KR20110041144A - Method for constructing continuous filled steel tube girder bridge - Google Patents
Method for constructing continuous filled steel tube girder bridge Download PDFInfo
- Publication number
- KR20110041144A KR20110041144A KR1020090098191A KR20090098191A KR20110041144A KR 20110041144 A KR20110041144 A KR 20110041144A KR 1020090098191 A KR1020090098191 A KR 1020090098191A KR 20090098191 A KR20090098191 A KR 20090098191A KR 20110041144 A KR20110041144 A KR 20110041144A
- Authority
- KR
- South Korea
- Prior art keywords
- steel pipe
- truss girder
- filled steel
- coping
- connecting member
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D6/00—Truss-type bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
본 발명은 충전강관 트러스거더교의 연속화 시공방법에 관한 것으로서, 상세하게는 하현재를 코핑부에 매립함으로써 아치형상의 거더 설계로 지점부에 발생하는 수직, 수평방향 분력으로 인한 휨, 비틀림의 거동을 효과적으로 제어할 수 있고, 상현재를 일체화시켜 교량에 작용하는 합성 하중에 의한 수축, 팽창에 대응하여 구조적으로 일체화 거동을 유도할 수 있도록 하는 충전강관 트러스거더교의 연속화 시공방법에 관한 것이다.The present invention relates to a continuous construction method of a filled steel tube truss girder bridge, and in particular, by embedding the lower chord in the coping section, the bending and torsional behavior caused by the vertical and horizontal component force generated at the point by the arch-shaped girder design effectively The present invention relates to a continuous construction method of a packed steel truss girder bridge which can be controlled and integrates a phase chord so that structural behavior can be induced structurally in response to shrinkage and expansion caused by a synthetic load acting on the bridge.
일반적으로 교량형식은 재료적 측면에서 크게 강교량과 콘크리트교량으로 구분된다. 강교량은 재료가 고가이면서 부재요소를 용접 또는 볼트 이음을 해야 하는 등의 제작공정이 복합하고, 압축하중에 의한 좌굴에 취약하므로 많은 보강재가 필요하다는 점에서 단점을 가지고 있다. 또한, 콘크리트 교량은 자중이 크므로 과대 단면설계가 불가피하고 거푸집 제작공정 등의 추가 공사비가 부담이 되며 품질관리 및 유지관리가 어렵다는 단점이 있다. 이러한 단점을 상호보완하고 각각의 구조재료가 갖는 장점을 극대화하기 위하여 부재의 거동특성에 부합하도록 합성 및 복합 구조를 활발히 적용하고 있다.In general, the bridge type is divided into steel bridge and concrete bridge in terms of material. Steel bridges have a disadvantage in that a large number of reinforcement materials are required because the manufacturing process such as welding or bolting a member element is complicated while the material is expensive, and it is vulnerable to buckling due to compressive load. In addition, concrete bridges have a disadvantage that excessive cross-sectional design is inevitable due to the large weight and additional construction cost such as formwork manufacturing process is burdened and quality control and maintenance are difficult. In order to compensate for these shortcomings and maximize the advantages of each structural material, synthetic and composite structures are actively applied to meet the behavior of members.
이러한 요건을 만족하는 구조형식 중의 하나로서 제안된 콘크리트 충전강관 부재는 강관 내부를 콘크리트계 재료로 충전함으로써 강관과 충전재료 간의 상호구속효과로 인해 부재의 변형성능과 강성 및 내력을 향상시킬 수 있는 구조부재이다.The concrete filled steel pipe member proposed as one of the structural types satisfying these requirements is a structure that can improve the deformation performance, rigidity and strength of the member due to the mutual binding effect between the steel pipe and the filling material by filling the inside of the steel pipe with concrete material. It is absent.
콘크리트 충전강관 구조는 축압축력이 주하중으로 작용하는 기둥부재에 대해서 내력 및 연성도 증대를 목적으로 개발되었으나, 콘크리트 충전강관 부재가 갖는 우수한 내력, 탁월한 변형성능, 소음 및 진동 억제 효과 등의 장점에 착안하여 교량 거더로 활용하는 방안을 모색하기 시작하였으며, 단일 강관 구조 또는 동일 단면의 철근콘크리트구조에 비해 내력증대, 변형성능 향상, 강성 증대 등의 우수한 역학적 효과를 얻을 수 있다.The concrete filled steel pipe structure was developed for the purpose of increasing the strength and ductility of the pillar member whose axial compressive force acts as the main load.However, the concrete filled steel pipe structure has the advantages of excellent strength, excellent deformation performance, noise and vibration suppression effect. With the focus on, it has begun to find ways to use it as a bridge girder, and compared with a single steel pipe structure or reinforced concrete structure of the same section, excellent mechanical effects such as increased strength, deformation performance, and rigidity can be obtained.
충전강관 트러스거더교는 아치효과를 이용하여 거더의 효율을 높이는 이점을 갖는다.Filled steel truss girder bridge has the advantage of increasing the efficiency of the girder by using the arch effect.
이러한 충전강관 트러스거더교는 도 1에 도시된 바와 같이 교각(10)의 상부에 형성된 코핑부(11)에 탄성 받침대(13)에 상현재(21)와 하현재(23) 및 보강재(25)로 이루어지는 단위 충전강관 트러스거더(20)를 거치시키고, 단위 충전강관 트러스거더(20)를 상호 연결한 후 단위 충전강관 트러스거더(20)의 상면에 바닥판(30)을 설치하는 구조로 이루어진다.The filled steel tube truss girder bridge as shown in Fig. 1 as the
한편, 이러한 충전강관 트러스거더교의 구조는 구조형태상 트러스 구조와 유사하나, 인장재와 압축재로 구성되는 트러스 부재와 달리 휨과 비틀림 등의 부재력이 추가로 발생하는 것이 특징이다.On the other hand, the structure of the filled steel tube truss girder bridge is similar in structure to the truss structure, but unlike the truss member composed of the tension member and the compression member is characterized in that additional member forces such as bending and torsion.
특히, 하현재(23)의 경우 휨 성분 등에 의한 인장력 및 아치형상으로 집중되는 압축력에 충분히 대응할 수 있는 지지 형식이 요구되는 실정이다.In particular, in the case of the
그러나, 일반적인 직선형 거더에 적용되는 탄성받침형식의 지점부 처리로는 충전강관 트러스 거더교의 아치형상으로 인해 발생하는 상기의 작용력 등을 충분히 처리할 수 없고, 아치형상의 역학적인 이점을 반영할 수 없는 등 구조적으로 다소 불리한 점이 있다.However, the elastic bearing type point treatment applied to general straight girders cannot sufficiently handle the above-mentioned action force generated by the arch of the filled steel truss girder bridge, and cannot reflect the mechanical advantages of the arch. There are some structural disadvantages.
본 발명은 상기와 같은 문제점을 해결하기 위한 것으로, 하현재를 코핑부에 매립함으로써 아치형상의 거더 설계로 지점부에 발생하는 수직, 수평방향 분력으로 인한 휨, 비틀림의 거동을 효과적으로 제어할 수 있고, 상현재를 일체화시켜 교량에 작용하는 합성 하중에 의한 수축, 팽창에 대응하여 구조적으로 일체화 거동을 유도할 수 있으며, 코핑부 상면에 탄성 받침대를 설치하여 충격하중 감소 및 지점침하 등에 대응할 수 있고, 바닥판을 연속화 시공으로 신축이음을 제거하도록 하는 충전강관 트러스거더교의 연속화 시공방법을 제공하는데 그 목적이 있다.The present invention is to solve the above problems, by embedding the lower chord in the coping portion, it is possible to effectively control the bending and torsional behavior due to vertical and horizontal component force generated in the point portion by the arch-shaped girder design, By integrating the phase chords, structural behavior can be induced structurally in response to the contraction and expansion caused by the composite load acting on the bridge.An elastic pedestal can be installed on the upper surface of the coping part to cope with impact load reduction and point settlement. It is an object of the present invention to provide a continuous construction method of a filled steel tube truss girder bridge to remove the expansion joint by the continuous construction of the plate.
상기와 같은 목적을 달성하기 위한 본 발명의 특징은,Features of the present invention for achieving the above object,
교각의 상부에 코핑부를 타설하되, 상기 코핑부의 양측면 하단부에 각각의 연결 부재를 일체로 형성하는 코핑부 타설 공정과; 상현재, 하현재, 수직 보강재 및 사 보강재로 이루어지는 단위 충전강관 트러스거더를 상기 교각의 코핑부를 중 심으로 교축 방향으로 상호 이격되어 대칭되도록 설치하되, 각각의 상기 단위 충전강관 트러스거더의 하현재를 상기 코핑부의 연결 부재에 고정시키는 트러스 설치 공정; 및 상기 각각의 단위 충전강관 트러스거더의 상면에 바닥판을 형성하는 바닥판 형성 공정으로 이루어지는 것을 특징으로 한다.A coping part placing process in which a coping part is poured on an upper part of the piers, and each connection member is integrally formed at lower ends of both sides of the coping part; Upper chord, lower chord, unit filled steel tube truss girder consisting of a vertical reinforcement and yarn reinforcement is installed so as to be symmetrically spaced apart from each other in the axial direction with the coping portion of the pier, the lower chord of each unit filled steel tube truss girder A truss installation step of fixing the connection member to the coping portion; And a bottom plate forming process of forming a bottom plate on an upper surface of each unit-filled steel tube truss girder.
여기에서, 상기 연결 부재는 내부에 무수축 몰탈과 같은 채움재가 충전되도록 중공상의 강관과; 상기 강관의 내부에 무수축 몰탈과 같은 채움재가 원활히 충전되도록 상기 강관의 외측면에 형성되는 복수의 충전홀과; 상기 코핑부와 일체화되도록 상기 강관의 외측면에 결합되는 복수의 앵커; 및 상기 단위 충전강관 트러스거더의 하현재가 앵커 볼트에 의해 결합되도록 상기 강관의 일단에 형성되는 플랜지로 이루어진다.Here, the connecting member and the hollow steel pipe so that the filling material such as non-contraction mortar is filled therein; A plurality of filling holes formed in an outer surface of the steel pipe such that a filling material such as non-contraction mortar is smoothly filled in the steel pipe; A plurality of anchors coupled to the outer surface of the steel pipe to be integrated with the coping portion; And a flange formed at one end of the steel pipe such that the lower chord of the unit filled steel pipe truss girder is coupled by an anchor bolt.
여기에서 또한, 상기 코핑부는 타설시 상기 연결 부재가 일체로 형성되되, 상기 연결 부재의 플랜지가 노출되도록 상기 연결 부재의 플랜지 부분을 블록 아웃시킨다.Here, the coping portion is formed integrally with the connecting member when pouring, block out the flange portion of the connecting member to expose the flange of the connecting member.
여기에서 또, 상기 코핑부는 상기 연결 부재와 단위 충전강관 트러스거더의 하현재가 연결되는 블록 아웃 부분에 무수축 몰탈과 같은 채움재를 충전한다.Here, the coping portion fills a filler such as non-shrink mortar in the block-out portion to which the lower chord of the connecting member and the unit filled steel tube truss girder is connected.
여기에서 또, 상기 코핑부는 타설시 상기 연결 부재가 일체로 형성되되, 상기 연결 부재의 플랜지를 외부로 돌출시킨다.Here, the coping portion is formed integrally with the connecting member when pouring, protrudes the flange of the connecting member to the outside.
여기에서 또, 각각의 상기 단위 충전강관 트러스거더는 끝단에 형성된 수직 보강재가 상기 코핑부에 설치된 탄성 받침대에 거치된다.Here, each of the unit packed steel tube truss girder is a vertical reinforcement formed at the end is mounted on the elastic support provided in the coping portion.
상기와 같이 구성되는 본 발명인 충전강관 트러스거더교의 연속화 시공방법에 따르면, 하현재를 코핑부에 매립함으로써 아치형상의 거더 설계로 지점부에 발생하는 수직, 수평방향 분력으로 인한 휨, 비틀림의 거동을 효과적으로 제어할 수 있고, 상현재를 일체화시켜 교량에 작용하는 합성 하중에 의한 수축, 팽창에 대응하여 구조적으로 일체화 거동을 유도할 수 있으며, 코핑부 상면에 탄성 받침대를 설치하여 충격하중 감소 및 지점침하 등에 대응할 수 있고, 바닥판을 연속화 시공으로 신축이음을 제거할 수 있는 효과가 있다.According to the continuous construction method of the filling steel pipe truss girder bridge of the present invention configured as described above, by embedding the lower chord in the coping portion, the bending and torsional behavior due to the vertical and horizontal component force generated in the point portion by the arch-shaped girder design effectively It is possible to control and integrate the phase chords to induce the structural integration behavior in response to the contraction and expansion caused by the composite load acting on the bridge, and by installing the elastic support on the upper surface of the coping part to reduce impact load and settle down It can cope, and there is an effect that can remove the expansion joint by the continuous construction of the bottom plate.
이하, 본 발명에 따른 충전강관 트러스거더교의 구성을 첨부된 도면을 참조하여 상세하게 설명하면 다음과 같다.Hereinafter, described in detail with reference to the accompanying drawings the configuration of the filled steel tube truss girder bridge according to the present invention.
하기에서 본 발명을 설명함에 있어, 관련된 공지 기능 또는 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명은 생략할 것이다. 그리고 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로서 이는 사용자, 운용자의 의도 또는 관례 등에 따라 달라질 수 있다. 그러므로 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.In the following description of the present invention, if it is determined that a detailed description of a related known function or configuration may unnecessarily obscure the subject matter of the present invention, the detailed description thereof will be omitted. The following terms are defined in consideration of the functions of the present invention, and may be changed according to the intentions or customs of the user, the operator, and the like. Therefore, the definition should be based on the contents throughout this specification.
도 2는 본 발명에 따른 충전강관 트러스거더교의 구성을 나타낸 사시도이고, 도 3은 도 2의 측단면도이며, 도 4는 본 발명의 다른 실시예에 따른 충전강관 트러스거더교의 구성을 나타낸 사시도이고, 도 5는 도 4의 측단면도이며, 도 6은 본 발명에 따른 충전강관 트러스거더교중 연결 부재의 구성을 나타낸 사시도이다.Figure 2 is a perspective view showing the configuration of a filled steel tube truss girder bridge according to the present invention, Figure 3 is a side cross-sectional view of Figure 2, Figure 4 is a perspective view showing the configuration of a filled steel tube truss girder bridge according to another embodiment of the present invention, Figure 5 is a side cross-sectional view of Figure 4, Figure 6 is a perspective view showing the configuration of the connection member filling steel pipe truss girder bridge according to the present invention.
도 2 내지 도 6을 참조하면, 본 발명에 따른 충전강관 트러스거더교(100)는 교각(110)과, 연결 부재(120)와, 단위 충전강관 트러스거더(130)와, 바닥판(140)으로 구성된다.2 to 6, the filled steel pipe
먼저, 교각(110)은 통상의 방식인 현장 타설 또는 프리캐스트 방식으로 제작된다. 여기에서, 교각(110)의 상단에는 코핑부(111)가 형성되는 데, 코핑부(111)의 양측면 하단부에 하기에서 설명할 연결 부재(120)가 각각 일체로 형성된다. 여기에서 또한, 코핑부(111)는 연결 부재(120)의 해당 부분을 블록 아웃시키거나 연결 부재(120)의 플랜지(127)를 외부로 돌출시키고, 연결 부재(120)와 하기에서 설명할 단위 충전강관 트러스거더(130)가 결합되면 블록 아웃 부분에 무수축 몰탈을 충전한다. 여기에서 또한, 코핑부(111)의 상면에는 탄성 받침대(113)가 설치된다.First, the
그리고, 연결 부재(120)는 내부에 무수축 몰탈과 같은 채움재가 충전되도록 중공상의 강관(121)과, 강관(121)의 내부에 무수축 몰탈과 같은 채움재가 원활히 충전되도록 강관(121)의 외측면에 형성되는 복수의 충전홀(123)과, 코핑부(111)와 일체화되도록 강관(121)의 외측면에 결합되는 복수의 앵커(125)와, 단위 충전강관 트러스거더(130)가 앵커 볼트(101)에 의해 결합되도록 강관(121)의 일단에 형성되는 플랜지(127)로 구성된다.And, the
또한, 단위 충전강관 트러스거더(130)는 경사를 가지며 아치 형태로 형성되는 하현재(131)와, 하현재(131)에서 상방향으로 수직으로 결합되는 수직 보강재(133)와, 수직 보강재(133)와 수직 보강재(133) 사이에 결합되는 사 보강재(135)와, 수직 보강재(133) 및 사 보강재(135)의 상단에 설치되는 상현재(137)로 이루어 진다. 여기에서, 단위 충전강관 트러스거더(130)는 2개조가 한 쌍을 이루며 형성되고, 선택에 따라 2개조를 수평 보강재(미도시)를 통해 상호 연결시킬 수도 있다. 여기에서 또한, 단위 충전강관 트러스거더(130)의 상현재(137)는 상면에 하기에서 설명할 바닥판(140)과 결합되도록 복수의 앵커(139)가 돌출 형성되는 것이 바람직하다. 여기에서 또, 단위 충전강관 트러스거더(130)는 교각(110)의 코핑부(111)와 대응되는 부분에 수직 보강재(133)가 위치한다.In addition, the unit filled steel
또, 바닥판(140)은 통상의 방식인 현장 타설 또는 프리캐스트 방식으로 단위 충전강관 트러스거더(130)의 상현재(137)에 설치된다.In addition, the
이하, 본 발명에 따른 충전강관 트러스거더교의 연속화 시공방법을 첨부된 도면을 참조하여 상세하게 설명하면 다음과 같다.Hereinafter, described in detail with reference to the accompanying drawings the continuous construction method of the filled steel tube truss girder bridge according to the present invention.
도 7은 본 발명에 따른 충전강관 트러스거더교의 연속화 시공방법을 설명하기 위한 공정도이다.7 is a process chart for explaining a continuous construction method of the filled steel tube truss girder bridge according to the present invention.
먼저, 설계에 따라 교각(110)을 설치하고, 각각의 교각(110)의 상부에 코핑부(111)를 타설한다(S100). 이때, 코핑부(111)의 양측면 하단부에 각각의 연결 부재(120)를 일체로 형성하는 데, 연결 부재(120)의 해당 부분을 블록 아웃시키거나 연결 부재(120)의 플랜지(127)를 외부로 돌출시킨다. 한편, 코핑부(111)의 상면에는 탄성 받침대(113)에 설치된다.First, the
그리고, 상현재(137), 하현재(131), 수직 보강재(133) 및 사 보강재(135)로 이루어지는 단위 충전강관 트러스거더(130)를 크레인과 같은 인양 장비를 이용하여 교각(110)의 코핑부(111)를 중심으로 상호 이격시키되, 교축 방향으로 대칭되도록 한 다음, 각각의 단위 충전강관 트러스거더(130)의 하현재(131)를 코핑부(111)의 연결 부재(120)에 고정시킨다(S110). 이때, 코핑부(111)가 블록 아웃된 경우 해당 부분에 무수축 몰탈과 같은 채움재를 충전한다.In addition, the nose of the
한편, 단위 충전강관 트러스거더(130)의 하현재(131)가 코핑부(111)의 연결 부재(120)에 고정되면 상현재(137)는 서로 일정 거리 이격된 상태를 유지하고, 단위 충전강관 트러스거더(130)의 끝단에 형성된 수직 보강재(133)는 코핑부(111)에 설치된 탄성 받침대(113)에 거치된다.Meanwhile, when the
그런 다음, 각각의 단위 충전강관 트러스거더(130)의 상면에 신축이음을 제거하도록 바닥판(140)을 연속화 시공한다(S120).Then, the
본 발명은 다양하게 변형될 수 있고 여러 가지 형태를 취할 수 있으며 상기 발명의 상세한 설명에서는 그에 따른 특별한 실시 예에 대해서만 기술하였다. 하지만 본 발명은 상세한 설명에서 언급되는 특별한 형태로 한정되는 것이 아닌 것으로 이해되어야 하며, 오히려 첨부된 청구범위에 의해 정의되는 본 발명의 정신과 범위 내에 있는 모든 변형물과 균등물 및 대체물을 포함하는 것으로 이해되어야 한다.As those skilled in the art would realize, the described embodiments may be modified in various ways, all without departing from the spirit or scope of the present invention. It is to be understood, however, that the present invention is not limited to the specific forms referred to in the description, but rather includes all modifications, equivalents, and substitutions within the spirit and scope of the invention as defined by the appended claims. Should be.
도 1은 종래의 충전강관 트러스거더교의 구성을 나타낸 측면도,1 is a side view showing the configuration of a conventional filled steel tube truss girder bridge,
도 2는 본 발명에 따른 충전강관 트러스거더교의 구성을 나타낸 사시도,Figure 2 is a perspective view showing the configuration of a filled steel tube truss girder bridge according to the present invention,
도 3은 도 2의 측단면도,3 is a side cross-sectional view of FIG.
도 4는 본 발명의 다른 실시예에 따른 충전강관 트러스거더교의 구성을 나타낸 사시도,Figure 4 is a perspective view showing the configuration of a filled steel tube truss girder bridge according to another embodiment of the present invention,
도 5는 도 4의 측단면도,5 is a side cross-sectional view of FIG. 4;
도 6은 본 발명에 따른 충전강관 트러스거더교중 연결 부재의 구성을 나타낸 사시도,Figure 6 is a perspective view showing the configuration of the connection member filling steel pipe truss girder bridge according to the present invention,
도 6은 본 발명에 따른 충전강관 트러스거더교의 연속화 시공방법을 설명하기 위한 공정도.Figure 6 is a process chart for explaining the continuous construction method of the filled steel tube truss girder bridge according to the present invention.
<도면의 주요 부분에 관한 부호의 설명><Explanation of symbols on main parts of the drawings>
10, 110 : 교각 20, 130 : 단위 충전강관 트러스거더10, 110:
30, 140 : 바닥판 120 : 연결 부재30, 140: bottom plate 120: connecting member
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090098191A KR101096170B1 (en) | 2009-10-15 | 2009-10-15 | Method for constructing continuous filled steel tube girder bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090098191A KR101096170B1 (en) | 2009-10-15 | 2009-10-15 | Method for constructing continuous filled steel tube girder bridge |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20110041144A true KR20110041144A (en) | 2011-04-21 |
KR101096170B1 KR101096170B1 (en) | 2011-12-22 |
Family
ID=44047167
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020090098191A KR101096170B1 (en) | 2009-10-15 | 2009-10-15 | Method for constructing continuous filled steel tube girder bridge |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101096170B1 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20140011049A (en) * | 2012-07-17 | 2014-01-28 | 대우조선해양 주식회사 | Dock structure of barge plant |
US10161090B2 (en) | 2015-10-21 | 2018-12-25 | Korea Railroad Research Institute | Method for launching/constructing bridge using assembly of precast bottom plate and concrete-filled steel tube truss girder |
KR20190089684A (en) * | 2018-01-22 | 2019-07-31 | 네이버 주식회사 | Method and system for providing navigation function through aerial view |
KR20200143987A (en) * | 2019-06-17 | 2020-12-28 | 주식회사 창성디앤씨 | Reinforcement unit for support point of steel girder and construction method thereof |
CN115418951A (en) * | 2022-05-31 | 2022-12-02 | 宁波市政工程建设集团股份有限公司 | Assembly type cantilever bent cap support and construction method thereof |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102545486B1 (en) * | 2022-08-23 | 2023-06-21 | 주식회사 유승이피씨 | Roof structure for soundproof tunnel |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002173910A (en) | 2000-12-07 | 2002-06-21 | Nkk Corp | Joining structure of steel truss beam and reinforced concrete pier |
JP4944679B2 (en) | 2007-06-18 | 2012-06-06 | 大成建設株式会社 | Truss construction method |
-
2009
- 2009-10-15 KR KR1020090098191A patent/KR101096170B1/en not_active IP Right Cessation
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20140011049A (en) * | 2012-07-17 | 2014-01-28 | 대우조선해양 주식회사 | Dock structure of barge plant |
US10161090B2 (en) | 2015-10-21 | 2018-12-25 | Korea Railroad Research Institute | Method for launching/constructing bridge using assembly of precast bottom plate and concrete-filled steel tube truss girder |
KR20190089684A (en) * | 2018-01-22 | 2019-07-31 | 네이버 주식회사 | Method and system for providing navigation function through aerial view |
KR20200143987A (en) * | 2019-06-17 | 2020-12-28 | 주식회사 창성디앤씨 | Reinforcement unit for support point of steel girder and construction method thereof |
CN115418951A (en) * | 2022-05-31 | 2022-12-02 | 宁波市政工程建设集团股份有限公司 | Assembly type cantilever bent cap support and construction method thereof |
CN115418951B (en) * | 2022-05-31 | 2024-06-04 | 宁波市政工程建设集团股份有限公司 | Assembled cantilever bent cap bracket and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
KR101096170B1 (en) | 2011-12-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101184654B1 (en) | Method for constructing united joint of tube filled concrete block | |
KR101022853B1 (en) | Composite girder for constructing bridge | |
KR100889273B1 (en) | Construction method for rhamen bridge | |
KR100947306B1 (en) | Composite bridge structure with concrete shear connector and construction method of the same | |
KR100999019B1 (en) | Construction method using arch type hybrid girder | |
KR101096176B1 (en) | Method for constructing continuous filled steel tube girder bridge | |
KR101096170B1 (en) | Method for constructing continuous filled steel tube girder bridge | |
KR101973240B1 (en) | Construction methods inducing compressive stress in slab of negative moment area for type of rahmen bridge using precast girder | |
KR101208231B1 (en) | Method for constructing continuous supporting structure of corrugated steel web PSC beam | |
KR101260863B1 (en) | Rhamen bridge having prestressed concrete girder of arch-shaped and construction method thereof | |
JP2003253621A (en) | Continuous beam structure for continuing existing simple beam bridge | |
KR100823448B1 (en) | The improved seismic resistant continuation structure of prestressed concrete composite beam bridge and method thereof | |
KR101582599B1 (en) | Bridge construction method for forming continuous point part of pier using copping for connecting girder | |
KR100909004B1 (en) | Hybrid composite girder continuous bridge and constructing method therefor | |
KR20160073710A (en) | Prestressed Steel-Concrete Composite Box Girder, Bridge using such Composite Box Girders, and Continuous Structure of such Composite Box Girders | |
KR101232329B1 (en) | Integral bridge and construction method using arched and concrete-filled tube | |
KR101156223B1 (en) | Method for constructing continuous filled steel tube girder bridge | |
KR102033052B1 (en) | Method for constructing truss bridge support with infilled tube using src girder | |
KR20140125754A (en) | Bridge construction method for forming continuous point part of pier using copping for connecting girder | |
CN112853934A (en) | Novel energy-consuming and shock-absorbing type inter-tower linkage structure of framing tower-connected cable-stayed bridge | |
KR102009704B1 (en) | Steel permanent landfill form using upper flange box compound gider and construction method using the same | |
KR100462966B1 (en) | Prestressed Concrete U-Girder of compositive girder bridge | |
KR100767145B1 (en) | Construction method of prestressed concrete temporary bridge that can be assembled and dismantled using lateral steel wire | |
KR20060017949A (en) | Field-fabricated prestressing steel-composed girder and construction method of continuous bridge using the girder | |
JP4039216B2 (en) | Composite truss bridge and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20141209 Year of fee payment: 4 |
|
LAPS | Lapse due to unpaid annual fee |