KR20210098162A - Under ground structure using column steel pipe wall and construction method thereof - Google Patents

Under ground structure using column steel pipe wall and construction method thereof Download PDF

Info

Publication number
KR20210098162A
KR20210098162A KR1020200012008A KR20200012008A KR20210098162A KR 20210098162 A KR20210098162 A KR 20210098162A KR 1020200012008 A KR1020200012008 A KR 1020200012008A KR 20200012008 A KR20200012008 A KR 20200012008A KR 20210098162 A KR20210098162 A KR 20210098162A
Authority
KR
South Korea
Prior art keywords
steel pipe
wall
slab
underground structure
reinforcing bar
Prior art date
Application number
KR1020200012008A
Other languages
Korean (ko)
Inventor
김찬수
Original Assignee
주식회사 에코피앤씨
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 에코피앤씨 filed Critical 주식회사 에코피앤씨
Priority to KR1020200012008A priority Critical patent/KR20210098162A/en
Publication of KR20210098162A publication Critical patent/KR20210098162A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • E02D29/05Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench
    • E02D29/055Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench further excavation of the cross-section proceeding underneath an already installed part of the structure, e.g. the roof of a tunnel
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention relates to an underground structure construction method using a peristyle type steel pipe wall, capable of bringing about structural substantiality and facilitating construction. According to the present invention, the underground structure construction method using a peristyle type steel pipe wall includes the following steps of: (a) forming two lines of wall parts while maintaining intervals by consecutively installing metal steel pipes while excavating a part, in which an underground structure is going to be constructed, in a vertical direction after performing a linear survey on the same; (b) installing a pillar part by installing metal steel pipes at regular intervals by performing excavation along a space between the two lines of wall parts; (c) performing bed excavation by excavating the surface of the ground between the pillar part and the wall parts; (d) constructing an upper slab between the pillar part and the wall parts in a space formed by the bed excavation; (e) excavating a lower part of the upper slab while backfilling the upper side of the upper slab; and (f) constructing a lower slab in the space between the pillar part and the wall parts excavated in the step (e).

Description

주열식 강관 벽체를 이용한 지중구조물 및 그 시공방법{UNDER GROUND STRUCTURE USING COLUMN STEEL PIPE WALL AND CONSTRUCTION METHOD THEREOF}Underground structure using cast-heated steel pipe wall and its construction method

본 발명은 주열식 강관 벽체를 이용한 지중구조물 및 그 시공방법에 관한 것으로서, 보다 상세하게는 구조적으로 견고하고 시공을 용이하게 할 수 있는 주열식 강관 벽체를 이용한 지중구조물 및 그 시공방법에 관한 것이다.The present invention relates to an underground structure using a cast-heated steel pipe wall and a construction method thereof, and more particularly, to an underground structure using a cast-heated steel pipe wall that is structurally strong and can facilitate construction, and a construction method thereof.

일반적으로 지하 구조물을 축조하는 공법은 흙막이 벽을 설치하고 가설형 강지지체를 이용하여 토압이나 수압 등의 외력을 지탱하면서 지상에서 지하의 기초바닥까지 굴착을 완료한 다음, 각 층 구조물을 바닥에서 상부로 순차적으로 축조하면서 가설형강지지체를 해체하여 시공하는 개착식 공법을 이용하고 있다.In general, the method of constructing an underground structure is to install a retaining wall, use a temporary steel support to support external forces such as earth pressure or water pressure, complete excavation from the ground to the basement floor, and then move each floor structure from the floor to the upper part. It uses the open-cut method of dismantling and constructing the temporary beam support while sequentially constructing it.

이러한 개착식 공법은 지하 구조물의 규모가 크고 굴토심도가 깊은 대형 현장에서는 흙막이 벽에 작용하는 토압과 수압 등의 외력을 지탱하여 주어야 하나 가설형강 지지체로는 변형이 크게 일어날 수밖에 없다.In this open-cut method, external forces such as earth pressure and water pressure acting on the retaining wall must be supported at large sites with large underground structures and deep excavation depth, but deformation of the temporary section steel support is inevitable.

또한 개착식 공법은 건축물이 밀집된 도심지에서는 흙막이 벽의 큰 변형을 유발하고 지반침하로 인하여 주변 건축물에 위해가 발생될 수 있는 문제가 있으며, 외부에 노출된 상태에서 굴착작업과 구조물 설치 작업을 수행함에 따라 소음과 진동 및 분진에 의한 환경 및 민원이 발생한다.In addition, the excavation method has a problem in that it causes large deformation of the retaining wall in downtown areas where buildings are dense and may cause damage to surrounding structures due to ground subsidence. Accordingly, environmental and civil complaints due to noise, vibration and dust occur.

통상적으로 개착식 공법으로 지하구조물을 형성하려면 지반을 따라서 굴착을 실시한 후, 굴착공간을 따라서 간격을 유지하며 2열로 벽체를 설치하고, 양 벽체 사이에 하부 및 상부 슬래브를 형성하는 방법으로 박스형태의 지하구조물을 시공하게 된다.In general, to form an underground structure using the open-cut method, after excavation is carried out along the ground, the walls are installed in two rows while maintaining the distance along the excavation space, and the lower and upper slabs are formed between the two walls. Underground structures will be built.

이때 벽체에는 브래킷을 설치하고, 이 브래킷에 PC구조 또는 RC구조로 이루어진 하부 및 상부 슬래브를 끼우거나 거치하는 방식으로 고정시켜 설치하게 된다.At this time, a bracket is installed on the wall, and the lower and upper slabs made of a PC structure or an RC structure are fixed to the bracket by inserting or mounting.

그러나 이렇게 설치된 하부 및 상부 슬래브는 브래킷에 완전히 고정되어 있지 않으므로 연결부위가 구조적으로 취약하다.However, since the lower and upper slabs installed in this way are not completely fixed to the bracket, the connection part is structurally weak.

개착식 공법의 개선 공법으로 지하 터파기를 하지 않고 미리 양측 벽체를 매설한 후 상부 슬래브를 타설하고 상부 슬래브 하부 지반을 소정의 깊이로 굴착한 다음 하부 슬래브를 타설하는 역타설 공법이 알려져 있다.As an improvement method of the openwork method, a reverse casting method is known in which the upper slab is poured after the walls on both sides are buried in advance without excavating the underground trench, the upper slab lower ground is excavated to a predetermined depth, and then the lower slab is poured.

한국 등록특허공보 제10-1590032호Korean Patent Publication No. 10-1590032

본 발명은 상기한 바와 같은 종래의 문제점을 해결하기 위하여 제안된 것으로서, 본 발명의 목적은 구조적으로 견고하고 시공을 용이하게 할 수 있는 주열식 강관 벽체를 이용한 지중구조물 및 그 시공방법을 제공하는데 있다.The present invention has been proposed to solve the problems of the prior art as described above, and an object of the present invention is to provide an underground structure using a cast-heated steel pipe wall that is structurally strong and can facilitate construction, and a construction method thereof. .

본 발명이 제안하는 주열식 강관 벽체를 이용한 지중구조물 시공방법은 a) 지중구조물이 시공될 부분의 선형측량을 실시한 후 종방향을 따라서 굴착하면서 금속재의 강관을 연속적으로 설치하여 간격을 유지하며 2열로 벽체부를 형성하는 단계; b) 상기 2열의 벽체부들 사이를 따라서 굴착하여 금속재의 강관을 일정 간격으로 설치하여 기둥부를 설치하는 단계; c) 상기 벽체부와 기둥부 사이의 지표면을 굴착하여 터파기를 실시하는 단계; d) 상기 터파기로 형성된 공간의 벽체부와 기둥부 사이에 상부슬래브를 시공하는 단계; e) 상기 상부슬래브의 상부면을 되메우기 하면서 상부슬래브의 하부쪽을 굴착하는 단계; f) 상기 e)단계에서 굴착된 벽체부와 기둥부 사이의 공간에 하부슬래브를 시공하는 단계; 를 포함하는 주열식 강관 벽체를 이용한 지중구조물 시공방법을 제공한다.The method for constructing an underground structure using a columnar steel pipe wall proposed by the present invention is a) After performing a linear survey of the part where the underground structure is to be constructed, and excavating along the longitudinal direction, continuously install metal steel pipes to maintain the spacing and forming a wall portion; b) excavating along between the two rows of wall parts to install metal steel pipes at regular intervals to install the column parts; c) performing excavation by excavating the ground surface between the wall part and the pillar part; d) constructing an upper slab between the wall part and the column part of the space formed by the excavation; e) excavating the lower side of the upper slab while backfilling the upper surface of the upper slab; f) constructing a lower slab in the space between the wall and the column excavated in step e); It provides a method of constructing an underground structure using a cast-heated steel pipe wall comprising a.

상기 b)단계에서는 굴착을 진행하면서 벽체부를 이루는 강관들 사이를 철판으로 연결하는 단계가 더 행하여진다.In step b), the step of connecting the steel pipes constituting the wall portion with an iron plate while excavation is carried out is further performed.

상기 a)단계 및 b)단계가 완료된 후 벽체부 및 기둥부를 이루는 강관의 내부에 콘크리트를 타설하는 단계가 더 행하여질 수 있다.After the steps a) and b) are completed, the step of pouring concrete into the inside of the steel pipe constituting the wall portion and the column portion may be further performed.

상기 d)단계 및 f)단계를 진행할 때 상부슬래브 및 하부슬래브는 철근콘크리트 구조물로 형성하거나 또는 철골콘크리트구조물로 형성할 수 있다.When performing steps d) and f), the upper slab and the lower slab may be formed of a reinforced concrete structure or a steel framed concrete structure.

또한 본 발명은 지중에 간격을 유지하며 종방향을 따라서 주열식으로 설치된 강관 및 이들 강관들 사이에 연결된 철판으로 이루어진 구조물을 2열로 형성한 벽체부; 상기 벽체부들 사이를 따라서 종방향으로 간격을 유지하며 지중에 설치되는 강관으로 이루어진 기둥부; 상기 양쪽 벽체부들 사이의 굴착된 공간을 따라서 벽체부와 기둥부에 각각 연결되어 벽체부들 사이에 박스형태의 공간을 이루도록 형성되는 복수층의 슬래브; 를 포함하는 주열식 강관 벽체를 이용한 지중구조물을 제공한다.In addition, the present invention is a wall portion formed in two rows of a structure consisting of a steel pipe installed in a column type along the longitudinal direction and an iron plate connected between the steel pipes while maintaining a gap in the ground; a column part made of a steel pipe installed underground while maintaining a distance in the longitudinal direction along between the wall parts; a plurality of layers of slabs respectively connected to the wall portion and the column portion along the excavated space between the both wall portions to form a box-shaped space between the wall portions; It provides an underground structure using a columnar steel pipe wall comprising a.

상기 벽체부 및 기둥부를 구성하는 강관은 내부 원주방향으로 복수의 리브 또는 스터드가 형성되고, 상기 리브 또는 스터드는 강관의 길이와 동일한 길이로 형성될 수 있다.A plurality of ribs or studs may be formed in the inner circumferential direction of the steel pipe constituting the wall part and the column part, and the ribs or studs may be formed to have the same length as the length of the steel pipe.

상기 각 벽체부를 이루는 강관들 사이는 철판이 연결되고, 상기 벽체부 및 기둥부를 구성하는 강관의 내부에 현장콘크리트가 타설될 수 있다.An iron plate is connected between the steel pipes constituting each of the wall parts, and on-site concrete may be poured into the steel pipes constituting the wall part and the column part.

상기 벽체부 및 기둥부를 구성하는 강관의 외부에는 슬래브철근이 고정될 수 있도록 슬래브철근 고정부가 형성되고, 상기 슬래브철근 고정부에는 슬래브철근의 끝단부 또는 연결철근이 끼워져 고정되는 고정홀이 형성된다.A slab reinforcing bar fixing part is formed on the outside of the steel pipe constituting the wall part and the column part so that the slab reinforcing bar can be fixed, and the slab reinforcing bar fixing part has a fixing hole in which the end of the slab reinforcing bar or the connecting reinforcing bar is inserted and fixed.

상기 슬래브는 철근콘크리트 구조물로 이루어지거나 또는 철근콘크리트 하부에 거더가 형성된 구조물로 이루어질 수 있다.The slab may be formed of a reinforced concrete structure or a structure in which a girder is formed under the reinforced concrete.

본 발명에 의한 주열식 강관 벽체를 이용한 지중구조물 및 그 시공방법은 상부슬래브를 시공한 후, 그 하부에서 내부굴착 및 하부슬래브 시공 작업이 이루어지므로 상부쪽 도로 등을 조기에 개방할 수 있어 공사로 인한 교통 혼잡을 최소화 할 수 있다.The underground structure using the cast-heated steel pipe wall according to the present invention and the construction method thereof, after the upper slab is constructed, internal excavation and lower slab construction work are performed in the lower part, so the upper road, etc. can be opened at an early stage. traffic congestion can be minimized.

또한 강관을 종방향으로 일정간격으로 설치한 후 강관 사이에 철판을 용접 등으로 고정하는 것으로 벽체부를 형성하여 벽체 외부에 토압 또는 수압에 강한 저항력을 발휘하여 누수를 완벽하게 차단할 수 있다.In addition, after installing steel pipes at regular intervals in the longitudinal direction, by fixing iron plates between the steel pipes by welding, etc., the wall part is formed to exhibit strong resistance to earth pressure or water pressure on the outside of the wall to completely block water leakage.

또한 강관의 내부 원주방향으로 복수의 리브 또는 스터드가 강관의 전체길이에 걸쳐 형성되어 강관의 구조가 더욱 튼튼하게 이루어져 견고한 벽체부를 형성할 수 있다.In addition, a plurality of ribs or studs are formed over the entire length of the steel pipe in the inner circumferential direction of the steel pipe, so that the structure of the steel pipe is made more robust to form a solid wall part.

그리고 벽체의 강관이나 철판 및 기둥 강관의 외부에는 상부슬래브 및 하부슬래브가 일체로 합성되는 슬래브철근 고정부가 형성되어 상, 하부슬래브는 슬래브철근 고정부와 함께 강관에 견고하게 고정될 수 있다.In addition, a slab reinforcing bar fixing part in which the upper slab and the lower slab are integrally synthesized is formed on the outside of the steel pipe or the steel plate and the column steel pipe of the wall, so that the upper and lower slabs can be firmly fixed to the steel pipe together with the slab reinforcing bar fixing part.

도 1은 본 발명에 따른 주열식 강관 벽체를 이용한 지중구조물 시공방법에 있어서 벽체부 및 기둥을 시공하는 것을 설명하기 위한 사시도이다.
도 2는 본 발명에 따른 주열식 강관 벽체를 이용한 지중구조물 시공방법에 제공된 강관의 확대단면도이다.
도 3은 본 발명에 따른 주열식 강관 벽체를 이용한 지중구조물 시공방법에 있어서 강관에 설치된 슬래브철근 고정부를 설명하기 위한 부분확대도이다.
도 4는 본 발명에 따른 주열식 강관 벽체를 이용한 지중구조물 시공방법에 있어서 슬래브철근이 배근된 것을 나타내는 사시도이다.
도 5a 내지 도 5d는 슬래브철근이 강관 또는 철판의 슬래브철근 고정부에 다양한 방식으로 고정된 것을 나타낸 예시도이다.
도 6은 본 발명에 따른 주열식 강관 벽체를 이용한 지중구조물 시공방법에 있어서 슬래브철근을 격자 형태로 배근한 것을 나타내는 사시도이다.
도 7은 본 발명에 따른 주열식 강관 벽체를 이용한 지중구조물 시공방법에 있어서 슬래브의 하부쪽에 거더를 형성한 것을 나타내는 사시도이다.
도 8은 본 발명에 따른 주열식 강관 벽체를 이용한 지중구조물 시공방법에 있어서 복수층의 슬래브가 시공완료된 것을 정면에서 바라본 도면이다.
1 is a perspective view for explaining the construction of a wall portion and a column in the underground structure construction method using a cast-heated steel pipe wall according to the present invention.
2 is an enlarged cross-sectional view of a steel pipe provided in a method for constructing an underground structure using a cast-heated steel pipe wall according to the present invention.
3 is a partially enlarged view for explaining the slab reinforcing bar fixed part installed on the steel pipe in the underground structure construction method using the cast-heated steel pipe wall according to the present invention.
4 is a perspective view showing that the slab reinforcement is reinforced in the underground structure construction method using the cast-heated steel pipe wall according to the present invention.
5A to 5D are exemplary views showing that the slab reinforcing bars are fixed to the slab reinforcing bars of the steel pipe or steel plate in various ways.
6 is a perspective view showing that slab reinforcing bars are arranged in a grid form in the underground structure construction method using a cast-heated steel pipe wall according to the present invention.
7 is a perspective view showing that a girder is formed on the lower side of the slab in the method for constructing an underground structure using a cast-heated steel pipe wall according to the present invention.
8 is a view from the front of the construction of a multi-layered slab is completed in the underground structure construction method using a cast-heated steel pipe wall according to the present invention.

이하, 본 발명의 바람직한 실시 예를 첨부한 도면을 참조하여 더욱 상세히 설명한다.Hereinafter, preferred embodiments of the present invention will be described in more detail with reference to the accompanying drawings.

도 1은 본 발명에 따른 주열식 강관 벽체를 이용한 지중구조물 시공방법에 있어서 벽체부 및 기둥을 시공하는 것을 설명하기 위한 사시도이고, 도 2는 본 발명에 제공된 강관의 확대 단면도이고, 도 3은 본 발명의 강관 및 철판에 제공된 슬래브철근 고정부를 설명하기 위한 부분확대도이고, 도 4는 본 발명에 따른 주열식 강관 벽체를 이용한 지중구조물 시공방법에 있어서 슬래브철근이 배근된 것을 나타내는 사시도이고, 도 5는 슬래브철근의 끝단부가 강관 및 철판의 슬래브철근 고정부에 다양한 방식으로 고정된 것을 나타낸 예시도로서, 본 발명에 따른 주열식 강관 벽체를 이용한 지중구조물 시공방법은 선형측량 - 강관벽체 건입 - 강관기둥 건입 - 상부터파기 - 상부슬래브 시공 - 상단 되메우기 및 하부굴착 - 하부슬래브 시공 순으로 진행된다.1 is a perspective view for explaining the construction of a wall part and a column in the underground structure construction method using a cast-heated steel pipe wall according to the present invention, FIG. 2 is an enlarged cross-sectional view of the steel pipe provided in the present invention, and FIG. 3 is this view It is a partial enlarged view for explaining the slab reinforcing bar provided in the steel pipe and the steel plate of the present invention, and FIG. 4 is a perspective view showing that the slab reinforcing bar is reinforced in the underground structure construction method using the columnar steel pipe wall according to the present invention, FIG. 5 is an exemplary view showing that the end of the slab reinforcing bar is fixed to the slab reinforcing bar of the steel pipe and steel plate in various ways. Construction of pillars - Digging from the top - Construction of the upper slab - Backfilling of the upper part and excavation of the lower part - Construction of the lower slab is carried out in the following order.

본 발명에 따른 주열식 강관 벽체를 이용한 지중구조물 시공방법은 먼저 지중구조물이 시공될 부분의 선형측량을 실시한 후, 종방향을 따라서 굴착하면서 금속재의 강관(2)을 연속적으로 설치하여 간격을 유지하며 2열로 벽체부(100)를 형성한다.In the underground structure construction method using a cast-heated steel pipe wall according to the present invention, first, a linear survey of the part where the underground structure is to be constructed is carried out, and then, the steel pipe 2 made of metal is continuously installed while excavating along the longitudinal direction to maintain the gap. The wall part 100 is formed in two rows.

벽체부(100)를 시공하기 전 지표면을 따라서 벽체부(100)가 형성될 부분을 따라서 도시되지 않은 가이드월 설치작업을 더 진행할 수도 있다.Before constructing the wall unit 100, a guide wall installation work (not shown) may be further performed along the portion where the wall unit 100 is to be formed along the ground surface.

이러한 가이드월은 예를 들면 공장에서 PC공법으로 제작된 일정길이를 갖는 사각단면 형태의 철근 콘크리트 구조물로 이루어질 수 있으며, 이러한 구조물을 시공현장으로 운반하여 크레인 등을 이용하여 선형측량이 완료된 지표면을 따라서 강관(2)이 설치될 양쪽으로 간격을 유지하며 서로 마주하는 상태로 설치할 수 있다.Such a guide wall may be made of, for example, a reinforced concrete structure in the form of a square cross-section having a certain length manufactured by the PC method in a factory. The steel pipe 2 may be installed in a state facing each other while maintaining an interval on both sides to be installed.

벽체부(100)를 이루는 강관(2)은 충분한 강도를 금속 파이프로 이루어지며, 강관(2) 내주면 원주방향으로 복수의 리브 또는 스터드(4)가 형성된다. 이 리브 또는 스터드(4)는 강관(2)의 전체길이에 거쳐 형성된다.The steel pipe 2 constituting the wall portion 100 is made of a metal pipe having sufficient strength, and a plurality of ribs or studs 4 are formed in the circumferential direction of the inner circumferential surface of the steel pipe 2 . These ribs or studs 4 are formed over the entire length of the steel pipe 2 .

이렇게 강관(2)의 전체길이에 리브 또는 스터드(4)가 형성되어 강관(2)은 구조적으로 튼튼하게 이루어지고, 또 그 내부에 콘크리트를 타설할 경우 합성력을 좋게 할 수 있다.In this way, the ribs or studs 4 are formed on the entire length of the steel pipe 2 so that the steel pipe 2 is structurally strong, and when concrete is poured therein, the composite strength can be improved.

또한 강관(2) 및 뒤에서 상세하게 설명되는 철판(8)의 외측으로는 뒤에서 상세하게 설명되는 슬래브를 구성하는 슬래브철근(10)을 강결 방식으로 견고하게 고정할 수 있도록 슬래브철근 고정부(6)가 형성된다.In addition, to the outside of the steel pipe 2 and the iron plate 8 to be described in detail later, the slab reinforcing bar 10 constituting the slab, which will be described in detail later, is firmly fixed in a rigid manner in a slab reinforcing bar fixing part 6 is formed

슬래브철근 고정부(6)는 철판 또는 철골구조로 이루어질 수 있으며, 기둥(2)에 용접으로 고정하여 설치할 수 있다.The slab reinforcing bar fixing part 6 may be formed of an iron plate or a steel frame structure, and may be installed by welding to the column 2 .

슬래브철근 고정부(6)에는 슬래브철근(10)의 끝단부가 끼워져 고정되는 고정홀(14)이 형성되어 슬래브철근(10) 끝단부를 강결 방식으로 고정하여 배근할 수 있다. 이렇게 슬래브철근(10) 끝단부를 슬래브철근 고정부(6)에 고정하면 더욱 튼튼하게 슬래브를 형성할 수 있다.In the slab reinforcing bar fixing part 6, a fixing hole 14 in which the end of the slab reinforcing bar 10 is inserted and fixed is formed, so that the slab reinforcing bar 10 can be reinforced by fixing the end in a rigid method. If the slab reinforcing bar 10 is fixed at the end of the slab reinforcing bar fixing part 6 in this way, a more robust slab can be formed.

이러한 슬래브철근 고정부(6)는 1단 또는 2단 형태로 형성되어 슬래브철근(10)을 단일 층으로 배근하거나 또는 2개 층으로 배근할 수 있다.This slab reinforcing bar fixing part 6 may be formed in one- or two-stage form, and the slab reinforcing bar 10 may be reinforced in a single layer or in two layers.

상기 기둥(2)은 일정한 길이로 제작할 수 있으며, 이러한 기둥(2)의 외측에 슬래브철근 고정부(6)를 설치하고 운송수단을 이용하여 시공현장으로 운반한 다음, 크레인 등을 이용하여 일정한 간격을 유지하며 굴착공간에 건입시켜 설치할 수 있다. 이때 건입된 기둥(2)의 높이를 일정하게 맞추는 레벨조절작업을 하면서 건입을 진행할 수 있다.The pillar (2) can be manufactured to a certain length, and the slab reinforcing bar fixing part (6) is installed on the outside of the pillar (2), transported to the construction site by means of transportation, and then at regular intervals using a crane or the like. and can be installed in the excavation space. At this time, it is possible to proceed with the erection while the level adjustment work to uniformly match the height of the erected pillar (2).

이러한 작업으로 종방향을 따라서 기둥(2)을 일정간격으로 설치하는 방법으로 1열의 벽체부(100)를 형성할 수 있으며, 이때 인접된 기둥(2)들 사이에 철판(8)을 용접으로 고정하여 흙막이 역할 및 완벽한 방수가 가능하여 강관(2)들 간의 설치된 상태를 더 견고하게 유지할 수 있는 역할을 할 수 있다.With this operation, one row of wall parts 100 can be formed by installing the pillars 2 at regular intervals along the longitudinal direction, and at this time, the iron plates 8 are fixed between the adjacent pillars 2 by welding. Thus, it is possible to serve as a retaining wall and to be completely waterproof, so that the installed state between the steel pipes 2 can be more firmly maintained.

이렇게 단위부재로 이루어진 강관(2)을 지중에 간격을 유지하며 종방향으로 나란히 주열식으로 각각 설치하여 일정구간에 2열로 이루어진 벽체부(100)를 형성할 수 있다.In this way, the steel pipe 2 made of the unit member is installed in a columnar manner side by side in the longitudinal direction while maintaining a gap in the ground to form the wall part 100 consisting of two rows in a certain section.

이러한 작업이 완료되면 2열로 형성된 벽체부(100)들 사이를 따라서 종방향으로 간격을 유지하며 상기와 동일한 강관(2)을 건입하는 방법으로 기둥부(200)를 시공한다.When this operation is completed, the column part 200 is constructed by the same method as above while maintaining the distance in the longitudinal direction along between the wall parts 100 formed in two rows.

이와 같은 기둥부(200)의 시공은 먼저, 기둥부를 이루는 강관(2)을 설치할 부분을 수직방향으로 굴착한 후, 강관(2)을 크레인 등을 이용하여 인상하여 굴착공간에 건입시켜 먼저 설치된 벽체부(100)를 구성하는 강관(2)의 레벨과 동일하게 맞추는 레벨조절을 하면서 건입을 완료할 수 있다. In the construction of the column part 200, first, the part where the steel pipe 2 constituting the column part is to be installed is excavated in the vertical direction, and then the steel pipe 2 is pulled up using a crane, etc. The construction can be completed while adjusting the level to match the level of the steel pipe 2 constituting the part 100 .

기둥부(200)에 사용되는 강관(2)의 외측면에도 슬래브가 견고하게 지지될 수 있도록 슬래브철근 고정부(6)가 형성되며, 이때 슬래브철근 고정부(6)는 벽체와 마주하는 강관(2)의 양쪽에 각각 형성되어 양측 방향으로 슬래브철근(10)을 고정할 수 있도록 구성된다.The slab reinforcing bar fixing part 6 is also formed on the outer surface of the steel pipe 2 used for the column 200 so that the slab can be firmly supported. 2) is respectively formed on both sides of the slab reinforcement 10 in both directions is configured to be fixed.

이렇게 설치된 벽체부(100) 및 기둥부(200)를 구성하는 강관(2)은 레벨 조절된 상태로 설치되어 강관(2)에 형성된 슬래브철근 고정부(6)는 동일한 레벨에 위치할 수 있다.The steel pipe 2 constituting the wall part 100 and the column part 200 installed in this way is installed in a level-controlled state, and the slab reinforcing bar fixing part 6 formed in the steel pipe 2 may be located at the same level.

그리고 벽체부(100) 및 기둥부(200)를 이루는 강관(2)의 내부에 콘크리트를 더 타설하면 벽체부(100) 및 기둥부(200)의 구조를 더욱 견고하게 구축할 수 있으며, 이때 강관(2) 내부에 타설된 현장콘크리트는 리브(4)에 의하여 강관(2) 내부와 일체로 견고하게 합성된다.In addition, if concrete is further poured into the inside of the steel pipe 2 constituting the wall part 100 and the column part 200 , the structure of the wall part 100 and the column part 200 can be more firmly built, at this time the steel pipe (2) The in-situ concrete cast inside is firmly combined with the inside of the steel pipe (2) by means of the ribs (4).

상기와 같은 공정이 완료되면, 벽체부(100) 사이의 지표면에서부터 상부쪽 터파기 작업을 실시한다. 이때 상부쪽 슬래브가 시공될 부분까지 터파기를 진행하면 된다.When the above process is completed, the upper excavation work is performed from the ground surface between the wall parts 100 . At this time, excavation can be carried out to the part where the upper slab is to be constructed.

이렇게 상부쪽 터파기 작업이 완료되면, 도 4 내지 도 6과 같이 상부슬래브를 형성하기 위하여 슬래브철근(10)을 배근하게 되는데, 이때 벽체부(100) 및 기둥부(200)를 구성하는 강관(2)에 형성된 슬래브철근 고정부(6)에 슬래브철근(10) 끝단부를 고정부재나 용접 등의 방법으로 고정시키면서 배근하면 된다.When the upper excavation work is completed in this way, the slab reinforcing bar 10 is reinforced to form the upper slab as shown in FIGS. 4 to 6 , and at this time, the steel pipe constituting the wall part 100 and the column part 200 ( Reinforcement is performed while fixing the end of the slab reinforcing bar 10 to the slab reinforcing bar fixing part 6 formed in 2) using a fixing member or welding method.

즉, 도 5a 및 도 5b와 같이 끝단부에 나사부가 형성된 슬래브철근(10)을 90도 각도로 절곡하여 슬래브철근 고정부(6)의 고정홀(14)에 끼우고 볼트 등과 같은 고정부재(16)를 슬래브철근(10)의 끝단부에 나사체결하여 슬래브철근(10)을 슬래브철근 고정부(6)에 강결 방식으로 고정할 수 있다.That is, as shown in FIGS. 5A and 5B, the slab reinforcing bar 10 having a threaded portion formed at the end is bent at an angle of 90 degrees and inserted into the fixing hole 14 of the slab reinforcing bar fixing unit 6, and a fixing member 16 such as a bolt or the like. ) can be screwed to the end of the slab reinforcing bar 10 to fix the slab reinforcing bar 10 to the slab reinforcing bar fixing part 6 in a rigid manner.

또한 도 5c와 같이 슬래브철근 고정부(6)의 고정홀(14)에 채널형태로 절곡된 연결철근(18)을 끼우고, 연결철근(18)의 끝단부에 슬래브철근(10)을 커플러(20)로 연결하거나, 또는 도 5d와 같이 슬래브철근 고정부(6)에 슬래브철근(10)의 끝단부를 용접(22)으로 고정할 수도 있다.In addition, as shown in Fig. 5c, the connecting reinforcing bar 18 bent in the channel form is inserted into the fixing hole 14 of the slab reinforcing bar fixing part 6, and the slab reinforcing bar 10 is attached to the end of the connecting reinforcing bar 18 by a coupler ( 20), or the end of the slab reinforcing bar 10 to the slab reinforcing bar fixing part 6 may be fixed by welding 22 as shown in FIG. 5d.

이와 같이 슬래브철근(10)을 강관(2)에 형성된 슬래브철근 고정부(6)에 강결로 고정하면 슬래브철근(10)과 함께 형성되는 슬래브는 구조적인 견고함이 극대화 된다. 슬래브철근(10)은 도 6과 같이 격자 형태로 배근할 수 있다.In this way, when the slab reinforcing bar 10 is fixed to the slab reinforcing bar fixing part 6 formed in the steel pipe 2 with steel grain, the structural rigidity of the slab formed together with the slab reinforcing bar 10 is maximized. The slab reinforcing bar 10 may be arranged in a grid form as shown in FIG. 6 .

그리고 슬래브철근(10)의 하부에는 도 4 및 도 6과 같이 기둥부(200)를 이루는 강관들 사이에 거더(12)를 더 설치하여 슬래브철근(10)을 지지함으로서 슬래브를 구조적으로 더욱 튼튼하게 구축할 수 있다.And in the lower part of the slab reinforcement 10, as shown in FIGS. 4 and 6, a girder 12 is further installed between the steel pipes forming the column part 200 to support the slab reinforcement 10 to make the slab structurally more robust. can be built

이때 설치되는 거더(12)는 통상적으로 사용되고 있는 거더를 사용할 수 있으므로 상세한 설명은 생략한다.At this time, since the installed girder 12 can use a girder that is generally used, a detailed description thereof will be omitted.

또한 도 7 및 도 8과 같이 벽체부(100)와 기둥부(200) 사이 및 기둥부(200)를 따라서 각각 거더(12)를 설치하고, 그 상부에 상기에서 설명한 방식으로 슬래브철근(10)을 배근한 후, 슬래브철근(10)에 현장콘크리트를 타설하여 슬래브를 시공할 수 있다. 이와 같이 슬래브를 구성하는 슬래브철근(10) 양단부를 슬래브철근 고정부(6)에 고정하고 그 하부에 거더(12)가 시공되면 슬래브 두께를 줄일 수 있고, 슬래브의 휨모멘트, 전단력, 지지력 등이 대폭 강화되어 슬래브의 구조적인 견고함을 극대화 할 수 있다.In addition, as shown in FIGS. 7 and 8, between the wall part 100 and the column part 200 and along the column part 200, respectively, the girder 12 is installed, and the slab reinforcing bar 10 is installed on the upper part in the manner described above. After placing the slab, the slab can be constructed by pouring on-site concrete to the slab reinforcing bar (10). In this way, when both ends of the slab reinforcing bar 10 constituting the slab are fixed to the slab reinforcing bar fixing part 6 and the girder 12 is constructed under the slab, the thickness of the slab can be reduced, and the bending moment, shear force, support force, etc. of the slab are reduced. It is greatly strengthened to maximize the structural rigidity of the slab.

이와 같이 최상부의 슬래브 시공이 완료되면, 시공된 슬래브의 상부는 되메우기 작업을 하고, 슬래브의 하부에서는 하부슬래브를 형성하기 위하여 내부굴착 작업을 진행한다.In this way, when the construction of the uppermost slab is completed, the upper part of the constructed slab is backfilled, and the internal excavation work is performed in the lower part of the slab to form a lower slab.

이렇게 상부슬래브를 시공한 후, 그 하부에서 하부슬래브 시공을 위한 내부굴착 작업 및 하부슬래브 시공 작업이 이루어지므로 그 상부쪽 도로 등을 조기에 개방할 수 있으므로 공사로 인한 교통 혼잡을 최소화 할 수 있다.After constructing the upper slab in this way, the internal excavation work and lower slab construction work for lower slab construction are carried out in the lower part, so the upper road can be opened early, so traffic congestion due to construction can be minimized.

그리고 하부슬래브가 설치되는 부분까지 굴착작업이 완료되면, 상기에서 설명한 상부슬래브 시공 작업을 할 때와 동일한 방법으로 하부슬래브철근 배근작업 및 콘크리트 타설 작업을 행하여 하부슬래브를 형성하면 된다.And when the excavation work is completed up to the part where the lower slab is installed, the lower slab reinforcement work and concrete pouring work are performed in the same manner as when the upper slab construction work described above to form the lower slab.

상기와 같이 주열식 강관벽체를 이용한 지중구조물 시공방법에 의하여 도 8과 같이 양측 벽체부(100) 사이에 복수의 기둥부(200)를 형성하고 복수층의 슬래브(24a)(24b)(24c)를 형성하여 일정구간에 박스 형태로 이루어진 지하구조물을 시공할 수 있으며, 이와 동일한 시공방법에 의하여 일정구간을 반복적으로 작업하며 연속적으로 이루어진 박스형태의 지하구조물을 형성할 수 있다.As described above, by the underground structure construction method using the columnar steel pipe wall, a plurality of column parts 200 are formed between the both side wall parts 100 as shown in FIG. 8, and a plurality of layers of slabs 24a, 24b, 24c It is possible to construct a box-shaped underground structure in a certain section by forming

이때 양측 벽체부(100) 사이에 형성되는 기둥부(200)는 벽체부(100)들 사이의 간격에 따라서 하나 또는 두개 이상을 형성할 수도 있다.At this time, one or two or more pillars 200 formed between the both side wall portions 100 may be formed according to the spacing between the wall portions 100 .

이와 같은 지하구조물은 예를 들면 지하차도로 이루어질 수 있는데, 위에서 설명한 동일한 시공방법으로 도 8과 같이 3개의 의 슬래브를 형성하여 2개 층으로 이루어진 지하구조물을 형성할 수도 있고, 또 3개 이상의 층으로 이루어진 지하구조물을 형성할 수도 있다.Such an underground structure may be formed of, for example, an underpass. In the same construction method described above, three slabs may be formed as shown in FIG. 8 to form an underground structure consisting of two floors, and three or more floors It is also possible to form an underground structure consisting of

상기에서는 본 발명의 바람직한 실시예가 예시를 목적으로 설명되어 있으나 이에 제한되지는 않으며, 특허청구범위와 발명의 상세한 설명 및 첨부한 도면의 범위 내에서 여러 가지로 변형하여 실시하는 것도 가능하다.In the above, the preferred embodiment of the present invention has been described for the purpose of illustration, but it is not limited thereto, and it is possible to carry out various modifications within the scope of the claims, the detailed description of the invention, and the accompanying drawings.

2: 강관
4: 리브 또는 스터드
6: 슬래브철근 고정부
8: 철판
10: 슬래브철근
12: 거더
14: 고정홀
16: 고정부재
18: 연결철근
20: 커플러
22: 용접
24a, 24b, 24c: 슬래브
100: 벽체부
200: 기둥부
2: steel pipe
4: Rib or stud
6: Slab rebar fixing part
8: iron plate
10: Slab reinforcement
12: girder
14: fixing hole
16: fixing member
18: connecting reinforcing bar
20: coupler
22: welding
24a, 24b, 24c: slab
100: wall part
200: pillar part

Claims (13)

a) 지중구조물이 시공될 부분의 선형측량을 실시한 후 종방향을 따라서 굴착하면서 금속재의 강관을 연속적으로 설치하여 간격을 유지하며 2열로 벽체부를 형성하는 단계;
b) 상기 2열의 벽체부들 사이를 따라서 굴착하고 금속재의 강관을 일정 간격으로 설치하여 기둥부를 설치하는 단계;
c) 상기 벽체부와 기둥부 사이의 지표면을 굴착하여 터파기를 실시하는 단계;
d) 상기 터파기로 형성된 공간의 벽체부와 기둥부 사이에 상부슬래브를 시공하는 단계;
e) 상기 상부슬래브의 상부면을 되메우기 하면서 상부슬래브의 하부쪽을 굴착하는 단계;
f) 상기 e)단계에서 굴착된 벽체부와 기둥부 사이의 공간에 하부슬래브를 시공하는 단계;
를 포함하는 주열식 강관 벽체를 이용한 지중구조물 시공방법.
a) performing a linear survey of the part where the underground structure is to be constructed and then continuously installing metal steel pipes while excavating along the longitudinal direction to maintain the spacing and forming wall parts in two rows;
b) excavating along between the two rows of wall parts and installing metal steel pipes at regular intervals to install column parts;
c) performing excavation by excavating the ground surface between the wall part and the column part;
d) constructing an upper slab between the wall part and the column part of the space formed by the excavation;
e) excavating the lower side of the upper slab while backfilling the upper surface of the upper slab;
f) constructing a lower slab in the space between the wall and the column excavated in step e);
A method of constructing an underground structure using a cast-heated steel pipe wall comprising a.
청구항 1에 있어서,
상기 b)단계에서는 굴착을 진행하면서 벽체부를 이루는 강관들 사이를 철판으로 연결하는 단계가 더 행하여지는 것을 특징으로 하는 주열식 강관 벽체를 이용한 지중구조물 시공방법.
The method according to claim 1,
In step b), a method of constructing an underground structure using a columnar steel pipe wall, characterized in that the step of connecting the steel pipes constituting the wall portion with an iron plate is further performed while excavation is carried out.
청구항 1에 있어서,
상기 a)단계 및 b)단계가 완료된 후 벽체부 및 기둥부를 이루는 강관의 내부에 콘크리트를 타설하는 단계가 더 행하여지는 것을 특징으로 하는 주열식 강관 벽체를 이용한 지중구조물 시공방법.
The method according to claim 1,
After the steps a) and b) are completed, the method of constructing an underground structure using a columnar steel pipe wall, characterized in that the step of pouring concrete into the inside of the steel pipe constituting the wall part and the column part is further performed.
청구항 1에 있어서,
상기 d)단계 및 f)단계를 진행할 때 상, 하부슬래브는 철근콘크리트 구조물로 형성하거나 또는 철골콘크리트구조물로 형성하는 것을 특징으로 하는 주열식 강관 벽체를 이용한 지중구조물 시공방법.
The method according to claim 1,
When performing steps d) and f), the upper and lower slabs are formed of a reinforced concrete structure or a steel framed concrete structure.
지중에 간격을 유지하며 종방향을 따라서 주열식으로 설치된 강관 및 이들 강관들 사이에 연결된 철판으로 이루어진 구조물을 2열로 형성한 벽체부;
상기 벽체부들 사이를 따라서 종방향으로 간격을 유지하며 지중에 설치되는 강관으로 이루어진 기둥부;
상기 양쪽 벽체부들 사이의 굴착된 공간을 따라서 벽체부와 기둥부에 각각 연결되어 벽체부들 사이에 박스형태의 공간을 이루도록 형성되는 복수층의 슬래브;
를 포함하는 주열식 강관 벽체를 이용한 지중구조물.
a wall part formed in two rows of a structure consisting of steel pipes installed in a column type along the longitudinal direction while maintaining a gap in the ground and an iron plate connected between the steel pipes;
a column part made of a steel pipe installed underground while maintaining a distance in the longitudinal direction along between the wall parts;
a plurality of layers of slabs respectively connected to the wall portion and the column portion along the excavated space between the both wall portions to form a box-shaped space between the wall portions;
An underground structure using a columnar steel pipe wall comprising a.
청구항 5에 있어서,
상기 벽체부 및 기둥부를 구성하는 강관은 내부 원주방향으로 복수의 리브 또는 스터드가 형성된 것을 특징으로 하는 주열식 강관 벽체를 이용한 지중구조물.
6. The method of claim 5,
The steel pipe constituting the wall part and the column part is an underground structure using a columnar steel pipe wall, characterized in that a plurality of ribs or studs are formed in the inner circumferential direction.
청구항 6에 있어서,
상기 리브 또는 스터드는 강관의 길이와 동일한 길이로 형성된 것을 특징으로 하는 주열식 강관 벽체를 이용한 지중구조물.
7. The method of claim 6,
The rib or stud is an underground structure using a columnar steel pipe wall, characterized in that it is formed to have the same length as the length of the steel pipe.
청구항 5에 있어서,
상기 벽체부 및 기둥부를 구성하는 강관의 내부에 현장콘크리트가 타설된 것을 특징으로 하는 주열식 강관 벽체를 이용한 지중구조물.
6. The method of claim 5,
An underground structure using a cast-heated steel pipe wall, characterized in that field concrete is poured inside the steel pipe constituting the wall part and the column part.
청구항 5에 있어서,
상기 벽체부 강관과 철판 및 기둥부를 구성하는 강관의 외부에는 슬래브철근이 고정될 수 있도록 슬래브철근 고정부가 형성된 것을 특징으로 하는 주열식 강관 벽체를 이용한 지중구조물.
6. The method of claim 5,
An underground structure using a cast-heated steel pipe wall, characterized in that a slab reinforcing bar fixing part is formed on the outside of the steel pipe constituting the wall part steel pipe, the iron plate and the column part so that the slab reinforcing bar can be fixed.
청구항 9에 있어서,
상기 슬래브철근 고정부에는 슬래브철근의 끝단부 또는 연결철근이 끼워져 고정되는 고정홀이 형성된 것을 특징으로 하는 주열식 강관 벽체를 이용한 지중구조물.
10. The method of claim 9,
An underground structure using a columnar steel pipe wall, characterized in that the slab reinforcing bar fixing part has a fixing hole in which the end of the slab reinforcing bar or the connecting reinforcing bar is inserted and fixed.
청구항 9에 있어서,
상기 슬래브철근 고정부는 1단 또는 2단으로 형성된 것을 특징으로 하는 주열식 강관 벽체를 이용한 지중구조물.
10. The method of claim 9,
The slab reinforcing bar fixing part is an underground structure using a columnar steel pipe wall, characterized in that it is formed in one or two stages.
청구항 5에 있어서,
상기 기둥부를 이루는 강관 사이에는 슬래브를 구성하는 슬래브철근을 지지하는 거더가 설치된 것을 특징으로 하는 주열식 강관 벽체를 이용한 지중구조물.
6. The method of claim 5,
An underground structure using a columnar steel pipe wall, characterized in that a girder supporting the slab reinforcing bar constituting the slab is installed between the steel pipes constituting the column part.
청구항 5에 있어서,
상기 슬래브는 철근콘크리트 구조물로 이루어지거나 또는 철근콘크리트 하부에 거더가 형성된 구조물로 이루어진 것을 특징으로 하는 주열식 강관 벽체를 이용한 지중구조물.
6. The method of claim 5,
The slab is an underground structure using a columnar steel pipe wall, characterized in that it is made of a reinforced concrete structure or a structure in which a girder is formed under the reinforced concrete.
KR1020200012008A 2020-01-31 2020-01-31 Under ground structure using column steel pipe wall and construction method thereof KR20210098162A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200012008A KR20210098162A (en) 2020-01-31 2020-01-31 Under ground structure using column steel pipe wall and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200012008A KR20210098162A (en) 2020-01-31 2020-01-31 Under ground structure using column steel pipe wall and construction method thereof

Publications (1)

Publication Number Publication Date
KR20210098162A true KR20210098162A (en) 2021-08-10

Family

ID=77315922

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200012008A KR20210098162A (en) 2020-01-31 2020-01-31 Under ground structure using column steel pipe wall and construction method thereof

Country Status (1)

Country Link
KR (1) KR20210098162A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20230108567A (en) * 2022-01-11 2023-07-18 송성민 Longitudinal and lateral integration structure of pile and structure manufactured using the same

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101590032B1 (en) 2015-02-12 2016-01-29 주식회사 대산시빌테크날러지 Column wall using pile and structure construction method therewith

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101590032B1 (en) 2015-02-12 2016-01-29 주식회사 대산시빌테크날러지 Column wall using pile and structure construction method therewith

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20230108567A (en) * 2022-01-11 2023-07-18 송성민 Longitudinal and lateral integration structure of pile and structure manufactured using the same

Similar Documents

Publication Publication Date Title
KR102208793B1 (en) Under ground structure using column wall and construction method thereof
KR100915099B1 (en) Structure for supporting retaining wall of earth with arch material and method constructing the arch structure
KR101687495B1 (en) Partial top-down construction method for building underground structures
WO2011114507A1 (en) Method of constructing underground structure to be newly built
KR20190022132A (en) Top-down method using precast-concrete colum
KR20150029512A (en) The horizontal structural frame and the underground construction methods using it
JP2007308995A (en) Under path and construction method for the same
KR101401057B1 (en) Method to build underground structures using the pillars and the stigma and steel beam and slab structures are formed
KR101296857B1 (en) Underground structure having slab beam with enhanced bearing power against earth pressure and construction methods of the same
KR20060092552A (en) The non-strut down framework construction method of having used cast in place concrete pile
KR102396786B1 (en) Underground expansion and top-down method of new building using reinforcement of existing underground outer wall
KR101296856B1 (en) Reinforcement structure for wall of underground structure and construction method of underground structure using the same
KR20210098162A (en) Under ground structure using column steel pipe wall and construction method thereof
KR100912574B1 (en) Retaining wall system using strut assembly and excavating method using the same
KR100625115B1 (en) downward reinforced-concrete underground structure using temporary assistant columns
KR20080025219A (en) Underground outer wall construction method using deck-plate and deck-plate for constructing underground outer wall
KR101908943B1 (en) RC WALL STRUCTURE FOR TOP-DOWN AND METHOD FOR CONSTRUCTING THE STRUCTUREa
KR20130100878A (en) Architecture using a complex steel pile and a constructing method thereof
JP4228308B2 (en) Reinforcement method for existing floors and seismic isolation method for existing buildings
KR20070052109A (en) Down-ward construction method of the underground slabs and retaining walls by the slim-type composit floor system consisted of the architectural conposit deep deck and unsymmetric h-beam without preliminary wall-attached support beams and sub-beams of the floor
KR101128955B1 (en) The Construction Method of Pressing Underground Structure
KR20210119935A (en) Underground structure using strut and method construturing the same
KR20110043976A (en) Top-down method using precast column and building structure thereof
KR20090108880A (en) Concrete filled column with double steel tube and construction method of underground structure using the same
JP3109038B2 (en) Underground skeleton structure and construction method

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E601 Decision to refuse application