KR20220094841A - Middle connecting structure of steel pilar and construction method thereof - Google Patents

Middle connecting structure of steel pilar and construction method thereof Download PDF

Info

Publication number
KR20220094841A
KR20220094841A KR1020200186481A KR20200186481A KR20220094841A KR 20220094841 A KR20220094841 A KR 20220094841A KR 1020200186481 A KR1020200186481 A KR 1020200186481A KR 20200186481 A KR20200186481 A KR 20200186481A KR 20220094841 A KR20220094841 A KR 20220094841A
Authority
KR
South Korea
Prior art keywords
steel
connecting member
steel column
horizontal
disposed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
KR1020200186481A
Other languages
Korean (ko)
Inventor
양숙경
Original Assignee
양숙경
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 양숙경 filed Critical 양숙경
Priority to KR1020200186481A priority Critical patent/KR20220094841A/en
Publication of KR20220094841A publication Critical patent/KR20220094841A/en
Ceased legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/32Columns; Pillars; Struts of metal
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

본 발명은 지하층의 철골을 구성하는 복수의 H빔으로 구성되는 강재 기둥과, 지상층의 철골을 구성하는 복수의 H빔으로 구성되는 강재 기둥을 상호 연결하는 강재기둥 중간 연결구조로서, 상기 지하층에 배치된 상기 강재 기둥의 상측 복수의 개소에 각각 배치되어 가로 방향과 세로 방향으로 배치된 복수의 강재 기둥과 연결될 수 있도록 "+"자 형상으로 배치되며 일체로 형성된 복수의 수평방향 브라켓과, 상기 수평방향 브라켓의 상면 중앙에서 일정 높이 돌출되는 연결부재의 단부에 구비되며 평탄한 상면을 구비한 제1접합부재로 이루어지는 제1중간 연결재와; 상기 지상층에 배치된 상기 강재 기둥의 하측 복수의 개소에 각각 배치되어 세로 방향으로 배치된 복수의 강재 기둥과 연결되며, 상기 제1중간 연결재의 상기 제1접합부재의 상면에 안착되어 체결되도록 평탄한 하면을 구비한 제2접합부재로 구성되는 제2중간 연결재를; 포함함으로써, 현장 용접 작업이 없이도 신속한 볼트조립으로 지하층과 지상층의 강재기둥을 상호 연결할 수 있도록 함으로써 시공 시간을 단축시킬 수 있도록 함과 아울러 정밀 시공이 가능하도록 하고, 현장 용접 작업이 이루어지지 않도록 하여 부식을 방지하고 화재 사고나 산재 사고가 감소되도록 함으로써 인명 피해를 줄여 사회적인 안전 비용을 절감시킬 수 있다. The present invention is a steel column intermediate connection structure that interconnects a steel column composed of a plurality of H-beams constituting the steel frame of the basement floor and a steel column composed of a plurality of H-beams constituting the steel frame of the ground floor, and is disposed in the basement floor A plurality of horizontal brackets arranged in a "+" shape and integrally formed to be connected to a plurality of steel columns arranged in the horizontal and vertical directions respectively disposed at a plurality of locations above the steel column, the horizontal direction a first intermediate connecting member provided at an end of the connecting member protruding at a predetermined height from the center of the upper surface of the bracket and comprising a first connecting member having a flat upper surface; A flat surface so as to be seated and fastened on the upper surface of the first connecting member of the first intermediate connecting member, each of which is disposed at a plurality of points below the steel column disposed on the ground floor and connected to a plurality of steel columns arranged in the vertical direction a second intermediate connecting member composed of a second connecting member having; By including, the construction time can be shortened by enabling rapid bolt assembly without on-site welding, and the steel columns of the basement and above-ground floors can be interconnected. It is possible to reduce the cost of social safety by reducing human casualties by preventing fire and industrial accidents.

Description

강재기둥 중간 연결구조 및 그 시공방법{MIDDLE CONNECTING STRUCTURE OF STEEL PILAR AND CONSTRUCTION METHOD THEREOF}Steel column intermediate connection structure and its construction method

본 발명은 토목 및 건축 기술분야에 관한 것으로서, 상세하게는, 지중 구조물의 강재기둥 중간 연결구조에 관한 것이다.The present invention relates to the field of civil engineering and construction technology, and more particularly, to a steel column intermediate connection structure of an underground structure.

종래의 지중 구조물의 시공방법은 크게 순타(順打)공법과 역타(逆打)공법으로 나누어 볼 수 있다.The conventional construction method of underground structures can be broadly divided into a forward (順打) method and a reverse (逆打) method.

순타공법은 보편적으로 적용되는 공법으로서, 지상으로부터 흙막이 벽체를 지지하는 버팀대, 앵커, 락볼트, 네일링, 레이커, 텐션 빔 등의 가설 지지수단에 의해 흙막이 벽체를 설치하면서 기초계획고까지 굴착한 후, 기초 구조물을 타설하고 최하단 흙막이 벽체 지지대를 철거하며 순차적으로 벽체 타설, 흙막이 벽체 지지대인 가시설철거를 반복적으로 수행하는 공법을 말한다.The straight punching method is a universally applied construction method. After excavating to the basic plan height while installing the retaining wall using temporary support means such as braces, anchors, rock bolts, nailing, rakers, and tension beams that support the retaining wall from the ground. , It refers to a construction method in which the foundation structure is poured, the lowermost retaining wall support is removed, and the wall is sequentially poured and the temporary facility demolition, which is the retaining wall support, is repeatedly performed.

역타공법은 탑다운(Top-Down) 방식의 공법으로서, 흙막이 벽체와 이를 지지하는 버팀대, 앵커, 락볼트, 네일링, 레이커, 텐션 빔 등 가설 지지수단을 설치하면서 굴착과 동시에 본 구조물 공사를 위에서 아래로 또는 아래에서 위로 구축하는 방식을 말한다.The reverse drilling method is a top-down method, and the construction of this structure is carried out from above while excavating while installing temporary support means such as retaining walls, braces, anchors, rock bolts, nailing, rakers, and tension beams. How to build from the bottom up or from the bottom up.

이는, 철근 콘크리트 구조 또는 철골철근 콘크리트 구조로서 CIP, SCW, H-형강, 지중연속벽(Slurry Wall) 등에 의한 흙막이 가시설이 필요하다.As a reinforced concrete structure or a steel-framed reinforced concrete structure, temporary retaining facilities such as CIP, SCW, H-beam, and slurry walls are required.

이러한 종래의 순타공법 및 역타공법은 모두 가시설의 설치 및 해체를 전제로 하는 것이므로, 흙막이 벽체에 미치는 횡토압에 저항하기 위하여 버팀대를 단계별로 설치하여야 하고, 구조물 완료 후 다시 철거하여야 하는 불편함이 있다.Since both of these conventional forward and reverse drilling methods presuppose the installation and dismantling of temporary facilities, braces must be installed step-by-step to resist the transverse earth pressure exerted on the retaining wall, and it is inconvenient to have to dismantle it again after completing the structure. .

이러한 불편한 문제점을 해결하기 위하여 철골 강재를 활용하여 가시설이 없는 시공이 이루어지고 있으나, 지상과 지하가 연결된 강재기둥은 현장 조립후 지하굴착이 어렵고, 통상적으로 지하 구조물 시공후 지상 구조물은 크레인으로 들어올려 현장 용접으로 연결하여 긴 기둥의 운반이나 연결 문제를 해결하고 있다. In order to solve this inconvenient problem, construction without temporary facilities is made using steel frame materials, but it is difficult to excavate underground after assembling on-site for steel columns that are connected to the ground and underground. It is connected by on-site welding to solve the transport and connection problems of long columns.

그러나, 최근 공사 현장에서 용접 작업중의 실수로 인하여 화재 등으로 인명 피해가 발생되는 빈도가 늘어남에 따라 현장 용접 작업없이 지상과 지하 구조물을 연결할 수 있는 시공 방법이 필요한 실정이다. However, in recent years, as the frequency of casualties caused by fires and the like due to mistakes during welding at a construction site increases, there is a need for a construction method that can connect the above-ground and underground structures without on-site welding work.

본 발명은 상기와 같은 문제점을 해결하기 위하여 도출된 것으로서, 현장 용접 작업이 없이도 신속한 볼트조립으로 지하층과 지상층의 강재기둥을 상호 연결할 수 있도록 함으로써 시공 시간을 단축시킬 수 있도록 함과 아울러 정밀 시공이 가능하도록 하고, 현장 용접 작업이 이루어지지 않도록 하여 화재 사고나 산재 사고가 감소되도록 함으로써 인명 피해를 줄여 사회적인 안전 비용을 절감시킬 수 있도록 하는 강재기둥 중간 연결구조를 제시하는 것을 그 목적으로 한다.The present invention was derived to solve the above problems, and it enables to shorten the construction time by enabling rapid bolt assembly without on-site welding work to interconnect the steel columns of the basement and above ground floors, and also enables precise construction The purpose of this is to present a steel column intermediate connection structure that can reduce human casualties and reduce social safety costs by preventing fire or industrial accidents by preventing on-site welding work.

상기 과제의 해결을 위하여, 본 발명은 지하층의 철골을 구성하는 복수의 H빔으로 구성되는 강재 기둥과, 지상층의 철골을 구성하는 복수의 H빔으로 구성되는 강재 기둥을 상호 연결하는 강재기둥 중간 연결구조로서, 상기 지하층에 배치된 상기 강재 기둥의 상측 복수의 개소에 각각 배치되어 가로 방향과 세로 방향으로 배치된 복수의 강재 기둥과 연결될 수 있도록 "+"자 형상으로 배치되며 일체로 형성된 복수의 수평방향 브라켓과, 상기 수평방향 브라켓의 상면 중앙에서 일정 높이 돌출되는 연결부재의 단부에 구비되며 평탄한 상면을 구비한 제1접합부재로 이루어지는 제1중간 연결재와; 상기 지상층에 배치된 상기 강재 기둥의 하측 복수의 개소에 각각 배치되어 세로 방향으로 배치된 복수의 강재 기둥과 연결되며, 상기 제1중간 연결재의 상기 제1접합부재의 상면에 안착되어 체결되도록 평탄한 하면을 구비한 제2접합부재로 구성되는 제2중간 연결재를; 포함한 것을 특징으로 하는 강재기둥 중간 연결구조를 제시한다. In order to solve the above problems, the present invention provides an intermediate connection between a steel column composed of a plurality of H-beams constituting the steel frame of the basement floor and a steel column composed of a plurality of H-beams constituting the steel frame of the ground floor. As a structure, a plurality of horizontally arranged and integrally formed in a "+" shape so as to be respectively disposed at a plurality of upper portions of the steel column disposed in the basement to be connected to a plurality of steel columns disposed in the horizontal and vertical directions. a first intermediate connecting member comprising a directional bracket and a first connecting member provided at an end of the connecting member protruding a predetermined height from the center of the upper surface of the horizontal bracket and having a flat upper surface; A flat surface so as to be seated and fastened on the upper surface of the first connecting member of the first intermediate connecting member, each of which is disposed at a plurality of points below the steel column disposed on the ground floor and connected to a plurality of steel columns arranged in the vertical direction a second intermediate connecting member composed of a second connecting member having; Presents a steel column intermediate connection structure, characterized in that it includes.

여기서, 상기 수평방향 브라켓의 종단면은 H빔과 동일한 형상으로 형성되고, 상기 수평방향 브라켓 단부 영역의 판면에는 복수의 체결공이 관통 형성되고, 상기 수평방향 브라켓과 연결되는 상기 강재 기둥의 단부 영역에도 복수의 체결공이 관통 형성되며, 상기 수평방향 브라켓과 상기 강재 기둥은 복수의 체결공이 관통 형성된 별도의 보조판넬이 외면에 덧붙임되어 상호 체결될 수 있다. Here, the longitudinal section of the horizontal bracket is formed in the same shape as the H-beam, and a plurality of fastening holes are formed through the plate surface of the horizontal bracket end region, and a plurality of fastening holes are also formed in the end region of the steel column connected to the horizontal bracket. of the fastening hole is formed through, and the horizontal bracket and the steel column may be coupled to each other by attaching a separate auxiliary panel having a plurality of fastening holes through it to the outer surface.

그리고, 상호 수직으로 배치된 상기 연결부재와 상기 제1접합부재 사이에는 일측면이 상기 연결부재에 접합되고 타측면이 상기 제1접합부재에 접합되는 보강리브가 구비될 수 있다. In addition, a reinforcing rib having one side joined to the connecting member and the other side to the first bonding member may be provided between the connecting member and the first bonding member disposed perpendicular to each other.

또한, 상호 수직으로 배치된 지상층의 상기 강재 기둥과 상기 제2접합부재 사이에는 일측면이 상기 강재 기둥에 접합되고 타측면이 상기 제2접합부재에 접합되는 보강리브가 구비될 수 있다. In addition, a reinforcing rib having one side bonded to the steel pillar and the other side bonded to the second bonding member may be provided between the steel column and the second bonding member of the ground layer disposed perpendicular to each other.

아울러, 복수의 상기 수평방향 브라켓과 상기 수형방향 브라켓 사이에는 수평 방향을 따라 배치되며 상기 수평방향 브라켓과 일체로 형성되는 보강부재가 구비될 수 있다. In addition, a reinforcing member disposed in a horizontal direction and integrally formed with the horizontal bracket may be provided between the plurality of horizontal brackets and the male bracket.

상기 과제의 해결을 위하여 본 발명은 지하층에 복수의 강재 기둥을 가로 방향과 세로 방향으로 연결하여 구조물을 형성하면서 상기 구조물의 상측 복수의 개소에 상기 제1중간 연결재를 설치하는 제1단계와; 지상층에 복수의 강재 기둥을 가로 방향과 세로 방향으로 연결하여 구조물을 형성하되, 세로 방향으로 연결된 강재 기둥의 하단에는 상기 제2중간 연결재가 일체로 형성되도록 하는 제2단계와; 지상층의 구조물을 지하층의 상부로 운반하여 상기 제1중간 연결재에 구비된 상기 제1접합부재의 상면에 상기 제2중간 연결재에 구비된 상기 제2접합부재의 하면이 안착되도록 하는 제3단계와; 상기 제1접합부재와 상기 제2접합부재의 판면에 형성된 체결공에 볼트와 너트를 체결하여 지하층의 구조물과 지상층의 구조물이 상호 연결되도록 하는 제4단계를; 포함한 강재기둥 중간 연결구조 시공방법을 제시한다. In order to solve the above problems, the present invention includes: a first step of installing the first intermediate connecting material at a plurality of locations above the structure while forming a structure by connecting a plurality of steel columns to the basement in the horizontal and vertical directions; a second step of forming a structure by connecting a plurality of steel columns to the ground floor in the horizontal and vertical directions, and forming the second intermediate connecting material integrally with the lower end of the vertically connected steel columns; a third step of transporting the structure of the ground floor to the upper part of the basement so that the lower surface of the second bonding member provided in the second intermediate connecting member is seated on the upper surface of the first connecting member provided in the first intermediate connecting member; a fourth step of fastening bolts and nuts to the fastening holes formed on the plate surfaces of the first bonding member and the second bonding member so that the structure of the basement floor and the structure of the above-ground floor are interconnected; The construction method of the intermediate connecting structure of the steel column is presented.

본 발명에 따른 강재기둥 중간 연결구조는 현장 용접 작업이 없이도 신속한 볼트조립으로 지하층과 지상층의 강재기둥을 상호 연결할 수 있도록 함으로써 시공 시간을 단축시킬 수 있는 효과가 있다. The steel column intermediate connection structure according to the present invention has the effect of shortening the construction time by allowing the steel columns of the basement and above ground to be interconnected by quick bolt assembly without on-site welding work.

그리고, 지하층과 지상층의 강재기둥을 볼트 조립으로 연결할 수 있도록 함으로써 정밀 시공이 가능하도록 하고, 현장 용접 작업이 이루어지지 않도록 하여 부식을 방지하고 화재 사고나 산재 사고가 감소되도록 함으로써 인명 피해를 줄여 사회적인 안전 비용을 절감시킬 수 있는 효과가 있다. In addition, it enables precise construction by connecting the steel columns of the basement and above ground by bolt assembly, prevents corrosion by preventing on-site welding work, and reduces fire and industrial accidents by reducing human damage and social safety It has the effect of reducing costs.

도 1은 본 발명에 따른 강재기둥 중간 연결구조의 구조를 도시한 사시도이고,
도 2는 본 발명에 따른 강재기둥 중간 연결구조를 측면에서 바라본 구조를 도시한 측면도이며,
도 3은 본 발명에 따른 강재기둥 중간 연결구조를 상측에서 내려다본 구조를 도시한 평면도이고,
도 4는 본 발명에 따른 강재기둥 중간 연결구조가 지하층 구조물과 지상층 구조물에 설치되어 연결된 상태의 구조를 도시한 시공상태도이다.
1 is a perspective view showing the structure of a steel column intermediate connection structure according to the present invention;
Figure 2 is a side view showing a structure viewed from the side of the steel column intermediate connection structure according to the present invention,
Figure 3 is a plan view showing a structure looking down from the top of the steel column intermediate connection structure according to the present invention,
4 is a construction state diagram illustrating a structure in which the steel column intermediate connection structure according to the present invention is installed and connected to the basement structure and the above-ground structure.

이하, 첨부도면을 참조하여 본 발명의 실시예에 관하여 상세히 설명한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명에 따른 강재기둥 중간 연결구조의 구조를 도시한 사시도이고, 도 2는 본 발명에 따른 강재기둥 중간 연결구조를 측면에서 바라본 구조를 도시한 측면도이며, 도 3은 본 발명에 따른 강재기둥 중간 연결구조를 상측에서 내려다본 구조를 도시한 평면도이고, 도 4는 본 발명에 따른 강재기둥 중간 연결구조가 지하층 구조물과 지상층 구조물에 설치되어 연결된 상태의 구조를 도시한 시공상태도이다. 1 is a perspective view showing the structure of a steel column intermediate connection structure according to the present invention, Figure 2 is a side view showing the structure viewed from the side of the steel column intermediate connection structure according to the present invention, Figure 3 is according to the present invention It is a plan view showing the structure of the steel column intermediate connection structure looking down from the upper side, and FIG. 4 is a construction state diagram showing the structure in which the steel column intermediate connection structure according to the present invention is installed and connected to the basement structure and the above-ground structure.

이들 도면에 도시된 바와 같이, 본 발명에 의한 강재기둥 중간 연결구조는, 지하층의 철골을 구성하는 복수의 H빔으로 구성되는 강재 기둥(10)과, 지상층의 철골을 구성하는 복수의 H빔으로 구성되는 강재 기둥(20)을 상호 연결하는 강재기둥 중간 연결구조로서, 상기 지하층에 배치된 상기 강재 기둥(10)의 상측 복수의 개소에 각각 배치되어 가로 방향과 세로 방향으로 배치된 복수의 강재 기둥(10)과 연결될 수 있도록 "+"자 형상으로 배치되며 일체로 형성된 복수의 수평방향 브라켓(110)과, 상기 수평방향 브라켓(110)의 상면 중앙에서 일정 높이 돌출되는 연결부재(121)의 단부에 구비되며 평탄한 상면을 구비한 제1접합부재(120)로 이루어지는 제1중간 연결재(100)와; 상기 지상층에 배치된 상기 강재 기둥(20)의 하측 복수의 개소에 각각 배치되어 세로 방향으로 배치된 복수의 강재 기둥(20)과 연결되며, 상기 제1중간 연결재(100)의 상기 제1접합부재(120)의 상면에 안착되어 체결되도록 평탄한 하면을 구비한 제2접합부재(210)로 구성되는 제2중간 연결재(200)를; 포함한 것을 특징으로 한다. As shown in these drawings, the steel column intermediate connection structure according to the present invention consists of a steel column 10 composed of a plurality of H-beams constituting the steel frame of the basement floor, and a plurality of H-beams constituting the steel frame of the ground floor. As a steel column intermediate connection structure for interconnecting the steel columns 20 to be configured, a plurality of steel columns arranged in a plurality of locations above the steel column 10 disposed in the basement, respectively, arranged in the horizontal and vertical directions A plurality of horizontal brackets 110 integrally formed and arranged in a "+" shape to be connected to (10), and the end of the connecting member 121 protruding at a predetermined height from the center of the upper surface of the horizontal bracket 110 a first intermediate connecting member 100 provided in and comprising a first joining member 120 having a flat upper surface; The first joining member of the first intermediate connecting member 100 is disposed at a plurality of lower portions of the steel column 20 disposed on the ground floor, respectively, and connected to a plurality of steel columns 20 arranged in the vertical direction. a second intermediate connecting member 200 composed of a second joining member 210 having a flat lower surface so as to be seated on the upper surface of the 120 and fastened thereto; characterized by including.

제1중간 연결재(100)는 지하층의 철골을 구성하는 복수의 H빔으로 구성되는 강재 기둥(10)의 상측 복수의 개소에 각각 배치되어 가로 방향과 세로 방향으로 배치된 복수의 강재 기둥(10)과 연결되어 지상층의 철골을 구성하는 복수의 H빔으로 구성되는 강재 기둥(20)과 연결되도록 하는 역할을 한다. The first intermediate connecting member 100 is disposed at a plurality of upper portions of the steel column 10 composed of a plurality of H-beams constituting the steel frame of the basement, respectively, a plurality of steel columns arranged in the horizontal and vertical directions (10) It is connected to and serves to be connected to the steel column 20 composed of a plurality of H-beams constituting the steel frame of the ground floor.

이를 위하여 제1중간 연결재(100)는 가로 방향과 세로 방향으로 배치된 복수의 강재 기둥(10)과 연결될 수 있도록 "+"자 형상으로 배치되며 일체로 형성된 복수의 수평방향 브라켓(110)과, 상기 수평방향 브라켓(110)의 상면 중앙에서 일정 높이 돌출되는 연결부재(121)의 단부에 구비되며 평탄한 상면을 구비한 제1접합부재(120)로 구성되어 있다. To this end, the first intermediate connecting material 100 is arranged in a "+" shape so as to be connected to a plurality of steel columns 10 arranged in the horizontal and vertical directions, and a plurality of horizontal brackets 110 integrally formed, It is provided at the end of the connecting member 121 protruding a predetermined height from the center of the upper surface of the horizontal bracket 110 and is composed of a first bonding member 120 having a flat upper surface.

수평방향 브라켓(110)은 H빔으로 구성되며 가로 방향과 세로 방향으로 "+"자 형상을 갖도록 배치되어 지하층의 철골을 구성하도록 가로 방향과 세로 방향으로 배치된 복수의 강재 기둥(10)과 각각 연결되어 강재 기둥(10)의 상측에 배치된다. The horizontal bracket 110 is composed of an H-beam and is arranged to have a “+” shape in the horizontal and vertical directions, and a plurality of steel columns 10 arranged in the horizontal and vertical directions to constitute the steel frame of the basement floor, respectively. It is connected and disposed on the upper side of the steel column (10).

그리고, 수평방향 브라켓(110) 단부 영역의 판면에는 복수의 체결공(111)이 관통 형성되고, 수평방향 브라켓(110)과 연결되는 강재 기둥(10)의 단부 영역에도 복수의 체결공(11)이 관통 형성되며, 수평방향 브라켓(110)과 강재 기둥(10)은 복수의 체결공(131)이 관통 형성된 별도의 보조판넬(130)이 외면에 덧붙임되어 상호 체결되어 있다. In addition, a plurality of fastening holes 111 are formed through the plate surface of the horizontal bracket 110 end region, and a plurality of fastening holes 11 are also formed in the end region of the steel column 10 connected to the horizontal bracket 110 . This is formed through, and the horizontal bracket 110 and the steel column 10 are coupled to each other by attaching a separate auxiliary panel 130 in which a plurality of fastening holes 131 are formed through the outer surface.

보조판넬(130)은 수평방향 브라켓(110)과 강재 기둥(10)의 상면과 하면 및 양 측면에 각각 구비된 상태에서 체결공(131)에 볼트가 체결되어 상호 결합이 이루어지도록 함으로써 체결력을 향상시킬 수 있도록 한다. The auxiliary panel 130 is provided on the upper, lower, and both sides of the horizontal bracket 110 and the steel column 10, respectively, and the bolts are fastened to the fastening hole 131 to achieve mutual coupling, thereby improving the fastening force. make it possible

그리고, 수평방향 브라켓(110)과 강재 기둥(10)의 체결력을 향상시킬 수 있도록 수평방향 브라켓(110)과 강재 기둥(10)에 형성된 체결공(111, 11)과 보조판넬(130)에 형성된 체결공(131)은 열과 행을 이루도록 복수로 형성되는 것이 효과적이다. And, in order to improve the fastening force between the horizontal bracket 110 and the steel column 10, the fastening holes 111 and 11 formed in the horizontal bracket 110 and the steel column 10 and the auxiliary panel 130 are formed. It is effective to form a plurality of fastening holes 131 to form columns and rows.

제1접합부재(120)는 "+"자 형상으로 배치된 수평방향 브라켓(110)의 상면 중앙에서 일정 높이 돌출되는 연결부재(121)의 단부에 구비되며 평탄한 상면을 구비한 부재이다. The first bonding member 120 is provided at the end of the connecting member 121 protruding at a predetermined height from the center of the upper surface of the horizontal bracket 110 arranged in a “+” shape, and is a member having a flat upper surface.

연결부재(121)는 수평방향 브라켓(110)의 상면 중앙 영역에서 일정 높이 돌출됨으로써 제1접합부재(120)와 제1접합부재(210)를 상호 체결시에 볼팅이 이루어질 수 있는 공간을 확보하는 역할을 한다. The connecting member 121 protrudes at a predetermined height from the central area of the upper surface of the horizontal bracket 110 to secure a space for bolting when the first bonding member 120 and the first bonding member 210 are mutually fastened. plays a role

제1접합부재(120)의 판면 복수의 개소에는 후술할 제2접합부재(210)와 체결이 이루어질 수 있도록 하는 복수의 체결공(122)이 관통 형성되어 있으며, 제2접합부재(210)가 완전히 제1접합부재(120)와 중첩되도록 상면에 안착된 상태에서 체결공(122)에 볼트를 체결하여 이들 사이의 체결이 이루어지도록 한다. A plurality of fastening holes 122 are formed through the plate surface of the first joining member 120 to be fastened to a second joining member 210 to be described later, and the second joining member 210 is formed therethrough. The bolts are fastened to the fastening holes 122 in a state of being seated on the upper surface to completely overlap the first joining member 120 so that the fastening between them is made.

그리고, 연결부재(121)와 제1접합부재(120) 사이에는 일측면이 연결부재(121)에 접합되고 타측면이 제1접합부재(120)에 접합되는 보강리브(140)가 구비됨으로써 연결부재(121)와 제1접합부재(120)의 강성을 높일 수 있도록 하는 것이 효과적이다. And, between the connecting member 121 and the first bonding member 120, one side is joined to the connecting member 121 and the other side is connected by being provided with a reinforcing rib 140 that is joined to the first bonding member 120. It is effective to increase the rigidity of the member 121 and the first bonding member 120 .

또한, 복수의 수평방향 브라켓(110)과 수평방향 브라켓(110) 사이에는 수평 방향을 따라 배치되며 수평방향 브라켓(110)과 일체로 형성되는 보강부재(150)가 구비됨으로써 "+"자 형상으로 배치된 수평방향 브라켓(110)의 변형을 방지할 수 있도록 하는 것이 바람직하다. In addition, a reinforcing member 150 disposed in a horizontal direction and integrally formed with the horizontal bracket 110 is provided between the plurality of horizontal brackets 110 and the horizontal bracket 110 to form a “+” shape. It is preferable to prevent deformation of the arranged horizontal bracket 110 .

아울러, 제1접합부재(120)와 연결부재(121)의 중앙 영역에는 중공(123)이 형성될 수 있는데, 이러한 중공(123)이 형성된 경우에는 제1접합부재(120)와 연결부재(121)를 제조하는데 소요되는 원가를 절감하고 경량화가 가능하도록 하여 운반이 용이하게 이루어지도록 할 수 있는 효과가 있고 기둥내부에 콘크리트를 채움으로써 기둥의 축방향 강성을 향상시키는 효과가 있다. In addition, a hollow 123 may be formed in the central region of the first bonding member 120 and the connecting member 121 . When the hollow 123 is formed, the first bonding member 120 and the connecting member 121 are formed. ), it has the effect of reducing the cost and making it possible to reduce the weight so that it can be easily transported, and it has the effect of improving the axial rigidity of the column by filling the column with concrete.

중공(123)을 형성하지 않는 경우에는 제1접합부재(120)와 연결부재(121) 자체의 강성을 높임으로써 변형을 방지할 수 있도록 하여 구조적인 안정성을 향상시킬 수 있는 효과가 있다. When the hollow 123 is not formed, the rigidity of the first bonding member 120 and the connecting member 121 itself is increased to prevent deformation, thereby improving structural stability.

한편, 제2중간 연결재(200)는 지상층에 배치된 강재 기둥(20)의 하측 복수의 개소에 각각 배치되어 세로 방향으로 배치된 복수의 강재 기둥(20)과 연결되어 일체로 구성되며, 제1접합부재(120)와 체결됨으로써 지하층에 배치된 강재 기둥(10)과 지상층에 배치된 강재 기둥(20)을 연결할 수 있도록 한다. On the other hand, the second intermediate connecting material 200 is connected to a plurality of steel columns 20 arranged in the vertical direction, respectively arranged at a plurality of points below the steel column 20 disposed on the ground floor and is integrally configured, the first By being fastened with the bonding member 120, it is possible to connect the steel column 10 disposed on the basement floor and the steel column 20 disposed on the ground floor.

이러한 제2중간 연결재(200)는 제1중간 연결재(100)의 제1접합부재(120)의 상면에 안착되어 체결되도록 평탄한 하면을 구비하고 제1접합부재(120)와 동일한 형상으로 형성된 제2접합부재(210)로 구성될 수 있다. The second intermediate connecting member 200 has a flat lower surface so as to be seated on the upper surface of the first joining member 120 of the first intermediate connecting member 100 and fastened to the second intermediate connecting member 100 and formed in the same shape as the first connecting member 120 . It may be composed of a bonding member 210 .

제2접합부재(210)의 판면 복수의 개소에는 제2접합부재(210)를 제1접합부재(120)와 상호 체결할 수 있도록 하는 복수의 체결공(211)이 관통 형성되어 제2잡합부재(210)가 제1접합부재(120)의 상면에 중첩되게 배치된 상태에서 볼트를 이용하여 이들 사이의 체결이 이루어지도록 한다. A plurality of fastening holes 211 for allowing the second joining member 210 to be mutually fastened with the first joining member 120 are formed through the plurality of portions of the plate surface of the second joining member 210 to form the second joining member. In a state in which the 210 is disposed to overlap the upper surface of the first bonding member 120, the fastening between them is made using a bolt.

그리고, 상호 수직으로 배치된 지상층의 상기 강재 기둥(20)과 상기 제2접합부재(210) 사이에는 일측면이 상기 강재 기둥(20)에 접합되고 타측면이 상기 제2접합부재(210)에 접합되는 보강리브(220)가 구비되도록 함으로써 제1접합부재(210)의 변형을 방지할 수 있도록 하는 것이 효과적이다. And, between the steel pillar 20 and the second bonding member 210 of the above-ground layer disposed perpendicular to each other, one side is joined to the steel pillar 20 and the other side is to the second bonding member 210. It is effective to prevent deformation of the first joining member 210 by providing the reinforcing rib 220 to be joined.

상술한 바와 같은 구성을 갖는 본 발명에 따른 강재기둥 중간 연결구조를 이용하여 지하층 구조물과 지상층 구조물을 상호 연결하는 과정을 도 4를 참조하여 설명하면 다음과 같다. The process of interconnecting the underground structure and the above-ground structure using the steel column intermediate connection structure according to the present invention having the above-described configuration will be described with reference to FIG. 4 .

우선, 지하층에 복수의 강재 기둥(10)을 가로 방향과 세로 방향으로 연결하여 구조물을 형성하면서 이러한 구조물의 상측 복수의 개소에 제1중간 연결재(100)를 설치하게 된다. First, while forming a structure by connecting a plurality of steel pillars 10 to the basement in the horizontal and vertical directions, the first intermediate connecting member 100 is installed at a plurality of locations above the structure.

제1중간 연결재(100)를 설치하는 방법은 제1중간 연결재(100)를 구성하는 수평방향 브라켓(110)의 단부와 가로 방향으로 배치되는 강재 기둥(10)이 나란하도록 배치한 후에 수평방향 브라켓(110)의 단부 영역과 강재 기둥(10)의 단부 영역에 각각 복수로 관통 형성된 체결공(111, 11)의 외면에 체결공(131)이 형성된 보조판넬(130)이 중첩되게 배치한 후에 볼트와 너트를 체결공(111, 11, 131)에 삽입하여 체결함으로써 제1중간 연결재(100)가 강재 기둥(10)과 연결되도록 한다. In the method of installing the first intermediate connecting material 100, the end of the horizontal bracket 110 constituting the first intermediate connecting material 100 and the steel column 10 arranged in the horizontal direction are arranged so that they are parallel to each other, and then the horizontal bracket After disposing the auxiliary panel 130 having the fastening holes 131 formed on the outer surfaces of the plurality of fastening holes 111 and 11 through the end region of 110 and the end region of the steel column 10, respectively, overlapping the bolts The first intermediate connecting material 100 is connected to the steel column 10 by inserting and fastening the and nuts into the fastening holes 111 , 11 and 131 .

그리고, 지상층에 복수의 강재 기둥(20)을 가로 방향과 세로 방향으로 연결하여 구조물을 형성하되, 세로 방향으로 연결된 강재 기둥(20)의 하단에는 제2중간 연결재(200)가 일체로 형성되도록 하여 제2접합부재(210)가 구비되도록 한다. And, a structure is formed by connecting a plurality of steel pillars 20 to the ground floor in the horizontal and vertical directions, and a second intermediate connecting member 200 is integrally formed at the lower end of the vertically connected steel pillars 20. The second bonding member 210 is provided.

이러한 상태에서 지상층의 구조물을 지하층의 상부로 운반하여 제1중간 연결재(200)에 구비된 제1접합부재(110)의 상면에 제2중간 연결재(200)에 구비된 제2접합부재(210)의 하면이 안착되도록 한다. In this state, the structure of the ground floor is transported to the upper part of the basement, and the second bonding member 210 provided in the second intermediate connecting member 200 on the upper surface of the first connecting member 110 provided in the first intermediate connecting member 200. Make sure that the bottom of the

그리고, 제1접합부재(110)와 제2접합부재(210)의 판면에 형성된 체결공(122, 211)에 볼트와 너트를 체결함으로써 결과적으로 지하층의 구조물과 지상층의 구조물이 상호 연결되도록 하여 시공이 완료되도록 한다. And, by fastening bolts and nuts to the fastening holes 122 and 211 formed on the plate surfaces of the first and second joining members 110 and 210, as a result, the structure of the basement floor and the structure of the ground floor are interconnected to each other. let this be done

상술한 바와 같이, 본 발명에 따른 강재기둥 중간 연결구조는, 현장 용접 작업이 없이도 신속한 볼트조립으로 강재기둥을 연결할 수 있도록 함으로써 시공 시간을 단축시킬 수 있도록 함과 아울러 정밀 시공이 가능하도록 하고, 현장 용접 작업이 이루어지지 않도록 하여 부식을 방지하고 화재 사고나 산재 사고가 감소되도록 함으로써 인명 피해를 줄여 사회적인 안전 비용을 절감시킬 수 있게 된다. As described above, the steel column intermediate connection structure according to the present invention enables the construction time to be shortened and precise construction is possible by enabling the steel column to be connected by quick bolt assembly without on-site welding work. It is possible to reduce the cost of social safety by reducing the loss of life by preventing corrosion by preventing welding work and reducing fire accidents and industrial accidents.

이상은 본 발명에 의해 구현될 수 있는 바람직한 실시예의 일부에 관하여 설명한 것에 불과하므로, 주지된 바와 같이 본 발명의 범위는 위의 실시예에 한정되어 해석되어서는 안 될 것이며, 위에서 설명된 본 발명의 기술적 사상과 그 근본을 함께 하는 기술적 사상은 모두 본 발명의 범위에 포함된다고 할 것이다.Since the above has only been described with respect to some of the preferred embodiments that can be implemented by the present invention, as noted, the scope of the present invention should not be construed as being limited to the above embodiments, and It will be said that the technical idea and the technical idea with the root are all included in the scope of the present invention.

10, 20 : 강재 기둥 11 : 체결공
100 : 제1중간 연결재 110 : 수평방향 브라켓
111 : 체결공 120 : 제1접합부재
121 : 연결부재 122: 체결공
123 : 중공 130 : 보조판넬
140 : 보강리브 150 : 보강부재
200 : 제2중간 연결재 210 : 제2접합부재
220 : 보강리브
10, 20: steel column 11: fastener
100: first intermediate connecting material 110: horizontal bracket
111: fastening hole 120: first joining member
121: connection member 122: fastening hole
123: hollow 130: auxiliary panel
140: reinforcing rib 150: reinforcing member
200: second intermediate connecting member 210: second connecting member
220: reinforcement rib

Claims (6)

지하층의 철골을 구성하는 복수의 H빔으로 구성되는 강재 기둥(10)과, 지상층의 철골을 구성하는 복수의 H빔으로 구성되는 강재 기둥(20)을 상호 연결하는 강재기둥 중간 연결구조로서,
상기 지하층에 배치된 상기 강재 기둥(10)의 상측 복수의 개소에 각각 배치되어 가로 방향과 세로 방향으로 배치된 복수의 강재 기둥과 연결될 수 있도록 "+"자 형상으로 배치되며 일체로 형성된 복수의 수평방향 브라켓(110)과, 상기 수평방향 브라켓(110)의 상면 중앙에서 일정 높이 돌출되는 연결부재(121)의 단부에 구비되며 평탄한 상면을 구비한 제1접합부재(120)로 이루어지는 제1중간 연결재(100)와;
상기 지상층에 배치된 상기 강재 기둥(20)의 하측 복수의 개소에 각각 배치되어 세로 방향으로 배치된 복수의 강재 기둥(20)과 연결되며, 상기 제1중간 연결재(100)의 상기 제1접합부재(120)의 상면에 안착되어 체결되도록 평탄한 하면을 구비한 제2접합부재(210)로 구성되는 제2중간 연결재(200)를;
포함한 것을 특징으로 하는 강재기둥 중간 연결구조.
As a steel column intermediate connection structure that interconnects the steel column 10 composed of a plurality of H-beams constituting the steel frame of the basement floor and the steel column 20 composed of a plurality of H-beams constituting the steel frame of the ground floor,
A plurality of horizontally arranged and integrally formed in a “+” shape so as to be respectively disposed at a plurality of upper portions of the steel column 10 arranged in the basement and connected to a plurality of steel columns arranged in the horizontal and vertical directions. A first intermediate connecting material comprising a directional bracket 110 and a first connecting member 120 having a flat upper surface and provided at the end of the connecting member 121 protruding at a predetermined height from the center of the upper surface of the horizontal bracket 110 . (100) and;
The first joining member of the first intermediate connecting member 100 is disposed at a plurality of lower portions of the steel column 20 disposed on the ground floor, respectively, and connected to a plurality of steel columns 20 arranged in the vertical direction. a second intermediate connecting member 200 composed of a second joining member 210 having a flat lower surface so as to be seated on the upper surface of the 120 and fastened thereto;
Steel column intermediate connection structure, characterized in that it includes.
제1항에 있어서,
상기 수평방향 브라켓(110)의 종단면은 H빔과 동일한 형상으로 형성되고, 상기 수평방향 브라켓(110) 단부 영역의 판면에는 복수의 체결공(111)이 관통 형성되고, 상기 수평방향 브라켓(110)과 연결되는 상기 강재 기둥(10)의 단부 영역에도 복수의 체결공이 관통 형성되며, 상기 수평방향 브라켓(110)과 상기 강재 기둥(10)은 복수의 체결공이 관통 형성된 별도의 보조판넬(130)이 외면에 덧붙임되어 상호 체결되는 것을 특징으로 하는 강재기둥 중간 연결구조.
According to claim 1,
A longitudinal section of the horizontal bracket 110 is formed in the same shape as the H-beam, and a plurality of fastening holes 111 are formed through the plate surface of the horizontal bracket 110 end region, and the horizontal bracket 110 is formed through. A plurality of fastening holes are also formed through the end region of the steel column 10 connected to the horizontal bracket 110 and the steel column 10 is a separate auxiliary panel 130 through which a plurality of fastening holes are formed. Steel column intermediate connection structure, characterized in that it is added to the outer surface and fastened to each other.
제1항에 있어서,
상호 수직으로 배치된 상기 연결부재(121)와 상기 제1접합부재(120) 사이에는 일측면이 상기 연결부재(121)에 접합되고 타측면이 상기 제1접합부재(120)에 접합되는 보강리브(140)가 구비된 것을 특징으로 하는 강재기둥 중간 연결구조.
According to claim 1,
Between the connecting member 121 and the first bonding member 120 disposed perpendicularly to each other, one side of the reinforcing rib is joined to the connecting member 121 and the other side is joined to the first bonding member 120 . (140) Steel column intermediate connection structure, characterized in that provided.
제1항에 있어서,
상호 수직으로 배치된 지상층의 상기 강재 기둥(20)과 상기 제2접합부재(210) 사이에는 일측면이 상기 강재 기둥(20)에 접합되고 타측면이 상기 제2접합부재(210)에 접합되는 보강리브(220)가 구비된 것을 특징으로 하는 강재기둥 중간 연결구조.
According to claim 1,
One side is joined to the steel post 20 and the other side is joined to the second bonding member 210 between the steel pillar 20 and the second bonding member 210 of the ground floor disposed perpendicular to each other. Steel column intermediate connection structure, characterized in that the reinforcing rib 220 is provided.
제1항에 있어서,
복수의 상기 수평방향 브라켓(110)과 상기 수형방향 브라켓(110) 사이에는 수평 방향을 따라 배치되며 상기 수평방향 브라켓(110)과 일체로 형성되는 보강부재(150)가 구비된 것을 특징으로 하는 강재기둥 중간 연결구조.
According to claim 1,
Steel material, characterized in that between the plurality of horizontal brackets (110) and the male brackets (110), a reinforcement member (150) disposed in a horizontal direction and integrally formed with the horizontal direction bracket (110) is provided. Inter-column connection structure.
제1항 내지 제5항 중 어느 한 항에 따른 강재기둥 중간 연결구조 시공방법으로서,
지하층에 복수의 강재 기둥(10)을 가로 방향과 세로 방향으로 연결하여 구조물을 형성하면서 상기 구조물의 상측 복수의 개소에 상기 제1중간 연결재(100)를 설치하는 제1단계와;
지상층에 복수의 강재 기둥(20)을 가로 방향과 세로 방향으로 연결하여 구조물을 형성하되, 세로 방향으로 연결된 강재 기둥(20)의 하단에는 상기 제2중간 연결재(200)가 일체로 형성되도록 하는 제2단계와;
지상층의 구조물을 지하층의 상부로 운반하여 상기 제1중간 연결재(200)에 구비된 상기 제1접합부재(110)의 상면에 상기 제2중간 연결재(200)에 구비된 상기 제2접합부재(210)의 하면이 안착되도록 하는 제3단계와;
상기 제1접합부재(110)와 상기 제2접합부재(210)의 판면에 형성된 체결공(122, 211)에 볼트와 너트를 체결하여 지하층의 구조물과 지상층의 구조물이 상호 연결되도록 하는 제4단계를;
포함한 것을 특징으로 하는 강재기둥 중간 연결구조 시공방법.
A method for constructing a steel column intermediate connection structure according to any one of claims 1 to 5,
A first step of connecting a plurality of steel pillars 10 to the basement layer in the horizontal and vertical directions to form a structure, and installing the first intermediate connecting member 100 at a plurality of locations above the structure;
A structure is formed by connecting a plurality of steel columns 20 to the ground floor in the horizontal and vertical directions, and the second intermediate connecting material 200 is integrally formed at the lower end of the vertically connected steel columns 20. Step 2;
The second bonding member 210 provided in the second intermediate connecting member 200 on the upper surface of the first connecting member 110 provided in the first intermediate connecting member 200 by transporting the above-ground structure to the upper part of the basement level. ) a third step of allowing the lower surface to be seated;
A fourth step of fastening bolts and nuts to the fastening holes 122 and 211 formed in the plate surfaces of the first bonding member 110 and the second bonding member 210 so that the structures of the basement floor and the structures on the ground floor are interconnected. cast;
Steel column intermediate connection structure construction method, characterized in that it includes.
KR1020200186481A 2020-12-29 2020-12-29 Middle connecting structure of steel pilar and construction method thereof Ceased KR20220094841A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200186481A KR20220094841A (en) 2020-12-29 2020-12-29 Middle connecting structure of steel pilar and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200186481A KR20220094841A (en) 2020-12-29 2020-12-29 Middle connecting structure of steel pilar and construction method thereof

Publications (1)

Publication Number Publication Date
KR20220094841A true KR20220094841A (en) 2022-07-06

Family

ID=82400165

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200186481A Ceased KR20220094841A (en) 2020-12-29 2020-12-29 Middle connecting structure of steel pilar and construction method thereof

Country Status (1)

Country Link
KR (1) KR20220094841A (en)

Similar Documents

Publication Publication Date Title
KR102187993B1 (en) Prefabricated Bridge Structure and Construction Method
KR101687495B1 (en) Partial top-down construction method for building underground structures
KR101221970B1 (en) Construction Method for Basement Structure without Temporary Structure
KR100856723B1 (en) Steel frame reverse casting system and method using cantilever type girder
JP2020037775A (en) Non-brace steel framed building method and column base unit
JP4060323B2 (en) Bracket support type downward frame driving system and downward frame driving method using the same
KR20210088850A (en) Top-down construction method
KR100634726B1 (en) Slab construction structure of underground structure and slab and underground retaining wall construction method without frame rib
CN110700274A (en) Mechanically-connected assembled stand column and stand column pile
KR20110016846A (en) Steel beam with solid extension
KR102330771B1 (en) Top-down construction method using bracket and double girder
KR100912574B1 (en) Soil barrier system using prefabricated brace and digging method using same
JP4060135B2 (en) Civil engineering structure
KR102452802B1 (en) A construction method to use the seismic resistant precast concrete members
KR20220094841A (en) Middle connecting structure of steel pilar and construction method thereof
KR102330479B1 (en) Moving method of mega modular structure using coupling frame and Column base structure
KR200383309Y1 (en) Form system for construction of underground slab
KR102523155B1 (en) Connecting structure of middle girder and construction method thereof
KR100808977B1 (en) Connecting device of corner brace in construction of temporary block construction
KR102108622B1 (en) Support structure of temporary strut for construction period reduction
JP2900840B2 (en) How to build underground structures
KR20120126927A (en) A double Raker system of an underground temporary structure
JP7725910B2 (en) Seismic isolation device installation method and seismic isolation device installation structure
JP7702218B2 (en) Method for constructing structure and structure
JPH05156654A (en) Top-down construction method

Legal Events

Date Code Title Description
PA0109 Patent application

Patent event code: PA01091R01D

Comment text: Patent Application

Patent event date: 20201229

PA0201 Request for examination
E902 Notification of reason for refusal
PE0902 Notice of grounds for rejection

Comment text: Notification of reason for refusal

Patent event date: 20220530

Patent event code: PE09021S01D

PG1501 Laying open of application
E601 Decision to refuse application
PE0601 Decision on rejection of patent

Patent event date: 20221212

Comment text: Decision to Refuse Application

Patent event code: PE06012S01D

Patent event date: 20220530

Comment text: Notification of reason for refusal

Patent event code: PE06011S01I