US11309816B2 - Wind turbine with overload-capable converter system - Google Patents
Wind turbine with overload-capable converter system Download PDFInfo
- Publication number
- US11309816B2 US11309816B2 US16/610,421 US201816610421A US11309816B2 US 11309816 B2 US11309816 B2 US 11309816B2 US 201816610421 A US201816610421 A US 201816610421A US 11309816 B2 US11309816 B2 US 11309816B2
- Authority
- US
- United States
- Prior art keywords
- converter system
- overload
- operating mode
- maximum
- switching frequency
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 claims abstract description 46
- 238000005259 measurement Methods 0.000 claims description 34
- 230000036316 preload Effects 0.000 claims description 16
- 230000015556 catabolic process Effects 0.000 claims description 13
- 238000006731 degradation reaction Methods 0.000 claims description 13
- 230000008859 change Effects 0.000 claims description 10
- 238000009529 body temperature measurement Methods 0.000 claims description 8
- 239000004065 semiconductor Substances 0.000 claims description 4
- 239000000463 material Substances 0.000 claims description 3
- 238000013021 overheating Methods 0.000 description 7
- 230000006399 behavior Effects 0.000 description 5
- 230000000694 effects Effects 0.000 description 4
- 230000008569 process Effects 0.000 description 4
- 238000004590 computer program Methods 0.000 description 3
- 230000032683 aging Effects 0.000 description 2
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 230000018109 developmental process Effects 0.000 description 2
- 238000010438 heat treatment Methods 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- HBMJWWWQQXIZIP-UHFFFAOYSA-N silicon carbide Chemical compound [Si+]#[C-] HBMJWWWQQXIZIP-UHFFFAOYSA-N 0.000 description 2
- 229910010271 silicon carbide Inorganic materials 0.000 description 2
- 230000003685 thermal hair damage Effects 0.000 description 2
- 230000001052 transient effect Effects 0.000 description 2
- 230000003679 aging effect Effects 0.000 description 1
- 230000003466 anti-cipated effect Effects 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 229910052710 silicon Inorganic materials 0.000 description 1
- 239000010703 silicon Substances 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02M—APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
- H02M1/00—Details of apparatus for conversion
- H02M1/32—Means for protecting converters other than automatic disconnection
- H02M1/325—Means for protecting converters other than automatic disconnection with means for allowing continuous operation despite a fault, i.e. fault tolerant converters
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02M—APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
- H02M1/00—Details of apparatus for conversion
- H02M1/32—Means for protecting converters other than automatic disconnection
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D17/00—Monitoring or testing of wind motors, e.g. diagnostics
- F03D17/009—Monitoring or testing of wind motors, e.g. diagnostics characterised by the purpose
- F03D17/021—Monitoring or testing of wind motors, e.g. diagnostics characterised by the purpose for monitoring power or current
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D9/00—Adaptations of wind motors for special use; Combinations of wind motors with apparatus driven thereby; Wind motors specially adapted for installation in particular locations
- F03D9/20—Wind motors characterised by the driven apparatus
- F03D9/25—Wind motors characterised by the driven apparatus the apparatus being an electrical generator
- F03D9/255—Wind motors characterised by the driven apparatus the apparatus being an electrical generator connected to electrical distribution networks; Arrangements therefor
- F03D9/257—Wind motors characterised by the driven apparatus the apparatus being an electrical generator connected to electrical distribution networks; Arrangements therefor the wind motor being part of a wind farm
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02P—CONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
- H02P9/00—Arrangements for controlling electric generators for the purpose of obtaining a desired output
- H02P9/006—Means for protecting the generator by using control
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02P—CONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
- H02P9/00—Arrangements for controlling electric generators for the purpose of obtaining a desired output
- H02P9/10—Control effected upon generator excitation circuit to reduce harmful effects of overloads or transients, e.g. sudden application of load, sudden removal of load, sudden change of load
- H02P9/107—Control effected upon generator excitation circuit to reduce harmful effects of overloads or transients, e.g. sudden application of load, sudden removal of load, sudden change of load for limiting effects of overloads
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2270/00—Control
- F05B2270/30—Control parameters, e.g. input parameters
- F05B2270/332—Maximum loads or fatigue criteria
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
- H02J2300/28—The renewable source being wind energy
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02P—CONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
- H02P2101/00—Special adaptation of control arrangements for generators
- H02P2101/15—Special adaptation of control arrangements for generators for wind-driven turbines
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/76—Power conversion electric or electronic aspects
Definitions
- the present invention relates to a method for operating a converter system of a wind turbine.
- the present invention also relates to a wind turbine having a converter system.
- the present invention also relates to a wind farm.
- grid operators establish rules of how decentralized producers are supposed to dynamically react to particular grid events such as grid faults or overloads/underloads.
- the situation may also arise in which a decentralized producer such as a wind turbine must also briefly feed in an increased current, in particular in an overload situation such as in the case of a short circuit in the electrical supply grid.
- Overload situations may likewise be produced by transient load connections in the electrical supply grid or by connecting transformers (transformer inrush) in the electrical supply grid which can likewise affect the decentralized energy producers.
- the decentralized energy producers may be able to be increasingly used to feed in power even when there is an overload situation in the electrical supply grid and for these energy producers not to be immediately limited for their own protection or for these energy producers not to have to be decoupled from the grid in an overload situation.
- converter systems are usually only prepared to be able to feed in a stipulated maximum power—provided with a safety margin, usually the nominal power, during continuous operation since otherwise there is the risk of overheating in components of the converter system if additional power is intended to be fed in with the converter system.
- German Patent and Trademark Office carried out a search in respect of the following prior art in the priority application for the present application: DE 10 2006 027 465 A1; DE 10 2008 003 299 A1; US 2013/0026841 A1; WO 2010/079235 A2 and CN 104 578 821 A.
- the wind turbine comprises the converter system for this purpose.
- the converter system may comprise, for example, one or more inverters which generate an electrical alternating current and feed it into the electrical supply grid. Situations may also occur in which, at least in the short term, the converter system takes power from the electrical supply grid, with the result that the exchange of electrical power with the electrical supply grid is generally referred to.
- the inverter is therefore configured to be able to provide or output an inverter current, in particular a multiphase alternating current, at its inverter output.
- the electrical power generated from the wind in the form of the inverter current can therefore be fed into the electrical supply grid at the grid connection point which is also generally referred to as the PCC (Point of Common Coupling).
- the converter system is therefore operated in a normal operating mode.
- the inverter generates an electrical alternating current from the power generated by the generator or a part of said power in order to feed this alternating current into the electrical supply grid.
- the electrical inverter preferably has a three-phase design and has at least one upper switch and one lower switch for each of the three phases for the purpose of generating the electrical inverter current.
- the switches of the inverter may be controlled in this case, for example, using a tolerance band method or a pulse width modulation method in order to generate the inverter current and to provide it at the inverter output.
- the converter system can be permanently operated in the normal operating mode without thermal overheating occurring in a component of the converter system.
- the normal operating mode can also be understood as nominal operation at a nominal operating point.
- an overload situation affecting the converter system is then captured.
- the situation therefore changes.
- the converter system is first of all still in the normal operating mode and captures or monitors stipulated measurement or signal variables or inputs which are described in yet more detail later.
- an overload situation can be identified or detected on the basis of stipulated limit values or other predetermined criteria which are generally continuously captured during operation of the converter system.
- overload situations may arise for various reasons, universal criteria from the point of view of the converter must therefore be stipulated in order to be able to detect overload situations, and/or it is possible to deliberately check for different criteria in order to be able to capture different overload situations.
- examples of an overload situation are a brief current increase on account of a transformer being connected (inrush effect), a severe voltage fluctuation in the grid as a result of a transient load connection and/or load disconnection.
- a grid operator can also request that the converter be changed over to the overload mode if an increased power is intended to be briefly provided, for example, by the converter system in the event of a fault such as a short circuit in the grid.
- the converter system changes over to the overload operating mode in a further step.
- the converter system is therefore configured for operation under overload.
- overcurrents which should normally be avoided and are, for example, up to 10% or more above a nominal current of the inverter system are now allowed.
- an average switching frequency for generating an output current is reduced.
- a converter shapes a current or a voltage by means of switching actions of circuit breakers, where the switching actions have an average switching frequency. This average switching frequency is reduced for the overload operating mode.
- a higher load on the converter system in particular an increased temperature and/or an increased output current, in the overload operating mode of the converter system for a predetermined maximum overload period. It has been recognized that such an increased load can be tolerated and the affected components are not damaged if this increased load is allowed only for a short period.
- a value of up to 30 seconds, preferably up to 10 seconds and, in particular, up to 5 seconds is preferably suggested as the maximum overload period.
- An overtemperature can therefore be allowed for a short period at a power transistor, in particular.
- the overtemperature describes a temperature at which degradation effects, that is to say aging effects, already occur or can occur in the transistor.
- An increased temperature limit is preferably predefined for allowing an increased temperature.
- An increased current upper limit for the output current is preferably predefined for limiting an increased output current.
- the frequency, the voltage and the output current are decisive for the total switching losses. If V ZK and I out are kept constant and the switching frequency is reduced, the switching losses also accordingly fall. Conversely, however, the reduced switching frequency also increases the so-called on-state losses, but the latter do not increase as greatly as the switching losses fall if the frequency is reduced. Accordingly, the power transistors are heated to a lesser extent with a reduced switching frequency if V ZK and I out are kept constant. An additional increased power or an increased output current can therefore be fed in by suitably selecting the switching frequency since the power transistors on average are switched less often and are therefore heated more slowly.
- the method according to the invention therefore makes it possible for the converter system to briefly feed in an overpower in an overload situation.
- the present converter system can be operated in an overload situation for longer than conventional converter systems and, as a result, can possibly briefly make an increased power available to the electrical supply grid.
- the average switching frequency is preferably reduced in the electrical converter system for a stipulated and maximum overload period.
- stipulated and maximum overload period In order to avoid the converter system being operated permanently in the overload operating mode in comparison with the normal operating mode, it is proposed to stipulate a maximum overload period, which is synonymous with the predetermined maximum overload period already mentioned.
- the maximum overload period may be stipulated on the basis of the thermal properties and also or alternatively on the basis of the thermal preload of the converter system.
- the practice of taking components of the converter system as a basis for this also comes into consideration, in particular the semiconductor switches used to shape the current or the voltage.
- the thermal properties relate, in particular, to thermal material properties, for example, the maximum thermal capacity or the maximum operating temperature of the relevant component. This may be, for example, the maximum junction temperature T j of the power transistor.
- the thermal conductivity and a thermal resistance also come into consideration. In this case, the thermal properties determine how long the converter system can be operated in the overload operating mode.
- an i 2 -t value which can synonymously also be referred to as a limit load integral can be considered. It predefines a limit for the load and this limit is composed of the overcurrent i and the period t for which this overcurrent occurs.
- the limit predefined in this manner is complied with if the square of the overcurrent i, integrated over the period, does not exceed the predefined value. If the overcurrent doubles, for example, it can be allowed only for a quarter of the period.
- the maximum period can likewise also be calculated from a known or expected overcurrent. If a maximum period for which an overcurrent can occur is known, the maximum current level can be calculated.
- a thermal preload of the converter system may be the instantaneous temperature at the time at which an overload situation occurs. Consequently, a converter system with a lower temperature at the time at which an overload situation was captured can be operated in the overload operating mode for longer than a warmer converter system with a higher temperature. This is because it was recognized that a cooler converter system can still absorb more heat in the form of energy, in its thermal capacity, than if it already has a high temperature, that is to say has already stored a lot of heat.
- the converter system therefore takes into account the thermal properties and the thermal preload of components in the converter system and therefore makes it possible to be able to use the thermal capacities in an overload situation as effectively as possible and to the maximum possible extent.
- components of the converter system may also be all components in the converter system which can heat up and can overheat. These include components such as inductors, switches, power supply units, heat sinks, coils and rectifiers, to name just a few examples.
- An overload situation is preferably captured by means of a current measurement, a temperature measurement or a voltage measurement.
- a combination of the measuring methods is likewise provided as a variant in this case.
- the current measurement is preferably carried out at the output of the converter system, in particular if this measured value is captured anyway for controlling the converter system, and an additional current measurement device can therefore be dispensed with.
- the temperature measurement is preferably carried out at a heat sink or directly at a live component of the converter, for example, directly at a power transistor.
- a heat sink is particularly readily accessible for measurement, whereas a measurement at a live component enables a measurement directly where overheating can also occur.
- An overload situation can likewise be determined by means of a voltage measurement which can be preferably carried out in an intermediate circuit of the converter system or directly in the electrical supply grid.
- a DC voltage measurement is consequently carried out in the case of a voltage measurement in an intermediate circuit of the converter system, in which case a voltage amplitude there, in particular, allows a conclusion to be drawn with respect to an overload situation.
- the frequency of the grid voltage can also be measured in addition to the amplitude of the grid voltage.
- a plurality of measurement and operating parameters are preferably respectively captured since an overload situation can affect a converter system in different ways.
- the thermal state of the converter system can generally also be assessed using the captured temperature.
- the exceeding of a stipulated limit temperature at a live component of the converter relates, in particular, to a temperature measurement at a component of the converter system.
- This temperature measurement is carried out, for example, using a suitable temperature sensor such as a PT100, and a measurement is carried out, in particular, at the components which heat up particularly quickly in an overload situation.
- a suitable temperature measuring point would therefore be on a heat sink of a power transistor, for example.
- the exceeding of a stipulated limit current at the output of the converter system preferably relates to the above-mentioned current measurement which can be carried out at the output of the converter system.
- a further criterion for capturing an overload situation is to operate the converter system within a defined voltage range in the normal operating mode and to stipulate an upper voltage limit and a lower voltage limit. If the instantaneous measured voltage leaves this stipulated voltage range, the converter system interprets this as an overload situation and changes over to the overload operating mode.
- the voltage ranges can be stipulated both for the intermediate circuit of the converter system and for an amplitude measurement of the grid voltage.
- another possible criterion is a stipulated frequency range of the voltage in the electrical supply grid, wherein an overload situation is also detected here if the instantaneous measured frequency value of the grid voltage leaves the stipulated frequency range, wherein the converter is operated again within this frequency range in the normal operating mode.
- a frequency measurement can also anticipate an overload situation if it captures a frequency behavior which triggers a behavior of the converter which in turn results in an overload situation.
- Another criterion for detecting an overload situation may be a request to output a higher power.
- this request can be transmitted to the converter system by means of an external signal.
- an overload situation need not necessarily be determined by metrology in the converter system, but rather the situation may also occur in which a grid operator requests that an increased power output be provided on account of a grid fault even though the inverter is already being operated at an upper limit of normal operating mode and therefore already outputs the maximum power output during continuous operation.
- the external signal can be predefined by any desired controller structure or manually from an operation center if, for example, an overload situation is expected but has not yet occurred.
- Thermal reserves for example, in the form of higher temperature limits, can therefore be enabled even though an overload situation has not yet occurred under certain circumstances.
- a current limitation is preferably carried out if a maximum overload period or a predefined i 2 t value or a predefined maximum value for a limit load integral is reached.
- the overload operating mode is not intended to be permanently present since otherwise thermal damage and severe degradation phenomena can occur.
- it is therefore proposed to carry out a current limitation of the converter system if a maximum overload period is reached, wherein the current limitation is stipulated, in particular, in such a manner that the live components of the converter system which have heated up no longer heat up any further or even cool down again.
- the converter system has a current limitation which is switched on only if a particular absolutely stipulated temperature limit value, which is above a relative temperature limit value in the normal operating mode, is reached.
- the converter system can therefore advantageously exhaust the thermal capacities of the components as far as possible, but prevent complete overheating.
- Another embodiment of the method proposes the practice of changing back into the normal operating mode again if the overload situation is no longer captured or detected.
- the converter system therefore makes it possible to automatically switch back to the normal operating mode and continuous operation. As a result, a state in which current which has greater distortion is fed in is kept as short as possible in terms of time, in particular.
- the maximum overload period which can also be referred to as an overload operating period, that is to say the time in which the converter system is allowed to be in an overload operating mode, is determined on the basis of the thermal preload of the converter system.
- the operating temperature which is present in a component of the converter system at the time of the captured overload situation can be used as the thermal preload.
- the maximum overload period can likewise be determined on the basis of a percentage output current value with respect to a nominal output current of the converter system. Therefore, a converter system which was operated at 25% of the nominal power during continuous operation for example, can be operated in an overload operating mode for longer than a converter system which was previously operated at 90% of the output current nominal value, for example.
- the converter system can therefore determine the thermal preload not only on the basis of a temperature measurement but also on the basis of the knowledge of the current nominal value which has been previously fed in.
- the maximum overload period can be determined on the basis thereof.
- the converter system is preferably operated with an increased power output at a reduced switching frequency in the overload operating mode in order to enable a briefly increased power output in an overload situation.
- the converter system is preferably prepared to change over to the overload operating mode at any time independently or on the request of a grid operator.
- overloads In addition to the severe overloads which occur relatively rarely and usually do not occur for longer than 10 ms, there may also be overloads, in the case of which less power must be directly provided. Overloads which last for a longer time may be present in this case for approximately 10 ms to 30 s.
- One variant therefore proposes allowing overloads for a period in the range of 10 ms to 30 s. Therefore, the proposed method primarily describes instantaneous reserve control in order to be able to react to grit faults and overload situations.
- One embodiment therefore proposes the practice of leaving the power output unchanged but nevertheless reducing the switching frequency. This makes it possible to relieve the load on the converter. This may also address a situation in which the output current rises even though the power output does not rise. Such a current rise can occur as a result of an inrush current, for example.
- the converter system is operated in such a manner that switching losses in the converter system are reduced as a result of the reduced switching frequency and a less ideal sinusoidal output current than in the normal operating mode is generated by the converter system in order to reduce switching losses and to protect the converter system from overheating.
- the converter system preferably has a first parameter set and a second parameter set which comprise the limit temperatures of the components of the converter system during normal operation and in the overload operating mode.
- the maximum limit temperatures in the overload operating mode are above relative temperature limits of the normal operating mode.
- other operating parameters which are predefined to the converter system in the overload operating mode, such as the average desired switching frequency value to be set and/or the desired power output value, can also be stored in the parameter set.
- desired values for a control method such as an increased desired current value in the case of overload feeding or desired values adapted in another manner for the converter system, such as a changed desired switching frequency value.
- desired values specifically adapted to the overload operating mode for a tolerance band method or a pulse width modulation method can also be stored in the parameter set of the overload operating mode.
- the maximum limit temperatures in the overload operating mode are greater than the maximum limit temperatures in the normal operating mode
- the average desired switching frequency value in the overload operating mode is less than the average desired switching frequency value in the normal operating mode
- the first desired power output value is greater than or equal to the second desired power output value
- Uncontrolled transition behaviors are also avoided, in particular, as a result of the proposed changing over from the first parameter set to the second parameter set that operation in the overload mode is implemented in a simple manner.
- the temperature limits during normal operation may be relative temperature limits which can be exceeded for a short time, but can already result in degradation phenomena in the components of the converter system.
- the temperature limits in the overload operating mode should be understood as meaning, in particular, absolute limits which must not be exceeded in any component of the converter system since otherwise local thermal damage can be produced in the converter system. It is pointed out as a precaution that, when determining the temperature limits in the overload operating mode in an expert manner, there is a safety margin with respect to a temperature limit at which a component of the converter system would be thermally destroyed.
- the inverter can be briefly operated in the overload operating mode above a relative temperature limit based on normal operation, in which case this operating mode should be present only briefly.
- the proposed converter system or the converter system with the proposed method therefore has a larger usable operating range and briefly enables a power output above 100% of the output power based on the maximum output power during continuous operation of nominal operation.
- the time in which the converter system is in the overload operating mode is preferably recorded.
- an overtemperature value describes a temperature value of any desired component of the converter system which exceeds a limit temperature.
- the temperature value for example, is integrated over time as soon as the relative temperature limit of the normal operating mode is exceeded.
- the integration is carried out until the temperature of the converter system falls below the relative limit temperature of the normal operating mode again.
- the temperature value above the relative limit value in the normal operating mode is therefore also referred to as an overtemperature value.
- the converter system is preferably operated during overload operation with a frequency or switching frequency which is reduced by 50%, preferably by 75%, in particular by 90%, in comparison with the normal operating mode.
- a significant reduction in the switching frequency is therefore proposed in order to thereby significantly reduce the switching losses during overload operation, with the result that at least a higher current can be accordingly fed in with the same heat development.
- the current and voltage measurement in the converter system or in the electrical supply grid preferably also comprises a frequency and amplitude measurement of the measured current and of the measured voltage. It is therefore possible to capture the corresponding measurement variables for embodiments described above.
- the converter system is therefore configured to perform an overload situation on the basis of a frequency or amplitude measurement of the measured current or of the voltage since overload situations or grid events can be detected or anticipated on the basis of a frequency or amplitude change.
- the frequency and amplitude measurement likewise includes being able to measure the change rates of the frequency and the amplitude of the current and the voltage in order to be able to predict a strong decrease in an occurring overload situation on the basis of the derivative or the gradient.
- a wind turbine for exchanging electrical power with an electrical supply grid at a grid connection point.
- the wind turbine comprises a converter system for generating an electrical current and/or an electrical voltage, wherein the converter system in this case may also have a plurality of converters or a plurality of converter cabinets. If the output power of a single converter does not suffice to feed in the power generated by the generator of the wind turbine, a plurality of converters or switchgear cabinets may also be connected in parallel with a converter.
- a control device for controlling the converter system is proposed as a further component of the wind turbine.
- the control device may be provided as a process computer or may be implemented on such a process computer. It is therefore proposed to implement the control device as hardware or as part of a computer program.
- the control unit is prepared to operate the converter system in an overload situation with a switching frequency which is reduced in comparison with normal operation.
- the control device can change a clock frequency or a tolerance bandwidth, for example.
- a measuring device for capturing an overload situation affecting the converter system.
- a measuring device can capture different measurement variables depending on the place of use.
- a first measuring device e.g., ammeter
- a second measuring device e.g., temperature sensor
- a voltage measurement e.g., by a voltmeter
- the measuring devices are used to capture measurement data or measured values, on the basis of which an overload situation is derived or detected.
- a plurality of measuring devices may also be used at the same time to capture measurement data or measured values so that an overload situation can also be redundantly captured, if necessary, if a measuring device fails, for example, or if a plurality of the criteria which were described at the outset and indicate a prevailing overload situation are satisfied.
- the changeover device which can change over between the normal operating mode and the overload operating mode, may also be provided on a process computer or may be implemented as part of a computer program.
- the changeover device may also be part of the control device.
- one embodiment proposes that the wind turbine, in particular the control device, is configured to perform a method according to one of the embodiments described above.
- the converter system preferably has temperature-resistant power transistors, wherein the power transistors consist, in particular, of modern semiconductor materials such as SiC, GaN or SiGE.
- the power transistors consist, in particular, of modern semiconductor materials such as SiC, GaN or SiGE.
- modern power transistors based on silicon carbide provide positive electrical properties with respect to the switching speed, the thermal conductivity and the critical field strength in comparison with conventional power transistors based on silicon.
- a converter system is therefore proposed, which converter system uses modern power transistors which are distinguished by better temperature resistance and therefore likewise constructively increase the ability of the converter system to be overload-capable.
- the wind turbine has a first parameter set and a second parameter set.
- the two parameter sets comprise operating parameters for operating the wind turbine in the normal operating mode and in the overload operating mode, for example, the maximum limit temperatures of the components of the converter system, the average switching frequency to be set for the respective operating mode and/or the desired power output value.
- the parameter sets may be stored in the control device of the wind turbine, that is to say—as described above—in a process computer or as part of a computer program. The changeover device can therefore change over between the stored parameter sets and therefore configures the wind turbine or the converter system for operation in the normal operating mode or in the overload operating mode.
- a wind farm having a plurality of wind turbines, which wind farm, according to another embodiment, has at least one wind turbine according to an embodiment described above.
- the wind farm preferably has only wind turbines of this type.
- the wind farm therefore likewise enables a normal operating mode and an overload operating mode, wherein an additional total power of all wind turbines can be temporarily fed into the electrical supply grid in an overload situation.
- the overload capability of the individual wind turbines may be different in a wind farm having different types of wind turbines.
- each wind turbine can provide only as much additional power in an overload situation as permitted by its converter system or as stipulated by the overload operating period described above.
- the wind farm can therefore also pass through the overload situation.
- FIG. 1 shows a schematic view of a wind turbine.
- FIG. 2 shows a schematic view of a wind farm.
- FIG. 3 schematically shows a first control-based changeover to an overload operating mode from a normal operating mode according to one embodiment if an overload situation has been captured.
- FIG. 4 schematically shows a second control-based changeover to an overload operating mode from a normal operating mode according to one embodiment if an overload situation has been captured.
- FIGS. 5A-5C schematically show the profile of the power output, the switching frequency and the temperature development in the converter system during a temporary overload situation.
- FIG. 1 shows a wind turbine 100 having a tower 102 and a nacelle 104 .
- a rotor 106 having three rotor blades 108 and a spinner 110 is arranged on the nacelle 104 .
- the rotor 106 is caused to rotate by the wind during operation and thereby drives a generator in the nacelle 104 .
- FIG. 2 shows a wind farm 112 having three wind turbines 100 , by way of example, which may be identical or different.
- the three wind turbines 100 are therefore representative of fundamentally any desired number of wind turbines in a wind farm 112 .
- the wind turbines 100 provide their power, namely the generated current in particular, via an electrical farm grid 114 .
- the respectively generated currents or powers from the individual wind turbines 100 are added and a transformer 116 is usually provided, which transformer steps up the voltage in the farm in order to then feed it into the supply grid 120 at the feed-in point 118 which is also generally referred to as the PCC.
- FIG. 2 is only a simplified illustration of a wind farm 112 which does not show any control, for example, even though control is naturally present.
- the farm grid 114 may also be different, for example, by virtue of a transformer also being present at the output of each wind turbine 100 , for example, to name just one other exemplary embodiment.
- FIG. 3 schematically shows a tolerance band method which can be used, for example, as a preferred control method in the converter system, in order to be able to control the power transistors in the converter system and to generate a stipulated output current.
- the output current I A generated by the converter system is plotted against the time t in FIG. 3 , wherein only a sine wave of a phase current of one phase is illustrated for the sake of a better illustration.
- the tolerance band method is based on the principle that an upper limit (OB) and a lower limit (UB), which run around an optimum sine, are stipulated for the output current I A of the converter system, wherein the optimum sine is predefined as the desired value I soll .
- OB upper limit
- UB lower limit
- the output current I IST usually measured at the output of the converter system runs only within the stipulated tolerance limits, which is also referred to as the tolerance band. If the measured output current I IST reaches either the upper limit or the lower limit of the tolerance band in this case, a changeover operation of the power transistors of the converter is carried out or a commutation operation to another current path is carried out by means of a changed switch position in the inverter.
- the upper limit OB 1 and the lower limit UB 1 are closer to the sinusoidal desired current value I soll than the upper limit OB 2 and lower limit UB 2 .
- the limits OB 2 and UB 2 are at a greater distance from the desired current value I soll .
- the power transistors in the converter system must switch more frequently in the first time period to the time t 1 than is the case in the second time period after t 1 . Therefore, the switching frequency of the power transistors is on average lower in the time period after t 1 .
- the normal operating mode is present until the time t 1 , that is to say none of the criteria which indicate an overload situation is satisfied or is detected by the converter system.
- At the time t 1 at least one of the criteria described above is now satisfied by way of example, with the result that a changeover to the overload operating mode is carried out by the converter system, in each case a new upper limit OB 2 and a new lower limit UB 2 are predefined in the tolerance band method.
- the average switching frequency f sw1 in the normal operating mode is greater than the frequency f sw2 in the overload operating mode and the power output from the converter system is approximately constant.
- control methods may also be provided, for example, a so-called pulse width modulation method.
- This control method is generally known to a person skilled in the art.
- a pulse width modulation method in order to generate a lower average frequency, the rise of a linearly rising or falling sawtooth or triangular signal is quite generally reduced.
- the sawtooth or triangular signal is processed together with a carrier signal in order to generate a PWM signal for controlling the power transistors. Therefore, the average switching frequency falls in such a pulse width modulation method if the frequency or the rise of the sawtooth or triangular signal is reduced.
- the further exemplary embodiment shown in FIG. 4 shows how a higher load on the converter system can be allowed.
- the two tolerance band limits OB 2 and UB 2 are increased and a new desired output current value I soll,2 in the overload operating mode is predefined.
- the new values for OB 2 , UB 2 and I soll,2 can be included in the parameter set for the overload operating mode.
- the distance of the tolerance band limits OB 1 to UB 1 and OB 2 to UB 2 remains unchanged in the overload operating mode, with the result that the average switching frequency f sw1 in the normal operating mode corresponds to the average switching frequency f sw2 in the overload operating mode.
- the converter system therefore generates a higher output current I overload in the overload operating mode.
- this current is allowed only for a predetermined maximum overload period. Additionally or alternatively, higher temperature limits are also allowed for the converter system in the overload operating mode for a short time period. This is not illustrated in FIG. 4 .
- the converter system can be operated in the overload operating mode if a higher power requirement is expected or if an external signal requests this.
- An increased desired power output value can therefore be briefly predefined or set. If an increased power is not required, it is also possible to allow at least one increased temperature limit in the overload operating mode without reducing the average switching frequency. It has been recognized that such an excessive power increase can be allowed if it is brief.
- FIGS. 5A-5C illustrate the behavior of the converter system when an overload situation occurs at the time t 1 .
- FIG. 5A illustrates the power output behavior of the converter system in an overload situation based on a maximum nominal power P N,max which can be fed in by the converter system during continuous operation.
- a higher nominal power P can be fed into the electrical supply grid according to the proposed solution by reducing the frequency by 50% and by feeding at less ideal sinusoidal current into the supply grid.
- a frequency reduction of the average switching frequency f sw at the time t 1 is illustrated in FIG. 5B in the curve section OL 2 .
- the average switching frequency f sw can be kept constant, which is shown by the curve section OL 1 in FIG. 5B , and an increased power can nevertheless be fed in, which is illustrated by the curve section OL 1 in FIG. 5A .
- the curve section OL 2 in FIG. 5A illustrates only the unchanged profile of the power P as orientation.
- OL 1 The possibility of using the reduced switching frequency on account of the lower switching losses in order to be able to briefly output an increased power is indicated by OL 1 in FIG. 5A .
- an increased root mean square value of the output current for example, is generated by the converter system during overload operation in comparison with the normal operating mode. However, this results in the converter system or the live components of the converter system being thermally heated. This is illustrated in FIG. 5C .
- FIG. 5C illustrates an idealized temperature profile T M .
- the heating power output corresponds to the heating power generated in a component of the converter system and therefore there is a constant profile.
- the temperature T M is preferably determined at the component(s) at which overheating would form most quickly in an overload situation. If the output power is now increased at the time t 1 in an overload situation, more thermal energy is consequently generated, under the assumption mentioned, than can be output via the provided cooling sections or heat sinks. This results in a rise in the temperature of the components in the converter system after the overload situation occurs at the time t 1 .
- the temperature limit T 1,rel relates to the relative temperature limit in the normal operating mode
- the temperature limit T 2,max is the maximum temperature limit during overload operation
- the temperature T krit corresponds to a critical and absolute maximum temperature at which the component of the converter system is thermally destroyed. If the measured temperature value T M now exceeds the temperature limit T 1,rel , as a result of the increased power feed, aging phenomena (degradation) may already occur at or in the components of the converter system. The converter system is therefore at a desired overtemperature in the temperature range from T 1,rel to T 2,max .
- FIG. 5C indicates a temperature-time area A T which can be recorded and stored as an overload history in a suitable storage medium in order to be able to draw conclusions on the frequency of overloads and create a thermal load profile of the components.
- a square of an output current i A 2 can be integrated over time and the integral, that is to say the area below such an i A 2 curve over time, must then remain below a limit value.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Combustion & Propulsion (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Chemical & Material Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Inverter Devices (AREA)
- Control Of Eletrric Generators (AREA)
- Wind Motors (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
P sw =f sw·(E on(V ZK ,I out ,T j)+E off(V ZK ,I out ,T j)) Equation (1)
with
-
- VZK=Input voltage
PSW=Switching losses Eon=Switch-on losses (intermediate circuit voltage)
fsw=Switching
frequency Eoff=Switch-off losses Iout=Output current
Tj=Junction temperature
- VZK=Input voltage
-
- exceeding of a stipulated limit temperature value at a live component of the converter system;
- exceeding of a stipulated limit current at the output of the converter system;
- exceeding of a stipulated limit voltage in the converter system;
- exceeding of a stipulated voltage range in the electrical supply grid if the converter system is operated within the voltage range in the normal operating mode;
- exceeding of a stipulated frequency range of the voltage in the electrical supply grid if the converter system is operated within the frequency range in the normal operating mode;
- a request to output a higher power which is predefined by means of an external signal.
Claims (21)
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102017109728.7 | 2017-05-05 | ||
DE102017109728.7A DE102017109728A1 (en) | 2017-05-05 | 2017-05-05 | Wind energy plant with overloadable inverter system |
PCT/EP2018/061339 WO2018202772A1 (en) | 2017-05-05 | 2018-05-03 | Wind turbine with overload-capable converter system |
Publications (2)
Publication Number | Publication Date |
---|---|
US20200059178A1 US20200059178A1 (en) | 2020-02-20 |
US11309816B2 true US11309816B2 (en) | 2022-04-19 |
Family
ID=62116863
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US16/610,421 Active US11309816B2 (en) | 2017-05-05 | 2018-05-03 | Wind turbine with overload-capable converter system |
Country Status (11)
Country | Link |
---|---|
US (1) | US11309816B2 (en) |
EP (1) | EP3619802B1 (en) |
JP (1) | JP2020522215A (en) |
KR (1) | KR20200003891A (en) |
CN (1) | CN110603722B (en) |
BR (1) | BR112019023134A2 (en) |
CA (1) | CA3061836C (en) |
DE (1) | DE102017109728A1 (en) |
DK (1) | DK3619802T3 (en) |
RU (1) | RU2725184C1 (en) |
WO (1) | WO2018202772A1 (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018028753A1 (en) * | 2016-08-09 | 2018-02-15 | Mhi Vestas Offshore Wind A/S | Wind turbine control method and system |
DE102017112491A1 (en) * | 2017-06-07 | 2018-12-13 | Wobben Properties Gmbh | Method for operating a wind farm |
EP3692617A1 (en) * | 2017-10-06 | 2020-08-12 | Vestas Wind Systems A/S | Method for operating a wind power facility |
TWI713289B (en) * | 2019-07-05 | 2020-12-11 | 友達光電股份有限公司 | Load control system and load control method |
EP3890136A1 (en) * | 2020-03-30 | 2021-10-06 | Wobben Properties GmbH | Method for operating a converter, in particular a wind energy plant |
CN113357090B (en) * | 2021-06-28 | 2023-04-07 | 新疆金风科技股份有限公司 | Cabin assembly and wind generating set |
Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0549298A (en) | 1991-08-06 | 1993-02-26 | Matsushita Electric Ind Co Ltd | Control method for pwm inverter |
JPH066978A (en) | 1992-06-17 | 1994-01-14 | Meidensha Corp | Power converter |
US5345375A (en) | 1991-12-16 | 1994-09-06 | Regents Of The University Of Minnesota | System and method for reducing harmonic currents by current injection |
EP1107416A1 (en) | 1999-12-06 | 2001-06-13 | Schneider Electric Industries SA | Thermal protection relay |
US6452819B1 (en) | 1999-02-25 | 2002-09-17 | Alovs Wobben | Inverter without harmonics |
WO2005027301A1 (en) | 2003-09-16 | 2005-03-24 | General Electric Company | Method for operating a frequency converter of a generator |
JP2007020262A (en) | 2005-07-06 | 2007-01-25 | Toshiba Mitsubishi-Electric Industrial System Corp | Power converter |
DE102006027465A1 (en) | 2006-06-12 | 2007-12-13 | Woodward Seg Gmbh & Co. Kg | Current limit for a double-fed asynchronous machine |
DE102008003299A1 (en) | 2008-01-07 | 2009-07-09 | Woodward Seg Gmbh & Co. Kg | Method for operating a wind energy plant |
WO2010079235A2 (en) | 2009-01-12 | 2010-07-15 | Vestas Wind Systems A/S | Load dependent converter switching frequency |
JP2010178617A (en) | 2009-01-30 | 2010-08-12 | Power Integrations Inc | Controller for power supply, integrated circuit controller for power supply, and power supply |
JP2012029438A (en) | 2010-07-22 | 2012-02-09 | Toshiba Mitsubishi-Electric Industrial System Corp | Power conversion apparatus |
EP2530816A2 (en) | 2011-05-30 | 2012-12-05 | General Electric Company | System and method for converter switching frequency control |
US20130026841A1 (en) | 2010-03-23 | 2013-01-31 | Falah Hosini | Voltage Source Converter And A Method For Fault Handling Thereof |
JP2015012657A (en) | 2013-06-27 | 2015-01-19 | 三菱電機株式会社 | Power conversion device and power conversion method |
CN104578821A (en) | 2015-01-29 | 2015-04-29 | 深圳市禾望电气股份有限公司 | Method and device for adjusting switch frequency of wind power converter |
US20150138852A1 (en) * | 2012-08-03 | 2015-05-21 | Abb Technology Ag | Overload limitation in peak power operation |
CN105594113A (en) | 2013-09-30 | 2016-05-18 | 株式会社日立产机系统 | Power conversion device and control method |
RU2653361C1 (en) | 2017-07-10 | 2018-05-08 | Общество С Ограниченной Ответственностью "Форпик Стандарт Сервис" | Method of automatic discharge of the electric power system with parallely operating generator units |
-
2017
- 2017-05-05 DE DE102017109728.7A patent/DE102017109728A1/en not_active Withdrawn
-
2018
- 2018-05-03 CN CN201880029917.0A patent/CN110603722B/en active Active
- 2018-05-03 EP EP18722959.6A patent/EP3619802B1/en active Active
- 2018-05-03 JP JP2019560272A patent/JP2020522215A/en active Pending
- 2018-05-03 BR BR112019023134-0A patent/BR112019023134A2/en not_active Application Discontinuation
- 2018-05-03 WO PCT/EP2018/061339 patent/WO2018202772A1/en active Application Filing
- 2018-05-03 DK DK18722959.6T patent/DK3619802T3/en active
- 2018-05-03 CA CA3061836A patent/CA3061836C/en active Active
- 2018-05-03 US US16/610,421 patent/US11309816B2/en active Active
- 2018-05-03 RU RU2019139377A patent/RU2725184C1/en active
- 2018-05-03 KR KR1020197035924A patent/KR20200003891A/en not_active Application Discontinuation
Patent Citations (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0549298A (en) | 1991-08-06 | 1993-02-26 | Matsushita Electric Ind Co Ltd | Control method for pwm inverter |
US5345375A (en) | 1991-12-16 | 1994-09-06 | Regents Of The University Of Minnesota | System and method for reducing harmonic currents by current injection |
JPH07502160A (en) | 1991-12-16 | 1995-03-02 | リージェンツ オブ ザ ユニバーシティ オブ ミネソタ | 3-phase power supply voltage conversion |
JPH066978A (en) | 1992-06-17 | 1994-01-14 | Meidensha Corp | Power converter |
JP2002538752A (en) | 1999-02-25 | 2002-11-12 | アロイス・ヴォベン | Inverter that does not output harmonics |
US6452819B1 (en) | 1999-02-25 | 2002-09-17 | Alovs Wobben | Inverter without harmonics |
US6563685B2 (en) | 1999-12-06 | 2003-05-13 | Schneider Electric Industries Sa | Thermal protection relay |
EP1107416A1 (en) | 1999-12-06 | 2001-06-13 | Schneider Electric Industries SA | Thermal protection relay |
US7787266B2 (en) * | 2003-09-16 | 2010-08-31 | General Electric Company | Method for operating a frequency converter of a generator |
WO2005027301A1 (en) | 2003-09-16 | 2005-03-24 | General Electric Company | Method for operating a frequency converter of a generator |
CN100449904C (en) | 2003-09-16 | 2009-01-07 | 通用电气公司 | Method for operating frequence converter of a generator |
JP2007020262A (en) | 2005-07-06 | 2007-01-25 | Toshiba Mitsubishi-Electric Industrial System Corp | Power converter |
DE102006027465A1 (en) | 2006-06-12 | 2007-12-13 | Woodward Seg Gmbh & Co. Kg | Current limit for a double-fed asynchronous machine |
US8242753B2 (en) | 2006-06-12 | 2012-08-14 | Woodward Seg Gmbh & Co Kg | Current limitation for a double-fed asynchronous machine |
US8487461B2 (en) | 2008-01-07 | 2013-07-16 | Woodward Kempen | Method for operating a wind energy installation |
DE102008003299A1 (en) | 2008-01-07 | 2009-07-09 | Woodward Seg Gmbh & Co. Kg | Method for operating a wind energy plant |
WO2010079235A2 (en) | 2009-01-12 | 2010-07-15 | Vestas Wind Systems A/S | Load dependent converter switching frequency |
US8222882B2 (en) | 2009-01-30 | 2012-07-17 | Power Integrations, Inc. | Power supply controller with input voltage compensation for efficiency and maximum power output |
JP2010178617A (en) | 2009-01-30 | 2010-08-12 | Power Integrations Inc | Controller for power supply, integrated circuit controller for power supply, and power supply |
US20130026841A1 (en) | 2010-03-23 | 2013-01-31 | Falah Hosini | Voltage Source Converter And A Method For Fault Handling Thereof |
JP2012029438A (en) | 2010-07-22 | 2012-02-09 | Toshiba Mitsubishi-Electric Industrial System Corp | Power conversion apparatus |
EP2530816A2 (en) | 2011-05-30 | 2012-12-05 | General Electric Company | System and method for converter switching frequency control |
US20150138852A1 (en) * | 2012-08-03 | 2015-05-21 | Abb Technology Ag | Overload limitation in peak power operation |
CN104737430A (en) | 2012-08-03 | 2015-06-24 | Abb技术有限公司 | Overload limitation in peak power operation |
JP2015012657A (en) | 2013-06-27 | 2015-01-19 | 三菱電機株式会社 | Power conversion device and power conversion method |
CN105594113A (en) | 2013-09-30 | 2016-05-18 | 株式会社日立产机系统 | Power conversion device and control method |
CN104578821A (en) | 2015-01-29 | 2015-04-29 | 深圳市禾望电气股份有限公司 | Method and device for adjusting switch frequency of wind power converter |
RU2653361C1 (en) | 2017-07-10 | 2018-05-08 | Общество С Ограниченной Ответственностью "Форпик Стандарт Сервис" | Method of automatic discharge of the electric power system with parallely operating generator units |
Also Published As
Publication number | Publication date |
---|---|
DK3619802T3 (en) | 2021-09-06 |
BR112019023134A2 (en) | 2020-05-26 |
EP3619802B1 (en) | 2021-07-07 |
CA3061836C (en) | 2023-03-28 |
RU2725184C1 (en) | 2020-06-30 |
US20200059178A1 (en) | 2020-02-20 |
CN110603722A (en) | 2019-12-20 |
WO2018202772A1 (en) | 2018-11-08 |
KR20200003891A (en) | 2020-01-10 |
CN110603722B (en) | 2022-02-01 |
CA3061836A1 (en) | 2019-11-22 |
EP3619802A1 (en) | 2020-03-11 |
JP2020522215A (en) | 2020-07-27 |
DE102017109728A1 (en) | 2018-11-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11309816B2 (en) | Wind turbine with overload-capable converter system | |
US9812967B2 (en) | Inrush current limiting method based on buck+boost topology | |
US8817427B2 (en) | Current limitation system for limiting the effects of a fault in a DC grid and a method of operating a current limitation system | |
US9000734B2 (en) | Method and arrangement for operating a wind turbine converter | |
US8760218B2 (en) | System and method for operating an electric power converter | |
US11233400B2 (en) | Balancing reactive current between a DFIG stator and a grid-side inverter | |
US10298140B2 (en) | Wind turbine converter control | |
US10958071B2 (en) | Adaptive active power control in renewable energy power plants | |
US8331071B2 (en) | Interconnection switching system and method for connecting a distributed energy resource to an electrical power system | |
KR101375256B1 (en) | Parallel converter operation system of wind power generator | |
US12047027B2 (en) | Method of protecting a converter of a wind turbine and protection system | |
US11705737B2 (en) | Method for feeding in electrical power by means of a wind power installation | |
US11605944B2 (en) | Dynamic control of trip temperature for power module | |
CA3143410C (en) | Method for feeding in electrical power by means of a wind farm | |
Widerski et al. | Power electronic supply system with the wind turbine dedicated for average power receivers | |
Shaikh et al. | TESTING OF NEW SIMPLE-STRUCTURED AC SOLID-STATE CIRCUIT BREAKER |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FEPP | Fee payment procedure |
Free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
AS | Assignment |
Owner name: WOBBEN PROPERTIES GMBH, GERMANY Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:BROMBACH, JOHANNES;REEL/FRAME:052265/0268 Effective date: 20200205 |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: FINAL REJECTION MAILED |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: AWAITING TC RESP., ISSUE FEE NOT PAID |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |