Method for constructing extra-large variable cross section tunnelInfo
- Publication number
- SE543647C2 SE543647C2 SE1750913A SE1750913A SE543647C2 SE 543647 C2 SE543647 C2 SE 543647C2 SE 1750913 A SE1750913 A SE 1750913A SE 1750913 A SE1750913 A SE 1750913A SE 543647 C2 SE543647 C2 SE 543647C2
- Authority
- SE
- Sweden
- Prior art keywords
- constructing
- temporary
- tunnel
- excavating
- primary support
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D21/00—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/04—Driving tunnels or galleries through loose materials; Apparatus therefor not otherwise provided for
Abstract
Disclosed is a method for constructing an extra-large variable section tunnel. The method comprises: excavating a left pilot tunnel (11) and timely constructing primary supports and temporary supports; packing large boot-shaped wall feet (13) and constructing a right pilot tunnel (12) by the same process; excavating the upper half part of the left side of a main tunnel (2) and timely constructing a first-layer primary support (23), a temporary vertical brace (91) and a temporary inverted arch; excavating the lower half part of the left side of the main tunnel (2) and timely constructing the first-layer primary support (23) and the temporary vertical brace (91 ); constructing the upper half part of the right side of the main tunnel by the same process, and excavating a middle arch part and timely constructing the first-layer primary support; constructing a second-layer primary support (24) and removing the temporary vertical braces and the temporary inverted arches of the arch part; excavating a central part and timely constructing primary support (8) of the inverted arches; removing the temporary supports (17) of the left and right lower pilot tunnels, packing an inverted arch secondary lining, and filling the bottom of the tunnel; and finally one-time packing an arch wall secondary lining (22) by means of a model board trolley. The construction method effectively reduces the safety risk of removing the temporary supports, increases the operation freedom degree and accelerates the construction schedule.
Applications Claiming Priority (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420797002.3U CN204327118U (en) | 2014-12-15 | 2014-12-15 | Super large Varied section tunnel advanced support structure |
CN201420795169.6U CN204436406U (en) | 2014-12-15 | 2014-12-15 | Super large Varied section tunnel support structure |
CN201410776845.XA CN104653197B (en) | 2014-12-15 | 2014-12-15 | Method for constructing extra-large variable cross section tunnel |
CN201410777849.XA CN104500100A (en) | 2014-12-15 | 2014-12-15 | Advanced support structure for oversized variable-section tunnel |
CN201410777881.8A CN104405411B (en) | 2014-12-15 | 2014-12-15 | Oversized variable cross section tunnel supporting structure |
PCT/CN2015/094285 WO2016095630A1 (en) | 2014-12-15 | 2015-11-11 | Method for constructing extra-large variable cross section tunnel |
Publications (2)
Publication Number | Publication Date |
---|---|
SE1750913A1 SE1750913A1 (en) | 2017-07-12 |
SE543647C2 true SE543647C2 (en) | 2021-05-18 |
Family
ID=56125861
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SE1750913A SE543647C2 (en) | 2014-12-15 | 2015-11-11 | Method for constructing extra-large variable cross section tunnel |
SE1750912A SE543306C2 (en) | 2014-12-15 | 2015-11-11 | Support structure for tunnel having ultra-large variable section |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SE1750912A SE543306C2 (en) | 2014-12-15 | 2015-11-11 | Support structure for tunnel having ultra-large variable section |
Country Status (3)
Country | Link |
---|---|
MY (2) | MY198470A (en) |
SE (2) | SE543647C2 (en) |
WO (3) | WO2016095629A1 (en) |
Families Citing this family (66)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN207672602U (en) * | 2017-05-11 | 2018-07-31 | 吴震 | The pull-type vertical retaining wall structure structure of anchor |
CN106988750B (en) * | 2017-05-26 | 2023-07-14 | 中铁四局集团有限公司 | Implementation mode of ultra-short-distance underpass of existing station of large-span interval tunnel |
CN107130977B (en) * | 2017-06-27 | 2023-10-10 | 长江勘测规划设计研究有限责任公司 | Hollow guide excavation structure and excavation method for ultra-large span dome of underground nuclear reactor cavity |
CN107630706B (en) * | 2017-10-24 | 2023-05-26 | 中交第二航务工程局有限公司 | Tunnel bottom structure for eliminating tunnel inverted arch bulge in high-earth-pressure area and construction method |
CN107605493A (en) * | 2017-10-31 | 2018-01-19 | 淮矿西部煤矿投资管理有限公司 | A kind of comprehensive pick construction system and method |
CN107605509A (en) * | 2017-11-08 | 2018-01-19 | 中铁十局集团有限公司 | Sand-pebble layer small curve radius shallow tunnel subsurface excavation method advanced supporting construction method |
CN107916935B (en) * | 2017-11-13 | 2024-01-23 | 浙江大学城市学院 | Soil body composite reinforcement structure for soft soil shield to penetrate existing subway and construction method |
CN108005675A (en) * | 2017-11-16 | 2018-05-08 | 中国电建集团昆明勘测设计研究院有限公司 | The dynamic superposition coupling supporting method and supporting construction in a kind of fault belt tunnel |
CN107893669A (en) * | 2017-12-20 | 2018-04-10 | 贵州大学 | A kind of U-shaped steel for roadway support covers booth structure |
CN107939419A (en) * | 2017-12-20 | 2018-04-20 | 贵州大学 | A kind of tunnel U-shaped steel covers canopy supporting construction |
CN108798720B (en) * | 2018-03-30 | 2023-08-01 | 中国建筑股份有限公司 | Anchor grid integrated arch foot reinforcement system for underground engineering arch cover method and construction method thereof |
CN108590704A (en) * | 2018-04-27 | 2018-09-28 | 中铁十二局集团有限公司 | Light section per-fore pouring liquid with small pipe pays maintaining method in advance |
CN108643934B (en) * | 2018-04-28 | 2024-04-02 | 中铁二院重庆勘察设计研究院有限责任公司 | Construction method based on combined step inverted arch in upper-layer and lower-layer overlapped tunnel |
CN108561156B (en) * | 2018-04-30 | 2024-03-19 | 安徽省公路桥梁工程有限公司 | Separated tunnel arch-changing supporting structure and construction method thereof |
CN108979659B (en) * | 2018-07-04 | 2022-02-01 | 中铁第一勘察设计院集团有限公司 | Reinforcing structure and method for underpass structure of soft soil water-rich large-section tunnel group |
CN108645298A (en) * | 2018-07-20 | 2018-10-12 | 中铁十八局集团有限公司 | The micro- blasting construction method that shakes of the leading pilot tunnel of existing tunnel is closed at short skylight point interval |
CN109026057A (en) * | 2018-07-25 | 2018-12-18 | 西南交通大学 | A kind of tunnel combined support structure suitable for drift-sand stratum |
CN109404005B (en) * | 2018-11-09 | 2023-09-15 | 中铁第一勘察设计院集团有限公司 | Pre-reinforcing system for small hole and large hole of underground tunnel and construction method |
CN109372521A (en) * | 2018-11-22 | 2019-02-22 | 中铁十四局集团有限公司 | New pipe-roof method construction technology and construction pipe suspension device |
CN109538236B (en) * | 2018-12-07 | 2024-04-02 | 中铁十局集团有限公司 | Tunnel entering structure and tunnel entering construction method |
CN109538246A (en) * | 2018-12-26 | 2019-03-29 | 中铁科学研究院有限公司 | Ledge method tunneling subway station arch springing ruggedized construction and construction method |
CN109667603A (en) * | 2018-12-28 | 2019-04-23 | 中铁第四勘察设计院集团有限公司 | A kind of super shallow-buried tunnel structure and construction method |
CN109505630B (en) * | 2019-01-14 | 2023-09-08 | 中铁一局集团有限公司 | Full-hydraulic crawler-type self-propelled trestle and construction method |
CN109578014B (en) * | 2019-01-28 | 2024-02-09 | 中铁第六勘察设计院集团有限公司 | Anti-surging bottom sealing structure and construction method |
CN109538250B (en) * | 2019-01-28 | 2023-09-15 | 中南大学 | Device and method for quick construction of tunnel primary support with mould sprayed concrete |
CN109885329B (en) * | 2019-02-28 | 2023-04-07 | 新华三信息技术有限公司 | Upgrading method and system and electronic equipment |
CN109763838B (en) * | 2019-03-13 | 2023-09-15 | 中铁第一勘察设计院集团有限公司 | Assembled inverted arch structure suitable for tunnel by drilling and blasting method and assembling method thereof |
CN109973111A (en) * | 2019-03-22 | 2019-07-05 | 北京城建集团有限责任公司 | A kind of pilot tunnel water storage system and its construction method |
CN109882206B (en) * | 2019-04-09 | 2020-05-22 | 湖南科技大学 | Multi-support cooperative method for controlling coal mine broken surrounding rock |
CN109973100B (en) * | 2019-05-21 | 2024-02-09 | 中铁第六勘察设计院集团有限公司 | Supporting form for realizing small-radius turning of tunnel by mining method and construction method |
CN110017149A (en) * | 2019-05-21 | 2019-07-16 | 成都市建筑设计研究院 | A kind of ledge tunneling is suitable to build underground structure and construction method |
CN110230504A (en) * | 2019-06-25 | 2019-09-13 | 深圳市综合交通设计研究院有限公司 | A kind of soft lower hard full packet waterproof of compound stratum composite lining structure resistant to pressure and its construction method |
CN110750820B (en) * | 2019-09-19 | 2023-03-28 | 中国人民解放军军事科学院国防工程研究院工程防护研究所 | Underground cave depot excavation support stability judging method based on energy mutation |
CN111125827A (en) * | 2020-02-28 | 2020-05-08 | 中国十七冶集团有限公司 | Loess tunnel earthwork excavation and supporting method based on BIM technology |
CN111472812A (en) * | 2020-04-24 | 2020-07-31 | 重庆交通建设(集团)有限责任公司 | Construction method for filling and pouring concrete into inverted arch of tunnel |
CN111691894A (en) * | 2020-06-22 | 2020-09-22 | 中铁十八局集团有限公司 | Construction process of hole pipe shed |
CN112065443A (en) * | 2020-08-19 | 2020-12-11 | 中铁五局集团有限公司 | Continuous beam second section construction method based on karst cave underground river environment tunnel construction |
CN112031814B (en) * | 2020-09-17 | 2022-07-29 | 攀钢集团工程技术有限公司 | Cave-entering construction method for crossing shallow-layer high-load highway |
CN112228117A (en) * | 2020-10-28 | 2021-01-15 | 中铁十二局集团有限公司 | Construction method for large-section primary support large arch springing |
CN112627857B (en) * | 2020-12-07 | 2022-11-15 | 广东华隧建设集团股份有限公司 | Construction method of tunnel secondary lining |
CN112647985B (en) * | 2020-12-28 | 2022-08-12 | 中国科学院武汉岩土力学研究所 | Combined supporting device of lock pin anchor pipe/anchor rod and steel arch frame and construction method |
CN112682062B (en) * | 2020-12-31 | 2023-08-25 | 中铁大桥局集团第五工程有限公司 | Construction method of small-clear-distance stereo cross tunnel |
CN112682048B (en) * | 2020-12-31 | 2023-08-29 | 中铁大桥局集团第五工程有限公司 | Replacement reinforcement construction method for small clear distance up-span existing tunnel of newly-built tunnel |
CN112855225A (en) * | 2021-03-01 | 2021-05-28 | 中铁上海工程局集团有限公司 | High-safety soft rock tunnel support construction method |
CN113309550B (en) * | 2021-05-19 | 2024-02-27 | 甘肃路桥建设集团有限公司 | Modular temporary supporting and assembling structure for ultra-large section loess tunnel |
CN113187514B (en) * | 2021-05-25 | 2024-02-23 | 中铁九局集团第七工程有限公司 | Construction method for dovetail section of urban railway mine tunnel |
CN113392449B (en) * | 2021-06-01 | 2022-12-30 | 中铁二院工程集团有限责任公司 | Optimization design method of large-span arch support composite foundation |
CN113294175B (en) * | 2021-06-03 | 2023-12-29 | 中国建筑股份有限公司 | Construction method of tunnel secondary lining structure and tunnel secondary lining structure |
CN113338951B (en) * | 2021-06-30 | 2023-11-03 | 中交路桥建设有限公司 | Three-step roof-picking construction method for rapid tunnel intersection |
CN113565513A (en) * | 2021-07-13 | 2021-10-29 | 中交路桥华南工程有限公司 | Upper and lower step reserved core soil excavation method for tunnel excavation |
CN113847050B (en) * | 2021-07-16 | 2023-08-22 | 中交投资南京有限公司 | Construction method of ultra-long highway tunnel in lava mountain area |
CN113803073B (en) * | 2021-09-27 | 2024-01-19 | 长江勘测规划设计研究有限责任公司 | Construction method of tunnel structure for manually clearing obstacle in water-rich sand layer |
CN114060063A (en) * | 2021-11-01 | 2022-02-18 | 中铁十九局集团第二工程有限公司 | Double-layer steel frame concrete-sprayed primary support structure suitable for large deformation of tunnel and support method |
CN114046162A (en) * | 2021-11-19 | 2022-02-15 | 中电建路桥集团有限公司 | High ground temperature tunnel bottom plate heat insulation structure |
CN114086968B (en) * | 2021-11-27 | 2024-04-09 | 中铁广州工程局集团有限公司 | Construction method for undermining existing building undercut tunnel |
CN114109421B (en) * | 2021-12-03 | 2024-01-30 | 中铁隧道局集团有限公司 | Construction method for open TBM through long fault fracture zone |
CN114320340B (en) * | 2021-12-28 | 2023-09-12 | 中铁第六勘察设计院集团有限公司 | Large-span non-column underground tunnel structure and method based on advanced pilot tunnel and opposite-pulling anchor cable |
CN114233302B (en) * | 2021-12-29 | 2024-03-15 | 中铁四院集团西南勘察设计有限公司 | Arch cover construction method suitable for underground excavation station |
CN114320320A (en) * | 2021-12-31 | 2022-04-12 | 北京住总集团有限责任公司 | Supporting structure suitable for underground excavation section local expanding excavation and expanding excavation method |
CN114320312A (en) * | 2022-01-06 | 2022-04-12 | 江西省交通设计研究院有限责任公司 | Tunnel entering construction method of primary support wall-pasting method tunnel |
CN114320314A (en) * | 2022-01-11 | 2022-04-12 | 龙元建设集团股份有限公司 | Zoning excavation method for small-clear-distance and ultra-large-section highway tunnel |
CN114753401B (en) * | 2022-04-08 | 2023-05-26 | 中铁十九局集团第五工程有限公司 | Construction method for tunnel bottom karst cave treatment |
CN115142878B (en) * | 2022-07-04 | 2023-05-16 | 中铁十二局集团有限公司 | CRD method subsection linkage rapid construction method for upper soft and lower hard strata |
CN115306424B (en) * | 2022-08-29 | 2023-07-21 | 中国建筑第二工程局有限公司 | Large-section transverse channel horsehead door breaking operation platform and construction method |
CN116163761A (en) * | 2023-04-06 | 2023-05-26 | 中交(广州)建设有限公司 | Quick switching structure and quick switching excavation method for tunnel in underground tunnel |
CN117107777B (en) * | 2023-10-13 | 2024-04-05 | 中国铁路设计集团有限公司 | Method for constructing underground excavation subway section from open excavation slope foundation pit |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004052408A (en) * | 2002-07-22 | 2004-02-19 | Maeda Corp | Tunnel excavating method |
CN102226398A (en) * | 2011-06-02 | 2011-10-26 | 中铁二院工程集团有限责任公司 | Soft rock four-line large-span tunnel compound double-side wall bracing cable conversion excavation construction method |
CN102345460A (en) * | 2011-06-21 | 2012-02-08 | 北京交通大学 | Settlement control method for shallow large-section loess tunnel |
CN101666232B (en) * | 2009-09-27 | 2012-08-22 | 中铁四局集团有限公司 | Construction method of six-zone digging of super cross section tunnel |
CN102182466B (en) * | 2011-04-08 | 2013-05-01 | 中铁上海设计院集团有限公司 | Excavating method for jump-digging of double-side wall guide pit combined arch part of tunnel |
CN103775095A (en) * | 2014-02-26 | 2014-05-07 | 中铁第一勘察设计院集团有限公司 | Ridge soft-foundation tunnel advance double guide tunnel and construction method thereof |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4445723A (en) * | 1982-07-26 | 1984-05-01 | Mcquade Paul D | Method of circle mining of ore |
JP2648051B2 (en) * | 1991-07-19 | 1997-08-27 | 株式会社フジタ | Construction method of arch shell in tunnel precedent |
KR20060084203A (en) * | 2005-01-19 | 2006-07-24 | 주식회사 하이콘엔지니어링 | Method for constructing 2-arch tunnel using steel pile support |
JP2012036624A (en) * | 2010-08-06 | 2012-02-23 | Taisei Corp | Tunnel construction method |
CN102797481B (en) * | 2012-08-13 | 2015-03-25 | 中铁一局集团有限公司 | Large-span tunnel arch secondary lining steel bar binding construction method based on skeleton beams |
CN103306687B (en) * | 2012-10-31 | 2015-09-16 | 北京中铁瑞威基础工程有限公司 | Soft rock tunnel long cantilever horizontal jet grouting Deformation control construction method |
CN103437783A (en) * | 2013-08-22 | 2013-12-11 | 天津市市政工程设计研究院 | Shallow-buried excavation long-span pilot tunnel arch cover combined construction method |
CN204327118U (en) * | 2014-12-15 | 2015-05-13 | 中铁第四勘察设计院集团有限公司 | Super large Varied section tunnel advanced support structure |
CN104500100A (en) * | 2014-12-15 | 2015-04-08 | 中铁第四勘察设计院集团有限公司 | Advanced support structure for oversized variable-section tunnel |
CN204436406U (en) * | 2014-12-15 | 2015-07-01 | 中铁第四勘察设计院集团有限公司 | Super large Varied section tunnel support structure |
CN104405411B (en) * | 2014-12-15 | 2017-05-10 | 中铁第四勘察设计院集团有限公司 | Oversized variable cross section tunnel supporting structure |
CN104653197B (en) * | 2014-12-15 | 2017-02-08 | 中铁第四勘察设计院集团有限公司 | Method for constructing extra-large variable cross section tunnel |
-
2015
- 2015-11-11 SE SE1750913A patent/SE543647C2/en unknown
- 2015-11-11 WO PCT/CN2015/094284 patent/WO2016095629A1/en active Application Filing
- 2015-11-11 WO PCT/CN2015/094286 patent/WO2016095631A1/en active Application Filing
- 2015-11-11 MY MYPI2017702978A patent/MY198470A/en unknown
- 2015-11-11 MY MYPI2017702979A patent/MY198020A/en unknown
- 2015-11-11 WO PCT/CN2015/094285 patent/WO2016095630A1/en active Application Filing
- 2015-11-11 SE SE1750912A patent/SE543306C2/en unknown
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004052408A (en) * | 2002-07-22 | 2004-02-19 | Maeda Corp | Tunnel excavating method |
CN101666232B (en) * | 2009-09-27 | 2012-08-22 | 中铁四局集团有限公司 | Construction method of six-zone digging of super cross section tunnel |
CN102182466B (en) * | 2011-04-08 | 2013-05-01 | 中铁上海设计院集团有限公司 | Excavating method for jump-digging of double-side wall guide pit combined arch part of tunnel |
CN102226398A (en) * | 2011-06-02 | 2011-10-26 | 中铁二院工程集团有限责任公司 | Soft rock four-line large-span tunnel compound double-side wall bracing cable conversion excavation construction method |
CN102345460A (en) * | 2011-06-21 | 2012-02-08 | 北京交通大学 | Settlement control method for shallow large-section loess tunnel |
CN103775095A (en) * | 2014-02-26 | 2014-05-07 | 中铁第一勘察设计院集团有限公司 | Ridge soft-foundation tunnel advance double guide tunnel and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
MY198470A (en) | 2023-08-31 |
SE1750913A1 (en) | 2017-07-12 |
SE1750912A1 (en) | 2017-07-12 |
MY198020A (en) | 2023-07-26 |
SE543306C2 (en) | 2020-11-24 |
WO2016095629A1 (en) | 2016-06-23 |
WO2016095630A1 (en) | 2016-06-23 |
WO2016095631A1 (en) | 2016-06-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SE543647C2 (en) | Method for constructing extra-large variable cross section tunnel | |
PH12016502613A1 (en) | Formwork panel for concrete-work shutterings | |
IL251953B (en) | Method and platform/system for creating a web-based form that incorporates an embedded knowledge base, wherein the form provides automatic feedback to a user during and following completion of the form | |
MX2017003767A (en) | Watering mat for supplying fluids for the root region of plants, and watering system. | |
MX2017007373A (en) | Last system for braiding footwear. | |
IL250322A0 (en) | Improved method for controlling the activity of at least two light radiation sources belonging to a stereolithography machine | |
WO2015179883A3 (en) | Support arrangement | |
ZA201604911B (en) | Hydraulic control system of fully-hydraulic drill type coal mining machine | |
HK1253688A1 (en) | Process of liner connection for partial rehabilitation of a pipe system | |
FR3038899B1 (en) | METHODS FOR MAKING A REINFORCED ELASTOMER COMPOSITE WITH SILICA AND PRODUCTS CONTAINING THE SAME | |
GB201501828D0 (en) | Method of enlarging the space beneath a masonry arch bridge,and a masonry arch bridge | |
FR3033867B1 (en) | METHOD FOR FILLING RESERVOIRS WITH PRESSURIZED GAS | |
PL3247811T3 (en) | Plant for recycling of white slag generated during a steel production step | |
GB201502801D0 (en) | Control method for crane system including a spreader beam | |
PE20170801A1 (en) | CONCRETE HOLLOW TOWER INSTALLATION METHOD FORMED BY MORE THAN ONE SECTION AND CORRESPONDING CONCRETE HOLLOW TOWER | |
CO2019009864A2 (en) | Paste for use in mining processes | |
EP3277562A4 (en) | Arrangement for controlling deflection motions of a crawler track driven undercarriage | |
IL272862A (en) | Reinforcement system for the concrete lining of the inner shell of a tunnel construction | |
PT3158138T (en) | A joint between beam elements and column elements made of prefabricated reinforced concrete | |
ZA202001496B (en) | Quick identification method of transportation tunnel arch crown collapse | |
FI20145398A (en) | Method and system for controlling the boom of a forestry machine | |
PL3059346T3 (en) | Assembly for the placement of concrete, including a screed guide/control joint | |
GB2509277A (en) | Scaffolding dropper/hanger platform | |
HUP1900016A2 (en) | Process for the production of reinforcement for reinforced concrete components | |
PL3691953T3 (en) | Method for operating a rail-guided superstructure machine, and superstructure machine |