Title
US9384889B2 (en) Vacuum induction melting and strip casting equipment for rare earth permanent magnetic alloy
CN202945304U (en) Vacuum-induction smelting and rapid hardening equipment for rare-earth permanent-magnet alloy
CN107262687B (en) A kind of manufacturing method of vacuum melting rapid hardening equipment and rapid hardening alloy
CN103801667B (en) RE permanent magnetic alloy vacuum induction melting rapid hardening equipment
CN108580819B (en) Vacuum induction melting cast sheet furnace, alloy cast sheet manufacturing method and alloy cast sheet
CN203286888U (en) Fully-closed magnesium alloy vacuum melting furnace
CN108759471A (en) Continuous vacuum induction melting slab stove, alloy casting piece manufacturing method and alloy casting piece
CN202945305U (en) Vacuum-induction smelting and rapid hardening equipment for rare-earth permanent-magnet alloy
CN102126726A (en) Method and equipment for efficiently purifying polysilicon powder by utilizing electron beams
CN201283426Y (en) Vacuum induction smelting furnace
CN204286085U (en) A kind of visual can the Mg-based hydrogen storage smelting furnace of the salable insulation of freely openable
CN210346289U (en) Anti-oxidation medium-frequency induction furnace
CN107262688B (en) A kind of vacuum melting rapid hardening equipment and rapid hardening alloy manufacturing methods with secondary cooling
CN107326156B (en) A kind of Nd-Fe-B permanent magnetic vacuum-sintering heat treatment method and vacuum heat treatment equipment
CN112626360A (en) Intelligent vacuum melting rapid hardening equipment and manufacturing method of rapid hardening alloy
CN105177598A (en) Technique for grain boundary diffusion of heavy rare earth of neodymium-iron-boron magnet
US20140348690A1 (en) Method for flexibly sintering rare earth permanent magnetic alloy and sintering equipment thereof
CN103394674B (en) The method of casting thin foundry goods vaccum sensitive stove and casting thin-wall titanium alloy foundry goods
CN203470862U (en) Stainless steel continuous casting sheet billet semi-underground slow cooling pit
CN102941335A (en) Vacuum suction casting device, formula and preparation method for AlNiCo permanent-magnet alloy casting
CN102490996A (en) Insulation case
CN214442901U (en) Vacuum rapid hardening device
CN205614027U (en) Vacuum melting rapid hardening equipment
CN204035496U (en) A kind of neodymium iron boron is processed into covering device
CN111940718B (en) Non ferrous metal powder high heat preservation sintering device

Legal Events

Date Code Title Description
STCF Information on status: patent grant

Free format text: PATENTED CASE

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YR, SMALL ENTITY (ORIGINAL EVENT CODE: M2551); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY

Year of fee payment: 4

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YR, SMALL ENTITY (ORIGINAL EVENT CODE: M2552); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY

Year of fee payment: 8