KR20120029563A KR1020100091433A KR20100091433A KR20120029563A KR 20120029563 A KR20120029563 A KR 20120029563A KR 1020100091433 A KR1020100091433 A KR 1020100091433A KR 20100091433 A KR20100091433 A KR 20100091433A KR 20120029563 A KR20120029563 A KR 20120029563A
Authority
KR
South Korea
Prior art keywords
pipe
leakage
flange
discharge pipe
flanges
Prior art date
Application number
KR1020100091433A
Other languages
Korean (ko)
Other versions
KR101192096B1 (en
Inventor
박정민
배덕희
이재영
최득수
Original Assignee
한전케이피에스 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한전케이피에스 주식회사 filed Critical 한전케이피에스 주식회사
Priority to KR1020100091433A priority Critical patent/KR101192096B1/en
Publication of KR20120029563A publication Critical patent/KR20120029563A/en
Application granted granted Critical
Publication of KR101192096B1 publication Critical patent/KR101192096B1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders
    • F16L55/168Devices for covering leaks in pipes or hoses, e.g. hose-menders from outside the pipe
    • F16L55/17Devices for covering leaks in pipes or hoses, e.g. hose-menders from outside the pipe by means of rings, bands or sleeves pressed against the outside surface of the pipe or hose
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L13/00Non-disconnectible pipe-joints, e.g. soldered, adhesive or caulked joints
    • F16L13/02Welded joints
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L41/00Branching pipes; Joining pipes to walls
    • F16L41/08Joining pipes to walls or pipes, the joined pipe axis being perpendicular to the plane of the wall or to the axis of another pipe
    • F16L41/16Joining pipes to walls or pipes, the joined pipe axis being perpendicular to the plane of the wall or to the axis of another pipe the branch pipe comprising fluid cut-off means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/07Arrangement or mounting of devices, e.g. valves, for venting or aerating or draining
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders
    • F16L55/1604Devices for covering leaks in pipes or hoses, e.g. hose-menders by means of a by-pass conduit

Abstract

PURPOSE: A blocking device of the leaking part of a pipe and a construction method are provided to enhance air-tightness of the contact part with a pipe since airtight packing is installed on the upper and lower parts of the inner circumferential surface of first and second flanges. CONSTITUTION: A blocking device of the leaking part of a pipe comprises first and second flanges(10,20), a discharge pipe(30), an opening/closing valve(40), and a guide hose(50). The first and second flanges are formed in a semi-circle shape to protect the leaked part of a pipe. The discharge pipe is integrally connected to the second flange. The opening/closing valve opens/closes the flow path of the discharge pipe. The guide hose is connected to one side of the discharge pipe. The guide hose guides fluid leaked through the discharge pipe to a drain.

Description

배관 누설부 차단장치 및 시공방법{A PIPE LEAK AREA REPAIR TOOL AND METHOD} Pipe Leakage Breaker and Construction Method {A PIPE LEAK AREA REPAIR TOOL AND METHOD}
본 발명은 배관 누설부 차단장치에 관한 것으로서, 더욱 상세하게는 발전소 가동 중 배관에서 누설부위가 발견되었을 때 발전소 가동을 유지시키는 가운데 임시 조치가 신속하게 이루어질 수 있도록 하기 위한 누설부 차단장치에 관한 것이다.The present invention relates to a pipe leakage blocking device, and more particularly, to a leakage blocking device for promptly performing temporary measures while maintaining the power plant operation when a leaking portion is found in the pipe during operation of the power plant. .
일반적으로, 복합화력발전은 천연가스나 경유 등의 연료를 사용하여 1차로 가스터빈을 돌려 발전하고, 가스터빈에서 나오는 배기가스열을 다시 보일러에 통과시켜 증기를 생산해 2차로 증기터빈을 돌려 발전하는 것이다. 복합화력발전은 두 차례에 걸쳐 발전을 하기 때문에 기존 화력보다 열효율이 10%정도가 높고, 공해도 적고, 정지했다가 다시 가동하는 시간도 짧다는 장점도 있다.In general, combined cycle power generation uses fuels such as natural gas or diesel to turn the gas turbine first, and heats the exhaust gas from the gas turbine back to the boiler to produce steam. will be. Combined cycle power generation generates power twice, which has the advantage of 10% higher thermal efficiency, less pollution, and shorter operation time.
그리고, 복합화력발전은 현재 연료를 태워 얻은 증기를 이용하여 터빈-제너레이터(Turbine-Generator)를 돌려 전기를 발생시킴과 아울러 터빈을 지나친 증기를 이용하여 난방수를 가열함에 따라 아파트 등의 지역난방에 활용되기도 한다.In addition, the combined cycle power generator generates electricity by turning a turbine-generator using steam obtained by burning fuel, and heats the heating water using steam that passes through the turbine to the district heating such as an apartment. It can also be used.
한편, 복합화력발전소의 탈기기 공정에서의 복수의 저장탱크에 대한 유량흐름 및 제어가 이루어지게 되며, 그중 탈기기(Dearator)는 저장된 응축수에 포함된 불순물을 제거한 후 보일러 측으로 보내는 기능을 수행하기 위하여 유량제어밸브를 포함하고 있는 배수관로가 탈기기에 용접방식으로 연결 구성되어져 있다.On the other hand, the flow rate and control of the plurality of storage tanks in the degassing process of the combined cycle power plant is made, the deaerator (Dearator) to remove the impurities contained in the stored condensate to send to the boiler side to perform a function The drainage pipe containing the flow control valve is connected to the deaerator by welding.
그러나, 각 배관이 용접 결합되어진 연결부위에서 누설이 발생할 경우, 누수부위를 정비하기 위해 용접을 실시해야 하나, 계통내에 잔존하는 물이 계속 누설되어 용접작업이 불가능하게 된다.However, if leakage occurs at the joint where each pipe is welded, it is necessary to perform welding to maintain the leaked part, but water remaining in the system is continuously leaked, which makes the welding operation impossible.
따라서, 이러한 배수관로 용접부위에서 누설이 발생되어질 경우 종래에는 누설부위 정비를 위해서는 발전설비의 가동을 전면 중단시켜야 하기 때문에 엄청난 비용손실이 발생되어질 수 밖에 없는 문제점이 있었다.
Therefore, when leakage occurs at the welding site of the drain pipe, there is a problem in that a huge cost loss must occur because the entire operation of the power generation facility must be stopped to maintain the leakage site.
본 발명은 상기한 종래 탈기기 배수관로 연결부위에서의 누설발생시, 이를 효과적으로 정비할 수 있는 누설 차단장치 및 그 시공방법을 제공함으로서 발전소 운용효율 저하를 방지할 수 있도록 하는데 목적이 있다.An object of the present invention is to provide a leakage blocking device and a construction method thereof that can effectively maintain the leak when the leak occurs at the connection portion of the conventional degassing drainage pipe.
상기 목적을 이루기 위한 본 발명은, 배관 누설부위를 감쌀 수 있도록 반원형태를 이루는 가운데, 2개가 쌍을 이루며 구비되어진 제1플랜지 및 제2플랜지와; 상기 제2플랜지에 일체로 연결 구성되어지는 배출관과; 상기 배출관의 유로를 개폐하기 위한 개폐밸브;를 포함하는 구성을 이룸을 특징으로 한다.The present invention for achieving the above object, the first flange and the second flange which is provided in pairs in the form of a semi-circle, so as to cover the pipe leakage portion; A discharge pipe integrally connected to the second flange; Characterized in that the configuration including; opening and closing valve for opening and closing the flow path of the discharge pipe.
이러한 본 발명은, 발전소의 시공시 존재한 용접부위 결함에 따른 누설 발생시 원자로 출력을 차단하지 않고 플랜지 구조체를 이용하여 임시 조치가 가능하며, 전기를 생산하지 않는 발전소 계획예방전비기간에 누설부의 정상적인 용접 복구가 이루어질 수 있는 효과를 나타낸다.
In the present invention, when the leakage occurs due to the defect of the welding site existing during the construction of the power plant, it is possible to take temporary measures by using the flange structure without blocking the reactor output, and the normal welding of the leakage portion during the planned prevention period of the power plant that does not produce electricity. It shows the effect that recovery can take place.
도 1은 본 발명의 일 실시예에 따른 누설 차단장치 외관도.
도 2는 배관의 누설부 발생 상태도.
도 3은 본 발명 누설 차단장치의 배관 용접결합상태 단면도.
도 4는 본 발명 누설 차단장치의 배관 용접결합상태 사시도.
도 5는 본 발명 장치를 이용한 누설 보수과정 순서도.
도 6은 본 발명의 다른 실시예에 따른 플랜지 결합부 상세 구조도.
도 7 및 도 8은 본 발명의 다른 실시예에 따른 플랜지부 결합상태 단면도.
1 is an external view of a leakage blocking device according to an embodiment of the present invention.
2 is a view showing a leaking part of a pipe.
Figure 3 is a cross-sectional view of the pipe welding state of the present invention leakage blocker.
Figure 4 is a perspective view of the pipe welding state of the leakage blocking device of the present invention.
5 is a flow chart of a leak repair process using the present invention.
Figure 6 is a detailed structural diagram of the flange coupling portion according to another embodiment of the present invention.
7 and 8 is a cross-sectional view of the flange portion coupled state according to another embodiment of the present invention.
이하, 본 발명의 구체적인 실시 예를 첨부 도면을 참조하여 상세히 살펴보기로 한다.Hereinafter, specific embodiments of the present invention will be described in detail with reference to the accompanying drawings.
먼저, 본 실시 예에 따른 누설 차단장치의 구성을 도 1 내지 도 4를 통해 살펴보면, 배관(1)을 감쌀 수 있도록 반원 형상을 이루는 제1플랜지(10)와 제2플랜지(20)가 쌍을 이루어 구성되며, 그중 제2플랜지(20) 측에는 배출관(30)이 연결되어져 있으며, 배출관(30) 중단에는 유로 개폐를 위한 개폐밸브(40)가 구성되어져 있고, 배출관(30) 일단부에는 누설유량을 하수관으로 안내하기 위한 안내호스(50)가 연결 구성된다.First, referring to the configuration of the leakage blocking device according to the present embodiment through FIGS. 1 to 4, the first flange 10 and the second flange 20 forming a semicircular shape to surround the pipe 1 are paired. The discharge pipe 30 is connected to the second flange 20 side of the second flange 20, the on-off valve 40 for opening and closing the flow path is configured at the stop of the discharge pipe 30, the leakage flow rate at one end of the discharge pipe 30 Guide hose 50 for guiding the sewage pipe is configured.
이와 같은 구조를 이루는 본 발명 누설 차단장치를 이용한 배관 누설조치 과정을 도 5의 순서도를 참조하여 살펴보기로 한다.With reference to the flow chart of Figure 5 will be described with respect to the pipe leakage measure process using the present invention leakage blocking device forming such a structure.
먼저, 도 2에서와 같이 계통수가 흐르는 배관(1)의 용접 연결부위에 누설부(2)가 발생되어지게 되면, 발전기 운전을 정지시키지 않는 가운데 본 발명의 누설 차단장치를 이용하여 임시 막음조치를 실시하게 된다.First, as shown in FIG. 2, when the leaking portion 2 is generated at the welding connection portion of the pipe 1 through which the system flows, the temporary blocking action is performed by using the leakage blocking device of the present invention without stopping the generator operation. Will be implemented.
즉, 이때에는 제2플랜지(20)를 배관(1)의 누설부(2)에 대응되도록 위치시킴으로서 누설부(2)를 통해 누출되어지는 계통수가 배출관(30)을 통해 유도되어질 수 있게 되며, 이때 개폐밸브(40)는 배출관(30) 유로를 개방시킨 상태를 이루도록 하게 된다.That is, at this time, by positioning the second flange 20 to correspond to the leaking portion 2 of the pipe 1, the system water leaking through the leaking portion 2 can be guided through the discharge pipe 30, At this time, the opening and closing valve 40 is to achieve a state in which the discharge pipe 30 flow path opened.
그리고, 이와 같이 제2플랜지(20)가 먼저 배관(1) 일측에 부착된 후에는 계속하여 제1플랜지(10)를 배관(1) 반대측에 부착시킨 후 용접 작업을 실시 함으로서 도 3 및 도 4에서와 같이 용접부(S)에 의해 제1,2플랜지(10,20)가 배관(1)에 일체로 결합된 상태를 이루게 된다.In this way, after the second flange 20 is first attached to one side of the pipe 1, the first flange 10 is continuously attached to the other side of the pipe 1, and then welding is performed to perform the welding operation of FIGS. 3 and 4. As in the welding portion (S) to achieve a state in which the first and second flanges 10 and 20 are integrally coupled to the pipe 1.
이와 같은 본 발명의 누설 차단장치에 의한 누설부 임시조치가 완료되면, 개폐밸브(40)를 돌려서 배출관(30)의 내부 유로를 차단시킴으로서, 계통수의 배출이 방지되어지게 된다.When the temporary leakage portion of the leakage blocking device of the present invention is completed as described above, the internal flow path of the discharge pipe 30 is blocked by turning the on / off valve 40 to prevent the discharge of system water.
따라서, 배관(1) 누설부(2)의 임시 차단이 이루어진 상태로서, 발전기 운전에 영향을 미치지 않게 된다.Therefore, the temporary interruption of the leakage part 2 of the piping 1 is made, and it does not affect generator operation.
한편, 이러한 임시 차단상태로 발전기 운전이 이루어지는 중 발전소의 계획 예방정비기간에는 전기를 생산하지 않기 때문에 발전기 운전이 정지되면, 이때 본 발명의 누설 차단장치를 해체한 후 배관 누설부(2)를 정상적으로 용접하여 복구하게 된다.On the other hand, since the generator operation is stopped during the planned preventive maintenance period of the power plant during the generator operation in such a temporary shut-off state, when the generator operation is stopped, at this time, after disassembling the leakage blocking device of the present invention, the pipe leakage part 2 normally It will be repaired by welding.
즉, 이때에는 개폐밸브(40)를 개방하여 배출관(30) 내에 고여있던 계통수를 외부로 배출시킨 후, 배관(1)에 용접 결합되어져 있는 제1,2플랜지(10,20)를 분리시키게 된다.That is, in this case, the open / close valve 40 is opened to discharge the system water accumulated in the discharge pipe 30 to the outside, and the first and second flanges 10 and 20 welded to the pipe 1 are separated. .
이와 같이 임시 차단이 이루어져 있던 누설 차단장치를 해체시키더라도, 발전기 운전이 정지된 상태이므로 더이상 누설부(2)를 통한 누설이 발생되지 않기 때문에 이때 누설부(2)를 정상적으로 용접하여 막음 조치하게 되는 것이다.
In this way, even if the leakage blocking device is temporarily disconnected, since the generator operation is stopped, the leakage through the leakage part 2 does not occur anymore, and at this time, the leakage part 2 is normally welded and prevented. will be.
한편, 도 6 내지 도 8은 본 발명의 다른 실시 예에 따른 누설 차단장치 구조를 나타낸 것으로, 도 6은 제1,2플랜지(10,20)간 결합부 부분 확대도이고, 도 7은 제1,2플랜지(10,20)의 배관(1) 결합부 평단면도이며, 도 8은 제1플랜지(10)의 배관(1) 결합부 측단면도를 각각 나타낸다.On the other hand, Figures 6 to 8 show a leakage blocking device structure according to another embodiment of the present invention, Figure 6 is an enlarged view of the coupling portion between the first and second flanges 10,20, Figure 7 is a first 2 is a plan sectional view of the coupling portion 1 of the pipes 10 and 20, and FIG. 8 is a side cross-sectional view of the coupling portion 1 of the first flange 10, respectively.
즉, 도 6 및 도 7에 도시된 바와 같이 제1,2플랜지(10,20) 상호간 결합부위에 다단 형태의 단차부(12,22)를 형성시킴으로서, 상호간의 접촉면적이 증가되어질 수 있도록 함과 함께 플랜지간 결합부위의 기밀성이 증대되어질 수 있도록 함이 바람직하다.That is, as shown in FIGS. 6 and 7 by forming the stepped portion 12, 22 of the multi-stage type in the coupling portion between the first and second flanges (10, 20), the contact area between each other can be increased. In addition, the airtightness of the coupling portion between the flanges is preferably increased.
특히, 이와 같은 단차부(12,22) 구조로 인하여 결합부위를 통한 누수 차단효과가 극대화 되어질 수 있게 된다.In particular, due to the structure of the stepped portion 12, 22 it can be maximized the leakage blocking effect through the coupling portion.
또한, 도 6 및 도 8에 도시된 바와 같이 제1,2플랜지(10,20)의 내주면 상부와 하부에 각각 기밀패킹(11,21)을 구성시킴으로서, 배관(1)과의 접촉부위 기밀성을 증대시킬 수 있게 되어 용접부위를 통한 누수현상이 방지되어질 수 있도록 함이 바람직하다.6 and 8, airtight packings 11 and 21 are formed on the upper and lower inner circumferential surfaces of the first and second flanges 10 and 20, respectively. It is desirable to be able to increase the leakage phenomenon through the welding portion can be prevented.
또한, 도 7에 나타내어진 바와 같이 제1,2플랜지(10,,20)간 결합부의 기밀성 증대를 위해 일측 플랜지(10,20)에 박막의 기밀필름(13)을 구비시킴으로서, 결합부 틈새의 누수 차단효과를 향상시킬 수 있게 된다.
In addition, as shown in Figure 7 by providing a thin film of the airtight film 13 on one flange (10, 20) to increase the airtightness of the coupling portion between the first and second flanges (10, 20), Leakage blocking effect can be improved.
그리고, 상기에서 본 발명의 특정한 실시 예가 설명 및 도시되었지만 본 발명의 누설 차단장치 구조가 당업자에 의해 다양하게 변형되어 실시될 수 있음은 자명한 일이다.In addition, although specific embodiments of the present invention have been described and illustrated above, it is obvious that the structure of the leakage shield of the present invention may be variously modified and implemented by those skilled in the art.
그러나, 이와 같은 변형된 실시예들은 본 발명의 기술적 사상이나 범위로부터 개별적으로 이해되어져서는 안되며, 이와 같은 변형된 실시 예들은 본 발명의 첨부된 특허청구범위 내에 포함된다 해야 할 것이다.
However, such modified embodiments should not be understood individually from the spirit or scope of the present invention, such modified embodiments will be included within the appended claims of the present invention.
1 : 배관 2 : 누설부
10 : 제1플랜지 11,21 : 기밀패킹
12,22 : 단차부 13 : 기밀필름
20 : 제2플랜지 30 : 배출관
40 : 개폐밸브 50 : 안내호스
1: Piping 2: Leakage part
10: first flange 11,21: confidential packing
12,22 step difference 13: airtight film
20: second flange 30: discharge pipe
40: on-off valve 50: guide hose

Claims (6)

  1. 배관(1) 누설부위를 감쌀 수 있도록 반원형태를 이루는 가운데, 2개가 쌍을 이루며 구비되어진 제1플랜지(10) 및 제2플랜지(20)와;
    상기 제2플랜지(20)에 일체로 연결 구성되어지는 배출관(30)과;
    상기 배출관(30)의 유로를 개폐하기 위한 개폐밸브(40);
    상기 배출관(30)을 통해 누설되는 유량을 하수구로 안내하기 위해 배출관(30) 일측에 연결 설치되는 안내호스(50);
    를 포함하는 구성을 이룸을 특징으로 하는 배관 누설부 차단장치.
    The first flange 10 and the second flange 20, which are provided in pairs, are formed in a semicircle shape so as to cover the leakage part of the pipe 1;
    A discharge pipe 30 integrally connected to the second flange 20;
    On and off valve 40 for opening and closing the flow path of the discharge pipe 30;
    A guide hose 50 connected to one side of the discharge pipe 30 to guide the flow rate leaking through the discharge pipe 30 to the sewer;
    Piping leakage block device characterized in that the configuration comprising a room.
  2. 청구항 1에 있어서,
    상기 제1,2플랜지(10,20)의 내주면에는 배관(1)과의 기밀 유지를 위한 기밀패킹(11,21)이 구비되어진 것을 특징으로 하는 배관 누설부 차단장치.
    The method according to claim 1,
    An inner circumferential surface of the first and second flanges (10, 20), the airtight packing (11, 21) for maintaining the airtight with the pipe (1) is provided, characterized in that the pipe leakage block blocking device.
  3. 청구항 1에 있어서,
    상기 제1,2 플랜지(10,20)는 상호 용접이 이루어지는 양단부에 접촉면적 증대 및 기밀성 향상을 위한 다단 형태의 단차부(12,22)가 형성되어진 것을 특징으로 하는 배관 누설부 차단장치.
    The method according to claim 1,
    The first and second flanges (10, 20) is a pipe leakage part blocking device, characterized in that the stepped portion (12, 22) of the multi-stage form for increasing the contact area and airtightness is formed at both ends of the mutual welding.
  4. 청구항 1에 있어서,
    상기 제1,2플랜지(10,20)간 접촉부위의 내주측에는 박막의 기밀필름(13)이 구비되어지며, 상기 기밀필름(13)은 제1플랜지(10) 또는 제2플랜지(20) 중 어느 한쪽에 부착되어진 것을 특징으로 하는 배관 누설부 차단장치.
    The method according to claim 1,
    On the inner circumferential side of the contact portion between the first and second flanges 10 and 20, a thin film airtight film 13 is provided, and the airtight film 13 is one of the first flange 10 and the second flange 20. A pipe leakage blocker, characterized in that attached to either side.
  5. 반원형상의 쌍을 이루는 2개의 플랜지 중 일측 플랜지에는 개폐밸브가 설치된 배출관이 일체로 구비되어져 있는 제1,2플랜지를 배관 누설부위에 부착하여 배관을 감싸는 형태로 가 부착시키는 플랜지 부착단계;
    상기 배출관의 일단부에 안내호스를 연장 설치하여 누설되는 유량을 하수구로 안내토록 하는 안내호스 설치단계;
    상기 부착되어진 제1,2플랜지를 배관에 결합시켜 누설부를 통해 누설되는 유체가 배출관을 통해 유도되어질 수 있도록 제1,2플랜지간 접촉부위 및 배관과의 접촉부위에 용접작업을 실시하는 플랜지 용접단계;
    상기 플랜지 용접 완료 후 배출관에 구성되어져 있는 개폐밸브를 차단하여 누설 유체의 유로를 차단하는 밸브 차단단계;
    상기 밸브 차단 후 배관내에 유체가 흐르지 않는 계획예방 정비기간에 제1,2플랜지를 배관으로 부터 해체시킨 후 배관 누설부위를 용접마감하는 누설부 용접단계;
    로 이루어짐을 특징으로 하는 배관 누설부 차단 시공방법.
    A flange attachment step of attaching first and second flanges, each having a discharge pipe with an on / off valve, integrally provided at one side of two flanges constituting a semicircular pair to the pipe leakage part to wrap the pipe;
    A guide hose installation step of extending the guide hose at one end of the discharge pipe to guide the leaked flow rate to the sewer;
    Flange welding step of coupling the first and second flanges attached to the pipe to perform a welding operation on the contact portion between the first and second flanges and the contact portion with the pipe so that the fluid leaking through the leakage portion can be guided through the discharge pipe. ;
    A valve blocking step of blocking a flow path of a leakage fluid by closing the on / off valve configured in the discharge pipe after the flange welding is completed;
    A leakage part welding step of dismantling the first and second flanges from the pipe in a planned preventive maintenance period in which no fluid flows in the pipe after the valve is shut off, and then welding the pipe leakage part;
    Construction method for blocking the leakage of the pipe, characterized in that made of.
  6. 청구항 5에 있어서,
    상가 플랜지 부착단계에서는, 배출관이 결합되어져 있는 제2플랜지를 먼저 배관 누설부위에 부착시켜서 누설부를 통해 누설되는 유체가 배출관을 통해 유도되는 가운데 제1플랜지를 제2플랜지와 용접 결합을 실시하며, 이때에는 배출관의 개폐밸브를 개방시킨 상태에서 작업이 실시되어짐을 특징으로 하는 배관 누설부 차단 시공방법.
    The method according to claim 5,
    In the upper flange attaching step, the second flange, to which the discharge pipe is coupled, is first attached to the pipe leakage portion, and the first flange is welded to the second flange while the fluid leaking through the leakage portion is guided through the discharge pipe. Construction method for blocking the leakage of the pipe, characterized in that the operation is carried out in the state of opening and closing the valve of the discharge pipe.
KR1020100091433A 2010-09-17 2010-09-17 A pipe leak area repair tool and method KR101192096B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100091433A KR101192096B1 (en) 2010-09-17 2010-09-17 A pipe leak area repair tool and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100091433A KR101192096B1 (en) 2010-09-17 2010-09-17 A pipe leak area repair tool and method

Publications (2)

Publication Number Publication Date
KR20120029563A true KR20120029563A (en) 2012-03-27
KR101192096B1 KR101192096B1 (en) 2012-10-17

Family

ID=46133925

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100091433A KR101192096B1 (en) 2010-09-17 2010-09-17 A pipe leak area repair tool and method

Country Status (1)

Country Link
KR (1) KR101192096B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106907543A (en) * 2017-04-19 2017-06-30 武汉理工大学 A kind of press and open holes closure shunting equipment
US10400933B2 (en) 2013-05-23 2019-09-03 Severn Trent Water Limited Pipe connection

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105114755A (en) * 2014-12-03 2015-12-02 芜湖三峰节能设备有限公司 Flange short tube with valve
CN104964121B (en) * 2015-07-28 2017-10-24 中建八局第四建设有限公司 A kind of sleeve water leakage plugging method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008303982A (en) * 2007-06-07 2008-12-18 Mitsubishi Electric Building Techno Service Co Ltd Pipe repairing tool and pipe repairing method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10400933B2 (en) 2013-05-23 2019-09-03 Severn Trent Water Limited Pipe connection
CN106907543A (en) * 2017-04-19 2017-06-30 武汉理工大学 A kind of press and open holes closure shunting equipment
CN106907543B (en) * 2017-04-19 2018-11-30 武汉理工大学 A kind of press and open holes closure shunting equipment

Also Published As

Publication number Publication date
KR101192096B1 (en) 2012-10-17

Similar Documents

Publication Publication Date Title
KR101192096B1 (en) A pipe leak area repair tool and method
KR101272079B1 (en) A valve union
CN204267730U (en) Gas pipe line on-line rinsing seal arrangement
KR101266469B1 (en) Apparatus for sealing pipe
CN213983013U (en) Safety maintenance system for low-position block valve of generator set boiler
RU2020104863A (en) ELECTRICITY PRODUCTION METHOD
RU2020104862A (en) ELECTRICITY PRODUCTION METHOD
RU2020104713A (en) ELECTRICITY PRODUCTION METHOD
RU2020104712A (en) ELECTRICITY PRODUCTION METHOD
RU2020104864A (en) ELECTRICITY PRODUCTION METHOD
RU2020104500A (en) ELECTRICITY PRODUCTION METHOD
RU2020105857A (en) ELECTRICITY PRODUCTION METHOD
RU2020104711A (en) ELECTRICITY PRODUCTION METHOD
RU2020105856A (en) ELECTRICITY PRODUCTION METHOD
RU2020104502A (en) ELECTRICITY PRODUCTION METHOD
RU2020105858A (en) ELECTRICITY PRODUCTION METHOD
KR101161563B1 (en) Suppressor contrary current for flue gas of industrial boiler
RU2020105940A (en) ELECTRICITY PRODUCTION METHOD
RU2020104875A (en) ELECTRICITY PRODUCTION METHOD
RU2020104692A (en) ELECTRICITY PRODUCTION METHOD
RU2020105145A (en) ELECTRICITY PRODUCTION METHOD
RU2020104516A (en) ELECTRICITY PRODUCTION METHOD
RU2020105147A (en) ELECTRICITY PRODUCTION METHOD
RU2020105947A (en) ELECTRICITY PRODUCTION METHOD
RU2020105146A (en) ELECTRICITY PRODUCTION METHOD

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150923

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160912

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170926

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20180917

Year of fee payment: 7