KR20200069533A - Corner Platform System for the Boiler Furnace Inside Maintenance - Google Patents

Corner Platform System for the Boiler Furnace Inside Maintenance Download PDF

Info

Publication number
KR20200069533A
KR20200069533A KR1020180156674A KR20180156674A KR20200069533A KR 20200069533 A KR20200069533 A KR 20200069533A KR 1020180156674 A KR1020180156674 A KR 1020180156674A KR 20180156674 A KR20180156674 A KR 20180156674A KR 20200069533 A KR20200069533 A KR 20200069533A
Authority
KR
South Korea
Prior art keywords
corner
work
scaffolding
power plant
vertical direction
Prior art date
Application number
KR1020180156674A
Other languages
Korean (ko)
Inventor
김성섭
박현희
Original Assignee
김성섭
박현희
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김성섭, 박현희 filed Critical 김성섭
Priority to KR1020180156674A priority Critical patent/KR20200069533A/en
Publication of KR20200069533A publication Critical patent/KR20200069533A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/36Scaffolds for particular parts of buildings or buildings of particular shape, e.g. for stairs, cupolas, domes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/38Scaffolds partly supported by the building
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/08Scaffold boards or planks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/10Steps or ladders specially adapted for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • E04G2001/155Platforms with an access hatch for getting through from one level to another
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G2005/008Hoisting devices specially adapted as part of a scaffold system

Abstract

The present invention relates to a construction method, which installs a worktable of a corner part for welding work and inspection of the corner part in a combustion chamber of a boiler of a power plant in the corner part in the combustion chamber of the boiler by lifting the worktable of the corner part by using a winch after integrally assembling the same on the ground, thereby minimizing time, manpower and costs required in installation of a work scaffold, removing danger in the high place work for installing the work scaffold to secure safety, and easily dismantling the worktable of the corner part in a reverse order when the worktable for the corner part is dismantled.

Description

발전소 보일러 연소실(Furnace) 내부 코너부 작업대 및 시공방법{Corner Platform System for the Boiler Furnace Inside Maintenance}Corner Workbench and Construction Method of Power Plant Boiler Furnace {Corner Platform System for the Boiler Furnace Inside Maintenance}

본 발명은 발전소 보일러 내부의 일체형 코너부 작업대 및 그 시공방법에 관한 것으로서, 발전소 보일러 연소실(Furnace) 내부 코너부의 용접작업 및 점검을 위한 비계발판 대용으로 코너부 작업대를 지상에서 일체형으로 조립한 후, 상기 코너부 작업대를 윈치를 이용하여 인양시켜 보일러 연소실의 코너부에 설치하여 작업하는 발전소 보일러 연소실의 내부 코너부 작업대 및 그 시공방법에 관한 것이다.The present invention relates to an integrated corner worktable inside a boiler of a power plant and a construction method thereof, after assembling the corner worktable integrally from the ground as a scaffolding plate for welding work and inspection of the inside corner part of a power plant boiler combustion chamber, It relates to an inner corner workbench of a power plant boiler combustion chamber and a construction method for lifting the corner workbench using a winch and installing the corner workbench to a corner of the boiler combustion chamber.

일반적으로 발전소의 보일러 연소실과 같은 구조물의 내벽 용접작업 등을 수행하기 위해서, 비계 파이프와 안전발판을 사용하여 구조물 내벽에 작업자 이동할 수 있는 작업용 발판을 설치하였다.In general, in order to perform welding work on the inner wall of a structure such as a boiler combustion chamber of a power plant, a scaffolding pipe and a safety scaffold were used to install a work scaffold for worker movement on the inner wall of the structure.

그러나, 상기한 바와 같은 방식은 보일러의 바닥부터 상부 꼭대기까지 이어지는 구간을 작업자가 직접 비계를 설치해야 하기 때문에 설치에 많은 시간과 인력, 비용이 소요되는 문제가 있고, 고소작업으로 인해 작업자의 안전사고가 발생되며, 설치된 비계를 해체 하는데도 많은 시간과 인력, 비용이 소요되는 문제가 있었다.However, the above-described method has a problem in that it takes a lot of time, manpower, and cost to install the scaffold, since the operator must install the scaffold directly from the bottom to the top of the boiler. There is a problem that takes a lot of time, manpower, and cost to dismantle the scaffolding installed.

대한민국 등록특허 제10-1220129호Republic of Korea Registered Patent No. 10-1220129

본 발명은 상기한 문제점을 해결하기 위하여 안출된 것으로, 그 목적은 발전소 보일러 연소실 코너부의 용접작업을 위한 코너부 작업대를 지상에서 일체형으로 조립한 후, 상기 코너부 작업대를 윈치를 이용하여 인양시켜 보일러 연소실의 코너부에 설치하는 발전소 보일러의 일체형 코너부 작업대 및 그 시공방법을 제공함에 있다.The present invention was devised to solve the above problems, the purpose of which is to assemble a corner workbench for welding work at a corner of a power plant boiler combustion chamber, and lift the corner workbench using a winch. An object of the present invention is to provide an integrated corner part work table and a construction method for a power plant boiler installed in a corner part of a combustion chamber.

상기한 목적을 달성하기 위한 본 발명의 일 측면에 따르면, 발전소 보일러 연소실 코너부 용접작업을 위하여 설치되는 코너부 작업대로서, 3각형을 이루는 3점의 위치에 각각 수직하게 세워지는 기둥재; 상기 각각의 기둥재에 지지되어 수직방향으로 일정간격 반복하여 이격 설치되는 발판부; 상기 발판부의 장변 측을 개구시켜 상기 기둥재의 수직방향으로 작업자가 이동할 수 있도록 형성한 작업통로; 및 상기 작업통로를 수직방향으로 관통하여 설치되어 상하 위치에 있는 발판부와 발판부 사이를 작업자가 이동할 수 있도록 연결하는 사다리부;를 포함하는 발전소 보일러의 일체형 코너부 작업대가 제공될 수 있다.According to an aspect of the present invention for achieving the above object, as a corner portion work table installed for welding the corner portion of the power plant boiler combustion chamber, the pillar material is vertically erected at the position of each of the three points forming a triangular shape; A scaffolding unit supported on the respective pillars and repeatedly spaced apart at regular intervals in the vertical direction; A working passage formed by opening a long side of the scaffolding part so that an operator can move in a vertical direction of the pillar material; And a ladder part installed to penetrate the work passage in the vertical direction to connect the scaffold part and the scaffold part in an up and down position so that an operator can move. An integrated corner part work table of a power plant boiler can be provided.

또한, 상기 발판부는, 평행한 2개의 변을 갖는 사다리꼴 형상의 플레이트; 및 상기 플레이트의 테두리 및 하면의 구조강도를 지지하는 보강프레임;을 포함하는 것을 특징으로 한다.In addition, the scaffold portion, a trapezoidal plate having two parallel sides; And it characterized in that it comprises; a reinforcement frame for supporting the structural strength of the rim and the lower surface of the plate.

또한, 상기 작업통로는 개폐 가능한 도어를 형성하며, 상기 도어는 일측이 발판부에 힌지 결합되고, 타측이 잠금 및 해제가 가능한 핸들이 형성되는 것을 특징으로 한다.In addition, the working passage forms a door that can be opened and closed, one side of the door is hinged to the scaffolding part, and the other side is characterized in that a handle capable of being locked and unlocked is formed.

본 발명의 다른 측면에 따르면, 발전소 보일러 연소실 코너부의 용접작업을 위한 코너부 작업대를 지상에서 일체형으로 조립한 후, 상기 코너부 작업대를 윈치를 이용하여 인양시켜 보일러 연소실의 코너부에 설치하는 것을 특징으로 하는 발전소 보일러의 일체형 코너부 작업대 시공방법이 제공될 수 있다.According to another aspect of the present invention, after assembling the corner work table for welding work at the corner of the boiler section of the power plant boiler, integrally assembled from the ground, the corner work table is lifted using a winch and installed at the corner part of the boiler combustion chamber. A method for constructing an integrated corner workbench of a power plant boiler may be provided.

이때, 상기 윈치는 코너부 작업대의 단변 측 기둥재에 설치되도록 하고, 전체 길이의 하중이 분산되어 인양되도록 복수 개의 윈치를 분산 배치되도록 하는 것을 특징으로 한다.At this time, the winch is characterized in that to be installed on the short side side pillar material of the corner work table, a plurality of winches are distributed so that the entire length of the load is distributed and lifted.

또한, 상기 코너부 작업대는, 상기 3각형을 이루는 3점의 위치에 각각 수직하게 세워지는 기둥재; 상기 각각의 기둥재에 지지되어 수직방향으로 일정간격 반복하여 이격 설치되는 발판부; 상기 발판부의 장변 측을 개구시켜 상기 기둥재의 수직방향으로 작업자가 이동할 수 있도록 형성한 작업통로; 및 상기 작업통로를 수직방향으로 관통하여 설치되어 상하 위치에 있는 발판부와 발판부 사이를 작업자가 이동할 수 있도록 연결하는 사다리부;를 포함하는 것을 특징으로 한다.In addition, the corner work table, each of the pillars erected perpendicular to the position of the three points forming the triangular; A scaffolding unit supported on the respective pillars and repeatedly spaced apart at regular intervals in the vertical direction; A working passage formed by opening a long side of the scaffolding part so that an operator can move in a vertical direction of the pillar material; And a ladder part installed to penetrate the work passage in the vertical direction to connect the scaffold part in the vertical position and the scaffold part so that the worker can move.

이상에서와 같은 본 발명은 발전소 보일러 연소실 코너부의 용접작업을 위한 코너부 작업대를 지상에서 일체형으로 조립한 후, 상기 코너부 작업대를 윈치를 이용하여 인양시켜 보일러 연소실의 코너부에 설치함으로써, 작업발판 설치에 소요되는 시간관 인력, 비용을 최소화할 수 있는 효과를 갖는다.The present invention as described above, after assembling the corner work table integrally for welding work at the corner of the boiler section of the power plant boiler, lift the corner work table using a winch and install it on the corner part of the boiler combustion chamber, and work scaffolding. It has the effect of minimizing the time and manpower and cost required for installation.

또한, 본 발명은 작업발판 설치를 위한 고소작업의 위험성을 없애고, 코너부 작업대의 해체 시에도 설치의 역순으로 쉽게 해체할 수 있는 효과를 갖는다.In addition, the present invention has the effect of eliminating the risk of high work for installing the work scaffold, and can be easily dismantled in the reverse order of installation even when dismantling the corner workbench.

도 1은 본 발명에 따른 발전소 보일러의 일체형 코너부 작업대를 지상부 조립하는 과정을 도시한 도면대용 사진.
도 2는 본 발명의 코너부 작업대를 초기 인양하는 과정을 도시한 도면대용 사진.
도 3은 본 발명의 코너부 작업대를 수직방향으로 인양한 상태를 도시한 도면대용 사진.
1 is a photograph for a drawing table showing the process of assembling the work surface of the integrated corner portion of the power plant boiler according to the present invention.
Figure 2 is a drawing for a drawing showing the process of initially lifting the corner work table of the present invention.
Figure 3 is a photograph for a drawing table showing a state of lifting the corner work table in the vertical direction of the present invention.

이하, 첨부된 도면을 참조하여 본 발명의 일 실시예를 상세히 설명하면 다음과 같다.Hereinafter, an embodiment of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명에 따른 발전소 보일러의 일체형 코너부 작업대를 지상부 조립하는 과정을 도시한 도면대용 사진이다.1 is a photograph for a drawing table showing a process of assembling the work surface of the integrated corner part of the power plant boiler according to the present invention.

동 도면에서 보는 바와 같은 본 발명은 발전소 보일러 연소실 코너부 용접작업을 위하여 설치되는 코너부 작업대로서, 크게 기둥재(110), 발판부(120), 작업통로(130), 사다리부(140)로 구성된다.The present invention, as seen in the drawing, is a corner work table installed for welding work at a corner portion of a combustion chamber of a power plant boiler, and is largely composed of a pillar material 110, a scaffolding part 120, a work passage 130, and a ladder part 140. It is composed.

이하, 상기 각 구성요소들의 유기적 결합관계에 대해 설명하면 다음과 같다.Hereinafter, the organic coupling relationship between the components will be described.

먼저, 3각형을 이루는 3점의 위치에 각각 수직하게 세워지는 기둥재(110)가 개시된다. 이때, 상기 기둥재(110)는 H빔 등의 구조재를 사용하여 제작될 수 있다.First, the pillars 110 that are vertically erected at positions of three points forming a triangular shape are disclosed. At this time, the pillar material 110 may be manufactured using a structural material such as H beam.

그리고, 상기 각각의 기둥재(110) 사이에 복수의 발판부(120)가 설치되는데, 상기 발판부(120)는 평행한 장변(120a)과 단변(120b)을 형성하고, 상기 장변(120a)과 단변(120b) 사이를 잇는 2개의 빗변(120c)을 갖는 사다리 꼴 형상으로서, 단변(120b) 중앙과 1개의 기둥재(110)가 맞닿아 고정되고, 장변(120a)의 양측 단부와 2개의 기둥재(110)가 각각 맞닿아 고정된다.Then, a plurality of scaffolding portions 120 are installed between each of the pillar materials 110, and the scaffolding portions 120 form parallel long sides 120a and short sides 120b, and the long sides 120a. And a trapezoidal shape having two hypotenuses 120c connecting between the short sides 120b, the center of the short sides 120b and one pillar material 110 are fixed to each other, and two ends and two ends of the long sides 120a The pillar materials 110 are fixed to each other.

이때, 상기 발판부(120)와 기둥재(110) 사이는 볼트결합 또는 용접에 의해 고정되도록 할 수 있다.At this time, between the footrest portion 120 and the pillar material 110 may be fixed by bolting or welding.

상기 발판부(120)는 수직방향으로 일정간격 반복하여 이격 설치되는데, 상기 발판부(120)의 설치간격은 보일러 연소실(furnace) 코너부 용접작업에 적합한 간격을 유지하도록 한다.The scaffolding part 120 is installed to be spaced apart repeatedly at regular intervals in the vertical direction, and the installation interval of the scaffolding part 120 maintains an appropriate interval for welding the corner portion of the boiler combustion chamber.

상기 발판부(120)는 평행한 2개의 변을 갖는 사다리꼴 형상의 플레이트(121)를 형성한다.The scaffold 120 forms a trapezoidal plate 121 having two parallel sides.

이때, 상기 플레이트(121)의 테두리 및 하면에는 보강프레임(123)이 더 형성되는데, 상기 보강프레임(123)은 플레이트(121)의 구조강도를 지지하는 역할을 한다.At this time, a reinforcement frame 123 is further formed on an edge and a lower surface of the plate 121, and the reinforcement frame 123 serves to support the structural strength of the plate 121.

이때, 상기 보강프레임(123)은 "ㄷ" 자나, "ㄴ" 자 형상의 형강을 이용해 형성할 수 있는데, 플레이트(121) 테두리를 "ㄷ" 자 형상의 형강으로 감싸서 보강한 후, 플레이트(121) 저면을 "ㄴ" 자 형상의 형강으로 보강할 수 있다.At this time, the reinforcing frame 123 may be formed using "C" shaped or "b" shaped shaped steel. After reinforcing by enclosing the plate 121 border with shaped "C" shaped shaped steel, the plate 121 ) The bottom surface can be reinforced with "b" shaped section steel.

그리고, 상기 발판부(120)의 장변 측을 개구시켜 상기 기둥재(110)의 수직방향으로 작업자가 이동할 수 있도록 형성한 작업통로(130)가 형성되도록 한다.In addition, the long side of the scaffolding part 120 is opened to form a working passage 130 formed so that an operator can move in the vertical direction of the pillar material 110.

이때, 상기 작업통로(130)는 상하방향으로 개폐 가능한 도어(미도시)를 형성할 수 있는데, 상기 도어는 일측이 발판부(120)에 힌지 결합되고, 타측이 잠금 및 해제가 가능한 핸들(미도시)이 형성되도록 할 수 있다.At this time, the working passage 130 may form a door (not shown) that can be opened and closed in the vertical direction, wherein the door is hinged to one side of the footrest part 120 and the other side can be locked and unlocked (not shown) Hour) can be formed.

그리고, 상기 작업통로(130)를 수직방향으로 관통하여 사다리부(140)가 설치되는데, 상기 사다리부(140)는 상하 위치에 있는 발판부(120)와 발판부(120) 사이를 작업자가 이동할 수 있도록 연결하는 역할을 한다.In addition, a ladder part 140 is installed through the work passage 130 in the vertical direction, and the ladder part 140 moves between the scaffold part 120 and the scaffold part 120 in the vertical position. It serves to connect them.

그리고, 상기 발판부(120)의 상부 둘레에는 안전난간(150)을 더 형성할 수 있다.In addition, a safety railing 150 may be further formed around the upper portion of the scaffolding part 120.

이때, 상기 안전난간(150)은 발판부(120)의 단변(120b) 측에 설치되는 기둥재(110)를 기준으로 양측 빗변(120c)에 설치되는 수직재(151)와 상기 수직재(151)와 기둥재(110) 사이를 연결하는 수평재(153)로 이루어진다.In this case, the safety railing 150 is a vertical member 151 and the vertical member 151 installed on both sides of the hypotenuse 120c based on the pillar material 110 installed on the short side 120b side of the footrest portion 120 It consists of a horizontal member (153) connecting between the pillars (110).

상기 안전난간(150)은 조립식 비계로 설치할 수 있고, 발판부(120)와 기둥재(110) 사이에 별도의 클램프부재(155)를 통해 결합되도록 할 수 있다.The safety railing 150 may be installed as a prefabricated scaffold, and may be coupled through a separate clamp member 155 between the footrest part 120 and the pillar material 110.

이하, 도 1내지 도 3을 참조하여 본 발명에 따른 발전소 보일러의 일체형 코너부 작업대 시공방법에 대해 설명한다.Hereinafter, with reference to FIGS. 1 to 3, a method for constructing an integrated corner part work table of a power plant boiler according to the present invention will be described.

먼저, 도 1에서 보는 바와 같이 코너부 작업대(100)를 지상에서 조립한다.First, as shown in FIG. 1, the corner work table 100 is assembled from the ground.

상기 코너부 작업대(100)의 조립과정에 대해 설명하면, 2개의 기둥재(110)를 작업장 바닥에 설치한다. 이때, 상기 기둥재(110)는 H빔을 이용하는데, 보일러 연소실(300)의 높이에 맞춰 길이방향으로 복수 개의 H빔을 연장시켜 설치한다.When explaining the assembly process of the corner work table 100, two pillars 110 are installed on the floor of the workshop. At this time, the pillar material 110 uses an H beam, and is installed by extending a plurality of H beams in the longitudinal direction according to the height of the boiler combustion chamber 300.

이때, 작업장 바닥에 설치되는 2개의 기둥재(110)는 각각 평행한 상태가 유지되도록 한다.At this time, the two pillars 110 installed on the floor of the workshop are maintained in parallel.

이후, 복수의 발판부(120)를 상기 2개의 기둥재(110) 상면에 설치한다. 상기 발판부(120)는 수직방향으로 일정간격 반복하여 이격 설치되는데, 발판부(120)의 장변(120a)과 기둥재(110) 사이를 용접을 통해 견고히 용접되도록 한다.Thereafter, a plurality of scaffolding parts 120 are installed on the upper surfaces of the two pillars 110. The scaffolding part 120 is installed to be spaced repeatedly at regular intervals in the vertical direction, so that the long side 120a of the scaffolding part 120 and the pillar material 110 are welded firmly through welding.

이후, 상기 발판부(120)의 단변(120b) 위에 1개의 기둥재(110)를 위치시켜 용접에 의해 견고히 고정되도록 한다.Thereafter, one pillar material 110 is placed on the short side 120b of the scaffolding portion 120 so as to be firmly fixed by welding.

이후, 상기 발판부(120)와 기둥재(110)를 이용하여 안전난간(150)이 설치되도록 한다.Thereafter, the safety railing 150 is installed using the scaffolding part 120 and the pillar material 110.

이를 위해 발판부(120)의 단변(120b) 측에 설치되는 기둥재(110)를 기준으로 양측 빗변(120c)에 설치되는 수직재(151)를 설치하고, 상기 수직재(151)와 기둥재(110) 사이를 수평재(153)로 연결하여 작업자의 추락사고를 방비하도록 할 수 있다.To this end, the vertical member 151 installed on both sides of the hypotenuse 120c is installed based on the pillar material 110 installed on the short side 120b side of the scaffold 120, and the vertical member 151 and the pillar material 110 are installed. ) Can be connected to the horizontal material 153 to protect the worker from accidents.

이때, 상기 안전난간(150)은 조립식 비계로 설치할 수 있고, 수직재(151)와 수평재(153) 사이, 발판부(120) 및 기둥재(110)와 안전난간(150) 사이는 별도의 클램프부재(155)를 통해 결합되도록 한다.At this time, the safety railing 150 may be installed as a prefabricated scaffolding, between the vertical member 151 and the horizontal member 153, between the footrest 120 and the pillar member 110 and the safety railing 150, a separate clamp member (155).

상기한 과정을 통해 코너부 작업대(100)가 조립되고 나면, 윈치(200)를 코너부 작업대(100)에 걸어서 인양준비를 하도록 한다.After the corner workbench 100 is assembled through the above process, the winch 200 is walked to the corner workbench 100 to prepare for lifting.

상기 윈치(200)는 코너부 작업대(100)의 단변(120b) 측 기둥재(110)에 설치되도록 하는데, 전체 길이의 하중이 분산되어 인양되도록 복수 개의 윈치(200)를 분산 배치되도록 설치한다.The winch 200 is installed to be installed on the pillar 110 of the short side 120b side of the corner work table 100, so that a plurality of winches 200 are distributedly disposed so that the entire length of the load is distributed and lifted.

이때, 각각의 윈치(200)는 인양시 코너부 작업대(100)의 하중을 고르게 분산시켜 공중에 띄운 후, 코너부 작업대(100)의 최상단부 측부터 바로 세워지도록 윈치(200)를 작동시켜 수직방향으로 끌어올리게 된다.At this time, each winch 200 is lifted up evenly by distributing the load of the corner workbench 100 at the time of lifting, and then operating the winch 200 to stand upright from the top end side of the corner workbench 100 vertically. In the direction.

상기한 바와 같은 인양작업을 통해 세워진 코너부 작업대(100)는 보일러의 연소실(300) 코너부에 설치되는데, 장변(120a) 측이 코너부를 향하도록 설치된다.The corner work table 100 erected through the lifting operation as described above is installed in the corner portion of the combustion chamber 300 of the boiler, and the long side 120a side is installed toward the corner portion.

이후, 작업자는 사다리부(140)를 통해 상하 위치에 있는 발판부(120) 사이를 왕래하면서 용접작업을 수행하게 되는데, 작업자는 작업통로(130)의 도어(미도시)를 이동시에만 개방하고 평상시에는 닫힌 상태가 유지되도록 하여 안전사고를 예방할 수 있다.Subsequently, the worker performs a welding operation through the ladder portion 140 while moving between the scaffolding portions 120 located at the up and down positions, and the operator opens the door (not shown) of the work passage 130 only when moving and normally In this way, it is possible to prevent a safety accident by keeping it closed.

앞서 살펴본 바와 같은 본 발명은 발전소 보일러 연소실 코너부의 용접작업을 위한 코너부 작업대를 지상에서 일체형으로 조립한 후, 상기 코너부 작업대를 윈치를 이용하여 인양시켜 보일러 연소실의 코너부에 설치함으로써, 작업발판 설치에 소요되는 시간관 인력, 비용을 최소화할 수 있고, 작업발판 설치를 위한 고소작업의 위험성을 없애고, 코너부 작업대의 해체 시에도 설치의 역순으로 쉽게 해체할 수 있게 된다.The present invention as described above, after assembling the corner workbench for welding work at the corner of the boiler section of the power plant boiler, integrally assembled from the ground, and then lifting the corner workbench using a winch and installing it at the corner of the boiler combustion chamber, work scaffolding The time and labor required for installation can be minimized, and the risk of high work for installing a work scaffold is eliminated, and it can be easily dismantled in the reverse order of installation even when dismantling a corner workbench.

이상에서와 같이 본 발명은 상술한 특정의 바람직한 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.As described above, the present invention is not limited to the specific preferred embodiments described above, and various modifications can be made by anyone having ordinary skill in the art to which the present invention pertains without departing from the gist of the present invention as claimed in the claims. Needless to say, such modifications are within the scope of the claims.

100: 코너부 작업대 110: 기둥재
120: 발판부 120a:장변
120b:단변 120c:빗변
121: 플레이트 123: 보강프레임
130: 작업통로
140: 사다리부 150: 안전난간
151: 수직재 153: 수평재
155: 클램프부재 200: 윈치
300: 연소실
100: corner work table 110: pillar material
120: footrest 120a: long side
120b: short side 120c: hypotenuse
121: plate 123: reinforcement frame
130: working path
140: ladder part 150: safety railing
151: vertical material 153: horizontal material
155: clamp member 200: winch
300: combustion chamber

Claims (6)

발전소 보일러 연소실 코너부 용접작업을 위하여 설치되는 코너부 작업대로서,
3각형을 이루는 3점의 위치에 각각 수직하게 세워지는 기둥재(110);
상기 각각의 기둥재(110)에 지지되어 수직방향으로 일정간격 반복하여 이격 설치되는 발판부(120);
상기 발판부(120)의 장변 측을 개구시켜 상기 기둥재(110)의 수직방향으로 작업자가 이동할 수 있도록 형성한 작업통로(130); 및
상기 작업통로(130)를 수직방향으로 관통하여 설치되어 상하 위치에 있는 발판부(120)와 발판부(120) 사이를 작업자가 이동할 수 있도록 연결하는 사다리부(140);를 포함하는 발전소 보일러의 일체형 코너부 작업대.
As a corner workbench installed for welding work at a corner of a power plant boiler combustion chamber,
A pillar material 110 vertically erected at a position of three points forming a triangular shape;
A scaffolding part 120 supported by the pillar materials 110 and repeatedly spaced apart at regular intervals in the vertical direction;
A working passage 130 formed by opening a long side of the scaffolding part 120 so that an operator can move in a vertical direction of the pillar material 110; And
It is installed by penetrating the work passage 130 in the vertical direction, the ladder portion 140 to connect the scaffolding part 120 and the scaffolding part 120 in the vertical position so that the operator can move; Integral corner workbench.
제 1항에 있어서,
상기 발판부(120)는, 평행한 2개의 변을 갖는 사다리꼴 형상의 플레이트(121); 및
상기 플레이트(121)의 테두리 및 하면의 구조강도를 지지하는 보강프레임(123);을 포함하는 것을 특징으로 하는 발전소 보일러의 일체형 코너부 작업대.
According to claim 1,
The scaffold 120 includes a trapezoidal plate 121 having two parallel sides; And
A reinforcement frame 123 for supporting the structural strength of the rim and the lower surface of the plate 121; an integrated corner portion work table of a power plant boiler.
제 1항에 있어서,
상기 작업통로(130)는 개폐 가능한 도어를 형성하며, 상기 도어는 일측이 발판부(120)에 힌지 결합되고, 타측이 잠금 및 해제가 가능한 핸들이 형성되는 것을 특징으로 하는 발전소 보일러의 일체형 코너부 작업대.
According to claim 1,
The working passage 130 forms a door that can be opened and closed, and the door is one-sided hinged to the scaffolding part 120, and the other side is an integral corner part of a power plant boiler characterized in that a handle capable of being locked and unlocked is formed. bench.
발전소 보일러 연소실 코너부의 용접작업을 위한 코너부 작업대(100)를 지상에서 일체형으로 조립한 후, 상기 코너부 작업대(100)를 윈치(200)를 이용하여 인양시켜 보일러 연소실의 코너부에 설치하는 것을 특징으로 하는 발전소 보일러의 일체형 코너부 작업대 시공방법.After assembling the corner part work table 100 for welding work at the corner part of the boiler part of the power plant boiler, integrally assembling the work part 100 on the ground, lifting the corner part work table 100 using the winch 200 to install the corner part of the boiler part A method for constructing an integrated corner workbench of a power plant boiler. 제 4항에 있어서,
상기 윈치(200)는 코너부 작업대(100)의 단변(120b) 측 기둥재(110)에 설치되도록 하고, 전체 길이의 하중이 분산되어 인양되도록 복수 개의 윈치(200)를 분산 배치되도록 하는 것을 특징으로 하는 발전소 보일러의 일체형 코너부 작업대 시공방법.
The method of claim 4,
The winch 200 is to be installed on the pillar 110 of the short side (120b) side of the corner work table 100, and distributed to a plurality of winches 200 so that the entire length of the load is distributed and lifted Construction method of an integrated corner part of a power plant boiler.
제 4항 또는 5항 중 어느 한 항에 있어서,
상기 코너부 작업대(100)는, 상기 3각형을 이루는 3점의 위치에 각각 수직하게 세워지는 기둥재(110); 상기 각각의 기둥재(110)에 지지되어 수직방향으로 일정간격 반복하여 이격 설치되는 발판부(120); 상기 발판부(120)의 장변 측을 개구시켜 상기 기둥재(110)의 수직방향으로 작업자가 이동할 수 있도록 형성한 작업통로(130); 및 상기 작업통로(130)를 수직방향으로 관통하여 설치되어 상하 위치에 있는 발판부(120)와 발판부(120) 사이를 작업자가 이동할 수 있도록 연결하는 사다리부(140);를 포함하는 발전소 보일러의 일체형 코너부 작업대 시공방법.
The method of claim 4 or 5,
The corner work table 100 includes a pillar material 110 vertically erected at a position of three points forming the triangular shape; A scaffolding part 120 supported by the pillar materials 110 and repeatedly spaced apart at regular intervals in the vertical direction; A working passage 130 formed by opening a long side of the scaffolding part 120 so that an operator can move in a vertical direction of the pillar material 110; And a ladder part 140 installed to penetrate the work passage 130 in the vertical direction to connect the scaffolding part 120 and the scaffolding part 120 in an up and down position so that an operator can move. Construction method of the work piece of the corner.
KR1020180156674A 2018-12-07 2018-12-07 Corner Platform System for the Boiler Furnace Inside Maintenance KR20200069533A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180156674A KR20200069533A (en) 2018-12-07 2018-12-07 Corner Platform System for the Boiler Furnace Inside Maintenance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180156674A KR20200069533A (en) 2018-12-07 2018-12-07 Corner Platform System for the Boiler Furnace Inside Maintenance

Publications (1)

Publication Number Publication Date
KR20200069533A true KR20200069533A (en) 2020-06-17

Family

ID=71406034

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180156674A KR20200069533A (en) 2018-12-07 2018-12-07 Corner Platform System for the Boiler Furnace Inside Maintenance

Country Status (1)

Country Link
KR (1) KR20200069533A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102306156B1 (en) 2020-07-07 2021-09-29 주식회사 유진플렌트 Structure of connecting member for h-beam

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101220129B1 (en) 2011-07-01 2013-01-11 주식회사백상 Platform System for the Boiler Furnace Maintenance

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101220129B1 (en) 2011-07-01 2013-01-11 주식회사백상 Platform System for the Boiler Furnace Maintenance

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102306156B1 (en) 2020-07-07 2021-09-29 주식회사 유진플렌트 Structure of connecting member for h-beam

Similar Documents

Publication Publication Date Title
KR20200030196A (en) Outside workbench for offshore structures
JP3181041U (en) Mounting member for scaffolding for bridge
CN211775640U (en) Modular staircase regularization steel protection passageway
JP6622504B2 (en) Chimney demolition scaffold and chimney demolition method
KR20200069533A (en) Corner Platform System for the Boiler Furnace Inside Maintenance
JP6712501B2 (en) High-rise building demolition system and demolition method
JP3179138U (en) Scaffolding support for leg head construction
CN211691387U (en) Steel column is assembled operation platform for butt joint construction
JP5645334B2 (en) Structure dismantling system
JP2011153479A (en) Method for repairing exterior wall
JP5356091B2 (en) Crane girder exchanging method and crane girder exchanging apparatus
JP6320242B2 (en) How to install temporary pillars
JP6534938B2 (en) Lining plate installation and rain curing jig and lining plate installation method using the jig
JP6508958B2 (en) Demolition system and demolition method
JP2010090633A (en) Prefabricated work platform for cylindrical concrete structure
JPH09268778A (en) Disassembling method of water-contained gas holder and member used for the same method
JP6059176B2 (en) Mobile lifting scaffold for assembling temporary elevated jetty
JP3864189B2 (en) Tower-like structure dismantling device and dismantling method using it
JP4839052B2 (en) Rotating dismantling method of storage tank
KR200426228Y1 (en) supplemental work-scaffolding structure of form work
JPH0886037A (en) Plant building, constructing method therefor, and structure for its construction
KR102335856B1 (en) Safety railing for steel beam installation
JP6953655B1 (en) A set of boxes that make up the scaffold
CN219794600U (en) Hanging basket for building curtain wall construction
KR200465039Y1 (en) High scaffolding pole installation work

Legal Events

Date Code Title Description
E601 Decision to refuse application