TWM620840U - Stuffing tofu making device - Google Patents

Stuffing tofu making device Download PDF

Info

Publication number
TWM620840U
TWM620840U TW110211727U TW110211727U TWM620840U TW M620840 U TWM620840 U TW M620840U TW 110211727 U TW110211727 U TW 110211727U TW 110211727 U TW110211727 U TW 110211727U TW M620840 U TWM620840 U TW M620840U
Authority
TW
Taiwan
Prior art keywords
tofu
mold
valve
bean curd
filling
Prior art date
Application number
TW110211727U
Other languages
Chinese (zh)
Inventor
羅廣生
Original Assignee
羅廣生
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 羅廣生 filed Critical 羅廣生
Priority to TW110211727U priority Critical patent/TWM620840U/en
Publication of TWM620840U publication Critical patent/TWM620840U/en
Priority to CN202123059197.0U priority patent/CN216776020U/en

Links

Images

Landscapes

  • Beans For Foods Or Fodder (AREA)

Abstract

本新型創作係關於一種含餡豆腐製作裝置,包括一豆腐模具下模,該豆腐模具下模開口朝上,且底部設一兩段式震動台,且該豆腐模具下模之上方搭設一豆花料製作凹口模具,該豆花料製作凹口模具,設於該豆腐模具下模頂部,向下延伸設有複數相間隔之預位空心實底柱,且設一豆腐餡料投放器,供餡料落入,藉此,該豆腐模具下模內所承接之豆花料(經破花後)透過機械式兩段式震動台,可以省力將豆花料(豆腐基本原料)內的空氣或水分得以排除,並藉此降低人工密集與耗時,利於量產過程之自動化、機械化,節省成本。 The new creation relates to a device for making stuffed tofu. It includes a lower mold of tofu mold. The lower mold of the tofu mold has an opening facing upwards, and a two-stage vibration table is set at the bottom, and a bean curd material is placed above the lower mold of the tofu mold. A notch mold is made from the bean curd material, which is set on the top of the lower mold of the tofu mold, and is extended downward with a plurality of spaced apart pre-positioned hollow solid bottom posts, and a tofu filling dispenser is provided for fillings In this way, the bean curd material (after the flower is broken) received in the lower mold of the tofu mold passes through the mechanical two-stage vibrating table, which can save effort to remove the air or moisture in the bean curd material (basic tofu raw material). And to reduce labor intensive and time-consuming, which is conducive to the automation and mechanization of the mass production process, and saves costs.

Description

含餡豆腐製作裝置 Stuffing tofu making device

本新型創作係關於一種食品製造設備,尤指一種豆腐適當位置包有餡料塊之食品製造設備。 This new creation is about a kind of food manufacturing equipment, especially a kind of food manufacturing equipment in which tofu is wrapped with fillings in appropriate places.

按,利用大豆製成豆腐製品係中國之國粹。早期之豆腐係使用石製之水磨,用水浸泡後之黃豆放入裝有漏斗的水磨內,磨成豆乳加入凝結劑,而形成豆腐。日後基於口感之需求而衍生出各種口味之豆腐產品,而本案新型創作人更關注於各種所謂「含餡豆腐」之技術研發,不斷在其產品、製造方法與設備上大幅創新,例如申請並取得發明專利之台灣發明第I285624號「一種含餡豆腐製造方法及其塑型盒」、台灣發明第I234435號「一次注型之含餡豆腐之製造裝置及製造方法」、台灣發明第I347170號「含餡板豆腐及其製造方法」等研發。 Press, the use of soybeans to make tofu products is the quintessence of China. In the early tofu, a stone water mill was used. Soybeans soaked in water were put into a water mill equipped with a funnel, and then ground into soy milk and added a coagulant to form tofu. In the future, various flavors of tofu products will be derived based on the demand for taste. The new creator of this case pays more attention to the technological research and development of various so-called "stuffed tofu", and continues to innovate greatly in its products, manufacturing methods and equipment, such as applying for and obtaining Taiwan Invention No. I285624 "A method of manufacturing stuffed tofu and its moulding box", Taiwan Invention No. I234435 "A device and method for manufacturing stuffed tofu with one injection", Taiwan Invention No. I347170 "Containing "Jianban tofu and its manufacturing method" and other research and development.

惟基於研發之不輟,本案新型創作人發現在以往的研發中,主要製程仍偏重於人工與部份機械,尤其在豆腐製造過程中,以往需要透過人力將豆花料進行破花(本案所稱之「豆花料」,係指豆腐基本之漿料,而所謂「破花」係指將空氣與水排出的製作過程),將豆花料內的空氣或水分壓制排除,由於過往製程需要耗費時程,然而現今傳統技藝下,欠缺足夠人力的傳承,製作豆腐必須在高溫下進行,由於較為繁複與人力支出, 且豆腐製作完需要降溫冷藏使其便於儲存,故不利於大量製造及運送,因此有必要藉助機械力及冷藏設備以及烹調設備,來協助量產過程之自動化、機械化、以及儲存、冷凍運送時間。 However, based on continuous research and development, the new creator of this case found that in the past research and development, the main manufacturing process was still focused on labor and some machinery, especially in the tofu manufacturing process, in the past, it was necessary to use manpower to break the bean curd material (this case is called The "bean curd material" refers to the basic slurry of tofu, and the so-called "broken flower" refers to the production process of expelling air and water). The air or moisture in the bean curd material is suppressed and removed, because the past process takes time. However, under the current traditional skills, there is a lack of sufficient manpower to pass on. The production of tofu must be carried out at a high temperature. Due to the complexity and manpower expenditure, In addition, the tofu needs to be cooled and refrigerated to facilitate storage, which is not conducive to mass production and transportation. Therefore, it is necessary to use mechanical power, refrigeration equipment and cooking equipment to assist in the automation, mechanization, storage, and freezing of the mass production process.

有鑑於前述,本新型創作人認為應有一種改善構造,為此設計一種含餡豆腐製作裝置,包括一豆腐模具下模,該豆腐模具下模開口朝上,且底部設一兩段式震動台,且該豆腐模具下模之上方設置一豆花料製作凹口模具,該豆花料製作凹口模具並設有複數相等間隔之預位空心實底柱,且設一豆腐餡料投放器,供餡料由該預位空心實底柱分離後所形成之餡料放置之凹陷部位。 In view of the foregoing, the creator of the present model believes that there should be an improved structure, and for this purpose, a device for making stuffed tofu is designed, which includes a lower mold of tofu mold, the opening of the lower mold of the tofu mold faces upward, and a two-stage vibration table is set at the bottom. , And above the lower mold of the tofu mold is set a notch mold made of bean curd material, the concave mold made of bean curd material is provided with a plurality of pre-positioned hollow solid columns at equal intervals, and a tofu filling dispenser is provided for filling The recessed part of the filling formed after the material is separated from the pre-positioned hollow solid bottom column.

藉此,該豆腐模具下模內所承接之豆花料透過該兩段式震動台,可以相當省力將豆花料內的空氣或水分得以排除,尤其是當需要製作交錯混料(亦即豆腐內有餡料,而餡料中有豆腐)時,可以使豆花料更方便灌填餡料之孔隙,亦即藉由震動與豆花料間相互之擠壓,能夠適當排擠空氣,而令餡料之間充填豆花料得以確實。並藉此設計,加速豆腐製作工序,利於生產過程之自動化、機械化,降低成本。 As a result, the bean curd material received in the lower mold of the tofu mold can pass through the two-stage vibrating table, which can eliminate the air or moisture in the bean curd material with considerable effort, especially when it is necessary to make a staggered mixture (that is, the tofu contains Filling, and the filling contains tofu), it can make the bean curd material more convenient to fill the pores of the filling, that is, through the mutual squeezing between the bean curd material and the vibration, the air can be properly squeezed out, so that the filling The filling of bean curd material can be confirmed. And with this design, speed up the tofu production process, which is conducive to the automation and mechanization of the production process, and reduces the cost.

(1):豆腐模具下模 (1): Tofu mold lower mold

(11):兩段式震動台 (11): Two-stage vibration table

(12):定位槽 (12): Positioning slot

(2):豆花料製作凹口模具 (2): Making notch mold with bean curd material

(21):定位梢 (21): Positioning tip

(22):預位空心實底柱 (22): Pre-positioned hollow solid bottom column

(3):豆腐餡料投放器 (3): Tofu filling dispenser

(31):第一閥門 (31): The first valve

(311):第一電磁鐵開關 (311): First solenoid switch

(32):第二閥門 (32): Second valve

(321):第二電磁鐵開關 (321): Second solenoid switch

(33):第三閥門 (33): Third valve

(331):第三電磁鐵開關 (331): Third solenoid switch

(34):第四閥門 (34): Fourth valve

(341):第四電磁鐵開關 (341): Fourth solenoid switch

(4):餡料定位模 (4): Filling positioning mold

(41):定位梢 (41): Positioning Tip

(42):凸出部 (42): Projection

(5):豆腐模具上壓板 (5): Tofu mold upper pressing plate

(51):定位梢 (51): Positioning Tip

(A):餡料 (A): Filling

(B):豆花料 (B): Tofu material

(B1):凹陷部 (B1): Depressed part

第一圖係本新型創作立體分解側視圖 The first picture is a three-dimensional exploded side view of the new creation

第二圖係本新型創作於該豆腐模具下模內注入豆花料(經破花)料件示意圖 The second picture is a schematic diagram of the new tofu mold injecting the bean curd material (broken flower) into the lower mold of the tofu mold

第三圖係本新型創作將該豆花料製作凹口模具搭設於該豆腐模具下模頂 部,並已壓合示意圖 The third picture is the creation of the new model, the notch mold made of the bean curd material is placed on the top of the lower mold of the bean curd mold Part, and has been pressed into the schematic diagram

第四圖係本新型創作豆花料製作凹口模具取出形成複數凹陷部示意圖 The fourth figure is a schematic diagram of the notch mold for making bean curd material of the new type of creation, taking out to form a plurality of depressions

第五圖係本新型創作豆腐餡料投放器與餡料細部示意圖 The fifth figure is a detailed schematic diagram of the new creative tofu filling dispenser and the filling

第五a、五b圖係本新型創作豆腐餡料投放器落料示意圖 Figures 5a and 5b are schematic diagrams of blanking of the new creative tofu filling dispenser

第六圖係本新型創作餡料定位模之凸出部對於餡料形成壓著示意圖 The sixth figure is a schematic diagram of the protruding part of the filling positioning mold of the new type forming and pressing against the filling

第七圖係本新型創作繼續於豆腐模具下模內注入豆花料剩料示意圖 The seventh picture is a schematic diagram of the creation of the new model that continues to inject the bean curd material into the lower mold of the tofu mold

第八圖係本新型創作豆腐模具下模上方搭設豆腐模具上壓板示意圖 The eighth figure is a schematic diagram of the upper pressing plate of the tofu mold set up above the lower mold of the new creative tofu mold

第九圖係本新型創作豆腐模具上壓板取卸完成含餡豆腐示意圖 The ninth figure is a schematic diagram of the top platen of the new creative tofu mold is removed and the stuffed tofu is completed.

以下藉由圖式之配合,說明本新型創作之構造、特點以及實施例,俾使 貴審查委員對本新型創作有更進一步之理解。 The following illustrates the structure, characteristics and embodiments of the creation of the new type through the coordination of the diagrams, so as to enable your reviewer to have a better understanding of the creation of the new type.

請參閱第一圖所示,本新型創作包括一種含餡豆腐製作裝置,包括一豆腐模具下模(1),該豆腐模具下模(1)開口朝上,且底部設一兩段式震動台(11),且該豆腐模具下模(1)之上方另設一豆花料製作凹口模具(2),該豆花料製作凹口模具(2)向下延伸設有複數相間隔之預位空心實底柱(22),且設一豆腐餡料投放器(3),供餡料(A)由該豆腐餡料投放器(3)供給該預位空心實底柱(22)分離後所形成之凹陷部(B1)投入(請配合第四圖)。 Please refer to the first figure. This new creation includes a stuffed tofu making device, including a tofu mold lower mold (1), the tofu mold lower mold (1) has an opening facing upwards, and a two-stage vibrating table is set at the bottom (11), and above the bottom mold (1) of the tofu mold is another bean curd material making notch mold (2), and the bean curd material making notch mold (2) extends downward and is provided with a plurality of spaced pre-position hollows A solid bottom column (22), and a tofu filling dispenser (3) is provided, and the filling (A) is supplied by the tofu filling dispenser (3) to the pre-positioned hollow solid bottom column (22) after separation is formed Put in the recessed part (B1) (please match the fourth picture).

藉此,如第二圖所示,該豆腐模具下模(1)內所承接之豆花料(B)後,透過該兩段式震動台(11)之機械式震動,可以相當省力的將豆花料(B)內的空氣或水分得以排除(即俗稱之「破花」),尤其是當需要製作交錯混料(亦即餡料(A)內有豆腐,而豆腐中亦有餡料(A)),可以使該豆花料(B)更得以灌填餡料(A)中之孔隙,亦即藉由震動與該豆花料(B)間相互之擠 壓,能夠適時排擠空氣,而令餡料(A)之充填豆花料(B)之得以排除彼此孔隙內之空氣及水分。並藉此降低勞力密集與耗時,利於量產過程之自動化、機械化,降低成本。 Thereby, as shown in the second figure, after the bean curd material (B) received in the lower mold (1) of the tofu mold, through the mechanical vibration of the two-stage vibrating table (11), the bean curd can be reduced effortlessly The air or moisture in the material (B) can be eliminated (commonly known as "broken flower"), especially when it is necessary to make a staggered mixture (that is, there is tofu in the filling (A), and there is also filling in the tofu (A) )), the bean curd material (B) can be filled with the pores in the filling (A), that is, the squeezing between the bean curd material (B) and the bean curd material (B) by vibration The pressure can squeeze out the air in time, so that the filling (A) of the bean curd material (B) can remove the air and moisture in the pores of each other. And to reduce labor intensive and time-consuming, which is conducive to the automation and mechanization of the mass production process, and reduces the cost.

除前述外,本新型創作較佳實施例之一,請參閱第五a圖與第五b圖,係於該豆腐餡料投放器(3)包括二對稱之第一閥門(31)與第二閥門(32),該第一閥門(31)與第二閥門(32)閉合時所保留之空間,即容置下方餡料(A)之空間,該第一閥門(31)與第二閥門(32)各於外側連結一第一電磁鐵開關(311)與第二電磁鐵開關(321)。如第五b圖所示,藉由控制該第一電磁鐵開關(311)與第二電磁鐵開關(321)分別向外時,可以將該第一閥門(31)與第二閥門(32)打開,此時下方餡料(A)即可落下作為投料,反之則令該第一閥門(31)與第二閥門(32)閉合保持該下方餡料(A)不落下。 In addition to the foregoing, one of the preferred embodiments of the present invention, please refer to Figures 5a and 5b. The tofu filling dispenser (3) includes two symmetrical first valves (31) and second The valve (32), the space reserved when the first valve (31) and the second valve (32) are closed, that is, the space for the filling (A) below, the first valve (31) and the second valve ( 32) A first electromagnet switch (311) and a second electromagnet switch (321) are respectively connected to the outside. As shown in Figure 5b, by controlling the first solenoid switch (311) and the second solenoid switch (321) to be outwards respectively, the first valve (31) and the second valve (32) can be When opened, the lower filling (A) can fall as a feeding material, otherwise, the first valve (31) and the second valve (32) are closed to keep the lower filling (A) from falling.

而在該第一閥門(31)與第二閥門(32)之上方各設二對稱之第三閥門(33)與第四閥門(34),該第三閥門(33)與第四閥門(34)閉合時所保留之空間,即容置另一塊上方餡料(A)(即備用餡料)之空間,該第三閥門(33)與第四閥門(34)各於外側連結一第三電磁鐵開關(331)與第四電磁鐵開關(341),而該各第三電磁鐵開關(331)與第四電磁鐵開關(341),可以各伸入各該第三閥門(33)與第四閥門(34)所設之間隙,並可供抵於另一塊上方餡料(A)之底部(上方與下方之餡料,在製作時邊角即為圓角,上下重疊時即產生縫隙而容易插入),此時該上方餡料(A)受抵而不落下,反之則落下。並藉此控制含餡豆腐之供餡順暢機制降低人力支出與耗時,利於量產過程之自動化、機械化,降低成本。 And above the first valve (31) and the second valve (32) are provided with two symmetrical third valve (33) and fourth valve (34), the third valve (33) and the fourth valve (34) ) The space reserved when closed, that is, the space for accommodating another piece of upper filling (A) (ie spare filling). The third valve (33) and the fourth valve (34) are each connected to a third solenoid on the outside The iron switch (331) and the fourth electromagnet switch (341), and the third electromagnet switch (331) and the fourth electromagnet switch (341) can each extend into the third valve (33) and the third valve (33) and the fourth solenoid switch (341). The gap provided by the four valves (34) can be used to press against the bottom of another piece of upper filling (A) (the upper and lower fillings are rounded when they are made, and when the upper and lower overlaps are overlapped, there will be a gap. Easy to insert), at this time the upper filling (A) is resisted and does not fall, otherwise it falls. And to control the smooth filling mechanism of stuffed tofu to reduce labor expenditure and time-consuming, which is conducive to the automation and mechanization of the mass production process, and reduces the cost.

本新型創作另一實施例,配合第六圖所示,其中該豆腐模具 下模(1)之上方選擇性搭設一餡料定位模(4),該豆腐模具下模(1)之頂部外緣可以設有一定位槽(12),且該餡料定位模(4)向下凸伸一定位梢(41),藉以納入該定位槽(12)以形成緊配與密合,且該定位梢(41)向下延伸設有複數相間隔之凸出部(42),運用該各凸出部(42)對該凹陷部(B1)內置入餡料(A)時形成壓著。 Another embodiment of the present invention, as shown in Figure 6, in which the tofu mold A filling positioning mold (4) is optionally set up above the lower mold (1). The top outer edge of the lower mold (1) of the tofu mold may be provided with a positioning groove (12), and the filling positioning mold (4) is facing A positioning pin (41) protrudes downward to be incorporated into the positioning groove (12) to form a tight fit and close fit, and the positioning pin (41) extends downwards with a plurality of spaced protrusions (42), using the Each protruding portion (42) forms a pressing when the filling (A) is placed in the recessed portion (B1).

有關本案之製法,請參閱第二圖所示,首先於該豆腐模具下模(1)內注入豆花料(B)(已進行破花程序)。 For the preparation method of this case, please refer to the second figure. First, pour the bean curd material (B) into the lower mold (1) of the tofu mold (the flower breaking process has been carried out).

請參閱第三圖所示,將該豆花料製作凹口模具(2)供搭設於該豆腐模具下模(1)上部,該豆花料製作凹口模具(2)頂部下凸設有一定位梢(21),藉以納入該定位槽(12)以形成緊配與密合。並將該複數相間隔之預位空心實底柱(22)置入該豆花料(B)料件之中。 Please refer to the third figure, the notch mold (2) for making bean curd material is set up on the upper part of the lower mold (1) of the bean curd material, and the top of the bean curd material making notch mold (2) is protruding with a positioning pin ( 21), so as to be incorporated into the positioning groove (12) to form a tight fit and close fit. And the plurality of pre-positioned hollow solid bottom posts (22) spaced apart are placed in the bean curd material (B) material.

第四圖係顯示當該豆花料製作凹口模具(2)取出時,則該複數相間隔之預位空心實底柱(22)則會在該豆花料(B)料件稍微定型成複數凹陷部(B1)。 The fourth picture shows that when the bean curd material making notch mold (2) is taken out, the plurality of spaced apart pre-positioned hollow solid bottom posts (22) will be slightly shaped into a plurality of depressions in the bean curd material (B) Department (B1).

請參閱第五圖所示,當該豆腐餡料投放器(3)可以投料落下餡料(A)至該複數凹陷部(B1)。(細部請參閱前述第五a與第五b圖及其說明) Please refer to the fifth figure, when the tofu filling dispenser (3) can drop the filling (A) to the plurality of recesses (B1). (For details, please refer to the aforementioned fifth a and fifth b diagrams and their descriptions)

請參閱第六圖所示,藉由該餡料定位模(4)之該等凸出部(42),對於該餡料(A)時形成壓著並形成餡料較準確之定位。 Please refer to the sixth figure. With the protruding parts (42) of the filling positioning mold (4), the filling (A) is pressed and formed into a more accurate positioning of the filling.

請參閱第七圖所示,繼續於該豆腐模具下模(1)內注入剩餘之豆花料(B)料件。 Please refer to the seventh figure, continue to inject the remaining bean curd material (B) into the lower mold (1) of the tofu mold.

請參閱第八圖所示,繼續選擇於該豆腐模具下模(1)之上方搭設該豆腐模具上壓板(5),該豆腐模具上壓板(5)頂部下凸設有一定位梢 (51),藉以納入該定位槽(12)以形成緊配與密合。 Please refer to the eighth figure, continue to choose to set up the tofu mold upper pressing plate (5) above the tofu mold lower mold (1), and the tofu mold upper pressing plate (5) is provided with a positioning pin protruding from the top (51), so as to be incorporated into the positioning groove (12) to form a tight fit and close fit.

打開該兩段式震動台(11),待豆花料(B)凝結定型。然後請參閱第九圖所示將該豆腐模具上壓板(5)取卸經切割。完成含餡豆腐之製作。 Open the two-stage vibrating table (11), and wait for the bean curd material (B) to condense and set. Then please refer to the figure 9 to remove the upper pressing plate (5) of the tofu mold and cut it. Complete the production of stuffed tofu.

綜上所述,本新型創作確實符合可專利之積極要件,且無不予專利之消極要件,爰依法提出專利申請。惟舉凡依本新型創作申請專利範圍所作之均等變化,皆屬本案訴求標的之範疇。 In summary, the creation of this new model does meet the positive requirements for patentability, and there are all negative requirements for non-patentability, so a patent application is filed in accordance with the law. However, all the equal changes made in accordance with the scope of the patent application for the creation of the new model belong to the scope of the subject matter of this case.

(1):豆腐模具下模 (1): Tofu mold lower mold

(11):兩段式震動台 (11): Two-stage vibration table

(12):定位槽 (12): Positioning slot

(2):豆花料製作凹口模具 (2): Making notch mold with bean curd material

(21):定位梢 (21): Positioning tip

(22):預位空心實底柱 (22): Pre-positioned hollow solid bottom column

(3):豆腐餡料投放器 (3): Tofu filling dispenser

(4):餡料定位模 (4): Filling positioning mold

(41):定位梢 (41): Positioning Tip

(42):凸出部 (42): Projection

(5):豆腐模具上壓板 (5): Tofu mold upper pressing plate

(51):定位梢 (51): Positioning Tip

(A):餡料 (A): Filling

Claims (5)

一種含餡豆腐製作裝置,包括一豆腐模具下模,該豆腐模具下模開口朝上,且底部設一兩段式震動台,且該豆腐模具下模之上方設置一豆花料製作凹口模具,該豆花料製作凹口模具並設有複數相等間隔之預位空心實底柱,且設一豆腐餡料投放器,供餡料由該預位空心實底柱分離後所形成之餡料放置之凹陷部位。 A device for making stuffed tofu includes a lower mold of tofu mold, the opening of the lower mold of the tofu mold faces upward, and a two-stage vibration table is arranged at the bottom, and a notch mold made of bean curd material is arranged above the lower mold of the tofu mold, The bean curd material is made into a recessed mold and is provided with a plurality of pre-positioned hollow solid bottom posts at equal intervals, and a tofu filling dispenser is provided for the filling to be placed on the filling formed after the pre-positioned hollow solid bottom post is separated Depressed area. 如申請專利範圍第1項所述之含餡豆腐製作裝置,該豆腐餡料投放器包括二對稱之第一閥門與第二閥門,該第一閥門與第二閥門各於外側連結一第一電磁鐵開關與第二電磁鐵開關。 For the stuffed tofu making device described in item 1 of the scope of patent application, the tofu filling dispenser includes two symmetrical first valves and second valves, and the first valve and the second valve are each connected to a first solenoid on the outside Iron switch and second electromagnet switch. 如申請專利範圍第2項所述之含餡豆腐製作裝置,其中該第一閥門與第二閥門之上方各設二對稱之第三閥門與第四閥門,該第三閥門與第四閥門各於外側連結一第三電磁鐵開關與第四電磁鐵開關,而該各第三電磁鐵開關與第四電磁鐵開關,可以各伸入各該第三閥門與第四閥門所設之間隙。 As described in item 2 of the scope of patent application, the stuffed tofu making device, wherein two symmetrical third and fourth valves are provided above the first valve and the second valve, and the third valve and the fourth valve are respectively at A third electromagnet switch and a fourth electromagnet switch are connected to the outside, and the third electromagnet switch and the fourth electromagnet switch can each extend into the gap provided by the third valve and the fourth valve. 如申請專利範圍第1項所述之含餡豆腐製作裝置,其中該豆腐模具下模之上方選擇性搭設一餡料定位模,該豆腐模具下模之頂部外緣設有一定位槽,且該餡料定位模向下凸伸一定位梢,藉以納入該定位槽以形成緊配與密合,且該定位梢向下延伸設有複數相間隔之凸出部。 The stuffing-containing tofu making device described in item 1 of the scope of patent application, wherein a stuffing positioning mold is selectively set up above the bottom mold of the tofu mold, and a positioning groove is provided on the outer edge of the top of the bottom mold of the tofu mold, and the stuffing A positioning pin protrudes downward from the material positioning mold so as to be incorporated into the positioning groove to form a tight fit and tight fit, and the positioning pin extends downward to be provided with a plurality of spaced protruding parts. 如申請專利範圍第1項所述之含餡豆腐製作裝置,選擇性於該豆腐模具下模之上方搭設一豆腐模具上壓板,該豆腐模具上壓板頂部下凸設有一定位梢,藉以納入該定位槽以形成緊配與密合。 For the stuffed tofu making device described in item 1 of the scope of patent application, a tofu mold upper pressing plate is selectively set up above the lower mold of the tofu mold, and a positioning pin protrudes from the top of the tofu mold upper pressing plate to accommodate the positioning Groove to form a tight fit and tight fit.
TW110211727U 2021-10-05 2021-10-05 Stuffing tofu making device TWM620840U (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
TW110211727U TWM620840U (en) 2021-10-05 2021-10-05 Stuffing tofu making device
CN202123059197.0U CN216776020U (en) 2021-10-05 2021-12-07 Device for making bean curd with stuffing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW110211727U TWM620840U (en) 2021-10-05 2021-10-05 Stuffing tofu making device

Publications (1)

Publication Number Publication Date
TWM620840U true TWM620840U (en) 2021-12-01

Family

ID=80680112

Family Applications (1)

Application Number Title Priority Date Filing Date
TW110211727U TWM620840U (en) 2021-10-05 2021-10-05 Stuffing tofu making device

Country Status (2)

Country Link
CN (1) CN216776020U (en)
TW (1) TWM620840U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023155386A1 (en) * 2022-02-21 2023-08-24 罗广生 Pre-filled stuffing work apparatus for stuffed tofu

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023155386A1 (en) * 2022-02-21 2023-08-24 罗广生 Pre-filled stuffing work apparatus for stuffed tofu

Also Published As

Publication number Publication date
CN216776020U (en) 2022-06-21

Similar Documents

Publication Publication Date Title
TWM620840U (en) Stuffing tofu making device
CN107668217B (en) Processing technology of dried bean curd
CN207220042U (en) Pomander beans junket manufactures mould
CN218898175U (en) A forming mold for tofu production with good pressing effect
CN105494708B (en) Brick tea compacting die
CN103828952B (en) A kind of manufacture method of brick tea and brick tea thereof
CN203313992U (en) One-step forming device of preserved bean curd blanks
US2266336A (en) Mold for producing brick cheese
CN104397205B (en) A kind of production method and its cored mold of frying cored bean curd with odor
CN216533622U (en) Forming die of hollow chocolate ball
CN216651269U (en) Pre-filling operation device with stuffed tofu
KR20140082383A (en) The hwa duboo mould
TWM627902U (en) Pre-filling operation device for stuffed tofu
CN205284861U (en) Dried tofu forming die
CN104543061B (en) A kind of mould of heart-shaped compressed tea
KR102204681B1 (en) Multi-Stage Stacked Bean Curd Forming Cast having Weight Control Press Membber
CN221949141U (en) A chocolate-shaped pressed tea mold
CN206586383U (en) A kind of mould for being used to manufacture Five-pointed star chilli oil chafing dish bottom flavorings
KR101895892B1 (en) Automatic machine for sweet rice cookie
CN202773962U (en) Dry bean curd forming die box
CN221979942U (en) Tea cake forming device
CN212232564U (en) Cheese forming squeezer and mould
CN203884943U (en) Tri-Color Lipstick Mold
KR20200117391A (en) Method of Making Bean Curd by using hydrogen water
CN106343599B (en) The manufacture craft of compressed tea die and application mold progress compressed tea