RU2205263C2 RU2000106942/03A RU2000106942A RU2205263C2 RU 2205263 C2 RU2205263 C2 RU 2205263C2 RU 2000106942/03 A RU2000106942/03 A RU 2000106942/03A RU 2000106942 A RU2000106942 A RU 2000106942A RU 2205263 C2 RU2205263 C2 RU 2205263C2
Authority
RU
Russia
Prior art keywords
foundation
concrete
depth
equipment
anchor bolt
Prior art date
Application number
RU2000106942/03A
Other languages
Russian (ru)
Other versions
RU2000106942A (en
Inventor
С.К. Лапин
Original Assignee
АОЗТ "Ленинградский Промстройпроект"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by АОЗТ "Ленинградский Промстройпроект" filed Critical АОЗТ "Ленинградский Промстройпроект"
Priority to RU2000106942/03A priority Critical patent/RU2205263C2/en
Publication of RU2000106942A publication Critical patent/RU2000106942A/en
Application granted granted Critical
Publication of RU2205263C2 publication Critical patent/RU2205263C2/en

Links

Landscapes

  • Foundations (AREA)

Abstract

FIELD: construction engineering, particularly, methods of installation of anchor bolts in foundations for fastening process equipment including machines and equipment with dynamic loads. SUBSTANCE: method includes formation of pit. Novelty consists in that before concreting, fitted with subsequent locking on anchor bolt within range of its depth or part of depth of its location in concrete mass, in compliance of pit cross-section values, is bushing from porous low-permeable and noncohesive with fresh concrete material, for substance, polystyrene foam. In this case, strength of bushing material shall exceed value of maximum load from pressure arising in concrete placement by, at least, 10%. EFFECT: simplified method of formation of enclosing pit round anchor bolt. 1 dwg

Description

Изобретение относится к области строительства, а именно к способам установки анкерных болтов в фундаментах для крепления технологического оборудования, включая машины и оборудование с динамическими нагрузками. The invention relates to the field of construction, and in particular to methods of installing anchor bolts in the foundations for fastening technological equipment, including machines and equipment with dynamic loads.

Известен способ установки фундаментного болта, предусматривающий установку монтажных козлов для фиксации положения болта при бетонировании фундамента и установку с зазором изолирующей трубы коаксиально фундаментному болту с целью образования по высоте колодца для последующей рихтовки внутри него болта при последующем монтаже оборудования (Кондин А.Д., Гоц М.А. и др. Рациональные конструкции фундаментов промышленных зданий. Л.-М. Стройиздат, 1964, рис. 79, с. 181, рис. 80, с. 182) [1]. There is a method of installing a foundation bolt, involving the installation of mounting girders to fix the position of the bolt when concreting the foundation and installing an insulating pipe with a gap coaxial to the foundation bolt in order to form a well along the height of the well for subsequent straightening of the bolt inside it during subsequent installation of equipment (Kondin A.D., Gots MA and other Rational constructions of foundations of industrial buildings. L.-M. Stroyizdat, 1964, Fig. 79, p. 181, Fig. 80, p. 182) [1].

Недостаток известного решения заключается в сложности такого способа и в большом расходе металла для устройства ограждающих конструкций колодца. A disadvantage of the known solution lies in the complexity of this method and the high consumption of metal for the device enclosing structures of the well.

Известен способ установки фундаментного болта, включающий формирование колодца коаксиально оси анкерного болта на всей или части глубины заложения фундаментного болта ("Руководство по креплению технологического оборудования фундаментными болтами". М., Стройиздат, 1979, рис. 7-9, с. 11 и табл. 10, с. 35) [2]. There is a method of installing a foundation bolt, including the formation of a well coaxially with the axis of the anchor bolt at all or part of the depth of the foundation bolt ("Guide to fastening technological equipment with foundation bolts". M., Stroyizdat, 1979, Fig. 7-9, p. 11 and table . 10, p. 35) [2].

Этот способ обладает аналогичными недостатками. This method has similar disadvantages.

Целью изобретения является упрощение способа формирования ограждающего колодца вокруг фундаментного болта. The aim of the invention is to simplify the method of forming the enclosing well around the foundation bolt.

Для этого в известном способе установки фундаментного болта в фундаменте для крепления машин и оборудования, включающем формирование колодца, до бетонирования на фундаментный болт в пределах его глубины или части глубины заложения в бетонном массиве по размерам поперечного сечения колодца надевают с последующей фиксацией втулку из пористого малопроницаемого и несцепляемого со свежеукладываемым бетоном материала, например пенополистирола, причем прочность материала втулки должна превышать не менее чем на 10% максимальные нагрузки от давления, возникающего при укладке бетона. To do this, in the known method of installing the foundation bolt in the foundation for mounting machines and equipment, including the formation of a well, prior to concreting on the foundation bolt within its depth or part of the laying depth in the concrete mass, a sleeve of porous low-permeability is put on with the subsequent fixation and then fixed material that cannot be bonded to freshly laid concrete, for example expanded polystyrene, and the strength of the sleeve material must exceed at least 10% the maximum loads from pressure arising when laying concrete.

На чертеже изображен вариант установки фундаментного болта в бетонном и железобетонном фундаменте для крепления машин и оборудования. The drawing shows an option for installing a foundation bolt in a concrete and reinforced concrete foundation for fastening machinery and equipment.

Установка фундаментного болта осуществляется следующим образом. Installation of the foundation bolt is as follows.

На фундаментный болт 1 с временным раскреплением 2 и анкерной плитой 3 перед бетонированием на глубину заложения колодца 4 надевают втулку 5 с последующей ее фиксацией стяжкой 6. Затем производят бетонирование фундамента машины или оборудования 7. Втулка имеет габариты будущего колодца и выполнена из пористого малопроницаемого и несцепляемого со свежеукладываемым бетоном материала, например пенополистирола. Прочность материала втулки должна превышать не менее чем на 10% величину давления от свежеукладываемого бетона. Использование втулки, устанавливаемой на фундаментный болт, из пористого малопроницаемого и несцепляемого со свежеукладываемым бетоном материала позволяет, с одной стороны, сформировать колодец 4 заданного габарита вокруг фундаментного болта 1 в массиве фундамента 7, а, с другой, - в процессе последующего монтажа оборудования без особых дополнительных усилий рихтовать фундаментный болт 1 или заменять его в том случае, если втулка 5 при монтаже была установлена на всю глубину заделки фундаментного болта 1. При рихтовке и замене фундаментного болта 1 под действием механических воздействий, возникающих при его боковых смещениях или протаскивании, втулка 5, изготовленная из твердого пористого материала, легко разрушается и не препятствует перемещениям болта. 1. При необходимости в процессе рихтовки болта продукты разрушения материала втулки могут быть продуты сжатым воздухом. On the foundation bolt 1 with temporary loosening 2 and the anchor plate 3 before concreting to the depth of the well 4, put on the sleeve 5 with its subsequent fixation with a screed 6. Then make the foundation of the machine or equipment 7. The sleeve has the dimensions of the future well and is made of porous low permeability and non-adhesive with freshly laid concrete material, for example expanded polystyrene. The strength of the sleeve material must be at least 10% higher than the pressure from freshly laid concrete. The use of a sleeve mounted on a foundation bolt made of porous material that is poorly permeable and cannot be bonded with freshly laid concrete allows, on the one hand, to form a well 4 of a given size around the foundation bolt 1 in the foundation array 7, and, on the other hand, during the subsequent installation of equipment without special additional efforts to straighten the foundation bolt 1 or replace it if the sleeve 5 during installation was installed to the entire depth of the foundation bolt 1. When straightening and replacing the foundation of the bolt 1 by mechanical impacts arising at its lateral displacements or dragging of sleeve 5 made of porous solid material is easily broken and does not prevent displacement of the bolt. 1. If necessary, in the process of straightening the bolt, the products of destruction of the material of the sleeve can be purged with compressed air.

Claims (1)

Способ установки фундаментного болта в фундаменте для крепления машин и оборудования, включающий формирование колодца, отличающийся тем, что до бетонирования на фундаментный болт в пределах его глубины или части глубины заложения в бетонном массиве по размерам поперечного сечения колодца надевают с последующей фиксацией втулку из пористого малопроницаемого и несцепляемого со свежеукладываемым бетоном материала, например, пенополистирола, причем прочность материала втулки должна превышать не менее чем на 10% величину максимальной нагрузки от давления, возникающего при укладке бетона. A method of installing a foundation bolt in the foundation for fastening machines and equipment, including the formation of a well, characterized in that prior to concreting, the foundation bolt is put on a foundation of porous low permeability and subsequently fixed to the foundation bolt within its depth or part of the laying depth in the concrete mass with the subsequent cross section material, for example, expanded polystyrene, which cannot be bonded to freshly laid concrete, and the sleeve material strength must exceed at least 10% the maximum load ruski from the pressure arising when laying concrete.
RU2000106942/03A 2000-03-21 2000-03-21 Method of installation of anchor bolt in foundations for fastening of machines and equipment RU2205263C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2000106942/03A RU2205263C2 (en) 2000-03-21 2000-03-21 Method of installation of anchor bolt in foundations for fastening of machines and equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2000106942/03A RU2205263C2 (en) 2000-03-21 2000-03-21 Method of installation of anchor bolt in foundations for fastening of machines and equipment

Publications (2)

Publication Number Publication Date
RU2000106942A RU2000106942A (en) 2002-03-10
RU2205263C2 true RU2205263C2 (en) 2003-05-27

Family

ID=20232158

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2000106942/03A RU2205263C2 (en) 2000-03-21 2000-03-21 Method of installation of anchor bolt in foundations for fastening of machines and equipment

Country Status (1)

Country Link
RU (1) RU2205263C2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535509A (en) * 2010-12-28 2012-07-04 贵阳铝镁设计研究院有限公司 Construction method of high-flatness equipment foundation and adjusting structure thereof
CN104264705A (en) * 2014-10-14 2015-01-07 赵正义 Assembling type perpendicular connecting structure for fixed tower crane and concrete foundation
CN104746528A (en) * 2015-03-09 2015-07-01 赵正义 Assembled tower foundation vertical connection bolt anchorage structure
RU167767U1 (en) * 2015-08-07 2017-01-10 Федеральное государственное бюджетное образовательное учреждение высшего образования "Национальный исследовательский Московский государственный строительный университет" (НИУ МГСУ) Anchor bolt with anchor plate

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2004697C1 (en) * 1992-02-24 1993-12-15 Михаил Иосифович Браиловский Method for construction of prefabricated reinforced concrete foundation

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2004697C1 (en) * 1992-02-24 1993-12-15 Михаил Иосифович Браиловский Method for construction of prefabricated reinforced concrete foundation

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
РУКОВОДСТВО ПО КРЕПЛЕНИЮ ТЕХНОЛОГИЧЕСКОГО ОБОРУДОВАНИЯ ФУНДАМЕНТНЫМИ БОЛТАМИ. - М.: Стройиздат, 1979, с.7, рис.46, с.32, табл.8. *
САВИНОВ О.А. Современные конструкции фундаментов под машины и их расчет. - Л.-М.: Стройиздат, 1964, с. 15-24. КОНДИН А.Д., ГОЦ М.А. и др. Рациональные конструкции фундаментов промышленных зданий. - Л.-М.: Стройиздат, 1964, с. 181, рис.79, с. 182, рис.80. *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535509A (en) * 2010-12-28 2012-07-04 贵阳铝镁设计研究院有限公司 Construction method of high-flatness equipment foundation and adjusting structure thereof
CN104264705A (en) * 2014-10-14 2015-01-07 赵正义 Assembling type perpendicular connecting structure for fixed tower crane and concrete foundation
CN104264705B (en) * 2014-10-14 2016-04-27 赵正义 The assembling vertical connection construction on fixed tower machine and concrete basis
CN104746528A (en) * 2015-03-09 2015-07-01 赵正义 Assembled tower foundation vertical connection bolt anchorage structure
RU167767U1 (en) * 2015-08-07 2017-01-10 Федеральное государственное бюджетное образовательное учреждение высшего образования "Национальный исследовательский Московский государственный строительный университет" (НИУ МГСУ) Anchor bolt with anchor plate

Similar Documents

Publication Publication Date Title
CN208201880U (en) A kind of interior steel pipe underpinning device for replacing traditional support replacement mode of deep basal pit
KR20090025776A (en) Steel pipe column for mobile communication and installation method
WO2007136152A1 (en) Structure lifting and foundation reinforcing method using steel pipe
WO2011114507A1 (en) Method of constructing underground structure to be newly built
EP3607146B1 (en) Method for improving the mechanical and hydraulic characteristics of soils
WO2007058463A1 (en) Apparatus for fixing a wale
KR101300078B1 (en) Variable supporting device for sheathing work pile
CN105544762A (en) Method for installing seismic isolation layer
RU2205263C2 (en) Method of installation of anchor bolt in foundations for fastening of machines and equipment
CN101240533A (en) Pile foundation reinforcement prestressing pile locking method
CN214883827U (en) A construction hoist cantilevered foundation support system device
CN115897589A (en) Waterproof concrete interval pouring construction method for buried sewage treatment plant
JPH0996197A (en) Support wall structure and construction method
KR101188383B1 (en) Method for makiing open cassn using apparatus for pressing
CN212052921U (en) Foundation pit enclosure leakage repairing structure
JP2000120080A (en) Hollow cylindrical body and its construction method
CN116641369B (en) Methods for installing rebar in long spiral bored piles and methods for handling inadequate rebar installation.
JPH11310928A (en) Seismic isolation reinforcement method for existing structures
KR100430243B1 (en) Prestressed composition pile and the manufacturing process
CN211200447U (en) Compressor foundation bolt and mounting structure thereof
CN210459229U (en) Support assembled in deep basal pit and trade and prop construction frock
RU2000106942A (en) METHOD FOR INSTALLING LASK OF FOUNDATION BOLT IN FOUNDATIONS FOR FASTENING MACHINES AND EQUIPMENT
JP4511080B2 (en) Construction method of underground structure
CN207405633U (en) Foundation pit of the Fei Shou roads support with dynamic stress regulatory function