SU1054540A1 - Method of open-cast mining of sloping and gently-sloping mineral beds - Google Patents

Method of open-cast mining of sloping and gently-sloping mineral beds Download PDF

Info

Publication number
SU1054540A1
SU1054540A1 SU823449105A SU3449105A SU1054540A1 SU 1054540 A1 SU1054540 A1 SU 1054540A1 SU 823449105 A SU823449105 A SU 823449105A SU 3449105 A SU3449105 A SU 3449105A SU 1054540 A1 SU1054540 A1 SU 1054540A1
Authority
SU
USSR - Soviet Union
Prior art keywords
mining
layer
mineral
layers
overburden
Prior art date
Application number
SU823449105A
Other languages
Russian (ru)
Inventor
Федор Федорович Сандт
Александр Иванович Тимченко
Михаил Степанович Рогач
Юрий Александрович Самойлов
Лев Петрович Колокольцев
Михаил Михайлович Смирнов
Георгий Владимирович Качайник
Original Assignee
Предприятие П/Я Р-6767
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Предприятие П/Я Р-6767 filed Critical Предприятие П/Я Р-6767
Priority to SU823449105A priority Critical patent/SU1054540A1/en
Application granted granted Critical
Publication of SU1054540A1 publication Critical patent/SU1054540A1/en

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

СПОСОБ ОТКРЫТОЙ РАЗРАБОТКИ НАКЛОННЫХ И ПОЛОГИХ ПЛАСТОВ ПОЛЕЗНЫХ ИСКОПАЕМЫХ, включающий отработку вкрышнык пород и пластов горизонтальными сло ми с проведением разрезных траншей и отработку слоев вскрышными и добычными заходами, отличающийс  тем, что, с целью повышени  безопасности ведени  горных раJ6oT , уменьшени  потерь и разубоживани  полезного ископаемого, каждую разрезную траншею провод т в вис чем боку пласта на глубину двух слоев, вскрышные и добычные захрдки в преде лах каждого сло  отрабатывают от разрезной траншеи к выходу пласта на верхню|(Г площадку сло , при этом вскрышную заходку отрабатывают двум  забо ми с опережающей выемкой треугольной призмы, расположенной в указанной заходке со стороны, противоположной разрезной траншее и примыкающей к кровле пласта полезного ископаемого, а добычную заходку отрабатывают двум  забо ми с опережающей выемкой тре-. угольной призмы по пласту полезного ископаемого, примыкающей к породам по.чвы указанного пласта, причем полезное ископаемое при выемке треугольной призмы пласта размещают в бурт на верхней площадке добычной заходки и переэкскавируют указанный бурт одновременно с переэкскавацией полезного ископаемого отстающего забо  :л сд добычной заходки. 4METHOD OF OPEN DEVELOPMENT OF INCLINED AND LOOSE PLAINS OF USEFUL MINERALIZED, including mining of roofing rocks and formations in horizontal layers with the provision of split trenches and mining of layers by overburden and mining approaches, characterized in that, in order to improve the safety of mountain work, the layers of overburden and mining approaches, characterized in order to improve the safety of mountain work programs, in order to improve the safety of mountain work programs. , each split trench is conducted in a hanger to the side of the reservoir to a depth of two layers, the stripping and mining pits in the limits of each layer are worked from the split trench to the exit at the top of the layer (layer layer, while the overburden lock is worked by two faces, with a leading notch of a triangular prism, located in the indicated gate from the side opposite to the split trench and adjacent to the roof of the mineral layer, and the mining runoff is worked by two advance excavation of a trellised coal prism along the mineral reservoir adjacent to the rocks of the specified reservoir, and the mineral is placed in a collar on the upper platform when the triangular prism of the reservoir is excavated mining of the mining approach and re-exploring the specified collar simultaneously with re-extraction of the mineral lagging behind the mine: l sd mining mining. four

Description

Изобретение относитс  к горной промышленности и может быть использовано при открытой разработке наклонных и пологих пластов полезных ископаемых„ Известен спрсоб открытой разработки пологих пластов полезных ископаемых , включающий проведение разрезных траншей и отработку nhacTOB наклонными сло ми с выемкой слоев заходками ij Недостатком данного способа  вл етс  недостаточна  безопасность веде ни  горных работ при размещении части оборудовани  на наклонных рабочих площадках Наиболее близким по технической сущности и достигаемому результату  вл етс  способ открытой разработки наклонных и пологих пластов полезных ископаемых, включающий отработку вскрышных пород и пластов горизонтал ными сло ми с проведением разрезных траншей и отработку слоев вскрышными и добычными заходками 21 , Недостатками известного способа   л ютс  недостаточна  безопасность ведени  горных работ из-за необходимости размещени  части оборудовани  на наклонных рабочих площадках, относительно высокие потери и разубоживание полезного ископаемого в процессе отработки, ограниченна  область применени  (способы неэффективны на крутонаклонных пластах)„ Цель изобретени  - повышение безопасности ведени  горных работ и умень шение потерь и разубоживани  полезного ископаемого доставленна  цель достигаетс  тем что согласно способу открытой разработки наклонных и пологих пластов полезных ископаемых, включающему отработку вскрышных пород и пластов горизонтальными сло ми с проведением разрезных траншей и отработку слоев вскрышными добычными заходками, какаждую разрезную траншею провод т в вис чем боку пласта на глубину двух слоев, вскрышные и добычные заходки в пределах каждого сло  отрабатывают от разрезной траншеи к выходу пласта на верхнюю площадку сло , при этом вскрьпиную заходку отрабатывают двум  забо ми с опережающей выемкой треугольной призмы, располохеиной в указанной заходке со стороны, противоположной разрезной траншее и примыкающей к кровле пласта по/тёзного ископаемого , а добычную эаходку отрабатывают двум  забо ми с опережающей выемкой треугольной призмы по пласту ;полезного ископаемого, примыкающей к породам почвы указанного пласта, причем полезное ископаемое при выемке треугольной , призмы пласта размещают в бурт на верхней площадке заходки и переэкскавир ют указанный бурт одновременно с переэкскавацией полезного ископаемого отстающего забо  добычной заходки о На фиг с, 1 представлена схема ведени  горных работ, вид в плане; на фиг. 2 - разрез А-А на фиг 1; на фиго 3 разрез Б-Б на фиг, 1„ Способ реализуетс  следующим образом„ При разработке пологих пластов 1 и 2 полезного ископаемого, например фосфоритов, в вис чем боку пласта 1 провод т разрезную траншею 3 на глубину двух горизонтальных слоев 4 и 5 о После этого с верхней площадки верхнего сло  осуществл ют обуривание и валовое взрывание сразу двух слоев на всю ширину будущих заходок С опережением в пространстве отрабатывают вскрышную заходку 6 верхнего сло . Лл  этого с опережением основного забо  заходки осуществл ют зачистку разрыхленного пласта 1 экскаватором с выемкой треугольной призмы 7 вскрышных пород над пластом в пределах сло  и размещением пород в бурт 8 на поверхность разрыхленных вскрышных пород заходкио G отставанием от забо  зачистки осуществл ют отработку вскрышной заходки 6 верхнего сло  с одновременной переэкскавацией в транспортные средства, в частности автосамосвалы, пород бурта 8. .. Вслед за отработкой вскрышной за ходки осуществл ют выемку разрыхленного пласта 1 полезного ископаемого в пределах треугольной призмы 9 пласта 8 пределах сло  с зачисткой пород междупласть  и размещением полезного .ископаемого в бурт 10 на поверхность полезного ископаемого. Разрыхленное полезное ископаемое и бурт 10 отрабатывают в пределах сло  заходной 11 Аналогичным образом отрабатывают заходной 12 породы междупласть  в пределах верхнего сло  и заходкой 13 нижележащий пласт в пределвх этого сло , ;The invention relates to the mining industry and can be used in the open development of sloping and gently sloping mineral seams. Known is the open mining of sloping mineral strata, which includes cutting trenches and working nhacTOB with sloping layers with dredging by inserts. Ij The disadvantage of this method is insufficient security no mining operations when part of the equipment is placed on inclined work sites. The closest to the technical essence and the achieved The result is an open pit mining method of sloping and gentle mineral deposits, including the mining of overburden rocks and layers by horizontal layers with conducting trenches and mining of stripping and mining steps 21. The disadvantages of this method are insufficient safety of mining operations due to the need placing equipment on inclined work sites, relatively high losses and dilution of the mineral in the process of mining, limited area Changes (methods are ineffective on steeply inclined formations) "The purpose of the invention is to increase the safety of mining operations and reduce losses and dilution of mineral resources, the goal is achieved by the method of open development of inclined and flat mineral deposits, including the development of overburden and layers of horizontal layers with conducting split trenches and mining of layers by overburden mining stoppers, each split trench is conducted in a dangler to the side of the seam to a depth of The ear layers, the overburden and mining penetrations within each layer are worked from the split trench to the formation exit to the upper layer of the layer, while the scrap entry is worked out two times with a leading notch of a triangular prism, which is open in the indicated step from the side opposite to the split trench and adjacent to the top of the reservoir is of a fossil, and the mining output is worked by two faces with a leading excavation of a triangular prism along the reservoir; the mineral is adjacent to the rocks of the soil one wherein the mineral product when removing the triangular prism is placed in the reservoir at the top of shoulder stope and pereekskavir dissolved simultaneously with said shoulder pereekskavatsiey mineral lagging slaughtering stope mining of Figure s 1 is a diagram of mining operations, a plan view; in fig. 2 is a section A-A in FIG. 1; in FIG. 3, section BB, FIG. 1, “The method is implemented as follows.” In the development of flat layers 1 and 2 of mineral resources, such as phosphorites, a split trench 3 is suspended in the side of layer 1 to a depth of two horizontal layers 4 and 5 After that, from the upper platform of the upper layer, two layers are simultaneously drilled and grossly exploded simultaneously over the entire width of the future approaches. The stripping 6 of the upper layer is worked out ahead in space. To do this, ahead of the main indent, the stripping of the loosened formation 1 is carried out with an excavator with a notch of a triangular prism of 7 overburden over the formation within the layer and placing the rocks in the collar 8 onto the surface of the opening of the overburden G with a lag from the stripping of the upper stripping 6 layer with simultaneous re-excavation into vehicles, in particular dump trucks, of the collar rocks 8. .. Following the overburden mining, the loosened formation 1 is excavated along the a mineral within a triangular prism 9 of layer 8 within a layer with stripping of rocks between the areas and placing the mineral in a collar 10 on the surface of the mineral. The loosened mineral and burt 10 are processed within the lead-in layer 11 In the same way, the lead-in rock 12 is worked up between the area within the upper layer and the lower layer 13 in the limits of this layer;

После отработки-верхнего сло  приступают к отработке следующего сло  с использованием вышеуказанных по отработке сло  заходками. Од .новременно с отработкой слоев осу- j ществл ют разноску борта карьера фронтом И о Далее снова провод т разрезную траншею 15 дл  последующих двух слоев и приступают к их отработке . Отработку заходок в пределах каждого ю сло  осуществл ют ступенчатым фронтом начина  от разрезной траншеи кAfter the upper layer has been developed, the next layer is tested using the above-mentioned layer for the layer. At the same time with the mining of the layers, the pit junction is carried out by the front And then Next, a split trench 15 is again carried out for the next two layers and they are started for mining. The development of landings within each layer is carried out with a stepped front starting from the split trench to

борту курьера. Дл  транспортной ct..,-. с рабочей пло(чадки верхнего сло  на рабочую площадку нижнего сло , вдоль разрезной траншеи провод т съезд 16.courier board. For transport ct .., -. from the working area (upper layer pulls to the working platform of the lower layer; exit 16 is held along the split trench.

Предлагаемый способ позвол ет сократить потери и разубоживание полезного ископаемого, расширить об ласть применени , тем самым повысить эффективность горных работ при разработке наклонных и пологих пластов полезных ископаемых.The proposed method allows to reduce losses and dilution of the mineral, to expand the field of application, thereby increasing the efficiency of mining in the development of sloping and flat mineral layers.

ф1/гF1 / g

Claims (1)

СПОСОБ ОТКРЫТОЙ РАЗРАБОТКИ НАКЛОННЫХ И ПОЛОГИХ ПЛАСТОВ ПОЛЕЗНЫХ ИСКОПАЕМЫХ, включающий отработку вкрышных пород и пластов горизонтальными слоями с проведением разрезных траншей и отработку слоев вскрышными и добычными заходами, отличающийся тем, что, с целью повышения безопасности ведения горных раj5ot, уменьшения потерь и разубоживания полезного ископаемого, каждую разрезную траншею проводят в висячем боку пласта на глубину двух слоев, вскрышные и добычные заходки в пределах каждого слоя отрабатывают от разрезной траншеи к выходу пласта на верхнюю площадку слоя, при этом вскрышную заходку отрабатывают двумя забоями с опережающей выемкой треугольной призмы, расположенной в указанной заходке со стороны, противоположной разрезной траншее и примыкающей к кровле пласта полезного ископаемого,' а добычную заходку отрабатывают двумя забоями с опережающей выемкой тре-. угольной призмы по пласту полезного ископаемого, примыкающей к породам почвы указанного пласта, причем полезное ископаемое при выемке треугольной призмы пласта размещают в бурт на верхней площадке добычной заходки и переэкскавируют указанный бурт одновременно с переэкскавацией полезного ископаемого отстающего забоя добычной заходки.METHOD FOR OPEN DEVELOPMENT OF INCLINED AND GANFLOW PLAYS OF USEFUL FOSSILS, including working out of overburden and strata with horizontal layers with cutting trenches and working out layers with overburden and mining approaches, characterized in that, in order to increase the safety of mining and loss, reduce, reduce each split trench is carried out in the hanging side of the formation to a depth of two layers, overburden and production approaches within each layer are worked out from the split trench to the exit of the plat that the upper pad layer, wherein the stripping stope fulfill the two bottoms with advanced recess triangular prism positioned in said stope from the side opposite the split trench and adjacent the roof of reservoir minerals, 'and a mining stope fulfill the two bottoms with advanced tre- recess. a coal prism along a mineral layer adjacent to the soil of the indicated layer, and the mineral when excavating a triangular prism of the layer is placed in a shoulder at the upper site of a mining sunset and re-excavated said shoulder at the same time as re-excavation of the mineral lagging behind the bottom of a mining sunset. 1 J0545401 J054540
SU823449105A 1982-06-03 1982-06-03 Method of open-cast mining of sloping and gently-sloping mineral beds SU1054540A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU823449105A SU1054540A1 (en) 1982-06-03 1982-06-03 Method of open-cast mining of sloping and gently-sloping mineral beds

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU823449105A SU1054540A1 (en) 1982-06-03 1982-06-03 Method of open-cast mining of sloping and gently-sloping mineral beds

Publications (1)

Publication Number Publication Date
SU1054540A1 true SU1054540A1 (en) 1983-11-15

Family

ID=21015400

Family Applications (1)

Application Number Title Priority Date Filing Date
SU823449105A SU1054540A1 (en) 1982-06-03 1982-06-03 Method of open-cast mining of sloping and gently-sloping mineral beds

Country Status (1)

Country Link
SU (1) SU1054540A1 (en)

Similar Documents

Publication Publication Date Title
Hamrin et al. Underground mining methods and applications
CN105626071B (en) Mining method for gently inclined thin ore body
US3999804A (en) Longwall mining with chain pillar recovery
SU1054540A1 (en) Method of open-cast mining of sloping and gently-sloping mineral beds
RU2418166C1 (en) Compound development method of series of gently sloping beds of mine fields
RU2099524C1 (en) Combined method of mining of formation of steeply dipping coal seams
SU1155757A1 (en) Method of mining mineral deposits
RU2425216C1 (en) Complex development method of bed series of anticline deposits
RU2093679C1 (en) Method for opencast mining of contiguous horizontal and slightly inclined seams of minerals
SU1257221A1 (en) Method of mining ore bodies
RU2418168C1 (en) Compound development method of series of gently sloping beds of mine fields
SU1028846A1 (en) Method of mining steep ore deposit
SU1747682A1 (en) Method of robbing rib pillars
RU2422638C1 (en) Compound development method of series of gently sloping beds of syncline and brachysyncline mine fields
RU96109970A (en) COMBINED METHOD FOR DEVELOPING STEPS OF STEEP COAL COAST
SU949182A1 (en) Method for working gently sloping mineral seams
SU914773A1 (en) Method of filling an excavated space
SU1122824A1 (en) Method of mining seam deposits of minerals
RU2290510C1 (en) Open underground method for extracting formations of mineral resources
SU825962A1 (en) Method of controlling hard-to-cave roofs
SU1458574A1 (en) Method of mining ore bodies
RU2091583C1 (en) Method of mining of mineral upper horizons
RU2062879C1 (en) Method for open exploitation of drawn together inclined mineral seam
SU966235A1 (en) Method of winning thin gently-sloping mineral seams
RU2229600C1 (en) Method for excavation of steep-falling ore deposits