KR20140062253A - System and method for electric installation design - Google Patents

System and method for electric installation design Download PDF

Info

Publication number
KR20140062253A
KR20140062253A KR1020120128668A KR20120128668A KR20140062253A KR 20140062253 A KR20140062253 A KR 20140062253A KR 1020120128668 A KR1020120128668 A KR 1020120128668A KR 20120128668 A KR20120128668 A KR 20120128668A KR 20140062253 A KR20140062253 A KR 20140062253A
Authority
KR
South Korea
Prior art keywords
electrical equipment
modeling
dimensional
electric installation
control unit
Prior art date
Application number
KR1020120128668A
Other languages
Korean (ko)
Inventor
김창섭
Original Assignee
현대중공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 현대중공업 주식회사 filed Critical 현대중공업 주식회사
Priority to KR1020120128668A priority Critical patent/KR20140062253A/en
Publication of KR20140062253A publication Critical patent/KR20140062253A/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B71/00Designing vessels; Predicting their performance

Abstract

The present invention relates to an electric installation design system and a method thereof for modeling a three-dimensional electric installation. The electric installation design system according to the present invention comprises a control unit, a storage unit, an input unit, and a display unit. The control unit models the 3D electric installation by using an electric installation modeling program. The control unit generates a 3D modeling electric installation drawing from a 2D electric installation drawing. The control unit applies the electric installation attribute information of the 2D electric installation drawing to the 3D modeling electric installation drawing and models the 3D electric installation. The storage unit stores the electric installation modeling program; provides the same to the control unit; and stores data related to the electric installation modeling according to the control unit. The input unit inputs the command and the data which are applied according to a manual operation to the control unit. The display unit displays all screens for the electric installation modeling according to the control unit. The present invention is provided to automatically generate the 3D modeling electric installation drawing from the 2D electric installation drawing without individually working the 2D electric installation drawing and the 3D modeling electric installation drawing when the electric installation is deigned. The present invention is provided to read the electric installation attribute information of the 2D electric installation drawing; automatically apply the same to the 3D modeling electric installation drawing; and model the 3D electric installation without inputting the electric installation attribute information in the manual operation, thereby economically designing the electric installation.

Description

전장 설비 설계 시스템 및 방법{System and Method for Electric Installation Design}{System and Method for Electric Installation Design}

본 발명은 전장 설비 설계에 관한 것으로, 특히 선박 등에 설치되는 전장 설비를 설계하는 경우에 2차원 전장 설비 배치도로부터 3차원 모델링 전장 설비 도면을 자동 생성함과 아울러 2차원 전장 설비 배치도의 전장 설비 속성정보를 판독하여서 3차원 모델링된 전장 설비 도면에 자동으로 입력하여 부여함으로써 전장 설비를 고속으로 경제성 있게 3차원 모델링하도록 하는 전장 설비 설계 시스템 및 방법에 관한 것이다.The present invention relates to the design of electrical equipment, and in particular, in the case of designing an electrical equipment installed on a ship or the like, a three-dimensional modeling electrical equipment design drawing is automatically generated from a two-dimensional electrical equipment arrangement map, Dimensional modeling of the electrical equipment, and automatically inputting the three-dimensionally modeled electrical equipment to the three-dimensionally modeled electrical equipment drawings, thereby realizing high-speed and economical three-dimensional modeling of the electrical equipment.

일반적으로 선박 등의 대형 구조물을 제작하는 경우에 해당 구조물에 각종 전기, 전자 장비 및 전장 케이블을 포함하는 다양한 전장 설비를 설치한다.Generally, when a large structure such as a ship is manufactured, various electric equipment including various electric, electronic equipment and electric cable are installed in the structure.

이와 같이 다양한 전장 설비를 생산하기 위해서는 해당 전장 설비를 설계하되, 2차원 전장 설비 배치도를 작성함과 아울러 해당 전장 설비를 3차원 모델링하여서 설계한다.In order to produce such a variety of electric equipment, the electric equipment is designed, the two-dimensional electric equipment is laid out, and the electric equipment is three-dimensionally modeled.

종래에는 전장 설비를 설계하는 경우에 2차원 전장 설비 배치도와 3차원 모델링 전장 설비 도면을 개별로 작업하여 작성하였으며, 3차원 모델링 전장 설비 도면을 작성하는 경우 3차원 모델링 전장 설비 도면에 전장 설비의 속성 정보를 수작업으로 입력하여 작성하였다.In the past, in the case of designing electric facilities, two-dimensional electric facility layout and three-dimensional modeling electric field facility drawings were created separately. When three-dimensional modeling electric field facility drawings are created, Information was entered manually.

이와 같이, 종래에는 전장 설비의 설계시에 2차원 전장 설비 배치도와 3차원 모델링 전장 설비 도면을 개별로 작업하여 작성하고, 3차원 모델링 전장 설비 도면의 작성시에 3차원 모델링 전장 설비 도면에 전장 설비의 속성 정보를 수작업으로 입력하여 작성함에 기인하여, 설계 작업 공수가 증가하여 전장 설비 설계에 많은 인력과 시간이 소요되므로 전장 설비 설계 작업을 경제성 있게 수행하지 못하는 문제점이 있다.As described above, conventionally, a two-dimensional electric facility layout chart and a three-dimensional modeling electric field facility chart are created by working individually when designing electric facilities, and three-dimensional modeling electric field facility drawings are created by drawing an electric field facility The number of design work hours is increased due to the manual input of the attribute information of the electrical equipment, and therefore, the designing of the electrical equipment requires a lot of manpower and time, so that the electrical equipment design work can not be performed economically.

본 발명은 상술한 바와 같은 종래의 문제점을 해결하기 위하여 제안된 것으로, 선박 등에 설치되는 전장 설비를 설계하는 경우에 2차원 전장 설비 배치도로부터 3차원 모델링 전장 설비 도면을 자동 생성함과 아울러 2차원 전장 설비 배치도의 전장 설비 속성정보를 판독하여 3차원 모델링된 전장 설비 도면에 자동으로 입력하여 부여함으로써 설계 작업 공수를 감소시켜 전장 설비를 고속으로 경제성 있게 3차원 모델링하도록 하는 전장 설비 설계 시스템 및 방법을 제공함에 목적이 있다.SUMMARY OF THE INVENTION The present invention has been proposed in order to solve the conventional problems as described above, and it is an object of the present invention to automatically generate a three-dimensional modeling electrical equipment drawing from a two- Provided is a system and method for designing an electrical equipment facility that enables the electrical equipment to be modeled in a high-speed and economical manner by reducing the number of design work operations by automatically inputting and inputting the electrical equipment attribute information of the equipment arrangement diagram into the three-dimensionally modeled electrical equipment equipment drawings. There is purpose in.

상술한 바와 같은 목적을 달성하기 위한 본 발명에 따른 전장 설비 설계 시스템은, 전장 설비 모델링 프로그램에 의해 전장 설비를 3차원 모델링하되, 2차원 전장 설비 배치도로부터 3차원 모델링 전장 설비 도면을 생성하고 2차원 전장 설비 배치도의 전장 설비 속성정보를 상기 3차원 모델링 전장 설비 도면에 부여하여서 전장 설비를 3차원 모델링하는 제어부와; 상기 전장 설비 모델링 프로그램을 저장하여 제어부에 제공하며, 제어부의 제어에 따라 전장 설비 모델링 관련 데이터를 저장하는 저장부와; 수동 조작에 따라 인가되는 명령 및 데이터를 제어부에 입력하는 입력부와; 상기 제어부의 제어에 따라 전장 설비 모델링을 위한 제반 화면을 표시하는 표시부를 포함하여 이루어진다.In order to accomplish the above object, there is provided a system for designing an electrical and electronic equipment according to the present invention, which comprises three-dimensional modeling of electrical equipment by an electrical equipment modeling program, A control unit for assigning the electrical equipment attribute information of the electrical equipment arrangement map to the 3D modeling electrical equipment map to thereby model the electrical equipment in three dimensions; A storage unit for storing the electrical equipment modeling program and providing the electrical equipment modeling program to the control unit and storing data related to the electrical equipment modeling according to the control of the control unit; An input unit for inputting instructions and data to be applied to the control unit according to a manual operation; And a display unit for displaying various screens for modeling the electrical equipment under the control of the control unit.

본 발명에 따른 전장 설비 설계 시스템에 의하면, 상기 저장부에 저장되는 전장 설비 모델링 관련 데이터는 2차원 전장 설비 배치도, 3차원 모델링 전장 설비 도면 및 전장 설비 속성정보를 포함한다.According to the electrical equipment design system of the present invention, the electrical equipment modeling-related data stored in the storage unit includes a two-dimensional electrical equipment arrangement chart, a three-dimensional modeling electrical equipment chart, and electrical equipment facility property information.

그리고, 본 발명에 따른 전장 설비 설계 시스템에 의하면, 상기 제어부는 2차원 전장 설비 배치도에 존재하는 전장 설비들의 2차원 좌표를 3차원 좌표로 변환하여 3차원으로 표현하여 도시하여서 상기 2차원 전장 설비 배치도로부터 3차원 모델링 전장 설비 도면을 생성한다.According to the electrical equipment design system of the present invention, the control unit converts the two-dimensional coordinates of the electrical equipment existing in the two-dimensional electrical equipment facility layout into three-dimensional coordinates and displays the three-dimensional coordinates, Dimensional modeling electric line equipment drawing from the three-dimensional modeling electric line drawing.

한편, 상술한 바와 같은 목적을 달성하기 위한 본 발명에 따른 전장 설비 설계 방법은, 제어부가 입력부를 통한 모델링 명령 입력시에, 저장부에 저장되어 있는 2차원 전장 설비 배치도로부터 전장 설비 속성정보를 판독하여 저장부에 일시 저장하는 단계와; 상기 제어부가 상기 2차원 전장 설비 배치도에 존재하는 전장 설비들의 2차원 좌표를 3차원 좌표로 변환하여 3차원으로 표현하여 도시하여서 2차원 전장 설비 배치도로부터 3차원 모델링 전장 설비 도면을 생성하는 단계와; 상기 제어부가 상기 저장부에 일시 저장한 전장 설비 속성정보를 3차원 모델링 전장 설비 도면에 부여하여서 3차원 모델링 전장 설비 도면을 완성하고, 해당 3차원 모델링 전장 설비 도면을 표시부에 출력하여 표시함과 아울러 저장부에 저장하는 단계를 포함하여 이루어진다.According to another aspect of the present invention, there is provided a method for designing an electrical equipment, including the steps of: when a control unit inputs a modeling command through an input unit, reads electrical equipment attribute information from a two- Temporarily storing in a storage unit; Wherein the control unit converts the two-dimensional coordinates of the electrical equipment existing in the two-dimensional electrical equipment installation plan into three-dimensional coordinates and displays the three-dimensional coordinates to generate a three-dimensional modeling electrical equipment installation plan from the two- The control unit provides the electrical equipment attribute information temporarily stored in the storage unit to the 3D modeling electrical equipment drawing to complete the 3D modeling electrical equipment drawing and displays the corresponding 3D modeling electrical equipment drawing on the display unit, And storing it in a storage unit.

본 발명에 의하면, 선박 등에 설치되는 전장 설비를 설계하는 경우에 2차원 전장 설비 배치도와 3차원 모델링 전장 설비 도면을 개별로 작업하여 작성할 필요 없이 2차원 전장 설비 배치도로부터 3차원 모델링 전장 설비 도면을 자동 생성함과 아울러, 2차원 전장 설비 배치도의 전장 설비 속성정보를 판독하여 3차원 모델링 전장 설비 도면에 자동으로 부여하여서 수작업으로 전장 설비 속성 정보를 입력하지 않고서도 전장 설비를 3차원 모델링함으로써, 전장 설비 설계 작업을 고속으로 경제성 있게 수행하게 된다.According to the present invention, in the case of designing an electric facility installed on a ship or the like, it is not necessary to separately prepare a two-dimensional electric facility layout map and a three-dimensional modeling electric field facility drawing, Dimensional model of the electrical equipment, and also automatically assigns the electrical equipment attribute information of the two-dimensional electrical equipment facility map to the three-dimensional modeling electrical equipment facility map, thereby modeling the electrical equipment in three dimensions without manually inputting the electrical equipment facility attribute information. Design work can be carried out at high speed and economically.

도 1은 본 발명에 따른 전장 설비 설계 시스템을 도시한 도면이다.
도 2는 본 발명에 따른 전장 설비 설계 시스템에 의한 전장 설비 모델링 처리를 설명하기 위한 도면이다.
FIG. 1 is a diagram showing a system for designing an electrical equipment according to the present invention.
FIG. 2 is a diagram for explaining an electric-power-generating-equipment modeling process by the electric-field-facility designing system according to the present invention.

이하 첨부 도면을 참조하여 본 발명의 실시예를 상세히 설명한다. 본 발명은 도면에 도시된 실시예를 참고로 설명하였으나 이는 하나의 실시예로서 설명하는 것이며, 이것에 의해 본 발명의 기술적 사상과 그 핵심 구성 및 작용이 제한되지 않는다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings. Although the present invention has been described with reference to the embodiments shown in the drawings, it is to be understood that the present invention is not limited to the technical spirit and essential structure and operation of the present invention.

본 발명은 전장 설비를 3차원 모델링하는 경우에 2차원 전장 설비 배치도로부터 3차원 모델링 전장 설비 도면을 자동 생성함과 아울러 2차원 전장 설비 배치도의 전장 설비 속성정보를 판독하여서 3차원 모델링된 전장 설비 도면에 자동으로 입력하여 부여함으로써 수작업으로 전장 설비 속성 정보를 입력하지 않고서도 전장 설비를 3차원 모델링하도록 구현된다.The present invention relates to a three-dimensional modeling apparatus and method for automatically generating a three-dimensional modeling electrical equipment design drawing from a two-dimensional electrical equipment arrangement map and three-dimensionally modeling the electrical equipment facility map by reading the electrical equipment facility attribute information of the two- So that the electrical equipment is three-dimensionally modeled without manually inputting the electrical equipment attribute information.

이와 같이 구현하기 위한 본 발명에 따른 전장 설비 설계 시스템(10)은, 도 1에 도시된 바와 같이, 제어부(11), 통신부(12), 저장부(13), 입력부(14) 및 표시부(15)를 포함하여 이루어진다.1, a system 10 for designing an electrical and electronic equipment according to the present invention includes a control unit 11, a communication unit 12, a storage unit 13, an input unit 14, and a display unit 15 ).

제어부(11)는 전장 설비 설계 시스템(10)의 제반 구동을 관할하되, 2차원 전장 설비 배치도에 의거하여 3차원 모델링 전장 설비 도면을 생성하는 처리를 수행한다.The control unit 11 performs processing for generating three-dimensional modeling electrical equipment drawings based on the two-dimensional electrical equipment facility layout, with regard to all operations of the electrical equipment design system 10.

제어부(11)는 전장 설비 모델링 프로그램에 의해 3차원 모델링 전장 설비 도면을 생성하는데, 입력부(14)를 통한 모델링 명령 입력시에 2차원 전장 설비 배치도의 전장 설비 속성정보를 판독하고, 2차원 전장 설비 배치도의 2차원 좌표를 3차원 좌표로 변환하여서 3차원 모델링 전장 설비 도면을 생성하고, 해당 전장 설비 속성정보를 3차원 모델링된 전장 설비 도면에 부여함으로써 전장 설비를 3차원 모델링한다.The control unit 11 generates a three-dimensional modeling electrical equipment plan by using the electrical equipment modeling program. When the modeling command is input through the input unit 14, the control unit 11 reads the electrical equipment facility property information of the two- Three-dimensional modeling is performed by converting the two-dimensional coordinates of the layout into three-dimensional coordinates to generate a three-dimensional modeling electrical equipment design drawing and assigning the electrical equipment facility attribute information to the three-dimensionally modeled electrical equipment drawing.

그리고, 제어부(11)는 2차원 전장 설비 배치도로부터 전장 설비 속성정보를 판독하는 경우 2차원 전장 설비 배치도에 존재하는 전장 설비 심볼(Symbol) 및 회로 넘버(Circuit Number) 등을 포함하는 전장 설비 속성정보를 판독하여 저장부(13)에 일시 저장한다.When the controller 11 reads out the electrical equipment attribute information from the two-dimensional electrical equipment facility map, the control unit 11 obtains electrical equipment facility attribute information including an electrical equipment symbol and a circuit number existing in the two- And temporarily stores it in the storage unit 13.

또한, 제어부(11)는 2차원 전장 설비 배치도에 존재하는 전장 설비들의 2차원 좌표를 3차원 좌표로 변환하여 3차원으로 표현하여 도시함으로써 2차원 전장 설비 배치도로부터 3차원 모델링 전장 설비 도면을 생성한다.In addition, the controller 11 converts the two-dimensional coordinates of the electrical equipments existing in the two-dimensional electrical equipments arrangement diagram into three-dimensional coordinates and expresses them in three dimensions, thereby creating a three-dimensional modeling electrical equipments drawing from the two- .

제어부(11)는 2차원 전장 설비 배치도로부터 3차원 모델링 전장 설비 도면을 생성한 후에, 2차원 전장 설비 배치도로부터 판독하여 저장부(13)에 일시 저장하여 놓은 전장 설비 속성정보를 해당 3차원 모델링 전장 설비 도면에 부여함으로써, 3차원 모델링 전장 설비 도면을 완성한다.The control unit 11 generates a three-dimensional modeling electrical equipment plan from the two-dimensional electrical equipment facility layout, reads out the two-dimensional electrical equipment plan layout from the two-dimensional electrical equipment facility layout, temporarily stores the electrical equipment facility property information stored in the storage unit 13, Dimensional modeling electric field equipment drawings by completing the drawings.

그리고, 통신부(12)는 제어부(11)의 제어에 따라 통신망을 통해 통신하여서 전장 설비 설계 관련 데이터를 다른 부서에 전송케 한다. 저장부(13)는 전장 설비 모델링 프로그램을 저장하고, 해당 프로그램을 제어부(11)에 제공하며, 제어부(11)의 제어에 따라 2차원 전장 설비 배치도, 3차원 모델링 전장 설비 도면 및 전장 설비 속성정보를 포함하는 전장 설비 모델링 관련 데이터를 저장한다.The communication unit 12 communicates through the communication network under the control of the control unit 11 to transmit data related to the electrical equipment design to other departments. The storage unit 13 stores the electrical equipment modeling program and provides the program to the control unit 11. The control unit 11 controls the two-dimensional electrical equipment facility map, the three-dimensional modeling electrical equipment facility map, And the like.

또한, 입력부(14)는 설계자의 수동 조작에 따라 인가되는 명령 및 데이터를 제어부(11)에 입력한다. 그리고, 표시부(15)는 제어부(11)의 제어에 따라 전장 설비 모델링을 위한 제반 화면을 표시한다.The input unit 14 also inputs commands and data to be applied to the control unit 11 in accordance with the manual operation of the designer. Then, the display unit 15 displays various screens for modeling the electrical equipment under the control of the control unit 11. [

제어부(11)는 설계자가 입력부(14)를 통해 모델링 명령을 입력하면, 저장부(13)에 저장되어 있는 2차원 전장 설비 배치도로부터 전장 설비 속성정보를 판독하되, 2차원 전장 설비 배치도에 존재하는 전장 설비 심볼(Symbol) 및 회로 넘버(Circuit Number) 등을 포함하는 전장 설비 속성정보를 판독하여 저장부(13)에 일시 저장한다.When the designer inputs a modeling command through the input unit 14, the control unit 11 reads the electrical equipment attribute information from the two-dimensional electrical equipment facility map stored in the storage unit 13, Electric facility property information including an electric facility symbol and a circuit number, and temporarily stores the read electric facility property information in the storage unit 13.

그리고, 제어부(11)는 저장부(13)에 저장되어 있는 2차원 전장 설비 배치도에 존재하는 전장 설비들의 2차원 좌표를 3차원 좌표로 변환하여 3차원으로 표현하여 도시함으로써 2차원 전장 설비 배치도로부터 3차원 모델링 전장 설비 도면을 생성한다.The control unit 11 converts the two-dimensional coordinates of the electrical equipment existing in the two-dimensional electrical equipment facility layout diagram stored in the storage unit 13 into three-dimensional coordinates, and expresses the two-dimensional coordinates in a three- Generate a three-dimensional modeling electrical equipment plan.

이와 같이 2차원 전장 설비 배치도로부터 3차원 모델링 전장 설비 도면을 생성한 후에, 제어부(11)는 2차원 전장 설비 배치도로부터 판독하여 저장부(13)에 일시 저장하여 놓은 전장 설비 속성정보를 해당 3차원 모델링 전장 설비 도면에 부여함으로써, 3차원 모델링 전장 설비 도면을 완성하고, 해당 3차원 모델링 전장 설비 도면을 표시부(15)에 출력하여 표시함과 아울러 저장부(13)에 저장한다.After generating the three-dimensional modeling electric field facility map from the two-dimensional electric field facility map, the control unit 11 reads the electric field facility attribute information read from the two-dimensional electric field facility map and temporarily stored in the storage unit 13, Dimensional modeling electric field facility drawing is completed and the corresponding three-dimensional modeling electric field facility drawing is displayed on the display unit 15 for display and stored in the storage unit 13. [

상술한 바와 같은 기능을 구비하는 본 발명에 따른 전장 설비 설계 시스템(10)은 전장 설비를 3차원 모델링하는 경우에 도 2에 도시된 바와 같이 처리한다.The electrical system design system 10 according to the present invention having the functions as described above processes as shown in FIG. 2 when the electrical equipment is three-dimensionally modeled.

먼저, 제어부(11)는 입력부(14)를 통해 모델링 명령이 입력되면(S110), 저장부(13)에 저장되어 있는 2차원 전장 설비 배치도로부터 전장 설비 속성정보를 판독하되 2차원 전장 설비 배치도에 존재하는 전장 설비 심볼(Symbol) 및 회로 넘버(Circuit Number) 등을 포함하는 전장 설비 속성정보를 판독하여 저장부(13)에 일시 저장한다(S120).First, when a modeling command is input through the input unit 14 (S110), the control unit 11 reads the electrical equipment attribute information from the two-dimensional electrical equipment facility map stored in the storage unit 13, The electrical equipment attribute information including the electrical equipment symbol and the circuit number present is read and temporarily stored in the storage unit 13 at step S120.

그리고, 제어부(11)는 저장부(13)에 저장되어 있는 2차원 전장 설비 배치도에 존재하는 전장 설비들의 2차원 좌표를 3차원 좌표로 변환하여 3차원으로 표현하여 도시하여서 2차원 전장 설비 배치도로부터 3차원 모델링 전장 설비 도면을 생성한다(S130).The control unit 11 converts the two-dimensional coordinates of the electrical equipment existing in the two-dimensional electrical equipment facility layout diagram stored in the storage unit 13 into three-dimensional coordinates, expresses the two-dimensional coordinates in three dimensions, And a 3D modeling electrical equipment drawing is generated (S130).

그 후에, 제어부(11)는 2차원 전장 설비 배치도로부터 판독하여 저장부(13)에 일시 저장하여 놓은 전장 설비 속성정보를 해당 3차원 모델링 전장 설비 도면에 부여하여서 3차원 모델링 전장 설비 도면을 완성하고, 해당 3차원 모델링 전장 설비 도면을 표시부(15)에 출력하여 표시함과 아울러 저장부(13)에 저장한다(S140).Thereafter, the control unit 11 assigns the electrical equipment attribute information read from the two-dimensional electrical equipment facility layout and temporarily stored in the storage unit 13 to the corresponding three-dimensional modeling electrical equipment plan, thereby completing the three-dimensional modeling electrical equipment plan , And outputs the corresponding three-dimensional modeling electrical equipment drawing to the display unit 15 and displays it in the storage unit 13 (S140).

상술한 바와 같이, 본 발명은 전장 설비를 3차원 모델링하는 경우에 2차원 전장 설비 배치도로부터 3차원 모델링 전장 설비 도면을 자동 생성함과 아울러 2차원 전장 설비 배치도의 전장 설비 속성정보를 판독하여서 3차원 모델링된 전장 설비 도면에 자동으로 입력하여 부여함으로써 수작업으로 전장 설비 속성 정보를 입력하지 않고서도 전장 설비를 3차원 모델링한다.As described above, according to the present invention, in the case of three-dimensional modeling of electrical equipment, three-dimensional modeling electrical equipment design drawings are automatically generated from a two-dimensional electrical equipment facility layout map, and electrical equipment attribute information of a two- The model is automatically input and assigned to the modeled electrical equipment drawing, so that the electrical equipment is three-dimensionally modeled without manually inputting the electrical equipment attribute information.

이에, 본 발명은 전장 설비의 설계시에 2차원 전장 설비 배치도와 3차원 모델링 전장 설비 도면을 개별로 작업하여 작성할 필요없이 2차원 전장 설비 배치도로부터 3차원 모델링 전장 설비 도면을 자동 생성하게 되며, 전장 설비의 속성 정보를 수작업으로 입력하지 않고서도 3차원 모델링 전장 설비 도면을 작성하게 되므로, 설계 작업 공수를 감소시켜 전장 설비 설계 작업을 경제성 있게 수행하게 된다.Accordingly, the present invention automatically creates a three-dimensional modeling electrical equipment drawing from a two-dimensional electrical equipment arrangement diagram without separately creating a two-dimensional electrical equipment arrangement diagram and a three-dimensional modeling electrical equipment facility drawing at the time of designing the electrical equipment, Since the 3D modeling electrical equipment drawing is created without manually inputting the attribute information of the equipment, the design work flow can be reduced, and the electrical equipment design work can be performed economically.

본 발명은 상술한 설명에 한정되는 것은 아니고, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 본 발명의 기술사상을 벗어나지 아니하는 범위 내에서 본 발명을 여러 가지 형태로 변경하여 실시할 수 있을 것이며, 그러한 변경 실시는 본 발명의 기술적 범위에 해당된다고 할 것이다.It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit or scope of the invention. And such changes are considered to be within the technical scope of the present invention.

본 발명은 전장 설비를 3차원 모델링하여 설계하는 경우에 유용하게 적용할 수 있을 것이다. 본 발명에 의하면, 선박 등에 설치되는 전장 설비를 설계하는 경우에, 2차원 전장 설비 배치도와 3차원 모델링 전장 설비 도면을 개별로 작업하여 작성할 필요없이 2차원 전장 설비 배치도로부터 3차원 모델링 전장 설비 도면을 자동 생성함과 아울러, 2차원 전장 설비 배치도의 전장 설비 속성정보를 판독하여 3차원 모델링 전장 설비 도면에 자동으로 부여하여서 수작업으로 전장 설비 속성 정보를 입력하지 않고서도 전장 설비를 3차원 모델링함으로써, 전장 설비 설계 작업을 고속으로 경제성 있게 수행하게 된다.The present invention may be usefully applied to a case where three-dimensional modeling of electrical equipment is designed. According to the present invention, in the case of designing an electric facility installed on a ship or the like, it is not necessary to separately prepare a two-dimensional electric facility layout map and a three-dimensional modeling electric field facility map, Dimensionally modeling the electrical equipment attribute information of the two-dimensional electrical equipment facility map and automatically assigning it to the three-dimensional modeling electrical equipment facility map so that the electrical equipment is three-dimensionally modeled without manually inputting the electrical equipment attribute information, The facility design work can be carried out at high speed and economically.

10; 전장 설비 설계 시스템
11; 제어부
12; 통신부
13; 저장부
14; 입력부
15; 표시부
10; Electrical equipment design system
11; The control unit
12; Communication section
13; The storage unit
14; Input
15; Display portion

Claims (4)

전장 설비 설계 시스템으로서,
전장 설비 모델링 프로그램에 의해 전장 설비를 3차원 모델링하되, 2차원 전장 설비 배치도로부터 3차원 모델링 전장 설비 도면을 생성하고 2차원 전장 설비 배치도의 전장 설비 속성정보를 상기 3차원 모델링 전장 설비 도면에 부여하여서 전장 설비를 3차원 모델링하는 제어부와;
상기 전장 설비 모델링 프로그램을 저장하여 제어부에 제공하며, 제어부의 제어에 따라 전장 설비 모델링 관련 데이터를 저장하는 저장부와;
수동 조작에 따라 인가되는 명령 및 데이터를 제어부에 입력하는 입력부와;
상기 제어부의 제어에 따라 전장 설비 모델링을 위한 제반 화면을 표시하는 표시부를 포함하여 이루어지는 것을 특징으로 하는 전장 설비 설계 시스템.
As an electrical system design system,
Dimensional modeling electric field facility drawing from a two-dimensional electric field facility layout map by applying the electric field facility modeling program to the three-dimensional modeling of the electric field facility, and giving the electric field facility attribute information of the two-dimensional electric field facility layout map to the three- A controller for three-dimensionally modeling the electrical equipment;
A storage unit for storing the electrical equipment modeling program and providing the electrical equipment modeling program to the control unit and storing data related to the electrical equipment modeling according to the control of the control unit;
An input unit for inputting instructions and data to be applied to the control unit according to a manual operation;
And a display unit for displaying various screens for modeling the electrical equipment under the control of the control unit.
청구항 1에 있어서,
상기 저장부에 저장되는 전장 설비 모델링 관련 데이터는 2차원 전장 설비 배치도, 3차원 모델링 전장 설비 도면 및 전장 설비 속성정보를 포함하는 것을 특징으로 하는 전장 설비 설계 시스템.
The method according to claim 1,
Wherein the electrical equipment modeling-related data stored in the storage unit includes a two-dimensional electrical equipment facility layout, a three-dimensional modeling electrical equipment facility plan, and an electrical equipment facility property information.
청구항 1에 있어서,
상기 제어부는 2차원 전장 설비 배치도에 존재하는 전장 설비들의 2차원 좌표를 3차원 좌표로 변환하여 3차원으로 표현하여 도시하여서 상기 2차원 전장 설비 배치도로부터 3차원 모델링 전장 설비 도면을 생성하는 것을 특징으로 하는 전장 설비 설계 시스템.
The method according to claim 1,
Wherein the control unit converts the two-dimensional coordinates of the electrical equipments existing in the two-dimensional electrical equipments arrangement plan into three-dimensional coordinates and expresses the two-dimensional coordinates in three-dimensional form to generate a three-dimensional modeling electrical equipments plan from the two- System designing system.
전장 설비 설계 방법으로서,
제어부가 입력부를 통한 모델링 명령 입력시에, 저장부에 저장되어 있는 2차원 전장 설비 배치도로부터 전장 설비 속성정보를 판독하여 저장부에 일시 저장하는 단계와;
상기 제어부가 상기 2차원 전장 설비 배치도에 존재하는 전장 설비들의 2차원 좌표를 3차원 좌표로 변환하여 3차원으로 표현하여 도시하여서 2차원 전장 설비 배치도로부터 3차원 모델링 전장 설비 도면을 생성하는 단계와;
상기 제어부가 상기 저장부에 일시 저장한 전장 설비 속성정보를 3차원 모델링 전장 설비 도면에 부여하여서 3차원 모델링 전장 설비 도면을 완성하고, 해당 3차원 모델링 전장 설비 도면을 표시부에 출력하여 표시함과 아울러 저장부에 저장하는 단계를 포함하여 이루어지는 것을 특징으로 하는 전장 설비 설계 방법.
As a method for designing an electrical equipment,
When the control unit inputs the modeling command through the input unit, reads the electrical equipment facility property information from the two-dimensional electrical equipment facility map stored in the storage unit and temporarily stores the electrical equipment facility property information in the storage unit;
Wherein the control unit converts the two-dimensional coordinates of the electrical equipment existing in the two-dimensional electrical equipment installation plan into three-dimensional coordinates and displays the three-dimensional coordinates to generate a three-dimensional modeling electrical equipment installation plan from the two-
The control unit provides the electrical equipment attribute information temporarily stored in the storage unit to the 3D modeling electrical equipment drawing to complete the 3D modeling electrical equipment drawing and displays the corresponding 3D modeling electrical equipment drawing on the display unit, And storing the electric power in the storage unit.
KR1020120128668A 2012-11-14 2012-11-14 System and method for electric installation design KR20140062253A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120128668A KR20140062253A (en) 2012-11-14 2012-11-14 System and method for electric installation design

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120128668A KR20140062253A (en) 2012-11-14 2012-11-14 System and method for electric installation design

Publications (1)

Publication Number Publication Date
KR20140062253A true KR20140062253A (en) 2014-05-23

Family

ID=50890567

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120128668A KR20140062253A (en) 2012-11-14 2012-11-14 System and method for electric installation design

Country Status (1)

Country Link
KR (1) KR20140062253A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102099286B1 (en) 2019-09-18 2020-04-09 정재영 Method and apparatus for designing and constructing indoor electric facilities
KR20210067245A (en) * 2019-11-29 2021-06-08 박영란 PDMS Module for Designing Offshore Plant and 3 Dimensional modeling method using PDMS

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102099286B1 (en) 2019-09-18 2020-04-09 정재영 Method and apparatus for designing and constructing indoor electric facilities
KR20210067245A (en) * 2019-11-29 2021-06-08 박영란 PDMS Module for Designing Offshore Plant and 3 Dimensional modeling method using PDMS

Similar Documents

Publication Publication Date Title
JP5855469B2 (en) Carry-in route planning system
JP5734902B2 (en) Construction process management system and management method thereof
CN105945942A (en) Robot off line programming system and method
CN104239610A (en) Three-dimensional wiring design method of helicopter comprehensive testbed
CN109426690B (en) Method, device and equipment for generating visual model layout of space
CN104077446A (en) Method and system for extracting two-dimensional electric construction drawing from digitized three-dimensional model
CN104112028A (en) Method and device for displaying cable underground pipe network
Zhou et al. Computer-aided process planning in immersive environments: A critical review
CN111161129B (en) Three-dimensional interaction design method and system for two-dimensional image
CN105630378A (en) Double-touch screen-based three-dimensional virtual scene designing and assembling system and method
KR20140062253A (en) System and method for electric installation design
CN104615794B (en) For the mathematical model construction method in three-dimensional electric wiring software
KR101514708B1 (en) 3D Modeling Scheme using 2D Image
CN113269884A (en) BIM wiring modeling method and device for railway communication signal indoor engineering
CN109816192B (en) GIL pipe gallery engineering simulation control system
CN112560308A (en) Automobile crash test platform construction method and device based on finite elements
KR101568403B1 (en) Sketch curtain wall grid creation method
KR20140061713A (en) Electric installation design system and electric installation modelling checking method thereof
KR20180076409A (en) Method and apparatus for generating 3D models for initial ship outfitting design
JP6233034B2 (en) Substrate analysis program, information processing apparatus, and substrate analysis method
Liu et al. Research on real-time monitoring technology of equipment based on augmented reality
CN104268348B (en) Visual logistics monitoring system and its implementation based on Intouch
CN103065541A (en) Pendulum shear line three-dimension analogue simulation system and achieving method
CN112487534A (en) BIM technology-based method for analyzing net height of building
CN110162880A (en) Optical cable laying method, device, equipment and medium

Legal Events

Date Code Title Description
WITN Withdrawal due to no request for examination