RU2015122197A - METHOD FOR DETERMINING THE WELL OF INSTALLING A WELL FOR REPAIR - Google Patents
METHOD FOR DETERMINING THE WELL OF INSTALLING A WELL FOR REPAIR Download PDFInfo
- Publication number
- RU2015122197A RU2015122197A RU2015122197A RU2015122197A RU2015122197A RU 2015122197 A RU2015122197 A RU 2015122197A RU 2015122197 A RU2015122197 A RU 2015122197A RU 2015122197 A RU2015122197 A RU 2015122197A RU 2015122197 A RU2015122197 A RU 2015122197A
- Authority
- RU
- Russia
- Prior art keywords
- well
- repair
- filtration
- area
- determining
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2015122197A RU2608838C2 (en) | 2015-06-09 | 2015-06-09 | Method of determining moment of assigning well repair |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2015122197A RU2608838C2 (en) | 2015-06-09 | 2015-06-09 | Method of determining moment of assigning well repair |
Publications (2)
Publication Number | Publication Date |
---|---|
RU2015122197A true RU2015122197A (en) | 2017-01-10 |
RU2608838C2 RU2608838C2 (en) | 2017-01-25 |
Family
ID=57955689
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2015122197A RU2608838C2 (en) | 2015-06-09 | 2015-06-09 | Method of determining moment of assigning well repair |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2608838C2 (en) |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7114557B2 (en) * | 2004-02-03 | 2006-10-03 | Schlumberger Technology Corporation | System and method for optimizing production in an artificially lifted well |
US7711486B2 (en) * | 2007-04-19 | 2010-05-04 | Baker Hughes Incorporated | System and method for monitoring physical condition of production well equipment and controlling well production |
RU2346156C1 (en) * | 2007-07-11 | 2009-02-10 | ООО Научно-исследовательский институт технических систем "Пилот" | Hydrocarbon material extraction control system |
US8967250B2 (en) * | 2010-06-23 | 2015-03-03 | Mike Lisk | Well pumping and control system |
-
2015
- 2015-06-09 RU RU2015122197A patent/RU2608838C2/en active
Also Published As
Publication number | Publication date |
---|---|
RU2608838C2 (en) | 2017-01-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EA201790966A1 (en) | WAYS OF MANAGING THE FILLING OF EMPTANCY IN THE PLATE UNDER EXTRACTION OPERATIONS WITH FARMING TO INCREASE THE REFINING COEFFICIENT OF OIL RECOVERY | |
MY186645A (en) | Fluid inflow | |
EA201791883A1 (en) | AUTOMATIC DETECTION AND REGULATION OF EVENTS IN DRILLING IN SYSTEMS WITH A CLOSED CONTOUR | |
WO2013151985A3 (en) | Methods for determining wettability from nmr | |
EA201291471A1 (en) | ADDITIVES SURFACE-ACTIVE SUBSTANCES USED TO RESTORE PRODUCTIVITY IN DRILLING | |
BR112016021678A2 (en) | method and system for determining a mud weight window in a well, and, computer readable medium. | |
JP2015223174A5 (en) | ||
TR201907559T4 (en) | Method for tuning a recirculation pump system. | |
RU2016134036A (en) | INDICES OF STRUCTURAL DIFFERENCE OF UPPER ZONES OF FILLING THE ORDOVICIAN Limestone AND METHOD FOR DETERMINING THEM | |
RU2016133174A (en) | DETERMINATION OF CHARACTERISTICS OF A LOT OF FLUIDS USING THE GENERAL EQUATION OF STATE | |
EA201690194A1 (en) | METHOD AND APPLICATION OF THE COMPOSITION FOR FIXING THE LOOSE SANDY LAYERS IN OIL AND GAS WELLS | |
EA201690615A1 (en) | HYDRAULIC SUPPORT WELLS | |
RU2015118171A (en) | METHOD AND USE OF IDENTIFICATION OF PLUNGER FALL TIME | |
MX2015013614A (en) | Systems and methods for sample characterization. | |
RU2017116073A (en) | DETERMINATION OF BONDED HYDROCARBON FRACTION AND POROSITY BY DIELECTRIC SPECTROSCOPY | |
RU2015122197A (en) | METHOD FOR DETERMINING THE WELL OF INSTALLING A WELL FOR REPAIR | |
MX2017009969A (en) | Method and arrangement for operating an extraction in a borehole. | |
FR3035455B1 (en) | FLOATING SUPPORT WITH VARIABLE HORIZONTAL SECTION WITH DEPTH | |
MX2018007317A (en) | Methods and apparatus to calibrate rod pump controllers. | |
EA201892355A3 (en) | IMPROVEMENTS RELATING TO STRONG WELLS | |
RU2004110747A (en) | METHOD FOR CONCLUSION TO EFFECTIVE MODE OF OPERATION OF THE PLAST-WELL-PUMP SYSTEM USING THE OIL INDICATOR DIAGRAM | |
RU2016141279A (en) | METHOD AND DEVICE FOR HIERARCHICAL FILTRATION OF DOCUMENTS | |
MX2016009439A (en) | Determining water salinity and water-filled porosity of a formation. | |
EA201101030A1 (en) | METHOD OF MEASURING OIL WELL DEBITS | |
RU2018105730A (en) | Natural resource extraction system and method |