PL439759A1 - On-line diagnosis of bushings - Google Patents

On-line diagnosis of bushings

Info

Publication number
PL439759A1
PL439759A1 PL439759A PL43975921A PL439759A1 PL 439759 A1 PL439759 A1 PL 439759A1 PL 439759 A PL439759 A PL 439759A PL 43975921 A PL43975921 A PL 43975921A PL 439759 A1 PL439759 A1 PL 439759A1
Authority
PL
Poland
Prior art keywords
windings
winding
measured
points
measuring
Prior art date
Application number
PL439759A
Other languages
Polish (pl)
Other versions
PL243362B1 (en
Inventor
Jakub Bernatt
Stanisław Gawron
Tadeusz Glinka
Artur Polak
Original Assignee
Sieć Badawcza Łukasiewicz-Instytut Napędów I Maszyn Elektrycznych Komel
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sieć Badawcza Łukasiewicz-Instytut Napędów I Maszyn Elektrycznych Komel filed Critical Sieć Badawcza Łukasiewicz-Instytut Napędów I Maszyn Elektrycznych Komel
Priority to PL439759A priority Critical patent/PL243362B1/en
Publication of PL439759A1 publication Critical patent/PL439759A1/en
Publication of PL243362B1 publication Critical patent/PL243362B1/en

Links

Landscapes

  • Housings And Mounting Of Transformers (AREA)
  • Measurement Of Current Or Voltage (AREA)

Abstract

Diagnostyka on-line izolatorów  przepustowych L1, L2, L3 transformatorów wysokiego napięcia TWN bazuje na punktach pomiarowych P na izolatorach i kołnierzach K. Wynalazek dotyczy rozwiązania Układu Pomiarowego UP. Punkty pomiarowe P izolatorów L1, L2, L3 są połączone z początkami uzwojeń pierwotnych (1) transformatorków pomiarowych T1, T2, T3, a końce uzwojeń (1) są zwarte i są połączone z kołnierzem K. Uzwojenia wtórne (2) transformatorków T1, T2. T3 są połączone szeregowo, a wyjście sumaryczne z uzwojeń (2) jest włączone do Systemu Pomiarowego i Zabezpieczającego Transformatora SPiZTWN. W systemie SPiZTWN jest mierzone napięcie sumaryczne uzwojeń (2) bądź wyjście sumaryczne jest zwarte i mierzony jest prąd. Wyjścia każdego z uzwojeń wtórnych (2) transformatorków T1, T2, T3, są włączone do systemu SPiZTWN, gdzie mierzony jest prąd bądź napięcie każdego z uzwojeń (2) i prąd bądź napięcie sumaryczne. Na wejściu uzwojeń (1), między punkty pomiarowe P i K, są włączone rezystory R, przy czym rezystory R mogą mieć trzecie wyprowadzenie P1 i w tym przypadku skrajne zaciski rezystorów R są połączone z punktami P-K na izolatorze, a końce uzwojeń (1) są połączone z punktami P1-K. Transformatorek pomiarowy T z rdzeniem jednooczkowym jest jeden na którym są umieszczone cztery uzwojenia, początki trzech uzwojeń (1) są połączone z punktami pomiarowymi P izolatorów L1, L2, L3 bądź zaciskami P1 na rezystorach R, a końce tych  uzwojeń (1) są zwarte i są połączone z kołnierzem K, przy czym czwarte uzwojenie (2) jest pomiarowe, a wyjście z tego uzwojenia (2) jest włączone do systemu SPiZTWN, gdzie mierzone jest napięcie na uzwojeniu (2) bądź uzwojenie (2) jest zwarte i mierzony jest prąd uzwojenia (2).On-line diagnostics of the L1, L2, L3 bushings of TWN high voltage transformers is based on the measurement points P on insulators and K flanges. The invention concerns the solution of the UP Measurement System. Measurement points P of insulators L1, L2, L3 are connected to the beginnings of the primary windings (1) of the measuring transformers T1, T2, T3, and the ends of the windings (1) are short-circuited and are connected to the flange K. Secondary windings (2) of transformers T1, T2 . T3 are connected in series, and the summation output from the windings (2) is connected to the Measurement and Protection System of the SPiZTWN Transformer. In the SPiZTWN system, the sum voltage of the windings (2) is measured or the sum output is short-circuited and the current is measured. The outputs of each of the secondary windings (2) of the transformers T1, T2, T3 are connected to the SPiZTWN system, where the current or voltage of each winding (2) and the total current or voltage are measured. At the input of the windings (1), between the measuring points P and K, the resistors R are connected, while the resistors R may have the third P1 terminal, and in this case the extreme terminals of the resistors R are connected to the points P-K on the insulator, and the ends of the windings (1) are connected with points P1-K. There is one measuring transformer T with a single-eye core on which four windings are placed, the beginnings of three windings (1) are connected to the measuring points P of insulators L1, L2, L3 or terminals P1 on the resistors R, and the ends of these windings (1) are short-circuited and are connected to the K flange, the fourth winding (2) is measuring, and the output from this winding (2) is connected to the SPiZTWN system, where the voltage on the winding (2) is measured or the winding (2) is short-circuited and the current is measured the windings (2).

PL439759A 2021-12-06 2021-12-06 On-line diagnosis of bushings PL243362B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL439759A PL243362B1 (en) 2021-12-06 2021-12-06 On-line diagnosis of bushings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL439759A PL243362B1 (en) 2021-12-06 2021-12-06 On-line diagnosis of bushings

Publications (2)

Publication Number Publication Date
PL439759A1 true PL439759A1 (en) 2022-05-09
PL243362B1 PL243362B1 (en) 2023-08-14

Family

ID=81534701

Family Applications (1)

Application Number Title Priority Date Filing Date
PL439759A PL243362B1 (en) 2021-12-06 2021-12-06 On-line diagnosis of bushings

Country Status (1)

Country Link
PL (1) PL243362B1 (en)

Also Published As

Publication number Publication date
PL243362B1 (en) 2023-08-14

Similar Documents

Publication Publication Date Title
PL439759A1 (en) On-line diagnosis of bushings
RU2678330C1 (en) Currents in the high-voltage oil-filled transformers, auto-transformers or electrical reactors windings measuring device
JPH11500533A (en) Voltage transformer with increased electrical strength
US1550906A (en) Instrument transformer
RU2510030C2 (en) Device for scale transformation
US4607211A (en) Method of correcting inaccurate instrumental potential transformer ratio
SU289363A1 (en) INDUCTIVE ASSOCIATED ARMS FOR MEASURING SMALL COMPLEX RESISTANCES
Skubis et al. An improved model of mutual admittances of tapped windings
HU190346B (en) Electric current measuring circuit arrangement
SU886071A1 (en) Transformer
RU2575140C1 (en) Differential current measurement device
SU496612A1 (en) Cascade Current Transformer
RU2255347C1 (en) Galvanic decoupling unit for group testing of shunt electricity meters
SU996946A2 (en) Electric signal magnetoelectronic converter
RU14290U1 (en) Inductive voltage divider
RU2649405C1 (en) Device for connection to measuring transformer
PL229896B1 (en) System for measuring alternating voltage with galvanic separation
PL242573B1 (en) Method of determining the total, current and angular errors in the transformation of sinusoidal currents and harmonics of currents distorted by through current-voltage converters
SU1449915A1 (en) Instrument current converter
RU2643779C1 (en) Method of transformer relay protection
SU581436A1 (en) Binary inductive voltage divider
SU907533A1 (en) Magnetoelectronic voltage converter
SU1640656A1 (en) Transformer impedance standard
GB143160A (en) Means for measuring alternating electric currents
RU2557797C2 (en) Method for coordination of long four-wire non-homogeneous asymmetrical high-voltage power transmission line with superconducting insertion with electrical load