RU2378164C1 - Method for reconstruction of takeoff and landing strips of aerodrome - Google Patents

Method for reconstruction of takeoff and landing strips of aerodrome Download PDF

Info

Publication number
RU2378164C1
RU2378164C1 RU2009104780/03A RU2009104780A RU2378164C1 RU 2378164 C1 RU2378164 C1 RU 2378164C1 RU 2009104780/03 A RU2009104780/03 A RU 2009104780/03A RU 2009104780 A RU2009104780 A RU 2009104780A RU 2378164 C1 RU2378164 C1 RU 2378164C1
Authority
RU
Russia
Prior art keywords
tls
runway
length
takeoff
platform
Prior art date
Application number
RU2009104780/03A
Other languages
Russian (ru)
Inventor
Андрей Викторович Мартынов (RU)
Андрей Викторович Мартынов
Вадим Андреевич Недосеков (RU)
Вадим Андреевич Недосеков
Андрей Николаевич Покрамович (RU)
Андрей Николаевич Покрамович
Алексей Владимирович Титов (RU)
Алексей Владимирович Титов
Андрей Валентинович Тимочкин (RU)
Андрей Валентинович Тимочкин
Original Assignee
Федеральное государственное унитарное предприятие Государственный проектно-изыскательский и научно-исследовательский институт гражданской авиации "Аэропроект"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Федеральное государственное унитарное предприятие Государственный проектно-изыскательский и научно-исследовательский институт гражданской авиации "Аэропроект" filed Critical Федеральное государственное унитарное предприятие Государственный проектно-изыскательский и научно-исследовательский институт гражданской авиации "Аэропроект"
Priority to RU2009104780/03A priority Critical patent/RU2378164C1/en
Application granted granted Critical
Publication of RU2378164C1 publication Critical patent/RU2378164C1/en

Links

Images

Landscapes

  • Traffic Control Systems (AREA)
  • Road Paving Structures (AREA)

Abstract

FIELD: construction.
SUBSTANCE: technical solution is related to the field of construction, namely to reconstruction of takeoff and landing strips (TLS) of existing aerodromes for increase of their throughput capacity with observance of traffic safety. It is achieved by the fact that in method of reconstruction of takeoff and landing strips (TLS), crossing at the sharp angle, in aerodrome preferably located in piedmont area, which consists in extension of takeoff and landing strips, which is executed for the first TLS, arranged along existing first platform and having larger length, - on its short section, located behind the point of crossing of longitudinal axes of takeoff and landing strips with transfer of airplane start holding zone along it beyond the limits of runway strip of the second shorter TLS, extension of which is done by smaller length compared to extension of the first TLS, besides such extension is arranged on its section of larger length on the side opposite to airplane start holding zone created on it outside of runway strip of the first TLS, which is joined by means of steering rod to zone of start holding of the first TLS. AT the same time, when crossing longitudinal axes of specified TLS at the sharp angle, equal to 36°, the first TLS with length of 2890 m is extended at short section by 510 m to 3400 m, and the second TLS with length of 2230 m - is extended at section of larger length by 150 m, and additionally by 80 m from the side of start holding zone of airplanes on it to length of 2430 m, at the same time along runway strip of the first TLS from the side, which is opposite to the first platform, the second platform is erected, and the first TLS is connected by speed steering roads to main steering road, arranged along the second platform outside the runway strip of the first TLS, and additionally by speed steering roads to the first platform.
EFFECT: creation, as a result of reconstruction, of such crossing TLS, which provide for safe landing and takeoff of any airplanes, and also to improved conditions of aerodrome operation due to faster withdrawal of airplanes from crossing parts of TLS, to considerably reduce time for steering to end of any TLS.
2 cl, 1 dwg

Description

Предлагаемое техническое решение относится к области строительства, а именно - к реконструкции взлетно-посадочных полос (ВПП) существующих аэродромов для увеличения их пропускной способности с соблюдением безопасности движения.The proposed technical solution relates to the field of construction, namely, to the reconstruction of runways (runways) of existing airfields to increase their throughput in compliance with traffic safety.

Известен способ реконструкции взлетно-посадочной полосы аэродрома, при котором взлетно-посадочную полосу выполняют с покрытием, в котором образуют гнезда и размещают в них выпускные приспособления с форсунками, соединенными с трубопроводом антигололедной жидкости. Этим обеспечивается возможность работы взлетно-посадочной полосы при любой погоде (SU №1686057 А1, 1991).There is a method of reconstructing the runway of an airfield, in which the runway is coated to form nests and place exhaust devices in them with nozzles connected to the anti-icing liquid pipe. This makes it possible to run the runway in any weather (SU No. 1686057 A1, 1991).

Наиболее близким из известных является способ реконструкции взлетно-посадочных полос аэродрома, предназначенных для взлета и посадки самолетов, который содержит отдельную взлетную полосу и отдельную посадочную полосу. Взлетную полосу выполняют более узкой, покрытой материалом с низким коэффициентом трения, и оборудуют трамплинами, облегчающими взлет. Посадочную полосу выполняют более широкой, снабжают амортизирующим, вязким покрытием и оборудуют в конце бассейном с жидкостью или песчаной горкой, исключающими выкатывание самолета за предусмотренные пределы. Траектории взлетных и посадочных разворотов производятся в отдельных зонах и не пересекаются. Это позволяет увеличить безопасность взлета и посадки самолетов (RU №2336204 С1, 20.10.2008).The closest known method is the reconstruction of runways of an airfield intended for take-off and landing of aircraft, which contains a separate runway and a separate landing strip. The runway is made narrower, covered with material with a low coefficient of friction, and is equipped with jumps to facilitate takeoff. The landing strip is made wider, equipped with a shock-absorbing, viscous coating and equipped at the end with a pool of liquid or a sand slide, excluding the rollout of the aircraft beyond the prescribed limits. Take-off and landing turn trajectories are made in separate zones and do not intersect. This allows you to increase the safety of take-off and landing of aircraft (RU No. 2336204 C1, 10.20.2008).

Технической задачей настоящего изобретения является создание в результате реконструкции таких пересекающихся ВПП, которые обеспечивают безопасную посадку и взлет любых самолетов, а также улучшить условия эксплуатации аэродрома за счет ускорения вывода самолетов из пересекающихся частей ВПП, значительно сократить время заруливания на торец любой ВПП.The technical task of the present invention is the creation as a result of reconstruction of such intersecting runways that provide a safe landing and take-off of any aircraft, as well as improving the operating conditions of the airfield by accelerating the withdrawal of aircraft from the intersecting parts of the runway, significantly reducing the taxiing time to the end of any runway.

Достигается это тем, что в способе реконструкции пересекающихся под острым углом взлетно-посадочных полос (ВПП) аэродрома, предпочтительно расположенного в предгорной местности, заключающемся в удлинении взлетно-посадочных полос, которое производят для первой ВПП, расположенной вдоль существующего первого перрона и имеющей большую длину, на коротком ее участке, расположенном за точкой пересечения продольных осей взлетно-посадочных полос с перенесением зоны ожидания старта самолетов по ней за пределы летной полосы второй, более короткой ВПП, удлинение которой производят на меньшую длину, чем удлинение первой ВПП, причем такое удлинение выполняют на ее участке большей длины со стороны, противоположной созданной на ней вне летной полосы первой ВПП зоны ожидания старта по ней самолетов, которую сообщают рулежной дорожкой с зоной ожидания старта первой ВПП. При этом при пересечении продольных осей указанных ВПП под острым углом, равным 36°, первую ВПП длиной 2890 м удлиняют на коротком участке на 510 м, а вторую ВПП длиной 2230 м удлиняют на участке большей длины на 150 м и дополнительно на 80 м со стороны зоны ожидания старта по ней самолетов, причем вдоль летной полосы первой ВПП со стороны, противоположной первому перрону, возводят второй перрон, а первую ВПП соединяют скоростными рулежными дорожками с магистральной рулежной дорожкой, выполненной вдоль второго перрона вне летной полосы первой ВПП, и дополнительно скоростными рулежными дорожками к первому перрону.This is achieved by the fact that in the method of reconstruction of the intersecting at an acute angle of the runways (runways) of the aerodrome, preferably located in the foothill area, which consists in lengthening the runways that are produced for the first runway located along the existing first apron and having a large length , on its short section, located beyond the intersection of the longitudinal axes of the runways with the transfer of the waiting area for aircraft to start on it outside the flight strip of the second, shorter th runway, the extension of which is carried out by a shorter length than the extension of the first runway, and such extension is performed on its portion of a greater length from the side opposite to the aircraft waiting area for launching on it outside the flight strip of the first runway, which is reported by the taxiway with the waiting area start of the first runway. At the same time, when crossing the longitudinal axes of these runways at an acute angle of 36 °, the first runway with a length of 2890 m is lengthened in a short section by 510 m, and the second runway with a length of 2230 m is extended in a longer section by 150 m and an additional 80 m from the side waiting areas for the launch of aircraft on it, and along the runway of the first runway from the side opposite the first apron, a second apron is erected, and the first runway is connected by high-speed taxiways with a main taxiway made along the second apron outside the flight strip of the first runway, and optional high-speed taxiways to the first apron.

На чертеже представлен схематично вид в плане на реконструируемые пересекающиеся под острым углом взлетно-посадочные полосы аэродрома.The drawing shows a schematic plan view of the reconstructed runways of the airfield intersecting at an acute angle.

Способ реконструкции пересекающихся под острым углом взлетно-посадочных полос (ВПП) аэродрома осуществлен следующим образом. Удлинение взлетно-посадочных полос производят для первой ВПП 1, расположенной вдоль существующего первого перрона 2 и имеющей большую длину, на коротком ее участке 3, расположенном за точкой 4 пересечения продольных осей взлетно-посадочных полос с перенесением зоны 5 ожидания старта самолетов по ней за пределы летной полосы 6 второй 7, более короткой ВПП. Удлинение второй ВПП производят на меньшую длину, чем удлинение первой ВПП, причем такое удлинение выполняют на ее участке 8 большей длины со стороны, противоположной созданной на ней вне летной полосы 9 первой ВПП зоны 10 ожидания старта по ней самолетов, которую сообщают рулежной дорожкой 11 с зоной ожидания старта первой ВПП.The method of reconstruction of intersecting at an acute angle of the runways (runways) of the airfield is as follows. The runways are elongated for the first runway 1, located along the existing first apron 2 and having a large length, on its short section 3, located beyond the intersection point 4 of the longitudinal axes of the runways with the transfer of the zone 5 waiting for the start of aircraft on it outside runway 6 second 7, shorter runway. The extension of the second runway is performed by a shorter length than the extension of the first runway, and this extension is performed on its section 8 of a greater length from the side opposite to the aircraft created on it outside the flight strip 9 of the first runway of the waiting area 10 for launching it, which is reported by taxiway 11 s waiting area for the start of the first runway.

На примере аэродрома г.Сочи такая реконструкция произведена следующим образом. При пересечении продольных осей указанных ВПП под острым углом Е, равным 36°, первую ВПП удлиняют на коротком участке на 510 м до 3400 м, а вторую ВПП удлиняют на участке большей длины на 150 м и дополнительно на 80 м со стороны зоны ожидания старта по ней самолетов до длины 2430 м, причем вдоль летной полосы первой ВПП со стороны, противоположной первому перрону, возводят второй перрон 12, а первую ВПП соединяют скоростными рулежными дорожками 13 с магистральной рулежной дорожкой 14, выполненной вдоль второго перрона 12 вне летной полосы первой ВПП, и дополнительно скоростными рулежными дорожками 15 к первому перрону 2.On the example of the Sochi airfield, such reconstruction was carried out as follows. When the longitudinal axes of the indicated runways intersect at an acute angle E equal to 36 °, the first runway is extended in a short section by 510 m to 3400 m, and the second runway is extended in a longer section by 150 m and an additional 80 m from the start waiting area along aircraft to a length of 2430 m, and along the runway of the first runway from the side opposite the first apron, erect the second apron 12, and the first runway is connected by high-speed taxiways 13 with the main taxiway 14, made along the second apron 12 outside the flight strip of the first runway, and extra at very fast taxiways 15 to the first apron 2.

Такая реконструкция, кроме того, позволит обеспечить эксплуатацию всех типов самолетов с максимальной взлетной и посадочной массой, а также разместить площадки противообледенительной обработки в зоне, максимально приближенной к старту самолета, что значительно увеличит безопасность полетов и снизит трудоемкость производства таких работ.Such reconstruction, in addition, will ensure the operation of all types of aircraft with maximum take-off and landing weight, as well as place anti-icing sites in the area as close as possible to the start of the aircraft, which will significantly increase flight safety and reduce the complexity of such work.

Claims (2)

1. Способ реконструкции пересекающихся под острым углом взлетно-посадочных полос (ВПП) аэродрома, предпочтительно расположенного в предгорной местности, заключающийся в удлинении взлетно-посадочных полос, которое производят для первой ВПП, расположенной вдоль существующего первого перрона и имеющей большую длину, - на коротком ее участке, расположенном за точкой пересечения продольных осей взлетно-посадочных полос с перенесением зоны ожидания старта самолетов по ней за пределы летной полосы второй, более короткой ВПП, удлинение которой производят на меньшую длину, чем удлинение первой ВПП, причем такое удлинение выполняют на ее участке большей длины со стороны, противоположной созданной на ней вне летной полосы первой ВПП зоны ожидания старта по ней самолетов, которую сообщают рулежной дорожкой с зоной ожидания старта первой ВПП.1. The method of reconstruction of the intersecting at an acute angle of the runways (runways) of the aerodrome, preferably located in the foothills, which consists in lengthening the runways, which are produced for the first runway, located along the existing first apron and having a long length, - on a short its section located beyond the intersection of the longitudinal axes of the runways with the transfer of the waiting area for aircraft to start along it outside the flight strip of the second, shorter runway, the extension of which produce a smaller length than the first elongation of the runway, wherein such lengthening operate at its portion of greater length on the opposite side it is formed on the strip of the first runway start standby zone on it planes, which communicates with the first taxiway runway start standby area. 2. Способ реконструкции пересекающихся под острым углом ВПП аэродрома по п.1, отличающийся тем, что при пересечении продольных осей указанных ВПП под острым углом, равным 36°, первую ВПП длиной 2890 м удлиняют на коротком участке на 510 м до 3400 м, а вторую ВПП длиной 2230 м удлиняют на участке большей длины на 150 м, и дополнительно на 80 м со стороны зоны ожидания старта по ней самолетов до длины 2430 м, причем вдоль летной полосы первой ВПП со стороны, противоположной первому перрону, возводят второй перрон, а первую ВПП соединяют скоростными рулежными дорожками с магистральной рулежной дорожкой, выполненной вдоль второго перрона вне летной полосы первой ВПП, и дополнительно - скоростными рулежными дорожками к первому перрону. 2. The method of reconstruction of an aerodrome runway intersecting at an acute angle according to claim 1, characterized in that when crossing the longitudinal axes of said runways at an acute angle of 36 °, the first runway with a length of 2890 m is extended in a short section by 510 m to 3400 m, and the second runway with a length of 2230 m is lengthened in a longer section by 150 m, and additionally by 80 m from the side of the waiting area for launching aircraft on it to a length of 2430 m, and a second apron is erected along the flight strip of the first runway from the side opposite the first apron, and the first runway is connected by high-speed taxiways to ozhkami to backbone taxiway formed along the second platform is the strip of the first runway and additionally - speed taxiways to the first platform.
RU2009104780/03A 2009-02-13 2009-02-13 Method for reconstruction of takeoff and landing strips of aerodrome RU2378164C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2009104780/03A RU2378164C1 (en) 2009-02-13 2009-02-13 Method for reconstruction of takeoff and landing strips of aerodrome

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2009104780/03A RU2378164C1 (en) 2009-02-13 2009-02-13 Method for reconstruction of takeoff and landing strips of aerodrome

Publications (1)

Publication Number Publication Date
RU2378164C1 true RU2378164C1 (en) 2010-01-10

Family

ID=41644100

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2009104780/03A RU2378164C1 (en) 2009-02-13 2009-02-13 Method for reconstruction of takeoff and landing strips of aerodrome

Country Status (1)

Country Link
RU (1) RU2378164C1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2429325C1 (en) * 2010-10-13 2011-09-20 Федеральное государственное унитарное предприятие "Государственный проектно-изыскательский и научно-исследовательский институт гражданской авиации "Аэропроект" Method to reconstruct takeoff and landing strips of aerodrome
RU2631367C1 (en) * 2016-07-22 2017-09-21 Ника Николаевна Томская-Брук Airport for small and medium-size aviation (versions)
RU2683710C2 (en) * 2014-04-09 2019-04-01 Ранвей Инновейшенс Лимитед Runway arrangement
CN114411465A (en) * 2019-12-31 2022-04-29 中国人民解放军空军勤务学院 Double-runway highway runway airplane runway

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2433238A (en) * 1944-10-13 1947-12-23 Ramirez Humberto Villarreal Landing device for aircraft
SU389197A1 (en) * 1971-12-23 1973-07-05 FOUNDATION OF AIRPLANES, ROADS AND RAILWAYS

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2433238A (en) * 1944-10-13 1947-12-23 Ramirez Humberto Villarreal Landing device for aircraft
SU389197A1 (en) * 1971-12-23 1973-07-05 FOUNDATION OF AIRPLANES, ROADS AND RAILWAYS

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JP 4321492 (А), 11.11.1992. *
Реконструкция взлетной полосы аэропорта Сочи оценивается в 4 млрд рублей. http://www.aviaport.ru/didest/206/10/16/111519.html, опублик. 16.10.2006. Начался новый этап реконструкции взлетно-посадочной полосы аэродрома на космодроме "Плесецк" для приема тяжелых самолетов. http://www.dvinainform.ru/news/2004/05/8092.shtml, опублик. 05.05.2004. *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2429325C1 (en) * 2010-10-13 2011-09-20 Федеральное государственное унитарное предприятие "Государственный проектно-изыскательский и научно-исследовательский институт гражданской авиации "Аэропроект" Method to reconstruct takeoff and landing strips of aerodrome
RU2683710C2 (en) * 2014-04-09 2019-04-01 Ранвей Инновейшенс Лимитед Runway arrangement
RU2631367C1 (en) * 2016-07-22 2017-09-21 Ника Николаевна Томская-Брук Airport for small and medium-size aviation (versions)
CN114411465A (en) * 2019-12-31 2022-04-29 中国人民解放军空军勤务学院 Double-runway highway runway airplane runway

Similar Documents

Publication Publication Date Title
Benlic et al. Heuristic search for the coupled runway sequencing and taxiway routing problem
RU2378164C1 (en) Method for reconstruction of takeoff and landing strips of aerodrome
US7740205B1 (en) Auxiliary wing and flap assembly for an aircraft
US20100005688A1 (en) Method for cleaning, clearing, and/or treating an elongate path
KR20150115857A (en) Downwardly extending wing tip device
HRP20200637T1 (en) Runway arrangement
Holzäpfel et al. Wake vortex evolution during approach and landing with and without plate lines
DE102018004194A1 (en) Automatic de-icing of aircraft undersides
US1925139A (en) Method of and apparatus for airplanes
RU2429325C1 (en) Method to reconstruct takeoff and landing strips of aerodrome
US8757539B2 (en) System for transporting an airplane from a parking location to a takeoff location and from a landing location to a parking location
Ke et al. Research on planning and design of airport airfield area
US3061245A (en) Airfield runway construction and design
JP5745099B2 (en) Surface structure of the ground surface to facilitate the attenuation of wake turbulence in the short final of the approach area to the runway
US3333796A (en) Closed track airport with straight runways for instrument landing and take-off
WO2015152847A1 (en) An electric power generation system by means of the effects of wind and airplane at airports
RU2406652C2 (en) Vtol aircraft
DE2506974A1 (en) Jet orifices in plane bottom and on runway - are takeoff and landing aids giving lift and reducing runway length and stalling speed
RU2607037C1 (en) Aircraft
Knežević Aircraft ground icing and de-icing processes as mechanisms of the motion in Mirce Mechanics
Adamík et al. Changes in airport infrastructure caused by the historical development of aircraft
RU2336204C1 (en) Harmless airfield
RU2484279C1 (en) Method for improving braking efficiency of aircraft during ground rolling and increasing safety at takeoff and landing, and device for its implementation
RU2327617C1 (en) Taking-off device
CN106335638A (en) Track aircraft