RU2359090C2 RU2007122556/03A RU2007122556A RU2359090C2 RU 2359090 C2 RU2359090 C2 RU 2359090C2 RU 2007122556/03 A RU2007122556/03 A RU 2007122556/03A RU 2007122556 A RU2007122556 A RU 2007122556A RU 2359090 C2 RU2359090 C2 RU 2359090C2
Authority
RU
Russia
Prior art keywords
formwork
tiles
curb
row
sections
Prior art date
Application number
RU2007122556/03A
Other languages
Russian (ru)
Other versions
RU2007122556A (en
Inventor
Владимир Александрович Парамошко (RU)
Владимир Александрович Парамошко
Original Assignee
Владимир Александрович Парамошко
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Владимир Александрович Парамошко filed Critical Владимир Александрович Парамошко
Priority to RU2007122556/03A priority Critical patent/RU2359090C2/en
Publication of RU2007122556A publication Critical patent/RU2007122556A/en
Application granted granted Critical
Publication of RU2359090C2 publication Critical patent/RU2359090C2/en

Links

Images

Landscapes

  • Building Environments (AREA)
  • Finishing Walls (AREA)

Abstract

FIELD: construction.
SUBSTANCE: invention is related to construction industry and may be used for construction of different structures of industrial and civil construction. Method of erection of structures, consisting in the fact that armature frame is mounted, curbs are arranged, concrete mix is prepared, curbs are filled with concrete mix, curb is shifted to pour the next layer, described operations are repeated till completion of structure concrete foundation, plaster and tiling works are carried out. In process of foundation works performance grooves are arranged along its perimetre, wall curb sections are assembled from curb tiles and top-flatted armature frames, the first row of wall curb is organised from them by installation of the latter in foundation grooves, they are fixed relative to each other by means of belt armature by latching locks of the latter on armature frames of wall curb sections, sectional armature pipes are installed for communications arrangement. For the purpose of sealing inside of wall curb of the first row, slots are filled between curb tiles with sealing compound in order to prepare curb for filling with concrete on the basis of cement, lime, gypsum or clay with fillers, wall curb sections are assembled from curb tiles and top-flatted armature frames, the second row of wall curb is organised from them by installation of curb tiles on upper edge of curb tiles of the first row, dovetail fixing slots are joined. In order to make the second row of structure walls operations are performed that are similar to the first row, further making of structure walls is realised identically to method described above, the last row of this floor walls is made on the basis of curb tiles with rectangular groove, on completion of the first floor wall and installation of jacks ceiling curb tiles and top-flatted armature frames are joined together and installed in rows on jacks to create lower part of the first floor ceiling curb, the last row of ceiling curb lower part is made on the basis of ceiling curb tiles with rectangular slot, sectional armature pipes are installed for communications arrangement, curb sections of ceiling are fixed relative to each other by means of belt armature by latching locks of the latter on top-flatted armature frames of ceiling. In order to seal inside the first floor ceiling curb, slots between curb tiles are filled with sealing compound in order to prepare curb for filling with concrete with the help of concrete truck, having device for filling upper floor curbs with concrete, floor facing tiles are installed on armature frames of ceiling curb, the last row is made of floor facing tiles with rectangular groove, in manufacture of overlaying floors ceilings operations described above are carried out, all above described operations are performed to completion of structure base construction. Afterwards finishing works are carried out, for this purpose climate-protective relief decorative finishing tiles are inserted into dovetail fixing slots of external walls, in slots of internal walls - insulating, soundproof decorative finishing tiles are inserted, in ceiling slots - relief smooth finishing tiles, in floor slots - parquet, linoleum, carpet, tiled surfaces are inserted, openings are made in surface tiling, which are matched with outlets of armature pipes to install communications, curb sections are made for arched cover from light-transparent curb tiles and top-flatted armature frames, the first row of arched cover curb is organised from them, curb sections are fixed relative to each other by means of belt armature by latching locks of the latter in armature frames of curb sections, sectional armature pipes are installed to blowdown hot air in melting of snow or ice layer on arched cover. In order to seal the first row of arched cover curb, slots are filled inside between curb sections with light transparent sealing compound, the first row is filled in arched cover curb with liquid fast-hardening compound that becomes light transparent, curb sections are assembled from light-transparent curb tiles and top-flatted armature frames, the second row is organised from them for arched cover by installation of the second row curb tiles onto upper edges of facing tiles of the first row, curb sections are fixed relative to each other by means of belt armature, armature pipes are grown for hot air blowdown, in order to seal the second row of arched cover, slots are filled inside between curb sections with light-transparent sealing mixture, the second row of curb is filled with liquid fast-hardening compound that becomes light-transparent, described operations are repeated to completion of arched cover construction, afterwards portable curb is dismantled, on back parts of fixed elements reverse protrusions are arranged for fixing of dovetail type, the latter are inserted in required points in slots for fixing of dovetail type in walls, ceiling, floor. Also device has been described for method realisation.
EFFECT: increased manufacturability and efficiency of finishing works in construction and in case of minor routine repairs.
3 cl, 7 dwg

Description

Изобретение относится к строительной индустрии и может быть использовано для строительства различных сооружений промышленного и гражданского строительства.The invention relates to the construction industry and can be used for the construction of various structures of industrial and civil engineering.

Известен способ строительства, состоящий в том, что монтируют арматурный каркас фрагментов стен и перекрытий, изготовляют многоразовые опалубки, готовят бетонную смесь, заполняют опалубки бетонной смесью, выдерживают ее для затвердевания, переставляют опалубку для заливки следующего слоя, повторяют описанные выше операции вплоть до завершения бетонного остова сооружения, выполняют штукатурные и облицовочные работы.A known method of construction is that the reinforcing frame of wall and ceiling fragments is mounted, reusable formwork is made, the concrete mixture is prepared, the formwork is filled with concrete mixture, it is held for hardening, the formwork is rearranged to fill the next layer, the operations described above are repeated until the concrete is completed skeletal structures, perform plastering and facing work.

Недостатком указанного способа является низкая технологичность и производительность при выполнении отделочных работ.The disadvantage of this method is the low manufacturability and performance when performing finishing work.

Техническим результатом данного изобретения является повышение технологичности и производительности при выполнении отделочных работ в процессе строительства и при выполнении косметических текущих ремонтов.The technical result of this invention is to improve manufacturability and productivity when performing finishing work in the construction process and when performing cosmetic repairs.

Достигается это тем, что при выполнении фундаментных работ изготовляют канавки по его периметру; собирают из опалубочных плиток и "П"-образных арматурных каркасов стеновые опалубочные секции; организуют из них первый ряд стеновой опалубки установкой последних в канавки фундамента; фиксируют их относительно друг друга посредством поясной арматуры путем защелкивания замков последней на арматурных каркасах стеновых опалубочных секций; устанавливают секционированные трубы-арматуру для прокладки коммуникаций; для герметизации изнутри стеновой опалубки первого ряда заполняют щели между опалубочными плитками герметизирующей смесью с целью подготовки опалубки к заполнению бетоном на основе вяжущих веществ: цемента, извести, гипса или глины с заполнителями; собирают из опалубочных плиток и "П"-образных арматурных каркасов стеновые опалубочные секции; организуют из них второй ряд стеновой опалубки установкой опалубочных плиток на верхней кромке опалубочных плиток первого ряда; состыковывают пазы крепления типа "ласточкиного хвоста"; для изготовления второго ряда сооружения выполняют операции, аналогичные первому ряду; дальнейшее изготовление стен осуществляют аналогично, последний ряд стен данного этажа выполняют на основе опалубочных плиток с прямоугольным пазом; после завершения стен и установки домкратов соединяют между собой потолочные опалубочные плитки и "П"-образные арматурные каркасы и порядно устанавливают их на домкраты с образованием нижней части опалубки перекрытия первого этажа; последний ряд нижней части опалубки перекрытия выполняют на основе потолочных опалубочных плиток с прямоугольным пазом; устанавливают секционированные трубы-арматуру для прокладки коммуникаций; фиксируют опалубочные секции перекрытия относительно друг друга посредством поясной арматуры путем защелкивания замков последней на арматурных каркасах перекрытия; для герметизации изнутри опалубки перекрытия первого этажа заполняют щели между опалубочными плитками герметизирующей смесью с целью подготовки опалубки к заполнению бетоном при помощи бетоновоза, имеющего устройство для заполнения бетоном опалубок верхних перекрытий; устанавливают на арматурные каркасы опалубки перекрытия половые облицовочные плитки; последний ряд выполняют из половых облицовочных плиток с прямоугольным пазом; при изготовлении перекрытий вышележащих этажей выполняют описанные выше операции; повторяют описанные выше операции вплоть до полного завершения строительства остова сооружения; после этого выполняют отделочные работы, для чего в пазы крепления типа "ласточкиного хвоста" наружных стен вводят климатозащитные, рельефные, декоративные плитки покрытия, в пазы внутренних стен - утеплительные, звукоизолирующие, декоративные плитки покрытия, в пазы потолков - рельефные, гладкие плитки покрытия, в пазы пола - паркетные, линолеумовые, ковролиновые, кафельные плитки покрытия; выполняют в плитках покрытия отверстия, совмещаемые с выходами труб-арматуры для прокладки коммуникаций; собирают из светопрозрачных опалубочных плиток и "П"-образных арматурных каркасов опалубочные секции; организуют из них первый ряд опалубки сводчатого покрытия; фиксируют опалубочные секции относительно друг друга посредством поясной арматуры путем защелкивания замков последней на арматурных каркасах опалубочных секций; устанавливают секционированные трубы-арматуру для продувки горячего воздуха при плавлении снежного или ледового слоя на сводчатом покрытии; для герметизации первого ряда опалубки сводчатого покрытия заполняют изнутри щели между опалубочными секциями светопрозрачной герметизирующей смесью; заполняют первый ряд опалубки сводчатого покрытия жидким быстро затвердевающим становящимся светопрозрачным составом; собирают из светопрозрачных опалубочных плиток и "П"-образных арматурных каркасов опалубочные секции; организуют из них второй ряд опалубки сводчатого покрытия установкой опалубочных плиток второго ряда на верхние кромки опалубочных плиток первого ряда; фиксируют опалубочные секции относительно друг друга посредством поясной арматуры; наращивают трубы-арматуру для продувки горячего воздуха; с целью герметизации второго ряда опалубки сводчатого перекрытия заполняют изнутри щели между опалубочными секциями светопрозрачной герметизирующей смесью; заполняют второй ряд опалубки жидким быстро затвердевающим становящимся светопрозрачным составом; повторяют описанные выше операции вплоть до полного завершения строительства сводчатого покрытия, после чего демонтируют поддерживающую переносную опалубку; выполняют на тыльных частях прикрепляемых элементов обратные выступы для крепления типа "ласточкиного хвоста", вводят последние в необходимых местах в пазы для крепления типа "ласточкиного хвоста" стен, потолка, пола.This is achieved by the fact that when performing foundation work, grooves are made along its perimeter; assembled from formwork tiles and "P" -shaped reinforcing cages wall formwork sections; organize the first row of wall formwork from them by installing the latter in the foundation grooves; fix them relative to each other by means of belt reinforcement by snapping the locks of the latter on the reinforcing cages of wall formwork sections; install sectioned reinforcement pipes for laying communications; to seal the inside of the first row of wall formwork, fill the gaps between the formwork tiles with a sealing mixture in order to prepare the formwork for filling with concrete based on binders: cement, lime, gypsum or clay with aggregates; assembled from formwork tiles and "P" -shaped reinforcing cages wall formwork sections; organize the second row of wall formwork from them by installing formwork tiles on the upper edge of the first row of formwork tiles; docking the dovetail type grooves; for the manufacture of the second row of structures perform operations similar to the first row; further production of walls is carried out similarly, the last row of walls of this floor is based on shuttering tiles with a rectangular groove; after the walls are completed and jacks are installed, ceiling formwork tiles and “P” -shaped reinforcing frames are connected to each other and placed on jacks in order to form the lower part of the formwork of the ceiling of the first floor; the last row of the lower part of the shuttering formwork is performed on the basis of ceiling formwork tiles with a rectangular groove; install sectioned reinforcement pipes for laying communications; fix the shuttering sections of the overlap relative to each other by means of belt reinforcement by snapping the locks of the latter on the reinforcing frames of the overlap; to seal the inside of the formwork of the ceiling of the first floor, fill the gaps between the formwork tiles with a sealing mixture in order to prepare the formwork for filling with concrete using a concrete truck having a device for filling concrete of the formwork of the upper floors; install floor cladding tiles on reinforcing frameworks of flooring formwork; the last row is made of floor tiles with a rectangular groove; in the manufacture of floors of overlying floors, the operations described above are performed; repeat the above operations until the completion of the construction of the skeleton of the structure; after that, finishing work is done, for which climate protection, relief, decorative tiles are inserted into the grooves of the dovetail type of the external walls, insulation, soundproofing, decorative tiles are inserted into the grooves of the internal walls, relief, smooth tiles are inserted into the grooves of the ceilings, in the grooves of the floor - parquet, linoleum, carpet, tile tiles; perform holes in the tiles covering compatible with the exits of the pipe reinforcement for laying communications; assemble from translucent formwork tiles and "P" -shaped reinforcing frames formwork sections; organize the first row of vaulted formwork from them; formwork sections are fixed relative to each other by means of belt reinforcement by snapping the locks of the latter on the reinforcing cages of the formwork sections; sectionalized reinforcement pipes are installed for blowing hot air during melting of the snow or ice layer on the vaulted surface; to seal the first row of the formwork of the vaulted coating, fill the gaps between the formwork sections with a translucent sealing mixture from the inside; fill the first row of the formwork of the vaulted coating with liquid quickly hardening becoming a translucent composition; assemble from translucent formwork tiles and "P" -shaped reinforcing frames formwork sections; organize from them the second row of the formwork of the vaulted coating by installing the formwork tiles of the second row on the upper edges of the formwork tiles of the first row; formwork sections are fixed relative to each other by means of belt reinforcement; reinforcing pipes for blowing hot air; in order to seal the second row of the formwork of the vaulted floor, fill the gaps between the formwork sections with a translucent sealing mixture from the inside; fill the second row of the formwork with liquid quickly hardening becoming a translucent composition; repeat the above operations until the construction of the vaulted coating is completed, and then the supporting portable formwork is dismantled; perform back protrusions on the backs of the elements to be attached for fastening the dovetail type, insert the latter in the necessary places into the grooves for fastening the dovetail type of the walls, ceiling, floor.

В устройстве, реализующем предлагаемый способ, указанный технический результат достигается тем, что оно имеет стеновые опалубочные секции и опалубочные секции перекрытий, состоящие из "П"-образных арматурных каркасов и опалубочных плиток с крепежными приливами-замками и пазами для крепления типа "ласточкиного хвоста" для установки в них плиток покрытия, имеющих выступы для крепления типа "ласточкиного хвоста"; секционированные трубы-арматуру для прокладки коммуникаций; поясную арматуру с замками, а также климатозащитные, рельефные, декоративные, утеплительные, отделочные, влагозащитные, звукоизолирующие плитки покрытия; оно имеет опалубочные секции сводчатого покрытия, состоящие из "П"-образных арматурных каркасов и светопрозрачных опалубочных плиток с крепежными приливами-замками для крепления в "П"-образных арматурных каркасах; секционированные трубы-арматуру для продувки горячего воздуха при необходимости устранения слоя льда или снега с крыши сооружения; поясную арматуру с замками для фиксации опалубочных секций сводчатого покрытия относительно друг друга.In the device that implements the proposed method, the specified technical result is achieved in that it has wall formwork sections and shuttering sections of floors, consisting of "P" -shaped reinforcing frames and shuttering tiles with mounting tides-locks and grooves for fastening the type of "dovetail" for installation in them of coating tiles having protrusions for fastening the type of "dovetail"; sectioned pipe fittings for laying communications; belt fittings with locks, as well as climate protection, relief, decorative, insulation, decoration, moisture protection, soundproofing tiles; it has a formwork section of a vaulted coating, consisting of "P" -shaped reinforcing frames and translucent formwork tiles with mounting tides-locks for fastening in a "P" -shaped reinforcement cages; sectioned reinforcement pipes for purging hot air if necessary to eliminate the layer of ice or snow from the roof of the structure; belt reinforcement with locks for fixing the formwork sections of the vaulted coating relative to each other.

Сущность предлагаемого изобретения поясняется чертежами, где на:The essence of the invention is illustrated by drawings, where:

фиг.1 дан фрагмент устройства - вид сбоку;figure 1 is a fragment of the device is a side view;

фиг.2 - план фрагмента;figure 2 - plan fragment;

фиг.3 - вид стеновой опалубочной секции;figure 3 is a view of a wall formwork section;

фиг.4 дан фрагмент общего вида устройства - вид сбоку;figure 4 is a fragment of a General view of the device is a side view;

фиг.5 дан фрагмент стены с пазами для крепления типа "ласточкиного хвоста" и элемента, укрепляемого на стене с обратным выступом для крепления типа "ласточкиного хвоста";figure 5 shows a fragment of a wall with grooves for fastening the type of "dovetail" and the element mounted on the wall with a reverse protrusion for mounting the type of "dovetail";

фиг.6 дан общий вид устройства (разрез по А-А);6 is a General view of the device (section aa);

фиг.7 - то же (разрез по Б-Б).Fig.7 is the same (section along BB).

Предложенный способ состоит в том, что изготовляют "П"-образные арматурные каркасы, опалубочные плитки, поясную арматуру, секционированные трубы-арматуру, плитки покрытия, приемлемые для данного региона, выполняют фундамент сооружения. Собирают из опалубочных плиток и "П"-образных арматурных каркасов стеновые опалубочные секции. Организуют из последних первый ряд стеновой опалубки установкой их в канавки фундамента. Фиксируют опалубочные секции относительно друг друга посредством поясной арматуры путем защелкивания ее замков на "П"-образных арматурных каркасах стеновых опалубочных секций. Устанавливают трубы-арматуру для прокладки коммуникаций. Для герметизации изнутри стеновой опалубки первого ряда заполняют щели между опалубочными плитками герметизирующей смесью с целью подготовки опалубки к заполнению бетоном. При помощи бетоновоза, вызванного в соответствии с графиком, заполняют опалубку первого ряда бетоном и утрамбовывают его вибраторами. Предусматривают время для затвердения бетона. Собирают из опалубочных плиток и "П"-образных арматурных каркасов стеновые опалубочные секции. Организуют из последних второй ряд стеновой опалубки установкой опалубочных плиток на верхней кромке опалубочных плиток первого ряда. Состыковывают пазы крепления типа "ласточкиного хвоста". Для изготовления второго ряда стен сооружения выполняют операции, аналогичные работам по изготовлению первого ряда. Дальнейшее изготовление стен осуществляют аналогично описанному выше. Последний ряд стен данного этажа выполняют на основе опалубочных плиток с прямоугольным пазом. Для выполнения перекрытий устанавливают поддерживающие домкраты, выставляют их по высоте. Соединяют между собой потолочные опалубочные плитки и "П"-образные арматурные каркасы и порядно устанавливают их на домкраты с образованием нижней части опалубки перекрытия первого этажа. Последний ряд потолочной части опалубки перекрытия выполняют на основе опалубочных плиток с прямоугольным пазом. Устанавливают секционированные трубы-арматуру для прокладки коммуникаций. Фиксируют опалубочные секции перекрытия относительно друг друга посредством поясной арматуры путем защелкивания замков последней на "П"-образных арматурных каркасах опалубочных секций перекрытия. Для герметизации изнутри опалубки перекрытия первого этажа заполняют щели между опалубочными плитками герметизирующей смесью с целью подготовки опалубки к заполнению бетоном при помощи бетоновоза, имеющего устройство для заполнения бетоном опалубок верхних перекрытий. Устанавливают на арматурные каркасы опалубки перекрытия половые опалубочные плитки. Последний ряд выполняют из половых опалубочных плиток с прямоугольным пазом. При выполнении перекрытий вышележащих этажей осуществляют описанные выше операции. Повторяют все описанные выше операции вплоть до полного завершения строительства остова сооружения. Предложенный способ состоит в том, что изготовляют "П"-образные арматурные каркасы, светопрозрачные опалубочные плитки, секционированные трубы-арматуру, поясную арматуру. Собирают из светопрозрачных опалубочных плиток и "П"-образных арматурных каркасов опалубочные секции, организуют из них первый ряд опалубки сводчатого покрытия, фиксируют опалубочные секции относительно друг друга посредством поясной арматуры путем защелкивания замков последней на арматурных каркасах опалубочных секций, устанавливают секционированные трубы-арматуру для продувки горячего воздуха при плавлении снежного или ледового слоя на сводчатом покрытии. Для герметизации первого ряда опалубки сводчатого покрытия заполняют изнутри щели между опалубочными секциями светопрозрачной герметизирующей смесью. Заполняют первый ряд опалубки сводчатого покрытия жидким быстро затвердевающим становящимся светопрозрачным составом. Собирают из светопрозрачных опалубочных плиток и "П"-образных арматурных каркасов опалубочные секции. Организуют из них второй ряд опалубки сводчатого покрытия установкой опалубочных плиток второго ряда на верхние кромки опалубочных плиток первого ряда. Фиксируют опалубочные секции относительно друг друга посредством поясной арматуры. Наращивают трубы-арматуру для продувки горячего воздуха. С целью герметизации второго ряда опалубки сводчатого перекрытия заполняют изнутри щели между опалубочными секциями светопрозрачной герметизирующей смесью. Заполняют второй ряд опалубки жидким быстро затвердевающим становящимся светопрозрачным составом. Повторяют описанные выше операции вплоть до полного завершения строительства сводчатого покрытия, после чего демонтируют поддерживающую переносную опалубку.The proposed method consists in the fact that they produce "P" -shaped reinforcing cages, formwork tiles, waist reinforcement, sectioned reinforcement pipes, coating tiles acceptable for this region, fulfill the foundation of the structure. Wall formwork sections are assembled from formwork tiles and “P” -shaped reinforcing cages. From the latter, they organize the first row of wall formwork by installing them in the foundation grooves. The shuttering sections are fixed relative to each other by means of waist reinforcement by snapping its locks on the "P" -shaped reinforcing frames of the wall shuttering sections. Install pipe fittings for laying communications. To seal the inside of the wall formwork of the first row, fill the gaps between the formwork tiles with a sealing mixture in order to prepare the formwork for filling with concrete. Using a concrete truck, called in accordance with the schedule, fill the first row formwork with concrete and ram it with vibrators. Provide time for hardening concrete. Wall formwork sections are assembled from formwork tiles and “P” -shaped reinforcing cages. From the latter, they organize the second row of wall formwork by installing formwork tiles on the upper edge of the first row of formwork tiles. Docktail grooves are docked. For the manufacture of the second row of walls, structures perform operations similar to those for the manufacture of the first row. Further manufacture of the walls is carried out similarly as described above. The last row of walls of this floor is based on shuttering tiles with a rectangular groove. To perform the overlap, support jacks are installed, they are set in height. Ceiling formwork tiles and “P” -shaped reinforcing frames are connected together and they are placed on jacks in order to form the lower part of the formwork of the ceiling of the first floor. The last row of the ceiling part of the ceiling formwork is based on the formwork tiles with a rectangular groove. Install sectional reinforcement pipes for laying communications. The shuttering sections of the floor are fixed relative to each other by means of belt reinforcement by snapping the locks of the latter onto the “P” -shaped reinforcing frames of the shuttering sections of the overlap. To seal the inside of the formwork of the ceiling of the first floor, fill the gaps between the formwork tiles with a sealing mixture in order to prepare the formwork for filling with concrete using a concrete truck having a device for filling concrete of the formwork of the upper floors. Floor formwork tiles are installed on reinforcing frameworks of floor formwork. The last row is made of floor formwork tiles with a rectangular groove. When performing floors of overlying floors, the operations described above are carried out. All the operations described above are repeated until the completion of the construction of the structure. The proposed method consists in the manufacture of "P" -shaped reinforcing cages, translucent formwork tiles, sectioned pipe reinforcement, waist reinforcement. The formwork sections are assembled from translucent formwork tiles and “P” -shaped reinforcing frames, the first row of formwork of the vaulted coating is arranged from them, the formwork sections are fixed relative to each other by means of belt reinforcement by snap-locking the locks of the latter on the reinforcing frameworks of the formwork sections, sectionalized reinforcement pipes are installed for blowing hot air when melting a snow or ice layer on a vaulted surface. To seal the first row of the formwork of the vaulted coating, fill the gaps between the formwork sections with a translucent sealing mixture from the inside. The first row of the vaulted formwork is filled with liquid quickly hardening and becoming translucent. Assemble formwork sections from translucent formwork tiles and "P" -shaped reinforcing cages. They organize the second row of the formwork of the vaulted coating by installing the formwork tiles of the second row on the upper edges of the formwork tiles of the first row. Formwork sections are fixed relative to each other by means of belt reinforcement. Pipe fittings for purging hot air. In order to seal the second row of the formwork of the vaulted floor, fill the gaps between the formwork sections with a translucent sealing mixture from the inside. The second row of the formwork is filled with liquid quickly hardening and becoming translucent. The operations described above are repeated until the construction of the vaulted coating is completed, after which the supporting portable formwork is dismantled.

После этого выполняют отделочные работы, для чего в пазы крепления типа "ласточкиного хвоста" наружных стен вводят климатозащитные, рельефные, декоративные плитки покрытия. В пазы внутренних стен - утеплительные, звукоизолирующие, декоративные плитки покрытия. В пазы потолков - рельефные, гладкие плитки покрытия. В пазы пола - паркетные, линолеумовые, ковролиновые, кафельные плитки покрытия. Выполняют в плитках покрытия отверстия, совмещаемые с выходами труб-арматуры для прокладки коммуникаций. Осуществляют коммутацию коммуникаций.After that, finishing work is done, for which climate protection, relief, decorative tiles are introduced into the grooves of the dovetail type of the external walls. In the grooves of the internal walls - insulation, soundproofing, decorative tiles. In the grooves of the ceilings are embossed, smooth tiles. In the grooves of the floor - parquet, linoleum, carpet, tile flooring. Holes are made in the coating tiles, combined with the exits of the pipe reinforcement for laying communications. Carry out communications switching.

Во всех предметах, которые необходимо устанавливать на стенах, потолке и на полу, выполняют на тыльной части выступы для крепления типа "ласточкиного хвоста". В местах, где необходимо установить предметы оснащения помещений, вместо плиток покрытия в пазы для крепления типа "ласточкиного хвоста" вводят выступы для крепления типа "ласточкиного хвоста" предметов оснащения помещений, а затем вновь вводят плитки покрытия.In all objects that need to be installed on the walls, ceiling and floor, perform projections on the back for attachment such as "dovetail". In places where it is necessary to install objects of equipment for premises, instead of tiles of coating in the grooves for fastening the type of "dovetail" enter the tabs for fastening type "swallow tail" of the objects of equipment of the premises, and then re-enter the tiles of the coating.

Устройство, реализующее предлагаемый способ, имеет собираемые из левой 1 и правой 2 опалубочных плиток и "П"-образного арматурного каркаса 3 опалубочные стеновые секции, а также собираемые из потолочной 4 и половой 5 опалубочных плиток и "П"-образного арматурного каркаса 6 опалубочные секции перекрытий. Опалубочные плитки 1 и 2 опалубочных стеновых секций имеют крепежные приливы-замки 7 для крепления последних на "П"-образных арматурных каркасах 3 с образованием опалубочных стеновых секций. Опалубочные плитки 4 и 5 опалубочных секций перекрытий имеют крепежные приливы-замки 8 для крепления последних на "П"-образных арматурных каркасах 6 с образованием опалубочных секций перекрытий. Кроме того, опалубочные плитки 1 и 2 опалубочных стеновых секций имеют пазы 9 крепления типа "ласточкиного хвоста" для установки в них выступов 10 утеплительных, звукоизолирующих, декоративных плиток 11 покрытия внутренних стен или климатозащитных, рельефных, декоративных плиток 12 покрытия наружных стен. Опалубочные плитки 4 и 5 опалубочных секций перекрытий имеют пазы 13 крепления типа "ласточкиного хвоста" для установки в них гладких, рельефных, специализированных, приспособленных к монтажу люстр, плиток 14 покрытия потолка, а также паркетных, линолеумовых, ковролиновых, кафельных плиток 15 покрытия пола. Имеется модификация опалубочных плиток 1, 2, 4, 5 с прямоугольным пазом, позволяющим при выполнении из них последних рядов стен этажей и последних рядов комнатных этажных перекрытий заводить через них выступы 10 плиток покрытия и затем продвигать последние вдоль паза типа "ласточкиного хвоста" вплоть до полного заполнения ими внутренних и наружных стен, потолка и пола.A device that implements the proposed method has 3 formwork panels assembled from the left 1 and right 2 formwork tiles and a “P” -shaped reinforcing cage, as well as 6 formwork assembled from ceiling 4 and floor 5 formwork tiles and a “P” -shaped reinforcement cage overlapping sections. The shuttering tiles 1 and 2 of the shuttering wall sections have fastening tides-locks 7 for fastening the latter on the "P" -shaped reinforcing frames 3 with the formation of shuttering wall sections. The shuttering tiles 4 and 5 of the shuttering sections of the floors have fastening tides-locks 8 for fastening the latter on the "P" -shaped reinforcement cages 6 with the formation of shuttering sections of the floors. In addition, the shuttering tiles 1 and 2 of the shuttering wall sections have grooves of the “dovetail” type 9 for mounting the protrusions 10 of heat-insulating, soundproofing, decorative tiles 11 to cover the inner walls or climate-protective, embossed, decorative tiles 12 to cover the outer walls. The shuttering tiles 4 and 5 of the shuttering sections of the floors have grooves of the “dovetail” type 13 for installing smooth, embossed, specialized chandeliers, tiles 14 for ceiling coverings, as well as parquet, linoleum, carpet, tile 15 floor coverings . There is a modification of formwork tiles 1, 2, 4, 5 with a rectangular groove, which allows the protrusions of 10 tiles to be inserted through them the last rows of floor walls and the last rows of floor floors, and then push the latter along the dovetail groove up to their complete filling of the internal and external walls, ceiling and floor.

Опалубочные плитки 1, 2, 4, 5 могут изготовляться, например, методом литья из отходов производства - расплавленных металлургических шлаков, что позволяет экономить энергию за счет отсутствия необходимости обжигать плитки.Formwork tiles 1, 2, 4, 5 can be made, for example, by casting from production waste - molten metallurgical slag, which saves energy due to the absence of the need to burn the tiles.

Устройство имеет поясную арматуру 15 с замками 16, фиксируемыми при сборке опалубок на "П"-образных арматурных каркасах 3 или 6. Для прокладки коммуникаций после выполнения остова сооружения в стеновых опалубках и опалубках перекрытий предусмотрена закладка секционированных труб-арматуры 17, жестко соединяемых друг с другом посредством муфт 18, аналогичных используемым в противопожарных средствах. Трубопроводы изготовлены, например, из стали и выполняют функцию дополнительной арматуры сооружения.The device has a waist reinforcement 15 with locks 16, fixed when assembling the formwork on the "P" -shaped reinforcing frames 3 or 6. For laying communications after the skeleton of the structure in the wall formwork and formwork of the slabs, tabs of sectional reinforcement pipes 17 are provided that are rigidly connected to each other another by means of couplings 18 similar to those used in fire fighting means. Pipelines are made, for example, of steel and perform the function of additional reinforcement of the structure.

Герметизация опалубок перед заполнением их бетоном 19 осуществляется посредством замазок 20, например, из цементного раствора.Sealing the formwork before filling them with concrete 19 is carried out by means of putties 20, for example, from cement mortar.

Для поддержания до затвердевания бетона 19 перекрытий и консольных элементов сооружения служат домкраты 21. Утрамбовка бетона осуществляется вибратором 22.To maintain the concrete 19 hardening of the concrete floors and cantilever elements of the structure, jacks 21 are used. The concrete is rammed by a vibrator 22.

Устройство, реализующее предлагаемый способ, имеет собираемые из левой 23 и правой 24 светопрозрачных опалубочных плиток, изготовляемых, например, из стекла, и "П"-образного арматурного каркаса 25 опалубочные секции сводчатого покрытия. Светопрозрачные опалубочные плитки 23 и 24 имеют крепежные приливы-замки 26 для крепления их на "П"-образных арматурных каркасах 25 с образованием опалубочных секций. Устройство имеет поясную арматуру 27 с замками 28, защелкиваемыми при сборке опалубочных секций на "П"-образных арматурных каркасах 25.A device that implements the proposed method has assembled from the left 23 and right 24 translucent formwork tiles made of, for example, glass, and a "P" -shaped reinforcement cage 25 formwork sections of the vaulted coating. Translucent formwork tiles 23 and 24 have fastening tides-locks 26 for mounting them on the "P" -shaped reinforcing frames 25 with the formation of formwork sections. The device has a waist reinforcement 27 with locks 28, latched when assembling the formwork sections on the "P" -shaped reinforcement cages 25.

Для подачи горячего воздуха, предназначенного для расплавления снега или льда на крыше, устройство снабжено секционированными трубами-арматурой 29, жестко соединяемыми друг с другом при помощи муфт 30, аналогичных используемым в противопожарных средствах.To supply hot air intended for melting snow or ice on the roof, the device is equipped with sectioned pipes-fittings 29, rigidly connected to each other using couplings 30, similar to those used in fire fighting equipment.

Герметизация опалубочных секций сводчатого покрытия перед их заливкой осуществляется посредством замазок 31, например, из густого силикатного клея.The sealing of the formwork sections of the vaulted coating before pouring is carried out by means of putties 31, for example, of thick silicate glue.

Для заполнения рядов опалубочных секций служит жидкий раствор 32, например, состоящий из жидкого силиката натрия и фосфорной кислоты, смешиваемых перед заливкой, которые используются для тампонажа неустойчивых грунтов.To fill the rows of the shuttering sections is a liquid solution 32, for example, consisting of liquid sodium silicate and phosphoric acid, mixed before pouring, which are used for grouting unstable soils.

Для поддержания опалубочных секций сводчатого покрытия служат домкраты 33 поддерживающей переносной опалубки, установленной на центральной конструкции 34 между построенными стенами 35.To maintain the formwork sections of the vaulted coating, jacks 33 of the supporting portable formwork are installed, mounted on a central structure 34 between the constructed walls 35.

Для установки сводчатого покрытия на стенах служат опоры 36.To install the vaulted coating on the walls are supports 36.

Устройство для выравнивания краев паза типа "ласточкиного хвоста" смежных опалубочных плиток представляет собой раздвижную конструкцию, имеющую упругий элемент 37, повторяющий контуры паза опалубочной плитки 38, выполненный, например, из упругой стальной пластины, жестко связанной, например при помощи заклепок 39, с направляющей планкой 40, в которой установлен с возможностью поворота на 90° фиксатор 41. Последний установлен в планке 40 при помощи раздвижной шайбы. Для управления фиксатором 41 имеется ручка 43.A device for aligning the edges of a dovetail groove of adjacent formwork tiles is a sliding structure having an elastic element 37 repeating the contours of the formwork tile 38 made, for example, of an elastic steel plate rigidly connected, for example by means of rivets 39, with a guide the bracket 40, in which the latch 41 is mounted rotatably 90 °. The latter is mounted in the bracket 40 by means of a sliding washer. To control the latch 41 has a handle 43.

Предметы 44 оснащения помещений имеют на тыльных сторонах выступы 45 для крепления типа "ласточкиного хвоста" для введения их в пазы 46 крепления типа "ласточкиного хвоста" на поверхностях 47 помещений. Плитки покрытия 48 также имеют выступы 49 для крепления типа "ласточкиного хвоста" для введения их в пазы 46 для крепления типа "ласточкиного хвоста" поверхностей 47 помещений.Objects 44 of the equipment of premises have on the rear sides protrusions 45 for fastening the type of "dovetail" for insertion into the grooves 46 of the fastening of the type "dovetail" on the surfaces 47 of the premises. Coating tiles 48 also have tabs 49 for attaching a dovetail type for insertion into grooves 46 for attaching a dovetail type to surfaces 47 of the rooms.

Работа устройства осуществляется следующим образом.The operation of the device is as follows.

После выполнения фундамента сооружения собираются из левых 1 и правых 2 опалубочных плиток и "П"-образных арматурных каркасов 3 стеновые опалубочные секции (фиг.3), а из них организуется первый ряд стеновой опалубки, для чего они устанавливаются в канавке фундамента и фиксируются между собой посредством поясной арматуры 15, замки 16 которой защелкиваются на арматурных каркасах 3 стеновых опалубочный секций. Устанавливаются трубы-арматура 17 для прокладки коммуникаций. Затем первый ряд стеновой опалубки герметизируется, для чего выполняются замазки 20, например, из цементного раствора, которым заполняются изнутри все щели опалубки. После затвердевания герметизирующих замазок 20 вызывается, в соответствии с графиком, бетоновоз с устройством для заполнения бетоном 19 стеновой опалубки. После заполнения опалубки первого ряда бетоном 19 осуществляется его уплотнение при помощи вибратора 22. Опалубка второго ряда организуется после затвердения бетона 19 первого ряда из опалубочных секций, собираемых аналогично описанному выше. При этом нижние части опалубочных плиток 1 и 2 фиксируются на верхних кромках опалубочных плиток первого ряда, для чего совмещаются пазы 9 крепления типа "ласточкиного хвоста" первого и второго рядов опалубок. Операции по изготовлению второго ряда стен сооружения осуществляется аналогично первому ряду. Дальнейшее изготовление стен сооружения осуществляется аналогично описанному выше. Последний ряд стен первого этажа выполняется на основе опалубочных плиток с прямоугольным пазом. Для выполнения перекрытия первого этажа устанавливаются поддерживающие домкраты 21 и выставляются по высоте. Далее соединяются потолочные опалубочные плитки 4 и "П"-образные арматурные каркасы 6 и порядно устанавливаются на домкраты 21 с образованием нижней части опалубки перекрытия первого этажа. Последний ряд потолочной части опалубки перекрытия выполняется на основе опалубочных плиток с прямоугольным пазом. Устанавливаются секционированные трубы-арматура 17 для прокладки коммуникаций. Фиксируются опалубочные секции перекрытия относительно друг друга посредством поясной арматуры путем защелкивания замков 16 последней на "П"-образных арматурных каркасах 6 опалубочных секций перекрытия. При этом совмещаются пазы крепления типа "ласточкиного хвоста" всех рядов потолочных опалубочных плиток 4. Для герметизации изнутри опалубки перекрытия первого этажа заполняются щели путем образования замазок 20. После этого на "П"-образные арматурные каркасы 6 порядно устанавливаются половые опалубочные плитки 5. Последний ряд выполняется из половых облицовочный плиток с прямоугольным пазом. После затвердевания герметизирующих замазок 20 вызывается бетоновоз с устройством для заполнения бетоном отметок, расположенных вверху. Заполняется бетоном 19 опалубка перекрытия первого этажа с тем, чтобы его верхний уровень совпал с низом опалубочных половых плиток 5 после его утрамбовки вибратором 22. Повторяются все описанные выше операции вплоть до полного завершений строительства остова сооружения. После постройки стен устанавливается конструкция 12, на которой установлены домкраты 34. Последние разводятся так, что образуется сферическая поверхность.After the foundation is completed, the structures are assembled from left 1 and right 2 formwork tiles and “P” -shaped reinforcing frames 3 wall formwork sections (Fig. 3), and the first row of wall formwork is organized from them, for which they are installed in the foundation groove and fixed between by means of belt reinforcement 15, locks 16 of which are latched onto reinforcing cages 3 of wall formwork sections. Fittings 17 are installed for laying communications. Then the first row of wall formwork is sealed, for which putties 20 are made, for example, of cement mortar, with which all the formwork slots are filled from the inside. After the hardening of the sealing putty 20, a concrete truck with a device for filling concrete 19 of the wall formwork is called in accordance with the schedule. After filling the formwork of the first row with concrete 19, it is sealed with a vibrator 22. The formwork of the second row is organized after the concrete 19 of the first row is hardened from the formwork sections assembled similarly as described above. In this case, the lower parts of the formwork tiles 1 and 2 are fixed on the upper edges of the formwork tiles of the first row, for which the grooves 9 of the “dovetail” type of fastening of the first and second rows of formwork are combined. Operations for the manufacture of the second row of walls of the structure are carried out similarly to the first row. Further manufacture of the walls of the structure is carried out similarly to that described above. The last row of walls on the first floor is based on shuttering tiles with a rectangular groove. To perform the overlapping of the first floor, support jacks 21 are installed and set in height. Next, ceiling formwork tiles 4 and "P" -shaped reinforcement cages 6 are connected and installed in order on the jacks 21 with the formation of the lower part of the formwork of the ceiling of the first floor. The last row of the ceiling part of the ceiling formwork is based on formwork tiles with a rectangular groove. Installed sectional pipe reinforcement 17 for laying communications. The shuttering sections of the floor are fixed relative to each other by means of waist reinforcement by snapping the locks 16 of the latter onto the "P" -shaped reinforcing frames 6 of the shuttering sections of the floor. At the same time, the dovetail mounting grooves of all rows of ceiling formwork tiles are combined 4. To seal the shuttering of the first floor from the inside of the formwork, the gaps are filled by forming putties 20. After that, floor formwork tiles 5 are installed on the “P” -shaped reinforcement cages 5. Last the row is made of floor tiles with a rectangular groove. After hardening of the sealing putty 20, a concrete truck is called up with a device for filling concrete with marks located at the top. Concrete 19 is filled with the formwork of the first floor overlap so that its upper level coincides with the bottom of the formwork floor tiles 5 after it has been tamped with a vibrator 22. All the above operations are repeated until the completion of the construction of the structure. After the walls are built, a structure 12 is installed on which jacks 34 are installed. The latter are bred so that a spherical surface is formed.

Из левых 23 и правых 24 светопрозрачных опалубочных плиток и "П"-образных арматурных каркасов 25 собираются опалубочные секции, из которых организуется первый ряд опалубки сводчатого покрытия, для чего они устанавливаются на опоры 14, смонтированные на верхней части стен 35, и фиксируются между собой посредством поясной арматуры 27, для чего замки 28 последней защелкиваются на "П"-образных арматурных каркасах 25 опалубочных секций. Устанавливаются секционированные трубы-арматура 29, жестко соединяемые между собой при помощи муфт 30.From the left 23 and right 24 translucent formwork tiles and “P” -shaped reinforcing cages 25 formwork sections are assembled, from which the first row of formwork of the vaulted coating is organized, for which they are installed on the supports 14 mounted on the upper part of the walls 35 and are fixed to each other by means of the waist reinforcement 27, for which the locks 28 of the latter are latched onto the "P" -shaped reinforcement cages 25 of the shuttering sections. Sectionalized reinforcement pipes 29 are mounted rigidly connected to each other by means of couplings 30.

Затем первый ряд опалубки герметизируется, для чего выполняются замазки 31, которыми заполняется изнутри все щели опалубки.Then, the first row of formwork is sealed, for which putties 31 are performed, with which all slots of the formwork are filled from the inside.

После затвердевания замазок 31 опалубка заполняется жидким раствором 32.After the hardening of the putty 31, the formwork is filled with a liquid solution 32.

Опалубка второго ряда организуется после затвердения раствора 32 в опалубке первого ряда. При этом нижние части опалубочных плиток 23 и 24 устанавливаются на верхних кромках опалубочных плиток первого ряда.The formwork of the second row is organized after the hardening of the solution 32 in the formwork of the first row. In this case, the lower parts of the formwork tiles 23 and 24 are installed on the upper edges of the formwork tiles of the first row.

Действия по изготовлению второго и последующих рядов сводчатого покрытия осуществляется аналогично описанному выше.The steps for manufacturing the second and subsequent rows of vaulted coatings are carried out similarly to those described above.

После установки нового ряда опалубочных плиток 38 до герметизации зазоров и заливки бетоном в каждый паз опалубочных плиток 38 вводятся упругие элементы 40 устройства после предварительного сведения их крыльев. Затем поворотом ручки 43 фиксатор поворачивается на 90° и раздвигаются крылья упругого элемента 37, чем выравниваются края пазов типа "ласточкиного хвоста" смежных опалубочных плиток 38. После затвердевания бетона и установки следующего ряда опалубочных плиток 38 в устройствах для выравнивания краев пазов поворачивается фиксатор 41 в исходное состояние, а затем после извлечения указанных фиксаторов они устанавливаются на смонтированном ряду опалубочных плиток, как было описано выше.After installing a new series of shuttering tiles 38 before sealing gaps and pouring concrete into each groove of shuttering tiles 38, elastic elements 40 of the device are introduced after preliminary information of their wings. Then, by turning the handle 43, the latch rotates 90 ° and the wings of the elastic element 37 are extended, thereby aligning the edges of the dovetail grooves of adjacent formwork tiles 38. After the concrete has hardened and the next row of formwork tiles 38 has been installed in the devices for aligning the edges of the grooves, the latch 41 rotates the initial state, and then after removing these latches, they are installed on the mounted row of shuttering tiles, as described above.

После завершения строительства остова сооружения, на поверхностях 47 которого имеются пазы 46 для крепления типа "ласточкиного хвоста", в них вводятся выступы 49 для крепления типа "ласточкиного хвоста" плиток покрытия 48, а в необходимых местах выступы 45 предметов 44 оснащения помещений. После этого выполняются отделочные работы, для чего в пазы 46 крепления типа "ласточкиного хвоста" вводятся выступы 49 утеплительных, звукоизолирующих, декоративных плиток 48 покрытия внутренних стен. В пазы наружных стен - выступы климатозащитных, рельефных, декоративных плиток покрытия наружных стен. В пазы потолка - выступы гладких, рельефных, специализированных, приспособленных к монтажу люстр, плиток покрытия потолка. В пазы пола - выступы паркетных, линолеумовых, ковролиновых, кафельных плиток покрытия пола.After the completion of the construction of the structure’s core, on the surfaces of which 47 there are grooves 46 for fastening the “dovetail” type, protrusions 49 for fastening the “dovetail” type of the covering tiles 48 are introduced into them, and in the necessary places, the protrusions are 45 objects 44 of the room equipment. After that, finishing work is carried out, for which protrusions 49 of insulating, soundproofing, decorative tiles 48 of the inner wall coating are introduced into the grooves 46 of the dovetail type of fastening. In the grooves of the outer walls are the protrusions of the climate-protective, embossed, decorative tiles covering the outer walls. In the grooves of the ceiling are protrusions of smooth, embossed, specialized, adapted for mounting chandeliers, tiles covering the ceiling. In the grooves of the floor are the ledges of the parquet, linoleum, carpet, tile flooring.

Claims (2)

1. Способ возведения сооружений, заключающийся в том, что монтируют арматурный каркас, изготавливают опалубки, готовят бетонную смесь, заполняют опалубки бетонной смесью, переставляют опалубку для заливки следующего слоя, повторяют описанные операции вплоть до завершения бетонного остова сооружения, выполняют штукатурные и облицовочные работы, отличающийся тем, что при выполнении фундаментных работ изготавливают канавки по его периметру, собирают из опалубочных плиток и П-образных арматурных каркасов стеновые опалубочные секции, организуют из них первый ряд стеновой опалубки установкой последних в канавки фундамента, фиксируют их относительно друг друга посредством поясной арматуры путем защелкивания замков последней на арматурных каркасах стеновых опалубочных секций, устанавливают секционированные трубы-арматуру для прокладки коммуникаций, для герметизации изнутри стеновой опалубки первого ряда заполняют щели между опалубочными плитками герметизирующей смесью с целью подготовки опалубки к заполнению бетоном на основе цемента, извести, гипса или глины с заполнителями, собирают из опалубочных плиток и П-образных арматурных каркасов стеновые опалубочные секции, организуют из них второй ряд стеновой опалубки установкой опалубочных плиток на верхней кромке опалубочных плиток первого ряда, состыковывают пазы крепления типа "ласточкин хвост", для изготовления второго ряда стен сооружения выполняют операции, аналогичные первому ряду, дальнейшее изготовление стен сооружения осуществляют аналогично описанному выше, последний ряд стен данного этажа выполняют на основе опалубочных плиток с прямоугольным пазом, после завершения стены первого этажа и установки домкратов соединяют между собой потолочные опалубочные плитки и П-образные арматурные каркасы и порядно устанавливают их на домкраты с образованием нижней части опалубки перекрытия первого этажа, последний ряд нижней части опалубки перекрытия выполняют на основе потолочных опалубочных плиток с прямоугольным пазом, устанавливают секционированные трубы-арматуру для прокладки коммуникаций, фиксируют опалубочные секции перекрытия относительно друг друга посредством поясной арматуры путем защелкивания замков последней на П-образных арматурных каркасах перекрытия, для герметизации изнутри опалубки перекрытия первого этажа заполняют щели между опалубочными плитками герметизирующей смесью с целью подготовки опалубки к заполнению бетоном при помощи бетоновоза, имеющего устройство для заполнения бетоном опалубок верхних этажей, устанавливают на арматурные каркасы опалубки перекрытия половые облицовочные плитки, последний ряд выполняют из половых облицовочных плиток с прямоугольным пазом, при изготовлении перекрытий вышележащих этажей выполняют описанные выше операции, повторяют все описанные выше операции вплоть до полного завершения строительства остова сооружения, после этого выполняют отделочные работы, для чего в пазы крепления типа "ласточкин хвост" наружных стен вводят климатозащитные рельефные декоративные плитки покрытия, в пазы внутренних стен - утеплительные, звукоизолирующие декоративные плитки покрытия, в пазы потолков - рельефные, гладкие плитки покрытия, в пазы пола - паркетные, линолеумовые, ковролиновые, кафельные плитки покрытия, выполняют в плитке покрытия отверстия, совмещаемые с выходами труб-арматуры для прокладки коммуникаций, для сводчатого покрытия собирают из светопрозрачных опалубочных плиток и П-образных арматурных каркасов опалубочные секции, организуют из них первый ряд опалубки сводчатого покрытия, фиксируют опалубочные секции относительно друг друга посредством поясной арматуры путем защелкивания замков последней на арматурных каркасах опалубочных секций, устанавливают секционированные трубы-арматуру для продувки горячего воздуха при плавлении снежного или ледового слоя на сводчатом покрытии, для герметизации первого ряда опалубки сводчатого покрытия заполняют изнутри щели между опалубочными секциями светопрозрачной герметизирующей смесью, заполняют первый ряд опалубки сводчатого покрытия жидким быстро затвердевающим, становящимся светопрозрачным составом, собирают из светопрозрачных опалубочных плиток и П-образных арматурных каркасов опалубочные секции, организуют из них второй ряд опалубки сводчатого покрытия установкой опалубочных плиток второго ряда на верхние кромки опалубочных плиток первого ряда, фиксируют опалубочные секции относительно друг друга посредством поясной арматуры, наращивают трубы-арматуру для продувки горячего воздуха, с целью герметизации второго ряда опалубки сводчатого перекрытия заполняют изнутри щели между опалубочными секциями светопрозрачной герметизирующей смесью, заполняют второй ряд опалубки жидким быстро затвердевающим, становящимся светопрозрачным составом, повторяют описанные выше операции вплоть до полного завершения строительства сводчатого покрытия, после чего демонтируют поддерживающую переносную опалубку, выполняют на тыльных частях прикрепляемых элементов обратные выступы для крепления типа "ласточкин хвост", вводят последние в необходимых местах в пазы для крепления типа "ласточкин хвост" стен, потолка, пола.1. The method of erecting structures, which consists in installing a reinforcing cage, making formwork, preparing concrete mix, filling the formwork with concrete mix, rearranging the formwork to fill the next layer, repeating the described operations until the completion of the concrete core of the structure, performing plastering and facing work, characterized in that when performing foundation work, grooves are made along its perimeter, wall formwork sections, org are assembled from formwork tiles and U-shaped reinforcing cages lower the first row of wall formwork from them by installing the latter in the foundation grooves, fix them relative to each other by means of belt reinforcement by snapping the locks of the latter on the reinforcing cages of wall formwork sections, install sectional reinforcement pipes for laying communications, fill the gaps from the inside of the first row wall formwork between formwork tiles with a sealing mixture in order to prepare the formwork for filling with concrete based on cement, lime, gypsum or clay carriers, assemble wall formwork sections from formwork tiles and U-shaped reinforcing cages, arrange the second row of wall formwork from them by installing formwork tiles on the upper edge of the first row of formwork tiles, join the dovetail mounting grooves, to make the second row of walls of the structure operations similar to the first row, the further manufacture of the walls of the structure is carried out similarly as described above, the last row of walls of this floor is performed on the basis of shuttering tiles with a straight line with a groove in the groove, after completing the wall of the first floor and installing the jacks, the ceiling formwork tiles and U-shaped reinforcing frames are connected together and placed on the jacks in order to form the lower part of the floor formwork of the floor, the last row of the lower part of the formwork is made on the basis of ceiling formwork tiles with a rectangular groove, set up sectional reinforcement pipes for laying communications, fix the shuttering sections of the ceiling relative to each other by means of a belt fittings by snapping the locks of the latter on the U-shaped reinforcing frameworks of the floor, to seal the inside of the formwork of the floor of the first floor, fill the gaps between the formwork tiles with a sealing mixture in order to prepare the formwork to be filled with concrete using a concrete truck with a device for filling concrete formwork of the upper floors, installed on reinforcing cages of flooring formwork floor tiles, the last row is made of floor tiles with a rectangular groove, in the manufacture of The floors of the overlying floors carry out the operations described above, repeat all the operations described above until the construction of the structure is completed, then do the finishing work, for which climatic protective embossed decorative tiles are introduced into the grooves of the dovetail type of the external walls, into the grooves of the internal walls - insulating, soundproofing decorative tiles, in the grooves of the ceilings - relief, smooth tiles, in the grooves of the floor - parquet, linoleum, carpet, tile coating molds, holes are made in the coating tile that are compatible with the exits of pipe fittings for laying communications, for vaulted coating, formwork sections are assembled from translucent formwork tiles and U-shaped reinforcing cages, the first row of formwork of the vaulted coating is arranged from them, formwork sections are fixed relative to each other each other by means of waist reinforcement by snapping the locks of the latter on the reinforcing cages of the shuttering sections, sectionalized reinforcement pipes are installed for blowing hot water to melt the snow or ice layer on the vaulted coating, to seal the first row of the vaulted formwork, fill the gaps between the formwork sections with a translucent sealing mixture, fill the first row of the vaulted formwork with a liquid that quickly hardens, becomes a translucent, and collect it from translucent of shaped reinforcing cages formwork sections, organize from them the second row of vaulted formwork by installing formwork tiles of the second about the row to the upper edges of the shuttering tiles of the first row, fix the shuttering sections relative to each other by means of belt fittings, increase the reinforcement pipes for blowing hot air, in order to seal the second row of the shuttering formwork, fill the gaps between the shuttering sections with a translucent sealing mixture, fill the second row formwork liquid quickly hardening, becoming a translucent composition, repeat the operations described above until the completion of the construction of their chatogo cover, and then dismantle the supports portable formwork is carried out on the back of the attached element back projections for fixing the "dovetail", introduced last in the appropriate places in the slots for attaching a "dovetail" the walls, ceiling and floor. 2. Устройство для осуществления способа по п.1, содержащее каркас, облицовочные материалы, бетон, причем оно имеет стеновые опалубочные секции и опалубочные секции перекрытий, состоящие из П-образных арматурных каркасов и опалубочных плиток с крепежными приливами-замками и пазами для крепления типа "ласточкин хвост" для установки в них плиток покрытия, имеющих выступы для крепления типа "ласточкин хвост", секционированные трубы-арматуру для прокладки коммуникаций, поясную арматуру с замками, а также климатозащитные рельефные, декоративные, утеплительные, отделочные, влагозащитные, звукоизолирующие плитки покрытия, имеет опалубочные секции сводчатого покрытия, состоящие из П-образных арматурных каркасов и светопрозрачных опалубочных плиток с крепежными приливами-замками для крепления в П-образных арматурных каркасах, секционированные трубы-арматуру для продувки горячего воздуха при необходимости устранения слоя льда или снега с крыши сооружения, поясную арматуру с замками для фиксации опалубочных секций сводчатого покрытия друг относительно друга. 2. The device for implementing the method according to claim 1, containing a frame, cladding materials, concrete, moreover, it has wall formwork sections and shuttering sections of floors, consisting of U-shaped reinforcing frames and shuttering tiles with mounting tides-locks and grooves for fastening type “dovetail” for installing cover tiles with protrusions for fastening such as “dovetail”, sectional pipe fittings for laying communications, waistband fittings with locks, as well as climate protection relief, decorative , insulating, finishing, moisture-proof, soundproofing tiles, has formwork sections of vaulted coverings, consisting of U-shaped reinforcing frames and translucent formwork tiles with mounting tides-locks for fastening in U-shaped reinforcing frames, sectional reinforcement pipes for blowing hot air if necessary, to remove the layer of ice or snow from the roof of the structure, belt reinforcement with locks for fixing the formwork sections of the vaulted coating relative to each other.
RU2007122556/03A 2007-06-15 2007-06-15 Method for erection of structures and device for its realisation RU2359090C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2007122556/03A RU2359090C2 (en) 2007-06-15 2007-06-15 Method for erection of structures and device for its realisation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2007122556/03A RU2359090C2 (en) 2007-06-15 2007-06-15 Method for erection of structures and device for its realisation

Publications (2)

Publication Number Publication Date
RU2007122556A RU2007122556A (en) 2008-12-20
RU2359090C2 true RU2359090C2 (en) 2009-06-20

Family

ID=41026117

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2007122556/03A RU2359090C2 (en) 2007-06-15 2007-06-15 Method for erection of structures and device for its realisation

Country Status (1)

Country Link
RU (1) RU2359090C2 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2452824C2 (en) * 2009-08-17 2012-06-10 Владимир Александрович Парамошко Method to erect structures resistant to earthquake attacks
RU2462562C1 (en) * 2011-04-27 2012-09-27 Владимир Александрович Парамошко Method of erect structures resistant to damage by earthquakes and device for its realisation
CN102839818A (en) * 2011-06-21 2012-12-26 无锡市现代钢结构工程有限公司 Cast-in-place gypsum wall and construction method thereof
RU2549623C1 (en) * 2014-04-15 2015-04-27 Владимир Александрович Парамошко Erection of non-polluting power-saving building or structure
RU2551040C1 (en) * 2014-04-15 2015-05-20 Владимир Александрович Парамошко Method for erection of ecologically clean energy saving buildings and constructions, resistant to earthquakes, hurricanes, acts of war
RU2552726C1 (en) * 2014-04-15 2015-06-10 Владимир Александрович Парамошко Method to erect roof of green power-saving building or structure
RU2617734C1 (en) * 2016-07-08 2017-04-26 Владимир Александрович Парамошко Method for quick erection of structures
RU2636841C1 (en) * 2016-11-08 2017-11-28 Владимир Александрович Парамошко Method of quick erecting of structures resistant to earthquakes and hurricanes

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112008364A (en) * 2020-09-22 2020-12-01 芜湖瑞明汽车部件有限公司 Rear-view mirror assembly devices convenient to dismouting

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2452824C2 (en) * 2009-08-17 2012-06-10 Владимир Александрович Парамошко Method to erect structures resistant to earthquake attacks
RU2462562C1 (en) * 2011-04-27 2012-09-27 Владимир Александрович Парамошко Method of erect structures resistant to damage by earthquakes and device for its realisation
CN102839818A (en) * 2011-06-21 2012-12-26 无锡市现代钢结构工程有限公司 Cast-in-place gypsum wall and construction method thereof
RU2549623C1 (en) * 2014-04-15 2015-04-27 Владимир Александрович Парамошко Erection of non-polluting power-saving building or structure
RU2551040C1 (en) * 2014-04-15 2015-05-20 Владимир Александрович Парамошко Method for erection of ecologically clean energy saving buildings and constructions, resistant to earthquakes, hurricanes, acts of war
RU2552726C1 (en) * 2014-04-15 2015-06-10 Владимир Александрович Парамошко Method to erect roof of green power-saving building or structure
RU2617734C1 (en) * 2016-07-08 2017-04-26 Владимир Александрович Парамошко Method for quick erection of structures
RU2636841C1 (en) * 2016-11-08 2017-11-28 Владимир Александрович Парамошко Method of quick erecting of structures resistant to earthquakes and hurricanes

Also Published As

Publication number Publication date
RU2007122556A (en) 2008-12-20

Similar Documents

Publication Publication Date Title
RU2359090C2 (en) Method for erection of structures and device for its realisation
RU2459913C2 (en) Set of leave-in-place form by vv podsevalov
CN111591852A (en) Construction method for additionally installing elevator and application thereof
RU2405087C1 (en) Method for erection of structures with application of crushed glass, porcelain, faience, wood, cardboard, paper, extracted from mechanisedly sorted domestic and industrial wastes
CN110670638A (en) Seamless construction method for expansion reinforcing belt of prefabricated house basement structure
RU2305158C2 (en) Retained form block
CN109707184A (en) The hard-cover integral vacuum toilet of fulgurite separate type, wall setting water pipe groove
RU2107784C1 (en) Method for erection and reconstruction of buildings and production of articles from composite materials mainly concrete for above purposes
RU118990U1 (en) WALL
HUE027970T2 (en) System of formwork blocks, structure constructed with same and method for constructing a structure
RU2107783C1 (en) Method for erection and reconstruction of buildings and production of articles from composite materials mainly of concrete for above purposes
RU96124582A (en) METHOD FOR CONSTRUCTION, RESTORATION OR RECONSTRUCTION OF BUILDINGS, STRUCTURES AND METHOD FOR PRODUCING CONSTRUCTION PRODUCTS AND CONSTRUCTIONS FROM COMPOSITE MATERIALS, PREFERREDLY, CONCRETE FOR CONSTRUCTION, REMEDIATION
RU57771U1 (en) OVERLAPPING, BLOCK FORMWORK FORMING OF OVERLAY AND ELEMENT OF REMOVABLE FORMWORK OF OVERLAPPING
RU2387763C1 (en) Method for erection of monolithic walls of residential buildings, housings and structures in combined curb
RU2270302C1 (en) Retained form set and building wall erection method
RU2057865C1 (en) Method for erecting buildings of monolithic concrete and reinforced concrete with monolithic facing
RU2812973C1 (en) Method of construction of buildings
RU96124441A (en) METHOD FOR CONSTRUCTION, RESTORATION OR RECONSTRUCTION OF BUILDINGS, STRUCTURES AND METHOD FOR PRODUCING CONSTRUCTION PRODUCTS AND CONSTRUCTIONS FROM COMPOSITE MATERIALS, PREFERREDLY, CONCRETE FOR CONSTRUCTION, REMEDIATION
CN213448829U (en) Novel combined structure of light batten and steel rib constructional column
EP4050169A1 (en) Method for building a modular unit and a prefabricated floor slab
KR100389535B1 (en) subway open cut structure water proofing method and panel thereby
RU56427U1 (en) WALL MODULAR DESIGN OF FACTORY MANUFACTURE
RU2132429C1 (en) Method for erection of walls with warmth-conserving panels
RU2452824C2 (en) Method to erect structures resistant to earthquake attacks
UA88483C2 (en) V. korniets' method for building

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20090616