SU898066A1 - Method of unattended mining of coal beds - Google Patents

Method of unattended mining of coal beds Download PDF

Info

Publication number
SU898066A1
SU898066A1 SU802881873A SU2881873A SU898066A1 SU 898066 A1 SU898066 A1 SU 898066A1 SU 802881873 A SU802881873 A SU 802881873A SU 2881873 A SU2881873 A SU 2881873A SU 898066 A1 SU898066 A1 SU 898066A1
Authority
SU
USSR - Soviet Union
Prior art keywords
coal
mining
unattended
coal beds
well
Prior art date
Application number
SU802881873A
Other languages
Russian (ru)
Inventor
Владимир Федорович Крылов
Петр Михайлович Трухин
Юрий Людвигович Худин
Ольгерд Васильевич Ким
Владимир Филиппович Самусев
Жорж Павлович Вареха
Original Assignee
Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Угольный Институт (Книуи)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Угольный Институт (Книуи) filed Critical Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Угольный Институт (Книуи)
Priority to SU802881873A priority Critical patent/SU898066A1/en
Application granted granted Critical
Publication of SU898066A1 publication Critical patent/SU898066A1/en

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Description

II

Изобретение относитс  к горной прокшшленности и предназначено дл  безлюдной выемки преимущественно тонких угольных пластов.The invention relates to mining prokesshennost and is intended for deserted excavation of predominantly thin coal seams.

Известен способ выемки угольных пластов без посто нного присутстви  людей в забое, включающий бурение скважин или проходку камер с выемочного штрека с оставлением или без. оставлени , межскважинных целиков 1JОднако данный способ недостаточно эффективен из-за значительных потерь угл .There is a method of excavation of coal seams without the constant presence of people in the bottomhole, including the drilling of wells or the penetration of chambers from the excavation drift, with or without leaving. abandonment of the interwell pillars 1J However, this method is not sufficiently effective due to the significant loss of coal.

Известен способ безлюдной выемки угольных пластов, включающий бурение с дневной поверхности в угольный пласт скважин, подачу.рабочего агента в разрушаемую зону по скважине, разрушение угл  и выдачу его на поверхность по скважине 2.There is a method of deserted excavation of coal seams, including drilling from the surface into the coal seam wells, feeding the working agent in the zone to be destroyed along the well, destruction of the coal and issuing it to the surface along the well 2.

Однако этот способ, также характеризуетс  недостаточной эффективностью .However, this method is also characterized by insufficient efficiency.

22

Цель изобретени  - повышение эффективности безлюдной выемки угольных пластов.The purpose of the invention is to increase the efficiency of deserted coal seams.

Поставленна  цель достигаетс  тей, что в створе скважин по падению пласта провод т две спаренные выработки , разрушаемую зону подготавливают разрезной печью,, по одной из скважин в качестве рабочего агента подают поток аэросмеси сжатого воздуха и абразивного материала в разрушаемую зону под углом к ее-плоскости со скоростью 120-150 м/с, а полезное ископаемое выдают на поверхность по другой скважине.The goal is to achieve that, in the well site, two paired workings are carried out along the dip of the reservoir, the fractured zone is prepared with a split furnace, one of the wells is fed with a flow of compressed air and abrasive material into the fracture zone at an angle to its plane as a working agent. at a speed of 120-150 m / s, and the mineral is delivered to the surface through another well.

На фиг. 1 изображена технологическа  схема осуществлени  способа; на фиг. 2 - схема подготовки шахтного пол .FIG. 1 shows a flow chart of the method; in fig. 2 - preparation scheme of the mine floor.

Способ осуществл етс  следующим образом.The method is carried out as follows.

По падению пласта провод тс  две спаренные выработки 1 и 2, С поверхности на эти выработки бур тс  скважины 3 и 4 дл  подачи и отвода аэросмеси на рассто нии друг от друга, равном длине очистного забо , и нарезаетс  очистной забой 5. На рис. 2 пунктиром показана последовательност изменени  формы линии очистного забо . Таким образом, производитс  от работка пласта по обе стороны подго товительных Ёыработок. В момент про цесса выемки подготовительные вырабо ки надежно герметизируютс  с помощью перемычек 6 и 7От компрессорной станции 8 сжатый воздух под. давлением 3-10 кгс/см потупает в загрузочный аппарат 9, который подает абразивный материал в скважину 3 и далее в трубопровод. В скважине и трубопроводе абразивный материал разгон етс  до скорости 120150 м/с, запаса  кинетическую энергию . Така  скорость принимаетс  из расчета надежного транспортировани  и получени  заданной энергии потока. Выход  из трубопровода, поток аэросмеси воздействует на угольный маесив и разрушает его. Отбитый уголь вместе с потоком аэросмеси движетс  вдоль линии очистного забо  и далее по горной выработке 10 и скважине 4 в отделитель 11.Two formations 1 and 2 are made after the dip of the formation. Wells 3 and 4 are drilled from the surface to these outputs to feed and disperse the air mixture at a distance from each other equal to the length of the clearing face, and the clearing face 5 is cut. 2, the dotted line shows the sequence of changing the shape of the line of the clearing slab. Thus, the reservoir is processed on both sides of the preparatory works. At the time of the excavation process, the preparatory works are reliably sealed with compressed air jumpers 6 and 7 from the compressor station 8. pressure of 3-10 kgf / cm sinks into the loading device 9, which feeds the abrasive material into the well 3 and further into the pipeline. In the well and the pipeline, the abrasive material accelerates to a speed of 120150 m / s, a reserve of kinetic energy. This speed is taken on the basis of reliable transportation and a given flow energy. The exit from the pipeline, the flow of the air mixture affects the coal mass and destroys it. Repulsed coal along with the flow of the mixture moves along the line of the clearing slab and further along the mine workings 10 and well 4 into the separator 11.

По мере разрушени  угольного массива увеличиваетс  поперечное сечение призабойного пространства, при этом скорость потока на этом участке снижаетс  и часть материала, поступающего с поверхности, выпадает из потока. Сечение снова сужаетс  до размеров, при которых скорость потока обеспечивает транспортирование пустой породы,.после чего происходит разрушение последующего участка угольного массива с заполнением выработанного пространства пустой породой .As the coal mass collapses, the cross-section of the bottomhole space increases, while the flow rate in this area decreases and a part of the material coming from the surface falls out of the flow. The section is again narrowed to the size at which the flow rate ensures the transport of waste rock, after which the subsequent section of the coal massif is destroyed, filling the mined-out space with empty rock.

Предлагаемый способ позвол ет значительно повысить эффективность безлюдной выемки угольных пластов.The proposed method allows to significantly increase the efficiency of deserted coal seams.

Claims (2)

1.Бринько Н.К. .0 направлени х развити  технологии выемки угл  без присутстви  людей.- Уголь, 1976,1.Brinko N.K. .0 directions for the development of coal mining technology without the presence of people. - Coal, 1976, № 6, с.. Н-15.№ 6, with .. H-15. 2.Авторское свидетельство СССР № 617598, кл. Е 21 С , 1977 г.2. USSR author's certificate number 617598, cl. E 21 C, 1977
SU802881873A 1980-02-08 1980-02-08 Method of unattended mining of coal beds SU898066A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU802881873A SU898066A1 (en) 1980-02-08 1980-02-08 Method of unattended mining of coal beds

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU802881873A SU898066A1 (en) 1980-02-08 1980-02-08 Method of unattended mining of coal beds

Publications (1)

Publication Number Publication Date
SU898066A1 true SU898066A1 (en) 1982-01-15

Family

ID=20877457

Family Applications (1)

Application Number Title Priority Date Filing Date
SU802881873A SU898066A1 (en) 1980-02-08 1980-02-08 Method of unattended mining of coal beds

Country Status (1)

Country Link
SU (1) SU898066A1 (en)

Similar Documents

Publication Publication Date Title
CN108625856A (en) A kind of mining methods in the two neighboring one ore removal lane of stope of underground mine
CN104632221B (en) Liquid carbon dioxide blasting induced caving mining method
CN107975373B (en) A kind of lower continuous digging hard-rock mine method of mechanization of liquid-gas phase transition induction
US3650564A (en) Mining method for methane drainage and rock conditioning
CN105422102B (en) A kind of vertical medium-length hole ore blast subsection access back-filling method
CN108798672B (en) A kind of mining methods for the area's ore high-efficiency mining that collapses greatly
CN104596375A (en) Fully mechanized excavation construction method for rock roadway
CN111058847B (en) Continuous large-aperture deep hole blasting mechanized mining method for thick and large ore body
CN113153291A (en) Comprehensive mechanical continuous mining method for hydraulic fracturing of gently inclined hard rock
CN105370280B (en) A kind of double-deck thin jade ore deposit nondestructive blasting mining methods of underground low-angle dip
CN105298493B (en) Underground low-angle dip lamelliform jade ore deposit nondestructive blasting mining methods
SU898066A1 (en) Method of unattended mining of coal beds
RU2634597C1 (en) Method for developing mine workings and conducting stoping operations
RU2143074C1 (en) Method of mining of thick inclined outburst-phone seam
US1195781A (en) Method of channeling and severing by blasting
RU2030581C1 (en) Method for combined mining of thick ore bodies
RU2391507C2 (en) Pilarless development method of coal beds
CN110714763A (en) Hydraulic fracturing coal mining method for coal face of ultra-thick coal seam
RU2540750C2 (en) Complex method of preliminary degassing of working coal bed, worked-out area and accompanying beds and controlled caving of heavy roof
RU2607131C1 (en) Thick flat dipping ore deposits at big depths development method
RU2471989C1 (en) Method to manage hard-to-collapse roof when mining gas-bearing beds in long faces with mechanical complexes
RU2471990C1 (en) Method to mine sloping and inclined coal beds of average capacity
RU2083832C1 (en) Method for development of steep impact-risky seams
RU2047765C1 (en) Method for development of inclined ore body
US2896929A (en) Method of driving rock excavations