US194317A - Improvement in tape-measures - Google Patents
Improvement in tape-measures Download PDFInfo
- Publication number
- US194317A US194317A US194317DA US194317A US 194317 A US194317 A US 194317A US 194317D A US194317D A US 194317DA US 194317 A US194317 A US 194317A
- Authority
- US
- United States
- Prior art keywords
- tape
- road
- bed
- cutting
- subdivisions
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01B—MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
- G01B3/00—Measuring instruments characterised by the use of mechanical techniques
- G01B3/10—Measuring tapes
- G01B3/1003—Measuring tapes characterised by structure or material; characterised by layout or indicia
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10S—TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10S33/00—Geometrical instruments
- Y10S33/16—Clips and rafters
Definitions
- This invention is in the nature of an iniprovement in measuring tapes; vand the invention consists in a measuringtape for roadcutting or otherexcavations, divided into subdivisions which bear a given relation to the vertical depth of the road bed or cutting, the subdivisions beginning at a given relative distance from the end of the tape, so that by the application of a measuring-tape so divided, the determination of the point for the commencement ofthe slope-cutting, and the location of the stakes to govern this feature is at once ascertained without the necessity of calculation.
- Figure l represents my measuringtape.
- Fig. 2 shows the ordinary footsubdivisions on the opposite side of the tape, and
- Fig.3 a diagram representing a cross-section of road-cutting, and showing the application of the tape.
- the level of the road-bed is designed to be below the level of the natural surface of l the ground, it is, of course, important to know the extent and inchnation of theinclined sides ofthe cutting, and we will suppose that the best angle of inclination to prevent slides and other inconveniences is one and a half feet of slope to every foot of perpendicular, and it is customary with engineers in laying out crosssections of cutting to arrive at this degree of slope by multiplying the vertical distance from the bed of the road to the surface of the ground by one and a half, which gives the ascertained, it becomes necessary to add half the width ofthe road-bed, (which, in the case supposed, would be nine feet,) in order to ar rive at the distance from the center of the road-bed to the extreme point of thel cutting at which the slope begins; so that, in a cut- ⁇ ting of any extent, yas in laying outl rail or connnon roads, a constant repetitionlof the calculation of ⁇ multiplying the vertical distance into
- A represents the natural surface ofthe ground
- -B the surface of the roadbed it is desired to construct.
- the level having determined the depth at which it is necessary to place the surface of the road-bed, this vertical distance, which is represented by the line B C, Fig. 3, is known.
- To ascertain the point at which the cutting is to commence it is simply n ecessary to apply the tape at the point where its subdivisions commence, to a stake, C, indicating the outer edge ot one side of the road-bed, and extend the tape along the surface of the ground a distance equal to.
- the position ofthe stake marking the outer edge of the road-bed before referred to is promptly ascertained by causing the subdivisions on the tape-measure to commence at a i distance ⁇ from the end of the tape equal to onehalt' the'width of the road, so that by simply applying the end of thetape to the stake marking the center ot the road and eX- y tending it, the tape will give the position for zero-point or commencement of the subdivisions ot' the tape farther from or nearer to its end, it may be used for wider or narrower formation widths, and by using a dierent unit in graduating the tape it may be adapted to a different angle of slope, and there may be different graduations for two different slopes on opposite sides of the same tapewith differently-shaped ii'gures and of different colors, however, to preven t confusion-or the Ordin ary division of feet and inches may occupy one side of the tape.
- a measuring-tape or device for road-cutting or other excavations provided with subdivisions commencing at a given relative distance from the end of the tape, and which bear a given relation to the perpendicular depth of the cutting, whereby the extent or slope oi' the cutting is determined by measurement alone, and without calculation, substantially as described.
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Road Repair (AREA)
Description
c. n. WARD. TAPE-MEASURES.
No. 194,317, Patented Aug.v21 ,1877.
N.PETERS, PHUTOLITHOGRAYHER, vWASHINGTON. D C.
UNITED STATES PATENT OFFICE.
CHARLES D. WARD, OF JERSEY CITY, NEW JERSEY.
IMPROVEMENT IN TAPE-MEASURES.
Specification forming part of Letters Patent No. 194,317, `dated August 21, 1877; application tiled t January '42, 1877.
'To "all 'whom it mayconcern:
Bei't known that I, CHARLES `DJWARD, of Jersey City, in the county of Hudson and State of New-Jersey, haveinvented a new and Improved Measuring-Tape; l'and that the following is a full, clear, and exact description of the same, reference b'einghad to the accompanying drawing, and to the letters of reference marked thereon, making part of this specification.
This invention is in the nature of an iniprovement in measuring tapes; vand the invention consists in a measuringtape for roadcutting or otherexcavations, divided into subdivisions which bear a given relation to the vertical depth of the road bed or cutting, the subdivisions beginning at a given relative distance from the end of the tape, so that by the application of a measuring-tape so divided, the determination of the point for the commencement ofthe slope-cutting, and the location of the stakes to govern this feature is at once ascertained without the necessity of calculation.
In the accompanying' sheet of drawings, Figure l represents my measuringtape. Fig. 2 shows the ordinary footsubdivisions on the opposite side of the tape, and Fig.3 a diagram representing a cross-section of road-cutting, and showing the application of the tape.
Similar letters of reference indicate like parts in both figures.
1n laying out a cutting for railroads and other purposes, of say eighteen feet width of road-bed, it is customary to first indicate the center of the road-bed by a stake, as at Gr, Fig. 3, the width of the road-bed being, of course, just nine feet on each side of this stake. Now, since the level of the road-bed is designed to be below the level of the natural surface of l the ground, it is, of course, important to know the extent and inchnation of theinclined sides ofthe cutting, and we will suppose that the best angle of inclination to prevent slides and other inconveniences is one and a half feet of slope to every foot of perpendicular, and it is customary with engineers in laying out crosssections of cutting to arrive at this degree of slope by multiplying the vertical distance from the bed of the road to the surface of the ground by one and a half, which gives the ascertained, it becomes necessary to add half the width ofthe road-bed, (which, in the case supposed, would be nine feet,) in order to ar rive at the distance from the center of the road-bed to the extreme point of thel cutting at which the slope begins; so that, in a cut- `ting of any extent, yas in laying outl rail or connnon roads, a constant repetitionlof the calculation of `multiplying the vertical distance into one and a half the degree of slope, and
adding half the width of the road-bed, becomes necessary, and, of course, errro'rs are liable to occur in this repeated calculation, which tend to interfere with the correctness of the work, and add to the expenses.
By my invention, however, no calculation is necessary, and therefore the work is laid out with greater accuracy and much more expeditiously. To that end I construct a measuring-tape with subdivisions bearing a given relation to the vertical depthof cutting, which in the case supposed would be one foot and six inches to every foot of vertical depth, these subdivisions commencing at a given relative point from the end of the tape, or at a point equal to one-half the width of the roadbed, (which in the case supposed would be nine feet from the end of the tape).
Now, my tape being constructed as above, it is applied as follows: Referring' to Fig. 3, A represents the natural surface ofthe ground, and-B the surface of the roadbed it is desired to construct. The level having determined the depth at which it is necessary to place the surface of the road-bed, this vertical distance, which is represented by the line B C, Fig. 3, is known. To ascertain the point at which the cutting is to commence, it is simply n ecessary to apply the tape at the point where its subdivisions commence, to a stake, C, indicating the outer edge ot one side of the road-bed, and extend the tape along the surface of the ground a distance equal to. one subdivision .(of one foot and six inches each in the case supposed) for every single foot of perpendicular depth of road-bed, when the point from which to commence the cutting o1' slope is at once ascertained and fixed bya stake or otherwise without the aid of any calculation whatsoever. As an example, if the vertical line B C, Fig. 3, is siX feet in length, (the subdivisions of the tape being one foot and six inches,) then the distance to the commencement ot' the slope-cutting would necessitate extending the tape six subdivisions from the stake at C, in-
dicating the outer edge at one side of the road-bed.
4 The position ofthe stake marking the outer edge of the road-bed before referred to is promptly ascertained by causing the subdivisions on the tape-measure to commence at a i distance` from the end of the tape equal to onehalt' the'width of the road, so that by simply applying the end of thetape to the stake marking the center ot the road and eX- y tending it, the tape will give the position for zero-point or commencement of the subdivisions ot' the tape farther from or nearer to its end, it may be used for wider or narrower formation widths, and by using a dierent unit in graduating the tape it may be adapted to a different angle of slope, and there may be different graduations for two different slopes on opposite sides of the same tapewith differently-shaped ii'gures and of different colors, however, to preven t confusion-or the Ordin ary division of feet and inches may occupy one side of the tape.
Having now described my invention, what 1 claim as new, and desire to secure by Letters Patent, is-
A measuring-tape or device for road-cutting or other excavations, provided with subdivisions commencing at a given relative distance from the end of the tape, and which bear a given relation to the perpendicular depth of the cutting, whereby the extent or slope oi' the cutting is determined by measurement alone, and without calculation, substantially as described.
CHARLES D. WARD.
Witnesses:
M. W. ROBINSON, M. D., C. R. KINsLEY.
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US194317A true US194317A (en) | 1877-08-21 |
Family
ID=2263723
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US194317D Expired - Lifetime US194317A (en) | Improvement in tape-measures |
Country Status (1)
| Country | Link |
|---|---|
| US (1) | US194317A (en) |
-
0
- US US194317D patent/US194317A/en not_active Expired - Lifetime
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US1074439A (en) | Measuring-scale. | |
| US6584697B1 (en) | Surveyors elevation measuring stick and method | |
| US854916A (en) | Ditch-leveling device. | |
| US1015773A (en) | Carpenter's tool. | |
| US1608713A (en) | Ruler | |
| US2798317A (en) | Grading markers | |
| US4433490A (en) | Flexible surveyor's marker | |
| US419711A (en) | Grading and leveling instrument | |
| US1442136A (en) | Adjustable square and bevel | |
| US1093867A (en) | Adjustable crown-templet. | |
| US1003857A (en) | Multimeter surveying instrument. | |
| US2711025A (en) | Rafter measuring device | |
| US1802603A (en) | Engineer's instrument | |
| US1195342A (en) | ducklow | |
| US645058A (en) | Level. | |
| US250777A (en) | Railway trace gage and level | |
| Ives | Highway curves | |
| US937202A (en) | Carpenter's square. | |
| US525611A (en) | Territory | |
| US3357106A (en) | Leveling rod device | |
| US591964A (en) | Bevel-square and protractor | |
| US716150A (en) | Measuring-rule. | |
| US613147A (en) | Ton hill | |
| US839932A (en) | Skid-setting gage. | |
| Heaton | Surveys and Plans for County Roads |