NO339748B1 - Double packing box air inversion and steam curing with onsite facilities - Google Patents

Double packing box air inversion and steam curing with onsite facilities Download PDF

Info

Publication number
NO339748B1
NO339748B1 NO20080825A NO20080825A NO339748B1 NO 339748 B1 NO339748 B1 NO 339748B1 NO 20080825 A NO20080825 A NO 20080825A NO 20080825 A NO20080825 A NO 20080825A NO 339748 B1 NO339748 B1 NO 339748B1
Authority
NO
Norway
Prior art keywords
liner
steam
gasket
inverted
inversion
Prior art date
Application number
NO20080825A
Other languages
Norwegian (no)
Other versions
NO20080825L (en
Inventor
Richard C Polivka
Franklin Thomas Driver
Steve J Hirtz
James H Blasczyk
Neil Birchler
Kyle Costa
Original Assignee
Ina Acquisition Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ina Acquisition Corp filed Critical Ina Acquisition Corp
Publication of NO20080825L publication Critical patent/NO20080825L/en
Publication of NO339748B1 publication Critical patent/NO339748B1/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders
    • F16L55/162Devices for covering leaks in pipes or hoses, e.g. hose-menders from inside the pipe
    • F16L55/165Devices for covering leaks in pipes or hoses, e.g. hose-menders from inside the pipe a pipe or flexible liner being inserted in the damaged section
    • F16L55/1651Devices for covering leaks in pipes or hoses, e.g. hose-menders from inside the pipe a pipe or flexible liner being inserted in the damaged section the flexible liner being everted
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C63/00Lining or sheathing, i.e. applying preformed layers or sheathings of plastics; Apparatus therefor
    • B29C63/26Lining or sheathing of internal surfaces
    • B29C63/34Lining or sheathing of internal surfaces using tubular layers or sheathings
    • B29C63/36Lining or sheathing of internal surfaces using tubular layers or sheathings being turned inside out
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C67/00Shaping techniques not covered by groups B29C39/00 - B29C65/00, B29C70/00 or B29C73/00
    • B29C67/0014Shaping techniques not covered by groups B29C39/00 - B29C65/00, B29C70/00 or B29C73/00 for shaping tubes or blown tubular films
    • B29C67/0018Turning tubes inside out
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T428/00Stock material or miscellaneous articles
    • Y10T428/13Hollow or container type article [e.g., tube, vase, etc.]
    • Y10T428/1352Polymer or resin containing [i.e., natural or synthetic]
    • Y10T428/139Open-ended, self-supporting conduit, cylinder, or tube-type article
    • Y10T428/1393Multilayer [continuous layer]

Abstract

Installation of a flexible cured in place liner by inverting the liner with air and curing the liner with steam introduced through a perforated lay flat hose without deflating the liner between the inversion and cure. The installation is performed with an apparatus having two independently operable glands with at least one fluid inlet port installed on the line downstream of the second gland liner. As the liner reaches the distal end of the conduit to be lined, it enters a sample and porting pipe with an exhaust pipe gland and exhaust pipe and it is pierced by a rigid porting tool. Steam is then introduced into the lay flat hose to cure the resin and is exhausted through an exhaust hose connected to a controllable exhaust pipe. After curing steam is replaced with air to cool the liner, the ends are cut to restore service through the host pipe.

Description

Oppfinnelsen angår inversjon og installering av herdet foring på stedet ved luft inversjon og dampherding og et apparat med doble styrepakninger for inversjon og herding av foringen. Fremgangsmåten og apparatet muliggjør en tilbakeholdnings stropp for å regulere hastigheten av inversjonen og en perforert liggende flat slange for innføring av damp for herding med en utløpsport for kontinuerlig gjennomstrømning uten å tømme foringen før dampherding. Fremgangsmåten og apparatet er i sær egnet for installering i foringer fra omtrent 18 til 36 tommer til omtrent 72 tommer og mer. The invention relates to inversion and installation of cured liner on site by air inversion and steam curing and an apparatus with double guide seals for inversion and curing of the liner. The method and apparatus provide a restraint strap to regulate the rate of inversion and a perforated horizontal flat hose for introducing steam for curing with an outlet port for continuous flow without emptying the liner prior to steam curing. The method and apparatus are particularly suitable for installation in liners from about 18 to 36 inches to about 72 inches and more.

Det er generelt kjent at ledningsrør eller rørledninger, i sær undergrunnsrør, for eksempel avløpsrør, vannledninger og gassledninger som brukes for å føre fluider, ofte krever reparasjon som skyldes fluidlekkasje eller svekkelse. Lekkasjen kan skje innover fra miljøet eller den førende del av rørledningen. Alternativt kan lekkasjen skje utover fra den ledende del av rørledningen til omgivelsene. I alle tilfeller er det ønskelig å unngå slik lekkasje. It is generally known that conduit pipes or pipelines, in particular underground pipes, such as drain pipes, water pipes and gas pipes used to carry fluids, often require repair due to fluid leakage or weakening. The leakage can occur inwards from the environment or the leading part of the pipeline. Alternatively, the leakage can occur outwards from the conducting part of the pipeline to the surroundings. In all cases, it is desirable to avoid such leakage.

Lekkasjen kan skyldes en feilaktig installering av det opprinnelige rør eller svekkelse av selve røret som skyldes normal aldring eller effektene ved enten transport av korroderende eller slipende materiale. Sprekker ved eller nær rørskjøter kan skyldes miljømessige forhold, for eksempel jordskjelv eller bevegelse av større kjøretøy på den overliggende flate eller tilsvarende naturlige eller menneskelige forårsakede vibrasjoner eller andre slike årsaker. Uansett årsak er slik lekkasje uønsket og kan føre til sløsing av fluid som transporteres i rørledningen eller føre til skade på omgivelsene og eventuelt offentlig helseskade. Hvis lekkasjen fortsetter kan den føre til strukturell svikt av det eksisterende ledningsrør som skyldes tap av jord- og sidestøtte av ledningsrøret. The leak may be due to incorrect installation of the original pipe or weakening of the pipe itself due to normal aging or the effects of either transporting corrosive or abrasive material. Cracks at or near pipe joints may be due to environmental conditions, such as earthquakes or the movement of large vehicles on the overlying surface or similar natural or man-made vibrations or other such causes. Regardless of the cause, such leakage is undesirable and can lead to waste of fluid transported in the pipeline or lead to damage to the environment and possibly damage to public health. If the leak continues, it can lead to structural failure of the existing conduit due to loss of ground and lateral support of the conduit.

På grunn av standig økende arbeidskostnader, energikostnader og maskinkostnader, blir det stadig vanskeligere og mindre økonomisk å reparere undergrunnsrør eller deler som kan lekke ved å grave dem opp og erstatte rørene. Som et resultat har det blitt utarbeidet forskjellige fremgangsmåter på stedelig reparasjon eller rehabilitering av eksisterende rørledninger. Disse nye fremgangsmåtene unngår utgiftene og risikoen forbundet med oppgraving og utskiftning av rør eller rørseksjoner samt ulempen for publikum. En av de mest vellykkede rørledningsreparasjons- eller grøftløse rehabiliteringsprosesser som for tiden er i utstrakt bruk, kalles Insituform® prosessen. Denne fremgangsmåte er beskrevet i US patent nr 4,009,063, 4,064,211 og 4,135,958. Due to ever-increasing labor costs, energy costs and machine costs, it is becoming increasingly difficult and less economical to repair underground pipes or parts that may leak by digging them up and replacing the pipes. As a result, various methods of on-site repair or rehabilitation of existing pipelines have been developed. These new methods avoid the expense and risk associated with digging up and replacing pipes or pipe sections and the inconvenience to the public. One of the most successful pipeline repair or trenchless rehabilitation processes currently in widespread use is called the Insituform® process. This method is described in US patent nos. 4,009,063, 4,064,211 and 4,135,958.

I standard utførelse av Insituform-prosessen, blir en langstrakt, fleksibel rørformet foring av filtduk, skum eller liknende resinimpregnerbart materiale med et ytre, ugjennomtrengelig belegg som har blitt impregnert med termoherdende resin, installert i den eksisterende rørledning. Generelt blir foringen installert ved hjelp av en vregnings-prosess som beskrevet i det siste av de to identifiserte Insituform-patenter. I vregnings-prosessen, trykker et radialt trykk mot det indre av en vrengt foring, mot og til inngrep med innerflaten av rørledningen. Imidlertid blir Insituform prosessen også praktisert ved å trekke en resinimpregnert foring til ledningsrøret ved hjelp av et rep eller kabel og ved å bruke en separat fluid ugjennomtrengelig oppblåsbar blære eller foring som blir vrengt i foringen slik at den kan herde mot innerveggen av den eksisterende rørlinjen. En slik resin impregnert foring kalles "stesherdete rør" eller "ClPP-foringer" og installasjonen kalles en ClPP-installasjon. In the standard implementation of the Insituform process, an elongated, flexible tubular liner of felt cloth, foam or similar resin-impregnatable material with an outer, impermeable coating that has been impregnated with thermosetting resin is installed in the existing pipeline. In general, the liner is installed using an offset process as described in the last of the two identified Insituform patents. In the warping process, a radial pressure pushes against the interior of a warped liner, against and into engagement with the inner surface of the pipeline. However, the Insituform process is also practiced by pulling a resin-impregnated liner to the conduit using a rope or cable and using a separate fluid impermeable inflatable bladder or liner that is twisted into the liner so that it can harden against the inner wall of the existing pipeline. Such a resin-impregnated liner is called "hardened pipes" or "ClPP liners" and the installation is called a ClPP installation.

Fleksible rørforinger av CIPP typen har et ytre, glatt lag av en relativt fleksibel, vesentlig ugjennomtrengelig polymer som belegger utsiden av foringen i dens innledende tilstand. Når det vrenges vil det ugjennomtrengelige laget befinne seg på innsiden av foringen etter at denne har blitt vrengt under installasjon. Etter hvert som den fleksible foring blir installert på plass i en rørledning, blir rørledningen trykksatt innenfra, fortrinnsvis ved å bruke vregnignsfluid, f. eks vann eller luft for å tvinge foringen radialt utover for å gripe og tilpasse seg innerflaten av den eksisterende rør-ledning. Flexible pipe liners of the CIPP type have an outer, smooth layer of a relatively flexible, substantially impermeable polymer that coats the outside of the liner in its initial state. When inverted, the impermeable layer will be on the inside of the liner after it has been inverted during installation. As the flexible liner is installed into place in a pipeline, the pipeline is pressurized from within, preferably using a shearing fluid such as water or air to force the liner radially outward to grip and conform to the inner surface of the existing pipeline .

Typisk blir et vregningstårn satt opp ved installasjonsstedet for å tilveiebringe det nødvendige trykk for å kunne vrenge foringen eller en blære. En vregningsenhet er også vist og beskrevet i US patenter nr 5,154,936, 5,167,901 (RE 35,444) og 5,597,353. Herdingen kan initieres ved å innføre varmt vann inn i den vrengte foringen gjennom en resirkuleringsslange som er festet til enden av den vrengte foring. Inversjonsvann blir resirkulert gjennom varmekilden, f.eks en varmtvannsbeholder eller en varmeveksler og returnert til den inverterte foring inntil herdingen av denne er fullført. Resinet som impregneres i det impregnerbare materialet blir så herdet til en hard, tett passende og stiv rørforing i den eksisterende rørledning. Den nye foring tetter effektivt eventuelle sprekker og reparerer enhver rørseksjon eller rørskjøtsvekkelse for å hindre ytterligere lekkasje enten til eller ut av den eksisterende rørledning. Det herdete resin tjener også til å styrke den eksisterende rørledningsvegg for å tilveiebringe ekstra strukturstøtte for det omgivende miljø. Typically, an overturning tower is set up at the installation site to provide the necessary pressure to overturn the casing or a bladder. A displacement unit is also shown and described in US Patent Nos. 5,154,936, 5,167,901 (RE 35,444) and 5,597,353. Curing can be initiated by introducing hot water into the twisted liner through a recirculation hose attached to the end of the twisted liner. Inversion water is recirculated through the heat source, eg a hot water tank or a heat exchanger and returned to the inverted liner until its curing is complete. The resin that is impregnated into the impregnable material is then cured into a hard, tight fitting and rigid pipe liner in the existing pipeline. The new liner effectively seals any cracks and repairs any pipe section or pipe joint weakening to prevent further leakage either into or out of the existing pipeline. The cured resin also serves to strengthen the existing pipeline wall to provide additional structural support for the surrounding environment.

Vregningstårnet som var tidskrevende å konstruere, krevde at arbeideren måtte befinne seg 10 meter over jorden og ofte nær trær eller elektriske ledninger. Fremgangsmåten ble forbedret med et apparat som gjorde at Insituform kunne frembringe et hydraulisk trykk ved bruk av en strupeventil. Foringen ble ført til toppen av apparatet og trukket gjennom ventilen ved å trykksette vann under ventilen. Det trykksatte vann tilførte en kraft på nesen av foringen slik at den ble invertert til røret som ble rehabilitert. Disse apparatene for rehabilitering av mindre rør har vært i bruk i omtrent 15 år. The tilting tower, which was time-consuming to construct, required the worker to be 10 meters above the ground and often close to trees or power lines. The process was improved with a device that allowed Insituform to generate a hydraulic pressure using a choke valve. The liner was brought to the top of the apparatus and pulled through the valve by pressurizing water under the valve. The pressurized water applied a force to the nose of the liner so that it was inverted to the pipe being rehabilitated. These devices for the rehabilitation of smaller pipes have been in use for about 15 years.

Hovedulempen ved å bruke disse apparatene med vann er mengden og tilgjengeligheten av inverteringsvann. Vannet på typisk varmes fra 55°F til 180°F for å kunne utføre herdingen og deretter kjøles ved å tilsette mer vann til 100°F før det ble frigjort til et akseptabelt deponeringssystem. The main disadvantage of using these appliances with water is the quantity and availability of inverting water. The water is typically heated from 55°F to 180°F to effect the cure and then cooled by adding more water to 100°F before being released into an acceptable disposal system.

Denne ulempen kan løses ved å bruke luft i stedet for vann for å frembringe inverteringskraften. Etter at foringen blir helt impregnert, kan den herdes med damp. Selv om vann er nødvendig for å frembringe dampen, er mengden vann i form av damp bare omtrent 5 - 10 % av det som kreves for vann inversjon, herding og nedkjøling. Dette innebærer at damp kan brukes for herding selv om vannet ikke lett er tilgjengelig på stedet. Den drastiske reduksjon i mengden av vann er resultatet av den høyere energi som finnes fra et pund vann i form av damp i motsetning til et pund oppvarmet vann. Et pund damp kondensert til et pund vann avgir omtrent 1000 BTU mens et pund vann avgir bare en BTU for hver grad temperaturfall. Dette reduserte vannkrav pluss en praktisk talt eliminering av oppvarmingssyklusen, reduserer for en stor del herdesyklus-og installasjonstid. This drawback can be solved by using air instead of water to produce the inverting power. After the liner is completely impregnated, it can be cured with steam. Although water is required to produce the steam, the amount of water in the form of steam is only about 5 - 10% of that required for water inversion, curing and cooling. This means that steam can be used for curing even if water is not readily available on site. The drastic reduction in the amount of water is the result of the higher energy available from a pound of water in the form of steam as opposed to a pound of heated water. A pound of steam condensed to a pound of water emits about 1000 BTUs while a pound of water emits only one BTU for each degree drop in temperature. This reduced water requirement plus a virtual elimination of the heating cycle greatly reduces cure cycle and installation time.

Med denne åpenbare fordel ved å bruke luftinversjon og dampherding er det et spørsmål om hvorfor industrien har vært så langsom med å slutte med vanninversjon og varmtvannsherding. With this obvious advantage of using air inversion and steam curing, one wonders why the industry has been so slow to abandon water inversion and hot water curing.

Når vann blir brukt for å invertere den resinimpregnerte foringen, blir den ikke-inverterte del av foringen fra den inverte nese til inverteringsapparatet presset opp av en kraft som er lik mengden av vann som fortrenges av foringen. Når det gjelder CIPP-foringer, innebærer dette at den effektive vekt av foringen blir vesentlig redusert, samt også den nødvendige kraft for å trekke den ikke-inverterte foring forover til inverteringsnesen. Når luft blir brukt for å frembringe inverteringskraften, ligger den ikke-inverterte foring på bunnen av røret og lufttrykket som virker på inverteringsnesen av foringen må trekke den fulle vekt av foringen forover. When water is used to invert the resin-impregnated liner, the non-inverted portion of the liner is pushed up from the invert nose of the inverting apparatus by a force equal to the amount of water displaced by the liner. In the case of CIPP liners, this means that the effective weight of the liner is significantly reduced, as well as the force required to pull the non-inverted liner forward to the invert nose. When air is used to produce the inverting force, the non-inverted liner rests on the bottom of the pipe and the air pressure acting on the inverting nose of the liner must pull the full weight of the liner forward.

Tre krefter må overvinnes for å invertere en ClPP-foring, uansett hva som brukes for å frembringe inverteringsenergien. Disse kreftene er: Three forces must be overcome to invert a ClPP liner, regardless of what is used to generate the inverting energy. These forces are:

1. Kraft som kreves for å invertere foringen (vende foringens innside ut). Denne kraft varierer med foringsrørtykkelsen, materialtype og forholdet mellom foringsrørets tykkelse og diameteren 2. Kraften som er nødvendig for å trekke foringen fra inverteringsapparatet til inverteringsnesen. 3. Kraften som er nødvendig for å trekke foringen gjennom inverteringsapparatet. 1. Force required to invert the liner (turn the liner inside out). This force varies with casing thickness, material type and the ratio of casing thickness to diameter 2. The force required to pull the casing from the inverting device to the inverting nose. 3. The force required to pull the liner through the inverting apparatus.

Kraft nummer en (1) ovenfor er generelt lik for både luft- og vanninversjoner. Force number one (1) above is generally the same for both air and water inversions.

Kraft nummer to (2) varierer meget mellom luft og vann og kan begrense luftinversjoner. Det er grenser for hvor mye trykk som kan brukes for å invertere en foring uten negativt å påvirke kvaliteten av den installerte ClPP-foring og/eller en skade på det eksisterende ledningsrør. Smøremiddel kan brukes for både vann- luftinversjon for å redusere den nødvendige trekk kraft. Force number two (2) varies greatly between air and water and can limit air inversions. There are limits to how much pressure can be applied to invert a liner without adversely affecting the quality of the installed ClPP liner and/or damage to the existing conduit. Lubricant can be used for both water-air inversion to reduce the required pulling force.

Kraft nummer tre (3) kan variere basert på apparatutformingen. I de fleste apparater som finnes i bruk for tiden, vil kraften som kreves for å trekke foringen gjennom apparatet øke når en eller begge krefter en og to øker. Dette skyldes at for å øke den tilgjengelige inversjonsenergi, begrenser et typisk apparat som er i bruk i dag tapet av trykksatt fluid fra trykk kammeret under foringsrørets inngangspunkt til apparatet og enden av røret som blir invertert. Denne begrensning oppnås typisk ved å øke lufttrykket i en pneumatisk strupe pakkboks eller å bruke en pakning som blir energisert av inverteringsfluidet. Bevegelsen innover gir i typiske tilfeller begrenset av paknings-materialet og kompresjonen av den inverte ClPP-foring. Dette frembringer i sin tur en økning av friksjonen mellom den inverte ClPP-foring og pakningen. Force number three (3) may vary based on the device design. In most apparatus currently in use, the force required to pull the liner through the apparatus will increase as one or both forces one and two increase. This is because in order to increase the available inversion energy, a typical apparatus in use today limits the loss of pressurized fluid from the pressure chamber below the casing entry point to the apparatus and the end of the pipe being inverted. This limitation is typically achieved by increasing the air pressure in a pneumatic throttle packing box or using a packing that is energized by the inverting fluid. The inward movement is typically limited by the packing material and the compression of the inverted ClPP liner. This in turn produces an increase in the friction between the inverted ClPP liner and the gasket.

I betraktning av disse åpenbare fordeler med dampherdings sammenlignet med varmtvannsherding, har bruken av damp blitt foreslått også i betraktning av energien den bærer. Luften inverterer en blære og gjennomstrømmende damp for herding har blitt beskrevet i Insituform US patent nr 6,708,728 og 6,679,293. Fremgangsmåtene beskrevet i disse patentskrift utnytter inntrekning og oppblåsningsteknologi og brukes for tiden i mindre foringer. De er fordelaktige i forhold til vannvregning med mindre diameter. Imidlertid bruker ikke den beskrevne fremgangsmåte bruken av en liggende, flat slange for å innføre damp. Videre egner bruk av en punktert beholder som beskrevet i disse patentene seg ikke godt for foringer med middels og større diametre. Generelt anses foringer av middels størrelse å være mellom 18 og 36 tommer i diameter. Større diametre er slike med en diameter på 42 tommer og mer. Considering these obvious advantages of steam curing compared to hot water curing, the use of steam has been suggested also considering the energy it carries. Air inverting a bladder and flowing steam for curing has been described in Insituform US Patent Nos. 6,708,728 and 6,679,293. The methods described in these patents utilize indentation and inflation technology and are currently used in smaller liners. They are advantageous in relation to water displacement with a smaller diameter. However, the described method does not employ the use of a horizontal, flat tube to introduce steam. Furthermore, the use of a punctured container as described in these patents is not well suited for liners with medium and larger diameters. In general, medium-sized liners are considered to be between 18 and 36 inches in diameter. Larger diameters are those with a diameter of 42 inches and more.

Følgelig er det ønskelig å tilveiebringe en fremgangsmåte for forbedret luftinversjon/dampherdeinstallasjon av ClPP-foringer som bruker en tilbakeholdningsstropp og liggende flat slange for fordeling av damp til den inverterte foring for å sikre fullstendig herding uten termisk lagdeling og uten å måtte tømme foringen før injisering av damp for herding. Accordingly, it is desirable to provide a method for improved air inversion/steam curing installation of ClPP liners that utilizes a containment strap and horizontal flat tubing for distribution of steam to the inverted liner to ensure complete curing without thermal stratification and without having to evacuate the liner prior to injection of steam for curing.

US 5358359 beskriver et apparat for vregning av en fleksibel foring inn i en eksisterende rørledning. Apparatet omfatter et fleksibelt, rørformet gardinmiddel US 5358359 describes an apparatus for driving a flexible liner into an existing pipeline. The device comprises a flexible, tubular curtain means

forbundet til et inverteringskammer. To oppblåsbare rørformede blærer av puter brukes for å presse mot gardinmiddelet og tette gardinmiddelet og vregningsforingen som sklir derigjennom. Inverteringsforingen er montert på utløpsenden til inverteringskammeret i hvilket inverteringstrykket utvikles. connected to an inversion chamber. Two inflatable tubular bladders of cushions are used to press against the curtain material and seal the curtain material and the warp lining that slides through it. The inverting liner is fitted to the outlet end of the inverting chamber in which the inverting pressure is developed.

Generelt blir en foring for et rør som herdes på stedet, invertert ifølge oppfinnelsen som definert i kravene ved å bruke et installasjonsapparat med to selektivt stive pakninger. Apparatet gjør det mulig å innføre et herdefluid etter vregning uten at foringen tømmes. En åpen ramme blir brukt for å feste foringen som blir invertert før den blir ført mellom en første selektivt, stiv pakkboks for å forme en luft- eller damptetning og en andre, selektivt stiv pakkeboks for å forme en lufttetning for inversjon. In general, a liner for a pipe that is cured in place is inverted according to the invention as defined in the claims using an installation apparatus with two selectively rigid gaskets. The device makes it possible to introduce a curing fluid after turning without emptying the liner. An open frame is used to secure the liner being inverted before being passed between a first selectively rigid packing box to form an air or vapor seal and a second selectively rigid packing box to form an air seal for inversion.

I en foretrukket utførelse av oppfinnelsen er inversjonsapparatet en vertikalt anbrakt ramme for anbringelse over et innstigningshull, slik at en resinimpregnert foring som er festet til rammen, blir invertert og ført gjennom første og andre pakkbokser før den når det eksisterende ledningsrør. Foringen har en tørr del som er festet til og som føres gjennom rammen forsynt med minst en inversjonsherdende fluidport anbrakt mellom de to pakkboksene. Hver pakkboks har to faste elementer. I en utførelse av oppfinnelsen er et element et fast element på den ene side og som virker med et motstående fortregningsbart fast element for å danne pakkboksen. Alternativt kan begge faste elementer fortrenges for å danne tetninger. Den første eller oppstrømspakning kan omfatte et komprimerbart materiale som er festet over de faste elementene for å sikre dannelse av damptetningen under herdesyklusen. Fortrinnsvis er de faste elementene rør, hvor den inverterte del av foringen tilveiebringer et vesentlig sammentrykkende material for å danne en egnet damptetning. Den andre eller lufttetning blir satt til et bestemt mellomrom under den første halvdel av inversjonen, avhengig av foringens tykkelse. En økning i inversjonstrykket vil ikke kreve tilleggstrykk mot den resinimpregnerte foringen. In a preferred embodiment of the invention, the inversion apparatus is a vertically placed frame for placement over an entry hole, so that a resin-impregnated liner attached to the frame is inverted and passed through first and second stuffing boxes before it reaches the existing conduit. The liner has a dry part which is attached to and which is passed through the frame provided with at least one inversion curing fluid port located between the two stuffing boxes. Each packing box has two fixed elements. In one embodiment of the invention, an element is a fixed element on one side and which acts with an opposite offsetable fixed element to form the packing box. Alternatively, both fixed elements can be displaced to form seals. The first or upstream packing may comprise a compressible material which is secured over the solid elements to ensure formation of the vapor seal during the curing cycle. Preferably, the fixed elements are tubes, where the inverted part of the lining provides a substantial compressive material to form a suitable vapor seal. The second or air seal is placed at a specific gap during the first half of the inversion, depending on the thickness of the lining. An increase in the inversion pressure will not require additional pressure against the resin-impregnated lining.

Delen av foringen som er festet til inngangsrammen som føres gjennom første og andre pakninger holdes tørr og blir ikke impregnert med resin. Minst en fluid port for innføring av inversjon og deretter herdende fluid, blir formet gjennom veggen av den tørre del av foringen. I en foretrukket utførelse av oppfinnelsen er en første port mellom de to pakningene for innføring av inversjonsfluid, for eksempel luft og også for innføring av damp under herdefasen. En andre port er installert i veggen av den tørre del av foringen nedstrøms av andre pakning for innføring av inversjonsfluidet, for eksempel luft for å invertere foringen. The part of the liner attached to the entry frame that is passed through the first and second gaskets is kept dry and is not impregnated with resin. At least one fluid port for introducing inversion and then curing fluid is formed through the wall of the dry portion of the liner. In a preferred embodiment of the invention, a first port is between the two seals for the introduction of inversion fluid, for example air and also for the introduction of steam during the curing phase. A second port is installed in the wall of the dry part of the liner downstream of the second packing for introducing the inversion fluid, such as air, to invert the liner.

I en utførelse av oppfinnelsen kan invensjonsforbedringens hylse av impregnerbart materiale plasseres i den tørre innløpsdelen av foringen, slik at den inverterte foring med ugjennomtrengelig lag på ytterflaten lett kan føres gjennom den tørre del av foringen som er festet i rammen. Hylsen som vender mot det impregnerbare lag av inverteringsforingen kan smøres for å forbedre inversjonen gjennom pakkboksen. In an embodiment of the invention, the inventive improvement's sleeve of impregnable material can be placed in the dry inlet part of the lining, so that the inverted lining with an impermeable layer on the outer surface can easily be passed through the dry part of the lining which is fixed in the frame. The sleeve facing the impregnable layer of the invert liner can be lubricated to improve inversion through the stuffing box.

En selektiv åpning og stegning av pakkboksene gjør det mulig å føre en tilbake-holdningskabel eller stropp for å regulere hastigheten under den andre halvdel av inversjonen og føring av en liggende, flat slange og dampfeste for innføring av varmluft eller damp under herdingen. Bruk av en perforert, liggende og flat slange for dampherding gjør det mulig å innføre damp langs hele lengden av den inverterte foringen for å unngå følgende av oppsamlingen av kondens som ofte fører til dårlig herdete deler av foringen under dampherdingen. De doble pakkboksene gjør det mulig å føre den liggende, flate dampslange med dampfeste gjennom rammen og inn i den inverte foringen uten å tømme denne før innføring av herdefluid. Fortrinnsvis har den liggende, flate slange vekslende hull anordnet langs lengden nær kanten. Typiske er dette Va til 1 Vz tommer fra kanten av den liggende, flate slange. Dette hullmønstret sikrer fordeling av damp i bunnen langs hele lengden av foringen uansett slangens retning. A selective opening and elevation of the stuffing boxes allows for the passage of a restraint cable or strap to regulate the speed during the second half of the inversion and the passage of a horizontal flat hose and steam attachment for the introduction of hot air or steam during curing. The use of a perforated, horizontal and flat tube for steam curing allows steam to be introduced along the entire length of the inverted liner to avoid the consequences of the accumulation of condensation which often leads to poorly cured parts of the liner during steam curing. The double packing boxes make it possible to pass the horizontal, flat steam hose with steam attachment through the frame and into the inverted liner without emptying it before introducing curing fluid. Preferably, the horizontal, flat tube has alternating holes arranged along its length near the edge. Typically, this is Va to 1 Vz inches from the edge of the lying flat hose. This hole pattern ensures distribution of steam in the bottom along the entire length of the liner regardless of the direction of the hose.

En sampel- og porteringshylse med minst en forhåndsinstallert skillevegg som passer for å forme en utløpsport i den distale ende av den inverterte foringen for å motta en porteringsverktøy, kan anbringes i det distale adgangspunktet. Etter at inversjonen blir stoppet med den distale ende av foringen fanget av porteringshylsen, kan et porterings eller slissebor brukes for å danne en utløpsport i den oppblåste foring. En justerbar utløpsslange blir koplet til utløpsporten og damp blir innført i foringen gjennom den liggende, flate slange og herderesinet uten at den inverterte foring tømmes. A sample and porting sleeve with at least one pre-installed partition suitable to form an outlet port at the distal end of the inverted liner to receive a porting tool can be placed in the distal access point. After the inversion is stopped with the distal end of the liner captured by the porting sleeve, a porting or slotted drill can be used to form an outlet port in the inflated liner. An adjustable outlet hose is connected to the outlet port and steam is introduced into the liner through the horizontal flat hose and the curing resin without emptying the inverted liner.

Følgelig er et formål med oppfinnelsen å tilveiebringe en forbedret fremgangsmåte for å invertere en ClPP-foring. Accordingly, an object of the invention is to provide an improved method of inverting a ClPP liner.

Det er videre et formål med oppfinnelsen å tilveiebringe et apparat med dobbel pakkeboks for å invertere en ClPP-foring med luft og herding med damp. It is a further object of the invention to provide a double packing box apparatus for inverting a ClPP liner with air and curing with steam.

Det er videre et formål med oppfinnelsen å tilveiebringe en forbedret fremgangsmåte for luftinversjon og dampherding av en ClPP-foring med et apparat med stive, doble pakkbokser. It is further an object of the invention to provide an improved method for air inversion and steam curing of a ClPP liner with an apparatus with rigid, double packing boxes.

Det er videre et formål med oppfinnelsen å tilveiebringe en forbedret fremgangsmåte hvor en rørforing blir herdet på stedet og invertert med luft og herdet med damp uten at foringen tømmes etter å ha vært anbrakt i et eksisterende ledningsrør. It is further an object of the invention to provide an improved method where a pipe lining is cured in place and inverted with air and cured with steam without the lining being emptied after being placed in an existing conduit pipe.

Det er videre et formål med oppfinnelsen å tilveiebringe en fremgangsmåte og et apparat som egner seg for luftinversjon og dampherding, der foringen blir invertert gjennom et segment av foringen som er formet med minst en port for innføring av luft og/eller damp. It is a further object of the invention to provide a method and an apparatus which is suitable for air inversion and steam curing, where the liner is inverted through a segment of the liner which is shaped with at least one port for the introduction of air and/or steam.

Det er videre et formål med oppfinnelsen å tilveiebringe en forbedret fremgangsmåte for luftinversjon av en ClPP-foring med en tilbakeholdingsstropp og liggende, flat slange for innføring av damp for å herde foringen. It is further an object of the invention to provide an improved method for air inversion of a ClPP liner with a restraint strap and horizontal, flat tube for introducing steam to cure the liner.

Andre fordeler og formål med oppfinnelsen vil fremgå av spesifikasjonen. Other advantages and purposes of the invention will appear from the specification.

Oppfinnelsen skal beskrives nærmere i det følgende, der: The invention shall be described in more detail in the following, where:

Figur 1 er et skjematisk perspektivriss av et apparat med doble, stive pakkbokser for luftinversjon og dampherding av en rørforing herdet på stedet og som er konstruert og anordnet ifølge oppfinnelsen, Figure 1 is a schematic perspective view of an apparatus with double, rigid stuffing boxes for air inversion and steam curing of a pipe lining cured in place and which is constructed and arranged according to the invention,

Figur 2 er et skjematisk riss av høyre side av inversjonsapparatet på figur 1, Figure 2 is a schematic view of the right side of the inversion apparatus in Figure 1,

Figur 3 er et perspektivriss av inversjonsapparatet på figur 1 og 2 med en installert ClPP-foring og luft- og damptilkoblinger under dampherding i samsvar med oppfinnelsen, Figur 4 er et skjematisk riss i snitt som viser posisjonen av pakningene av apparatet på figur 3 under den første halvdel av luftinversjonen, Figur 5 er et skjematisk riss i snitt som viser posisjonen av pakningen av apparatet på figur 3 halvveis i inversjonen, Figur 6 er et skjematisk riss i snitt som viser posisjonen av pakkboksen av apparatet på figur 3 under den andre halvdel av inversjonen, Figur 7 er et skjematisk riss i snitt som viser posisjonen av pakningen av apparatet på figur 3 ved fullføringen av inversjonen, Figur 8 er et skjematisk riss i snitt som viser de forberedende trinn for å kople den liggende, flate slange til dampinnløpet før herding, Figur 9(a) og 9(b) er skjematisk planriss og snitt av en fleksibel porteringshylse med en installert skillevegg som er festet for bruk med den inverterte foring, Figur 10 er et riss i snitt av en skilleveggfestet av figur 9 som viser detaljer av konstruksjonen av porteringen av en invertert ende av en helt invertert foring som blir fanget av hylsen; Figur 1 l(a)-l l(g) er et skjematisk riss i snitt av fremgangsmåten for å forme en utløps-port i den inverterte foring fanget i porteringshylsen på figur 9 og en invertert herdet foring på stedet som er ført til et sampel- og porteringsrør før og etter portering med et porteringsverktøy, Figur 12(a) og 12(b) er skjematiske riss i snitt av trinnene for å installere en kondensatdrenering i den distale ende av den inverterte foring etter å ha utført trinnene som vist på figur 11 (a)-ll(g). Figur 13 er et skjematisk riss i snitt som viser posisjonen av pakningene av apparatet på figur 3 med luft/damp tilførselsslange festet som forberedelse for å innføre damp for herding; og Figur 14(a) og 14(b) viser en utløpsporteringsteknikk som egner seg for foringsrør med mindre diameter. Figure 3 is a perspective view of the inversion apparatus of Figures 1 and 2 with an installed ClPP liner and air and steam connections during steam curing in accordance with the invention, Figure 4 is a schematic sectional view showing the position of the gaskets of the apparatus of Figure 3 below the first half of the air inversion, Figure 5 is a schematic sectional view showing the position of the packing of the apparatus of Figure 3 halfway through the inversion, Figure 6 is a schematic sectional view showing the position of the packing box of the apparatus of Figure 3 during the second half of the inversion, Figure 7 is a schematic sectional view showing the position of the gasket of the apparatus of Figure 3 at the completion of the inversion, Figure 8 is a schematic sectional view showing the preparatory steps for connecting the horizontal flat hose to the steam inlet prior to curing , Figures 9(a) and 9(b) are schematic plan views and sections of a flexible porting sleeve with an installed partition attached for use with the inverted liner , Figure 10 is a sectional view of a partition mount of Figure 9 showing details of the construction of the porting of an inverted end of a fully inverted liner which is captured by the sleeve; Figure 1 l(a)-l l(g) is a schematic cross-sectional view of the method of forming an outlet port in the inverted liner captured in the porting sleeve of Figure 9 and an inverted hardened liner in place which is taken to a sample and porting pipe before and after porting with a porting tool, Figures 12(a) and 12(b) are schematic cross-sectional views of the steps for installing a condensate drain at the distal end of the inverted liner after performing the steps shown in Figure 11 (a)-ll(g). Figure 13 is a schematic sectional view showing the position of the gaskets of the apparatus of Figure 3 with air/steam supply hose attached in preparation for introducing steam for curing; and Figures 14(a) and 14(b) show an outlet porting technique suitable for smaller diameter casing.

En forbedret fremgangsmåte og et apparat for luftinvertering og dampherding av en ClPP-foring i samsvar med AS TM F1216 Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Inversion and Curing of a Resin- Impregnated Tube er beskrevet. Fremgangsmåten og apparatet er godt egnet for installering av CIPP-foringsrør av middels diameter som virker fra overflaten gjennom strukturen, f.eks innstigningshull for å rehabilitere eksisterende nedgravde rørledninger og ledningsrør. An improved method and apparatus for air inversion and steam curing of a ClPP liner in accordance with AS TM F1216 Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Inversion and Curing of a Resin-Impregnated Tube is described. The method and apparatus are well suited for installation of medium diameter CIPP casing working from the surface through the structure, eg entry holes to rehabilitate existing buried pipelines and conduits.

Et inverteringsapparat 11 er konstruert og anordnet ifølge oppfinnelsen vist på figur 1. Apparatet 11 er en stiv ramme dimensjonert for anbringelse over inverteringsadgangen til ledningsrøret som skal fores. Apparatet 11 er fremstilt av metallstenger eller rør for å danne en ramme 12 med en tilstrekkelig bredde "w" for å motta en flat rørforing for herding på stedet, for installasjon. Rammen 12 er vesentlig rektangulær i den viste utførelse og har en rektangulær inngangsåpning 13 med flere kroker 14 for å feste inverteringsforingen. Åpningen 13 har en tykkelse "t" som er valgt for at den tørre del av den inverterte fuktede foring skal kunne festes på kroker 14 og inverteres gjennom inngangsåpningen 13. An inverting device 11 is constructed and arranged according to the invention shown in figure 1. The device 11 is a rigid frame dimensioned for placement over the inverting access to the conduit to be lined. The apparatus 11 is fabricated from metal rods or tubes to form a frame 12 of a sufficient width "w" to receive a flat tube liner for curing in place, for installation. The frame 12 is substantially rectangular in the embodiment shown and has a rectangular entrance opening 13 with several hooks 14 for attaching the inverting liner. The opening 13 has a thickness "t" which is chosen so that the dry part of the inverted moistened liner can be attached to hooks 14 and inverted through the entrance opening 13.

Rammen 12 har en høyde "h" som er tilstrekkelig for å støtte en første eller oppstrøms pakning 16 formet av et fast pakningselement 17 og et motstående, samvirkende forflytningsbart pakningselement 18 anbrakt nær inngangen 13. Et par luftsylindre 19 er festet til enden av rammen 12 og forbundet til det forflytningsbare elementet 18 for at dette kan bevege seg mot det faste elementet 17.1 den viste utførelse er sylindrene 19 pneumatisk luftsylindre med lineære føringslagre 20a. Sylindrene 19 kan være enhver mekanisk lukkemekanisme eller motor av enhver type, for eksempel en hydraulisk eller elektrisk eller mekanisk klemmemekanisme. The frame 12 has a height "h" sufficient to support a first or upstream packing 16 formed by a fixed packing member 17 and an opposing co-operating movable packing member 18 located near the inlet 13. A pair of air cylinders 19 are attached to the end of the frame 12 and connected to the movable element 18 so that this can move towards the fixed element 17.1 the embodiment shown, the cylinders 19 are pneumatic air cylinders with linear guide bearings 20a. The cylinders 19 can be any mechanical closing mechanism or motor of any type, for example a hydraulic or electrical or mechanical clamping mechanism.

En andre eller nedstrøms pakning 21, formet på samme måte som den første pakning 16, har et stivt pakningselement 22 festet til rammen 12 og et bevegelig pakningselement 23 på et par lineære føringslagre 20b med en påfestet luftsylinder 24. Høyden "h" av rammen 12 er valgt for å gi tilstrekkelig plass mellom den første pakning 16 og den andre pakning 21 for å kunne bruken en fluid innløpsport installert i den tørre del av en invertert foring for innføring av luft og/eller damp. En inverteringsfluid innløps-åpning er installert i den tørre del av den inverterte foring og anbrakt nedstrøms av den andre pakning 21 og før innstigningsåpningen. En fullstendig beskrivelse av foringen og installasjonsportene vil bli gitt nedenfor. A second or downstream packing 21, shaped in the same way as the first packing 16, has a rigid packing member 22 attached to the frame 12 and a movable packing member 23 on a pair of linear guide bearings 20b with an attached air cylinder 24. The height "h" of the frame 12 is chosen to provide sufficient space between the first packing 16 and the second packing 21 to enable the use of a fluid inlet port installed in the dry part of an inverted liner for the introduction of air and/or steam. An inverting fluid inlet opening is installed in the dry part of the inverted liner and placed downstream of the second packing 21 and before the entry opening. A full description of the liner and installation ports will be provided below.

I den fiste utførelse på figur 1, har rammen 12 en bunn 25 formet av to siderør 26 og 27 sveiset til en rektangulær frontramme 28 formet av et bunnrør 29, to vertikale siderør 31 og 32 og et øvre rør 33. Vertikale rør 33 og 32 er sveiset til bunnsiderørene henholdsvis 26 og 27. En tilsvarende, rektangulær ryggramme 34 formet av et bunnrør 36, to siderør 37 og 38 og et øvre rør 39, er sveiset til bunnsidebjeikene 26 og 27 på samme måte som frontrammen 28. Et par av første horisontale pakningsbærerør 41 og 42 er festet mellom frontsiderørene 31 og 32 av frontrammen 28 og siderørene 37 og 38 av den bakre ramme 34. Likeledes er et par bærebjelker 43 og 44 festet mellom frontrammen 28 og ryggrammen 34 for å støtte den andre pakning 21. Fire skrå bærerør 46, 47, 48 og 49 er sveiset mellom fronten og ryggen av siderørene 26 og 27 for å gi stabilitet til rammen 12. Selv om skrå bærerrør er vist, er det tenkt at også rektangulære bærerelementer som danner et trinn kan brukes for å tilveiebringe en arbeidsplatform ved eller rundt høyden av den andre pakning 21. In the embodiment shown in Figure 1, the frame 12 has a bottom 25 formed by two side tubes 26 and 27 welded to a rectangular front frame 28 formed by a bottom tube 29, two vertical side tubes 31 and 32 and an upper tube 33. Vertical tubes 33 and 32 are welded to the bottom side tubes 26 and 27 respectively. A corresponding, rectangular back frame 34 formed by a bottom tube 36, two side tubes 37 and 38 and an upper tube 39, is welded to the bottom side beams 26 and 27 in the same way as the front frame 28. A pair of first horizontal gasket support tubes 41 and 42 are fixed between the front side tubes 31 and 32 of the front frame 28 and the side tubes 37 and 38 of the rear frame 34. Likewise, a pair of support beams 43 and 44 are fixed between the front frame 28 and the back frame 34 to support the second gasket 21. Four inclined support tubes 46, 47, 48 and 49 are welded between the front and back of the side tubes 26 and 27 to provide stability to the frame 12. Although inclined support tubes are shown, it is contemplated that rectangular support members forming a step may also be used to provide a working platform at or around the height of the second packing 21.

Luftsylindre 19 er vist montert over den første pakning 16 og den andre pakning 21. Hver sylinder er koplet til en kopling, slik at den kan kjøre på et par lineære føringslagre 20. Luftsylindre 19 har hver en luftkopling 50 forbundet til en luftswitch kontrolltavle Air cylinders 19 are shown mounted above the first gasket 16 and the second gasket 21. Each cylinder is connected to a coupling, so that it can run on a pair of linear guide bearings 20. Air cylinders 19 each have an air coupling 50 connected to an air switch control board

53 vist på figur 3. 53 shown in Figure 3.

Det faste pakningselement 17 og det forflytbare pakningselement 18 av den første pakning 16 har et sammentrykkbart, høytemperatur motstandstepper 54 og 56 montert på de motstående flater. Dette sammentrykkbare materialet 54 og 56 vil tilpasse seg og tett gripe en invertert foring med en tilbakeholdningsstropp og liggende flat slange når de føres gjennom en første pakning 16 under den andre halvdel av inversjonen. I tillegg vi det sammentrykkbare materialet 54 og 56 danne en passende tetning når den første pakning lukkes under dampherdingen. The fixed packing element 17 and the movable packing element 18 of the first packing 16 have a compressible, high temperature resistance blankets 54 and 56 mounted on the opposite surfaces. This compressible material 54 and 56 will conform to and tightly grip an inverted liner with a restraint strap and lying flat tubing as they are passed through a first gasket 16 during the second half of the inversion. In addition, the compressible material 54 and 56 form a suitable seal when the first seal is closed during steam curing.

De stive, samvirkende motstående flater av elementene 22 og 23 av den andre pakning 21 kan være flate. Krumningen kan legges til tilpasningsflatene ved å sveise et rør med liten diameter til bjelkene 22 og 23 eller ved å bruke før for element 22 og 23. Denne krummede flate gir en glattere overflate for å gripe den inverterte foring. The rigid, cooperating opposing surfaces of the elements 22 and 23 of the second gasket 21 can be flat. The curvature can be added to the mating surfaces by welding a small diameter tube to the beams 22 and 23 or by using a former for members 22 and 23. This curved surface provides a smoother surface for gripping the inverted liner.

Den andre pakning 21 danner lufttettingen under luftinversjonen. Ved begynnelsen og første halvdel av inversjonen, blir den andre pakning 21 lukket til en avstand på omtrent fire ganger tykkelsen av foringsrøret ved å bruke en mellomromsinnstillings innretning. Denne innretning kan være passende tilpassede avstandsstykker plassert på føringslagrene 20a og 20b. Etter at tilbakeholdingsstroppen og den liggende, flate slange blir ført gjennom den andre pakning under den andre halvdel av inversjonen, blir mellomrommet av den andre pakning 21 redusert til omtrent to ganger foringen av veggtykkelsen. The second seal 21 forms the air seal during the air inversion. At the beginning and first half of the inversion, the second packing 21 is closed to a distance of about four times the thickness of the casing using a gap setting device. This device can be suitably adapted spacers placed on the guide bearings 20a and 20b. After the restraint strap and the lying flat tubing are passed through the second gasket during the second half of the inversion, the space of the second gasket 21 is reduced to approximately twice the liner wall thickness.

Ved å bruke denne konstruksjon vil en økning av inverteringslufttrykket få foringsrøret til å invertere uten å øke trykket mot foringen ved den andre pakning 21 ved hjelp av elementene 22 og 23. Lufttrykket til sylindrene 19 kan økes for å hindre at pakningen 21 åpner til et mellomrom som er mer enn to ganger foringsrørets tykkelse. Mellomromsjusteringsinnretningen, f.eks avstandsstykkende plassert på føringslagrene eller gjengede bolter, hindrer en reduksjon av mellomrommet utenfor det som er ønskelig. Using this design, an increase in the inverting air pressure will cause the casing to invert without increasing the pressure against the casing at the second packing 21 by means of elements 22 and 23. The air pressure to the cylinders 19 can be increased to prevent the packing 21 from opening to a gap which is more than twice the casing thickness. The gap adjustment device, e.g. spacers placed on the guide bearings or threaded bolts, prevents a reduction of the gap beyond what is desired.

Tetningen rundt den inverterte foring frembringes av den tørre del av selve foringen, slik at tettingen får en identisk profil og dimensjon. Således er det ikke nødvendig å bekymre seg om dannelse av en tetning ved kantene av den utflatede foring. Lengden av kantperimeter av den utflatede foring er minimal sammenliknet med langsiden av den utførte foring, slik at belastninger på kantene blir minimal og ingen tilleggsstegning eller støtting av kantene trengs. Dette gjør det mulig å bruke rette, stive rør eller bjelker for å danne tetningen. Fremgangsmåten og apparatet som beskrevet, tilveiebringer en fordel i forhold til tidligere inversjonsinnretninger. I disse sistnevnte innretninger, blir formingen av en tetning ved kantene vanskelig på grunn av inversjonen som fortsetter nedstrøms av tetningen eller pakningen. Her er det en fordel at inversjonen av forings-røret har begynt før foringen passerer gjennom en pakning for å danne en inversjon og herdet tetning. The seal around the inverted liner is produced by the dry part of the liner itself, so that the seal has an identical profile and dimension. Thus, there is no need to worry about forming a seal at the edges of the flattened liner. The length of the edge perimeter of the flattened lining is minimal compared to the long side of the finished lining, so that loads on the edges are minimal and no additional seaming or supporting of the edges is needed. This allows straight, rigid pipes or beams to be used to form the seal. The method and apparatus as described provides an advantage over prior inversion devices. In these latter devices, forming a seal at the edges becomes difficult because of the inversion that continues downstream of the seal or gasket. Here it is an advantage that the inversion of the casing has begun before the casing passes through a gasket to form an inversion and hardened seal.

Figur 3 viser et apparat 11 med en invertert foring 101 festet kroker 14 på inngangsåpningen 13 under dampherdetrinnet. Foringen 101 er fremstilt med en tørr endedel 102 og blir fuktet like før der hvor inverteringsforingen føres til ledningsrøret for rehabilitering. En luftinnløpsport 106 er anordnet i et tørt område 102b mellom en andre pakning 21 og begynnelsen av utfuktingen ved området 103. En luftslange 107 er forbundet til luftinnløpsporten 106 og en luftkilde (ikke vist). Figure 3 shows an apparatus 11 with an inverted liner 101 attached hooks 14 on the entrance opening 13 during the steam curing stage. The liner 101 is produced with a dry end part 102 and is moistened just before where the inverting liner is led to the conduit for rehabilitation. An air inlet port 106 is arranged in a dry area 102b between a second seal 21 and the beginning of the humidification at area 103. An air hose 107 is connected to the air inlet port 106 and an air source (not shown).

En luft/damp innløpsport 108 er også installert i foringsområdet 102a mellom den første pakning 16 og den andre pakning 21. En damps lange 109 er koplet til dampinnløps-porten 108 og til en varmebeholder (ikke vist). An air/steam inlet port 108 is also installed in the lining area 102a between the first gasket 16 and the second gasket 21. A steam pipe 109 is connected to the steam inlet port 108 and to a heater (not shown).

Apparatet 11 på figur 3 viser en installasjon og anbringelse av en første pakning 16 og en andre pakning 21 etter at inversjonen er fullført og under dampherding. Her blir den første pakning 16 lukket for å danne en damptetning over dampen som føres til damp-innløpsporten 108. Den andre pakning 21 er åpen, slik at damp kan føres inn i den inverterte foring 101 gjennom den liggende, flate slange som er installert ved foringen 101 for å bevirke herdingen. The apparatus 11 in Figure 3 shows an installation and placement of a first gasket 16 and a second gasket 21 after the inversion has been completed and during steam curing. Here, the first packing 16 is closed to form a steam seal over the steam which is fed to the steam inlet port 108. The second packing 21 is open, so that steam can be fed into the inverted liner 101 through the horizontal, flat hose installed at the liner 101 to effect the curing.

Rekkefølgende av inversjons- og herdetrinnene er vist skjematisk i rekkefølge på figur 4 - 13. Under den første halvdel av inversjonen på figur 4, er den første tetning 16 åpen og den andre tetning 21 er lukket til et mellomrom på 4T (fire ganger tykkelsen av foringen 101) ved å bruke mellomroms innstillingsanordninger. Inversjonsluft blir matet i til en luftinnløpsport 106 fra en luftinnløpsslange 107 for at foringen 101 kan invertere innenfor en tørr foringsdel 102b og til ledningsrøret som blir foret. Halvveis av inversjonen, blir den første pakning 16 lukket for å gripe en tilbakeholdningsstropp 111 og en liggende, flat slange 112 som vist på figur 5. Den liggende, flate slange 112 har en lukket ende 112a. Under den andre halvdel av inversjonen, som vist på figur 6, blir den andre pakning 21 åpnet og inversjonsluft blir matet inn i luftinversjons innløpsporten 106 for å fullføre inversjonen. På dette tidspunkt blir den andre pakning 21 lukket og den første pakning 16 åpnet som vist på figur 7. The sequence of the inversion and curing steps is shown schematically in sequence in Figures 4 - 13. During the first half of the inversion in Figure 4, the first seal 16 is open and the second seal 21 is closed to a gap of 4T (four times the thickness of the liner 101) using spacer adjusting devices. Inversion air is fed into an air inlet port 106 from an air inlet hose 107 to allow the liner 101 to invert within a dry liner portion 102b and to the conduit being lined. Halfway through the inversion, the first gasket 16 is closed to engage a restraint strap 111 and a lying flat tube 112 as shown in Figure 5. The lying flat tube 112 has a closed end 112a. During the second half of the inversion, as shown in Figure 6, the second seal 21 is opened and inversion air is fed into the air inversion inlet port 106 to complete the inversion. At this point, the second seal 21 is closed and the first seal 16 is opened as shown in figure 7.

På dette tidspunkt, og når den første pakning er 16 blir åpnet, blir den liggende, flate slange 112 skåret over den første pakning 16 og et dampkne blir festet til den avskårne ende. Dampkneet 113 og overskytende, liggende, flat slange 112 blir senket inn i rammen 12 mellom den første pakning 16 og den lukkede, andre pakning 21 og kneet 113 blir festet til baksiden av luft/damp porten 108. Alternativt kan en fleksibel flatliggende adapter festet til den flatliggende slange på utsiden av det inverterte området som deretter kan settes inn i luft/damp porten for å gjøre det lettere å tilsette damp til det inverterte rør. Den flatliggende adapter kan være en tynn, rørformet og stiv og bøyelig metallhylse med en utvidet profil som hindrer den i å bli trukket inn i luft/damp porten. Rørdelen av hylsen blir satt inn i den avskårne ende av den liggende, flate slange og satt inn i innløpsporten. Den liggende, flate slange blir så grepet mellom det utvidete området av hylsen og porten. Slakket i den liggende, flate slange 112 vil falle inn i den inverte enden når den første pakning 16 blir lukket og den andre pakning 21 åpnet ved begynnelsen av dampsyklusen som vist på figur 13. At this point, and when the first packing 16 is opened, the horizontal flat tube 112 is cut across the first packing 16 and a steam knee is attached to the cut end. The steam elbow 113 and excess flat hose 112 are sunk into the frame 12 between the first gasket 16 and the closed second gasket 21 and the elbow 113 is attached to the rear of the air/steam port 108. Alternatively, a flexible flat adapter can be attached to the flat tubing on the outside of the inverted area which can then be inserted into the air/steam port to facilitate the addition of steam to the inverted tube. The flat-lying adapter can be a thin, tubular and rigid and flexible metal sleeve with an extended profile that prevents it from being drawn into the air/steam port. The tube part of the sleeve is inserted into the cut end of the horizontal flat hose and inserted into the inlet port. The horizontal, flat tubing is then gripped between the expanded area of the sleeve and the port. The slack in the horizontal flat tube 112 will fall into the inverted end when the first seal 16 is closed and the second seal 21 is opened at the beginning of the steam cycle as shown in Figure 13.

I en utførelse av oppfinnelsen kan en inversjonsforbedrende hylse 115 av et impregnerbart materiale plasseres i den tørre innløpsdelen av foringen for å gjøre det lettere å invertere gjennom pakningen. I dette tilfellet vil en inverteringsforing med et ugjennomtrengelig lag på ytterflaten lett kunne føres gjennom den tørre del av foringen festet i rammen. Hylsen som vender mot det ugjennomtrengelige lag av den inverterte foring kan smøres for å gjøre inversjonen lettere gjennom pakningen. In one embodiment of the invention, an inversion-enhancing sleeve 115 of an impregnable material can be placed in the dry inlet portion of the liner to facilitate inversion through the packing. In this case, an invert liner with an impermeable layer on the outer surface will easily be passed through the dry part of the liner attached to the frame. The sleeve facing the impermeable layer of the inverted liner can be lubricated to facilitate inversion through the gasket.

Like etter fullføringen av inversjonen, blir den inverterte foring 101 portert i nedstrøms adgangsåpningen. En gjennomstrømningsport 130 i den inverte distale ende av foringen 101 som vist på figur 10, anordnet uten at foringen 101 blir tømt. En fleksibel porteringshylse 117 som vist på figur 9(a) og 9(b) er festet i det mottakende innstigningshull. Hylsen 117 som kan være fast med mindre diametre, omfatter et utløpsskilleveggfeste 118 og et kondensat dreneringsskillevegg feste 119. Figur 9 viser et feste 110 i snitt festet til hylsen 117 av en flens 121 og bolter 122. Hylsen 117 blir festet i den mottakende ende av det eksisterende ledningsrør og foringen 101 blir invertert gjennom hylsen og holdt deri. Samtidig blir en utløpsport 130 og en kondensatport 163 formet ved skilleveggfestet 118 og 119 med en festehylse 139 installert i porteringshylsen 117 for å bruke fremgangsmåten som skissert i forbindelse med figur 11 og 12. Just after the completion of the inversion, the inverted liner 101 is ported into the downstream access port. A flow port 130 in the inverted distal end of the liner 101 as shown in Figure 10, arranged without the liner 101 being emptied. A flexible porting sleeve 117 as shown in Figures 9(a) and 9(b) is fixed in the receiving entry hole. The sleeve 117, which can be fixed with smaller diameters, comprises an outlet partition wall attachment 118 and a condensate drainage partition wall attachment 119. Figure 9 shows an attachment 110 in section attached to the sleeve 117 by a flange 121 and bolts 122. The sleeve 117 is attached at the receiving end of the existing conduit and liner 101 is inverted through the sleeve and held therein. At the same time, an outlet port 130 and a condensate port 163 are formed at the partition mount 118 and 119 with a mounting sleeve 139 installed in the porting sleeve 117 to use the method as outlined in connection with Figures 11 and 12.

Utløpsporten 130 er formet i den distale ende etter trinnene vist på figur 1 l(a)-l l(g). Porteringshylsen 117 kan formes fra en lengde av ClPP-foringsmaterialet forsynt med et andre skilleveggfeste 119 for å forme den andre port 163 for en kondensatdrenering 164 som vist på figur 14(a) og 14(b). The outlet port 130 is formed at the distal end following the steps shown in Figure 1 l(a)-l l(g). The port sleeve 117 may be formed from a length of the ClPP lining material provided with a second partition wall attachment 119 to form the second port 163 for a condensate drain 164 as shown in Figures 14(a) and 14(b).

En hette 138 blir fjernet og en kuleventil 171 blir installert på festehylsen 139. Kuleventilen 171 er lukket med en nippel 172 som er installert derpå. En hullsag 173 med en borestang 174 er satt inn i nippelen 172 og en gjenget hullsag stangføring 176 er festet til enden av nippelen 172. Et bor 173 er festet til stangen 174. Kuleventilen 171 blir åpnet på porten 130 eller 163 og boret 177 blir startet for å skjære et hull 130 og 163 samtidig som lufttrykket opprettholdes i foringen 101. Når porten 130 og 163 er helt avskåret, blir kuleventilen 171 lukket og boret 177 og hullsagen 173 blir fjernet fra festet 131. Utløpsslangen 61 blir så festet til nippelen 172. A cap 138 is removed and a ball valve 171 is installed on the attachment sleeve 139. The ball valve 171 is closed with a nipple 172 which is installed thereon. A hole saw 173 with a drill rod 174 is inserted into the nipple 172 and a threaded hole saw rod guide 176 is attached to the end of the nipple 172. A drill 173 is attached to the rod 174. The ball valve 171 is opened on port 130 or 163 and the drill 177 is started to cut a hole 130 and 163 while maintaining the air pressure in the liner 101. When the port 130 and 163 are completely cut off, the ball valve 171 is closed and the drill 177 and the hole saw 173 are removed from the attachment 131. The outlet hose 61 is then attached to the nipple 172.

Kondensatporten 163 kan formes ifølge de samme trinn som vist på figur 1 l(a) til 1 l(g). Etter fjerning av boret 177, blir en kondensat rørpakning 181 plassert på nippelen 172 og en kondensatdreneringsslange 182 blir plassert i pakningen 182 for å nå bunnen av foringen 101. Pakningen 181 blir strammet for å hindre at slangen 182 beveger seg. For foringer med mindre diameter, kan utløps- og kondensatporter anordnet ved å bruke et porteringsverktøy som vist på figur 14(a) og 14(b). The condensate port 163 can be formed according to the same steps as shown in figure 1l(a) to 1l(g). After removing the drill 177, a condensate pipe gasket 181 is placed on the nipple 172 and a condensate drain hose 182 is placed in the gasket 182 to reach the bottom of the liner 101. The gasket 181 is tightened to prevent the hose 182 from moving. For smaller diameter liners, outlet and condensate ports can be provided using a porting tool as shown in Figures 14(a) and 14(b).

På figur 13 blir damp innført til den festede, perforerte og liggende, flate slange 86 for å innlede herding av resinet i den inverte foring 101 med pakningene 16 og 21 i posisjonen vist på figur 3.1 et eksempel på utførelse av oppfinnelsen, er den liggende, flate slange 86 et høyttemperatur, termoplastrør med 4 tommer diameter og en åttende-dels tomme åpninger. Størrelsen og avstanden kan variere avhengig av varmekilden og foringens størrelse og lengde. Åpningene frembringes med en fot intervaller med en halv tomme fra de foldete kanter ved motstående kanter. Avstanden fra hver kant kan variere avhengig av størrelse og lengde. In figure 13, steam is introduced to the fixed, perforated and lying, flat hose 86 to initiate curing of the resin in the inverted liner 101 with the seals 16 and 21 in the position shown in figure 3.1 an example of embodiment of the invention, it is lying, flat hose 86 a high-temperature, thermoplastic pipe with 4-inch diameter and one-eighth-inch openings. The size and distance may vary depending on the heat source and the liner's size and length. The openings are made at one-foot intervals of one-half inch from the folded edges at opposite edges. The distance from each edge may vary depending on size and length.

Åpningsmønstret beskrevet tilveiebringer mer damp ved den proksimale ende av foringen 101 og sikrer god blanding selv om slangen 112 blir vridd. Dette sikrer også at dampen blir injisert i et kondensat som dannes i røret som blir invertert for å herde delen av resinet i foringen som dekkes av kondensatansamlingen. Damp blir tilveiebrakt fra dampinnløpsslangen som blir regulert av en ventilmanifold. Dampstrømmen blir justert for å opprettholde et herdetrykk på omtrent 3 - 6 psi inntil herdesyklusen blir fullført. The opening pattern described provides more steam at the proximal end of the liner 101 and ensures good mixing even if the hose 112 is twisted. This also ensures that the steam is injected into a condensate which forms in the tube which is inverted to cure the part of the resin in the liner covered by the condensate build-up. Steam is supplied from the steam inlet hose which is regulated by a valve manifold. The steam flow is adjusted to maintain a cure pressure of approximately 3 - 6 psi until the cure cycle is completed.

I en typisk installasjon blir åpninger i den liggende, flate slange 112 formet med omtrent en fots mellomrom når en fire tommers slange blir foldet og skåret i et vekslende mønster med omtrent en halv tomme inn fra toppen og bunnen av det foldete rør. Således blir to hull formet ved hvert sted, slik at de to hullene blir formet i et vekslende mønster. Den liggende, flate slange 86 har en lukket distal ende og kan variere i størrelse fra omtrent 2 til 8 tommer i diameter. Diameteren av åpningene varierer fra omtrent 1/8 til 1/2 tommer og fortrinnsvis mellom omtrent 3/16 til 3/8 tommer i diameter. Avhengig av det bestemte resin som velges, vil et med høy eksoterm under herdingen bare kreve åpninger med mindre størrelser ettersom mindre damp kreves for å fullføre herdingen. I enkelte systemer kan flere enn en perforert, liggende flat slange brukes. In a typical installation, openings in the horizontal flat tubing 112 are formed approximately one foot apart when a four inch tubing is folded and cut in an alternating pattern approximately one half inch in from the top and bottom of the folded tubing. Thus, two holes are formed at each location, so that the two holes are formed in an alternating pattern. The lying flat tube 86 has a closed distal end and can vary in size from about 2 to 8 inches in diameter. The diameter of the openings ranges from about 1/8 to 1/2 inch and preferably between about 3/16 to 3/8 inch in diameter. Depending on the particular resin chosen, one with a high exotherm during the cure will only require smaller sized openings as less steam is required to complete the cure. In some systems, more than one perforated, horizontal flat hose can be used.

Samtidig som utløpsporten 130 blir installert, blir et dampkne eller en fleksibel, flatliggende adapter 113 festet til den proksimale ende av den liggende, flate slange 112 over inngangsåpningen 13. Kneet 113 og overskytende, liggende, flat slange 112 blir senket gjennom den første pakning 16 og festet til den lukkede luft/damp port 108. Som vist på figur 13 blir den første pakning 16 deretter stengt og luft/damp tilførselsslangen 109 blir koplet til dampinnløpsporten 108 på foringen 101 og den andre pakningen 21 blir åpnet. På dette tidspunkt blir luft og damp innført i luft/damp innløpsporten 108 og ført gjennom den perforerte, liggende, flate slange for å starte oppvarmingen av foringen 101. Etter at en 3°F økning i temperaturen blir påvist i den distale ende, blir full damp tilført for å utføre herdingen. Utløpsdampen går gjennom en utløpsslange forbundet til utløpsporten 130 i den distale ende av foringen 101. At the same time as the outlet port 130 is installed, a steam elbow or flexible flat adapter 113 is attached to the proximal end of the horizontal flat hose 112 above the inlet opening 13. The elbow 113 and excess horizontal flat hose 112 are lowered through the first gasket 16 and attached to the closed air/steam port 108. As shown in Figure 13, the first gasket 16 is then closed and the air/steam supply hose 109 is connected to the steam inlet port 108 on the liner 101 and the second gasket 21 is opened. At this point, air and steam are introduced into the air/steam inlet port 108 and passed through the perforated, horizontal, flat tubing to initiate heating of the liner 101. After a 3°F rise in temperature is detected at the distal end, full steam added to effect the curing. The outlet steam passes through an outlet hose connected to the outlet port 130 at the distal end of the liner 101.

Installasjonsfremgangsmåten er som følger. The installation procedure is as follows.

1. En utfuktet ClPP-foring med en første tørr ende blir vendt med innsiden ut og ført gjennom inngangsåpningen og festet til kroker. Foringen blir anbrakt gjennom begge pakningene i innstigningshullet av ledningsrøret. En luftslange er festet til innløpsåpningen på den tørre del av foringen. 2. En 2" tilførselsslange er koplet fra utløpsenden av luft/damp manifolden til luftinnløpet på inversjonsenheten. Lufttrykk- og temperaturmålere (lea) er koplet til en luft/damp manifold. 3. Et tilbakeholdingsrep og en perforert, liggende, flat slange er koplet til en andre ende av ClPP-foringen. 4. Et passende smøremiddel blir lagt på de absorberende filtlag ved innløpet til forbedringshylsen plassert i den tørre del av foringen. 1. A moistened ClPP liner with a first dry end is turned inside out and passed through the entrance opening and attached to hooks. The liner is placed through both gaskets in the entry hole of the conduit pipe. An air hose is attached to the inlet opening on the dry part of the liner. 2. A 2" supply hose is connected from the outlet end of the air/steam manifold to the air inlet of the inversion unit. Air pressure and temperature gauges (lea) are connected to an air/steam manifold. 3. A restraint rope and a perforated horizontal flat hose are connected to another end of the ClPP liner 4. A suitable lubricant is applied to the absorbent felt layers at the inlet of the improvement sleeve located in the dry part of the liner.

Installasjonsrekkefølgen som beskrevet i forbindelsen med figur 4 - 8 , blir deretter fulgt. The installation sequence as described in connection with figures 4 - 8 is then followed.

Som vist på figur 14(a) og 14(b), er det en PVC- eller stiv rørsampel støpning av metall med en utløpsrør sammenstilling 161 med en støpning 162 og stålrør 163 i det bortre nedstigningshullet tilpasset for å motta et inverteringsrør. Etter hvert som inverteringens nese når bortre innstigningshull, blir inversjonen senket for at foringsrøret kan nå sampel støpingen 162 og stålrøret 163. Inversjonen blir stoppet når nesen av inverteringsforingen er omtrent en diameter forbi enden av sampel støpningen 162. As shown in Figures 14(a) and 14(b), there is a PVC or rigid pipe sample casting of metal with an outlet pipe assembly 161 with a casting 162 and steel pipe 163 in the far downcomer hole adapted to receive an inversion pipe. As the nose of the inversion reaches the far entry hole, the inversion is lowered to allow the casing to reach the sample casting 162 and the steel tube 163. The inversion is stopped when the nose of the inversion casing is approximately one diameter past the end of the sample casting 162.

Tilbakeholdingsrepet blir løsnet og den inverterte foring blir portert ved å sette inn et stålporteringsrør 164 med en gjennomtregningsspiss 166 i den nedre enden og ventil 167 i den øvre ende. En flens eller o-ring 168 tilveiebringer en spiss på porteringsrøret 164 for å hindre at røret 164 gjennomtrenger den andre siden av foringen. The restraining rope is released and the inverted liner is ported by inserting a steel porting tube 164 with a penetration tip 166 at the lower end and valve 167 at the upper end. A flange or o-ring 168 provides a tip on the porting tube 164 to prevent the tube 164 from penetrating the other side of the liner.

En operatør som er ansvarlig for portering, varsler inverteringseden at vedkommende er forberedt for å portere den inverterte foring, slik at lufttilførselen kan justeres for å opprettholde trykket over den inverterte foring etter at den har blitt portert. An operator responsible for porting notifies the inverter that he is prepared to port the inverted liner so that the air supply can be adjusted to maintain pressure over the inverted liner after it has been ported.

Etter at foringen har blitt tilfredsstillende portert, blir porteringsrørventilen 167 lukket og en utløpsslange med en ventil i den bortre ende blir festet til porteringsrørventilen 167. Kontrollen med utløpet blir nå utført i den bortre enden av utløpsslangen. After the casing has been satisfactorily ported, the porting pipe valve 167 is closed and an outlet hose with a valve at the far end is attached to the porting pipe valve 167. The control of the outlet is now carried out at the far end of the outlet hose.

Ved fullføringen av inversjonen, blir kontrollen av utløpet nå gjort i den bortre ende av utløpsslangen. Utløpsventilen og luftinnløpsregulatoren blir justert etter behov for å opprettholde god strøm og anbefalt oppvarming og herdetrykk. Utløps- og kondensatporter er installert som vist på figur 1 l(a) til 1 l(h). Upon completion of the inversion, control of the outlet is now done at the far end of the outlet hose. The outlet valve and air inlet regulator are adjusted as needed to maintain good flow and recommended heating and curing pressure. Outlet and condensate ports are installed as shown in Figure 1 l(a) to 1 l(h).

Varmekjelutgangen blir lukket og damptilførselsslangen blir festet til luftdamp manifolden. Oppvarming blir nå startet. Innerflatetemperaturen ved posisjonen kl 6, i det bortre innstigningshull, blir overvåket. Den oppvarmede dampluftblanding bør være omtrent 180°F og fortsette inntil det blir en 3°F økning ved grensesnittet i det bortre innstigningshull. Etter at oppvarmingen er fullført, blir mengden av luft i luft/damp blandingen langsomt redusert til null og full dampstrøm blir opprettholdt ved 225 til 240°F ved det anbefalte herdetrykk. Full dampherding fortsetter i mellom 1 til 4 timer etter behov, avhengig av foringens lengde og tykkelse samt omgivelsesmiljøet. The boiler outlet is closed and the steam supply hose is attached to the air steam manifold. Heating is now started. The inner surface temperature at the 6 o'clock position, in the far entry hole, is monitored. The heated steam-air mixture should be approximately 180°F and continue until there is a 3°F rise at the far entry hole interface. After heating is complete, the amount of air in the air/steam mixture is slowly reduced to zero and full steam flow is maintained at 225 to 240°F at the recommended curing pressure. Full steam curing continues for between 1 to 4 hours as required, depending on liner length and thickness as well as the surrounding environment.

Etter at herdesyklusen er fullført, blir damp langsomt stengt av og luft blir samtidig lagt til for å opprettholde det anbefalte herdetrykk. Foringen blir deretter kjølt ned i minst 15 minutter eller inntil grensesnitt temperaturen er 130°C i den bortre ende, dvs ved det lengste av de to. After the curing cycle is complete, steam is slowly shut off and air is simultaneously added to maintain the recommended curing pressure. The liner is then cooled for at least 15 minutes or until the interface temperature is 130°C at the far end, i.e. at the longer of the two.

Damptilførsel blir så stengt av ved kjelen. Når kjelens tilførselsslangetrykk når null, blir damptilførselsslangen frakoplet. Når nedkjølingen er fullført, blir luftkompressoren stengt og trykket i luftslangen blir frigjort og lufttilførselsslangen blir frakoplet. Steam supply is then shut off at the boiler. When the boiler supply hose pressure reaches zero, the steam supply hose is disconnected. When the cooldown is complete, the air compressor is shut down and the pressure in the air hose is released and the air supply hose is disconnected.

På dette punkt blir endene fjernet fra det forede rør og tjenestene blir gjeninstallert ved å bruke standard prosedyrer. At this point, the ends are removed from the lined pipe and the services are reinstalled using standard procedures.

Den fleksible foring som blir herdet på stedet, er av kjent type. Den blir formet av minst et lag av fleksibelt resin ugjennomtrengelig materiale, for eksempel et filtlag med et ytre, ugjennomtrengelig polymer filmlag. Filtlaget og filmlaget blir sømmet sammen langs en linje for å danne en rørforing. En kompatibel termoplastfilm i form av en tape eller ekstrudert materiale blir plassert på eller ekstrudert over sømlinjen for å sikre foringens ugjennomtrengelighet. The flexible lining which is cured on site is of a known type. It is formed from at least one layer of flexible resin impermeable material, for example a felt layer with an outer impermeable polymer film layer. The felt layer and the film layer are stitched together along a line to form a pipe liner. A compatible thermoplastic film in the form of a tape or extruded material is placed on or extruded over the seam line to ensure liner impermeability.

For foringer med større diametre, kan flere lag av filt brukes. Filtlagene kan være av naturlig eller syntetisk fleksibel resinabsorberbare materialer, for eksempel polyester-eller akrylfibre. Den ugjennomtrengelige film ytterst, kan være en passende polyolefin, for eksempel polypropylen eller en annen kvalitetspolymer som kan motstå damp-temperatur, som kjent i faget. I det innledende trinn, i alle grøftløse rehabiliterings-installasjoner, blir den eksisterende rørledning forberedt ved rensing og videokontroll. For linings with larger diameters, several layers of felt can be used. The felt layers can be made of natural or synthetically flexible resin-absorbable materials, for example polyester or acrylic fibres. The outermost impermeable film may be a suitable polyolefin, for example polypropylene or another quality polymer which can withstand steam temperature, as known in the art. In the initial step, in all trenchless rehabilitation installations, the existing pipeline is prepared by cleaning and video inspection.

Før installasjonen begynner ifølge oppfinnelsens fremgangsmåte, blir et termoherdende resin impregnert i filten i en foring av en prosess som kalles "utfukting". Utfuktingen innebærer generelt injisering av resin inn i filtlaget gjennom enden eller en åpning anordnet i det ugjennomtrengelige filmlag og suget ut et vakuum og føre den impregnerte foring gjennom nipruller som kjent i faget. En slik fremgangsmåte for vakuumimpregnering, er beskrevet Insituform US patent nr 4,366,012. En lang rekke resiner kan brukes, for eksempel polyester, vinylestere, epoksyresiner og liknende som kan modifiseres etter behov. Det er videre ønskelig å bruke et resin som er relativt stabilt ved romtemperatur, men som herder lett under oppvarming. Before installation begins according to the method of the invention, a thermosetting resin is impregnated into the felt in a lining by a process called "wetting". The dewetting generally involves injecting resin into the felt layer through the end or an opening arranged in the impermeable film layer and sucking out a vacuum and passing the impregnated liner through nip rollers as known in the art. Such a method for vacuum impregnation is described in Insituform US patent no. 4,366,012. A wide range of resins can be used, for example polyester, vinyl esters, epoxy resins and the like which can be modified as required. It is also desirable to use a resin which is relatively stable at room temperature, but which hardens easily when heated.

Luftinversjonen og dampherde installasjonen av foringer av rør som herdes på stedet (CIPP), på måten beskrevet heri, er kostnadseffektiv og en effektiv fremgangsmåte for å installere og herde foringer med middels til stor diameter (18" - 84"). Bruk av damp for å herde uten å tømme foringen, krever prosedyrer som skiller seg meget fra de mer typiske varmtvanns herdinger av ClPP-foringer med samme diameter. Bruken av damp herding for CIPP-foringer med middels og stor diameter krever også en annen teknologi som brukes for dampherding av mindre ClPP-foringer med diameter (6" - 15"). The air inversion and steam cure installation of cured-in-place pipe (CIPP) liners, as described herein, is a cost-effective and efficient method for installing and curing medium to large diameter (18" - 84") liners. Using steam to cure without draining the liner requires procedures that differ greatly from the more typical hot water cures of ClPP liners of the same diameter. The use of steam curing for medium and large diameter CIPP liners also requires a different technology to that used for steam curing smaller diameter ClPP liners (6" - 15").

Bruk riktig, er damp en mer miljøvennlig herdemetode enn vann ved at den bruker bare omtrent 5 % av vann og mellom omtrent 15 til 30 % av energien som brukes i en varmtvanns herding. Tidligere forsøk med å utvide bruken av dampherding av ClPP-foringer til diametre på 18" og over har ofte ført til en ufullstendig herding av den nedre del av den installerte ClPP-foring. Forsøk på å løse dette herdeproblemet på ved å bruke større mengder vann og/eller damp og luft, har bare vist seg å være delvis vellykket. I tillegg vil innføring av større mengder damp kunne føre til en forlenget herdesyklus tid og øket energibruk. Selv med en forlenget herdesyklus og mer energi, er det vanskelig å oppnå en effektiv herding under enkelte feltforhold. Det er antatt at dette kan skyldes en termisk stratifisering og nærvær av kondenseringsområder som samler seg i de nedre deler av røret og den herdete foring. Det oppsamlede kondensat isolerer og hindrer varmeoverføring til resinlaminatet fra dampteppet ovenfor. Used correctly, steam is a more environmentally friendly curing method than water in that it uses only about 5% of water and between about 15 to 30% of the energy used in a hot water cure. Previous attempts to extend the use of steam curing of ClPP liners to diameters of 18" and above have often resulted in incomplete curing of the lower portion of the installed ClPP liner. Attempts to solve this curing problem by using larger amounts of water and/or steam and air, have only been partially successful. In addition, the introduction of larger amounts of steam could lead to a longer curing cycle time and increased energy use. Even with a longer curing cycle and more energy, it is difficult to achieve a effective curing under some field conditions. It is believed that this may be due to thermal stratification and the presence of areas of condensation that collect in the lower parts of the pipe and the cured liner. The collected condensate insulates and prevents heat transfer to the resin laminate from the vapor blanket above.

Varmtvannsherding av middels til store ClPP-foringer krever typisk mellom omtrent 1500 til 2500 BTU per pund av resin som herdes. På en annen side krever mindre dampherdete foringer (6" - 12") omtrent 700 til 100 BTU per pund resin som herdes. Hot water curing of medium to large ClPP liners typically requires between approximately 1500 to 2500 BTUs per pound of resin being cured. On the other hand, smaller steam cured liners (6" - 12") require about 700 to 100 BTUs per pound of resin being cured.

De beskrevne fremgangsmåter oppnår vedvarende ClPP-herding mellom omtrent 300 til 500 BTU per pund resin, selv i områder med oppsamlet kondensat i bunnen av CIPP-foringen. Dette er mulig på grunn av bruk av en dampinjeksjonsmetode som regulerer dampinjeksjons stedene for å eliminere termisk stratifisering og negativ virkning på herdingen av oppsamlet kondensat. Fremgangsmåten regulerer også mengden og plasseringen av dampinjeksjonen langsetter ClPP-foringen for å maksimere varme-overføringen fra hvert pund av damp til resinfiltlamintat før den tømmes fra den bortre ende av ClPP-foringen som kondensat eller vanndamp. The described methods achieve sustained ClPP curing between approximately 300 to 500 BTU per pound of resin, even in areas of accumulated condensate at the bottom of the CIPP liner. This is possible due to the use of a steam injection method that regulates the steam injection locations to eliminate thermal stratification and negative effect on the hardening of collected condensate. The process also regulates the amount and location of steam injection along the ClPP liner to maximize the heat transfer from each pound of steam to the resin felt laminate before it is discharged from the far end of the ClPP liner as condensate or steam.

Som beskrevet her blir damp injisert i en lukket slange som ligger i inverteringen av den ekspanderte ClPP-foring. En eller flere uavhengige utløpsporter med en regulerings-ventil er tilveiebrakt for å regulere utløpet av vanndamp og kondensat fra den distale ende av ClPP-foringen. Slangen inneholder et antall åpninger av passende størrelse og avstand, tykkelse og lengde av installasjonen langs hele lengden av slangen. Plasseringen av åpningen rundt slageperiferien er konstruert slik at et antall åpninger langs etter slangen, uansett langens retning under plasseringen i ClPP-foringen, vil føres mot bunnen av ClPP-foringen. Dette frembringer en kontinuerlig injeksjon av damp inn i ethvert oppsamlet kondensat gjennom herdesyklusen. Dampen som injiseres inn i kondensatet varmer kondensatet over temperaturen som er nødvendig for å sikre herdingen. As described here, steam is injected into a closed tube located in the inversion of the expanded ClPP liner. One or more independent discharge ports with a control valve are provided to regulate the discharge of water vapor and condensate from the distal end of the ClPP liner. The hose contains a number of openings of suitable size and spacing, thickness and length of the installation along the entire length of the hose. The location of the opening around the stroke periphery is designed so that a number of openings along the length of the hose, regardless of the direction of the length under the location in the ClPP liner, will be directed towards the bottom of the ClPP liner. This produces a continuous injection of steam into any collected condensate throughout the curing cycle. The steam injected into the condensate heats the condensate above the temperature necessary to ensure curing.

Den lukkede ende på dampinjeksjonsslangen fører til at det innvendige trykk i injeksjonsslangen blir høyere enn det innvendige herdetrykk i ClPP-foringen. Ettersom den injiserte damp beveger seg gjennom lengden av slangen blir den tvunget ut gjennom åpninger og danner et dampteppe i ClPP-foringen. Forskjellen mellom det innvendige trykk i dampinjeksjonsslangen og ClPP-trykket avtar når dampen beveger seg vekk fra injeksjonsenden av dampinjeksjonsslangen. Følgelig avtar mengden damp som injiseres fra hver åpning langs etter dampinjeksjonsslangen. The closed end of the steam injection hose causes the internal pressure in the injection hose to be higher than the internal curing pressure in the ClPP liner. As the injected steam moves through the length of the tubing, it is forced out through openings and forms a steam blanket in the ClPP liner. The difference between the internal pressure in the steam injection hose and the ClPP pressure decreases as the steam moves away from the injection end of the steam injection hose. Consequently, the amount of steam injected from each orifice decreases along the steam injection tube.

Dette fører til tre ting: This leads to three things:

1. Økning i oppholdstiden der det meste av dampen blir tilgjengelig i ClPP-foringen for å maksimere energioverføringen til resinfilt laminatet. 2. Legge kontinuerlig energi til dampteppet når det beveger seg mot utløps-enden av ClPP-foringen og holder energioverføringsraten høyere. 3. Dampinjeksjon i dampteppet forårsaket også turbulens som eliminerer termisk stratifisering og øker energioverføringen. 1. Increase in residence time where most of the steam becomes available in the ClPP liner to maximize energy transfer to the resin felt laminate. 2. Add continuous energy to the vapor blanket as it moves towards the outlet end of the ClPP liner and keep the energy transfer rate higher. 3. Steam injection into the steam blanket also caused turbulence which eliminates thermal stratification and increases energy transfer.

Kjennskap til de fysiske egenskapene av ClPP-foringen (diameter, lengde, tykkelse, resin- og katalysatorsystem) og tilgjengelige kjelekapasitet i BUT per time, gjør det mulig å justere åpningsstørrelsen for å passe til kjelens kapasitet i pund damp per time med anbefalt herdesyklustid. Knowing the physical characteristics of the ClPP liner (diameter, length, thickness, resin and catalyst system) and available boiler capacity in BUT per hour allows the orifice size to be adjusted to match the boiler capacity in pounds of steam per hour with the recommended curing cycle time.

Det vil fremgå at fremgangsmåten ifølge oppfinnelsen gjør det mulig å dra fordel av herdingen av en resinforing med strøm gjennom damp. Ved å praktisere fremgangsmåten kan et rørelement lett inverteres gjennom en eksisterende rørledning. Ved å tilveiebringe et apparat med to stive pakninger blir det mulig å installere en inverteringsforing med en tilbakeholdingsstropp og en liggende, flat slange. Bruk av mellomromsinnstillingsinnretninger for å opprettholde mellomrommet ved den andre pakning, gjør det mulig å øke vregningstrykket til å fullføre profilen av foringen uten å øke pakningstrykket mot inverteringsforingen. Damp blir så ført inn i den inverterte foring for å utnytte den høyere energi som finnes i dampen som vesentlig forkorter herdesyklusen sammenliknet med varmtvannsherding. It will be seen that the method according to the invention makes it possible to take advantage of the curing of a resin lining with current through steam. By practicing the method, a pipe element can easily be inverted through an existing pipeline. By providing an apparatus with two rigid gaskets, it is possible to install an inversion liner with a restraint strap and a horizontal, flat hose. The use of gap adjustment devices to maintain the gap at the second packing allows the inverting pressure to be increased to complete the profile of the liner without increasing the packing pressure against the inverting liner. Steam is then introduced into the inverted liner to utilize the higher energy contained in the steam which significantly shortens the curing cycle compared to hot water curing.

Claims (26)

1. Fremgangsmåte for å invertere en resinimpregnert herdet foring (101) på stedet i et eksisterende ledningsrør med et installasjonsapparat (11) med en åpning (13) og en første pakning (16) og en andre pakning (21) nedstrøms og i avstand fra den første pakning og nedstrøms av åpningen,karakterisert ved: feste den fremre ende av foringen (101) til apparatets åpning (13) oppstrøms av den første pakning (16), invertere foringen gjennom apparatet forbi minst en pakning, installere en fluidinnløpsport (108) i den inverterte del av foringen (102a, 102b) nedstrøms av minst en pakning, installere en andre fluidinnløpsport (106) i den inverterte foring anbrakt nedstrøms av den andre pakning (21) med den første innløpsport (108) anbrakt mellom apparatets to pakninger (16, 21), stenge en av pakningene (16, 21) med fluidinnløpsporten på nedstrømssiden derav, innføre et trykkinversjonsfluid i den inverterte del av foringen gjennom fluidinnløpsporten, og la foringen invertere som svar på fluidet som innføres gjennom fluidinnløpsorten.1. Method for inverting a resin-impregnated cured liner (101) in situ in an existing conduit with an installation apparatus (11) having an opening (13) and a first gasket (16) and a second gasket (21) downstream and spaced from the first gasket and downstream of the opening, characterized by: attaching the forward end of the liner (101) to the apparatus opening (13) upstream of the first gasket (16), inverting the liner through the apparatus past at least one gasket, installing a fluid inlet port (108) in the inverted part of the liner (102a, 102b) downstream of at least one gasket, install a second fluid inlet port (106) in the inverted liner located downstream of the second gasket (21) with the first inlet port (108) located between the apparatus's two gaskets (16, 21), close one of the packings (16, 21) with the fluid inlet port on the downstream side thereof, introduce a pressure inversion fluid into the inverted portion of the liner through the fluid inlet port, and allow the liner to invert in response to the fluid entering is introduced through the fluid inlet. 2. Fremgangsmåte ifølge krav 1,karakterisert vedat innløpsporten (108, 106) installeres før foringen festes til apparatet.2. Method according to claim 1, characterized in that the inlet port (108, 106) is installed before the liner is attached to the device. 3. Fremgangsmåte ifølge krav 1,karakterisert vedaten del av foringen (102a, 102b) plassert i apparatet blir invertert før den festes til og plasseres i apparatet.3. Method according to claim 1, characterized by the fact that part of the liner (102a, 102b) placed in the device is inverted before it is attached to and placed in the device. 4. Fremgangsmåte ifølge krav 1, ytterligerekarakterisertved: lukke den andre pakning (21) for å gripe og tette den inverterte del av foringen (102a, 102b), innføre herdefluid i den andre porten (108) i foringen for å herde resinet, og kjøle den herdete foring.4. Method according to claim 1, further characterized by: closing the second seal (21) to grip and seal the inverted part of the liner (102a, 102b), introducing curing fluid into the second port (108) in the liner to cure the resin, and cooling the cured guidance. 5. Fremgangsmåte ifølge krav 4,karakterisert vedat den omfatter: feste en tilbakeholdingsstropp (111) til enden av inverteringsforingen og, når starten av tilbakeholdingsstroppen befinner seg mellom pakningene (16, 21), lukke den første pakning (16) og åpne den andre pakning (21) for at stroppen (111) kan føres derigjennom, og ved fullføring av inversjonen, innføre herdefluid i en av innløpsportene (106, 108).5. Method according to claim 4, characterized in that it comprises: attaching a retaining strap (111) to the end of the inverting liner and, when the start of the retaining strap is located between the gaskets (16, 21), closing the first gasket (16) and opening the second gasket (21) ) so that the strap (111) can be passed through, and upon completion of the inversion, introduce curing fluid into one of the inlet ports (106, 108). 6. Fremgangsmåte ifølge krav 5, ytterligerekarakterisertved å feste en liggende flat slange (112) til den distale ende av foringen med tilbakeholdingsstroppen (111).6. Method according to claim 5, further characterized by attaching a lying flat tube (112) to the distal end of the liner with the restraint strap (111). 7. Fremgangsmåte ifølge krav 6,karakterisert vedat den liggende, flate slange (112) er lukket i den distale ende festet til foringen.7. Method according to claim 6, characterized in that the lying, flat hose (112) is closed at the distal end attached to the liner. 8. Fremgangsmåte ifølge krav 6, ytterligerekarakterisertved å feste den liggende, flate slangen til den første innløpsport (108), lukke den første pakning (16) og åpne den andre pakning (21) og fortsette inversjonen inntil den liggende, flate slange (112) hviler på bunnen av foringen.8. Method according to claim 6, further characterized by attaching the horizontal flat hose to the first inlet port (108), closing the first gasket (16) and opening the second gasket (21) and continuing the inversion until the horizontal flat hose (112) rests on the bottom of the lining. 9. Fremgangsmåte ifølge krav 8,karakterisert vedat å feste den liggende, flate slange til innløpsporten omfatter trinnene: skjære den liggende, flate slange (112) oppstrøms av den første pakning (16), feste en ende av et kne (113) til den avskårne ende av den liggende, flate slange (12), og feste den andre ende av kneet (113) til den første innløpsporten (108).9. Method according to claim 8, characterized in that attaching the horizontal flat hose to the inlet port comprises the steps: cutting the horizontal flat hose (112) upstream of the first gasket (16), attaching one end of a knee (113) to the cut end of the horizontal, flat hose (12), and attach the other end of the elbow (113) to the first inlet port (108). 10. Fremgangsmåte ifølge krav 8,karakterisert vedat å feste den liggende, flate slange til innløpsporten omfatter trinnene: skjære den liggende, flate slange (112) oppstrøms av den første pakning, mate den avskårne ende av den liggende, flate slange (112) gjennom den første innløpsporten (108), sette inn en bøybar, rørformet og stiv hylse med en utvidet ende inn i den avskårne ende av den liggende, flate slange, bøye den liggende, flate slange (112) til rørdelen av hylsen, og sette inn den liggende, flate slange (112) og rørdelen av hylsen i innløpsporten (108), der enden av den liggende, flate slange (112) blir grepet mellom den utvidete del av hylsen og innløpsporten (108) og den liggende, flate slangen (112) blir hindret i å knekke når hylsen danner en gradvis bøyning mot den andre pakning (21).10. Method according to claim 8, characterized in that attaching the lying flat tube to the inlet port comprises the steps of: cutting the lying flat tube (112) upstream of the first gasket, feeding the cut end of the lying flat tube (112) through the first inlet port (108), insert a flexible, tubular, rigid sleeve with an extended end into the cut end of the horizontal flat tubing, bend the horizontal flat tubing (112) to the tube portion of the sleeve, and insert the horizontal, flat hose (112) and the pipe part of the sleeve in the inlet port (108), where the end of the horizontal flat hose (112) is caught between the extended part of the sleeve and the inlet port (108) and the horizontal flat hose (112) is obstructed in breaking when the sleeve forms a gradual bend towards the second gasket (21). 11. Fremgangsmåte ifølge krav 6,karakterisert vedat den liggende, flate slange (112) er perforert langs dens lengde for å fordele herdende fluid langs etter det indre av den inverterte foring.11. Method according to claim 6, characterized in that the lying, flat hose (112) is perforated along its length to distribute hardening fluid along the interior of the inverted liner. 12. Fremgangsmåte ifølge krav 6,karakterisert vedtrinnene med å stenge den første pakning (16) etter at den liggende, flate slange (112) og tilbakeholdingsbånd (111) forbindelsen føres derigjennom og åpne den andre pakning (21) for at forbindelsen kan passere og fortsette å invertere foringen.12. Method according to claim 6, characterized by the steps of closing the first seal (16) after the horizontal, flat hose (112) and restraint band (111) connection is passed through it and opening the second seal (21) so that the connection can pass and continue to invert the liner. 13. Fremgangsmåte ifølge krav 1,karakterisert vedtrinnet med å portere nedstrøms enden av den inverterte foring etter at inversjonen er fullført uten at den inverterte foring tømmes.13. Method according to claim 1, characterized by the step of porting the downstream end of the inverted liner after the inversion is completed without emptying the inverted liner. 14. Fremgangsmåte ifølge krav 4,karakterisert vedat inversjonsfluidet er luft og at herdefluidet er damp.14. Method according to claim 4, characterized in that the inversion fluid is air and that the curing fluid is steam. 15. Luftinversjons- og dampherdeapparat (11) for installering av en resinimpregnert herdet rørforing (101) på stedet, med en stiv ramme (12) med en åpning (13) for å føre foringen (101) derigjennom og første og andre pakninger montert på rammen nedstrøms av åpningen,karakterisert vedmidler (17) for å sikre en invertert del av foringen ved åpningen, hver pakning (16, 21) har minst ett selektivt flyttbart stivt pakningselement (18, 23) for å justere mellomrommet til pakningen for å gripe den inverterte foringen som er ført derigjennom.15. Air inversion and steam curing apparatus (11) for installing a resin-impregnated cured pipe liner (101) on site, having a rigid frame (12) with an opening (13) for passing the liner (101) therethrough and first and second gaskets mounted on the frame downstream of the opening, characterized by means (17) for securing an inverted part of the lining at the opening, each packing (16, 21) has at least one selectively movable rigid packing member (18, 23) for adjusting the gap of the packing to engage the inverted liner passed therethrough. 16. Apparat ifølge krav 15, ytterligerekarakterisert vedmotorer (19, 24) koblet til de flyttbare elementer for å justere mellomrommet mellom pakningselementene.16. Apparatus according to claim 15, further characterized by motors (19, 24) connected to the movable elements to adjust the space between the packing elements. 17. Apparat ifølge krav 15,karakterisert vedat minst en motor (19, 24) er montert på rammen (12) og koplet til de bevegelige pakningselementer (18, 23).17. Apparatus according to claim 15, characterized in that at least one motor (19, 24) is mounted on the frame (12) and connected to the movable packing elements (18, 23). 18. Apparat ifølge krav 16,karakterisert vedat det ytterligere omfatter en motor (19, 24) montert på rammen (12) i enden av hvert forflyttbart pakningselement (16, 21).18. Apparatus according to claim 16, characterized in that it further comprises a motor (19, 24) mounted on the frame (12) at the end of each movable packing element (16, 21). 19. Apparat ifølge krav 16,karakterisert vedat motorene (19, 24) er pneumatiske sylindere montert på den stive ramme (12).19. Apparatus according to claim 16, characterized in that the motors (19, 24) are pneumatic cylinders mounted on the rigid frame (12). 20. Apparat ifølge krav 15,karakterisert vedat de bevegelige pakningselementer (18, 23) blir forflyttet på lineære føringslagre montert til rammen.20. Apparatus according to claim 15, characterized in that the movable packing elements (18, 23) are moved on linear guide bearings mounted to the frame. 21. Apparat ifølge krav 15,karakterisert vedat mellomrommet mellom pakningselementene (18, 23) av den andre pakning (21) er fast ved et minimum ved hjelp av en mellomromsjusteringsanordning for å begrense forflytningen av de bevegelige elementer (18, 23).21. Apparatus according to claim 15, characterized in that the space between the packing elements (18, 23) of the second packing (21) is fixed at a minimum by means of a space adjustment device to limit the movement of the movable elements (18, 23). 22. Apparat ifølge krav 21,karakterisert vedat mellomromsjusteringsanordningen er minst et avstandsstykke av en ønsket størrelse for plassering på føringslagrene (21a) mellom pakningselementene (22, 23).22. Apparatus according to claim 21, characterized in that the space adjustment device is at least a spacer of a desired size for placement on the guide bearings (21a) between the packing elements (22, 23). 23. Apparat ifølge krav 21,karakterisert vedat mellomromsjusteringsanordningen er en justeringsbolt som kan justeres for å begrense forflytningen av det forflyttbare pakningselementet (23).23. Apparatus according to claim 21, characterized in that the space adjustment device is an adjustment bolt which can be adjusted to limit the movement of the movable packing element (23). 24. Apparat ifølge krav 15, ytterligerekarakterisert vedflere kroker (14) anordnet på rammen (12) oppstrøms av den første pakning for montering av foringen (101) som skal inverteres.24. Apparatus according to claim 15, further characterized by several hooks (14) arranged on the frame (12) upstream of the first gasket for mounting the liner (101) to be inverted. 25. Apparat ifølge krav 15,karakterisert vedat pakningselementene (17, 18, 22, 23) er stive metallstenger.25. Apparatus according to claim 15, characterized in that the packing elements (17, 18, 22, 23) are rigid metal rods. 26. Apparat ifølge krav 15,karakterisert vedat pakningselementene (17, 18, 22, 23) er metallrør.26. Apparatus according to claim 15, characterized in that the packing elements (17, 18, 22, 23) are metal tubes.
NO20080825A 2005-08-17 2008-02-15 Double packing box air inversion and steam curing with onsite facilities NO339748B1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US70893405P 2005-08-17 2005-08-17
US11/504,909 US8066499B2 (en) 2005-08-17 2006-08-16 Dual gland air inversion and steam cure of cured in place liners
PCT/US2006/031927 WO2007022232A1 (en) 2005-08-17 2006-08-16 Dual gland air inversion and steam cure of cured in place liners

Publications (2)

Publication Number Publication Date
NO20080825L NO20080825L (en) 2008-05-16
NO339748B1 true NO339748B1 (en) 2017-01-30

Family

ID=37421048

Family Applications (1)

Application Number Title Priority Date Filing Date
NO20080825A NO339748B1 (en) 2005-08-17 2008-02-15 Double packing box air inversion and steam curing with onsite facilities

Country Status (19)

Country Link
US (2) US8066499B2 (en)
EP (1) EP1945991B1 (en)
JP (1) JP5185819B2 (en)
CN (1) CN101268301A (en)
AT (1) ATE528571T1 (en)
AU (1) AU2006279596B2 (en)
CA (1) CA2619729C (en)
DE (1) DE212006000051U1 (en)
DK (2) DK1945991T3 (en)
ES (1) ES2375376T3 (en)
HK (1) HK1119759A1 (en)
IL (1) IL189509A0 (en)
MX (1) MX2008002178A (en)
NO (1) NO339748B1 (en)
NZ (1) NZ565714A (en)
PL (3) PL1945991T3 (en)
RU (1) RU2388959C2 (en)
TW (2) TWI382922B (en)
WO (1) WO2007022232A1 (en)

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE212006000004U1 (en) * 2005-02-09 2007-04-12 Insituform Holdings Uk Ltd Outlet and / or condensate connection for on-site hardening inserts and devices
US7476348B2 (en) 2005-03-04 2009-01-13 High Bar, Llc Liner installation in pipes
US8256468B1 (en) 2008-03-10 2012-09-04 Timothy John Frew Methods and apparatus for lining a passageway
WO2011017403A1 (en) * 2009-08-04 2011-02-10 Zia Systems, Llc System and method for real-time tracking of objects
US8439605B2 (en) * 2010-03-09 2013-05-14 Michels Corporation Apparatus for everting a liner into a pipe and pressure connector for the same
US8608888B2 (en) * 2010-03-09 2013-12-17 Michels Corporation Method and apparatus for stretching a liner and everting the liner into a pipe
US8465690B1 (en) * 2010-07-01 2013-06-18 John Heisler Fluid inversion liner apparatus
US8807171B1 (en) 2011-01-31 2014-08-19 Jeffrey M. Tanner Method and system for lining pipes
KR101416417B1 (en) * 2013-04-12 2014-07-09 현대자동차 주식회사 Device for manufacturing fuel cell stack parts
DE102013212768A1 (en) * 2013-06-28 2014-12-31 Karl Otto Braun Gmbh & Co. Kg Pipe repair lining and process for removing liquids
WO2016026141A2 (en) 2014-08-22 2016-02-25 5Elem Material Scientific (Jiangsu) Co., Ltd Fracturing liquid delivery hose for recovery of shale oil and gas, and manufacturing method thereof
US9851041B2 (en) 2015-03-04 2017-12-26 Emagineered Solutions, Inc. Tubing everting apparatus, assemblies, and methods
US10139030B2 (en) * 2016-06-02 2018-11-27 Rush Sales Company, Inc. Cured-in-place pipe unit and rehabilitation
US10851933B2 (en) * 2017-04-06 2020-12-01 Subsurface, Inc. CIPP liner feed roller
CN107498858A (en) * 2017-09-19 2017-12-22 西安交通大学 A kind of fiber reinforced thermosetting resin based composites 3D printing method and device
US11173634B2 (en) 2018-02-01 2021-11-16 Ina Acquisition Corp Electromagnetic radiation curable pipe liner and method of making and installing the same
US10704728B2 (en) 2018-03-20 2020-07-07 Ina Acquisition Corp. Pipe liner and method of making same
US11254045B2 (en) 2019-08-26 2022-02-22 Jeffrey M. Tanner Method and system for lining pipes
US11598473B2 (en) * 2021-04-27 2023-03-07 Pipe Restoration Llc Inversion liner assist adapter
US11827484B1 (en) 2023-01-12 2023-11-28 Omega Liner Company, Inc. Cured-in-place-pipe (CIPP) end cap internal roller apparatus

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4685983A (en) * 1984-08-28 1987-08-11 Long Technologies, Inc. Method and apparatus for the installation of a liner within a conduit
WO1992014961A1 (en) * 1991-02-22 1992-09-03 Inpipe Sweden Ab A method and a device for feeding a flexible lining material
US5358359A (en) * 1993-04-30 1994-10-25 Insituform (Netherlands) B.V. Apparatus for everting a tube
US20030015247A1 (en) * 2001-07-17 2003-01-23 Driver Franklin Thomas Installation of cured in place liners with air and steam and installation apparatus

Family Cites Families (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1393480A (en) 1964-02-11 1965-03-26 Process and apparatus for the inner lining of tubes
GB2042673B (en) * 1978-12-29 1983-05-11 Tokyo Gas Co Ltd Method and apparatus for providing the inner surface of a pipe with a flexible tubular lining material through a liquid resin under pressure
US4385885A (en) * 1980-03-07 1983-05-31 Insituform International, Inc. Lining of passageways
US4366012A (en) 1981-02-05 1982-12-28 Insituform International Inc. Impregnation process
JPH0534916Y2 (en) * 1989-07-17 1993-09-03
US5223204A (en) * 1990-03-06 1993-06-29 Get, Inc. Method and apparatus for reversing a tubular bag
US5154936A (en) 1990-10-05 1992-10-13 Insituform Licensees B.V. Apparatus for everting a tube
JP2554436B2 (en) * 1993-03-12 1996-11-13 株式会社湘南合成樹脂製作所 Tube lining material inversion method
US5374174A (en) * 1993-05-17 1994-12-20 Insituform (Netherlands) B.V. Apparatus for/installing a liner within a service pipe or the like
GB9312190D0 (en) * 1993-06-12 1993-07-28 Insituform Technologies Limite Improvements relating to the lining of pipelines and passage-ways
US5597353A (en) * 1994-10-07 1997-01-28 Insituform (Netherlands) B.V. Compact apparatus for everting a liner and method
US5520484A (en) * 1995-02-03 1996-05-28 Shonan Gosei-Jushi Seisakusho K.K. Eversion nozzle, and a method for repairing an underground tubular conduit
US5736166A (en) 1996-06-11 1998-04-07 Insituform (Netherlands) B.V. Flow-through apparatus for lining of pipelines
US6138718A (en) * 1998-10-30 2000-10-31 Link-Pipe (H. K.), Ltd. Apparatus and method for repairing pressure pipes
US6390795B1 (en) * 2000-06-21 2002-05-21 Repipe Holdings, Inc. Apparatus for everting a tube
GB0025425D0 (en) * 2000-10-17 2000-11-29 Impreline Technologies Ltd Pipe lining apparatus
US6539979B1 (en) * 2001-08-10 2003-04-01 Insituform (Netherlands) B.V. Pressurized bladder canister for installation of cured in place pipe
US20040020544A1 (en) * 2002-04-05 2004-02-05 Takao Kamiyama Pressure bag and method of lining branch pipe
MX2007007912A (en) * 2004-12-27 2007-12-06 Proline Technologies N A Llc Method, apparatus and system for lining conduits.
US7476348B2 (en) * 2005-03-04 2009-01-13 High Bar, Llc Liner installation in pipes
MX2007013359A (en) * 2005-04-25 2008-01-21 Ina Acquisition Corp Air inversion and steam cure of cured in place liners apparatus and method.

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4685983A (en) * 1984-08-28 1987-08-11 Long Technologies, Inc. Method and apparatus for the installation of a liner within a conduit
WO1992014961A1 (en) * 1991-02-22 1992-09-03 Inpipe Sweden Ab A method and a device for feeding a flexible lining material
US5358359A (en) * 1993-04-30 1994-10-25 Insituform (Netherlands) B.V. Apparatus for everting a tube
US20030015247A1 (en) * 2001-07-17 2003-01-23 Driver Franklin Thomas Installation of cured in place liners with air and steam and installation apparatus

Also Published As

Publication number Publication date
NZ565714A (en) 2011-02-25
DK200700299U1 (en) 2008-05-23
PL65046Y1 (en) 2010-07-30
HK1119759A1 (en) 2009-03-13
EP1945991B1 (en) 2011-10-12
IL189509A0 (en) 2008-08-07
US8066499B2 (en) 2011-11-29
JP5185819B2 (en) 2013-04-17
DE212006000051U1 (en) 2008-04-10
NO20080825L (en) 2008-05-16
CA2619729C (en) 2014-04-29
RU2008110043A (en) 2009-09-27
ATE528571T1 (en) 2011-10-15
US8038913B2 (en) 2011-10-18
DK200700299U3 (en) 2008-09-12
TW201304938A (en) 2013-02-01
PL64747Y1 (en) 2009-12-31
WO2007022232A8 (en) 2008-05-02
EP1945991A1 (en) 2008-07-23
AU2006279596A1 (en) 2007-02-22
DK1945991T3 (en) 2011-12-12
PL1945991T3 (en) 2012-03-30
CA2619729A1 (en) 2007-02-22
JP2009504456A (en) 2009-02-05
CN101268301A (en) 2008-09-17
WO2007022232A1 (en) 2007-02-22
US20090165927A1 (en) 2009-07-02
AU2006279596B2 (en) 2013-05-16
TWI382922B (en) 2013-01-21
US20070114689A1 (en) 2007-05-24
ES2375376T3 (en) 2012-02-29
RU2388959C2 (en) 2010-05-10
MX2008002178A (en) 2008-04-22
TW200724362A (en) 2007-07-01

Similar Documents

Publication Publication Date Title
NO339748B1 (en) Double packing box air inversion and steam curing with onsite facilities
KR101188048B1 (en) Installation of cured in place liners with air and flow-through steam to cure
US6708728B2 (en) Installation of cured in place liners with air and steam and installation apparatus
EP1886059B1 (en) Air inversion and steam cure of cured in place liners apparatus and method
US7866968B2 (en) Reusable inversion sleeve assembly for inversion of cured in place liners
CA2836627C (en) Dual gland air inversion and steam cure of cured in place liners
RU2439420C2 (en) Device for air inverting and steam curing of tube insert cured at worksite