KR20170033163A - Water conduit and its construction method - Google Patents

Water conduit and its construction method Download PDF

Info

Publication number
KR20170033163A
KR20170033163A KR20150131146A KR20150131146A KR20170033163A KR 20170033163 A KR20170033163 A KR 20170033163A KR 20150131146 A KR20150131146 A KR 20150131146A KR 20150131146 A KR20150131146 A KR 20150131146A KR 20170033163 A KR20170033163 A KR 20170033163A
Authority
KR
Grant status
Application
Patent type
Prior art keywords
mortar
surogwan
formed
portion
seating
Prior art date
Application number
KR20150131146A
Other languages
Korean (ko)
Inventor
임종순
이경학
Original Assignee
임종순
이경학
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/04Pipes or fittings specially adapted to sewers
    • E03F3/046Open sewage channels
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B11/00Drainage of soil, e.g. for agricultural purposes
    • E02B11/005Drainage conduits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B13/00Irrigation ditches, i.e. gravity flow, open channel water distribution systems
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B5/00Artificial water canals, e.g. irrigation canals
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B5/00Artificial water canals, e.g. irrigation canals
    • E02B5/005Canals entirely situated above ground level, e.g. on piers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B5/00Artificial water canals, e.g. irrigation canals
    • E02B5/02Making or lining canals

Abstract

본 발명은 몸체부, 소켓부, 안착부로 이루어진 수로관을 서로 연결하여 시공할 때 연결되는 부분에 모르타르충진공간을 형성하고 이 모르타르충진공간으로 초속경모르타르를 주입하여 응고되면서 수로관이 서로 결속되도록 함으로, 오랜 기간이 지난 후에도 수로관의 연결 부분이 떨어져 물이 새어나가는 현상이 생기지 않도록 개선된 수로관을 개시한다. By the invention as coagulation to form a mortar-filled space in the portion which is connected to installation by connecting each other the surogwan made part body portion, the socket portion, mounting and initial velocity around injecting mortar in the mortar-filled space so that surogwan the bond with each other, a long time off after the connection of the last surogwan discloses an improved surogwan avoid the phenomenon out of the water leaks occur.

Description

수로관 및 이의 시공방법{WATER CONDUIT AND ITS CONSTRUCTION METHOD} Surogwan and methods for their construction {WATER CONDUIT AND ITS CONSTRUCTION METHOD}

본 발명은 수로관에 관한 것으로, 더욱 상세하게는 서로 직렬로 연결되게 시공하였을 때 연결되는 부분의 결속력을 향상시켜 오랜 기간이 지난 후에도 수로관의 연결 부분이 떨어져 물이 새어나가는 현상이 생기지 않도록 개선된 수로관 및 이의 시공방법에 관한 것이다. The present invention relates to a surogwan, and more particularly, to an improved surogwan so as not this improves the coupling force of the connecting portion away from the connection portion of the surogwan after last a long period of time which water is leaking phenomenon when the construction to be connected in series with each other and to a construction method thereof.

일반적으로 도로, 농업부지 또는 관계시설 등에는 물을 원활하게 배수하면서 필요시에는 배수되는 물을 이용할 수 있게 하는 배수시설이 구비된다. In general, roads, agricultural land, or related facilities, etc., when necessary, while smooth drainage of water is equipped with a drainage system that allows you to use the water that is drained.

이러한 배수시설의 일례를 들면, 다수의 수로관을 연속적으로 서로 연결되게 설치하는 방법이 있다. E. An example of such a drainage system, a method for the installation to be connected to each other a number of surogwan continuously. 즉, 일정 크기로 제작된 수로관을 현장으로 옮겨 놓은 후 서로 연속적으로 연결되게 조립한 다음, 수로관의 연결 부분을 모르타르로 발라서 고정하게 된다. That is, after placing the transferred surogwan manufactured into a predetermined size to the field is fixed to the anointed and then, the connection portion of the mortar surogwan assembly to be continuously connected to each other.

그러나 수로관의 연결 부분을 모르타르로 발라서 고정하는 종래의 설치 방식은 수로관을 오래 사용하게 되면 모르타르가 떨어져 나가면서 수로관의 연결 부분이 틀어지게 되고 연결 부분에서 틈새가 생겨 물이 새어나가게 되는 현상이 발생한다. However, the conventional installation method of securing anointed the connection portion of the surogwan a mortar is when the longest surogwan As you mortar is away from the connection portion of the surogwan becomes play is a phenomenon that is out a gap originated in connection parts water leak occurred . 따라서 종래에는 수로관은 몇 년에 한 번씩 정기적으로 유지보수를 해야 하는 불편함과 이에 따른 비용이 소요되는 문제점이 있다. Therefore, conventionally, surogwan has the inconvenience and problems this costly due to the need to maintain a regular, once in several years.

한편, 대한민국 등록실용신안 제20-0433062호에는 수로관의 연결 부분을 볼트와 너트로 고정하는 방식이 개시되어 있다. On the other hand, the Republic of Korea Registered Utility Model No. 20-0433062 discloses a method for fixing the connection portion of the surogwan as bolts and nuts is disclosed. 그러나 이러한 연결 방식은 설치 작업이 복잡할 뿐만 아니라 볼트와 너트에 녹이 생겨 주변을 오염시키는 문제점이 있다. However, this connection has a problem that not only the installation complexity rust contamination blossomed around the nuts and bolts.

한편, 대한민국 등록특허 제10-1066899호에는 수로관의 연결 부분에 공간을 형성하고 이 공간에 충진재를 매워서 서로 고정하는 방식이 개시되어 있다. On the other hand, the Republic of Korea Patent No. 10-1066899 discloses a space is formed in the connection portion of the surogwan discloses a method for fixing each other maewoseo a filler in this space. 그러나 이러한 연결 방식도 오래 사용하면 충진재가 떨어져 나가면서 연결 부분에 틈새가 생기는 문제점이 있다. However, this connection also uses a long way off, there is a problem As you fill the gaps occurring in the connection portion.

1) 대한민국 등록특허 제10-1066899호(등록일: 2011년09월16일), 발명의 명칭: "관 모듈 및 이를 이용한 수로관" 1) The Republic of Korea Patent No. 10-1066899 (Publication date: September 09, 2011 May 16), the name of the invention: "surogwan tube module and using the same." 2) 대한민국 등록실용신안 제20-0433062호(등록일: 2006년12월01일), 고안의 명칭: "볼트 조립식 프리캐스트 콘크리트 수로관" 2) The Republic of Korea Utility Model Registration No. 20-0433062 (registered 1 December 2006), invented the name of "bolt prefabricated precast concrete surogwan" 3) 대한민국 등록실용신안 제20-0400425호(등록일: 2005년10월31일), 고안의 명칭: "수로관과 수로관 거푸집" 3) The Republic of Korea Utility Model Registration No. 20-0400425 (registered on October 31, 2005), invented the name of "surogwan surogwan and die." 4) 대한민국 공개특허 제10-2015-0088012호(공개일: 2015년07월31일), 발명의 명칭: "수로관의 신축이음장치 및 그 시공방법" 4) one Republic of Korea Patent Publication No. 10-2015-0088012 call (published: March 07, 2015 May 31), title of the invention: "expansion joints in the construction method and surogwan"

본 발명은 상술한 문제점을 개선하기 위해 제안된 것으로, 그 목적은 다수의 수로관을 연결하여 배수시설을 설치할 때 수로관의 연결 부분을 견고하게 고정할 수 있도록 개선하여 오랜 기간 사용하더라도 수로관의 연결 부분이 틀어지고 분리되는 현상이 생기지 않도록 한 수로관을 제공하는 데 있다. Even if the invention is used to be proposed to improve the above problems, and its object is a long time to improve so that by connecting a plurality of surogwan to firmly fix the connection portion of the surogwan when installing the drainage system is connected to part of the surogwan to provide a surogwan prevent the phenomenon of play is separate occurs.

본 발명의 다른 목적은, 상기 수로관의 시공방법을 제공하는 데 있다. Another object of the invention is to provide a construction method of the surogwan.

상술한 목적은, 좌측벽과 우측벽이 바닥면으로 연결되어 내부에 전후방으로 수로가 관통 형성되고 상면이 개구된 형상을 갖는 몸체부와, 상기 몸체부의 선단부에 일체로 형성되고 내면에는 안착턱이 형성된 소켓부와, 상기 몸체부의 후단부에 일체로 형성되어 상기 안착턱에 안착되는 안착부로 이루어진 수로관에 있어서, 상기 안착턱의 내면에는 좌측과 바닥과 우측을 연통하는 모르타르충진공간이 형성되고, 상기 안착부의 중간에는 상하로 관통하는 공기배출공이 관통 형성되되, 두 개 이상의 수로관을 서로 연결하기 위해 앞에 위치한 수로관의 안착부를 뒤에 위치한 수로관의 안착턱에 올려놓았을 때 공기배출공과 모르타르충진공간이 연통되게 구성되어, 앞에 위치한 수로관의 안착부를 뒤에 위치한 수로관의 안착턱에 올려놓은 상태에서 모르 The above object is achieved by the left side wall and right side wall is connected to the bottom surface back and forth therein, and channel are formed through the body portion having an upper surface of the opening shape, formed integrally at the distal end of the body portion inside surface mounted jaw in the formed socket part and, surogwan are integrally formed on and then the body portion end consisting of parts mounted that the seat secured to the jaw, the inner surface of the seating jaw mortar-filled space in communication with the left and bottom and the right side is formed, the seating portion the middle are formed a through hole air discharge penetrating up and down, to be more than one for surogwan connecting to each other in the back portion seated in surogwan in front when placed onto the seating jaw of surogwan air exhaust ball and mortar-filled space in communication It is configured, in not know have on surogwan seating jaw located behind a portion of the seating in front of the state surogwan 르충진공간으로 초속경모르타르를 주입하면 초속경모르타르가 모르타르충진공간과 공기배출공에 충진됨과 아울러 응고되면서 서로 결속하도록 구성된 것을 특징으로 하는 수로관에 의해 달성된다. When the LE-filled space initial velocity around the injection mortar as well as coagulation soon as Zinnia If mortar is filled in the mortar-filled space and the air discharge hole is achieved by the surogwan, characterized in that is configured to bond to each other.

그리고 상기 모르타르충진공간의 단면은 개구되는 면보다 안쪽으로 파진 부분이 더 큰 직경을 갖도록 형성되어 모르타르충진공간에 주입되어 응고된 초속경모르타르가 분리되는 현상이 생기지 않도록 구성된 것을 특징으로 한다. And an end surface of the mortar-filled space is formed inside that opening portions pajin than cotton so as to have a larger diameter, characterized in that configured so that there is no phenomenon that the mortar is injected into the filling space coagulation zinnia light mortar separation.

그리고 상기 공기배출공은 적어도 한 군데 이상 형성되되, 상부보다 하부가 더 좁은 면적으로 갖도록 형성되어 초속경모르타르가 주입 및 응고된 후 상기 안착부가 상방향으로 들어올려지지 않도록 구성된 것을 특징으로 한다. And it is characterized in that is configured so that it does not lift up to the air discharge hole is at least a portion being formed at least one place, is formed in the lower portion than the upper portion so as to have a narrower area of ​​the seating after the initial velocity around the mortar is injected and solidified upward.

상기 다른 목적은, 좌측벽과 우측벽이 바닥면으로 연결되어 내부에 전후방으로 수로가 관통 형성되고 상면이 개구된 형상을 갖는 몸체부와, 상기 몸체부의 선단부에 일체로 형성되고 내면에는 안착턱이 형성된 소켓부와, 상기 몸체부의 후단부에 일체로 형성되어 상기 안착턱에 안착되는 안착부로 이루어지되, 상기 안착턱의 내면에는 좌측과 바닥과 우측을 연통하는 모르타르충진공간이 형성되고, 상기 안착부의 중간에는 상하로 관통하는 공기배출공이 관통 형성된 수로관을 여러 개 준비하는 단계; The further object is, the left side wall and right side wall is connected to the bottom surface back and forth therein, and channel are formed through the body portion having an upper surface of the opening shape, formed integrally at the distal end of the body portion inside surface mounted jaw and the socket portion is formed, is integrally formed on the post of the body portion end of said seat jidoe made parts secured to be secured to the jaw, the inner surface of the seating jaw mortar-filled space in communication with the left and bottom and the right side is formed, and the seating portion the middle of the step of preparing multiple holes surogwan air outlet formed through-penetrating up and down; 앞에 위치한 수로관의 안착부를 뒤에 위치한 수로관의 안착턱에 포개지게 올려놓은 방식으로 여러 개의 수로관을 현장에 맞게 서로 연결하는 단계; Coupling each other to fit the site multiple surogwan surogwan the front seat part way sewn up be superimposed on the seating jaw of surogwan located behind the located; 안착부가 안착턱에 포개지게 올려놓은 상태에서 모르타르충진공간으로 초속경모르타르를 주입하여 초속경모르타르가 모르타르충진공간과 공기배출공에 충진되도록 하는 단계; Further comprising: a mounting portion mounting the jaws nested be mortar-filled space per second diameter injecting mortar in the off state up to per second around the mortar so that the mortar filled into the filling space and the air discharge hole; 및 충진된 초속경모르타르를 자연 경화시키는 단계;로 이루어진 것을 특징으로 하는 수로관 시공공법에 의해 달성된다. And the initial velocity around the filled mortar step of curing nature; is achieved by the construction method according to claim surogwan made.

본 발명에 따른 수로관을 이용하여 배수시설을 시공하게 되면 수로관이 연결 부분이 견고하게 결속되기 때문에 오랜 기간 사용하더라도 수로관의 연결 부분이 틀어지고 분리되는 현상이 생기지 않으며, 따라서 수로관 연결 부분의 정기적인 유지보수가 필요없어 비용과 노동력이 절감되는 효과가 있다. When the drainage system by using a surogwan according to the invention the construction surogwan is not even with a long period of time This phenomenon is turn is connected to part of the surogwan is separated occur because the connection part is firmly bound, and therefore periodic maintenance of surogwan connections no maintenance is required there is an effect that the cost and labor savings.

도 1은 본 발명에 따른 수로관을 나타낸 전방 사시도, 1 is a perspective view showing a front surogwan according to the invention,
도 2는 본 발명에 따른 수로관을 나타낸 후방 사시도, Figure 2 is a rear perspective view showing the surogwan according to the invention,
도 3은 본 발명에서 모르타르충진공간 부분을 확대해서 나타낸 평단면도, Figure 3 is a horizontal sectional view showing a close-up of the mortar-filled portion of the space in the present invention,
도 4와 도 5는 본 발명에서 공기배출공 부분의 실시예를 나타낸 부분 단면도, 4 and 5 are partial cross-sectional view showing an embodiment of the air discharge hole portion in the present invention,
도 6은 본 발명에서 공기배출공 부분의 다른 실시예 구조를 설명하기 위해 나타낸 부분 단면도, Figure 6 is a partial cross-sectional view shown for explaining another example structure of the air discharge hole portion in the present invention,
도 7은 본 발명에 따라 수로관의 시공 상태를 나타낸 단면도, Figure 7 is a sectional view of the construction of state surogwan According to the invention,
도 8은 본 발명에 따른 수로관의 시공 순서를 설명하기 위해 나타낸 도면. Figure 8 is a view to explain the construction sequence of surogwan according to the invention.

첨부된 도면들을 참조하여 본 발명에 대해 상세히 설명하면 다음과 같다. More specifically for the present invention with reference to the accompanying drawings as follows.

도 1 내지 도 3을 참조하면, 기본적으로 수로관은 좌측벽과 우측벽이 바닥면으로 연결되어 내부에 전후방으로 수로(12)가 관통 형성되고 상면이 개구된 형상을 갖는 몸체부(10)와, 몸체부(10)의 선단부에 일체로 형성되고 내면에는 안착턱(22)이 형성된 소켓부(20)와, 몸체부(10)의 후단부에 일체로 형성되어 안착턱(22)에 안착되는 안착부(30)로 이루어진다. And even when 1 to 3, the default surogwan has a body portion 10 having a left side wall and right side wall is connected to the ground plane in the fore-and-aft within the channels 12 are formed through the upper surface of the opening shape, seat formed integrally with the front end of the body portion 10 and the inner surface are integrally formed at the rear end portion of the socket portion 20 is formed with a mounting projection 22, the body portion 10 is seated on the seating jaw (22) It comprises a portion (30). 즉, 안착턱(22)과 안착부(30)를 서로 대응되게 형성되어 안착부(30)를 안착턱(22)에 올려 놓는 방식으로 다수의 수로관이 서로 연결되게 설치된다. That is, it is installed to be a number of surogwan connected to each other by putting them on the receiving projection 22 and the seating portion 30 seated is formed to correspond to each other, the seating section 30 jaw 22.

이러한 기본적인 구성에 더해, 본 발명에 따른 수로관은 안착턱(22)의 내면에 좌측과 바닥과 우측을 연통하는 모르타르충진공간(100)이 형성되고, 안착부(30)의 중간에는 상하로 관통하는 공기배출공(200)이 관통 형성된 구조를 갖는다. In addition to this basic configuration, the middle of surogwan is mounted jaw (22) left and mortar-filled cavity 100 for connecting the bottom and the right side is formed, and the receiving portions 30 on the inner surface according to the present invention, penetrating up and down has a structure in the air exhaust hole 200 is formed through.

여기서, 공기배출공(200)과 모르타르충진공간(100)은 두 개 이상의 수로관을 서로 연결하기 위해 앞에 위치한 수로관의 안착부(30)를 뒤에 위치한 수로관의 안착턱(22)에 올려놓았을 때 서로 간에 연통되게 구성되는 것이 바람직하다. Here, each other when placed onto the air outlet hole 200 and the mortar-filled space 100 is seated in surogwan surogwan located behind the receiving portions 30 of the jaw 22 is located in front in order to connect one another two or more surogwan it is configured to be in communication between is preferred.

그리고 모르타르충진공간(100)과 공기배출공(200)는 초속경모르타르(300)가 충진되게 구성된다. And mortar-filled space 100 and the air discharge hole 200 is configured to be filled with the initial velocity around the mortar (300). 여기서, 초속경모르타르(300)는 모르타르 분말과 점착액을 믹싱하여 제조되는 것으로, 일정 시간이 지나면 신속하게 응고되는 특징으로 가지며, 시판되는 제품을 사용하면 된다. Here, the initial velocity around the mortar (300) is to be prepared by mixing the powder and the adhesive mortar mixture, characterized in that is has a certain amount of time after rapid solidification, and by using a commercially available product.

따라서, 앞에 위치한 수로관의 안착부(30)를 뒤에 위치한 수로관의 안착턱(22)에 올려놓으면 안착부(30)가 안착턱(22)에 밀착되면서 모르타르충진공간(100)에 의해 앞, 뒤에 위치한 수로관의 안착부(30)와 안착턱(22)의 사이에 공간이 형성되는데, 이 모르타르충진공간(100)에 초속경모르타르(300)를 주입하면 초속경모르타르(300)가 모르타르충진공간(100)과 공기배출공(200)에 충진됨과 아울러 응고되면서 앞, 뒤에 위치한 수로관을 서로 결속하게 된다. Therefore, If you place the seating portion 30 of the surogwan in front of the seating jaw 22 of surogwan located behind the receiving portions 30 are mounted jaws 22, as close to the located behind the front, with the mortar-filled cavity 100 a space is formed between the seating portion 30 and the mounting projection 22 of the surogwan, when the mortar injected into the filling space per second diameter mortar 300 to 100 per second diameter mortar 300 is a mortar-filled space (100 ) as well as clot as soon filled in the air exhaust hole 200 is bound to one another in front, it is located behind surogwan.

여기서, 모르타르충진공간(100)의 단면은 개구되는 면보다 안쪽으로 파진 부분이 더 큰 직경을 갖도록 형성되어 모르타르충진공간(100)에 주입되어 응고된 초속경모르타르(300)가 분리되는 현상이 생기지 않도록 구성되는 것이 바람직하다. Here, the end surface of the mortar-filled space 100 is not to be a two pajin part inside which the opening than cotton are formed to have a larger diameter is injected into the mortar-filled space 100 is solidified zinnia light mortar 300, separation phenomena occur it is configured are preferred. 예를 들면, 모르타르충진공간(100)의 단면은 도 3에 도시된 바와 같이 사다리꼴 형상을 하도록 구성하면 된다. For example, the cross-section of the mortar-filled space 100 is be configured to have a trapezoidal shape as shown in Fig.

그리고 공기배출공(200)은 안착부(30)의 중간 부분에 한 군데 형성되게 구성할 수도 있으나, 도 6에 도시된 바와 같이 세 군데 정도 형성되게 구성하는 것이 바람직하다. And the air discharging hole 200 is preferably configured to be formed in the three places around, as shown in one place, but may be configured to be formed in a middle part, Fig. 6 of the receiving portions 30. The 그래야만 결속력이 더욱 향상되기 때문이다. Only then, because solidarity is to be further improved. 또한, 공기배출공(200)은 상부보다 하부가 더 좁은 면적으로 갖도록 형성되는 것이 바람직하다. In addition, the air exhaust hole 200 may be formed lower than the upper part so as to have a narrower area. 그래야만 초속경모르타르(300)가 주입 및 응고된 후 안착부(30)가 상방향으로 들어올려지지 않도록 잡아주기 때문이다. Only then it is because initial velocity around the mortar 300 cycle so that it does not hold up the receiving portions (30) after the injection and solidification is loaded in an upward direction. 예들 들면, 공기배출공(200)은 도 4에 도시된 바와 같이 상단이 넓은 계단 형상을 하도록 구성할 수도 있고, 도 5에 도시된 바와 같이 역 원뿔 형상을 하도록 구성할 수도 있을 것이다. Eg., An air discharge hole 200 will also be configured to the reverse conical shape as shown in Figure 4. The block diagram may be, to make a wide step shape as shown in the top 5.

한편, 본 발명은 도 6에 도시된 바와 같이 안착부(30)의 저면에 폭방향을 따라 길게 모르타르충진공간(100)과 연통되는 보조충진공간(400)을 형성하고, 이 보조충진공간(400)의 중간에 상방향으로 관통되는 공기배출공(200)을 형성하게 구성할 수도 있다. On the other hand, the invention forms a secondary filling space 400 that is along the width direction on the bottom surface of the seating portion 30 and hold communication with a mortar-filled space 100, as shown in Figure 6, and the secondary filling space (400 ) may be configured to form an air discharge hole 200 which is penetrating in the direction of the middle. 여기서, 보조충진공간(400)은 모르타르충진공간(100)에 초속경모르타르(300)를 충진할 때 함께 충진되는 공간으로 안착부(30)와 안착턱(22)의 결속력을 더욱 향상시키기 위함이다. Here, the secondary fill area 400 is intended to further improve the cohesion of the mortar-filled space seating of a space filled with when filling the initial velocity around the mortar 300 to 100 in section 30 and the mounting jaw (22) .

이제, 이와 같이 구성된 본 발명에 따른 수로관을 통해 배수시설을 시공하기 위해 수로관을 연결 시공하는 공법을 설명한다. Now it will be described a method for construction through surogwan according to the present invention constructed in this manner connected to the surogwan construction the drainage system.

먼저, 시공 현장에 따라 상술한 바와 같은 수로관을 여러 개 준비한다. First, the multiple preparing surogwan as described above depending on the construction site. 즉, 좌측벽과 우측벽이 바닥면으로 연결되어 내부에 전후방으로 수로(12)가 관통 형성되고 상면이 개구된 형상을 갖는 몸체부(10)와, 몸체부(10)의 선단부에 일체로 형성되고 내면에는 안착턱(22)이 형성된 소켓부(20)와, 몸체부(10)의 후단부에 일체로 형성되어 상기 안착턱(22)에 안착되는 안착부(30)로 이루어지되, 안착턱(22)의 내면에는 좌측과 바닥과 우측을 연통하는 모르타르충진공간(100)이 형성되고, 안착부(30)의 중간에는 상하로 관통하는 공기배출공(200)이 관통 형성된 수로관을 여러 개 준비한다. I.e., integrally formed on the front end of a body portion 10, channel 12 in the front and rear inside the left side wall and right side wall connected to the bottom surface is formed through which the upper surface of the opening shape, the body part 10 and the inner surface are integrally formed on the rear end of the seating jaw 22. the socket portion 20 is formed, the body portion 10 jidoe comprises a seating part 30, which is seated on the seating jaw 22, a seating jaw 22, the mortar-filled cavity 100 for connecting the left and bottom and the right side is formed, and the middle surogwan air discharge hole (200) penetrating vertically is formed through the mounting part 30 is prepared more than one inner surface of the do.

그런 다음, 앞에 위치한 수로관의 안착부(30)를 뒤에 위치한 수로관의 안착턱(22)에 포개지게 올려놓은 방식으로 여러 개의 수로관을 현장에 맞게 서로 연결한다. Then in the following, before surogwan manner place of the receiving portions 30 is raised to be superimposed on the receiving projection 22 of the surogwan located behind and in connection with each other for multiple surogwan the field.

그런 다음, 안착부(30)가 안착턱(22)에 포개지게 올려놓은 상태에서 모르타르충진공간(100)으로 초속경모르타르(300)를 주입하여 초속경모르타르(300)가 모르타르충진공간(100)과 공기배출공(200)에 충진되도록 한다. Then, the receiving portions 30 are mounted jaws 22 by the mortar-filled space 100 in the initial velocity around the mortar 300 in the off state up be superimposed on the injection zinnia light mortar 300 is a mortar-filled cavity 100 and such that filling the air discharge hole 200. the 이때, 초속경모르타르(300)를 모르타르충진공간(100)으로 주입할 때는 신속하기 주입하기 위해 모르타르충진공간(100)의 좌측와 우측에서 동시에 주입하는 것이 좋다. At this time, when the initial velocity injection mortar around 300 in a mortar-filled cavity 100 may be injected at the same time in jwacheukwa right of the mortar-filled cavity 100 in order to inject the rapid. 즉, 초속경모르타르(300)의 응고 시간이 매우 짧기 때문에 천천히 주입하게 되면 주입하는 도중에 일부분이 응고될 수 있으므로 신속하게 주입하기 위해 모르타르충진공간(100)의 좌측와 우측에서 동시에 주입하는 것이 좋다. That is, the initial velocity when the light may be slowly injected into the injection because the part can be solidified quickly injected at the same time on the right side of the jwacheukwa mortar-filled cavity 100 for injecting during because mortar 300 solidification time is very short of. 이때, 모르타르충진공간(100)에 있는 공기는 공기배출공(200)을 통해 배출되기 때문에 초속경모르타르(300)의 주입이 가능하게 된다. At this time, air in the mortar-filled space 100 is to enable the injection of the light mortar Zinnia 300 since the discharged through the air discharge hole 200. The 따라서 모르타르충진공간(100)으로 주입되는 초속경모르타르(300)가 모르타르충진공간(100)에 꽉 채워지게 충진되면서 공기배출공(200)을 통해 올라오게 되면 이를 육안으로 확인하고 주입을 멈추면 된다. Therefore, the mortar-filled space per second around the mortar (300) injected with 100 is chumyeon If while filling be tightly clamped in the mortar-filled space 100 is brought up through the air discharge hole 200, verify this with the naked eye, and stops the injection . 물론, 초속경모르타르(300)를 충진하다가 공기배출공(200)을 통해 넘치게 되면 넘친 부분만 닦아내면 된다. Of course, the initial velocity while filling a light mortar 300 is wiped only the inner surface portion overflowed when flooded through the air discharge hole 200. The

마지막으로, 충진된 초속경모르타르(300)를 자연 경화시키면 초속경모르타르(300)가 응고되면서 여러 개의 수로관이 서로 연결된 상태로 시공이 완료된다. Finally, the construction of the light mortar filled per second 300 to the nature when cured as a solidified initial velocity around the mortar 300 is connected to each other several surogwan state is completed. 즉, 초속경모르타르(300)가 응고되면서 결속 및 접착력에 의해 수로관과 수로관의 연결 부분을 잡아주기 때문에 여러 개의 수로관이 서로 연결된 상태를 유지하게 되는 것이다. That is, the initial velocity would be to maintain a state in which multiple surogwan connected to each other due to light while the mortar (300), the solidification period hold surogwan and the connecting portion of surogwan by the binding and adhesion.

이상에서와같이 본 발명은 특정의 실시예와 관련하여 도시 및 설명하였지만, 청구범위에 의해 나타난 발명의 사상 및 영역으로부터 벗어나지 않는 한도 내에서 다양한 개조 및 변화 가능하다는 것을 당 업계에서 통상의 지식을 가진 자라면 누구나 쉽게 알 수 있을 것이다. As in the above, the present invention provides one of ordinary skill in the art that with respect to the specific embodiments that although shown and described, various modifications and changes can be in without departing road from the spirit and scope of the invention indicated by the claims Now if anyone would make it easier to understand.

10: 몸체부 12: 수로 10: body 12: the number of
20: 소켓부 22: 안착턱 20: socket part 22: mounting jaw
30: 안착부 100: 모르타르충진공간 30: receiving portion 100: mortar-filled space
200: 공기배출공 300: 초속경모르타르 200: air exhaust hole 300: zinnias around mortars
400: 보조충진공간 400: auxiliary filling space

Claims (4)

  1. 좌측벽과 우측벽이 바닥면으로 연결되어 내부에 전후방으로 수로가 관통 형성되고 상면이 개구된 형상을 갖는 몸체부와, 상기 몸체부의 선단부에 일체로 형성되고 내면에는 안착턱이 형성된 소켓부와, 상기 몸체부의 후단부에 일체로 형성되어 상기 안착턱에 안착되는 안착부로 이루어진 수로관에 있어서, And the socket portion, the left wall and the right side wall connected to the bottom surface and the channel is formed through in the front-to-back inside the body portion having an upper surface of the opening shape, formed integrally at the distal end of the body portion inside surface seat having a jaw, in surogwan integrally formed parts made seat being mounted on the seating jaw after the end of the body portion,
    상기 안착턱의 내면에는 좌측과 바닥과 우측을 연통하는 모르타르충진공간이 형성되고, The inner surface of the seating jaw, the mortar-filled space in communication with the bottom of the left and right side is formed,
    상기 안착부의 중간에는 상하로 관통하는 공기배출공이 관통 형성되되, The seating portion, the intermediate air exhaust holes being formed through-penetrating up and down,
    두 개 이상의 수로관을 서로 연결하기 위해 앞에 위치한 수로관의 안착부를 뒤에 위치한 수로관의 안착턱에 올려놓았을 때 공기배출공과 모르타르충진공간이 연통되게 구성되어, When placed onto the surogwan seating jaw located behind a seat portion of surogwan located in front in order to connect the two or more surogwan each other is configured to be a ball and mortar filling the air discharge space in communication,
    앞에 위치한 수로관의 안착부를 뒤에 위치한 수로관의 안착턱에 올려놓은 상태에서 모르타르충진공간으로 초속경모르타르를 주입하면 초속경모르타르가 모르타르충진공간과 공기배출공에 충진됨과 아울러 응고되면서 서로 결속하도록 구성된 것을 특징으로 하는 수로관. When in placed on the seating jaw of surogwan located behind parts fit of surogwan the mortar-filled space per second diameter injecting mortar in front as soon zinnia light mortar is filled in the mortar-filled space and the air discharge hole as well as coagulation characterized in that is configured to bond to each other surogwan of.
  2. 제1항에 있어서, According to claim 1,
    상기 모르타르충진공간의 단면은 개구되는 면보다 안쪽으로 파진 부분이 더 큰 직경을 갖도록 형성되어 모르타르충진공간에 주입되어 응고된 초속경모르타르가 분리되는 현상이 생기지 않도록 구성된 것을 특징으로 하는 수로관. An end surface of the mortar-filled space surogwan, characterized in that this is configured so that a portion of the pajin inside which an opening is formed to have a larger diameter than cotton is injected into the mortar-filled space coagulation zinnia light mortar separation phenomenon occurs.
  3. 제1항에 있어서, According to claim 1,
    상기 공기배출공은 적어도 한 군데 이상 형성되되, 상부보다 하부가 더 좁은 면적으로 갖도록 형성되어 초속경모르타르가 주입 및 응고된 후 상기 안착부가 상방향으로 들어올려지지 않도록 구성된 것을 특징으로 하는 수로관. It said air discharging hole is being formed, at least more than one place, and then is formed in the lower portion than the upper portion so as to have a narrower area around the initial velocity mortar is injected and solidified surogwan, characterized in that configured so that it does not lift up by the seating portion upward.
  4. 좌측벽과 우측벽이 바닥면으로 연결되어 내부에 전후방으로 수로가 관통 형성되고 상면이 개구된 형상을 갖는 몸체부와, 상기 몸체부의 선단부에 일체로 형성되고 내면에는 안착턱이 형성된 소켓부와, 상기 몸체부의 후단부에 일체로 형성되어 상기 안착턱에 안착되는 안착부로 이루어지되, 상기 안착턱의 내면에는 좌측과 바닥과 우측을 연통하는 모르타르충진공간이 형성되고, 상기 안착부의 중간에는 상하로 관통하는 공기배출공이 관통 형성된 수로관을 여러 개 준비하는 단계; And the socket portion, the left wall and the right side wall connected to the bottom surface and the channel is formed through in the front-to-back inside the body portion having an upper surface of the opening shape, formed integrally at the distal end of the body portion inside surface seat having a jaw, are integrally formed on the post of the body portion end jidoe made parts secured that the seat secured to the jaw, the inner surface of the seating jaw, the mortar-filled space in communication with the left and bottom and the right side is formed, and the seating parts of the middle through-down the step of preparing the air discharge holes formed through multiple surogwan that;
    앞에 위치한 수로관의 안착부를 뒤에 위치한 수로관의 안착턱에 포개지게 올려놓은 방식으로 여러 개의 수로관을 현장에 맞게 서로 연결하는 단계; Coupling each other to fit the site multiple surogwan surogwan the front seat part way sewn up be superimposed on the seating jaw of surogwan located behind the located;
    안착부가 안착턱에 포개지게 올려놓은 상태에서 모르타르충진공간으로 초속경모르타르를 주입하여 초속경모르타르가 모르타르충진공간과 공기배출공에 충진되도록 하는 단계; Further comprising: a mounting portion mounting the jaws nested be mortar-filled space per second diameter injecting mortar in the off state up to per second around the mortar so that the mortar filled into the filling space and the air discharge hole; And
    충진된 초속경모르타르를 자연 경화시키는 단계;로 이루어진 것을 특징으로 하는 수로관 시공공법. Surogwan construction method according to claim consisting of; the filled per second path comprising natural cure the mortar.
KR20150131146A 2015-09-16 2015-09-16 Water conduit and its construction method KR20170033163A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20150131146A KR20170033163A (en) 2015-09-16 2015-09-16 Water conduit and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20150131146A KR20170033163A (en) 2015-09-16 2015-09-16 Water conduit and its construction method

Publications (1)

Publication Number Publication Date
KR20170033163A true true KR20170033163A (en) 2017-03-24

Family

ID=58500666

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20150131146A KR20170033163A (en) 2015-09-16 2015-09-16 Water conduit and its construction method

Country Status (1)

Country Link
KR (1) KR20170033163A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040000425A (en) 2001-04-13 2004-01-03 꼼미사리아 아 레네르지 아토미끄 Detachable substrate or detachable structure and method for the production thereof
KR20040033062A (en) 2001-09-18 2004-04-17 퀄컴 인코포레이티드 Method and apparatus for service authorization in a communication system
KR101066899B1 (en) 2011-02-18 2011-09-27 권태우 Using this module, pipes and surogwan
KR20150088012A (en) 2014-01-23 2015-07-31 강원대학교산학협력단 Expansion joint device for an aqueduct and construction method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040000425A (en) 2001-04-13 2004-01-03 꼼미사리아 아 레네르지 아토미끄 Detachable substrate or detachable structure and method for the production thereof
KR20040033062A (en) 2001-09-18 2004-04-17 퀄컴 인코포레이티드 Method and apparatus for service authorization in a communication system
KR101066899B1 (en) 2011-02-18 2011-09-27 권태우 Using this module, pipes and surogwan
KR20150088012A (en) 2014-01-23 2015-07-31 강원대학교산학협력단 Expansion joint device for an aqueduct and construction method thereof

Similar Documents

Publication Publication Date Title
US5819487A (en) Prestressed concrete poles with internal bolting and leveling structures
US5425600A (en) Drainage block feedthrough for assembly of walls constructed of specialized retaining blocks
GB2137273A (en) Improvements in or relating to wall ties
KR100799358B1 (en) Combined retaining wall and method for constructing thereof
KR100943062B1 (en) The basis structure of steel pipe and method
KR100789426B1 (en) Composite pile
KR101204763B1 (en) Structure of sandwich pannel with precast concrete and cast in place concrete for pipe utility conduit
FR2544005A1 (en) Swimming pool sidewalls of concrete
JP2008096063A (en) Foundation pile serving also as underground heat exchanger, installing method for underground heat exchanger, and underground heat exchanger
KR100758356B1 (en) Boundary stone establishing structure and method
US2898090A (en) Safety fence for motorways
JP2007255091A (en) Method of filling grout, joint method of pc member, and joint structure of pc member
KR101109320B1 (en) Field assembly concrete culvert box having underground excavation prevention structure and construction method thereof
JP2004183338A (en) Tunnel cut-off structure and construction method therefor
US4231683A (en) Process and a device for making anchorages in soils and rocks
KR100950666B1 (en) Connection for Pile Head, Connection Structure and Method of Pile and Precast Concrete Pier Structure
KR100579003B1 (en) Structure prevent from leakage water of electric manhole
KR100965855B1 (en) Joint structure and method for combining steel member on concrete member
DE102008010660B3 (en) Construction of a wind power plant
KR100824833B1 (en) The Prefabricated Precast Concrete Culvert Connecting By Inserting Steel Rod Into Ring.
KR101119829B1 (en) Method for cast-in-place pile construction using punctured couplers
KR20040105940A (en) Structures and Methods for Connection between Precast Decks and Prestressed Concrete Girders
KR100935518B1 (en) It combines the production of a synthetic resin ground water bohotong heart closed upper protective ball device
KR200342265Y1 (en) Hume concrete pipe connection structure
JP2009127283A (en) Method of anchoring plurality of prestressing steel strands by after-bond method, and tool for use therein

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E90F Notification of reason for final refusal
E601 Decision to refuse application