RU2502628C1 - System for extraction, storage and unloading of natural gas - Google Patents

System for extraction, storage and unloading of natural gas Download PDF

Info

Publication number
RU2502628C1
RU2502628C1 RU2012122426/11A RU2012122426A RU2502628C1 RU 2502628 C1 RU2502628 C1 RU 2502628C1 RU 2012122426/11 A RU2012122426/11 A RU 2012122426/11A RU 2012122426 A RU2012122426 A RU 2012122426A RU 2502628 C1 RU2502628 C1 RU 2502628C1
Authority
RU
Russia
Prior art keywords
natural gas
vessel
storage
unloading
pipeline
Prior art date
Application number
RU2012122426/11A
Other languages
Russian (ru)
Other versions
RU2012122426A (en
Inventor
Александр Николаевич Суслов
Светлана Владимировна Милославская
Original Assignee
Александр Николаевич Суслов
Светлана Владимировна Милославская
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Александр Николаевич Суслов, Светлана Владимировна Милославская filed Critical Александр Николаевич Суслов
Priority to RU2012122426/11A priority Critical patent/RU2502628C1/en
Publication of RU2012122426A publication Critical patent/RU2012122426A/en
Application granted granted Critical
Publication of RU2502628C1 publication Critical patent/RU2502628C1/en

Links

Images

Abstract

FIELD: transport.
SUBSTANCE: invention relates to ship building and sea transport, particularly, to operation and design of natural gas production, storage and unloading vessels. Proposed system comprises natural gas extraction vessel and liquefied natural gas storage vessel connected with the formed by pipeline. To ensure safety, natural gas liquefaction is performed at extraction vessel while storage and unloading is carried out at storage vessel spaced from the first one by explosion-proof distance. Transfer of liquefied natural gas from first vessel to second one is performed via heat-insulated pipeline with required buoyancy and rigidity and articulated with both vessels.
EFFECT: higher safety in operation.
2 cl, 2 dwg

Description

Изобретение относится к области судостроения и морского транспорта, а более конкретно к эксплуатации и конструкции судов для добычи, хранения и выгрузки природного газа - судов типа Floating Production Storage and Offloading Unit (FPSO).The invention relates to the field of shipbuilding and maritime transport, and more particularly to the operation and design of ships for the extraction, storage and unloading of natural gas - ships of the type Floating Production Storage and Offloading Unit (FPSO).

Известны суда типа FPSO, представляющие собой систему добычи природного газа, его хранения и выгрузки, включающую также оборудование по сжижению природного газа, для последующей его транспортировки [Караев Р.Н., Разуваев В.Н., Портной А.С. Океанотехника и морские операции на шельфе. - СПб.: Моринтех, 2008.].FPSO type vessels are known, which are a system of natural gas production, its storage and unloading, which also includes equipment for liquefying natural gas for its subsequent transportation [Karaev R.N., Razuvaev V.N., Portnoy A.S. Ocean engineering and offshore operations. - St. Petersburg: Morintech, 2008.].

К недостаткам указанного типа судов относится вероятность возникновения аварийной ситуации, обусловленная тем, что на судне сосредоточено большое количество опасных технологических процессов: добыча, сжижение, отгрузка, которые осуществляются с применением различного оборудования. Следовательно, существует риск возникновения тяжелой аварийной ситуации: пожар и взрыв всего хранящегося на судне сжиженного газа.The disadvantages of this type of vessel include the likelihood of an emergency, due to the fact that a large number of hazardous technological processes are concentrated on the vessel: production, liquefaction, shipping, which are carried out using various equipment. Consequently, there is a risk of a serious emergency: fire and explosion of all liquefied gas stored on the ship.

Сжиженный природный газ (СПГ) хранится на добывающем судне до момента отгрузки его на танкер-челнок. Для хранения используются грузовые танки. Также известна схема, когда СПГ добывается и проходит первичную обработку на одном судне, а последующее его сжижение и хранение происходит на втором судне (патент США №US 6889522 В2). При этом газ с первого судна передается на второе судно посредством плавучего трубопровода.Liquefied natural gas (LNG) is stored on the production vessel until it is shipped to the shuttle tanker. For storage, cargo tanks are used. Also known is the scheme where LNG is produced and undergoes primary processing on one vessel, and its subsequent liquefaction and storage occurs on the second vessel (US patent No. US 6889522 B2). In this case, gas from the first vessel is transmitted to the second vessel through a floating pipeline.

К недостаткам известной схемы относится то, что сжижение природного газа осуществляется на втором судне. Это приводит к риску возникновения пожара (взрыва) всего объема хранимого сжиженного газа из-за возможных аварий при операциях по сжижению газа. Также в указанном патенте не учтена возможность использования схемы в условиях арктического шельфа, а именно возможное повреждение трубопровода льдами.The disadvantages of the known scheme include the fact that the liquefaction of natural gas is carried out on the second vessel. This leads to the risk of fire (explosion) of the entire volume of stored liquefied gas due to possible accidents during gas liquefaction operations. Also, the said patent does not take into account the possibility of using the scheme in the conditions of the Arctic shelf, namely, possible damage to the pipeline by ice.

Заявляемое изобретение направлено на обеспечение безопасности при функционировании судов типа FPSO.The claimed invention is aimed at ensuring safety during the operation of ships of the FPSO type.

Для достижения указанной цели предлагается разделить добычу, сжижение и хранение СПГ за счет использования двух судов. На первом судне предлагается осуществлять добычу и сжижение газа, а на втором хранение - и отгрузку СНГ.To achieve this goal, it is proposed to separate the production, liquefaction and storage of LNG through the use of two vessels. On the first vessel, it is proposed to produce and liquefy gas, and on the second, storage and shipment of the CIS.

Эффективность предлагаемого решения достигается за счет удаления судна-хранилища СПГ от добывающего судна FPSO на определенное расстояние.The effectiveness of the proposed solution is achieved by removing a certain distance from the LNG storage vessel from the FPSO production vessel.

Сущность изобретения видна из рис.1, где показан общий вид предлагаемой схемы. На рис.2 показана схема теплоизолированного трубопровода с элементами плавучести и жесткости, имеющего шарнирное закрепление с добывающим судном и судном-хранилищем.The invention is visible from Fig. 1, which shows a General view of the proposed scheme. Fig. 2 shows a diagram of a thermally insulated pipeline with elements of buoyancy and rigidity, which is hinged with a producing vessel and a storage vessel.

Рис.2. Схема трубопровода, соединяющего добывающее судно и судно-хранилищеFig. 2. Scheme of the pipeline connecting the production vessel and the storage vessel

Предлагаемая схема работает следующим образом. На судне типа FPSO 1 добывается природный газ, происходит его обработка, сжижение. Затем по трубопроводу 3 СПГ передается на судно-хранилище 2. Трубопровод 3 может быть выполнен как в надводном исполнении, так и в подводном. Подводное исполнение трубопровода может быть использовано в ледовых условиях, чтобы предотвратить повреждение трубопровода 3. Теплоизолированный трубопровод 3 при эксплуатации в подводном исполнении имеет плавучесть 4, а элементы жесткости 5 обеспечивают его фиксацию в заданном положении. Трубопровод 3 имеет шарнирное закрепление с добывающим судном 1 и судном-хранилищем 2. Такой тип закрепления не будет препятствовать вращению судна типа FPSO 1 вокруг турели. При необходимости (шторм, невозможность противостояния перемещениям ледового поля) шарнирные элементы соединения двух судов могут быть разъединены, а затем опять соединены.The proposed scheme works as follows. FPSO 1 type vessel produces natural gas, processes it, and liquefies it. Then, through the pipeline 3, the LNG is transmitted to the storage vessel 2. The pipeline 3 can be performed both in the surface version and in the underwater one. Underwater execution of the pipeline can be used in ice conditions to prevent damage to the pipeline 3. The heat-insulated pipeline 3 during operation in the underwater execution has buoyancy 4, and the stiffening elements 5 ensure its fixation in a predetermined position. Pipeline 3 is articulated with a production vessel 1 and a storage vessel 2. This type of fixing will not impede the rotation of the FPSO 1 vessel around the turret. If necessary (storm, inability to withstand movements of the ice field), the hinged elements of the connection of the two vessels can be disconnected and then connected again.

Claims (2)

1. Система добычи, хранения и выгрузки природного газа, включающая добывающее судно, на котором происходит добыча природного газа, и судно-хранилище сжиженного природного газа, связанное с первым судном посредством трубопровода, отличающаяся тем, что для обеспечения безопасности процесс сжижения природного газа происходит на добывающем судне, а хранение и отгрузка сжиженного природного газа осуществляется на судне-хранилище, которое удалено от первого судна на взрывобезопасное расстояние, передача сжиженного природного газа от первого судна ко второму осуществляется по плавучему теплоизолированному трубопроводу, имеющему необходимую плавучесть и жесткость и связанному с судами посредством шарнирного соединения.1. The system of production, storage and unloading of natural gas, including a production vessel on which natural gas is produced, and a storage vessel for liquefied natural gas, connected to the first vessel through a pipeline, characterized in that for the safety of the natural gas liquefaction process occurs production vessel, and storage and shipment of liquefied natural gas is carried out on the storage vessel, which is distant from the first vessel, the transmission of liquefied natural gas from the first the second vessel is carried out by floating a thermally insulated conduit having desired buoyancy and rigidity and associated with vessels through a pivot connection. 2. Система добычи, хранения и выгрузки природного газа по п.1, отличающаяся тем, что для использования системы в ледовых условиях соединяющий трубопровод выполнен в подводном исполнении. 2. The system of production, storage and unloading of natural gas according to claim 1, characterized in that for using the system in ice conditions, the connecting pipeline is made underwater.
RU2012122426/11A 2012-05-30 2012-05-30 System for extraction, storage and unloading of natural gas RU2502628C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2012122426/11A RU2502628C1 (en) 2012-05-30 2012-05-30 System for extraction, storage and unloading of natural gas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2012122426/11A RU2502628C1 (en) 2012-05-30 2012-05-30 System for extraction, storage and unloading of natural gas

Publications (2)

Publication Number Publication Date
RU2012122426A RU2012122426A (en) 2013-12-10
RU2502628C1 true RU2502628C1 (en) 2013-12-27

Family

ID=49682646

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2012122426/11A RU2502628C1 (en) 2012-05-30 2012-05-30 System for extraction, storage and unloading of natural gas

Country Status (1)

Country Link
RU (1) RU2502628C1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2659159C1 (en) * 2015-02-19 2018-06-28 Блюуотер Энерджи Сервисез Б.В. Fluids transfer between the first vessel and the second vessel method and system
RU2762601C1 (en) * 2017-11-24 2021-12-21 Фмс Текноложи Device for transferring cryogenic products between a floating structure and a stationary or floating structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1996036529A1 (en) * 1995-05-18 1996-11-21 Den Norske Stats Oljeselskap A.S A method of loading and treatment of hydrocarbons
RU2201375C1 (en) * 2002-06-06 2003-03-27 Куликов Николай Владимирович Ice-breaker (versions), method and system for single-support mooring and servicing of ships
US20040106339A1 (en) * 2000-07-20 2004-06-03 Breivik Kare G System for transferring a load from ship-based production and storage units to dynamically positioned tankers
US6889522B2 (en) * 2002-06-06 2005-05-10 Abb Lummus Global, Randall Gas Technologies LNG floating production, storage, and offloading scheme
RU78181U1 (en) * 2008-07-07 2008-11-20 Ласло Эндревич Сабов MARINE TERMINAL FOR UNLOADING LIQUID OR VISCOUS PRODUCTS AND UNDERWATER PIPE FOR THEIR TRANSPORT

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1996036529A1 (en) * 1995-05-18 1996-11-21 Den Norske Stats Oljeselskap A.S A method of loading and treatment of hydrocarbons
US20040106339A1 (en) * 2000-07-20 2004-06-03 Breivik Kare G System for transferring a load from ship-based production and storage units to dynamically positioned tankers
RU2201375C1 (en) * 2002-06-06 2003-03-27 Куликов Николай Владимирович Ice-breaker (versions), method and system for single-support mooring and servicing of ships
US6889522B2 (en) * 2002-06-06 2005-05-10 Abb Lummus Global, Randall Gas Technologies LNG floating production, storage, and offloading scheme
RU78181U1 (en) * 2008-07-07 2008-11-20 Ласло Эндревич Сабов MARINE TERMINAL FOR UNLOADING LIQUID OR VISCOUS PRODUCTS AND UNDERWATER PIPE FOR THEIR TRANSPORT

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2659159C1 (en) * 2015-02-19 2018-06-28 Блюуотер Энерджи Сервисез Б.В. Fluids transfer between the first vessel and the second vessel method and system
RU2762601C1 (en) * 2017-11-24 2021-12-21 Фмс Текноложи Device for transferring cryogenic products between a floating structure and a stationary or floating structure

Also Published As

Publication number Publication date
RU2012122426A (en) 2013-12-10

Similar Documents

Publication Publication Date Title
AU2016259407B2 (en) Floating LNG Plant
EP2838784B1 (en) Floating lng plant comprising a first and a second converted lng carrier and a method for obtaining the floating lng plant
CA2897182C (en) System and method for heading control of a floating lng vessel using real-time monitored cargo containment system strain data
CA2897186C (en) System and method for heading control of a floating lng vessel using a set of real-time monitored hull integrity data
JP2016520468A5 (en)
AU2017207324B2 (en) Natural gas liquefaction vessel
KR101388871B1 (en) Floating Storage Regasfication Power generation Bunkering
RU2502628C1 (en) System for extraction, storage and unloading of natural gas
KR102276360B1 (en) LNG Bunkering System And Method For Ship
KR20150041820A (en) Gas Liquefaction System And Method
KR102333068B1 (en) Lng-fpso
KR20120001499A (en) Topside arrangement for a marine structure
NO20141176A1 (en) Process and plant for the production of LNG
KR20120000973A (en) Topside arrangement for a marine structure
Hoog et al. The Mooring Bay Concept for LNG Loading in Harsh and Ice Conditions
KR20120003659U (en) Passage way and hull structure having the same for marine structure
KR20150105711A (en) Warming Up Apparatus For LNG Cargo Tank Maintenance
KR20160136869A (en) FLNG and Method of Bunkering for FLNG
KR20120003770U (en) Turret assembly floating marine structure
KR20140052349A (en) Side cell reinforeced structure of offshore structure and mooring system using the same
KR20180000170U (en) Offshore structure and ship with a escape route
Persey et al. Floating Production, Storage and Offloading Units: Some Legal Issues
CA2842621A1 (en) Lng export terminal with a twin-hull fso

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees