US1036681A - Sinking joint-caissons and building piers, walls, &c. - Google Patents
Sinking joint-caissons and building piers, walls, &c. Download PDFInfo
- Publication number
- US1036681A US1036681A US61233011A US1911612330A US1036681A US 1036681 A US1036681 A US 1036681A US 61233011 A US61233011 A US 61233011A US 1911612330 A US1911612330 A US 1911612330A US 1036681 A US1036681 A US 1036681A
- Authority
- US
- United States
- Prior art keywords
- pier
- caisson
- adjacent
- shell
- caissons
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000000463 material Substances 0.000 description 11
- 238000009412 basement excavation Methods 0.000 description 7
- 238000000034 method Methods 0.000 description 5
- 238000010276 construction Methods 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 229910001018 Cast iron Inorganic materials 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical group [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 229910052751 metal Inorganic materials 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 229910000746 Structural steel Inorganic materials 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/385—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
Definitions
- the present invention is based on a particular application of the aforesaid broad invention to the building or sinking of what I call joint piers or caissons, that is to say piers (or the caissons used in sinking them) which are to engage with an adjacent pier or piers so as to form a substantially continuous wall for keeping water out of an excavation or for other purposes.
- Figures 1', 2, 3 and 4 are diagrammatic plan views of four different arrangements of the adjacent caissons or coder-dams.
- Fig. 5 is a side elevation of Fig. 1.
- Fig. 6 is a vertical section of the joint caisson of Fig. 1.
- Fig. 7 is a horizontal section on the line 7-7 of Fig. 6.
- Fig. 8 is a horizontal section of a modification in detail.
- Fig. 9 is a vertical section similar to Fig. 6 showing the concrete placed in the bottom of the caisson and extending to the adjacent caissons.
- Fig. 10 is a horizontal section on the line l0l0 of the same.
- Fig. 11 is a horizontal section of another construction.
- Fig. 12 is an enlarged detail.
- Fig. 1 shows a pair of caissons or coffer-dams A of any usual or suitable type and between which a joint caisson is to be sunk to prevent the passage of earth and water.
- the caissons are provided with large circular recesses or key ways B in their ends into which the ier formed by the joint caisson is to exten so as to interlock the several piers.
- the joint caisson O is made circular.
- Each pier of the wall may have a right hand end projectingv into a keyway in the adjacent left hand end of the next pier, or the joint caissons and the piers formed thereby may be of substantially the same lengths as the other piers.
- the design of the joint caissons, or of all the caissons, as the case may be, is such as to facilitate the extending of the concrete outward beyond the line of the caisson so as to close the space which is necessarily left as a clearance in sinking the caisson, thus bringing the concrete of one pier into contact and preferably into interlocking engagement with the adjacent face of the next caisson or pier.
- the main caissons A and the joint caisson C have been shown carried down'to rock E.
- the keyways and keys extend from the cutting edges of the caissons to the surface of the ground.
- the purpose of the joint caisson is to remove the quicksand or other earth lying between the ends of the other caissons and to provide a filling of concrete extending entirely between the ends of the main caissons. For. this purpose, after sinking the joint caisson a removable part of it,
- a joint caisson permitting this operation is shown in Figs. (5 and 7,various modifications thereof being illustrated in my co-pending application above referred to.
- a series of collapsible rings composed of cast iron blocks H forin-' ng an internal supporting or re nforcing structure so that the shellGinay be made of extremely light metal adapted only to keep out the water, and to be air tight where pneumatic pressure is employed.
- 'Eac'h ring of blocks is pressed outward firmly against the shell and in case of necessity fastened thereto so as to be supported independently of the other rings.
- the caisson having been sunk to the desired depth the lowermost ring of blocks H may be withdrawn, leaving the shell unsupported for so short a distance that there is no danger of its collapsing, after which the body of H. concrete may be introduced to a height nearly reaching the bottom of the next ring the entire caisson is filled.
- ThlSCOIlCIQtG then supports the bottom part of the shell and the process may be repeated step by step upward until In making a' joint caisson the operation is carried still further.
- the segments of the shell G adjacent to the ends of the next main caisson are unbolted from the remaining portions of the shell and the earth removed until the end of the adjacent main caisson is reached.
- the concrete is then introduced so as not only to fill the shell of the joint caisson, but to extend out of the'shell and to make direct contact with the adjacent main caisson in the manner shown at L in Figs. 9 and 10. This operation is repeated step by step upward to the desired height,
- Figs. 7 and 10 are for the case of a circular joint caisson and show the removal of a quadrant of the shell. The length removed, however, may be greater or less according to the circumstances.
- Each of the sheet iron rings constituting the shell corresponds in height to one, or to an exact number of rings of the reinforcing blocks H so that the same height of reinforcing rings and shell may be removed for each operation.
- moval of portions of the shell as described is advantageous to make the rings of sheetmetal slightly conical and overlapping in the manner indicated in Fig. 6. Under ordinary conditions the removal of a partof' the shell would involve danger of the falling in of the outside material.
- a joint caisson lying close to the end of another caisson there is only a small amount of material liable to fall in, and
- the outward flow :of air or the inward flow of material from the sides of the removed plates may be fguarded against by stock ramming in the space J or by various mechanical devices such for example as the packing strip K, Fig. 8, arranged to be pushed outward 'against the face of the adjacent main caisson A.
- a strip may be movable independently of the shell and carried, for example, in slots in the cast iron blocks, or it may be fastened to the parts of the shell 'G so as to carry with it the part ofthe :shell which has not been removed.
- strip can be made in short lengths corresponding to the heights of the supporting rings or of the shell rings, or it can be in longer lengths.
- the shell is to keep out: water, and to hold air'
- the chief function of the in the case of pneumatic work. here open excavation is practicable and where the con- :ditions of the earth permit the shell. may be omitted in whole or in part.
- the entire circumference of the. shell may be omitted.
- the conditions may permit the omission of the shell over a part of the circumference ad acent to the main ca1sson, as in Fig. 11.
- An apparatus for forming a pier in contact with an adjacent pier comprising a shell having a removable portion on the side toward the adjacent pier, and comprising also a removable internal stiflening structure.
- An apparatus for forming a pier in contact with an adjacent pier comprising a shell having a removable portion on the side toward the adjacent pier, and comprising also an internal stiffening structure consisting of collapsible and removable rings.
- An apparatus for forming a pier in contact with an adjacent pier comprising a shell having separately removable portions located one above another and on the side toward the adjacent pier and adapted to be removed in upward succession to permit the extension of the filling material to the adjacent pier in corresponding upward succession.
- An apparatus for forming a pier in contact with an adjacent pier said appa ratus comprising a shell having separately removable portions located one above another and on the side toward the adjacent pier and adapted to be removed in upward succession to permit the extension of the filling material to the adjacent pier in corresponding upward succession, and comprising also a removable internal stiffening structure.
- An apparatus for forming a pier in cont-act with an adjacent pier comprising a shell having separately removable portions located one above another and on the side toward the adjacent pier and adapted tobe removed in upward succession to permit the extension of the filling material to the adjacent pier in corresponding upward succession, and comprising also an internal stifiening structure consisting of collapsible rings removable in upward succession.
- An apparatus for forming a pier in contact with an adjacent pier comprising a structure having a removable portion on the side towardthe adjacent pier, and means for preventing the inflow of the outside material at the side of the opening to be formed by the removal of said portion.
- An apparatus for forming a pier in contact with an adjacent pier comprising a structure having a removable portion on the side toward the adjacent pier, and a strip adapted to be set in place from the inside of the caisson for preventing the infiow of outside material at the side of the opening to be formed by the removal of said portion.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Bridges Or Land Bridges (AREA)
Description
D. E. MORAN. SINKING JOINT CAISSONS AND BUILDING PIERS, -WALLS, 6w.
APPLICATION FILED MAR. 4, 1911.
Patented Aug. 27, 1912.
2 SHEETS-SHEET l.
| l I I I I I I I I I l l I I flg/nmsfs I S g {M INVENTOI? D. B. MORAN. SINKING JOINT mussons AND BUILDING mas, WALLS, &0.
APPLICATION FILED MAR. 4, 1911. 1,036,681, Patented Aug. 27,1912.
2 SHBETS-SHBET 2.
INVENTOR WITNESSES ATTORNEY COLUMBIA PLANOORAPH CO" WASHINGTON. D- Cm DANIEL E. MORAN, OF MENDI-IAM, NEW JERSEY.
SINKING- JOINT-GAISSONS AND BUILDING PIERS, WALLS, 8w.
Specification of Letters Patent.
Application filed March 4, 1911.
Patented Aug. 27,1912. Serial No. 612,330.
To all whom it may concern:
Be it known that I, DANIEL E. MORAN, a citizen of the United States, residing at Mendham, county of Morris, and State of New Jersey, have invented new and useful Improvements in Sinking J oint-Caissons and Building Piers, Walls, &c., of which the following is a s ecification.
In a co-pen ing application I have described and claimed broadly a cheap and advantageous method of building piers, columns, shafts or the like of concrete or equivalent material.
The present invention is based on a particular application of the aforesaid broad invention to the building or sinking of what I call joint piers or caissons, that is to say piers (or the caissons used in sinking them) which are to engage with an adjacent pier or piers so as to form a substantially continuous wall for keeping water out of an excavation or for other purposes.
The accompanying drawings illustrateembodiments of the invention.
Figures 1', 2, 3 and 4 are diagrammatic plan views of four different arrangements of the adjacent caissons or coder-dams. Fig. 5 is a side elevation of Fig. 1. Fig. 6 is a vertical section of the joint caisson of Fig. 1. Fig. 7 is a horizontal section on the line 7-7 of Fig. 6. Fig. 8 is a horizontal section of a modification in detail. Fig. 9 is a vertical section similar to Fig. 6 showing the concrete placed in the bottom of the caisson and extending to the adjacent caissons. Fig. 10 is a horizontal section on the line l0l0 of the same. Fig. 11 is a horizontal section of another construction. Fig. 12 is an enlarged detail.
Referring to the drawings, Fig. 1 shows a pair of caissons or coffer-dams A of any usual or suitable type and between which a joint caisson is to be sunk to prevent the passage of earth and water. The caissons are provided with large circular recesses or key ways B in their ends into which the ier formed by the joint caisson is to exten so as to interlock the several piers. In this case the joint caisson O is made circular.
In the construction shown in Fig. 2 the adjacent piers A are not provided with a keyway and the joint caisson G has no interlocking engagement.
' In the case shown in Fig. 3 the adjacent piers A are provided with recesses or keyways 13 and the joint caisson C is not en- Various other plans may be adopted.-
Each pier of the wall, for example, may have a right hand end projectingv into a keyway in the adjacent left hand end of the next pier, or the joint caissons and the piers formed thereby may be of substantially the same lengths as the other piers. The design of the joint caissons, or of all the caissons, as the case may be, is such as to facilitate the extending of the concrete outward beyond the line of the caisson so as to close the space which is necessarily left as a clearance in sinking the caisson, thus bringing the concrete of one pier into contact and preferably into interlocking engagement with the adjacent face of the next caisson or pier. The problem is simplified as much as possible by the use of main caissons or piers A of the ordinary type, without special construction, leaving only a clear space of about four feet between their ends for the handling of forms, the location of shores, etc.; and subsequently sinking between these main piers caissons of special construction. YVhether the joint be made in each caisson or only with special caissons it is an advantage of this invention that the joint is made without the necessity of special work below the cutting edge, the entire caisson being carried down to rock in the ordinary Way, or to concrete which has been laterally extended below the cutting edge of adjoining caissons, or to other suitable sub-foundations.
In the case shown in Fig. 5 the main caissons A and the joint caisson C have been shown carried down'to rock E. The keyways and keys extend from the cutting edges of the caissons to the surface of the ground. The purpose of the joint caisson is to remove the quicksand or other earth lying between the ends of the other caissons and to provide a filling of concrete extending entirely between the ends of the main caissons. For. this purpose, after sinking the joint caisson a removable part of it,
adjacent to the end of the main caisson, is
withdrawn andthe intervening earth is removed and the caisson filled with concrete which extends through the opening thus provided to make contact with the adjacent main caisson. This operation is performed step by step from the bottom upward. An example of a joint caisson permitting this operation is shown in Figs. (5 and 7,various modifications thereof being illustrated in my co-pending application above referred to. Projecting upward from the angle iron ring F, constituting the cutting edge, is a shell Gr of sheet metal preferably formed of overlapping rings. Each ring is formed in segments as shown in Fig. 7 with inturned flanges bolted together (Fig. 12).
Within the shell is a series of collapsible rings composed of cast iron blocks H forin-' ng an internal supporting or re nforcing structure so that the shellGinay be made of extremely light metal adapted only to keep out the water, and to be air tight where pneumatic pressure is employed. 'Eac'h ring of blocks is pressed outward firmly against the shell and in case of necessity fastened thereto so as to be supported independently of the other rings. The caisson having been sunk to the desired depth the lowermost ring of blocks H may be withdrawn, leaving the shell unsupported for so short a distance that there is no danger of its collapsing, after which the body of H. concrete may be introduced to a height nearly reaching the bottom of the next ring the entire caisson is filled.
of blocks. ThlSCOIlCIQtG then supports the bottom part of the shell and the process may be repeated step by step upward until In making a' joint caisson the operation is carried still further. After the lowermost ring of blocks H is withdrawn the segments of the shell G adjacent to the ends of the next main caisson are unbolted from the remaining portions of the shell and the earth removed until the end of the adjacent main caisson is reached. The concrete is then introduced so as not only to fill the shell of the joint caisson, but to extend out of the'shell and to make direct contact with the adjacent main caisson in the manner shown at L in Figs. 9 and 10. This operation is repeated step by step upward to the desired height,
usually to the tops of the caissons or piers.
Figs. 7 and 10 are for the case of a circular joint caisson and show the removal of a quadrant of the shell. The length removed, however, may be greater or less according to the circumstances. Each of the sheet iron rings constituting the shell corresponds in height to one, or to an exact number of rings of the reinforcing blocks H so that the same height of reinforcing rings and shell may be removed for each operation. moval of portions of the shell as described In order to facilitate the reit is advantageous to make the rings of sheetmetal slightly conical and overlapping in the manner indicated in Fig. 6. Under ordinary conditions the removal of a partof' the shell would involve danger of the falling in of the outside material. In the case of a joint caisson lying close to the end of another caisson there is only a small amount of material liable to fall in, and
"this material has to be removed in any case. The inflow of material from the sides of 'the opening, say at J, Fig. 10, will generally be prevented by the narrowness of the space and by the retention of the adjacent portion of the shell Gr Of the joint caisson.
In especially bad soil the outward flow :of air or the inward flow of material from the sides of the removed plates may be fguarded against by stock ramming in the space J or by various mechanical devices such for example as the packing strip K, Fig. 8, arranged to be pushed outward 'against the face of the adjacent main caisson A. Such a strip may be movable independently of the shell and carried, for example, in slots in the cast iron blocks, or it may be fastened to the parts of the shell 'G so as to carry with it the part ofthe :shell which has not been removed. strip can be made in short lengths corresponding to the heights of the supporting rings or of the shell rings, or it can be in longer lengths. shell is to keep out: water, and to hold air' The The chief function of the in the case of pneumatic work. here open excavation is practicable and where the con- :ditions of the earth permit the shell. may be omitted in whole or in part. For example, :in passing through dry earth or impervious clay the entire circumference of the. shell may be omitted. Or the conditions may permit the omission of the shell over a part of the circumference ad acent to the main ca1sson, as in Fig. 11.
only necessary to remove the interior rings and excavate the earth out to the face. of the main caisson, whereupon the concre e can be laid as in Fig. 10. The cast iron :rlngs not only serve to maintain the form of the excavation by support ng the pressure of the earth and to permit excavation through them, but they serve by their weight and stiflness to sink the caisson. The two. functions of weight and vertical stiffness inay be separately provided for, using a removable structure of comparatively light weight and sinking it by means of su erposed weights, jacks or the like; Various other modifications may be made, as explained more fully in my co-pending application above referred to.- V. V
What I claim is V Y 1. An apparatus for connecting two ad "jacent. piers, said apparatus comprising a shell adapted to be sunk between piers and In such case it is j having on each of the two sides adjacent to said piers a removable portion extending clear to the top of the structure.
2. An apparatus for forming a pier in contact with an adjacent pier, said apparatus comprising a shell having a removable portion on the side toward the adjacent pier, and comprising also a removable internal stiflening structure.
3. An apparatus for forming a pier in contact with an adjacent pier, said apparatus comprising a shell having a removable portion on the side toward the adjacent pier, and comprising also an internal stiffening structure consisting of collapsible and removable rings.
4:. An apparatus for forming a pier in contact with an adjacent pier, said apparatus comprising a shell having separately removable portions located one above another and on the side toward the adjacent pier and adapted to be removed in upward succession to permit the extension of the filling material to the adjacent pier in corresponding upward succession.
5. An apparatus for forming a pier in contact with an adjacent pier, said appa ratus comprising a shell having separately removable portions located one above another and on the side toward the adjacent pier and adapted to be removed in upward succession to permit the extension of the filling material to the adjacent pier in corresponding upward succession, and comprising also a removable internal stiffening structure.
6. An apparatus for forming a pier in cont-act with an adjacent pier, said apparatus comprising a shell having separately removable portions located one above another and on the side toward the adjacent pier and adapted tobe removed in upward succession to permit the extension of the filling material to the adjacent pier in corresponding upward succession, and comprising also an internal stifiening structure consisting of collapsible rings removable in upward succession.
7. An apparatus for forming a pier in contact with an adjacent pier, said apparatus comprising a structure having a removable portion on the side towardthe adjacent pier, and means for preventing the inflow of the outside material at the side of the opening to be formed by the removal of said portion.
8. An apparatus for forming a pier in contact with an adjacent pier, said apparatus comprising a structure having a removable portion on the side toward the adjacent pier, and a strip adapted to be set in place from the inside of the caisson for preventing the infiow of outside material at the side of the opening to be formed by the removal of said portion.
9. The method of building a pier in contact with an adjacent pier which consists in sinking a suitable structure adapted to maintain the form of the excavation, removing at least a side portion of said structure toward the adjacent pier removing the earth out to said adjacent pier and introduc ng concrete extending out to the adjacent pier.
10. The method of building a pier in contact with an adjacent pier which consists in sinking a suitable structure adapted to maintain the form of the excavation, simultaneously sinking a shell around said structure, removing said structure and a side portion of said shell toward the ad acent pier, removing the earth out to said adjacent pier and introducing concrete 1n place of said structure and extending out to the adjacent pier.
11. The method of building a pier in contact with an adjacent pier which consists in sinking a suitable structure adapted to maintain the form of the excavation, simultaneously sinking a shell around said structure, removing said structure in successlve sections from the bottom upward and simultaneously removing side portions of said shell toward the adjacent pier, removing the earth outward to the adjacent pier and introducing concrete in successive sections in place of the sections of said structure removed and extending out to the adjacent ier. p In witness whereof, I have hereunto signed my name in the presence of two subscribing witnesses.
DANIEL E. MORAN.
Witnesses:
W. WV. CoRLErT, D. ANTHONY USINA.
Copies of this patent may be obtained for five cents each, by addressing the Commissioner of Patents, Washington, D. G.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US61233011A US1036681A (en) | 1911-03-04 | 1911-03-04 | Sinking joint-caissons and building piers, walls, &c. |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US61233011A US1036681A (en) | 1911-03-04 | 1911-03-04 | Sinking joint-caissons and building piers, walls, &c. |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US1036681A true US1036681A (en) | 1912-08-27 |
Family
ID=3104960
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US61233011A Expired - Lifetime US1036681A (en) | 1911-03-04 | 1911-03-04 | Sinking joint-caissons and building piers, walls, &c. |
Country Status (1)
| Country | Link |
|---|---|
| US (1) | US1036681A (en) |
-
1911
- 1911-03-04 US US61233011A patent/US1036681A/en not_active Expired - Lifetime
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US1951292A (en) | Assembled pile | |
| US4425743A (en) | Inground fluid storage tank and method of erection thereof | |
| US1060271A (en) | Method of building subaqueous tunnels. | |
| US480127A (en) | o rourke | |
| US996397A (en) | Support for building-walls, &c. | |
| US1684816A (en) | Method for building monolithic-concrete underground structures | |
| US1952380A (en) | Wall structure | |
| US764798A (en) | Apparatus for building tunnels or the like. | |
| US1907943A (en) | Caisson | |
| US629133A (en) | Subaqueous tunnel and method of constructing same. | |
| US1398221A (en) | Construction of caissons, cofferdams, and the like | |
| US1963351A (en) | Method of constructing foundations | |
| US576843A (en) | Richard s | |
| US1858664A (en) | Emergency closure or lock for weirs, sluice gates, and the like | |
| US1089573A (en) | Method of lining shafts with concrete. | |
| US1394571A (en) | Subaqueous structure and method | |
| US1751835A (en) | Cofferdam and method of construction | |
| US1870248A (en) | Method and apparatus for building retaining walls, piers, etc. | |
| US1007723A (en) | Apparatus for sinking wells. | |
| US974023A (en) | Method of and apparatus for building masonry walls in shifting soils. | |
| GB2057541A (en) | Building a shaft on a submerged tunnel | |
| US2596788A (en) | Cofferdam | |
| US1221067A (en) | Tunnel and method of building same. | |
| US1221068A (en) | Method of building and placing piers. | |
| US1505238A (en) | Breakwater-wall construction |