SU909188A1 - Entry-driving set - Google Patents
Entry-driving set Download PDFInfo
- Publication number
- SU909188A1 SU909188A1 SU802904826A SU2904826A SU909188A1 SU 909188 A1 SU909188 A1 SU 909188A1 SU 802904826 A SU802904826 A SU 802904826A SU 2904826 A SU2904826 A SU 2904826A SU 909188 A1 SU909188 A1 SU 909188A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- formwork
- complex
- lining
- temporary
- support
- Prior art date
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Description
(54) ПРОХОДЧЕСКИЙ КОМПЛЕКС(54) PASSAGE COMPLEX
1one
Изобретение относитс к горной промышленности , в частности к средствам механизации проведени и закреплени горизонтальных и наклонных горных выработок .The invention relates to the mining industry, in particular to the means of mechanization of conducting and securing horizontal and inclined mine workings.
Известен комплекс дл механизирован- 5 ной проходки выработок, включающий комбайн со стреловидным рабочим органом, ограждающую призабойное пространство временную крепь, и закрепленный на крепи крепеустановщик, производ щий работы по креплению выработки за временной крепью 1.A known complex for mechanized excavation of workings, which includes a harvester with an arrow-shaped working body, protects the temporary lining, and fastens the support for temporary support 1, securing the bottom hole.
Такой комплекс позвол ет увеличить скорость проходки, так как процессы обработки забо и возведени крепи могут осуществл тьс параллельно, однако уро- is вень механизации установки посто нного креплени низкий ввиду того, что механизируютс лищь работы по подъему верхн ков крепи и их поддержанию на врем монтажа со стойками.Such a complex allows to increase the penetration rate, since the processes of downhole and erection of lining can be carried out in parallel, however, the level of mechanization of the installation of a permanent attachment is low due to the fact that the work on raising the lining of the lining and maintaining them with racks.
Наиболее близким к предлагаемо.му вл етс проходческий комплекс, включающий проходческий комбайн с породоразрущающим и погрузочно-транспортным органами , механизированную временную крепьThe closest to the offer. Is a tunnel complex, including a tunneling harvester with rock-breaking and loading-transporting bodies, a mechanized temporary support
с перекрытием дл поддержани кровли в призабойном пространстве выработки, устройство дл возведени верхн ков и зат жек посто нной крепи, содержащее ко.мплект опалубок и механизм переустановки опалубок 2.with an overlap for supporting the roof in the bottomhole production space, a device for erecting upper and permanent fixing tines containing a set of formwork and a mechanism for resetting formwork 2.
Однако в известном проходческом комплексе на значительном участке временного закреплени не обеспечиваетс равномерный контакт верхн ков крепи с кровлей, так как заполнение пустот (забутовка), установка стоек и другие заключительные работы по креплению производ тс за комбайном . Кроме того, расположение механизма перестановки опалубок на комбайне исключает независимость перемещени комбайна от креплени выработки, что снижает производительность работы комплекса в целом.However, in the well-known tunnel complex, a uniform contact of the temporary fixings does not ensure uniform contact of the upper supports with the roof, since the filling of voids (packing), installation of racks and other final fixing works are performed behind the combine. In addition, the arrangement of the mechanism for shifting the formwork on the combine eliminates the independence of the movement of the combine from fixing production, which reduces the productivity of the complex as a whole.
Цель изобретени - повыщение производительности проходческого комплекса путем механизации установки опалубок с размещаемыми на ней элементами посто нного креплени за поддерживающей призабойное пространство временной крепью.The purpose of the invention is to increase the productivity of the tunnel complex by mechanizing the installation of formwork with permanent fastening elements placed on it behind a temporary lining supporting the bottom-hole space.
Указанна цель достигаетс тем, что механизм перестановки опалубок выполнен в виде приемного полка с монтажным столом, установленным на приемном полке с возможностью перемещени посредством привода вдоль оси выработки, при этом полок консольно закреплен в задней части перекрыти временной крепи посредством рычажно-параллелограммного подъемника.This goal is achieved by the fact that the formwork permutation mechanism is made in the form of a receiving shelf with an assembly table mounted on the receiving shelf with the possibility of movement by means of a drive along the axis of generation, while the shelves are cantilevered in the rear part of the temporary support by means of a lever-parallelogram lift.
Кажда опалубка имеет выполненную в виде арки раму с башмаками дл верхН ков посто нной крепи и боковые щитки, шарнирно закрепленные к концам рамы с возможностью поджати к бокам выработки посредством гидродомкратов, при этом к каждому щитку закреплена опорна гидростойка .Each formwork has an arch-shaped frame with shoes for upper fixed supports and side panels hinged to the ends of the frame with the ability to press to the sides of the excavation by means of hydraulic jacks, with a supporting hydrocaster attached to each shield.
Кроме того, привод перемещени монтажного стола выполнен в виде гидроцилиндра с умножителем хода.In addition, the movement of the mounting table is made in the form of a hydraulic cylinder with a stroke multiplier.
На фиг. 1 изображен проходческий комплекс , вид сбоку (механизированные опалубки и крепление показаны в сечении по оси выработки); на фиг. 2 - разрез А-А на фиг. ; па фиг. 3 - вид Б на фиг. 1.FIG. 1 shows a tunnel complex, side view (mechanized formwork and fastener are shown in section along the axis of generation); in fig. 2 shows section A-A in FIG. ; pas figs. 3 is a view B in FIG. one.
Комплекс содержит проходческий комбайн 1, ограждающую призабойное простра .нство над ко.мбайном, механизированную 1ременную крепь 2 с распорными гидростойками 3 и перекрыти ми 4, а также комплект опалубок 5. На крепи посредством подвески 6 установлен подъемник 7 рычажнопараллелограм .много действи , включающий подъемные балки 8, т ги 9 и осуществл юП1ие подъем балоч гидроцилиндром 10, а также приемный полок 11 с подвижным монтажным столом 12. Перемещение стола рздоль полка (вдоль оси выработки осуществл етс гидроцилиндром с умножителем хода (не показаны). Монтажный стол 12 выполнен с возможностью установки на мего опалубок 5, содержащие;, опорные гидростойки 13 с индивидуальным питанием, раму 14 с бащ.маками 5, а также боковые щитки 16, св занные с рамой 14 щарниром 17. Поджатие щитков к бокам выработки осу1цествл етс гидроцилиндрами 18. Башмаки выполнены с возможностью установки в них верхн ка 19 посто нного креплени . Элементы зат жки 20 креплени укладываютс на раму 16, а ножки 21 посто нной крепи подвод т под верхн к 19.The complex contains a tunneling machine 1, enclosing a bottomhole space above the mounter, a mechanized temporary support 2 with expansion posts 3 and overlaps 4, as well as a set of formwork 5. On the support by means of the suspension 6 a lift 7 is mounted, a lever-parallelogram of many actions, including lifting beams 8, girders 9 and lifting the beam through the hydraulic cylinder 10, as well as receiving shelves 11 with a movable mounting table 12. Moving the table to the shelf (along the working axis is carried out by a hydraulic cylinder with a travel multiplier (not shown). The mounting table 12 is adapted to be installed on mego formwork 5, containing ;, supporting hydroracks 13 with individual power supply, frame 14 with bashmakami 5, as well as side panels 16 connected with frame 14 by a joint 17. Preload shields to the sides of the excavation is provided by hydraulic cylinders 18. The shoes are configured to mount a permanent fastener 19. The fastening elements 20 of the fastener are placed on the frame 16, and the legs of the fixed lining are guided below the top to 19.
Комплекс работает следующим образом.The complex works as follows.
Одновременно с обработкой забо проходческим комбайном 1 за временной крепью 2 с помощью опалубок 5 производитс закрепление проводимой выработки. Дл чего у одной из опалубок 5 опорные гидростойки 13 привод т в сдвинутое положение и устанавливают ее на монтажном столе 12 подъемника 7, где в бащмаки 15 заклады-, вают верхн ки 19 посто нного креплени и укладывают зат жку 20. Затем вслед за передвижкой временной крепи, 2 к забою.Simultaneously with the processing, the driving unit 1 for the temporary fixture 2 uses formwork 5 to fix the working output. For this, in one of the formwork 5, the support posts 13 are placed in a shifted position and are placed on the assembly table 12 of the lift 7, where the fasteners 15 are laid, the top 19 of the fixed attachment is attached and the stop is placed 20. Then, after shifting lining, 2 to the face.
подн тием .приемного полка 11 к кровле и перемещением вдоль контактного стола 12 производ т установку опалубки на обнаженную за временной крепью поверхность, поддержива ее при этом податчиком наraising the receiving shelf 11 to the roof and moving along the contact table 12 install the formwork on the exposed surface behind the temporary lining, while maintaining it on the
врем приведени опорных гидростоек 13 в рабочее положение. Одновременно с этим на дальней от забо опалубке производ т окончательный монтаж посто нного креплени - к верхн кам крепи 19 устанавливают ножки 21, заполн ют пустоты и полностью закладывают зат жку 20. После этого, снима распор с опорных гидростоек 13, опалубки подхватывают и устанавливают на монтажный стол 12. Далее цикл повтор етс . Количество опалубок в комплекте определ етс величиной зоны действи the time of bringing the support gidroek 13 in the working position. At the same time, a permanent assembly is made at the farthest formwork — the legs 21 are installed to the top lining 19, the legs 21 are filled, the voids are filled and the hitch 20 is completely laid. After that, the strut is removed from the support girders 13, the forms are picked up and set on assembly table 12. Next, the cycle repeats. The number of formwork in the set is determined by the size of the zone
подъемника 7 - ходом монтажного стола.lift 7 - the progress of the assembly table.
Использование изобретени позвол ет в высокой степени механизировать процесс креплени выработки вслед за проходчесКИМ комбайном при одновременном обеспечении надежной безопасности обслуживающего персонала.The use of the invention allows a high degree of mechanization of the process of fixing the production following the shearer combine, while ensuring reliable safety of the staff.
Кроме того, конструктивное выполнение комплекса позвол ет использовать типовые удерживающие или распорно-щагающие устройства дл работы ко.мбайна на наклонных выработках, что повыщает эффективность его применени .In addition, the constructive implementation of the complex allows the use of typical retaining or spacer-shaving devices for the operation of the cubicle on inclined workings, which increases the efficiency of its use.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802904826A SU909188A1 (en) | 1980-04-01 | 1980-04-01 | Entry-driving set |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802904826A SU909188A1 (en) | 1980-04-01 | 1980-04-01 | Entry-driving set |
Publications (1)
Publication Number | Publication Date |
---|---|
SU909188A1 true SU909188A1 (en) | 1982-02-28 |
Family
ID=20887479
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU802904826A SU909188A1 (en) | 1980-04-01 | 1980-04-01 | Entry-driving set |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU909188A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2627339C1 (en) * | 2016-08-26 | 2017-08-07 | Акционерное Общество "Копейский Машиностроительный Завод" | Cutter-loader |
RU209274U1 (en) * | 2016-08-26 | 2022-03-10 | Акционерное Общество "Копейский Машиностроительный Завод" | MINING COMBINE |
CN114790903A (en) * | 2021-06-11 | 2022-07-26 | 泰安市岱岳区永泰矿山技术有限公司 | Supporting single frame body for roadway |
-
1980
- 1980-04-01 SU SU802904826A patent/SU909188A1/en active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2627339C1 (en) * | 2016-08-26 | 2017-08-07 | Акционерное Общество "Копейский Машиностроительный Завод" | Cutter-loader |
RU209274U1 (en) * | 2016-08-26 | 2022-03-10 | Акционерное Общество "Копейский Машиностроительный Завод" | MINING COMBINE |
CN114790903A (en) * | 2021-06-11 | 2022-07-26 | 泰安市岱岳区永泰矿山技术有限公司 | Supporting single frame body for roadway |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102654060B (en) | Tunnel excavation staggered type supporting device | |
SU909188A1 (en) | Entry-driving set | |
RU2026982C1 (en) | Shaft-sinking set | |
CN202090874U (en) | Integrated advance support device for mine speedy drivage | |
RU2144138C1 (en) | Shaft-sinking set | |
RU2515759C1 (en) | Heading blast digger | |
SU949189A1 (en) | Method for supporting horizontal preparatory workings | |
SU1062400A1 (en) | Power support for roof at borderline of driven working and caved-in space in pillar-less coal mining | |
SU1375826A1 (en) | Method of supporting excavation workings in pillar-less mining of coal seams | |
SU777230A1 (en) | Method of securing stope working roof | |
RU2011833C1 (en) | Shaft-sinking complex for driving rock workings | |
SU1286777A1 (en) | Support for haulage drifts | |
SU472196A1 (en) | Interfloor support | |
SU1606708A1 (en) | Arch shield for mining steep coal seams | |
SU1752956A1 (en) | Method of mining bed mineral deposits | |
SU703665A1 (en) | Method of assembling the powdered roof support of stoping machinery sets | |
SU1326736A1 (en) | Method of mounting mechanised set by erection machine | |
RU2003810C1 (en) | Method for bringing powered mining complex to under seam roof in recoverable pillar | |
SU844775A1 (en) | Power roof support for thin steep beds | |
SU877054A1 (en) | Excavating machinery set | |
SU754064A1 (en) | Method of mining thick ore bodies | |
SU1694921A1 (en) | Method of longwall development from base opening | |
SU787660A1 (en) | Temporary support of trench and pit walls | |
SU1565963A1 (en) | Lining for sinking vertical working | |
SU393455A1 (en) | VPTB |