SU1767132A1 - Method and apparatus for dismantling planks with filling - Google Patents

Method and apparatus for dismantling planks with filling Download PDF

Info

Publication number
SU1767132A1
SU1767132A1 SU904858595A SU4858595A SU1767132A1 SU 1767132 A1 SU1767132 A1 SU 1767132A1 SU 904858595 A SU904858595 A SU 904858595A SU 4858595 A SU4858595 A SU 4858595A SU 1767132 A1 SU1767132 A1 SU 1767132A1
Authority
SU
USSR - Soviet Union
Prior art keywords
dismantling
backfill
rebounds
lifting
loops
Prior art date
Application number
SU904858595A
Other languages
Russian (ru)
Inventor
Виктор Борисович Дзюба
Павел Андреевич Чуйко
Владислав Васильевич Гуржий
Иван Павлович Христодоров
Original Assignee
Научно-Исследовательский И Конструкторско-Технологический Институт Городского Хозяйства
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Научно-Исследовательский И Конструкторско-Технологический Институт Городского Хозяйства filed Critical Научно-Исследовательский И Конструкторско-Технологический Институт Городского Хозяйства
Priority to SU904858595A priority Critical patent/SU1767132A1/en
Application granted granted Critical
Publication of SU1767132A1 publication Critical patent/SU1767132A1/en

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Использование: в ремонтно-строительном производстве дл  демонтажа подборов с засыпкой. Сущность изобретени : способ демонтажа подборов с засыпкой включает освобождение крайних участков у опор балок перекрыти  от засыпки и подборов, строповку, подъем и транспортирование их в отведенное место. Строповку подборов осуществл ют путем заведени  троса с петл ми на конце в щель между нижней плоскостью подборов и верхней плоскостью подшивки потолка, установки направл ющих узлов устройства дл  демонтажа на балках перекрыти  по кра м удаленного участка, пропуск концов троса через проушины направл ющих узлов устройства с последующим присоединением их концов к грузоподъемному устройству. Устройство дл  демонтажа подборов с засыпкой содержит направл ющие узлы с проушинами и пропущенные через них тросы с петл ми на концах. Направл ющие узлы выполнены в виде параллельно установленных щек, жестко соединенных регулируемыми по длине упорными стержн ми, оси которых перпендикул рны плоскост м щек. 3 ил. СП СUsage: in the repair and construction industry for the dismantling of rebounds with backfilling. SUMMARY OF THE INVENTION: A method for dismantling rebounds with backfill involves freeing the outermost sections of the beam supports from backfill and rebounds, slinging, lifting and transporting them to the allotted place. The lifting of the pickups is carried out by placing the cable with loops at the end into the slot between the bottom plane of the pickups and the top plane of the ceiling cushioning, installing guide units for dismantling the overlap beams along the edges of the remote section, passing the ends of the cable through the lugs of the guide nodes of the device the subsequent connection of their ends to the lifting device. The device for dismantling backfill pickups contains guide nodes with eyelets and cables passed through them with loops at the ends. The guide nodes are made in the form of parallel-installed cheeks, rigidly connected by length-adjustable stop rods, the axes of which are perpendicular to the planes of the cheeks. 3 il. THX

Description

Изобретение относитс  к ремонтно- строительному производству, в частности к способу демонтажа подборов с засыпкой и устройству дл  его бсуществлени  при капитальном ремонте, восстановлении или реконструкции зданий и сооружений.The invention relates to repair and construction production, in particular, to a method for dismantling pick-ups and a device for carrying it out during an overhaul, refurbishment or reconstruction of buildings and structures.

Известен способ разборки перекрытий по дерев нным балкам, выбранный в качестве прототипа, заключающийс  в том, что после удалени  чистых пологов и лаг приступают к рыхлению засыпки и смазки при помощи ломиков. Разрыхленную засыпку и смазку груз т совковыми лопатами на ленточный транспортер и транспортируют к дерев нному наклонному лотку, по которому опускают в заранее подготовленные контейнеры или бункера, наход щихс  на уров- первого этажа и в дельнейшемThere is a known method of disassembling the overlaps on the wooden beams, chosen as a prototype, which consists in the fact that after removing the clean canopies and lag, they begin to loosen the backfill and lubricate with crowbars. The loosened backfilling and lubrication are loaded with shovel shovels onto a conveyor belt and transported to a wooden inclined chute, which is lowered into pre-prepared containers or bunkers located on the first floor level and further

транспортируют на городскую свалку автотранспортом . После удалени  засыпки и смазки приступают к сн тию подборов1 подборы снимают также при помощт ломиков складируют в отдельные штабели и при помощи башенного крана удал ют с перекрыти  на приобретенный складtransported to the city dump by road. After removing the backfill and lubrication, they proceed to the removal of the pickups. 1 The picks are also removed with the help of stowers and stored in separate piles and removed with a tower crane from the ceiling to the acquired warehouse.

Известно устройство дл  строповки и подъема плавающих объектов, выбранное в качестве прототипа, с о дер жащее направл ющий узел и захватную петлю, выполненную из троса с огонами на концах, сопр гаемого с направл ющим узлом и заведенного на гак судового грузогюдъемного устройства, направл ющий узел содержит систему шарнирно соединенных между собой рычагов с замками, включающую два верхних и два боковых рычага и распорнуюA device for slinging and lifting floating objects, selected as a prototype, has a supporting guide knot and a gripping loop made of a cable with lights at the ends, coupled with the guide knot and mounted on a ship lifting device, guiding the knot contains a system of pivotally interconnected levers with locks, comprising two upper and two side levers and a spacer

XIXi

ОчOch

V4V4

ss

планку, состо щую из двух частей, захватна  петл  закреплена в замках рычажной системы, верхние рычаги соединены между собой посредством распорной планки, один из огонов захватной петли надет на распор- ную планку, а другой пропущен через первый и заведен на гак судового грузоподъет ного устройства, при этом конец троса передГвторым огоном жестко прикреплен к одному из верхних рычагов. верхние рычаги выполнены с группами отверстий , а распорна  планка снабжена ос ми , сопр гаемыми с отаерсти ми верхних рычагов.a two-part bar, a gripping loop is fixed in the locks of the lever system, the upper levers are interconnected by means of a spacer bar, one of the lugs of the gripping loop is put on the bar plate, and the other is passed through the first bar and mounted on the hook of the ship's lifting device , while the end of the cable before the second light is rigidly attached to one of the upper levers. the upper arms are made with groups of holes, and the spacer bar is provided with axles matching with the openings of the upper arms.

Недостаток известного способа и уст- ройстоа (инструментов) дл  реализации способа заключаетс  в том, что они не обеспечивают повышени  производительности труда за счет сокращени  процента ручного труда в общем объеме трудозатрат по де- монтажу,The disadvantage of the known method and device (tools) for implementing the method is that they do not provide an increase in labor productivity by reducing the percentage of manual labor in the total amount of labor costs for disassembly,

Цель изобретени  состоит в повышении производительности труда за счет замены трудоемких процессов и сокрэщении их количестваThe purpose of the invention is to increase labor productivity by replacing labor-intensive processes and reducing their number

Поставленна  цель достигаетс  тем, что в способе демонтажа подборов с засыпкой, включающем освобождение крайни участков у опор балок перекрыти  от засыпки и подборов, строповку, подъем и транспорти- рование в отведенное место грузоподъемным устройством, согласно изобретению, строповку подборов осуществл ют путем заведени  троса с петл ми на концах в щель кежду нижней плоскостью подборов и вер- хней плоскостью подшивки потолка, установки направл ющих узлов устройства дл  демонтажа на балках перекрыти  по кра м удал емого участка, пропуска концов троса через проушины направл ющих узлов уст- ройства с последующим присоединением их концов к грузоподъемному устройству.The goal is achieved by the fact that in the method of dismantling pick-ups, which include the release of extreme areas at the supports of the beams from the backfill and rebounds, slinging, lifting and transporting to a designated place with a lifting device according to the invention, slinging rebounds is done by placing a cable with loops at the ends into the gap between the lower plane of the selections and the upper plane of the ceiling filing, installing guide units for dismantling the beams on the edges along the edges of the section to be removed, OSCAL cable ends through the eyelets of the guide assemblies an apparatus followed by the addition of their ends to a hoisting device.

Поставленна  цель достигаетс  также тем, что в устройство дл  демон гажз подборой с засыпкой, включающем направл ю- щие узлы с проушинами и пропущенные через них тросы с петл ми на концах, согласно изобретению, направл ющие узлы выполнены в виде параллельно установленных щек, жестко объединенных между со- бой регулируемыми по длине упорными стержн ми, оси которых перпендикул рны плоскост м щек.This goal is also achieved by the fact that in a device for demon gas seals with backfill, including guide nodes with eyelets and cables passed through them with loops at the ends, according to the invention, guide nodes are made in the form of parallel-mounted cheeks rigidly joined between them are length-adjustable stop rods whose axes are perpendicular to the plane of the cheeks.

Именно за вл емое расположение ре- гули руемых по длинеупорных стержней, образование объема между плоскост ми щек устройства и Соотношение сил массы устройства к силам трени  подборов обеспечивают , согласно способу, заводку подборов с засыпкой в указанный объем и тем самымIt is the claimed arrangement of the length-adjustable rods that are controlled by the device, the formation of volume between the device's cheek planes and the ratio of the forces of mass of the device to the forces of friction of rebounds ensure, according to the method, the charging of rebounds with filling in the specified volume and thereby

способствуют достижению цели изобретб- ни . Это позвол ет сделать вывод, что за вл емые изобретени  св заны между собой единым изобретательским замыслом,contribute to the achievement of the goal of the invention. This allows us to conclude that the claimed inventions are interconnected by a single inventive concept,

Сравнение за вл емых технических решений с прототипом позволило установить соответствие их Критерию Новизна. При изучении других известных технических решений в данной области техники признаки, отличающие за вл емые изобретени  от прототипа, не были вы влены и потому они обеспечивают за вл емому техническому решению соответствие критерию существенные отличи .Comparison of the proposed technical solutions with the prototype made it possible to establish compliance with the Novelty Criterion. When studying other known technical solutions in this field of technology, the signs that distinguish the claimed inventions from the prototype have not been identified and therefore they provide the claimed technical solution with the criterion of significant differences.

Пример. На действующем объекте во врем  комплексного капитального ремонта дома в г. Киеве по ул, Саксаганского дом 79 после сн ти  паркета и черных полов применен за вл емый способ демонтажа подборов с засыпкой. В результате повысилась производительность труда за счет снижени  процента ручнбго труда в общем объеме трудозатрат по демонтажу подборов и засыпки , Следовательно, удалось достичь сокращени  времени демонтажа подборов и засыпки по сравнению с традиционными известными способами,Example. At the existing facility during complex overhaul of the house in Kiev, Saksaganskogo St. 79, after removing the parquet and black floors, the proposed method of dismantling rebounds with backfilling was applied. As a result, labor productivity increased by reducing the percentage of manual labor in the total amount of labor for dismantling pickups and backfilling. Consequently, the time taken for dismantling pickups and backfilling was reduced compared to traditional known methods,

По за вл емому способу рабочий процесс начинаетс  с освобождени  крайних участков вблизи опор балок перекрыти  у несущих стен от засыпки и подборов (2-3 подборных элемента). В открывшуюс  щель между нижней плоскостью подборов и верхней плоскостью подшивки потолка завод т тросы с петл ми на концах. Устанавливают устройство на две балки перекрыти . Завод т тросы с петл ми в проушины щек устройства и строп т к четырехветаевому стропу, подвешенному к крюку крана. Нат жением тросов крана осуществл ют сбор подборов с засыпкой в объем, заключенный между параллельными плоскост ми щек тросами с петл ми на концах. Устройство вместе с подборами и засыпкой транспортируют краном в отведенное место на стройплощадке .According to the claimed method, the workflow begins with the release of the extreme sections near the supports of the girders of the supporting walls from backfill and rebounds (2-3 pickup elements). In the opened gap between the bottom plane of the pickups and the top plane of the ceiling filing, wind up the cables with loops at the ends. Install the device on two floor beams. Install cables with loops in the lugs of the device cheeks and lines to the four-vest line suspended from the crane hook. Tensioning the cables of the crane collects pickups with backfill into the volume enclosed between the parallel planes of the cheeks with cables with loops at the ends. The device together with the pickups and backfilling is transported by crane to the designated place on the construction site.

На фиг, 1 представлено устройство с освобожденными крайними участками от подборов и засыпкой; на фиг. 2 - установленное устройство на две балки с заведенными стропами; на фиг. 3 - момент подъема устройства с подборами и засыпкой.Fig, 1 shows the device with the freed extreme areas from rebounds and backfilling; in fig. 2 - installed device on two beams with slings installed; in fig. 3 - the moment of lifting the device with rebounds and backfilling.

Устройство дл  осуществлени  способа состоит из двух параллельных щек 1, к верхним кромкам которых прикрепл ют проушины 2, а к нижним п ты 3, в нижней плоскости которых имеютс  заостренные зубь  4, двух крайних стержней 5 с регулировочными шайбами 6, центрального стержн  7 с регулировочными шайбами 6, двухThe device for carrying out the method consists of two parallel cheeks 1, with lugs 2 attached to the upper edges, and to the lower heels 3, in the lower plane of which there are pointed teeth 4, two extreme rods 5 with adjusting washers 6, a central rod 7 with adjusting washers 6, two

пластин 8 со ст жными муфтами 9 дл  регулировки их по длине и двух тросов 10 с петл ми ha концах,plates 8 with tension sleeves 9 for adjusting them along the length and two cables 10 with loops ha ends,

Устройство работает следующим образом .The device works as follows.

У несущих стен 11 здани  вблизи опор балок 12 перекрыти  освобождают крайние участки 13 от засыпки 14 и подборов 15 (2-3 подборных элементов). В открывшуюс  щель 16 между нижней плоскостью подборов 15 и верхней плоскостью подшивки потолка 17 завод т тросы 10 с петл ми на концах. С помощью регулировочных шайб 6 на крайних и центральном стержн х 5 и 7 и ст жных муфт 9 на пластинах 8 выставл ют внутренний размер параллельных щек 1, соответствующий размеру между балками 12 перекрыти . При помощи крана устанавливают устройство на две балки 12 перекрыти , которое под собственным весом зубь ми 4, имеющихс  в нижней плоскости п т 3, жестко закрепл ютс  на них. В проушины 2 прикрепленных к верхним кромкам параллельных щек 1 завод т тросы 10 с петл ми на концах и строп т к четырехветвево- му стропу 18. подвешенному к крюку крана. Нат жением тросов крзна осуществл ют сбор подборов 15 совместно с засыпкой 14 тросами 10 с петл ми на концах в объем, заключенный между параллельными плоскост ми щек 1 с боков, центральным и крайним стержн ми 7 и 5 снизу и с торцов устройства.At the bearing walls 11 of the building near the supports of the beams 12 of the overlap, the end sections 13 are freed from backfilling 14 and rebounds 15 (2-3 pick-up elements). In the opened slot 16, between the lower plane of the rebounds 15 and the upper plane of the ceiling cushion 17, wind up the cables 10 with loops at the ends. Using the adjusting washers 6 on the outer and central rods x 5 and 7 and the clamp sleeves 9 on the plates 8, the inner size of the parallel cheeks 1 is exposed, corresponding to the size between the beams 12 of the overlap. With the help of a crane, the device is installed on two beams 12 of the overlap, which, under its own weight, the teeth 4, which are located in the lower plane of n 3, are rigidly fixed to them. In the lugs 2 attached to the upper edges of the parallel cheeks 1, winding cables 10 with loops at the ends and lines to the four-legged sling 18. suspended from the crane hook. Tensioning the rope cables collects clips 15 along with filling 14 cables 10 with loops at the ends into the volume enclosed between the parallel planes of the cheeks 1 from the sides, the central and extreme rods 7 and 5 from the bottom and from the ends of the device.

При дальнейшем движении тросов крана устройство вместе с подборами 15 и засыпкой 14 поднимают и транспортируют в отведенное место на стройплощадке или груз т на транспортное средство.Upon further movement of the crane's ropes, the device, together with the pickups 15 and the backfill 14, is lifted and transported to the designated place on the building site or loaded onto the vehicle.

Цикл повтор етс .The cycle is repeated.

Использование предлагаемого способа демонтажа подборов с засыпкой и устройство дл  его осуществлени  позвол ет по сравнению с существующими снизить процент ручного труда в общем объеме трудозатрат по демонтажу подборов с засыпкой, следовательно, повышаетс  производительность труда, т.е. сокращаютс  сроки ремонта здани  в целом,Using the proposed method for dismantling pick-ups and a device for carrying it out allows, in comparison with the existing ones, to reduce the percentage of manual labor in the total amount of labor for dismantling pick-ups with backfill, therefore, labor productivity increases, i.e. the repair time of the building as a whole is shortened

Формул а изобретен и Formula invented and

1.Способ демонтажа с засыпкой, включающий освобождение крайних участков у опор балок перекрыти  от засыпки и подборов , с роповку, подъем и транспортирование в отведенное место грузоподъемным устройством,отличающийс  тем,что, с целью повышени  производительности труда, строповку подборов осуществл ют путем заведени  троса с петл ми на концах1. A method of dismantling with backfilling, including the release of the extreme sections at the supports of the floor beams from backfill and rebounds, with lifting, lifting and transporting to the allotted place with a lifting device, characterized in that, in order to increase labor productivity, the slinging of rebounds is carried out by fitting a cable with loops on the ends

в щель между нижней плоскостью подборов и верхней плоскостью подшивки потолка, установки направл ющих узлов устройства дл  демонтажа на балках перекрыти  по кра м удал емого участка, пропуск концовinto the slot between the bottom plane of the pickups and the top plane of the ceiling filing, installation of the device guide assemblies for dismantling on the beams, overlapping along the edges of the section to be removed, skipping the ends

троса через проушины направл ющих узлов устройства с последующим присоединением их концов к грузоподъемному устройству .a cable through the lugs of the device guide assemblies with the subsequent connection of their ends to the lifting device.

2,Устройство дл  демонтажа подборов с засыпкой, включающее направл ющие узлы с проушинами и пропущенные через них тросы с петл ми на концах, отличающеес  тем, что, с целью повышени  производительности , направл ющие узлы выполнены в виде параллельйо установленных щек. жестко объединенных между собой регулируемыми по длине упорными стержн ми, оси которых перпендикул рны плоскост м щек.2, A device for dismantling pick-ups, comprising guide units with eyelets and cables passed through them with loops at the ends, characterized in that, in order to improve performance, the guide units are made in the form of parallel-mounted cheeks. rigidly interconnected length-adjustable stop rods, the axes of which are perpendicular to the plane of the cheeks.

.//.//

Фиг. /FIG. /

; ъг. г; fg g

-XI..-Xi ..

....

/4/four

юYu

4, 114, 11

i/i /

....

..В Y/..In Y /

и f. Л7and f. L7

Claims (2)

Формула изобретенияClaim 1. Способ демонтажа с засыпкой, включающий освобождение крайних участков у Опор балок перекрытия от засыпки и подборов, с?роповку, подъем и транспортирование в отведенное место грузоподъемным устройством, от лича ю щ и й с я тем, что, с целью повышения производительности труда, строповку подборов осуществляют путем заведения троса с петлями на концах в щель между нижней плоскостью подборов и верхней плоскостью подшивки потолка, установки направляющих узлов устройства для демонтажа на балках перекрытия по краям удаляемого участка, пропуск концов троса через проушины направляющих узлов устройства с последующим присоединением их концов к грузоподъемному устройству.1. The method of dismantling with backfill, including the release of the extreme sections at the Supports of floor beams from backfill and rebounds, digging, lifting and transporting to a designated place with a lifting device, in order to increase labor productivity slings of the seals are carried out by inserting a cable with loops at the ends into the gap between the lower plane of the seams and the upper plane of the ceiling hemming, installing the guide assemblies of the device for dismantling on the floor beams along the edges of the deleted section, a pass the ends of the cable through the eyes of the guide nodes of the device with the subsequent connection of their ends to the lifting device. 2, Устройство для демонтажа подборов с засыпкой, включающее направляющие узлы с проушинами и пропущенные через них тросы с петлями на концах, о т л и ч а ю щ ее с я тем, что, с целью повышения произво; дительности, направляющие узлы выполнены в виде параллельйо установленных щек. жестко объединенных между собой регулируемыми по длине упорными стержнями, оси которых перпендикулярны плоскостям щек. .2, A device for dismantling rebounds with backfill, including guide assemblies with lugs and cables passed through them with loops at the ends, so as to increase production; Direction, the guide nodes are made in the form of parallel mounted cheeks. rigidly interconnected thrust rods adjustable in length, whose axes are perpendicular to the planes of the cheeks. . , Составитель В. Дзюба , Compiled by V. Dziuba Редактор Л. Волкова Editor L. Volkova Техред М.Моргентал Корректор Н. Бучок Tehred M. Morgenthal Corrector N. Buchok
Заказ 3531 Тираж ПодписноеOrder 3531 Circulation Subscription ВНИИПИ Государственного комитета по изобретениям и открытиям при ГКНТ СССРVNIIIPI of the State Committee for Inventions and Discoveries at the State Committee for Science and Technology 113035, Москва, Ж-35, Раушская наб., 4/5113035, Moscow, Zh-35, Raushskaya nab., 4/5 Производственно-издательский комбинат Патент, г. Ужгород, ул.Гагарина, 101Production and Publishing Combine Patent, Uzhgorod, 101 Gagarin St.
SU904858595A 1990-08-20 1990-08-20 Method and apparatus for dismantling planks with filling SU1767132A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU904858595A SU1767132A1 (en) 1990-08-20 1990-08-20 Method and apparatus for dismantling planks with filling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU904858595A SU1767132A1 (en) 1990-08-20 1990-08-20 Method and apparatus for dismantling planks with filling

Publications (1)

Publication Number Publication Date
SU1767132A1 true SU1767132A1 (en) 1992-10-07

Family

ID=21531776

Family Applications (1)

Application Number Title Priority Date Filing Date
SU904858595A SU1767132A1 (en) 1990-08-20 1990-08-20 Method and apparatus for dismantling planks with filling

Country Status (1)

Country Link
SU (1) SU1767132A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Голов Г.И., Полтавцев А.В. Технологи разработки зданий,- Киев: Будивельник, 1980, с. 33. Авторское свидетельство СССР №789315, кл. В 66 С 1/12, 1978. *

Similar Documents

Publication Publication Date Title
JP3885584B2 (en) Construction method of composite truss bridge
CN101725111B (en) Totally enclosed cradle and construction method for suspending cast of concrete by using same
CN111622126B (en) Construction method of high-altitude vertical manned channel in high mountain rock area
CN109488038B (en) Method for installing beam string flexible inhaul cable spanning existing building
CN101487234B (en) Construction method for transverse beam hoisting in-position of arch first and beam late tied-arch bridge
CN105113803B (en) High-altitude sliding hoisting device of corridor truss of mountain and implementing method of high-altitude sliding hoisting device
CN106703420A (en) Large-span ball joint spherical wire frame cluster rocker hoisting construction method
CN106049293A (en) Method for installing stiffening beam of suspension bridge over navigable river and swing shift system used in method
CN106184237A (en) A kind of Light-duty Quick-installation cableway
JP4956634B2 (en) Laying slabs on bridge girders
SU1767132A1 (en) Method and apparatus for dismantling planks with filling
CN116573545A (en) Simple lifting frame for pipe jacking working well soil outlet
CN107487423B (en) Marine suspension scaffold and construction method thereof
CN201362571Y (en) Equipment of cross beam for hoisting arch-first and girder-late tied bars arch bridge
RU2232863C2 (en) Craneless method for mounting and dismounting drilling derricks, mast and tower constructions with enlarged sections
CN112722734B (en) Method for transporting heavy steel pipes with large calibers in pipe gallery
CN110886214B (en) Mounting and dismounting method of maintenance platform for bridge maintenance vehicle
JP2937683B2 (en) Precast slab construction method in suspended slab bridge construction method and jig used for the construction method
CN221116790U (en) Portable lifting device for slope protection material
CN116281646B (en) Automatic crane for bridge construction and working method thereof
CN116838110B (en) Method for installing large-span steel truss roof lower air pipe
CN112660988B (en) A conveyer that is used for heavy steel pipe of heavy bore in piping lane
CN202157356U (en) Movable unearthed hanging device for hole-digging piles
CN220264973U (en) Partition plate installation lifting device
CN115059092B (en) Supporting structure in foundation pit