US11486547B1 - Magnetic hanger for welding equipment - Google Patents
Magnetic hanger for welding equipment Download PDFInfo
- Publication number
 - US11486547B1 US11486547B1 US17/462,778 US202117462778A US11486547B1 US 11486547 B1 US11486547 B1 US 11486547B1 US 202117462778 A US202117462778 A US 202117462778A US 11486547 B1 US11486547 B1 US 11486547B1
 - Authority
 - US
 - United States
 - Prior art keywords
 - rack
 - hook
 - permanent magnets
 - tubular metal
 - vertical sections
 - Prior art date
 - Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
 - Active
 
Links
- 238000003466 welding Methods 0.000 title description 20
 - 229910052751 metal Inorganic materials 0.000 claims abstract description 124
 - 239000002184 metal Substances 0.000 claims abstract description 124
 - 238000004804 winding Methods 0.000 claims description 10
 - 239000011796 hollow space material Substances 0.000 claims description 7
 - 230000000717 retained effect Effects 0.000 claims description 6
 - 239000007789 gas Substances 0.000 description 87
 - 238000000034 method Methods 0.000 description 9
 - 239000000463 material Substances 0.000 description 8
 - 230000009977 dual effect Effects 0.000 description 7
 - 238000010586 diagram Methods 0.000 description 6
 - 229910001172 neodymium magnet Inorganic materials 0.000 description 5
 - 230000001681 protective effect Effects 0.000 description 5
 - XKRFYHLGVUSROY-UHFFFAOYSA-N Argon Chemical compound [Ar] XKRFYHLGVUSROY-UHFFFAOYSA-N 0.000 description 4
 - 239000000853 adhesive Substances 0.000 description 3
 - 230000001070 adhesive effect Effects 0.000 description 3
 - 150000002739 metals Chemical class 0.000 description 3
 - 239000004033 plastic Substances 0.000 description 3
 - 229920003023 plastic Polymers 0.000 description 3
 - 239000004417 polycarbonate Substances 0.000 description 3
 - 229920000515 polycarbonate Polymers 0.000 description 3
 - 238000003860 storage Methods 0.000 description 3
 - 229920000049 Carbon (fiber) Polymers 0.000 description 2
 - CWYNVVGOOAEACU-UHFFFAOYSA-N Fe2+ Chemical compound [Fe+2] CWYNVVGOOAEACU-UHFFFAOYSA-N 0.000 description 2
 - XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
 - 229910052786 argon Inorganic materials 0.000 description 2
 - 239000010953 base metal Substances 0.000 description 2
 - 239000004917 carbon fiber Substances 0.000 description 2
 - 239000001307 helium Substances 0.000 description 2
 - 229910052734 helium Inorganic materials 0.000 description 2
 - SWQJXJOGLNCZEY-UHFFFAOYSA-N helium atom Chemical compound [He] SWQJXJOGLNCZEY-UHFFFAOYSA-N 0.000 description 2
 - 239000011261 inert gas Substances 0.000 description 2
 - 239000003562 lightweight material Substances 0.000 description 2
 - VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 2
 - 239000000203 mixture Substances 0.000 description 2
 - 238000012986 modification Methods 0.000 description 2
 - 230000004048 modification Effects 0.000 description 2
 - 238000010926 purge Methods 0.000 description 2
 - WFKWXMTUELFFGS-UHFFFAOYSA-N tungsten Chemical compound [W] WFKWXMTUELFFGS-UHFFFAOYSA-N 0.000 description 2
 - 229910052721 tungsten Inorganic materials 0.000 description 2
 - 239000010937 tungsten Substances 0.000 description 2
 - 239000010963 304 stainless steel Substances 0.000 description 1
 - 229910000521 B alloy Inorganic materials 0.000 description 1
 - ZOXJGFHDIHLPTG-UHFFFAOYSA-N Boron Chemical compound [B] ZOXJGFHDIHLPTG-UHFFFAOYSA-N 0.000 description 1
 - 229910000640 Fe alloy Inorganic materials 0.000 description 1
 - 229910000583 Nd alloy Inorganic materials 0.000 description 1
 - 229910000589 SAE 304 stainless steel Inorganic materials 0.000 description 1
 - NIXOWILDQLNWCW-UHFFFAOYSA-N acrylic acid group Chemical group C(C=C)(=O)O NIXOWILDQLNWCW-UHFFFAOYSA-N 0.000 description 1
 - 229910052782 aluminium Inorganic materials 0.000 description 1
 - XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
 - 238000013459 approach Methods 0.000 description 1
 - 238000005219 brazing Methods 0.000 description 1
 - 238000011109 contamination Methods 0.000 description 1
 - 230000008878 coupling Effects 0.000 description 1
 - 238000010168 coupling process Methods 0.000 description 1
 - 238000005859 coupling reaction Methods 0.000 description 1
 - 230000001934 delay Effects 0.000 description 1
 - 239000000428 dust Substances 0.000 description 1
 - 230000000694 effects Effects 0.000 description 1
 - 239000000945 filler Substances 0.000 description 1
 - 231100001261 hazardous Toxicity 0.000 description 1
 - 238000010438 heat treatment Methods 0.000 description 1
 - 239000000696 magnetic material Substances 0.000 description 1
 - 238000004519 manufacturing process Methods 0.000 description 1
 - 230000003647 oxidation Effects 0.000 description 1
 - 238000007254 oxidation reaction Methods 0.000 description 1
 - 229920000642 polymer Polymers 0.000 description 1
 - 238000005476 soldering Methods 0.000 description 1
 - 239000007787 solid Substances 0.000 description 1
 - 238000006467 substitution reaction Methods 0.000 description 1
 - 230000000007 visual effect Effects 0.000 description 1
 - 238000011179 visual inspection Methods 0.000 description 1
 - 238000005303 weighing Methods 0.000 description 1
 
Images
Classifications
- 
        
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
 - F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
 - F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
 - F17C13/00—Details of vessels or of the filling or discharging of vessels
 - F17C13/08—Mounting arrangements for vessels
 - F17C13/084—Mounting arrangements for vessels for small-sized storage vessels, e.g. compressed gas cylinders or bottles, disposable gas vessels, vessels adapted for automotive use
 
 - 
        
- B—PERFORMING OPERATIONS; TRANSPORTING
 - B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
 - B25H—WORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
 - B25H3/00—Storage means or arrangements for workshops facilitating access to, or handling of, work tools or instruments
 - B25H3/04—Racks
 
 - 
        
- B—PERFORMING OPERATIONS; TRANSPORTING
 - B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
 - B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
 - B23K37/00—Auxiliary devices or processes, not specially adapted for a procedure covered by only one of the other main groups of this subclass
 
 - 
        
- B—PERFORMING OPERATIONS; TRANSPORTING
 - B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
 - B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
 - B23K37/00—Auxiliary devices or processes, not specially adapted for a procedure covered by only one of the other main groups of this subclass
 - B23K37/02—Carriages for supporting the welding or cutting element
 - B23K37/0294—Transport carriages or vehicles
 
 - 
        
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
 - F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
 - F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
 - F17C2201/00—Vessel construction, in particular geometry, arrangement or size
 - F17C2201/01—Shape
 - F17C2201/0104—Shape cylindrical
 - F17C2201/0109—Shape cylindrical with exteriorly curved end-piece
 
 - 
        
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
 - F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
 - F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
 - F17C2201/00—Vessel construction, in particular geometry, arrangement or size
 - F17C2201/03—Orientation
 - F17C2201/032—Orientation with substantially vertical main axis
 
 - 
        
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
 - F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
 - F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
 - F17C2205/00—Vessel construction, in particular mounting arrangements, attachments or identifications means
 - F17C2205/01—Mounting arrangements
 - F17C2205/0123—Mounting arrangements characterised by number of vessels
 - F17C2205/0126—One vessel
 
 - 
        
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
 - F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
 - F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
 - F17C2205/00—Vessel construction, in particular mounting arrangements, attachments or identifications means
 - F17C2205/01—Mounting arrangements
 - F17C2205/0153—Details of mounting arrangements
 - F17C2205/0157—Details of mounting arrangements for transport
 - F17C2205/0165—Details of mounting arrangements for transport with handgrip
 
 - 
        
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
 - F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
 - F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
 - F17C2205/00—Vessel construction, in particular mounting arrangements, attachments or identifications means
 - F17C2205/01—Mounting arrangements
 - F17C2205/0153—Details of mounting arrangements
 - F17C2205/018—Supporting feet
 
 - 
        
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
 - F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
 - F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
 - F17C2205/00—Vessel construction, in particular mounting arrangements, attachments or identifications means
 - F17C2205/03—Fluid connections, filters, valves, closure means or other attachments
 - F17C2205/0302—Fittings, valves, filters, or components in connection with the gas storage device
 - F17C2205/0352—Pipes
 - F17C2205/0364—Pipes flexible or articulated, e.g. a hose
 
 - 
        
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
 - F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
 - F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
 - F17C2221/00—Handled fluid, in particular type of fluid
 - F17C2221/01—Pure fluids
 - F17C2221/018—Acetylene
 
 - 
        
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
 - F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
 - F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
 - F17C2250/00—Accessories; Control means; Indicating, measuring or monitoring of parameters
 - F17C2250/04—Indicating or measuring of parameters as input values
 - F17C2250/0404—Parameters indicated or measured
 - F17C2250/0443—Flow or movement of content
 
 
Definitions
- the present disclosure relates to device used to store, transport and organize welding equipment.
 - Welding is a fabrication process that is used to join two metal pieces or objects. The process involves heating a portion of the metal pieces or objects where they are to be joined. Unlike brazing and soldering, welding uses temperatures that are high enough to actually melt the base metal of the metal pieces or objects. A filler material may also be melted along with the base metal, but the melted metals are then allowed to cool and fuse together to form a strong connecting joint between the two pieces or objects.
 - TIG welding is a type of arc welding that uses a tungsten electrode and an inert shielding gas to prevent oxidation or contamination of the metal in the area being welded.
 - Popular inert shielding gases for TIG welding include argon and helium.
 - TIG welding with helium gas may be referred to as heliarc welding.
 - TIG welding processes will use a gas flowmeter and regulator that control a single gas flow stream. Such processes may require only a single gas hose.
 - Other TIG welding processes may use a dual gas flowmeter and regulator that control two gas flow streams from a single gas source. Dual gas flow streams of the same gas composition at the same or separate flow rates may be used for back purging, trail purging or other dual applications. These later processes may require two gas hoses.
 - One embodiment provides an apparatus comprising a rack including a first upper hook and a first lower hook.
 - the first upper hook is vertically aligned with the first lower hook, wherein the first upper hook opens upward and the first lower hook opens downward.
 - the apparatus further includes two or more permanent magnets physically secured to the rack, wherein the permanent magnets are positioned to simultaneously magnetically engage a side surface of a cylindrical gas tank and magnetically secure the rack to the side surface of the cylindrical gas tank.
 - FIGS. 1A-B are perspective and front views of a magnetic hanger for supporting a gas flow meter and two gas hoses according to a first embodiment.
 - FIG. 1C is a perspective view of the magnetic hanger that is magnetically secured to a cylindrical gas tank and supports a gas flow meter and two gas hoses.
 - FIG. 2 is a cross-sectional diagram of metal pipe that secures a pair of magnets in a vertical section of the metal pipe.
 - FIG. 3 is a cross-sectional diagram of a compressible sleeve received about a portion of metal pipe to form a handle.
 - FIG. 4 is a cross-sectional diagram of two feet secured to a bottom horizontal section of metal pipe.
 - FIG. 5 is a top view of an upper rack welded to a frame.
 - FIG. 6A is a partial cross-sectional view of a threaded connector that may threadably secure a gas flow meter and/or a protective cap.
 - FIG. 6B is a partial cross-sectional view of the gas flow meter threadably connected to the threaded connector.
 - FIGS. 7A-B are perspective and side views of a magnetic hanger for supporting a gas flow meter and one gas hose according to a second embodiment.
 - FIGS. 8A-B are top views of the magnetic hanger of FIGS. 7A-B and the magnetic hanger of FIGS. 1A-C , respectively.
 - FIGS. 9A-B are perspective and top views of a lower tubular structure of a rack that includes permanent magnets in both a vertical tubular section and a horizontal tubular section.
 - FIG. 10 is a perspective view of a rack having a rib formed inside the intermediate frame and a flat panel secured to the rib.
 - One embodiment provides an apparatus comprising a rack including a first upper hook and a first lower hook.
 - the first upper hook is vertically aligned with the first lower hook, wherein the first upper hook opens upward, and the first lower hook opens downward.
 - the apparatus further includes two or more permanent magnets physically secured to the rack, wherein the permanent magnets are positioned to simultaneously magnetically engage a side surface of a cylindrical gas tank and magnetically secure the rack to the side surface of the cylindrical gas tank.
 - the first upper hook and the first lower hook may be disposed for winding a hose about the first upper hook and the first lower hook in a side-to-side configuration.
 - the first upper hook and the first lower hook may cooperate together to establish a non-rotating hose reel, rack or hanger.
 - the upper and lower hooks allow the hose to be wound snug so that the hose stays in place during transport or use of the rack.
 - the rack may include a second upper hook and a second lower hook.
 - the second upper hook opens upward, and the second lower hook opens downward.
 - the second upper hook is preferably vertically aligned with the second lower hook.
 - the first upper hook and the first lower hook may extend in a first lateral direction, while the second upper hook and the second lower hook extend in a second lateral direction generally opposite of the first lateral direction.
 - the first and second lateral directions may be referred to as left-ward and right-ward directions as a user faces the front of the rack.
 - the first upper hook and the first lower hook are disposed for winding a first hose about the first upper hook and the first lower hook in a front-to-back configuration
 - the second upper hook and the second lower hook are disposed for winding a second hose about the second upper hook and the second lower hook in a front-to-back configuration
 - the rack may be formed with tubular metal.
 - Tubular metal has the benefits of being strong and durable, while also having less weight than a solid metal bar or bracket.
 - the tubular metal may have various cross-sections, such as square or circular.
 - a preferred tubular metal is a metal pipe, which can be readily bent to form a rigid structure of various configurations.
 - the tubular metal may be a metal pipe having a nominal pipe size of 0.5 inch, and the metal pipe may have bends with a radius between about 1 and about 2 inches.
 - the tubular metal may be 304 stainless steel, aluminum or other metal.
 - the first upper and lower hooks may each form a loop hook.
 - the loop hook may be formed with a metal pipe having a continuous section of the metal pipe that extends out to form the hook.
 - the entirety of the first upper hook and/or the first lower hook may be formed as a continuous section of metal pipe or other material that is free from sharp or hazardous edges or points.
 - the rack may include seamless contoured edges and joints. A preferred rack may be free of any sharp edges that could potentially cut a person, or the hoses being supported on the rack.
 - the rack may include at least two vertical sections of the tubular metal that include one or more of the permanent magnets.
 - the at least two vertical sections that include magnets are laterally spaced apart to receive an arc of the cylindrical gas tank between the at least two vertical sections.
 - one or more of the permanent magnets may be received in a hollow space within the tubular metal that forms each of the vertical sections.
 - the permanent magnets received within the tubular metal of each vertical section may be retained in the vertical section of the tubular metal by bends, setbacks and/or crimps in the metal pipe at both ends of the vertical section where the permanent magnets are located.
 - the permanent magnets that are retained in a vertical section are further secured in a fixed position such that the permanent magnets will not slide within the tubular metal.
 - the permanent magnets and the vertical section may have selected relative lengths such that the permanent magnets are caught by the setback of each bend and cinched into place.
 - the rack may include one or more permanent magnets received within a plurality of tubular sections that may engage the tank.
 - a rack may have at permanent magnets received in one or more vertical sections, one or more horizontal sections, and/or one or more sections that is neither vertical nor horizontal. Accordingly, the number and placement of the permanent magnets may vary as a function of the tubular metal configuration of the rack and the amount of weight to be supported by the rack.
 - the rack may further include a handle that is accessible along the top of the rack and is substantially centered front-to-back and side-to-side of the rack.
 - the handle is positioned for a user to carry the rack with one hand while the rack hangs downward from the handle. Centering the handle from front-to-back and side-to-side causes the rack to hang relatively straight downward depending upon the weight and size of any hoses and/or a flowmeter supported by the rack.
 - the rack may further include a pair of vertical hand holds that are accessible along the front of the rack.
 - a pair of vertical hand holds accessible along the front of the rack may be useful to grab the rack with two hands, lift the rack into position to one side of the cylindrical gas tank, then move the rack toward the cylindrical gas tank until the permanent magnets engage a side of the cylindrical gas tank. With the permanent magnets securing the rack to the side of the gas tank, the user may release the hand holds and the rack will stay in position supported by the gas tank.
 - the rack includes upper and lower sets of vertical sections of the tubular metal.
 - Each set of vertical sections includes first and second vertical sections that are laterally spaced apart to receive an arc of the cylindrical gas tank between the first and second vertical sections.
 - the permanent magnets are effective to secure the rack to the cylindrical gas tank but may also be effective to secure the rack to other ferrous metal structures such as a beam, pipe or storage rack. These other ferrous metal structures may be available at the job site or in a storage area.
 - the first and second vertical sections of the upper set of vertical sections may each include one or more of the permanent magnets.
 - the first and second vertical sections of the lower set of vertical sections may also each include one or more of the permanent magnets.
 - the upper set of vertical sections of the tubular metal may be formed by the first upper hook or portions of the first and second upper hooks
 - the lower set of set of vertical sections of the tubular metal may be formed by the first lower hook or portions of the first and second upper hooks
 - the two or more permanent magnets may include first and second upper permanent magnets that are laterally spaced apart and first and second lower permanent magnets that are laterally spaced apart.
 - the first upper permanent magnet is preferably vertically aligned with the first lower permanent magnet
 - the second upper permanent magnet is preferably vertically aligned with the second lower permanent magnet.
 - the vertical alignment of the magnets facilitates the magnets simultaneously engaging the cylindrical gas tank over a range of gas tank diameters.
 - the first and second upper permanent magnets and the first and second lower permanent magnets may be positioned to simultaneously magnetically engage the exterior surface of cylindrical gas tanks having a diameter from about 5 inches to about 9 inches.
 - the rack may include one or more horizontal sections of the tubular metal and a plurality of feet may be secured to the one or more horizontal sections of the tubular metal.
 - Each foot may be a compressible pad received about the tubular metal or partially inserted into a hole drilled in the bottom surface of the tubular metal.
 - the rack further include an intermediate frame formed with the tubular metal.
 - the first upper hook may be coupled to an upper end of the intermediate frame in an upward orientation
 - the first lower hook may be coupled to a lower end of the intermediate frame in a downward orientation.
 - the first upper hook and the first lower hook may have the same configuration, but are used in opposite orientations (i.e., one oriented to open upward to form the first upper hook and another one oriented to open downward to form the first lower hook).
 - the first upper hook, the first lower hook and the intermediate frame may each be formed as a separate continuous loop of the tubular metal having multiple bends.
 - the first upper hook, the first lower hook and the intermediate frame may form three continuous loops of metal pipe having bends that form the desired structure of the respective components. The individual components may then be welded together in the desired configuration.
 - the intermediate frame may have a flat panel extending within the intermediate frame.
 - the intermediate frame may include a support for a gas flow meter.
 - the flat panel may be made with the same material as the intermediate frame, such as metal tubing, or a different material, such as polycarbonate, acrylic, or other polymers or plastics.
 - a sheet metal rib is welded to the inward-facing surface of the intermediate frame and adapted to support the flat panel.
 - the sheet metal rib may be about 1/16 th inch thick and about 1/2 inch wide, and may be welded to the intermediate frame.
 - the flat panel may be riveted or otherwise fastened to the sheet metal rib.
 - the sheet metal rib may increase the strength or rigidity of the intermediate frame, and the attachment of the sheet metal rib to the intermediate frame allows the flat panel to be formed with a light-weight material, such as a carbon fiber, polycarbonate, various plastics, and metals that may be fastened to the rib in a manner other than welding directly to the intermediate frame.
 - a flowmeter mount may be a machined metal component having a flange or other feature that may be secured to the flat panel by rivets or other fasteners.
 - a threaded connector may be secured to a front of the rack.
 - the threaded connector may include a blind hole having internal screw threads for threadably receiving a gas flow meter.
 - the threaded connector may receive and protect external thread of a connector to a flow meter while supporting the weight of the flow meter.
 - a protective cap may be secured to the threaded connector to keep dust and dirt out of the blind hole.
 - the permanent magnets may be any known type, composition and/or shape of permanent magnets.
 - one suitable type of permanent magnet is a neodymium magnet.
 - Neodymium magnets are permanent magnets that are made from an alloy of neodymium, iron, and boron.
 - the permanent magnets may have any suitable shape, but embodiments having the permanent magnets received within a metal pipe will preferably have a circular cross-section that fits within the hollow space within the metal pipe.
 - a particular preferred permanent magnet may be cylindrical.
 - One non-limiting example of a permanent magnet is a neodymium magnet having a diameter of about 0.4 inches, a length of about 2.4 inches, and with grade N52 neodymium magnet material having a reported pull force of approximately 65 lbs.
 - the permanent magnets may include one or more permanent magnet in the shape of a ball.
 - Ball-shaped permanent magnets may fit easily within the hollow space within tubular sections of the rack, including the straight sections and bends that make contact with the cylindrical gas tank. Such ball-shaped permanent magnets may be used alone or in combination with cylindrical magnets in order to increase or maximize the amount of magnetic force that a given rack is capable of creating.
 - ball-shaped permanent magnets may be positioned within bent portions of the metal pipe, such as a section of metal pipe that follows the contour of a given cylindrical gas tank. Ball-shaped permanent magnets may also be received within the metal pipe yet allow the metal pipe to be bent properly and smoothly without making visual contortions in the metal pipe.
 - Some embodiments may use sleeves or pads of compressible material to provide cushioning to the rack.
 - a non-slip rubber or polymeric pad, sleeve or wrap may be secured to a section of tubular metal, such as to form a cushioned handle grip, a soft foot at the base of the rack, or a non-slip, non-abrasive surface about the sections that make contact with the bottle.
 - FIGS. 1A-B are perspective and front views of an apparatus for supporting a gas flow meter and two gas hoses according to a first embodiment.
 - the apparatus may be referred to as a magnetic hanger because it is magnetically securable to a side of a cylindrical gas tank and provides hooks and connectors for hanging or otherwise stored gas hoses and flow meters for use in a welding process.
 - the apparatus 10 includes a rack 20 and two or more permanent magnets 12 (illustrated in dashed lines) physically secured to the rack 20 . More specifically, the apparatus 10 of FIG. 1A illustrates a rack 20 having permanent magnets 12 secured within four different vertical sections of a metal pipe structure having bends that form the structure shown. The permanent magnets 12 may be retained in the short vertical sections shown by bend above and just below the permanent magnets 12 . Other methods of securing magnets to a rack may also be utilized, such as securing the permanent magnets with screws or adhesive without limitation.
 - the rack 20 includes a first upper hook 30 and a first lower hook 40 .
 - the rack 20 further includes an intermediate frame 70 .
 - the first upper hook 30 is coupled to an upper end of an intermediate frame 70 with the first upper hook 30 in an upward orientation (i.e., opening upward).
 - the first lower hook 40 is coupled to a lower end of the intermediate frame 50 with the first lower hook 40 in a downward orientation (i.e., opening downward).
 - the first upper hook 30 is vertically aligned with the first lower hook 40 .
 - the first upper hook 30 and the first lower hook 40 are disposed for winding a first hose 14 about the first upper hook 30 and the first lower hook 40 in a front-to-back configuration (see first hose 14 in FIG. 1C ).
 - the rack 20 further includes a second upper hook 50 and a second lower hook 60 .
 - the second upper and lower hooks 50 , 60 are coupled to the upper and lower ends of the intermediate frame 50 .
 - the second upper hook 50 is vertically aligned with the second lower hook 60 , with the second upper hook 50 in an upward configuration (i.e., opening upward) and the second lower hook 60 in a downward configuration (i.e., opening downward).
 - the second upper hook 50 and the second lower hook 60 are disposed for winding a second hose 16 about the second upper hook 50 and the second lower hook 60 in a front-to-back configuration (see second hose 16 in FIG. 1C ).
 - the first upper hook 30 and the first lower hook 40 extend in a first lateral direction (generally to the left in FIG. 1A ), and the second upper hook 50 and the second lower hook 60 extend in a second lateral direction (generally to the right in FIG. 1A ) that is generally opposite of the first lateral direction.
 - the first upper hook 30 and the second upper hook 50 are formed as a substantially continuous loop of the tubular metal having multiple bends.
 - a single piece of the tubular metal, such as a metal pipe may be bent into the illustrated configuration with the two ends 31 , 51 being brought together in alignment and proximate the same location.
 - the two ends 31 , 51 may be welded together at some point 15 to form a continuous loop.
 - first lower hook 40 and the second lower hook 60 are formed as a substantially continuous loop of the tubular metal having multiple bends.
 - a single piece of the tubular metal such as a metal pipe, may be bent into the illustrated configuration with the two ends 41 , 61 being brought together in alignment and proximate the same location.
 - the two ends 41 , 61 may be welded together at some point 13 to form a continuous loop.
 - the intermediate frame 70 may also be formed as a continuous loop of the tubular metal having multiple bends.
 - a single piece of the tubular metal such as a metal pipe, may be bent into the illustrated configuration with the two ends 71 , 72 being brought together in alignment and proximate the same location.
 - the two ends 71 , 72 may be welded together at some point 17 to form a continuous loop.
 - the tubular metal structure that forms the first and second upper hooks 30 , 50 is identical to the tubular metal structure that forms the first and second lower hooks 40 , 60 .
 - the two tubular structures i.e., a first tubular structure including the upper hooks 30 , 50 and a second tubular structure including the lower hooks 40 , 60
 - the tubular metal structures may be different or merely similar.
 - the upper tubular structure may further include a handle 37 and the lower tubular structure may further include a support 47 using the same or similar configuration of the tubular structures.
 - any one or more of the first upper hook 30 , first lower hook 40 , second upper hook 50 , and second lower hook 60 may form a loop hook.
 - a loop hook is formed when an elongate structural member extends out and back to form a loop in the shape of a hook. Accordingly, the hook may be light weight, yet have a broad effective width and no terminal ends to deal with.
 - a first hose and/or cord may be wound around a first leg 32 and a second leg 34 of the first upper hook 30 , as well as around a first leg 42 and a second leg 44 of the first lower hook 40 .
 - the first hose and/or cord may be secured in coiled configuration with no sharp bends in the first hose and/or cord.
 - a second hose and/or cord may be wound around a first leg 52 and a second leg 54 of the second upper hook 50 , as well as around a first leg 62 and a second leg 64 of the second lower hook 60 .
 - the second hose and/or cord may be secured in coiled configuration with no sharp bends in the second hose and/or cord.
 - the rack 20 includes two upper vertical sections 36 , 56 of the tubular metal that are disposed along the back of the rack and laterally spaced apart to receive an arc of the cylindrical gas tank between the two vertical sections 36 , 56 . These two upper vertical sections 36 , 56 are the preferred location for securing permanent magnets 12 .
 - the rack 20 further includes two lower vertical sections 46 , 66 of the tubular metal that are also disposed along the back of the rack and laterally spaced apart to receive an arc of the cylindrical gas tank between the two vertical sections 46 , 66 . These two lower vertical sections 36 , 56 may also securing permanent magnets 12 .
 - the first upper vertical section 36 is axially aligned with the first lower vertical section 46
 - the second upper vertical section 56 is axially aligned with the second lower vertical section 66 .
 - each of the vertical sections 36 , 46 , 56 , 66 may simultaneously contact the side of a cylindrical gas tank and the permanent magnets 12 secured to each of the vertical sections 36 , 46 , 56 , 66 may simultaneously magnetically engage the cylindrical gas tank.
 - the rack 20 may be magnetically secured to the cylindrical gas tank in a stable manner to support any hoses, flow meters or other equipment supported by the rack 20 .
 - the two upper vertical sections 36 , 56 could secure permanent magnets 12 , with the two lower vertical sections 46 , 66 forming points of contact against the cylindrical gas tank without permanent magnets.
 - the rack 20 may be grabbed by a user in various locations, the rack 20 may include some preferred features for handling.
 - the rack 20 may include a conveniently located section that forms a handle 37 .
 - the handle 37 is accessible along the top of the rack 20 and is substantially centered front-to-back and side-to-side of the rack 20 .
 - the rack 20 may be grabbed with two hands at opposing positions 73 , 74 along the sides of the frame 70 .
 - the frame 70 has a flat panel 75 extending within the frame 70
 - the flat panel 75 may have a pair of cut-outs 77 , 78 that cooperate with the frame 70 at positions 73 , 74 to form a pair of hand holds.
 - a user may grab the rack 20 by the handle 37 to carry the rack in one hand with the arm extending down to the user's side. Once at a work location, the user may set the rack 20 on the ground, then grab the hand holds to lift the rack and position it against a cylindrical gas tank.
 - the first lower hook 40 , the second lower hook 60 , the frame 70 and any other section, such as the horizontal section 46 may lie in a plane to rest in a stable manner on a flat surface.
 - the rack 20 is shown with feet 18 secured at various locations along the bottom of the rack 20 .
 - the rack 20 further includes a threaded connector 80 secured to a front of the rack 20 .
 - the threaded connector 80 may be connected to, or integrated with, the panel 75 .
 - the threaded connector 80 may include a blind hole having internal screw threads for threadably receiving a gas flow meter.
 - FIG. 1B is a front view of the rack 20 .
 - the rack 20 has component labeled with the same reference numbers that were used to identify the same components in FIG. 1A .
 - the front view of FIG. 1B highlights that the arrangement of the first upper hook 30 , the first lower hook 40 , the second upper hook 50 , and the second lower hook 60 .
 - the first upper hook 30 and the first lower hook 40 are vertically aligned to form a first (non-rotational) hose reel
 - the second upper hook 50 and the second lower hook 60 are vertically aligned to form a second (non-rotational) hose reel.
 - FIG. 1B shows three of the feet 18 supporting the rack 20 as it rests on a flat surface.
 - FIG. 1C is a perspective view of the apparatus 10 with the rack 20 magnetically secured to a cylindrical gas tank 5 using permanent magnets 12 (only one shown; see also FIG. 1A ).
 - the rack 20 is elevated above the floor or ground upon which the cylindrical gas tank 5 sits.
 - the only necessary connection between the rack 20 and the cylindrical gas tank 5 is the magnetic engagement (i.e., magnetic attraction or magnetic pull) between the permanent magnets 12 and the cylindrical gas tank 5 .
 - the rack 20 has the same configuration as in FIGS. 1A and 1B but illustrates a first hose 14 supported by the first upper hook 30 and the first lower hook 40 , as well as a second hose 14 supported by the second upper hook 50 and the second lower hook 60 .
 - the rack 20 also supports a dual flow meter and flow regulator 19 that is secured to the threaded connector 80 (not shown; see FIGS. 1A and 1B ). Note that the dual flow meter and flow regulator 19 is in the proper orientation to be disconnected from the threaded connector 80 and raised slightly for subsequent connection to the threaded port 6 of the cylindrical gas tank 5 .
 - the rack 20 may be equipped or outfitted with a hose, such as 100 ft of inert gas argon hose.
 - the rack may be further equipped or outfitted with a TIG torch with hoses and hookups for a welding machine and a dual flowmeter for coupling to the tank.
 - the weight of these items may vary between different manufacturers and the length of hose used, but the rack with neodymium magnets have been shown to support equipment weighing as much as about 16.6 lbs. It is believed that the use of additional magnets will enable the rack to support even greater amounts of weight.
 - FIG. 2 is a cross-sectional diagram of a partial section of metal pipe 90 that secures a pair of magnets 12 in a vertical section 56 of the metal pipe 90 .
 - the permanent magnets 12 With one or more permanent magnets 12 that have a circular cross-section, the permanent magnets 12 are received in a hollow space within the metal pipe 90 that forms the vertical section 56 .
 - the metal pipe 90 has a first bend 91 and a second bend 92 adjacent the vertical section 56 such that the permanent magnets 12 are retained within the vertical section 56 .
 - the permanent magnets 12 are rigid and of a size that is unable to pass through the bends 91 , 92 and are effectively retained within the vertical section 56 .
 - adhesives or fasteners are necessary to secure the permanent magnets 12 to the rack 20 , but adhesives or fasteners may be used in combination with, or as a substitute for, placing the permanent magnets within the metal pipe 90 between bends 91 , 92 .
 - the bends 91 , 92 and/or other bends in the rack may have the same radius (“r”), such as a 1.5-inch radius. As shown, the setback of the bend may slightly catch the secure the permanent magnets in place.
 - FIG. 3 is a cross-sectional diagram of a portion of metal pipe 100 that may be positioned to form the handle 37 .
 - the handle 37 is formed from a horizontal section of the metal pipe 100 .
 - a compressible pad or sleeve 102 may be securely received about the metal pipe 10 or otherwise formed as part of the rack.
 - FIG. 4 is a cross-sectional diagram of two feet 18 secured to a bottom horizontal section of metal pipe 110 , as may form a part of the first or second lower hook 40 , 60 .
 - the horizontal section of metal pipe 110 has two a compressible sleeve 18 received about the metal pipe 110 .
 - FIG. 5 is a top view of a pair of metal pipes 120 having their ends welded together to form a continuous loop, and the two metal pipes welded together along a distance of close contact.
 - the welds 122 secure the ends of the pipes 120 and the welds 124 secure the two metal pipes together.
 - the configuration of metal pipes may be implemented where the upper tubular structure (including first and second upper hooks 20 , 50 ) is connected to the top of the intermediate frame 70 . Accordingly, the two ends 31 , 51 are welded together at point 15 to form a continuous loop, and the two ends 71 , 72 are welded together at point 17 to form a continuous loop.
 - FIG. 6A is a partial cross-sectional view of a threaded connector 80 that may threadably secure a gas flow meter 19 and/or a protective cap 130 .
 - the threads 82 of the threaded connector 80 may be the same as the threads of the port 6 of the cylindrical gas tank 5 (see FIG. 1C ).
 - the threads 82 of the threaded connector 80 may be internal threads following the same standard as the internal threads of the port 6 of the cylindrical gas tank 5 (see FIG. 1C ). Accordingly, the external threads 84 of the gas flow meter 19 may safely and securely connect with both the threaded connector 80 and the port 6 .
 - FIG. 6B is a partial cross-sectional view of the gas flow meter 19 after having been threadably connected to the threaded connector 80 .
 - FIGS. 7A-B are perspective and side views of an apparatus including a rack 130 and permanent magnets 12 for supporting welding equipment, such as a gas flow meter and a gas hose according to a second embodiment.
 - the rack 130 is similar to the rack 20 of FIGS. 1A-C , but only has hooks for a single hose. Furthermore, the rack 130 has a first upper hook 140 and a first lower hook 150 upon which a first hose can be would from side-to-side.
 - the rack 130 may otherwise include any one or more feature of the rack 20 of FIGS. 1A-C .
 - the rack 130 may be made with a tubular metal such as a metal pipe, may secure permanent magnets 12 is vertical sections to simultaneously engage a cylindrical gas tank, may form handle 37 , may include feet 18 , may include an intermediate frame 70 with hand holds and a threaded connector 80 , and may form three continuous tubular metal loops that are welded together.
 - the rack 130 does not have loop hooks extending laterally to opposing sides of the frame 70 . Rather, a hose and/or cord may be wound about the legs 141 , 142 , 151 , 152 .
 - FIG. 8A is a top view of the rack 130 of FIGS. 7A-B .
 - the permanent magnets 12 in the vertical sections of the first upper hook 140 are shown to be laterally spaced apart from each other and in contact the side of the cylindrical gas tank 5 (illustrated in dashed lines). Accordingly, the permanent magnets 12 are in sufficiently close proximity to the cylindrical gas tank 5 to magnetically engage the cylindrical gas tank 5 and support the rack 130 . Furthermore, the permanent magnets 12 are positioned so that they may magnetically engage different sizes (diameters) of cylindrical gas tanks, including both tank 5 and a hypothetical larger (diameter) tank 5 A.
 - the sections of the first upper hook 140 extend inward (frontward) toward the intermediate frame 70 to leave room for a portion of either cylindrical gas tank 5 , 5 A to extend between the vertical sections that secure the permanent magnets 12 .
 - This same arrangement may be implemented for the first lower hook 150 (not shown; see FIG. 7A ) to facilitate engagement with either cylindrical gas tank 5 , 5 A.
 - FIG. 8B is a top view of the rack 20 of FIGS. 1A-C .
 - the rack 20 has the first upper hook 30 and the second upper hook 50 (as well as the first lower hook 40 and the second lower hook 60 , not shown; see FIG. 1A ), but otherwise is secured to either cylindrical gas tank 5 , 5 A in the same manner as rack 130 .
 - the permanent magnets 12 in the vertical sections of the first and second upper hooks 30 , 50 are preferably vertically aligned with the permanent magnets 12 in the first and second lower hooks 40 , 60 , so that four of the permanent magnets 12 may simultaneously magnetically engage either of cylindrical gas tanks 5 , 5 A despite the fact that the cylindrical gas tanks 5 , 5 A have different diameters.
 - the permanent magnets may simultaneously magnetically engage the exterior surface of cylindrical gas tanks having a diameter from about 5 inches to about 9 inches.
 - FIGS. 9A-B are perspective and top views of the first lower hook 150 of the rack 130 of FIGS. 7A, 7B and 8A .
 - FIG. 9A shows the first lower hook 150 with the legs 151 , 152 .
 - Permanent magnets 12 are received in the two vertical tubular sections 154 , 155 as well as the two additional tubular sections 156 , 157 , which may be horizontal and/or at an angle to horizontal.
 - the number of permanent magnets 12 that magnetically engage or attract the cylindrical gas tank may be increased without necessarily increasing the size of the rack or particular tubular sections.
 - the configuration of those horizontal or angled tubular sections 156 , 157 may need to be specifically selected to match or cooperate with a cylindrical gas tank of a particular diameter. Note that the configuration of the tubular sections 156 , 157 have been modified slightly from the corresponding tubular sections shown in FIG. 7A in order to position the permanent magnets 12 therein closer to the surface of a cylindrical gas tank.
 - FIG. 9B is a top view of the first lower hook 150 of the rack 130 of FIGS. 7A .
 - the first lower hook 150 has the two vertical sections 154 , 155 in close proximity to the surface of the cylindrical gas tank 5 so that the permanent magnets 12 within the two vertical sections 154 , 155 are able to magnetically engage the cylindrical gas tank 5 .
 - This is similar to what is shown in FIG. 8A .
 - the two horizontal or angled tubular sections 156 , 157 which together may form a connection between the two vertical sections 154 , 155 , also include a pair of permanent magnets 12 .
 - the two horizontal or angled tubular sections 156 , 157 follow a path or configuration that approaches the surface of the cylindrical gas tank 5 , such that the permanent magnets 12 within the two horizontal or angled tubular sections 156 , 157 are also able to magnetically engage the cylindrical gas tank 5 .
 - the first lower hook 150 may include a greater number of permanent magnets, or a greater amount of permanent magnetic material, than for the first lower hook as shown in FIG. 7A having permanent magnets only in the vertical sections. It should be recognized that the first upper hook 140 of the rack 130 in FIG.
 - FIG. 10 is a perspective view of a rack 160 including the first upper hook 140 (as shown in FIGS. 7A-B ), the first lower hook 150 (as shown in FIGS. 9A-B ), and an intermediate frame 162 that is connected to both the first upper and lower hooks 140 , 150 .
 - a rib 164 is formed and secured inside the intermediate frame 162 .
 - the rib 164 is shown as a sheet metal rib, such as having dimension of about 1/16 th inch thick and about 1/2 inch wide following the shape of the intermediate frame 162 .
 - the rib 164 may be welded to the intermediate frame 162 at any number of points around the interface between these components.
 - the rib 164 has a flat forward face that include holes 166 (ten holes shown) for securing a flat panel 168 .
 - the flat panel 168 includes a matching pattern of holes 170 (ten holes shown) so that an equal number of fasteners, such as rivets, may be used to fasten the flat panel 168 to the sheet metal rib 164 .
 - the sheet metal rib may increase the strength or rigidity of the intermediate frame, and the attachment of the sheet metal rib to the intermediate frame allows the flat panel 168 to be formed with a light-weight material, such as a carbon fiber, polycarbonate, various plastics, and metals that may be fastened to the rib in a manner other than welding directly to the intermediate frame.
 - a flowmeter mount 180 is secured to the flat panel 168 with additional fasteners so that a machined metal, threaded connector 182 is accessible through a hole 172 through the flat panel 168 .
 - the flowmeter mount 180 has a circumferential flange 184 with holes in a pattern that matches a pattern of holes in the flat panel 168 around the hole 172 , such that the flange 184 may be secured to the flat panel 168 with fasteners, such as rivets.
 - fasteners such as rivets.
 
Landscapes
- Engineering & Computer Science (AREA)
 - Mechanical Engineering (AREA)
 - General Engineering & Computer Science (AREA)
 - Physics & Mathematics (AREA)
 - Optics & Photonics (AREA)
 - Filling Or Discharging Of Gas Storage Vessels (AREA)
 
Abstract
A rack includes a first upper hook that opens upward and a first lower hook that opens downward, wherein the first upper and lower hooks are vertically aligned. Two or more permanent magnets are physically secured to the rack, wherein the permanent magnets are positioned to simultaneously magnetically engage a side surface of a cylindrical gas tank and magnetically secure the rack to the side surface of the cylindrical gas tank. A hose may be wound about the first and second hooks in a side-to-side configuration. In one option, the rack may include a second upper and lower hooks that extend in opposing lateral directions to receive separate hoses. In another option, the rack may be formed with tubular metal and the permanent magnets may be disposed inside vertical sections of the tubular metal. That rack may also secure a gas flow meter.
  Description
The present disclosure relates to device used to store, transport and organize welding equipment.
    Welding is a fabrication process that is used to join two metal pieces or objects. The process involves heating a portion of the metal pieces or objects where they are to be joined. Unlike brazing and soldering, welding uses temperatures that are high enough to actually melt the base metal of the metal pieces or objects. A filler material may also be melted along with the base metal, but the melted metals are then allowed to cool and fuse together to form a strong connecting joint between the two pieces or objects.
    One important example of a welding process is referred to as tungsten inert gas (TIG) welding. TIG welding is a type of arc welding that uses a tungsten electrode and an inert shielding gas to prevent oxidation or contamination of the metal in the area being welded. Popular inert shielding gases for TIG welding include argon and helium. TIG welding with helium gas may be referred to as heliarc welding.
    Some TIG welding processes will use a gas flowmeter and regulator that control a single gas flow stream. Such processes may require only a single gas hose. Other TIG welding processes may use a dual gas flowmeter and regulator that control two gas flow streams from a single gas source. Dual gas flow streams of the same gas composition at the same or separate flow rates may be used for back purging, trail purging or other dual applications. These later processes may require two gas hoses.
    In any jobsite there is a need to organize and maintain welding hoses from becoming a hazard or being damaged. Loose hose that lay along the ground or a floor may cause workers to slip, trip, or fall. Loose or coiled hoses are also more likely become damaged due to a wide variety of activities and equipment at the job site. Even the simple act of improper storage of the hoses or gas flowmeter can lead to rips, cuts, frays, broken gauges, and damage to threaded parts. Toolboxes containing other tools that could potentially puncture or damage equipment are a particular hostile environment for the hoses and gas flowmeter. Although a daily pre-operational checklist of equipment including visual inspection of welding hoses and equipment will detect such damage, this damage may be expensive or cause work delays.
    One embodiment provides an apparatus comprising a rack including a first upper hook and a first lower hook. The first upper hook is vertically aligned with the first lower hook, wherein the first upper hook opens upward and the first lower hook opens downward. The apparatus further includes two or more permanent magnets physically secured to the rack, wherein the permanent magnets are positioned to simultaneously magnetically engage a side surface of a cylindrical gas tank and magnetically secure the rack to the side surface of the cylindrical gas tank.
    
    
    One embodiment provides an apparatus comprising a rack including a first upper hook and a first lower hook. The first upper hook is vertically aligned with the first lower hook, wherein the first upper hook opens upward, and the first lower hook opens downward. The apparatus further includes two or more permanent magnets physically secured to the rack, wherein the permanent magnets are positioned to simultaneously magnetically engage a side surface of a cylindrical gas tank and magnetically secure the rack to the side surface of the cylindrical gas tank.
    In some embodiments, the first upper hook and the first lower hook may be disposed for winding a hose about the first upper hook and the first lower hook in a side-to-side configuration. The first upper hook and the first lower hook may cooperate together to establish a non-rotating hose reel, rack or hanger. The upper and lower hooks allow the hose to be wound snug so that the hose stays in place during transport or use of the rack.
    In some embodiments, the rack may include a second upper hook and a second lower hook. The second upper hook opens upward, and the second lower hook opens downward. In addition, the second upper hook is preferably vertically aligned with the second lower hook. Optionally, the first upper hook and the first lower hook may extend in a first lateral direction, while the second upper hook and the second lower hook extend in a second lateral direction generally opposite of the first lateral direction. The first and second lateral directions may be referred to as left-ward and right-ward directions as a user faces the front of the rack. In some embodiments, the first upper hook and the first lower hook are disposed for winding a first hose about the first upper hook and the first lower hook in a front-to-back configuration, and the second upper hook and the second lower hook are disposed for winding a second hose about the second upper hook and the second lower hook in a front-to-back configuration.
    In some embodiments, the rack may be formed with tubular metal. Tubular metal has the benefits of being strong and durable, while also having less weight than a solid metal bar or bracket. The tubular metal may have various cross-sections, such as square or circular. A preferred tubular metal is a metal pipe, which can be readily bent to form a rigid structure of various configurations. In one option, the tubular metal may be a metal pipe having a nominal pipe size of 0.5 inch, and the metal pipe may have bends with a radius between about 1 and about 2 inches. As non-limiting examples, the tubular metal may be 304 stainless steel, aluminum or other metal.
    In some embodiments, the first upper and lower hooks may each form a loop hook. For example, the loop hook may be formed with a metal pipe having a continuous section of the metal pipe that extends out to form the hook. Furthermore, the entirety of the first upper hook and/or the first lower hook may be formed as a continuous section of metal pipe or other material that is free from sharp or hazardous edges or points. For example, the rack may include seamless contoured edges and joints. A preferred rack may be free of any sharp edges that could potentially cut a person, or the hoses being supported on the rack.
    In some embodiments, the rack may include at least two vertical sections of the tubular metal that include one or more of the permanent magnets. The at least two vertical sections that include magnets are laterally spaced apart to receive an arc of the cylindrical gas tank between the at least two vertical sections. Optionally, one or more of the permanent magnets may be received in a hollow space within the tubular metal that forms each of the vertical sections. Furthermore, the permanent magnets received within the tubular metal of each vertical section may be retained in the vertical section of the tubular metal by bends, setbacks and/or crimps in the metal pipe at both ends of the vertical section where the permanent magnets are located. In one option, the permanent magnets that are retained in a vertical section are further secured in a fixed position such that the permanent magnets will not slide within the tubular metal. For example, the permanent magnets and the vertical section may have selected relative lengths such that the permanent magnets are caught by the setback of each bend and cinched into place.
    In some embodiments, the rack may include one or more permanent magnets received within a plurality of tubular sections that may engage the tank. For example, a rack may have at permanent magnets received in one or more vertical sections, one or more horizontal sections, and/or one or more sections that is neither vertical nor horizontal. Accordingly, the number and placement of the permanent magnets may vary as a function of the tubular metal configuration of the rack and the amount of weight to be supported by the rack.
    Some embodiments of the rack may further include a handle that is accessible along the top of the rack and is substantially centered front-to-back and side-to-side of the rack. The handle is positioned for a user to carry the rack with one hand while the rack hangs downward from the handle. Centering the handle from front-to-back and side-to-side causes the rack to hang relatively straight downward depending upon the weight and size of any hoses and/or a flowmeter supported by the rack. In a separate option, the rack may further include a pair of vertical hand holds that are accessible along the front of the rack. While the centered handle is useful for carrying the rack and any equipment supported by the rack, a pair of vertical hand holds accessible along the front of the rack may be useful to grab the rack with two hands, lift the rack into position to one side of the cylindrical gas tank, then move the rack toward the cylindrical gas tank until the permanent magnets engage a side of the cylindrical gas tank. With the permanent magnets securing the rack to the side of the gas tank, the user may release the hand holds and the rack will stay in position supported by the gas tank.
    In some embodiments, the rack includes upper and lower sets of vertical sections of the tubular metal. Each set of vertical sections includes first and second vertical sections that are laterally spaced apart to receive an arc of the cylindrical gas tank between the first and second vertical sections. Furthermore, the permanent magnets are effective to secure the rack to the cylindrical gas tank but may also be effective to secure the rack to other ferrous metal structures such as a beam, pipe or storage rack. These other ferrous metal structures may be available at the job site or in a storage area. The first and second vertical sections of the upper set of vertical sections may each include one or more of the permanent magnets. Optionally, the first and second vertical sections of the lower set of vertical sections may also each include one or more of the permanent magnets. In an optional configuration, the upper set of vertical sections of the tubular metal may be formed by the first upper hook or portions of the first and second upper hooks, and the lower set of set of vertical sections of the tubular metal may be formed by the first lower hook or portions of the first and second upper hooks.
    In some embodiments, the two or more permanent magnets may include first and second upper permanent magnets that are laterally spaced apart and first and second lower permanent magnets that are laterally spaced apart. The first upper permanent magnet is preferably vertically aligned with the first lower permanent magnet, and the second upper permanent magnet is preferably vertically aligned with the second lower permanent magnet. The vertical alignment of the magnets facilitates the magnets simultaneously engaging the cylindrical gas tank over a range of gas tank diameters. In one non-limiting example, the first and second upper permanent magnets and the first and second lower permanent magnets may be positioned to simultaneously magnetically engage the exterior surface of cylindrical gas tanks having a diameter from about 5 inches to about 9 inches.
    In some embodiments, the rack may include one or more horizontal sections of the tubular metal and a plurality of feet may be secured to the one or more horizontal sections of the tubular metal. Each foot may be a compressible pad received about the tubular metal or partially inserted into a hole drilled in the bottom surface of the tubular metal.
    Some embodiments of the rack further include an intermediate frame formed with the tubular metal. Accordingly, the first upper hook may be coupled to an upper end of the intermediate frame in an upward orientation, and the first lower hook may be coupled to a lower end of the intermediate frame in a downward orientation. In one option, the first upper hook and the first lower hook may have the same configuration, but are used in opposite orientations (i.e., one oriented to open upward to form the first upper hook and another one oriented to open downward to form the first lower hook). In a further option, the first upper hook, the first lower hook and the intermediate frame may each be formed as a separate continuous loop of the tubular metal having multiple bends. For example, the first upper hook, the first lower hook and the intermediate frame may form three continuous loops of metal pipe having bends that form the desired structure of the respective components. The individual components may then be welded together in the desired configuration.
    In some embodiments, the intermediate frame may have a flat panel extending within the intermediate frame. Among other potential uses, the intermediate frame may include a support for a gas flow meter. As non-limiting examples, the flat panel may be made with the same material as the intermediate frame, such as metal tubing, or a different material, such as polycarbonate, acrylic, or other polymers or plastics. In one option, a sheet metal rib is welded to the inward-facing surface of the intermediate frame and adapted to support the flat panel. For example, the sheet metal rib may be about 1/16th inch thick and about 1/2 inch wide, and may be welded to the intermediate frame. The flat panel may be riveted or otherwise fastened to the sheet metal rib. Beneficially, the sheet metal rib may increase the strength or rigidity of the intermediate frame, and the attachment of the sheet metal rib to the intermediate frame allows the flat panel to be formed with a light-weight material, such as a carbon fiber, polycarbonate, various plastics, and metals that may be fastened to the rib in a manner other than welding directly to the intermediate frame. In a further option, a flowmeter mount may be a machined metal component having a flange or other feature that may be secured to the flat panel by rivets or other fasteners.
    In some embodiments, a threaded connector may be secured to a front of the rack. For example, the threaded connector may include a blind hole having internal screw threads for threadably receiving a gas flow meter. The threaded connector may receive and protect external thread of a connector to a flow meter while supporting the weight of the flow meter. When the flow meter has been disconnected from the threaded connector, such as during use to control gas flow from the cylindrical gas tank, a protective cap may be secured to the threaded connector to keep dust and dirt out of the blind hole.
    The permanent magnets may be any known type, composition and/or shape of permanent magnets. However, one suitable type of permanent magnet is a neodymium magnet. Neodymium magnets are permanent magnets that are made from an alloy of neodymium, iron, and boron. The permanent magnets may have any suitable shape, but embodiments having the permanent magnets received within a metal pipe will preferably have a circular cross-section that fits within the hollow space within the metal pipe. A particular preferred permanent magnet may be cylindrical. One non-limiting example of a permanent magnet is a neodymium magnet having a diameter of about 0.4 inches, a length of about 2.4 inches, and with grade N52 neodymium magnet material having a reported pull force of approximately 65 lbs. In one option, the permanent magnets may include one or more permanent magnet in the shape of a ball. Ball-shaped permanent magnets may fit easily within the hollow space within tubular sections of the rack, including the straight sections and bends that make contact with the cylindrical gas tank. Such ball-shaped permanent magnets may be used alone or in combination with cylindrical magnets in order to increase or maximize the amount of magnetic force that a given rack is capable of creating. Furthermore, ball-shaped permanent magnets may be positioned within bent portions of the metal pipe, such as a section of metal pipe that follows the contour of a given cylindrical gas tank. Ball-shaped permanent magnets may also be received within the metal pipe yet allow the metal pipe to be bent properly and smoothly without making visual contortions in the metal pipe.
    Some embodiments may use sleeves or pads of compressible material to provide cushioning to the rack. In one option, a non-slip rubber or polymeric pad, sleeve or wrap may be secured to a section of tubular metal, such as to form a cushioned handle grip, a soft foot at the base of the rack, or a non-slip, non-abrasive surface about the sections that make contact with the bottle.
    In reference to FIG. 1A , the apparatus  10 includes a rack  20 and two or more permanent magnets 12 (illustrated in dashed lines) physically secured to the rack  20. More specifically, the apparatus  10 of FIG. 1A  illustrates a rack  20 having permanent magnets  12 secured within four different vertical sections of a metal pipe structure having bends that form the structure shown. The permanent magnets  12 may be retained in the short vertical sections shown by bend above and just below the permanent magnets  12. Other methods of securing magnets to a rack may also be utilized, such as securing the permanent magnets with screws or adhesive without limitation.
    The rack  20 includes a first upper hook  30 and a first lower hook  40. The rack  20 further includes an intermediate frame  70. The first upper hook  30 is coupled to an upper end of an intermediate frame  70 with the first upper hook  30 in an upward orientation (i.e., opening upward). Similarly, the first lower hook  40 is coupled to a lower end of the intermediate frame  50 with the first lower hook  40 in a downward orientation (i.e., opening downward). As shown, the first upper hook  30 is vertically aligned with the first lower hook  40. In these and other positions, the first upper hook  30 and the first lower hook  40 are disposed for winding a first hose  14 about the first upper hook  30 and the first lower hook  40 in a front-to-back configuration (see first hose  14 in FIG. 1C ).
    The rack  20 further includes a second upper hook  50 and a second lower hook  60. As with the first upper and  lower hooks    30, 40, the second upper and  lower hooks    50, 60 are coupled to the upper and lower ends of the intermediate frame  50. As shown, the second upper hook  50 is vertically aligned with the second lower hook  60, with the second upper hook  50 in an upward configuration (i.e., opening upward) and the second lower hook  60 in a downward configuration (i.e., opening downward). In these and other positions, the second upper hook  50 and the second lower hook  60 are disposed for winding a second hose  16 about the second upper hook  50 and the second lower hook  60 in a front-to-back configuration (see second hose  16 in FIG. 1C ).
    The first upper hook  30 and the first lower hook  40 extend in a first lateral direction (generally to the left in FIG. 1A ), and the second upper hook  50 and the second lower hook  60 extend in a second lateral direction (generally to the right in FIG. 1A ) that is generally opposite of the first lateral direction. Furthermore, the first upper hook  30 and the second upper hook  50 are formed as a substantially continuous loop of the tubular metal having multiple bends. For example, a single piece of the tubular metal, such as a metal pipe, may be bent into the illustrated configuration with the two ends 31, 51 being brought together in alignment and proximate the same location. Optionally, the two ends 31, 51 may be welded together at some point  15 to form a continuous loop.
    Similarly, the first lower hook  40 and the second lower hook  60 are formed as a substantially continuous loop of the tubular metal having multiple bends. For example, a single piece of the tubular metal, such as a metal pipe, may be bent into the illustrated configuration with the two ends 41, 61 being brought together in alignment and proximate the same location. Optionally, the two ends 41, 61 may be welded together at some point  13 to form a continuous loop.
    The intermediate frame  70 may also be formed as a continuous loop of the tubular metal having multiple bends. For example, a single piece of the tubular metal, such as a metal pipe, may be bent into the illustrated configuration with the two ends 71, 72 being brought together in alignment and proximate the same location. Optionally, the two ends 71, 72 may be welded together at some point  17 to form a continuous loop.
    In the embodiment shown, the tubular metal structure that forms the first and second  upper hooks    30, 50 is identical to the tubular metal structure that forms the first and second  lower hooks    40, 60. However, the two tubular structures (i.e., a first tubular structure including the  upper hooks    30, 50 and a second tubular structure including the lower hooks 40, 60) may be disposed in opposite orientations. In other embodiments, the tubular metal structures may be different or merely similar. Still, the upper tubular structure may further include a handle  37 and the lower tubular structure may further include a support  47 using the same or similar configuration of the tubular structures.
    Independent of whether the upper and lower tubular metal structures are formed as a continuous loop, any one or more of the first upper hook  30, first lower hook  40, second upper hook  50, and second lower hook  60 may form a loop hook. A loop hook is formed when an elongate structural member extends out and back to form a loop in the shape of a hook. Accordingly, the hook may be light weight, yet have a broad effective width and no terminal ends to deal with.
    For example, a first hose and/or cord may be wound around a first leg  32 and a second leg  34 of the first upper hook  30, as well as around a first leg  42 and a second leg 44 of the first lower hook  40. By winding the hose and/or cord around these four   legs      32, 34, 42, 44, the first hose and/or cord may be secured in coiled configuration with no sharp bends in the first hose and/or cord. Similarly, a second hose and/or cord may be wound around a first leg  52 and a second leg  54 of the second upper hook  50, as well as around a first leg  62 and a second leg  64 of the second lower hook  60. By winding the second hose and/or cord around these four    legs        52, 54, 62, 64, the second hose and/or cord may be secured in coiled configuration with no sharp bends in the second hose and/or cord.
    The rack  20 includes two upper  vertical sections    36, 56 of the tubular metal that are disposed along the back of the rack and laterally spaced apart to receive an arc of the cylindrical gas tank between the two  vertical sections    36, 56. These two upper  vertical sections    36, 56 are the preferred location for securing permanent magnets  12. The rack  20 further includes two lower  vertical sections    46, 66 of the tubular metal that are also disposed along the back of the rack and laterally spaced apart to receive an arc of the cylindrical gas tank between the two  vertical sections    46, 66. These two lower  vertical sections    36, 56 may also securing permanent magnets  12. In the configuration shown, the first upper vertical section  36 is axially aligned with the first lower vertical section  46, and the second upper vertical section  56 is axially aligned with the second lower vertical section  66. In this configuration, each of the    vertical sections        36, 46, 56, 66 may simultaneously contact the side of a cylindrical gas tank and the permanent magnets  12 secured to each of the    vertical sections        36, 46, 56, 66 may simultaneously magnetically engage the cylindrical gas tank. Accordingly, the rack  20 may be magnetically secured to the cylindrical gas tank in a stable manner to support any hoses, flow meters or other equipment supported by the rack  20. Optionally, the two upper  vertical sections    36, 56 could secure permanent magnets  12, with the two lower  vertical sections    46, 66 forming points of contact against the cylindrical gas tank without permanent magnets.
    Although the rack  20 may be grabbed by a user in various locations, the rack  20 may include some preferred features for handling. First, the rack  20 may include a conveniently located section that forms a handle  37. As shown, the handle  37 is accessible along the top of the rack  20 and is substantially centered front-to-back and side-to-side of the rack  20. Second, the rack  20 may be grabbed with two hands at opposing positions  73, 74 along the sides of the frame  70. Where the frame  70 has a flat panel  75 extending within the frame  70, the flat panel  75 may have a pair of cut- outs    77, 78 that cooperate with the frame  70 at positions  73, 74 to form a pair of hand holds. In one example, a user may grab the rack  20 by the handle  37 to carry the rack in one hand with the arm extending down to the user's side. Once at a work location, the user may set the rack  20 on the ground, then grab the hand holds to lift the rack and position it against a cylindrical gas tank.
    For setting the rack  20 on the ground or other surface, the first lower hook  40, the second lower hook  60, the frame  70 and any other section, such as the horizontal section  46, may lie in a plane to rest in a stable manner on a flat surface. The rack  20 is shown with feet  18 secured at various locations along the bottom of the rack  20.
    The rack  20 further includes a threaded connector  80 secured to a front of the rack  20. For example, the threaded connector  80 may be connected to, or integrated with, the panel  75. In one embodiment, the threaded connector  80 may include a blind hole having internal screw threads for threadably receiving a gas flow meter.
    The rack  20 has the same configuration as in FIGS. 1A and 1B  but illustrates a first hose  14 supported by the first upper hook  30 and the first lower hook  40, as well as a second hose  14 supported by the second upper hook  50 and the second lower hook  60. The rack  20 also supports a dual flow meter and flow regulator  19 that is secured to the threaded connector 80 (not shown; see FIGS. 1A and 1B ). Note that the dual flow meter and flow regulator  19 is in the proper orientation to be disconnected from the threaded connector  80 and raised slightly for subsequent connection to the threaded port 6 of the cylindrical gas tank 5. This may be accomplished without disconnecting either of the two  hoses    14, 16 from the dual flow meter and flow regulator  19 and without uncoiling or unwinding the hoses and/or cords from the rack. In reference to FIG. 1A and 1B , note how the first hose  14 is wound around the four   legs      32, 34, 42, 44, and the second hose  16 is wound around the four    legs        52, 54, 62, 64.
    In one non-limiting example, the rack  20 may be equipped or outfitted with a hose, such as 100 ft of inert gas argon hose. The rack may be further equipped or outfitted with a TIG torch with hoses and hookups for a welding machine and a dual flowmeter for coupling to the tank. Although the weight of these items may vary between different manufacturers and the length of hose used, but the rack with neodymium magnets have been shown to support equipment weighing as much as about 16.6 lbs. It is believed that the use of additional magnets will enable the rack to support even greater amounts of weight.
    The terminology used herein is for the purpose of describing particular embodiments only and is not intended to limit the scope of the claims. As used herein, the singular forms “a”, “an” and “the” are intended to include the plural forms as well, unless the context clearly indicates otherwise. It will be further understood that the terms “comprises” and/or “comprising,” when used in this specification, specify the presence of stated features, integers, steps, operations, elements, components and/or groups, but do not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components, and/or groups thereof. The terms “preferably,” “preferred,” “prefer,” “optionally,” “may,” and similar terms are used to indicate that an item, condition or step being referred to is an optional (not required) feature of the embodiment.
    The corresponding structures, materials, acts, and equivalents of all means or steps plus function elements in the claims below are intended to include any structure, material, or act for performing the function in combination with other claimed elements as specifically claimed. Embodiments have been presented for purposes of illustration and description, but it is not intended to be exhaustive or limited to the embodiments in the form disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art after reading this disclosure. The disclosed embodiments were chosen and described as non-limiting examples to enable others of ordinary skill in the art to understand these embodiments and other embodiments involving modifications suited to a particular implementation.
    
  Claims (25)
1. An apparatus, comprising:
    a rack formed with tubular metal, the rack including a first upper hook and a first lower hook, wherein the first upper hook is vertically aligned with the first lower hook, and wherein the first upper hook opens upward and the first lower hook opens downward; and
two or more permanent magnets positioned to simultaneously magnetically engage a side surface of a cylindrical gas tank and magnetically secure the rack to the side surface of the cylindrical gas tank, wherein the rack includes at least two vertical sections of the tubular metal that are laterally spaced apart to receive an arc of the cylindrical gas tank between the at least two vertical sections, and wherein, for each of the at least two vertical sections, one or more of the permanent magnets are received in a hollow space within the tubular metal that forms the vertical section.
2. The apparatus of claim 1 , wherein the first upper hook and the first lower hook are disposed for winding a hose about the first upper hook and the first lower hook in a side-to-side configuration.
    3. The apparatus of claim 1 , wherein the rack includes a second upper hook and a second lower hook, wherein the second upper hook is vertically aligned with the second lower hook, and wherein the second upper hook opens upward and the second lower hook opens downward.
    4. The apparatus of claim 3 , wherein the first upper hook and the first lower hook extend in a first lateral direction, and wherein the second upper hook and the second lower hook extend in a second lateral direction generally opposite of the first lateral direction.
    5. The apparatus of claim 4 , wherein the first upper hook and the first lower hook are disposed for winding a first hose about the first upper hook and the first lower hook in a front-to-back configuration, and wherein the second upper hook and the second lower hook are disposed for winding a second hose about the second upper hook and the second lower hook in a front-to-back configuration.
    6. The apparatus of claim 1 , wherein the first upper hook is a loop hook, and wherein the first lower hook is a loop hook.
    7. The apparatus of claim 1 , wherein, for each of the at least two vertical sections, the permanent magnets received within the tubular metal are retained in the vertical section of the tubular metal by bends in the tubular metal at both ends of the vertical section.
    8. The apparatus of claim 7 , wherein the tubular metal has a nominal pipe size of 0.5 inch, and wherein bends in the tubular metal have a radius between about 1 and about 2 inches.
    9. The apparatus of claim 1 , wherein the rack further includes a handle that is accessible along the top of the rack and is substantially centered front-to-back and side-to-side of the rack.
    10. The apparatus of claim 9 , wherein the rack further includes a pair of vertical hand holds that are accessible along the front of the rack.
    11. An apparatus, comprising:
    a rack formed with tubular metal, the rack including a first upper hook and a first lower hook, wherein the first upper hook is vertically aligned with the first lower hook, and wherein the first upper hook opens upward and the first lower hook opens downward; and
two or more permanent magnets physically secured to the rack, wherein the permanent magnets are positioned to simultaneously magnetically engage a side surface of a cylindrical gas tank and magnetically secure the rack to the side surface of the cylindrical gas tank, wherein the rack includes upper and lower sets of vertical sections of the tubular metal, wherein each set of vertical sections includes first and second vertical sections that are laterally spaced apart to receive an arc of the cylindrical gas tank between the first and second vertical sections.
12. The apparatus of claim 11 , wherein the first and second vertical sections of the upper set of vertical sections each include one or more of the permanent magnets.
    13. The apparatus of claim 12 , wherein the first and second vertical sections of the lower set of vertical sections each include one or more of the permanent magnets.
    14. The apparatus of claim 11 , wherein the upper set of vertical sections of the tubular metal are formed by the first upper hook, and wherein the lower set of set of vertical sections of the tubular metal are formed by the first lower hook.
    15. The apparatus of claim 1 , wherein the two or more permanent magnets include first and second upper permanent magnets that are laterally spaced apart and first and second lower permanent magnets that are laterally spaced apart, wherein the first upper permanent magnet is vertically aligned with the first lower permanent magnet, and wherein the second upper permanent magnet is vertically aligned with the second lower permanent magnet.
    16. The apparatus of claim 15 , wherein the first and second upper permanent magnets and the first and second lower permanent magnets may simultaneously magnetically engage the exterior surface of cylindrical gas tanks having a diameter from about 5 inches to about 9 inches.
    17. An apparatus, comprising:
    a rack formed with tubular metal, the rack including a first upper hook and a first lower hook, wherein the first upper hook is vertically aligned with the first lower hook, and wherein the first upper hook opens upward and the first lower hook opens downward;
two or more permanent magnets physically secured to the rack, wherein the permanent magnets are positioned to simultaneously magnetically engage a side surface of a cylindrical gas tank and magnetically secure the rack to the side surface of the cylindrical gas tank;
one or more horizontal sections of the tubular metal that forms the rack; and
a plurality of feet secured to the one or more horizontal sections of the tubular metal.
18. The apparatus of claim 1 , wherein the rack further includes an intermediate frame formed with the tubular metal.
    19. The apparatus of claim 18 , wherein the first upper hook is coupled to an upper end of an intermediate frame in an upward orientation, and wherein the first lower hook is coupled to a lower end of the intermediate frame in a downward orientation.
    20. The apparatus of claim 19 , wherein the first upper hook and the first lower hook have the same configuration.
    21. The apparatus of claim 19 , wherein the first upper hook is formed as a continuous loop of the tubular metal having multiple bends, the first lower hook is formed as a continuous loop of the tubular metal having multiple bends and the intermediate frame is formed as a continuous loop of the tubular metal having multiple bends.
    22. The apparatus of claim 1 , further comprising:
    a threaded connector secured to a front of the rack, wherein the threaded connector includes a blind hole having internal screw threads for threadably receiving a gas flow meter.
23. The apparatus of claim 1 , wherein the rack includes upper and lower sets of vertical sections of the tubular metal, wherein each set of vertical sections includes first and second vertical sections that are laterally spaced apart to receive an arc of the cylindrical gas tank between the first and second vertical sections.
    24. The apparatus of claim 23 , wherein the first and second vertical sections of the upper set of vertical sections each include one or more of the permanent magnets received in a hollow space within the tubular metal that forms the vertical section, and wherein the first and second vertical sections of the lower set of vertical sections each include one or more of the permanent magnets received in a hollow space within the tubular metal that forms the vertical section.
    25. The apparatus of claim 1 , further comprising:
    one or more horizontal sections of the tubular metal that forms the rack; and
a plurality of feet secured to the one or more horizontal sections of the tubular metal.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title | 
|---|---|---|---|
| US17/462,778 US11486547B1 (en) | 2021-08-31 | 2021-08-31 | Magnetic hanger for welding equipment | 
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title | 
|---|---|---|---|
| US17/462,778 US11486547B1 (en) | 2021-08-31 | 2021-08-31 | Magnetic hanger for welding equipment | 
Publications (1)
| Publication Number | Publication Date | 
|---|---|
| US11486547B1 true US11486547B1 (en) | 2022-11-01 | 
Family
ID=83809592
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date | 
|---|---|---|---|
| US17/462,778 Active US11486547B1 (en) | 2021-08-31 | 2021-08-31 | Magnetic hanger for welding equipment | 
Country Status (1)
| Country | Link | 
|---|---|
| US (1) | US11486547B1 (en) | 
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title | 
|---|---|---|---|---|
| US20240253862A1 (en) * | 2017-07-31 | 2024-08-01 | Milwaukee Electric Tool Corporation | Storage Device System | 
| USD1053585S1 (en) * | 2023-05-16 | 2024-12-10 | Christian RUNIUS | Bottle rack for storage | 
| US12195229B2 (en) | 2018-01-24 | 2025-01-14 | Milwaukee Electric Tool Corporation | Tool storage | 
| US12409544B2 (en) | 2019-09-23 | 2025-09-09 | Keter Home And Garden Products Ltd | Sawhorse | 
Citations (13)
| Publication number | Priority date | Publication date | Assignee | Title | 
|---|---|---|---|---|
| US2313944A (en) * | 1940-12-16 | 1943-03-16 | Barnett A Keener | Portable welding unit | 
| US3128022A (en) * | 1961-03-01 | 1964-04-07 | Jr Conrad D Mastrud | Carrier for electric tools | 
| US3701463A (en) * | 1970-12-22 | 1972-10-31 | Goss Gas Inc | Holding and carrying rack for miniature oxygen and fuel gas tanks | 
| US4290529A (en) * | 1978-12-26 | 1981-09-22 | John H. Jones | Rack for boat fenders | 
| US4294481A (en) * | 1980-06-26 | 1981-10-13 | Uniweld Products, Incorporated | Gas cylinder carrier | 
| US4486044A (en) * | 1982-08-06 | 1984-12-04 | Tank-Tote Co. | Apparatus for supporting and transporting a gas cylinder | 
| US4773348A (en) * | 1986-10-01 | 1988-09-27 | Rowley William W | Boat fender holder | 
| US5340136A (en) * | 1992-09-04 | 1994-08-23 | Canadian Liquid Air Ltd. | Cylinder cart with magnetics | 
| US6056255A (en) * | 1998-05-14 | 2000-05-02 | Meade; Alta G. | Hanging torch stand | 
| US8647043B2 (en) * | 2009-04-17 | 2014-02-11 | Olav Lauvdal | Hand truck | 
| US9333596B2 (en) * | 2013-03-12 | 2016-05-10 | Workshops for Warriors | Welding support system | 
| US20180079438A1 (en) * | 2016-09-22 | 2018-03-22 | Air Systems, Inc. D.B.A. Air Systems International, Inc. | Air cylinder cart with manifold for supplying one or two control panels | 
| DE102017008813A1 (en) * | 2017-09-20 | 2019-03-21 | BBA Müller GmbH | Hand truck with several axles, especially for transporting gas cylinders made of steel | 
- 
        2021
        
- 2021-08-31 US US17/462,778 patent/US11486547B1/en active Active
 
 
Patent Citations (14)
| Publication number | Priority date | Publication date | Assignee | Title | 
|---|---|---|---|---|
| US2313944A (en) * | 1940-12-16 | 1943-03-16 | Barnett A Keener | Portable welding unit | 
| US3128022A (en) * | 1961-03-01 | 1964-04-07 | Jr Conrad D Mastrud | Carrier for electric tools | 
| US3701463A (en) * | 1970-12-22 | 1972-10-31 | Goss Gas Inc | Holding and carrying rack for miniature oxygen and fuel gas tanks | 
| US4290529A (en) * | 1978-12-26 | 1981-09-22 | John H. Jones | Rack for boat fenders | 
| US4294481A (en) * | 1980-06-26 | 1981-10-13 | Uniweld Products, Incorporated | Gas cylinder carrier | 
| US4486044A (en) * | 1982-08-06 | 1984-12-04 | Tank-Tote Co. | Apparatus for supporting and transporting a gas cylinder | 
| US4773348A (en) * | 1986-10-01 | 1988-09-27 | Rowley William W | Boat fender holder | 
| US5340136A (en) * | 1992-09-04 | 1994-08-23 | Canadian Liquid Air Ltd. | Cylinder cart with magnetics | 
| US6056255A (en) * | 1998-05-14 | 2000-05-02 | Meade; Alta G. | Hanging torch stand | 
| US8647043B2 (en) * | 2009-04-17 | 2014-02-11 | Olav Lauvdal | Hand truck | 
| US9333596B2 (en) * | 2013-03-12 | 2016-05-10 | Workshops for Warriors | Welding support system | 
| US20180079438A1 (en) * | 2016-09-22 | 2018-03-22 | Air Systems, Inc. D.B.A. Air Systems International, Inc. | Air cylinder cart with manifold for supplying one or two control panels | 
| US10053124B2 (en) * | 2016-09-22 | 2018-08-21 | Air Systems, Inc. | Air cylinder cart with manifold for supplying one or two control panels | 
| DE102017008813A1 (en) * | 2017-09-20 | 2019-03-21 | BBA Müller GmbH | Hand truck with several axles, especially for transporting gas cylinders made of steel | 
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title | 
|---|---|---|---|---|
| US20240253862A1 (en) * | 2017-07-31 | 2024-08-01 | Milwaukee Electric Tool Corporation | Storage Device System | 
| US12187491B2 (en) * | 2017-07-31 | 2025-01-07 | Milwaukee Electric Tool Corporation | Storage device system | 
| US12195229B2 (en) | 2018-01-24 | 2025-01-14 | Milwaukee Electric Tool Corporation | Tool storage | 
| US12286267B2 (en) | 2018-01-24 | 2025-04-29 | Milwaukee Electric Tool Corporation | Tool storage | 
| US12409544B2 (en) | 2019-09-23 | 2025-09-09 | Keter Home And Garden Products Ltd | Sawhorse | 
| USD1053585S1 (en) * | 2023-05-16 | 2024-12-10 | Christian RUNIUS | Bottle rack for storage | 
Similar Documents
| Publication | Publication Date | Title | 
|---|---|---|
| US11486547B1 (en) | Magnetic hanger for welding equipment | |
| US12116032B2 (en) | Welding cart with cable management system | |
| US9937579B2 (en) | Integrated cable management for welding and cutting systems | |
| EP1088619B1 (en) | Support for mounting a tool on a pipe | |
| US9919373B2 (en) | Soldering wire dispenser apparatus | |
| US10933692B1 (en) | Wheel righting apparatus | |
| CN102427910B (en) | Device for protecting the housing of a welding component | |
| EP2969382B1 (en) | Welding support system | |
| WO1998051196A1 (en) | Portable welding equipment storage rack | |
| MX2014009725A (en) | Wire handling facilitator. | |
| JP2005239348A (en) | Cable reel | |
| US4345789A (en) | Carrying device for cylindrical tanks | |
| AU2019203339B2 (en) | Removable welding wire spool arrangement for welding applications | |
| JP5248015B2 (en) | Storage device and manufacturing method thereof | |
| US6651751B2 (en) | Device for attaching fire extinguisher to a welding tank | |
| US20100308182A1 (en) | Systems and methods of deploying and securing temporary wires and extension cords | |
| JP3141012U (en) | Indicator for transporting long objects | |
| US20070080274A1 (en) | Equipment holder for use on scaffolding | |
| US9333595B2 (en) | Tool holder | |
| JP3248020U (en) | Welding machine trolley | |
| CN106002064A (en) | Fixing structure for welding | |
| RU173886U1 (en) | WELDING TORCH FOR ARG ARC WELDING WITH BUILT-IN AUTOMATIC FEED WIRE FEEDING | |
| US6334595B1 (en) | Device for supporting a hand-held tool | |
| US20120074185A1 (en) | Hose and cord buddy | |
| CN210429466U (en) | Dry-type transformer convenient to transportation | 
Legal Events
| Date | Code | Title | Description | 
|---|---|---|---|
| FEPP | Fee payment procedure | 
             Free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: MICROENTITY  | 
        |
| FEPP | Fee payment procedure | 
             Free format text: ENTITY STATUS SET TO MICRO (ORIGINAL EVENT CODE: MICR); ENTITY STATUS OF PATENT OWNER: MICROENTITY  | 
        |
| STCF | Information on status: patent grant | 
             Free format text: PATENTED CASE  |