SU59937A1 - A method of manufacturing a reinforced concrete insert in a wood pile - Google Patents

A method of manufacturing a reinforced concrete insert in a wood pile

Info

Publication number
SU59937A1
SU59937A1 SU2103D SU2103D SU59937A1 SU 59937 A1 SU59937 A1 SU 59937A1 SU 2103 D SU2103 D SU 2103D SU 2103 D SU2103 D SU 2103D SU 59937 A1 SU59937 A1 SU 59937A1
Authority
SU
USSR - Soviet Union
Prior art keywords
reinforced concrete
manufacturing
pile
wood pile
concrete insert
Prior art date
Application number
SU2103D
Other languages
Russian (ru)
Inventor
И.И. Кропотов
Original Assignee
И.И. Кропотов
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by И.И. Кропотов filed Critical И.И. Кропотов
Priority to SU2103D priority Critical patent/SU59937A1/en
Application granted granted Critical
Publication of SU59937A1 publication Critical patent/SU59937A1/en

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Description

Борьба с гниением свай в обьтных услови х их раб-оты, в мостовых опорах, Бриотан х,  абереж,ных и других гидротехнических сооружеии х с применением даже высококачественных антисептиков не дает положительных результатов в силу того, что антисаптики, в каком бы виде они нииримен лись, быстро вьш;ываютс  водой прИ колебани х ее горизонта и волнении. Дл  уст:ранени  этого  ;влени  предлагались уже комбинированные сваи - дерев нные с железобетонаьгми вставками , соедин ющими нижнюю и верхнюю части дерев нмой cBia« и располагаемымм в зоне колебани  уровн  -воды. Насто щее изобретеиие имеет в виду достигнуть посредством данного способа упрощени  изготовлени  железобетонной вставки и сборки ее на месте при обеспечении -наибольшей прочности конструкции . С этой целью готовую железобетонную муфту надевают, на голову забитой сваи с за1пОЛнением просвета между сваей и муфтой цементным раствором. ЗатеМ часть полости над головой забитой сваи бетонируют , вставл ют верх1нюю часть сваи и заполн ют раствором просвет между этой сваей и м уфтой.Combating the rotting of piles under the conditions of their work, in bridge piers, Briotans, abereas, and other hydraulic engineering constructions using even high-quality antiseptics does not give positive results due to the fact that antisaptics, in whatever form they are they were moving fast out; they were washed by water in the vibrations of its horizon and waves. For the wounds of this, the phenomena proposed were already combined piles — wood with reinforced concrete inserts connecting the lower and upper parts of the cBia wood and located in the level-water oscillation zone. The present invention is intended to be achieved by means of this method of simplifying the manufacture of a reinforced concrete insert and assembling it in situ while ensuring the greatest structural strength. For this purpose, the finished reinforced concrete sleeve is put on, on the head of the driven pile with the completion of the clearance between the pile and the coupling of cement mortar. Then, a part of the cavity above the head of the clogged pile is concreted, the upper part of the pile is inserted and the gap between this pile and the UF is filled with the solution.

На чертеже фиг. I изображает продольный разрез встав-ки в овае; фиг. 2 и 3 - арматуры (в двух проекци х); фиг. 4, 5, 6 - поперуечные разрезы верхней, средней и нижней частей вставки; фиг. 7 - кольцевой бандаж.In FIG. I depicts a longitudinal section of the insert in the shaft; FIG. 2 and 3 - reinforcement (in two projections); FIG. 4, 5, 6 - transverse sections of the upper, middle and lower parts of the insert; FIG. 7 - ring bandage.

Предлагаемый способ изготовлени  железобетонной вставки в дерев нной свае состоит в следующем. За1готовлгнчую иредварителъио железобетонную муфту нижней ее частью (обоймой) 1, армирова шной спиральной арматурой 4 с мо|нтажными стержн ми 4 (фиг. 2 w 3), падевают на голову «и1жней частн 11 сваи, забитой в грунт, и подаерживают  кор ми 8 из полосового или. круглого жеЛеза. Между горизонтальными ПОЛкавди  кОрей и раструбом нижнего конца обоймы 1 помещают кольцевой бандаж 9 (фиг. 7} из пакли и тому подобного материала , обмотанного Вокруг желе эного кольца. 10. Кольцев.ой бандаж надевают на. голову OBia«. после забввкИ в нее четырех  корей 8 и. опускают вниз на глубину, дюс гаемую рук.ой рабочего с иодмоетей Около сваи. Опускание бандажа до полок  корей происходит под давлением обоймы 1 во . ее опускани  вниз.The proposed method for manufacturing a reinforced concrete insert in a wooden pile is as follows. The ferroconcrete coupling of its lower part (ferrule) 1, the reinforced spiral reinforcement 4 with the mounting rods 4 (Fig. 2 w 3), is plowed onto the head of the 11 private pile, piled into the ground, and supported with core 8 from the band or. round the same. Between the horizontal POLKAVDI KOREY and the bell of the lower end of the sleeve 1, an annular band 9 is placed (Fig. 7} of tow and the like material wrapped around the gel ring. 10. Ring band. The bandage is put on the head of OBia ". korea 8 i. down is lowered to the depth dusible by the worker’s hand with iodmoyeta near the pile.The lowering of the bandage to the shelves of the korea takes place under the pressure of the cage 1 in. its lowering downwards.

SU2103D 1940-05-07 1940-05-07 A method of manufacturing a reinforced concrete insert in a wood pile SU59937A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU2103D SU59937A1 (en) 1940-05-07 1940-05-07 A method of manufacturing a reinforced concrete insert in a wood pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU2103D SU59937A1 (en) 1940-05-07 1940-05-07 A method of manufacturing a reinforced concrete insert in a wood pile

Publications (1)

Publication Number Publication Date
SU59937A1 true SU59937A1 (en) 1940-11-30

Family

ID=51211433

Family Applications (1)

Application Number Title Priority Date Filing Date
SU2103D SU59937A1 (en) 1940-05-07 1940-05-07 A method of manufacturing a reinforced concrete insert in a wood pile

Country Status (1)

Country Link
SU (1) SU59937A1 (en)

Similar Documents

Publication Publication Date Title
CN109487803B (en) A kind of prefabricated skeleton slope protection and construction method thereof
CN208917858U (en) Lumen type open caisson device in precast splice type
CN105275097A (en) A post-cast strip water-stop steel plate and demolition-free template net installing method
CN105672307A (en) Expanded-base combination end pile bearing foundation
CN104314075A (en) Conical concrete pile tip, tubular pile provided with pile tip and production method of tubular pile
SU59937A1 (en) A method of manufacturing a reinforced concrete insert in a wood pile
CN105332386B (en) Structure construction method for tower crane foundation serving as basement bottom plate
CN110173126A (en) A kind of barnacle body house wall reinforcement means
CN113529765A (en) Rapid precipitation construction method of anti-floating anchor rod
CN205577430U (en) Concrete placement structure is managed to big scale of construction composite steel concrete column body swift current ball formula pipe cluster in ground
CN211735285U (en) A hang well structure upside down for earth dam hole of collapsing is handled
GB732494A (en) Improvements in or relating to concrete and the like piles
GB511080A (en) Improvements relating to the construction of tunnels
CN105926652B (en) Method and structure for reinforcing inclined retaining wall
CN205501998U (en) Expand end combination end -bearing pile basis
US1969229A (en) Apparatus for forming concrete structures
US8024905B2 (en) Structural reinforcement system for concrete structures
CN206319314U (en) A kind of additional cuff back-up sand building stones prefabricated pile
CN212742515U (en) Firm pile foundation structure
CN107119726A (en) Stay equipment, method in a kind of post-cast strip
US2022551A (en) Veneering construction
CN109853729A (en) Reinforcing bar processing unit and its application method for pattern foundation pit supporting structure column and floor node
DE970760C (en) Process for the production of concrete piles in the ground by pressing the sunk borehole filled with aggregate with cement milk or the like while gradually withdrawing the press pipe
GB270041A (en) Improvements in and relating to concrete linings for shafts, wells and other shaft-like structures
US2144939A (en) Method of forming a foundation structure for bridges, piers, docks, sea walls, and the like