RU2011151046A - METHOD FOR DEVELOPING A MULTIPLAYER OIL DEPOSIT - Google Patents

METHOD FOR DEVELOPING A MULTIPLAYER OIL DEPOSIT Download PDF

Info

Publication number
RU2011151046A
RU2011151046A RU2011151046/02A RU2011151046A RU2011151046A RU 2011151046 A RU2011151046 A RU 2011151046A RU 2011151046/02 A RU2011151046/02 A RU 2011151046/02A RU 2011151046 A RU2011151046 A RU 2011151046A RU 2011151046 A RU2011151046 A RU 2011151046A
Authority
RU
Russia
Prior art keywords
reservoir
oil
water
pump
well
Prior art date
Application number
RU2011151046/02A
Other languages
Russian (ru)
Other versions
RU2491418C1 (en
Inventor
Илфат Нагимович Файзуллин
Альфис Мансурович Хуррямов
Ильшат Мухаметович Бакиров
Рашит Газнавиевич Рамазанов
Арслан Валерьевич Насыбуллин
Радик Зяузятович Зиятдинов
Original Assignee
Открытое акционерное общество "Татнефть" имени В.Д. Шашина
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Открытое акционерное общество "Татнефть" имени В.Д. Шашина filed Critical Открытое акционерное общество "Татнефть" имени В.Д. Шашина
Priority to RU2011151046/03A priority Critical patent/RU2491418C1/en
Publication of RU2011151046A publication Critical patent/RU2011151046A/en
Application granted granted Critical
Publication of RU2491418C1 publication Critical patent/RU2491418C1/en

Links

Abstract

Способ разработки нефтяной залежи, включающий внутрискважинную перекачку воды из нижележащего водоносного пласта в вышележащий продуктивный пласт по нагнетательной скважине и отбор нефти из продуктивного пласта через добывающую скважину, гидродинамически связанную с нагнетательной скважиной, отличающийся тем, что в интервале продуктивного пласта добывающей скважины устанавливают устройство для внутрискважинного разделение нефти и воды с возможностью подъема нефти на поверхность и сброса воды в ближайший по разрезу нижележащий водоносный пласт и/или выработанный по нефти пласт, а внутрискважинную перекачку воды в нагнетательной скважине из нижележащего водоносного пласта и/или выработанного нефтяного пласта в продуктивный пласт осуществляют с помощью насоса, обеспечивающего разработку продуктивного пласта, герметизируют устье нагнетательной скважины и запускают насос в работу, при этом при снижении напора воды на приеме насоса в нагнетательной скважине ниже определенного значения насос останавливают, а устройство для внутрискважинного разделения нефти и воды в добывающей скважине запускают в работу, при превышении напора воды на приеме насоса в нагнетательной скважине выше определенного значения напора насос включают в работу, а устройство для внутрискважинного разделение нефти и воды в добывающей скважине останавливают, при этом при ухудшении гидродинамической связи между добывающей и нагнетательной скважинами извлекают эксплуатационное оборудование, производят гидравлический разрыв продуктивного и/или водоносного пластов, после чего вновь спускают эксплуатационное оборудование �A method for developing an oil reservoir, including downhole pumping of water from an underlying aquifer into an overlying reservoir through an injection well and taking oil from the reservoir through a production well hydrodynamically connected to the injection well, characterized in that a device for the downhole is installed in the interval of the producing reservoir of the producing well separation of oil and water with the possibility of lifting oil to the surface and discharging water to the nearest the informative reservoir and / or the oil-produced reservoir, and the downhole pumping of water in the injection well from the underlying aquifer and / or the produced oil reservoir into the reservoir is carried out using a pump that ensures the development of the reservoir, seal the mouth of the injection well and put the pump into operation, at the same time, when the pressure of the water at the intake of the pump in the injection well decreases below a certain value, the pump is stopped, and the device for downhole separation of oil and The wells in the production well are put into operation, when the water pressure at the pump inlet in the injection well exceeds a certain pressure value, the pump is put into operation, and the device for downhole separation of oil and water in the production well is stopped, and if the hydrodynamic connection between the production and injection worsens wells extract production equipment, produce a hydraulic fracture of the productive and / or aquifer, and then release production equipment again

Claims (1)

Способ разработки нефтяной залежи, включающий внутрискважинную перекачку воды из нижележащего водоносного пласта в вышележащий продуктивный пласт по нагнетательной скважине и отбор нефти из продуктивного пласта через добывающую скважину, гидродинамически связанную с нагнетательной скважиной, отличающийся тем, что в интервале продуктивного пласта добывающей скважины устанавливают устройство для внутрискважинного разделение нефти и воды с возможностью подъема нефти на поверхность и сброса воды в ближайший по разрезу нижележащий водоносный пласт и/или выработанный по нефти пласт, а внутрискважинную перекачку воды в нагнетательной скважине из нижележащего водоносного пласта и/или выработанного нефтяного пласта в продуктивный пласт осуществляют с помощью насоса, обеспечивающего разработку продуктивного пласта, герметизируют устье нагнетательной скважины и запускают насос в работу, при этом при снижении напора воды на приеме насоса в нагнетательной скважине ниже определенного значения насос останавливают, а устройство для внутрискважинного разделения нефти и воды в добывающей скважине запускают в работу, при превышении напора воды на приеме насоса в нагнетательной скважине выше определенного значения напора насос включают в работу, а устройство для внутрискважинного разделение нефти и воды в добывающей скважине останавливают, при этом при ухудшении гидродинамической связи между добывающей и нагнетательной скважинами извлекают эксплуатационное оборудование, производят гидравлический разрыв продуктивного и/или водоносного пластов, после чего вновь спускают эксплуатационное оборудование и продолжают разработку многопластовой нефтяной залежи. A method for developing an oil reservoir, including downhole pumping of water from an underlying aquifer into an overlying reservoir through an injection well and taking oil from the reservoir through a production well hydrodynamically connected to the injection well, characterized in that a device for the downhole is installed in the interval of the producing reservoir of the producing well separation of oil and water with the possibility of lifting oil to the surface and discharging water to the nearest the informative reservoir and / or the oil-produced reservoir, and the downhole pumping of water in the injection well from the underlying aquifer and / or the produced oil reservoir into the reservoir is carried out using a pump that ensures the development of the reservoir, seal the mouth of the injection well and put the pump into operation, at the same time, when the pressure of the water at the intake of the pump in the injection well decreases below a certain value, the pump is stopped, and the device for downhole separation of oil and The wells in the production well are put into operation, when the water pressure at the pump inlet in the injection well exceeds a certain pressure value, the pump is put into operation, and the device for downhole separation of oil and water in the production well is stopped, and if the hydrodynamic connection between the production and injection worsens wells extract production equipment, produce a hydraulic fracture of the productive and / or aquifer, and then release production equipment again continue the development of multilayer oil reservoir.
RU2011151046/03A 2011-12-14 2011-12-14 Method to develop multizone oil reservoir RU2491418C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2011151046/03A RU2491418C1 (en) 2011-12-14 2011-12-14 Method to develop multizone oil reservoir

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2011151046/03A RU2491418C1 (en) 2011-12-14 2011-12-14 Method to develop multizone oil reservoir

Publications (2)

Publication Number Publication Date
RU2011151046A true RU2011151046A (en) 2013-06-20
RU2491418C1 RU2491418C1 (en) 2013-08-27

Family

ID=48785160

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2011151046/03A RU2491418C1 (en) 2011-12-14 2011-12-14 Method to develop multizone oil reservoir

Country Status (1)

Country Link
RU (1) RU2491418C1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106499370A (en) * 2016-08-22 2017-03-15 中国石油天然气股份有限公司 Well group synchronization dispensing divides each interval Liquid output computational methods of the separate-zone producer that adopts and device
CN111236919B (en) * 2020-02-27 2020-11-10 山东省地质科学研究院 Rock salt mine separate-layer mining pipe column and rock salt mine separate-layer mining method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2211311C2 (en) * 2001-01-15 2003-08-27 ООО Научно-исследовательский институт "СибГеоТех" Method of simultaneous-separate development of several productive formations and well unit for method embodiment
RU2292453C2 (en) * 2005-02-24 2007-01-27 Александр Сергеевич Трофимов Method for extracting a formation of hydrocarbons
RU2338059C2 (en) * 2005-12-05 2008-11-10 Общество с ограниченной ответственностью "Кубаньгазпром" Method of development of multibed oil deposits
RU2315863C2 (en) * 2005-12-06 2008-01-27 Александр Сергеевич Трофимов Method for multipay field survey and development
RU2303125C1 (en) * 2006-08-24 2007-07-20 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Multizone oil reservoir development method

Also Published As

Publication number Publication date
RU2491418C1 (en) 2013-08-27

Similar Documents

Publication Publication Date Title
MX2014007199A (en) Horizontal and vertical well fluid pumping system.
EA201400880A1 (en) METHOD OF OIL EXTRACTION
EA201270450A1 (en) REGULATORY METHOD AND DEVICE FOR WELL OPERATIONS
GB2467707A (en) Electrical submersible pump and gas compressor
EA201390035A1 (en) SYSTEM AND METHOD FOR PRODUCTION OF HYDROCARBONS FROM A WELL
WO2011149806A3 (en) Method for circulating a fluid entry entry out of a subsurface wellbore without shutting in the wellbore
EA200971134A1 (en) HYDROCARBONS
WO2011031682A3 (en) Multiple electric submersible pump system
RU2011151046A (en) METHOD FOR DEVELOPING A MULTIPLAYER OIL DEPOSIT
CN202381046U (en) Negative pressure flow string for oilfield pumping well
RU2004125555A (en) METHOD FOR DEVELOPING A CARBONATE MULTIPLAYER OIL DEPOSIT OF PORO-CRACKED POROSITY
RU2012101395A (en) METHOD FOR DEVELOPING AN OIL DEPOSIT LOCATED UNDER A GAS DEPOSIT AND SEPARATED FROM IT BY AN IMPRESSIBLE PLASTIC
EA201290503A1 (en) SYSTEM, METHOD AND CONFIGURATION FOR MAINTENANCE AND OPERATION OF BOTTLES
RU79616U1 (en) INSTALLATION FOR SIMULTANEOUS-SEPARATE WATER INJECTION IN TWO LAYERS
RU2590965C1 (en) Method of developing oil deposits
RU2427705C1 (en) Well pumping unit for simultaneous separate development of two reservoirs in well
RU74163U1 (en) Borehole PUMPING PLANT FOR SIMULTANEOUS-SEPARATE OIL PRODUCTION
RU2007112681A (en) METHOD FOR DEVELOPING SMALL SMALL PRODUCTIVE OIL DEPOSITS
RU133558U1 (en) ANTI-SAND ANCHOR
RU132507U1 (en) INTEGRATED SUBMERSIBLE BARBED ELECTRIC PUMP INSTALLATION
GB2549365A (en) Improved lift system for use in the production of fluid from a well bore
RU80192U1 (en) MULTI-PLASTIC DEPOSITS FOR OPERATION
CN202381047U (en) Autooscillation oil extraction device for oil field pumping well
RU2012117683A (en) WELL OPERATION METHOD
EA201501090A1 (en) METHOD OF OIL PRODUCTION

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20181215