RU2012111457A - METHOD AND DEVICE FOR MOVING HEAVY LOAD - Google Patents

METHOD AND DEVICE FOR MOVING HEAVY LOAD Download PDF

Info

Publication number
RU2012111457A
RU2012111457A RU2012111457/11A RU2012111457A RU2012111457A RU 2012111457 A RU2012111457 A RU 2012111457A RU 2012111457/11 A RU2012111457/11 A RU 2012111457/11A RU 2012111457 A RU2012111457 A RU 2012111457A RU 2012111457 A RU2012111457 A RU 2012111457A
Authority
RU
Russia
Prior art keywords
elevator
elevator car
heavy load
winch
car
Prior art date
Application number
RU2012111457/11A
Other languages
English (en)
Other versions
RU2550790C2 (ru
Inventor
Юсси ПЕРЯЛЯ
Йоуни РАТИА
Original Assignee
Коне Корпорейшн
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to FI20090357A priority Critical patent/FI20090357A/fi
Priority to FI20090357 priority
Application filed by Коне Корпорейшн filed Critical Коне Корпорейшн
Priority to PCT/FI2010/000058 priority patent/WO2011039405A1/en
Publication of RU2012111457A publication Critical patent/RU2012111457A/ru
Application granted granted Critical
Publication of RU2550790C2 publication Critical patent/RU2550790C2/ru

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/04Driving gear ; Details thereof, e.g. seals
    • B66B11/043Driving gear ; Details thereof, e.g. seals actuated by rotating motor; Details, e.g. ventilation
    • B66B11/0484Driving gear ; Details thereof, e.g. seals actuated by rotating motor; Details, e.g. ventilation with a clutch or a coupling system between several motors, e.g. switching different speeds, progressive starting, torque limitation, flywheel
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B9/00Kinds or types of lifts in, or associated with, buildings or other structures
    • B66B9/16Mobile or transportable lifts specially adapted to be shifted from one part of a building or other structure to another part or to another building or structure
    • B66B9/187Mobile or transportable lifts specially adapted to be shifted from one part of a building or other structure to another part or to another building or structure with a liftway specially adapted for temporary connection to a building or other structure
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/006Applications of loading and unloading equipment for lifts associated with buildings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B17/00Hoistway equipment
    • B66B17/14Applications of loading and unloading equipment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B19/00Mining-hoist operation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/06Arrangements of ropes or cables
    • B66B7/08Arrangements of ropes or cables for connection to the cars or cages, e.g. couplings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B9/00Kinds or types of lifts in, or associated with, buildings or other structures
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/04Driving gear ; Details thereof, e.g. seals
    • B66B11/06Driving gear ; Details thereof, e.g. seals with hoisting rope or cable positively attached to a winding drum

Abstract

1. Способ перемещения тяжелого груза (L), в котором тяжелый груз (L) поднимают и/или опускают при помощи лифта, содержащего кабину (1) и подъемный механизм (2), выполненный с возможностью перемещения кабины (1) лифта с одного уровня на другой при нормальном режиме эксплуатации лифта, причем тяжелый груз (L) устанавливают с обеспечением его поддержания кабиной лифта и указанную кабину перемещают до тех пор, пока груз (L) не окажется на необходимой высоте, после чего груз (L) выводят из поддержания кабиной лифта, отличающийся тем, что для перемещения тяжелого груза (L) к кабине (1) лифта временно присоединяют лебедку (3), которая не входит в состав указанного подъемного механизма (2), и перемещают кабину лифта, которая поддерживает тяжелый груз (L), с помощью указанной лебедки (3) до тех пор, пока тяжелый груз (L) не окажется на необходимой высоте, после чего тяжелый груз (L) выводят из поддержания кабиной (1) лифта.2. Способ по п.1, отличающийся тем, что усилие, тянущее вверх кабину (1) лифта, которая поддерживает тяжелый груз (L), отбирают по меньшей мере во время перемещения кабины (1) лифта частично от лебедки (3), временно присоединенной к кабине (1) лифта, и частично от противовеса (5), соединенного с кабиной (1) лифта при помощи подъемных тросов (4) лифта.3. Способ по п.1, отличающийся тем, что при перемещении кабины лифта, которая поддерживает тяжелый груз (L), с помощью лебедки (3) усилие, тянущее кабину (1) лифта вверх, прикладывают к указанной кабине (1) не с помощью подъемного механизма (2).4. Способ по п.1, отличающийся тем, что вес тяжелого груза (L) превышает номинальную нагрузку лифта.5. Способ по п.1, отличающийся тем, что тяжелый груз (L) представляет собой1. A method of moving a heavy load (L), in which a heavy load (L) is lifted and / or lowered by means of an elevator containing a car (1) and a lifting mechanism (2), made with the possibility of moving the elevator car (1) from one level on the other during normal operation of the elevator, and the heavy load (L) is installed to ensure its support by the elevator car and the specified car is moved until the load (L) is at the required height, after which the load (L) is taken out of support by the car elevator, characterized in that to move a heavy load (L), a winch (3) is temporarily connected to the elevator car (1), which is not part of the specified lifting mechanism (2), and the elevator car is moved, which supports the heavy load (L) , using the specified winch (3) until the heavy load (L) is at the required height, after which the heavy load (L) is taken out of support by the elevator car (1). 2. The method according to claim 1, characterized in that the force pulling up the elevator car (1), which supports the heavy load (L), is taken at least during the movement of the elevator car (1) partly from the winch (3) temporarily connected to the elevator car (1), and partly from the counterweight (5) connected to the elevator car (1) by hoisting cables (4) of the elevator. 3. The method according to claim 1, characterized in that when moving the elevator car, which supports the heavy load (L), using the winch (3), the force pulling the elevator car (1) upward is applied to said car (1) not by means of a lifting mechanism (2) .4. Method according to claim 1, characterized in that the weight of the heavy load (L) exceeds the rated load of the elevator. The method according to claim 1, characterized in that the heavy load (L) is

Claims (21)

1. Способ перемещения тяжелого груза (L), в котором тяжелый груз (L) поднимают и/или опускают при помощи лифта, содержащего кабину (1) и подъемный механизм (2), выполненный с возможностью перемещения кабины (1) лифта с одного уровня на другой при нормальном режиме эксплуатации лифта, причем тяжелый груз (L) устанавливают с обеспечением его поддержания кабиной лифта и указанную кабину перемещают до тех пор, пока груз (L) не окажется на необходимой высоте, после чего груз (L) выводят из поддержания кабиной лифта, отличающийся тем, что для перемещения тяжелого груза (L) к кабине (1) лифта временно присоединяют лебедку (3), которая не входит в состав указанного подъемного механизма (2), и перемещают кабину лифта, которая поддерживает тяжелый груз (L), с помощью указанной лебедки (3) до тех пор, пока тяжелый груз (L) не окажется на необходимой высоте, после чего тяжелый груз (L) выводят из поддержания кабиной (1) лифта.1. A method of moving a heavy load (L), in which a heavy load (L) is raised and / or lowered using an elevator comprising a cabin (1) and a lifting mechanism (2) configured to move the elevator car (1) from one level on the other during normal operation of the elevator, and the heavy load (L) is installed to ensure that it is maintained by the elevator car and the specified cabin is moved until the load (L) is at the required height, after which the load (L) is removed from the support by the cab elevator, characterized in that for moving the load For a small load (L), a winch (3), which is not part of the specified lifting gear (2), is temporarily attached to the elevator car (1), and the elevator car, which supports the heavy load (L), is moved using the specified winch (3) until the heavy load (L) is at the required height, after which the heavy load (L) is removed from the support of the elevator car (1).
2. Способ по п.1, отличающийся тем, что усилие, тянущее вверх кабину (1) лифта, которая поддерживает тяжелый груз (L), отбирают по меньшей мере во время перемещения кабины (1) лифта частично от лебедки (3), временно присоединенной к кабине (1) лифта, и частично от противовеса (5), соединенного с кабиной (1) лифта при помощи подъемных тросов (4) лифта.2. The method according to claim 1, characterized in that the force pulling up the elevator car (1), which supports the heavy load (L), is withdrawn at least during the movement of the elevator car (1) partially from the winch (3), temporarily connected to the elevator car (1), and partially from the counterweight (5) connected to the elevator car (1) by means of elevator cables (4).
3. Способ по п.1, отличающийся тем, что при перемещении кабины лифта, которая поддерживает тяжелый груз (L), с помощью лебедки (3) усилие, тянущее кабину (1) лифта вверх, прикладывают к указанной кабине (1) не с помощью подъемного механизма (2).3. The method according to claim 1, characterized in that when moving the elevator car, which supports the heavy load (L), using a winch (3), the force pulling the elevator car (1) upward is applied to said car (1) not with using the lifting mechanism (2).
4. Способ по п.1, отличающийся тем, что вес тяжелого груза (L) превышает номинальную нагрузку лифта.4. The method according to claim 1, characterized in that the weight of the heavy load (L) exceeds the nominal load of the elevator.
5. Способ по п.1, отличающийся тем, что тяжелый груз (L) представляет собой трансформатор здания.5. The method according to claim 1, characterized in that the heavy load (L) is a building transformer.
6. Способ по п.1, отличающийся тем, что лебедку (3) присоединяют к кабине (1) лифта так, что развиваемая ею грузоподъемность во временном подъемном устройстве превышает грузоподъемность, которую развивает подъемный механизм (2) в подъемном устройстве при нормальном режиме эксплуатации.6. The method according to claim 1, characterized in that the winch (3) is attached to the elevator car (1) so that the lifting capacity it develops in the temporary lifting device exceeds the carrying capacity that the lifting mechanism (2) develops in the lifting device during normal operation .
7. Способ по п.1, отличающийся тем, что до временного присоединения лебедки (3), которая не входит в состав указанного подъемного механизма (2), к кабине (1) лифта для перемещения тяжелого груза (L) лифт находится в режиме нормальной эксплуатации, при котором кабину лифта перемещают при помощи подъемного механизма (2) с одного этажа на другой.7. The method according to claim 1, characterized in that until the temporary connection of the winch (3), which is not part of the specified lifting mechanism (2), to the elevator car (1) to move the heavy load (L), the elevator is in normal mode operation, in which the elevator car is moved using a lifting mechanism (2) from one floor to another.
8. Способ по п.1, отличающийся тем, что до установки тяжелого груза (L) с обеспечением его поддержания кабиной лифта лифт выводят из нормального режима эксплуатации, причем в этом случае, например, предотвращают реагирование лифта на вызовы с этажей.8. The method according to claim 1, characterized in that prior to the installation of a heavy load (L) with its maintenance by the elevator car, the elevator is taken out of normal operation, and in this case, for example, the elevator is prevented from responding to calls from floors.
9. Способ по п.1, отличающийся тем, что после перемещения тяжелого груза (L) или тяжелых грузов на необходимую высоту/необходимые высоты и его или их выведения из поддержания кабиной лифта, лебедку (3), которая не входит в состав указанного подъемного механизма (2), отсоединяют от кабины (1) лифта и возвращают лифт в нормальный режим эксплуатации, при котором кабину (1) лифта перемещают при помощи подъемного механизма (2) с одного этажа на другой, и при этом она доступна для использования пассажирами.9. The method according to claim 1, characterized in that after moving the heavy load (L) or heavy loads to the required height / necessary heights and removing it or supporting it from the elevator car, a winch (3) that is not part of the said lifting mechanism (2), disconnected from the elevator car (1) and return the elevator to normal operation, in which the elevator car (1) is moved by means of a lifting mechanism (2) from one floor to another, and at the same time it is available for use by passengers.
10. Способ по п.1, отличающийся тем, что после выведения тяжелого груза (L) из поддержания кабиной (1) лифта и после отсоединения лебедки (3) от кабины (1) лифта лифт переводят обратно в нормальный режим эксплуатации.10. The method according to claim 1, characterized in that after removing the heavy load (L) from maintaining the elevator car (1) and after disconnecting the winch (3) from the elevator car (1), the elevator is transferred back to normal operation.
11. Способ по п.1, отличающийся тем, что лебедку (3) присоединяют к кабине (1) лифта до установки тяжелого груза (L) с обеспечением его поддержания кабиной (1) лифта.11. The method according to claim 1, characterized in that the winch (3) is attached to the elevator car (1) before installing heavy load (L) while maintaining it by the elevator car (1).
12. Способ по п.1, отличающийся тем, что до установки тяжелого груза (L) с обеспечением его поддержания кабиной (1) лифта свободный ход лебедки (3), присоединенной к кабине (1) лифта, устраняют, например, путем подъема с достижением натяжения подъемного троса, с помощью которого лебедка (3) присоединена к кабине (1) лифта.12. The method according to claim 1, characterized in that prior to the installation of a heavy load (L) with its support by the elevator car (1), the winch free travel (3) connected to the elevator car (1) is eliminated, for example, by lifting with reaching the tension of the lifting cable, with which the winch (3) is connected to the elevator car (1).
13. Способ по п.1, отличающийся тем, что до перевода механического тормоза в нерабочее положение к кабине (1) лифта с помощью лебедки (3) прикладывают направленное вверх усилие, величина которого предпочтительно по существу совпадает с величиной неустойчивости лифта.13. The method according to claim 1, characterized in that before the mechanical brake is inoperative, an upward force is applied to the elevator car (1) using a winch (3), the value of which preferably substantially coincides with the instability of the elevator.
14. Способ по п.1, отличающийся тем, что при поддержании тяжелого груза (L) кабиной (1) лифта до перевода механического тормоза в нерабочее положение к кабине (1) лифта с помощью лебедки (3) прикладывают направленное вверх усилие, которое пошагово увеличивают.14. The method according to claim 1, characterized in that while maintaining the heavy load (L) by the elevator car (1) until the mechanical brake is inoperative, an upward force is applied to the elevator car (1), which is stepwise increase.
15. Способ по п.1, отличающийся тем, что до перевода механического тормоза в нерабочее положение к кабине (1) лифта с помощью лебедки (3) прикладывают направленное вверх усилие, которое пошагово увеличивают путем периодического ослабления механического тормоза и/или периодического перемещения подъемного механизма вверх.15. The method according to claim 1, characterized in that until the mechanical brake is inoperative, an upward force is applied to the elevator car (1), which is incrementally increased by periodically weakening the mechanical brake and / or periodically moving the lift mechanism up.
16. Способ по п.1, отличающийся тем, что после перевода механического тормоза в нерабочее положение кабину (1) лифта перемещают при помощи лебедки (3) до тех пор, пока тяжелый груз (L) не окажется на необходимой высоте.16. The method according to claim 1, characterized in that after the mechanical brake is inoperative, the elevator car (1) is moved using a winch (3) until the heavy load (L) is at the required height.
17. Способ по п.1, отличающийся тем, что при перемещении кабины (1) лифта, поддерживающей тяжелый груз (L), с помощью лебедки (3) используют ограничитель скорости, выполненный с возможностью запуска аварийного торможения для замедления перемещения кабины (1) лифта после превышения предельного значения максимально допустимой скорости кабины (1), причем указанное предельное значение максимально допустимой скорости ограничителя предпочтительно меньше, чем для нормального режима эксплуатации лифта, когда кабину (1) лифта перемещают в нормальном режиме при помощи подъемного механизма (2) без лебедки (3).17. The method according to claim 1, characterized in that when moving the elevator car (1) supporting a heavy load (L) using a winch (3), a speed limiter is used, which is capable of triggering emergency braking to slow down the car (1) the elevator after exceeding the limit value of the maximum permissible speed of the car (1), and the specified limit value of the maximum permissible speed of the limiter is preferably less than for normal operation of the elevator, when the car (1) of the elevator is moved in normal mode press by means of a lifting mechanism (2) without a winch (3).
18. Способ по любому из п.п.1-17, отличающийся тем, что после выведения тяжелого груза (L) из поддержания кабиной (1) лифта устанавливают следующий тяжелый груз с обеспечением его поддержания кабиной (1) лифта, например, с того уровня, на который был доставлен тяжелый груз (L) на предыдущем этапе, и кабину лифта, которая поддерживает указанный следующий тяжелый груз, перемещают при помощи указанной лебедки (3) до тех пор, пока следующий тяжелый груз не окажется на необходимой высоте, после чего его выводят из поддержания кабиной лифта.18. The method according to any one of claims 1 to 17, characterized in that after the removal of the heavy load (L) from the support of the elevator car (1), the next heavy load is installed to ensure its maintenance by the elevator car (1), for example, the level to which the heavy load (L) was delivered in the previous step, and the elevator car that supports the next heavy load is moved using the specified winch (3) until the next heavy load is at the required height, after which it is withdrawn from maintaining the elevator car.
19. Лифтовое устройство для перемещения тяжелого груза (L) путем подъема и/или опускания указанного груза (L) при помощи лифта, содержащего кабину (1) и подъемный механизм (2), выполненный с возможностью перемещения указанной кабины (1) лифта с одного уровня на другой при нормальном режиме эксплуатации лифта, отличающееся тем, что для перемещения тяжелого груза (L) к кабине (1) лифта временно присоединена лебедка (3), которая не входит в состав указанного подъемного механизма (2), причем кабина (1) лифта выполнена с возможностью перемещения при помощи указанной лебедки (3) до тех пор, пока тяжелый груз (L) не окажется на необходимой высоте.19. An elevator device for moving a heavy load (L) by raising and / or lowering a specified load (L) using an elevator comprising a cabin (1) and a lifting mechanism (2) configured to move the specified cabin (1) of the elevator from one level to another during normal operation of the elevator, characterized in that to move the heavy load (L) to the elevator car (1), a winch (3) is temporarily attached, which is not part of the specified lifting mechanism (2), moreover, the car (1) the elevator is movable by shown winch (3) until the heavy load (L) is at the required height.
20. Лифтовое устройство по п.19, отличающееся тем, что вес тяжелого груза (L) превышает номинальную нагрузку лифта.20. The elevator device according to claim 19, characterized in that the weight of the heavy load (L) exceeds the nominal load of the elevator.
21. Лифтовое устройство по п.19 или 20, отличающееся тем, что лебедка (3) присоединена к кабине (1) лифта с получением подъемного соотношения 1:2. 21. The elevator device according to claim 19 or 20, characterized in that the winch (3) is attached to the elevator car (1) to obtain a lifting ratio of 1: 2.
RU2012111457/11A 2009-09-28 2010-09-28 Способ и устройство для перемещения тяжелого груза RU2550790C2 (ru)

Priority Applications (3)

Application Number Priority Date Filing Date Title
FI20090357A FI20090357A (fi) 2009-09-28 2009-09-28 Method and arrangement
FI20090357 2009-09-28
PCT/FI2010/000058 WO2011039405A1 (en) 2009-09-28 2010-09-28 Method and arrangement for moving a heavy load

Publications (2)

Publication Number Publication Date
RU2012111457A true RU2012111457A (ru) 2013-11-10
RU2550790C2 RU2550790C2 (ru) 2015-05-10

Family

ID=41136355

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2012111457/11A RU2550790C2 (ru) 2009-09-28 2010-09-28 Способ и устройство для перемещения тяжелого груза

Country Status (8)

Country Link
US (1) US9415974B2 (ru)
CN (1) CN102666347B (ru)
AU (1) AU2010302537B2 (ru)
FI (1) FI20090357A (ru)
HK (1) HK1173126A1 (ru)
MY (1) MY162224A (ru)
RU (1) RU2550790C2 (ru)
WO (1) WO2011039405A1 (ru)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110255341A (zh) * 2019-06-27 2019-09-20 云南沃克斯电梯有限公司 一种用于电梯的翻转运货装置

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FI125200B (fi) * 2013-07-04 2015-06-30 Kone Oyj Arrangement to reduce the displacement of the elevator car caused by the change in load
EP3233708A1 (de) * 2014-12-16 2017-10-25 Inventio AG Aufzugssystem mit einem verschiebbaren maschinenraum
EP3292066A1 (en) * 2015-05-06 2018-03-14 Inventio AG Moving a heavy, overload with an elevator
CN104973470B (zh) * 2015-06-19 2017-06-06 日立电梯(上海)有限公司 负载能力可变电梯及其超载运行方法
EP3353107A4 (en) * 2015-09-25 2019-06-26 KONE Corporation METHOD FOR INSTALLING AN ELEVATOR DURING THE CONSTRUCTION PHASE OF A BUILDING
EP3290377A1 (en) * 2016-09-02 2018-03-07 KONE Corporation Elevator with second rope attached to the car or counterweight and applying pulling forces
JP6611965B2 (ja) * 2017-01-26 2019-11-27 三菱電機株式会社 エレベータの据付方法
CN109179104A (zh) * 2018-11-16 2019-01-11 迅达(中国)电梯有限公司 电梯控制方法

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0774074B2 (ja) * 1987-09-02 1995-08-09 株式会社東芝 エレベータの足場なし据付装置
JPH06321441A (ja) * 1993-03-04 1994-11-22 Otis Elevator Co エレベータ巻上げ装置のプレトルク電流供給方法
JPH0774074A (ja) 1993-06-30 1995-03-17 Kawasaki Steel Corp レチクル
JP3146444B2 (ja) * 1995-07-04 2001-03-19 株式会社日立ビルシステム ロープ式エレベーターを利用した重量物運搬方法及びその方法に用いる重量物運搬装置
US6357556B1 (en) * 1997-03-07 2002-03-19 Kone Corporation Procedure and apparatus for the installation of an elevator
DE19960903A1 (de) * 1999-12-17 2001-06-28 Lenze Gmbh & Co Kg Aerzen Verfahren zum Anfahren eines unter Last stehenden Hebezeugs
US6446763B1 (en) * 2000-07-19 2002-09-10 Otis Elevator Company Integrated elevator installation hoist tool
CA2430325C (en) * 2001-06-21 2010-09-07 Kone Corporation Elevator
AU2003276290B2 (en) * 2002-11-04 2009-03-26 Kone Corporation Traction sheave elevator without counterweight
US20070256899A1 (en) * 2003-09-29 2007-11-08 Hughes Fanielle Method For Mounting A Car Drive Machine, Especially For Elevators Without Any Machine Room And Elevator Obtained
US7624848B2 (en) * 2004-05-07 2009-12-01 Inventio Ag Equipment for mounting an elevator drive
RU2356824C2 (ru) * 2004-12-29 2009-05-27 Отис Элевейтэ Кампэни Способ компенсации дисбаланса нагрузки в лифтовой установке и лифтовая установка
US20080308362A1 (en) * 2007-06-05 2008-12-18 Stefan Ernest Tucker Cable management assembly and method for construction elevator systems
FI20090085L (fi) * 2009-03-06 2010-09-30 Kone Corp Hissijärjestely ja menetelmä

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110255341A (zh) * 2019-06-27 2019-09-20 云南沃克斯电梯有限公司 一种用于电梯的翻转运货装置
CN110255341B (zh) * 2019-06-27 2020-08-28 云南沃克斯电梯有限公司 一种用于电梯的翻转运货装置

Also Published As

Publication number Publication date
MY162224A (en) 2017-05-31
FI20090357D0 (ru)
AU2010302537B2 (en) 2016-05-05
FI20090357A (fi) 2011-03-29
RU2550790C2 (ru) 2015-05-10
US9415974B2 (en) 2016-08-16
HK1173126A1 (zh) 2013-05-10
CN102666347B (zh) 2015-09-09
WO2011039405A1 (en) 2011-04-07
AU2010302537A1 (en) 2012-04-12
FI20090357A0 (fi) 2009-09-28
US20120201638A1 (en) 2012-08-09
CN102666347A (zh) 2012-09-12

Similar Documents

Publication Publication Date Title
CN201647849U (zh) 自动平衡塔式起重机
CN101979302B (zh) 可变配重电梯及液压电梯
EP2490972B1 (en) Elevator arrangement and method
FI119232B (fi) A method of installing a lift hoisting rope
ES2442142T3 (es) Método de instalación de un ascensor
AU2014289444B2 (en) Fall prevention device for a platform
CN105384035A (zh) 导轨安装装置和用于安装导轨的方法
CN205590191U (zh) 一种防超载式建筑塔吊
GB2451986A (en) Lifting system
CN105858536A (zh) 一种电力检修升降平台
CN206569968U (zh) 一种建筑材料搬运用安全型升降平台
US9561935B2 (en) Method and elevator arrangement
CN204454140U (zh) 一种提升设备的弹出式防坠落装置
CN201221322Y (zh) 新型石油钻井提升系统及井架
CN104443123A (zh) 一种双层停车装置
CN101062748B (zh) 用于提升设备的负载补偿装置
JP2012515126A5 (ru)
CN104140037B (zh) 墙板吊装系统
EA200601319A1 (ru) Лифт
EA200802393A1 (ru) Лифт без противовеса
CN104684834B (zh) 低顶部或低底坑电梯的补偿措施
EA200600797A1 (ru) Компенсирующее устройство для канатов лифта
US20160325965A1 (en) Elevator provided with a safety device arrangement
US7624848B2 (en) Equipment for mounting an elevator drive
CN102762484A (zh) 在电梯的制造中的方法