US20060143840A1 - Bridge that can be dismantled - Google Patents

Bridge that can be dismantled Download PDF

Info

Publication number
US20060143840A1
US20060143840A1 US10/527,466 US52746605A US2006143840A1 US 20060143840 A1 US20060143840 A1 US 20060143840A1 US 52746605 A US52746605 A US 52746605A US 2006143840 A1 US2006143840 A1 US 2006143840A1
Authority
US
United States
Prior art keywords
roadway
bridge
girders
slab
lane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US10/527,466
Inventor
Walter Steppacher
Werner Duerr
Roland Krause
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dornier GmbH
Eurobridge Mobile Bruecken GmbH
Original Assignee
Dornier GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dornier GmbH filed Critical Dornier GmbH
Assigned to EUROBRIDGE MOBILE BRUECKEN GMBH reassignment EUROBRIDGE MOBILE BRUECKEN GMBH ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: DUERR, WERNER, KRAUSE, ROLAND, STEPPACHER, WALTER
Publication of US20060143840A1 publication Critical patent/US20060143840A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/12Portable or sectional bridges
    • E01D15/133Portable or sectional bridges built-up from readily separable standardised sections or elements, e.g. Bailey bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal
    • E01D2101/34Metal non-ferrous, e.g. aluminium
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/40Plastics

Definitions

  • This invention relates to a dismountable bridge, i.e., a portable bridge for mobile use.
  • dismountable bridges should have only as much mass as is absolutely essential for the specific application. This is important in particular when the bridges are to be transported by air freight to their site of use.
  • Swiss Patent CH 336 183 discloses a pyramidal supporting structure that can also be used for a bridge.
  • Several connected pyramidal supporting structures form a framework beam with a triangular cross section, with lower chords running through the two lower corners, which are at the same level, and an upper chord running through the upper corner.
  • German Patent DE 40 00 987 A1 discloses a bridge building method for a composite beam bridge with a concrete roadway on a steel supporting structure.
  • the individual prefabricated concrete parts of the roadway which have previously been positioned on the bridge abutment in the axis of the bridge are inserted into their installed positions, one after the other, via the steel supporting structure and then are joined to concrete poured in place without a gap.
  • the object of this invention is to create a bridge consisting of a few weight-optimized components, with each component being fully tied into the load-bearing capacity of the bridge when assembled.
  • the inventive bridge which includes lane girders, which are designed as framework beams with a triangular cross section, with lower chords running through the two lower corners which are at the same level, and an upper chord running through the corner, and roadway slabs which form the roadway of the bridge.
  • the roadway slabs are placed on the upper chord.
  • Connecting means are provided with which the upper chord can be connected to the roadway slabs in a non-positive manner and with shear strength.
  • the lane girders are reinforced by the roadway slabs which are joined in a non-positive manner with shear strength and are laid on top of them. Therefore the lane girders can be designed very easily because the upper chord cross section, which is actually needed, is created only together with the roadway slab, which is joined rigidly and absorbs the longitudinal forces.
  • the minimized cross section of the unreinforced lane girder yields advantageous torque conditions for construction of the bridge, permitting the use of a lightweight laying device with only a few counterweights.
  • the bridge consists of only a few individual parts and can be laid very rapidly by means of mechanized construction equipment.
  • the inventive bridge In a particularly advantageous embodiment of the inventive bridge, several hinge lines are provided on the individual roadway slab sections in the longitudinal direction of the bridge, so that the roadway sections can be folded together.
  • the dismantled bridge can thus be stored in a manner that is optimal in terms of volume and thus is suitable for shipping by air freight.
  • the weight-optimized design of the bridge as well as the collapsible roadway slab sections permits air freight shipping in all conventional air-freight planes.
  • Typical spans of the inventive bridge are in the range of 25-30 meters.
  • the internal static connection of a lane girder is preferably implemented in an optimal manner in terms of weight by undetachable compounds (e.g., welding, riveting).
  • undetachable compounds e.g., welding, riveting.
  • the assembly of the bridge is thus possible with a minimal number of compound elements. There are no loose elements that could get lost easily in the terrain when there is rain, ice and/or snow or in the dark.
  • suitable materials for the bridge components include in particular aluminum and fiber-reinforced plastic (carbon fiber-reinforced plastic).
  • FIG. 1 shows bridge in accordance with an embodiment of the present invention in cross section across the longitudinal direction of the bridge
  • FIG. 2 shows a detail of the bridge of FIG. 1 , specifically of the non-positive connection with shear strength of the upper chord and the roadway slab in two sections parallel and transversally to the bridge longitudinal direction;
  • FIG. 3 shows a detail of another embodiment of the non-positive and rigid connection of the upper chord and the roadway slab in two sections parallel and transversely to the longitudinal direction of the bridge;
  • FIG. 4 shows a roadway slab section of the FIG. 1 bridge embodiment in the collapsed state for shipping of the bridge and in the partially unfolded state;
  • FIG. 5 shows a diagram of the method of erecting the bridge of FIG. 1 in two side views at different points in assembly.
  • FIG. 1 shows an inventive bridge in cross section. It has two lane girders 3 with a triangular cross section, composed of one or more lane girder sections in the longitudinal direction of the bridge.
  • the lane girders are each framework beams (diagonal bars 1 ), with a lower chord 4 being provided in the two lower corners and the upper chord 5 being provided in the upper corner of the cross section.
  • the two lane girders are connected by transverse couples 2 , which ensure that the two lane girders 3 will be parallel.
  • the upper chord is of such dimensions that it is capable of absorbing the tensile forces from the bridge erecting process.
  • the upper chords are designed so that they permit a non-positive and rigid connection to the roadway slab 6 which is placed on the upper chords 5 of the lane girders 3 .
  • FIG. 2 shows two pusher rods 9 arranged in pairs symmetrically with a horizontal central axis.
  • a connecting element of the pusher rod is labeled as 91 .
  • the two pusher rods 9 should be arranged preferably at an acute angle to the plane of the roadway.
  • the longitudinal force transmission between the roadway slabs themselves is accomplished by the footing of the slab cross-sectional areas at the ends (bending side to which pressure is applied).
  • the rigid and non-positive connection between the roadway slab 6 and the upper chord 5 may be implemented by a special flange element 8 ( FIG. 3 ).
  • the upper chord 5 and the roadway slab 6 are compressed by a chucking device 81 , 82 , 83 .
  • a shear-force-transmitting intermediate piece 84 which is three-dimensionally structured on one side (e.g., having teeth or grooving) is provided and is pressed on its toothed side against a second plastifying and shear-force-receiving intermediate piece 85 . By pressing the toothed side onto the second intermediate piece 85 , plastic deformation of the latter occurs.
  • the surface structure of the structured intermediate piece 84 is impressed upon the second intermediate piece so that in this area a form-fitting connection is achieved between the two intermediate pieces 84 , 85 .
  • Preferably ferrous materials, steels, sheet metal having good plastic workability may be used as the materials for the plastically deformable intermediate 85 .
  • FIG. 4 shows a section of the roadway slab 6 in the shipping position.
  • the roadway slabs can be collapsed along the hinge lines 10 to yield suitable dimensions for air freight.
  • FIG. 5 A construction method adapted to the design of the inventive bridge is illustrated in FIG. 5 .
  • the first illustration in FIG. 5 shows a snapshot according to which two roadway slab sections 61 , 62 have already been linked together and connected to the lane girders 3 .
  • a third roadway slab section 63 is pushed over the lane girder 3 using the guide elements 7 supported on rollers.
  • the guide system 7 may be designed easily and as a multifunctional system for lifting, lowering and guiding. It may be advanced manually or by manually operable drive devices such as cable winches.
  • the second illustration in FIG. 5 shows the completely assembled bridge after all four roadway slab sections 61 through 64 of the bridge have been erected and connected one after the other to the lane girders 3 in a non-positive manner with sheer strength.
  • the construction procedure takes place as follows: In the first step the two lane girders 4 of the bridge are erected as cantilevered structures. As soon as the two lane girders 3 have been set up on the two shores, the first roadway slab section 61 is unfolded and placed on the upper chords 5 of the two lane girders 3 on this end DE of the bridge. Guide elements 7 (arranged on the roadway slab section 63 in FIG.
  • this roadway slab is being installed at the point in time illustrated in this figure
  • the roadway slab section 61 is then advanced over the lane girders 5 to the other end JE of the bridge where the roadway slab section 61 is joined to the lane girders 3 in a non-positive manner with sheer strength so that the roadway slabs can be tied into the longitudinal force flow.
  • the next roadway slab section 62 is advanced in the same way over the lane girder 3 and folded up with the roadway slab section 61 installed previously and also connected to the lane girders 3 in a non-positive manner with sheer strength. This procedure ensures in particular that the roadway slab is optimally adapted to the bending line of the lane girder. Erecting the roadway slab sections described here is continued until reaching the end of the bridge on this side.
  • the roller-supported conveyance system may also be utilized to, for example, replace a defective segment of roadway of a bridge that has already been constructed.
  • the connections with sheer strength to the lane girders are manually released and roadway slabs can be advanced forward and in reverse again in the required order.
  • the number of bridge sections used depends on the span required and amounts to at least one.
  • the bridge depicted in FIG. 5 consists of four bridge sections, for example.

Abstract

There is provided a dismountable bridge with lane girders which are designed as framework beams with a triangular cross section, whereby lower chords run through the two lower corners, which are at the same level, and an upper chord runs through the upper corner. A roadway slab which forms the roadway of the bridge is placed on the upper chord and the upper chord is connected to the roadway slab in a non-positive manner with sheer strength.

Description

  • This application claims the priority of 102 42 794.1, filed Sep. 14, 2002, and PCT/DE2003/002996 filed Sep. 10, 2003 the disclosure of which is expressly incorporated by reference herein.
  • BACKGROUND AND SUMMARY OF THE INVENTION
  • This invention relates to a dismountable bridge, i.e., a portable bridge for mobile use.
  • The structures of dismountable bridges should have only as much mass as is absolutely essential for the specific application. This is important in particular when the bridges are to be transported by air freight to their site of use.
  • This means that the bridge must be designed so that the highest possible utilization of material is achieved in any load case and no components that carry little or no load need be carried as dead weight.
  • Swiss Patent CH 336 183 discloses a pyramidal supporting structure that can also be used for a bridge. Several connected pyramidal supporting structures form a framework beam with a triangular cross section, with lower chords running through the two lower corners, which are at the same level, and an upper chord running through the upper corner.
  • German Patent DE 40 00 987 A1 discloses a bridge building method for a composite beam bridge with a concrete roadway on a steel supporting structure. The individual prefabricated concrete parts of the roadway which have previously been positioned on the bridge abutment in the axis of the bridge are inserted into their installed positions, one after the other, via the steel supporting structure and then are joined to concrete poured in place without a gap.
  • The object of this invention is to create a bridge consisting of a few weight-optimized components, with each component being fully tied into the load-bearing capacity of the bridge when assembled.
  • This object is achieved with the inventive bridge, which includes lane girders, which are designed as framework beams with a triangular cross section, with lower chords running through the two lower corners which are at the same level, and an upper chord running through the corner, and roadway slabs which form the roadway of the bridge. The roadway slabs are placed on the upper chord. Connecting means are provided with which the upper chord can be connected to the roadway slabs in a non-positive manner and with shear strength.
  • Because of this type of construction, the lane girders are reinforced by the roadway slabs which are joined in a non-positive manner with shear strength and are laid on top of them. Therefore the lane girders can be designed very easily because the upper chord cross section, which is actually needed, is created only together with the roadway slab, which is joined rigidly and absorbs the longitudinal forces.
  • The minimized cross section of the unreinforced lane girder yields advantageous torque conditions for construction of the bridge, permitting the use of a lightweight laying device with only a few counterweights.
  • The bridge consists of only a few individual parts and can be laid very rapidly by means of mechanized construction equipment.
  • In a particularly advantageous embodiment of the inventive bridge, several hinge lines are provided on the individual roadway slab sections in the longitudinal direction of the bridge, so that the roadway sections can be folded together. The dismantled bridge can thus be stored in a manner that is optimal in terms of volume and thus is suitable for shipping by air freight.
  • The weight-optimized design of the bridge as well as the collapsible roadway slab sections permits air freight shipping in all conventional air-freight planes.
  • Typical spans of the inventive bridge are in the range of 25-30 meters.
  • The internal static connection of a lane girder is preferably implemented in an optimal manner in terms of weight by undetachable compounds (e.g., welding, riveting). The assembly of the bridge is thus possible with a minimal number of compound elements. There are no loose elements that could get lost easily in the terrain when there is rain, ice and/or snow or in the dark.
  • The framework of the lane girder preferably corresponds to the definition of framework according to Cremona. It is defined by the condition s=2*n-3 where s=number of bars and n=number of nodes. Such a framework can be designed optimally with regard to weight and flexural rigidity.
  • In addition to ferrous materials, suitable materials for the bridge components include in particular aluminum and fiber-reinforced plastic (carbon fiber-reinforced plastic).
  • Other objects, advantages and novel features of the present invention will become apparent from the following detailed description of the invention when considered in conjunction with the accompanying drawings.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 shows bridge in accordance with an embodiment of the present invention in cross section across the longitudinal direction of the bridge;
  • FIG. 2 shows a detail of the bridge of FIG. 1, specifically of the non-positive connection with shear strength of the upper chord and the roadway slab in two sections parallel and transversally to the bridge longitudinal direction;
  • FIG. 3 shows a detail of another embodiment of the non-positive and rigid connection of the upper chord and the roadway slab in two sections parallel and transversely to the longitudinal direction of the bridge;
  • FIG. 4 shows a roadway slab section of the FIG. 1 bridge embodiment in the collapsed state for shipping of the bridge and in the partially unfolded state;
  • FIG. 5 shows a diagram of the method of erecting the bridge of FIG. 1 in two side views at different points in assembly.
  • DETAILED DESCRIPTION
  • FIG. 1 shows an inventive bridge in cross section. It has two lane girders 3 with a triangular cross section, composed of one or more lane girder sections in the longitudinal direction of the bridge. The lane girders are each framework beams (diagonal bars 1), with a lower chord 4 being provided in the two lower corners and the upper chord 5 being provided in the upper corner of the cross section. The two lane girders are connected by transverse couples 2, which ensure that the two lane girders 3 will be parallel. The upper chord is of such dimensions that it is capable of absorbing the tensile forces from the bridge erecting process.
  • The upper chords are designed so that they permit a non-positive and rigid connection to the roadway slab 6 which is placed on the upper chords 5 of the lane girders 3.
  • The non-positive connection with shear strength between the roadway slab 6 and the upper chord 5 can be accomplished in a first embodiment by pusher rods 9 that transmit tensile and compressive forces. FIG. 2 shows two pusher rods 9 arranged in pairs symmetrically with a horizontal central axis. A connecting element of the pusher rod is labeled as 91. For an optimum transmission of tensile and compressive forces, the two pusher rods 9 should be arranged preferably at an acute angle to the plane of the roadway.
  • The longitudinal force transmission between the roadway slabs themselves is accomplished by the footing of the slab cross-sectional areas at the ends (bending side to which pressure is applied).
  • Alternatively, the rigid and non-positive connection between the roadway slab 6 and the upper chord 5 may be implemented by a special flange element 8 (FIG. 3). In doing so, the upper chord 5 and the roadway slab 6 are compressed by a chucking device 81, 82, 83. Between the upper chord 5 and the roadway slab 6, a shear-force-transmitting intermediate piece 84 which is three-dimensionally structured on one side (e.g., having teeth or grooving) is provided and is pressed on its toothed side against a second plastifying and shear-force-receiving intermediate piece 85. By pressing the toothed side onto the second intermediate piece 85, plastic deformation of the latter occurs. The surface structure of the structured intermediate piece 84 is impressed upon the second intermediate piece so that in this area a form-fitting connection is achieved between the two intermediate pieces 84, 85. Preferably ferrous materials, steels, sheet metal having good plastic workability may be used as the materials for the plastically deformable intermediate 85. By releasing the tension rig 81, 82, 83, the connection can be released again. The intermediate piece 85, once deformed, can be replaced by a new one for the next construction of a bridge so that an optimum sheer strength is always achieved.
  • FIG. 4 shows a section of the roadway slab 6 in the shipping position. There are two hinge lines 10 in the bridge span direction dividing the roadway slab 6 into an inside roadway slab element 61 and two outer roadway slab elements 62. The roadway slabs can be collapsed along the hinge lines 10 to yield suitable dimensions for air freight.
  • A construction method adapted to the design of the inventive bridge is illustrated in FIG. 5.
  • The first illustration in FIG. 5 shows a snapshot according to which two roadway slab sections 61, 62 have already been linked together and connected to the lane girders 3. A third roadway slab section 63 is pushed over the lane girder 3 using the guide elements 7 supported on rollers. The guide system 7 may be designed easily and as a multifunctional system for lifting, lowering and guiding. It may be advanced manually or by manually operable drive devices such as cable winches.
  • The second illustration in FIG. 5 shows the completely assembled bridge after all four roadway slab sections 61 through 64 of the bridge have been erected and connected one after the other to the lane girders 3 in a non-positive manner with sheer strength.
  • Specifically, the construction procedure takes place as follows: In the first step the two lane girders 4 of the bridge are erected as cantilevered structures. As soon as the two lane girders 3 have been set up on the two shores, the first roadway slab section 61 is unfolded and placed on the upper chords 5 of the two lane girders 3 on this end DE of the bridge. Guide elements 7 (arranged on the roadway slab section 63 in FIG. 5; this roadway slab is being installed at the point in time illustrated in this figure) are present on the roadway slab section; by means of these guide elements, the roadway slab section 61 is then advanced over the lane girders 5 to the other end JE of the bridge where the roadway slab section 61 is joined to the lane girders 3 in a non-positive manner with sheer strength so that the roadway slabs can be tied into the longitudinal force flow. Then the next roadway slab section 62 is advanced in the same way over the lane girder 3 and folded up with the roadway slab section 61 installed previously and also connected to the lane girders 3 in a non-positive manner with sheer strength. This procedure ensures in particular that the roadway slab is optimally adapted to the bending line of the lane girder. Erecting the roadway slab sections described here is continued until reaching the end of the bridge on this side.
  • The roller-supported conveyance system may also be utilized to, for example, replace a defective segment of roadway of a bridge that has already been constructed. The connections with sheer strength to the lane girders are manually released and roadway slabs can be advanced forward and in reverse again in the required order.
  • The method described here is optimally adapted to the construction of the inventive bridge and permits very rapid construction of the bridge.
  • The number of bridge sections used depends on the span required and amounts to at least one. The bridge depicted in FIG. 5 consists of four bridge sections, for example.
  • The foregoing disclosure has been set forth merely to illustrate the invention and is not intended to be limiting. Since modifications of the disclosed embodiments incorporating the spirit and substance of the invention may occur to persons skilled in the art, the invention should be construed to include everything within the scope of the appended claims and equivalents thereof.

Claims (17)

1. Dismountable bridge with lane girders formed as framework beams with a triangular cross section, whereby lower chords run through two lower corners which are at the same level and an upper chord runs through an upper corner, and a roadway slab which forms a roadway of the bridge, wherein the roadway slab is placed on the upper chord and connecting means are provided with which the upper chord is connected to the roadway slab in a non-positive manner with sheer strength.
2. Dismountable bridge as claimed in claim 1, wherein the connecting means for non-positive connection with sheer strength, connecting the upper chord to the roadway slab, include pusher rods that transmit tensile and compressive forces.
3. Dismountable bridge as claimed in claim 1, wherein the connecting means for non-positive connection with sheer strength, connecting the upper chord to the roadway slab, include a tensioning device and two intermediate pieces which transmit and/or receive sheer forces and are arranged between the upper chord and the roadway slab, whereby one of these intermediate pieces has a structuring on one side, and on operation of the tensioning device, this intermediate piece is pressed with its structured side against the other intermediate piece which is thereby plastically deformed.
4. Dismountable bridge as claimed in claim 1, wherein the individual sections of the roadway slab have two hinge lines in the longitudinal direction of the bridge by means of which they can be folded.
5. Method of constructing a bridge as claimed in claim 1, wherein
first, the lane girders are installed in a cantilevered manner,
then a first roadway slab section is advanced over the lane girders to a first end of the bridge and connected to the lane girders in a non-positive manner with sheer strength,
another roadway slab section is advanced over the lane girders and connected to the last section of roadway surface erected and connected to the lane girders in a non-positive manner which has sheer strength, and
additional roadway slab sections are then erected similarly until the second end of the bridge is reached.
6. A dismountable bridge, comprising:
at least two lane girders, said girders having a triangular cross-section and having lower chord at each of two lower corners of the triangular cross section and an upper chord at an upper corner of the triangular cross-section;
at least one roadway slab; and
at least one roadway connector,
wherein each of the at least one roadway slabs is configured to be placed on top of the lane girder upper chords, and each of the roadway connectors is configured to connect one roadway slab to one of the lane girders in a non-positive, shear-resistant manner.
7. The dismountable bridge of claim 6, wherein the roadway connectors include pusher rods which transmit tensile and compressive loads between the girders and the roadway slabs.
8. The dismountable bridge of claim 6, wherein
the roadway connectors include at least two mutually-adjacent intermediate pieces configured to cooperate with one another to span a gap between an upward-facing surface of each girder upper cord and a downward-facing surface of the roadway slab, and a tensioning device for drawing said girder upper cord and roadway slab toward one another,
the intermediate pieces are sized and configured such that when the removable tensioning device draws the girder upper cord and roadway slab toward one another, at least one of the intermediate pieces plastically deforms to conform shear-resisting features on the adjacent intermediate piece, and when the removable tensioning device is subsequently removed, the intermediate pieces cooperate with one another to transmit shear loads between their girder and the roadway slab.
9. The dismountable bridge as claimed in claim 6, wherein the roadway slabs include hinged individual sections, each hinged section being arranged to pivot about one of two hinge lines in the longitudinal direction of the bridge about which the individual sections pivot.
10. The dismountable bridge of claim 7, wherein the roadway slabs include hinged individual sections, each hinged section being arranged to pivot about one of two hinge lines in the longitudinal direction of the bridge about which the individual sections pivot.
11. The dismountable bridge of claim 8, wherein the roadway slabs include hinged individual sections, each hinged section being arranged to pivot about one of two hinge lines in the longitudinal direction of the bridge about which the individual sections pivot.
12. A method of constructing a bridge, comprising the steps of:
providing bridge components, including
at least two lane girders, said girders having a triangular cross-section and having lower chord at each of two lower corners of the triangular cross section and an upper chord at an upper corner of the triangular cross-section;
at least one roadway slab; and
at least one roadway connector configured to connect one roadway slab to one of the lane girders in a non-positive, shear-resistant manner;
erecting the lane girders parallel to one another between first and second ends of the bridge;
forming a continuous roadway surface by advancing each roadway slab over the lane girders until adjacent to another roadway slab or to a bridge end; and
connecting each roadway slab to each lane girder with at last one of the roadway connectors.
13. The method of claim 12, wherein the roadway connectors include pusher rods which transmit tensile and compressive loads between the girders and the roadway slabs.
14. The method of claim 12, wherein
the roadway connectors include at least two mutually-adjacent intermediate pieces configured to cooperate with one another to span a gap between an upward-facing surface of each girder upper cord and a downward-facing surface of the roadway slab, and a tensioning device for drawing said girder upper cord and roadway slab toward one another,
the intermediate pieces are sized and configured such that when the removable tensioning device draws the girder upper cord and roadway slab toward one another, at least one of the intermediate pieces plastically deforms to conform shear-resisting features on the adjacent intermediate piece, and when the removable tensioning device is subsequently removed, the intermediate pieces cooperate with one another to transmit shear loads between their girder and the roadway slab.
15. The method of claim 12, wherein the roadway slabs include hinged individual sections, each hinged section being arranged to pivot about one of two hinge lines in the longitudinal direction of the bridge about which the individual sections pivot.
16. The method of claim 13, wherein the roadway slabs include hinged individual sections, each hinged section being arranged to pivot about one of two hinge lines in the longitudinal direction of the bridge about which the individual sections pivot.
17. The method of claim 14, wherein the roadway slabs include hinged individual sections, each hinged section being arranged to pivot about one of two hinge lines in the longitudinal direction of the bridge about which the individual sections pivot.
US10/527,466 2002-09-14 2003-09-10 Bridge that can be dismantled Abandoned US20060143840A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE10242794A DE10242794B4 (en) 2002-09-14 2002-09-14 Demountable bridge
DE10242794.1 2002-09-14
PCT/DE2003/002996 WO2004027158A1 (en) 2002-09-14 2003-09-10 Bridge that can be dismantled

Publications (1)

Publication Number Publication Date
US20060143840A1 true US20060143840A1 (en) 2006-07-06

Family

ID=31983930

Family Applications (1)

Application Number Title Priority Date Filing Date
US10/527,466 Abandoned US20060143840A1 (en) 2002-09-14 2003-09-10 Bridge that can be dismantled

Country Status (4)

Country Link
US (1) US20060143840A1 (en)
EP (1) EP1537276A1 (en)
DE (1) DE10242794B4 (en)
WO (1) WO2004027158A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080124170A1 (en) * 2004-10-01 2008-05-29 James Frederick Seymour Temporary Roadway
RU2476635C1 (en) * 2011-07-06 2013-02-27 Федеральное бюджетное учреждение "3 Центральный научно-исследовательский институт Министерства обороны Российской Федерации" Dismountable metal bridge
CN106758741A (en) * 2016-12-08 2017-05-31 湖北华舟重工应急装备股份有限公司 Modular box type plate beam structure and the pontic erection method based on box type plate beam structure
WO2017118890A1 (en) * 2016-01-08 2017-07-13 Bright Structures Limited A bridging system
KR102026801B1 (en) * 2019-01-15 2019-09-30 김성 Cable-supported pedestrian bridge supported by cable

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008037551B4 (en) * 2008-11-14 2013-04-18 Lear Corporation Gmbh Device for operating light-emitting diode chains

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US191552A (en) * 1877-06-05 Improvement in bridges
US2953797A (en) * 1958-07-01 1960-09-27 Robert M Dodds Space frame support for skew bridge
US3103025A (en) * 1958-12-03 1963-09-10 Kaiser Aluminium Chem Corp Structural unit
US3257764A (en) * 1962-09-27 1966-06-28 Reynolds Metals Co Bridge construction with girder having triangular intermediate and rectangular end cross-sectional configurations
US4282619A (en) * 1979-11-16 1981-08-11 Havens Steel Company Truss structure
US4642830A (en) * 1983-12-07 1987-02-17 Bouygues Bridge truss, bridge span including such trusses, and method of constructing the truss
US5307533A (en) * 1991-01-07 1994-05-03 Williams Fairey Engineering Limited Modular bridges
US20040040100A1 (en) * 2002-09-04 2004-03-04 Mitsuhiro Tokuno Reinforcement structure of truss bridge or arch bridge

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL210462A (en) * 1954-10-25
GB2227266B (en) * 1988-10-11 1992-12-16 Thos Storey A deck for a bridge having girders constructed from pre-fabricated panels.
DE4000987C2 (en) * 1990-01-16 1995-04-27 Noell Gmbh Composite girder bridge and method for producing a composite girder bridge in sections

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US191552A (en) * 1877-06-05 Improvement in bridges
US2953797A (en) * 1958-07-01 1960-09-27 Robert M Dodds Space frame support for skew bridge
US3103025A (en) * 1958-12-03 1963-09-10 Kaiser Aluminium Chem Corp Structural unit
US3257764A (en) * 1962-09-27 1966-06-28 Reynolds Metals Co Bridge construction with girder having triangular intermediate and rectangular end cross-sectional configurations
US4282619A (en) * 1979-11-16 1981-08-11 Havens Steel Company Truss structure
US4642830A (en) * 1983-12-07 1987-02-17 Bouygues Bridge truss, bridge span including such trusses, and method of constructing the truss
US5307533A (en) * 1991-01-07 1994-05-03 Williams Fairey Engineering Limited Modular bridges
US20040040100A1 (en) * 2002-09-04 2004-03-04 Mitsuhiro Tokuno Reinforcement structure of truss bridge or arch bridge

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080124170A1 (en) * 2004-10-01 2008-05-29 James Frederick Seymour Temporary Roadway
RU2476635C1 (en) * 2011-07-06 2013-02-27 Федеральное бюджетное учреждение "3 Центральный научно-исследовательский институт Министерства обороны Российской Федерации" Dismountable metal bridge
WO2017118890A1 (en) * 2016-01-08 2017-07-13 Bright Structures Limited A bridging system
US20190024331A1 (en) * 2016-01-08 2019-01-24 Bright Structures Limited A bridging system
US10458079B2 (en) * 2016-01-08 2019-10-29 Bright Structures Limited Bridging system
AU2016384294B2 (en) * 2016-01-08 2021-12-16 Bright Structures Limited A bridging system
CN106758741A (en) * 2016-12-08 2017-05-31 湖北华舟重工应急装备股份有限公司 Modular box type plate beam structure and the pontic erection method based on box type plate beam structure
KR102026801B1 (en) * 2019-01-15 2019-09-30 김성 Cable-supported pedestrian bridge supported by cable

Also Published As

Publication number Publication date
DE10242794B4 (en) 2005-04-07
EP1537276A1 (en) 2005-06-08
DE10242794A1 (en) 2004-04-08
WO2004027158A1 (en) 2004-04-01

Similar Documents

Publication Publication Date Title
US5305572A (en) Long span post-tensioned steel/concrete truss and method of making same
JP5690815B2 (en) Support arch structure construction method
CN110409304B (en) Cantilever assembling construction method for segment prefabricated bent cap
JP2004520511A (en) Prestressed synthetic truss girder and method of manufacturing the same
EP1930520B9 (en) Modular latticework structure made of concrete
CN106906748B (en) Based on the construction method for mixing prestressed assembled corrugated steel web plate composite box girder
CN113481826B (en) Prefabricated assembled corrugated steel web plate combined box girder
CN113957782A (en) Bent cap structure adopting double-main-beam prefabrication and assembly method and construction method thereof
JP2008031733A (en) Bridge erection method
US20040128939A1 (en) Composite bearing deck comprising deck panel and concrete
CN113718632A (en) Bent cap structure that segmentation prefabrication was assembled
US20060143840A1 (en) Bridge that can be dismantled
JP3701250B2 (en) Cable stayed bridge and its construction method
EA006124B1 (en) Doubly prestressed roof-ceiling construction with grid flat-soffit for extremely large spans
KR100274141B1 (en) Manufacturing method of preplex composite beem by divisional method
JP2009108633A (en) Corrugated steel sheet web bridge construction apparatus and construction method of corrugated steel sheet web bridge
JP2004324164A (en) Method of constructing corrugated steel web pc bridge closure section
CN107142830B (en) Steel pipe web prestress steel-concrete combined girder structure and construction method
KR20080111686A (en) Bridge using phc girder and slab-phc complex girder
CN107938515B (en) Erection method of large-span lightweight emergency bridge suitable for emergency rescue and disaster relief
US5150556A (en) Chord truss roof structure
JP2963879B2 (en) Bridge girder
JP2000104221A (en) Combined truss bridge and erection method of the same
JP3720837B1 (en) Extrusion erection method
CN111005301A (en) Assembled combined beam bridge and construction method thereof

Legal Events

Date Code Title Description
AS Assignment

Owner name: EUROBRIDGE MOBILE BRUECKEN GMBH, GERMANY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:STEPPACHER, WALTER;DUERR, WERNER;KRAUSE, ROLAND;REEL/FRAME:017193/0928

Effective date: 20051017

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION