KR20110037651A - Hanger fixture - Google Patents

Hanger fixture Download PDF

Info

Publication number
KR20110037651A
KR20110037651A KR1020090095181A KR20090095181A KR20110037651A KR 20110037651 A KR20110037651 A KR 20110037651A KR 1020090095181 A KR1020090095181 A KR 1020090095181A KR 20090095181 A KR20090095181 A KR 20090095181A KR 20110037651 A KR20110037651 A KR 20110037651A
Authority
KR
South Korea
Prior art keywords
hole
groove
nut
fixing piece
hanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
KR1020090095181A
Other languages
Korean (ko)
Inventor
이남광
Original Assignee
이남광
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이남광 filed Critical 이남광
Priority to KR1020090095181A priority Critical patent/KR20110037651A/en
Publication of KR20110037651A publication Critical patent/KR20110037651A/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction
    • E04B9/20Means for suspending the supporting construction adjustable

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

본 발명은 행거 고정구에 관한 것이다.The present invention relates to a hanger fixture.

이를 위하여, 본 발명은 천정 슬래브의 밑면속에 매립되어지게 구성된 행거 고정구에 있어서, 상기 행거 고정구는 지지판의 중앙으로 형성된 제1관통홀에 결합구가 삽입되게 결합되고, 상기 결합구의 상부 외측에 너트삽입구의 몸체가 삽입되게 결합되며, 상기 너트삽입구의 몸체 상부로 형성된 헤드에 너트가 삽입되어지며, 상기 너트삽입구의 헤드에 캡이 씌워지게 결합되어지되, 상기 지지판은 제1관통홀의 내부 양측에 외측으로 향하는 가이드홈이 형성되어지며, 상기 가이드홈의 내부에 제1탄성고정편이 일체로 형성되어지고, 상기 제1탄성고정편은 배면이 가이드홈으로부터 이격되어지며, 전면에 제1산형돌기가 형성되어지고, 상기 결합구는 중공부재의 외부에 상기 제1산형돌기에 맞대어지게 걸리는 제2산형돌기가 수직으로 반복되게 형성되어짐을 특징으로 한다.To this end, the present invention is a hanger fixture configured to be embedded in the bottom surface of the ceiling slab, the hanger fixture is coupled to the coupling hole is inserted into the first through-hole formed in the center of the support plate, the nut insertion hole in the upper outer side of the coupling sphere The body is coupled to be inserted, the nut is inserted into the head formed into the upper portion of the body of the nut insertion hole, the cap of the head of the nut insertion hole is coupled to be covered, the support plate is on both sides of the inner side of the first through hole outward A guide groove is formed, the first elastic fixing piece is integrally formed inside the guide groove, and the first elastic fixing piece is spaced apart from the guide groove on the rear side, and a first mountain protrusion is formed on the front surface thereof. The coupling tool is formed so that the second ridge protrusion which is caught against the first ridge protrusion on the outside of the hollow member is vertically repeated The features.

Description

행거 고정구{Hanger anchor}Hanger anchors

본 발명은 행거 고정구에 관한 것으로서 특히, 거푸집 패널의 윗면에 결합구가 결합되어진 지지판이 못으로 고정되어지도록 하고, 너트가 삽입된 너트삽입구의 헤드에 캡이 씌워지며 헤드의 하부에 일체로 형성된 몸체가 결합구에 결합되어지도록 한 상태에서 콘크리트를 타설하여 천정 슬래브가 양생되어지도록 한 후 거푸집을 분리함과 동시에 행거 고정구가 천정 슬래브의 하부에 매립되어질 수 있도록 한 것이다.The present invention relates to a hanger fixture, and in particular, the support plate coupled to the coupling member on the upper surface of the formwork panel to be fixed with a nail, the body is formed integrally to the cap of the head of the nut insertion hole in which the nut is inserted The concrete slab is cast in the state that the coupler is coupled to the coupling unit so that the ceiling slab is cured, and then the formwork is separated and the hanger fixture is buried in the lower part of the ceiling slab.

일반적으로 건축 구조물의 천정 슬래브에는 전선배관과 수배관이 행거에 의하여 안정되게 설치되어지고, 설치된 전선배관과 수배관 및 천정 슬래브가 직접 외부로 노출되는 것을 방지하기 위한 방안으로 천정 마감재가 별도의 행거에 의하여 설치되어있다.In general, the ceiling slab of the building structure is securely installed by the hanger wire and water pipe by a hanger, and the ceiling finishing material is a separate hanger as a way to prevent the exposed wire pipe, water pipe and ceiling slab directly exposed to the outside. Installed by

전선배관이나 수배관 및 천정 마감재(이하, "천정 구조물"이라 한다.)를 설치하는 행거는 천정 슬래브의 밑면에 드릴로 앵커홀을 천공한 후 천공된 앵커홀에 앵커 고정체를 삽입하여 전산볼트를 결합시키거나 고정로드 등이 결합되어지게 설치되어 있다.Hanger for installing electric wire or water pipe and ceiling finish (hereinafter referred to as "ceiling structure") drills the anchor hole with the bottom of the ceiling slab and inserts the anchor fixing body into the drilled anchor hole Or the fixed rod is installed to be coupled.

전산볼트의 하부에 브라켓이 결합되어 전선배관이나 수배관이 안정되게 받쳐지도록 하고, 고정로드의 하부에 캐링찬낼과 M바 등이 순차적으로 결합되어 천정 마감재가 설치되어지게 된다.The bracket is coupled to the lower part of the computer bolt so that the electric wire pipe or the water pipe can be stably supported, and the ceiling finishing material is installed by sequentially combining the caring channal and the M bar at the lower part of the fixed rod.

그러나 천정 구조물을 설치하는 과정에서 전산볼트나 고정로드가 천정 슬래브의 하부에 결합되어지도록 하기 위해 천정 슬래브의 하부에 앵커홀 천공, 앵커홀에 앵커 고정체가 삽입되어지는 작업이 소요됨에 따라 천정 구조물의 설치기간이 지연되는 문제점이 있었다. 이로 인해 비용이 추가적으로 지출되는 문제점이 있었다.However, in the process of installing the ceiling structure, in order to ensure that the computer bolt or the fixing rod is coupled to the lower part of the ceiling slab, the anchor hole is drilled in the lower part of the ceiling slab, and the anchor fixture is inserted into the anchor hole. There was a problem that the installation period is delayed. As a result, there was a problem of additional expenses.

또한, 앵커홀 천공에 따른 진동과 소음이 발생됨과 동시에 발생된 분진이 주변으로 확산되어지게 됨에 따라 작업공간이 오염되는 문제점이 있었다.In addition, there is a problem that the working space is contaminated as the dust generated at the same time as the vibration and noise caused by the anchor hole drilling is spread to the surroundings.

그리고 시간이 경과함과 동시에 앵커 고정체의 체결력의 약화로 인하여 앵커 고정체가 앵커홀로부터 분리되어 하부로 떨어지거나 유동되어짐으로써, 천정 마감재에 변형이 발생되는 문제점이 있었다.In addition, due to the weakening of the fastening force of the anchor fixture as time passes, the anchor fixture is separated from the anchor hole and falls or flows downward, thereby causing deformation of the ceiling finish.

본 발명은 이와 같은 문제점을 해소하기 위해 창출된 것으로서 천정 슬래브가 시공되어지는 과정에서 천성 슬래브의 하부에 행거 고정구가 매립되어질 수 있 도록 한 것이다.The present invention was created to solve the above problems, so that the hanger fixture can be embedded in the lower part of the natural slab during the ceiling slab construction process.

본 발명은 천정 슬래브의 밑면속에 매립되어지게 구성된 행거 고정구(A)에 있어서, 상기 행거 고정구(A)는 지지판(10)의 중앙으로 형성된 제1관통홀(101)에 결합구(20)가 삽입되게 결합되고, 상기 결합구(20)의 상부 외측에 너트삽입구(30)의 몸체(301)가 삽입되게 결합되며, 상기 너트삽입구(30)의 몸체(301) 상부로 형성된 헤드(302)에 너트(40)가 삽입되어지며, 상기 너트삽입구(30)의 헤드(302)에 캡(50)이 씌워지게 결합되어지되, 상기 지지판(10)은 제1관통홀(101)의 내부 양측에 외측으로 향하는 가이드홈(102)이 형성되어지며, 상기 가이드홈(102)의 내부에 제1탄성고정편(11)이 일체로 형성되어지고, 상기 제1탄성고정편(11)은 배면이 가이드홈(102)으로부터 이격되어지며, 전면에 제1산형돌기(111)가 형성되어지고, 상기 결합구(20)는 중공부재(201)의 외부에 상기 제1산형돌기(111)에 맞대어지게 걸리는 제2산형돌기(202)가 수직으로 반복되게 형성되어짐을 특징으로 한다.In the present invention, in the hanger fixture (A) configured to be embedded in the bottom surface of the ceiling slab, the hanger fixture (A) is inserted into the coupling hole 20 in the first through-hole 101 formed in the center of the support plate 10 It is coupled so that the body 301 of the nut insertion hole 30 is inserted into the upper outer side of the coupling hole 20, the nut to the head 302 formed above the body 301 of the nut insertion hole 30 40 is inserted, and the cap 50 is coupled to the head 302 of the nut insert 30, the support plate 10 is the outer side of both sides of the inner side of the first through hole 101 The guide groove 102 is formed, the first elastic fixing piece 11 is integrally formed inside the guide groove 102, and the first elastic fixing piece 11 has a guide groove (back side) Is spaced apart from the 102, the first ridge protrusion 111 is formed on the front surface, the coupler 20 is the first ridge stone on the outside of the hollow member 201 It takes to be butted against each other (111) of claim 2 characterized by the mountain-shaped protrusion 202 is formed to doeeojim repeated vertically.

또한, 상기 너트삽입구(30)의 헤드(302)는 내부에 다각형태의 너트삽입홈(303)이 형성되어지고, 상기 헤드(302)의 하부에 몸체(301)가 하부로 연장되게 일체로 형성되어지되, 상기 몸체(301)의 내부로 상기 너트삽입홈(303)의 하부와 연결되는 제2관통홀(304)이 형성되어지고, 상기 제2관통홀(304)의 내주연부에 제1수직홈(305)이 대응되게 형성되어지며, 상기 제1수직홈(305)의 입구측에 제2탄성고정편(31)의 하부가 일체로 형성되어지고, 상기 제2탄성고정편(31)의 내측 전면에 제3 산형돌기(311)가 형성되어지고, 상기 제3산형돌기(311)가 제2산형돌기(202)에 맞대어지게 걸려짐을 특징으로 한다.In addition, the head 302 of the nut insertion opening 30 is formed with a nut insertion groove 303 of a polygonal shape therein, integrally formed so that the body 301 extends downward in the lower portion of the head 302. A second through hole 304 is formed in the body 301 and connected to a lower portion of the nut insertion groove 303, and a first vertical portion is formed at an inner circumference of the second through hole 304. The grooves 305 are formed to correspond to each other, and a lower portion of the second elastic fixing piece 31 is integrally formed at the inlet side of the first vertical groove 305, and the second elastic fixing piece 31 of the second elastic fixing piece 31 is formed. The third ridge protrusion 311 is formed on the inner front surface, and the third ridge protrusion 311 is caught to face the second ridge protrusion 202.

또한, 상기 헤드(302)는 외부에 요철홈(32)이 수직방향으로 반복되게 형성되어지며, 상기 캡(50)의 내부에 상기 요철홈(32)과 대응되는 제3탄성고정편(51)이 형성되어지되, 상기 제3탄성고정편(51)은 하부가 캡(50)의 입구측에 형성된 제2수직홈(501)의 입구측에 일체로 형성됨을 특징으로 한다.In addition, the head 302 is formed with the uneven groove 32 is repeated in the vertical direction on the outside, the third elastic fixing piece 51 corresponding to the uneven groove 32 in the cap 50. Is formed, the third elastic fixing piece 51 is characterized in that the lower portion is integrally formed on the inlet side of the second vertical groove 501 formed on the inlet side of the cap 50.

그리고 상기 지지판(10)의 제1관통홀(101)은 내부에 걸림홈(103)이 대응되게 형성되어지고, 상기 결합구(20)의 하부 외측에 걸림편(203)이 형성되어 상기 걸림홈(103)에 걸림편(203)이 결합되어지고, 상기 지지판(10)의 제1관통홀(101)과 가장자리 사이에 고정홀(104)이 형성되어짐을 특징으로 한다.In addition, the first through hole 101 of the support plate 10 has a locking groove 103 formed therein, and a locking piece 203 is formed at a lower outer side of the coupling hole 20 so that the locking groove is formed. The engaging piece 203 is coupled to the 103, and a fixing hole 104 is formed between the edge of the first through hole 101 and the edge of the support plate 10.

본 발명은 거푸집 패널에 콘크리트를 타설하여 천정 슬래브가 양생되어지도록 한 후 거푸집을 분리함과 동시에 행거 고정구가 천정 슬래브의 하부에 매립되어지게 함으로써, 별도의 앵커볼트를 사용하지 않고 전선배관이나 수배관 및 천정마감재 등이 용이하게 설치되어질 수 있는 효과를 얻을 수 있다.The present invention by placing concrete in the formwork panel to allow the ceiling slab to be cured, and at the same time to separate the formwork hanger fixture is embedded in the lower part of the ceiling slab, by using a separate anchor bolt without wire bolt or water pipe And it is possible to obtain the effect that the ceiling finishing material and the like can be easily installed.

또한, 앵커홀 천공 및 앵커 고정체가 필요 없음에 따라 작업 공기를 단축시킴과 동시에 지출되는 비용을 줄일 수 있는 효과를 더 얻을 수 있다.In addition, the need for anchor hole drilling and anchor fixings can further reduce the cost of work while simultaneously reducing the working air.

또한, 앵커홀 천공이 없음에 따라 진동과 소음 및 분진발생 없는 쾌적한 주변환경 또는 작업환경을 얻을 수 있는 효과가 있다.In addition, since there is no anchor hole perforation, there is an effect of obtaining a pleasant surrounding environment or a work environment without vibration, noise and dust generation.

그리고 행거 고정구가 천정 슬래브의 하부에 영구히 매립되어진 상태가 유지되어 고정력 또는 체결력의 약화를 가져오지 않게 됨에 따라 천정마감재의 변형을 방지할 수 있는 효과를 더 얻을 수 있다.And the hanger fixture is permanently embedded in the lower portion of the ceiling slab is maintained so that it does not lead to a weakening of the fastening force or fastening force can further obtain the effect of preventing the deformation of the ceiling finish material.

본 발명의 실시예를 첨부 도면을 참조하여 설명하면 다음과 같다.An embodiment of the present invention will be described with reference to the accompanying drawings.

도1은 본 발명에 따른 행거 고정구의 사시도이고, 도2는 본 발명에 따른 행거 고정구의 내,외부를 도시한 사시도이고, 도3은 본 발명에 따른 행거 고정구의 분해 사시도이고, 도4는 본 발명에 따른 행거 고정구의 저면 분해 사시도이고, 도5는 본 발명에 따른 행거 고정구를 분리하여 도시한 단면도이고, 도6a,도6b는 본 발명에 따른 행거 고정구의 종단면도이고, 도7a,도7b는 본 발명에 따른 행거 고정구의 결합상태를 확대 도시한 예시도이고, 도8a,도8b는 본 발명에 따른 행거 고정구의 사용상태를 도시한 단면도이다.Figure 1 is a perspective view of the hanger fixture according to the invention, Figure 2 is a perspective view showing the inside and outside of the hanger fixture according to the invention, Figure 3 is an exploded perspective view of the hanger fixture according to the invention, Figure 4 Bottom exploded perspective view of the hanger fixture according to the invention, Figure 5 is a cross-sectional view showing a separate hanger fixture according to the invention, Figure 6a, Figure 6b is a longitudinal cross-sectional view of the hanger fixture according to the invention, Figure 7a, Figure 7b Figure 8 is an enlarged view showing an engagement state of the hanger fixture according to the present invention, Figure 8a, Figure 8b is a cross-sectional view showing the state of use of the hanger fixture according to the present invention.

본 발명에 따른 행거 고정구(A)는 도1 내지 도8a,도8b에 도시된 바와 같이, 콘크리트(C)가 타설되어지는 천정 슬래브(S)의 밑면에 동시에 매립되어지는 것으로 지지판(10), 결합구(20), 너트삽입구(30), 너트(40) 및 캡(50)으로 구성되어 있다.Hanger fixture (A) according to the present invention, as shown in Figures 1 to 8a, 8b, the support plate (10), which is simultaneously embedded in the bottom surface of the ceiling slab (S) where the concrete (C) is poured It consists of a coupler 20, the nut insertion port 30, the nut 40, and the cap 50. As shown in FIG.

여기에서, 상기 지지판(10)은 소정 두께를 갖는 디스크형태의 중앙에 제1관통홀(101)이 형성되어지며, 상기 제1관통홀(101)의 내부 양측에 외측으로 향하는 가이드홈(102)이 형성되어지고, 상기 가이드홈(102)의 내부에는 제1탄성고정편(11)이 일체로 형성되어있다.Here, the support plate 10 has a first through hole 101 is formed in the center of the disk shape having a predetermined thickness, the guide groove 102 toward the outside on both inner sides of the first through hole 101 The first elastic fixing piece 11 is integrally formed in the guide groove 102.

상기 제1탄성고정편(11)은 배면이 가이드홈(102)으로부터 이격되어지며, 전면에 제1산형돌기(111)가 형성되어지고, 상기 제1탄성고정편(11)의 하부가 배면을 향하여 만곡되어지게 절곡되어진 상태에서 절곡되어진 끝 부분이 가이드홈(102)에 일체로 형성되어있다. The first elastic fixing piece 11 has a rear surface spaced apart from the guide groove 102, a first mountain protrusion 111 is formed on the front surface, and a lower portion of the first elastic fixing piece 11 has a rear surface. The bent end is formed integrally in the guide groove 102 in a state that is bent toward the curved.

상기 제1탄성고정편(11)은 배면이 가이드홈(102)을 향하여 근접되게 위치할 경우, 제1관통홀(101)의 내경 또는 단면적 보다 넓어지게 됨에 따라 후술하는 중공부재(201)에 형성된 제2산형돌기(202)가 용이하게 삽입되어질 수 있게 되고, 중공부재(201)가 완전히 삽입되어진 상태에서는 제1탄성고정편(11)의 탄성력에 의하여 제1탄성고정편(11)의 배면이 가이드홈(102)으로부터 이격되어지게 됨에 따라 제2산형돌기(202) 사이에 제1산형돌기(111)가 맞대어지게 걸려진 상태가 유지되어지게 된다.The first elastic fixing piece 11 is formed in the hollow member 201 to be described later as the rear surface is located closer to the guide groove 102, the inner diameter or the cross-sectional area of the first through-hole 101 is wider The second ridge protrusion 202 can be easily inserted, and when the hollow member 201 is fully inserted, the rear surface of the first elastic fixing piece 11 is formed by the elastic force of the first elastic fixing piece 11. As it is spaced apart from the guide groove 102, the state in which the first ridge protrusion 111 is hung between the second ridge protrusions 202 is maintained.

상기 지지판(10)의 제1관통홀(101)은 내부에 걸림홈(103)이 대응되게 형성되어 후술하는 결합구(20)의 하부 외측에 형성된 걸림편(203)이 결합되어질 수 있게 형성되어 있다.The first through hole 101 of the support plate 10 is formed so that the locking groove 103 is formed therein to be coupled to the locking piece 203 formed on the lower outer side of the coupling hole 20 to be described later. have.

상기 지지판(10)의 제1관통홀(101)과 가장자리 사이에 고정홀(104)이 형성되어 못(91)으로 거푸집 패널(90)의 상부에 결합 고정될 수 있게 형성되어 있다.A fixing hole 104 is formed between the first through hole 101 and the edge of the support plate 10, and is formed to be fixedly coupled to the upper portion of the formwork panel 90 by the nail 91.

상기 결합구(20)는 거푸집 패널(90) 설치시 지지판(10)에 너트삽입구(30)가 유동없이 고정되어지도록 하며 거푸집 패널(90) 해체시 결합구(20)로부터 지지판(10)만이 분리되어지도록 함과 동시에 전산볼트(B)가 용이하게 삽입되어지도록 하는 기능이 제공되어지게 구성되어 있다. The coupler 20 allows the nut insert 30 to be fixed to the support plate 10 without flow when the formwork panel 90 is installed, and only the support plate 10 is separated from the coupler 20 when the formwork panel 90 is dismantled. It is configured to be provided with a function to facilitate the insertion of the computer bolt (B) at the same time.

이를 위해, 중공부재(201)의 외부에 상기 제1산형돌기(111)에 맞대어지게 걸리는 제2산형돌기(202)가 수직으로 반복되게 일체로 형성되어지게 구성되어 있다. 상기 제2산형돌기(202)는 중공부재(201)의 외부에 대응되어지게 형성되도록 하는 것이 바람직하다.To this end, the second ridge protrusion 202 which is caught against the first ridge protrusion 111 on the outside of the hollow member 201 is configured to be integrally formed to repeat vertically. The second mountain protrusion 202 may be formed to correspond to the outside of the hollow member 201.

상기 결합구(20)의 하부 외측에 걸림편(203)이 형성되어 상기 걸림홈(103)에 걸림편(203)이 결합되어지게 형성되어 있다.A locking piece 203 is formed at the lower outer side of the coupling hole 20 so that the locking piece 203 is coupled to the locking groove 103.

상기 너트삽입구(30)는 너트(40)가 헛도는 것을 방지하여 일정한 깊이로 위치됨과 동시에 전산볼트(B)가 용이하게 삽입되는 기능을 갖는 것으로 결합구(20)의 중공부재(201)가 내측으로 삽입되어지는 몸체(301)의 상부에 너트삽입홈(303)이 형성된 헤드(302)가 일체로 형성되어 있다. The nut insertion hole 30 is located at a constant depth to prevent the nut 40 from screwing and at the same time having a function of easily inserting the computer bolt B, the hollow member 201 of the coupler 20 is A head 302 having a nut insertion groove 303 formed on an upper portion of the body 301 to be inserted inward is integrally formed.

상기 결합구(20)의 상부 외측에는 너트삽입구(30)의 몸체(301)가 삽입되어지며 상기 너트삽입구(30)의 몸체(301) 상부로 형성된 헤드(302)에 너트(40)가 삽입되어지게 형성되어 있다.The body 301 of the nut insertion hole 30 is inserted into the upper outer side of the coupler 20, and the nut 40 is inserted into the head 302 formed above the body 301 of the nut insertion hole 30. It is formed.

상기 너트삽입구(30)의 헤드(302)는 내부에 다각형태의 너트삽입홈(303)이 형성되어지고, 상기 헤드(302)의 하부에 몸체(301)가 하부로 연장되게 일체로 형성되어있다.The head 302 of the nut insert 30 is formed with a nut insertion groove 303 having a polygonal shape therein, and the body 301 is integrally formed at the lower portion of the head 302 so as to extend downward. .

상기 몸체(301)의 내부에는 상기 너트삽입홈(303)의 하부와 연결되는 제2관통홀(304)이 형성되어지고, 상기 제2관통홀(304)의 내주연부에 제1수직홈(305)이 대응되게 형성되어있다.A second through hole 304 connected to a lower portion of the nut insertion groove 303 is formed inside the body 301, and a first vertical groove 305 at an inner circumference of the second through hole 304. ) Is correspondingly formed.

상기 제1수직홈(305)의 입구측에는 제2탄성고정편(31)의 하부가 일체로 형성 되어지고, 상기 제2탄성고정편(31)의 내측 전면에 제3산형돌기(311)가 형성되어지고, 상기 제3산형돌기(311)가 결합구(20)의 중공부재(201)의 외면에 형성된 제2산형돌기(202)에 맞대어져 걸려지게 구성되어 있다.A lower portion of the second elastic fixing piece 31 is integrally formed at the inlet side of the first vertical groove 305, and a third mountain protrusion 311 is formed on the inner front surface of the second elastic fixing piece 31. The third mountainous projection 311 is configured to be caught against the second mountainous projection 202 formed on the outer surface of the hollow member 201 of the coupler 20.

상기 헤드(302)는 외부에 요철홈(32)이 수직방향으로 반복되게 형성되어 상기 요철홈(32)에 후술하는 캡(50)의 제3탄성고정편(51)이 걸려질 수 있게 형성되어 있다.The head 302 is formed so that the uneven groove 32 is repeated in the vertical direction on the outside so that the third elastic fixing piece 51 of the cap 50 to be described later is caught in the uneven groove 32. have.

상기 캡(50)은 너트삽입구(30)의 헤드(302)에 씌워져 타설되어지는 콘크리트의 일부가 너트(40)의 암나사산으로 유입되는 것을 방지하는 기능을 갖는 것으로 내부에 상기 요철홈(32)과 대응되는 제3탄성고정편(51)이 형성되어있다.The cap 50 has a function to prevent a part of the concrete to be covered by the head 302 of the nut insert 30 to flow into the female thread of the nut 40 to the concave-convex groove 32 therein The third elastic fixing piece 51 corresponding to is formed.

상기 제3탄성고정편(51)은 하부가 캡(50)의 입구측에 형성된 제2수직홈(501)의 입구측에 일체로 형성되어 있다. 즉, 제3탄성고정편(51)의 하단이 만곡형태로 벤딩된 상태로 벤딩된 끝부분 만이 일체로 형성되어 탄성력이 제공되어질 수 있다.The third elastic fixing piece 51 is integrally formed at the inlet side of the second vertical groove 501 formed at the inlet side of the cap 50. That is, only the bent end portion is integrally formed with the lower end of the third elastic fixing piece 51 bent in a curved shape to provide elastic force.

이와 같은 행거 고정구는 먼저, 지지판(10)을 들어 제1관통홀(101)의 하부가 결합구(20)의 중공부재(201)의 상단에 일치되도록 한 상태에서 지지판(10)을 하부로 가압시킴과 동시에 가이드홈(102)으로 제2산형돌기(202)가 슬라이디되어지면서 삽입된다.Such a hanger fixture first presses the support plate 10 downward while lifting the support plate 10 so that the lower portion of the first through hole 101 is aligned with the upper end of the hollow member 201 of the coupler 20. At the same time, the second ridge protrusion 202 is inserted into the guide groove 102 while being slid.

이때, 도7a의 우측에 도시된 바와 같이, 제2산형돌기(202)의 끝이 제1탄성고정편(11)에 형성된 제1산형돌기(111)에 맞닿아 제1탄성고정편(11)이 가이드홈(102)의 내측으로 밀림과 동시에 제1산형돌기(111)와 제2산형돌기(202) 사이에 상호간섭이 제거되어 용이하게 삽입된다.At this time, as shown in the right side of FIG. 7A, the end of the second ridge protrusion 202 abuts against the first ridge protrusion 111 formed on the first elastic fixing piece 11 so as to contact the first elastic fixing piece 11. The interference between the first and second mountain projections 111 and 202 is simultaneously pushed into the guide groove 102 and is easily inserted.

이어, 중공부재(201)의 하부에 형성된 걸림편(203)이 지지판(10)의 하부에 형성된 걸림홈(103)에 끼워져 걸려짐과 동시에 뒤로 밀려났던 제1탄성고정편(11)이 복원되어지면서 제2산형돌기(202)에 제1산형돌기(111)가 걸려지게 된다.Subsequently, the first elastic fixing piece 11, which is pushed backward at the same time as the locking piece 203 formed in the lower portion of the hollow member 201, is inserted into the locking groove 103 formed in the lower portion of the support plate 10, is restored. The first mountain projections 111 are caught by the second mountain projections 202.

다음, 지지판(10)의 상부로 노출된 결합구(20)의 중공부재(201)에 너트삽입구(30)의 몸체(301)에 형성된 제2관통홀(304)을 삽입하게 된다. 이때, 상기 제2관통홀(304)에 형성된 제2탄성고정편(31)이 제2산형돌기(202)에 의하여 제1수직홈(305)으로 밀리면서 삽입되어지고, 몸체(301)의 하부가 지지판(10)의 상부에 맞닿음과 동시에 밀려져 있는 제2탄성고정편(31)이 복원되어지게 되면서 도7a의 좌측에 도시된 바와 같이, 제2산형돌기(202)에 걸려져 고정된다.Next, the second through hole 304 formed in the body 301 of the nut insertion hole 30 is inserted into the hollow member 201 of the coupling hole 20 exposed to the upper portion of the support plate 10. At this time, the second elastic fixing piece 31 formed in the second through hole 304 is inserted while being pushed into the first vertical groove 305 by the second mountain protrusion 202, and the lower portion of the body 301 While the second elastic fixing piece 31 which is pushed in contact with the upper portion of the support plate 10 is restored, as shown on the left side of FIG. 7A, the second ridge protrusion 202 is caught and fixed. .

다음, 헤드(302)에 형성된 너트삽입홈(303)에 너트(40)를 끼워 안착시킨 후 캡(50)을 헤드(302)에 맞추어 끼우게 된다. 이때, 도7b에 도시된 바와 같이, 캡(50)의 내부에 형성된 제3탄성편(51)이 헤드(302)의 외측에 형성된 요철홈(32)에 걸리게 됨에 따라 역방향으로 분리되는 것을 막을 수 있게 되는 것으로 행거 고정구(A)가 결합되어지게 된다.Next, the nut 40 is seated in the nut insertion groove 303 formed in the head 302, and then the cap 50 is fitted to the head 302. In this case, as shown in FIG. 7B, the third elastic piece 51 formed in the cap 50 is prevented from being separated in the opposite direction as the third elastic piece 51 is caught by the uneven groove 32 formed on the outside of the head 302. Hanger fixture (A) is to be coupled to be.

이러한 과정을 통해 행거 고정구(A)가 결합되어지는 과정에서 행거 고정구(A)를 거푸집 패널(90)의 상부에 고정할 경우, 우선 지지판(10)에 결합구(20)가 결합되어진 상태에서 지지판(10)을 거푸집 패널(90)의 상부에 올려놓고, 못(91)을 고정홀(104)에 박아 지지판(10)이 고정되어지도록 한다.When the hanger fixture A is fixed to the upper part of the formwork panel 90 while the hanger fixture A is coupled through this process, the support plate 20 is first coupled to the support plate 10. 10 is placed on the top of the formwork panel 90, the nail 91 is driven into the fixing hole 104 so that the support plate 10 is fixed.

다음, 거푸집 패널(90)의 상부로 고정된 결합구(20)에 전기한 바와 같은 과정을 통해 너트삽입구(30)와 너트(40) 및 캡(50)이 결합되어지도록 한다.Next, the nut insertion hole 30 and the nut 40 and the cap 50 are coupled to each other through the process as described above in the coupling hole 20 fixed to the upper portion of the formwork panel 90.

한편, 거푸집 패널(90)의 상부에 콘크리트(C)를 타설하여 천정 슬래브(S)가 양생되어진 상태에서 거푸집 패널(90)을 제거할 경우, 거푸집 패널(90)의 상부로 지지판(10)이 못으로 고정되어져 있음으로써, 거푸집 패널(90)과 지지판(10)이 같이 천정 슬래브(S)로 부터 분리되어지게 된다. 이때, 결합구(20)의 하부에 형성된 걸림편(203)이 거푸집 패널(90)을 분리시키는 하중 또는 힘에 의하여 양측 하부로 젖혀지게 됨에 따라 지지판(10)과 거푸집 패널(90)이 같이 용이하게 분리되어지게 된다.On the other hand, when the formwork panel 90 is removed by pouring concrete C on the formwork panel 90 and the ceiling slab S is cured, the support plate 10 is placed on the formwork panel 90. By being fixed with a nail, the formwork panel 90 and the support plate 10 are separated from the ceiling slab S together. At this time, the support piece 10 and the formwork panel 90 are easily together as the engaging piece 203 formed at the lower portion of the coupler 20 is flipped to both lower portions by a load or a force separating the formwork panel 90. To be separated.

거푸집 패널(90)이 천정 슬래브(S)에서 분리되어진 상태에서는 너트삽입구(30)의 몸체(301)의 하단이 노출된 상태가 됨에 따라 전산볼트(B)를 몸체(301)의 제2관통홀(304)에 삽입하여 회전시킴과 동시에 너트삽입홈(303)에 삽입된 너트(40)에 전산볼트(B)가 체결되어지게되고, 전산볼트(B)가 너트(40)에 체결된 상태에서 전산볼트(B)의 하부에 행거 또는 M바(92) 등을 결합시키면 된다.In the state in which the formwork panel 90 is separated from the ceiling slab S, the lower end of the body 301 of the nut insertion hole 30 is exposed so that the computer bolt B is connected to the second through hole of the body 301. The threaded bolt B is fastened to the nut 40 inserted into the nut insertion groove 303 at the same time as it is rotated by being inserted into the 304, and the threaded bolt B is fastened to the nut 40. The hanger or M bar 92 or the like may be coupled to the lower portion of the computer bolt B.

도1은 본 발명에 따른 행거 고정구의 사시도.1 is a perspective view of a hanger fixture according to the present invention.

도2는 본 발명에 따른 행거 고정구의 내,외부를 도시한 사시도.Figure 2 is a perspective view showing the inside, outside of the hanger fixture according to the present invention.

도3은 본 발명에 따른 행거 고정구의 분해 사시도.Figure 3 is an exploded perspective view of the hanger fixture according to the present invention.

도4는 본 발명에 따른 행거 고정구의 저면 분해 사시도.Figure 4 is a bottom exploded perspective view of the hanger fixture according to the present invention.

도5는 본 발명에 따른 행거 고정구를 분리하여 도시한 단면도.Figure 5 is a cross-sectional view showing a separate hanger fixture according to the present invention.

도6a,도6b는 본 발명에 따른 행거 고정구의 종단면도.Figure 6a, Figure 6b is a longitudinal cross-sectional view of the hanger fixture according to the present invention.

도7a,도7b는 본 발명에 따른 행거 고정구의 결합상태를 확대 도시한 예시도.Figure 7a, Figure 7b is an exemplary view showing an enlarged coupling state of the hanger fixture according to the present invention.

도8a,도8b는 본 발명에 따른 행거 고정구의 사용상태를 도시한 단면도.Figure 8a, Figure 8b is a cross-sectional view showing a state of use of the hanger fixture according to the present invention.

<도면의 주요 부분에 대한 부호의 간단한 설명><Brief description of symbols for the main parts of the drawings>

10 : 지지판 11 : 제1탄성고정편10: support plate 11: the first elastic fixing piece

20 : 결합구 30 : 너트삽입구20: coupler 30: nut insertion hole

40 : 너트 50 : 캡40: nut 50: cap

101 : 제1관통홀 102 : 가이드홈101: first through hole 102: guide groove

111 : 제1산형돌기 201 : 중공부재111: first mountain projection 201: hollow member

202 : 제2산형돌기 301 : 몸체202: second mountain projection 301: body

302 : 헤드302: head

Claims (4)

천정 슬래브의 밑면속에 매립되어지게 구성된 행거 고정구(A)에 있어서,In the hanger fixture (A) configured to be embedded in the bottom surface of the ceiling slab, 상기 행거 고정구(A)는 지지판(10)의 중앙으로 형성된 제1관통홀(101)에 결합구(20)가 삽입되게 결합되고, 상기 결합구(20)의 상부 외측에 너트삽입구(30)의 몸체(301)가 삽입되게 결합되며, 상기 너트삽입구(30)의 몸체(301) 상부로 형성된 헤드(302)에 너트(40)가 삽입되어지며, 상기 너트삽입구(30)의 헤드(302)에 캡(50)이 씌워지게 결합되어지되, 상기 지지판(10)은 제1관통홀(101)의 내부 양측에 외측으로 향하는 가이드홈(102)이 형성되어지며, 상기 가이드홈(102)의 내부에 제1탄성고정편(11)이 일체로 형성되어지고, 상기 제1탄성고정편(11)은 배면이 가이드홈(102)으로부터 이격되어지며, 전면에 제1산형돌기(111)가 형성되어지고, 상기 결합구(20)는 중공부재(201)의 외부에 상기 제1산형돌기(111)에 맞대어지게 걸리는 제2산형돌기(202)가 수직으로 반복되게 형성되어짐을 특징으로 하는 행거 고정구.The hanger fixture (A) is coupled to the coupling hole 20 is inserted into the first through-hole 101 formed in the center of the support plate 10, the upper portion of the coupling hole 20 of the nut inserting hole (30) The body 301 is coupled to be inserted, the nut 40 is inserted into the head 302 formed above the body 301 of the nut insert 30, the head 302 of the nut insert 30 Cap 50 is coupled to be covered, the support plate 10 is formed with a guide groove 102 facing outwards on both inner sides of the first through hole 101, the inside of the guide groove 102 The first elastic fixing piece 11 is integrally formed, and the first elastic fixing piece 11 is spaced apart from the guide groove 102 at the rear thereof, and the first mountain protrusion 111 is formed on the front surface thereof. In addition, the coupler 20 is characterized in that the second ridge protrusion 202 that is caught against the first ridge protrusion 111 on the outside of the hollow member 201 is formed to be repeated vertically. Hanger fastener as. 제1항에 있어서,The method of claim 1, 상기 너트삽입구(30)의 헤드(302)는 내부에 다각형태의 너트삽입홈(303)이 형성되어지고, 상기 헤드(302)의 하부에 몸체(301)가 하부로 연장되게 일체로 형성되어지되, 상기 몸체(301)의 내부로 상기 너트삽입홈(303)의 하부와 연결되는 제2관통홀(304)이 형성되어지고, 상기 제2관통홀(304)의 내주연부에 제1수직홈(305)이 대응되게 형성되어지며, 상기 제1수직홈(305)의 입구측에 제2탄성고정편(31)의 하 부가 일체로 형성되어지고, 상기 제2탄성고정편(31)의 내측 전면에 제3산형돌기(311)가 형성되어지고, 상기 제3산형돌기(311)가 제2산형돌기(202)에 맞대어지게 걸려짐을 특징으로 하는 행거 고정구.The head 302 of the nut insert 30 is formed with a nut inserting groove 303 having a polygonal shape therein, and the body 301 is formed integrally with a lower portion of the head 302 to extend downward. A second through hole 304 is formed in the body 301 and connected to a lower portion of the nut insertion groove 303, and a first vertical groove in an inner circumference of the second through hole 304. 305 is formed to correspond, the lower portion of the second elastic fixing piece 31 is integrally formed at the inlet side of the first vertical groove 305, the inner front of the second elastic fixing piece 31 Hanger fixtures, characterized in that the third mountain projection (311) is formed, the third mountain projection (311) is caught against the second mountain projection (202). 제1항에 있어서,The method of claim 1, 상기 헤드(302)는 외부에 요철홈(32)이 수직방향으로 반복되게 형성되어지며, 상기 캡(50)의 내부에 상기 요철홈(32)과 대응되는 제3탄성고정편(51)이 형성되어지되, 상기 제3탄성고정편(51)은 하부가 캡(50)의 입구측에 형성된 제2수직홈(501)의 입구측에 일체로 형성됨을 특징으로 하는 행거 고정구.The head 302 is formed with the uneven groove 32 is repeated in the vertical direction on the outside, the third elastic fixing piece 51 corresponding to the uneven groove 32 is formed in the cap 50 The third elastic fixing piece (51) is a hanger fixture, characterized in that the lower portion is integrally formed on the inlet side of the second vertical groove (501) formed on the inlet side of the cap (50). 제1항에 있어서,The method of claim 1, 상기 지지판(10)의 제1관통홀(101)은 내부에 걸림홈(103)이 대응되게 형성되어지고, 상기 결합구(20)의 하부 외측에 걸림편(203)이 형성되어 상기 걸림홈(103)에 걸림편(203)이 결합되어지고, 상기 지지판(10)의 제1관통홀(101)과 가장자리 사이에 고정홀(104)이 형성되어짐을 특징으로 하는 행거 고정구.The first through hole 101 of the support plate 10 is formed with a locking groove 103 therein, and a locking piece 203 is formed at a lower outer side of the coupling hole 20 to allow the locking groove ( Hanger piece (203) is coupled to the hanger, characterized in that the fixing hole 104 is formed between the first through hole 101 and the edge of the support plate (10).
KR1020090095181A 2009-10-07 2009-10-07 Hanger fixture Abandoned KR20110037651A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090095181A KR20110037651A (en) 2009-10-07 2009-10-07 Hanger fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090095181A KR20110037651A (en) 2009-10-07 2009-10-07 Hanger fixture

Publications (1)

Publication Number Publication Date
KR20110037651A true KR20110037651A (en) 2011-04-13

Family

ID=44045095

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090095181A Abandoned KR20110037651A (en) 2009-10-07 2009-10-07 Hanger fixture

Country Status (1)

Country Link
KR (1) KR20110037651A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180061707A (en) * 2016-11-30 2018-06-08 (주)엘이디세이버 Support device for race way
CN110094009A (en) * 2019-05-08 2019-08-06 北京城建八建设发展有限责任公司 A kind of ceiling tie bar device
KR102321507B1 (en) * 2021-04-29 2021-11-03 추용대 Imbedded anchor for slab

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180061707A (en) * 2016-11-30 2018-06-08 (주)엘이디세이버 Support device for race way
CN110094009A (en) * 2019-05-08 2019-08-06 北京城建八建设发展有限责任公司 A kind of ceiling tie bar device
KR102321507B1 (en) * 2021-04-29 2021-11-03 추용대 Imbedded anchor for slab

Similar Documents

Publication Publication Date Title
KR200436827Y1 (en) Euroform fixture with excellent workability
KR20160026508A (en) Marble panel fixing device for wall exterior
KR20090037721A (en) Construction Sleeve Fixture
KR20110037651A (en) Hanger fixture
KR20150079384A (en) Angle supporting object for building stone panel construction
KR20130103691A (en) A strong anchor
KR20140143559A (en) Removable structure of ceilings
KR101048643B1 (en) Ceiling panel fixture
KR200442013Y1 (en) Wall through sleeve structure
KR200459900Y1 (en) a sleeve fixing tool of a mold
KR20110059937A (en) Exterior wall finishing material installation structure for building
KR101122349B1 (en) The pipe fixing device
KR200426760Y1 (en) Multifunctional Strong Anchor with High Compression and Adhesion
KR20100119021A (en) Construction method of ceiling panel hanger
KR200326563Y1 (en) Mold combination member
KR200279194Y1 (en) Install device for lintel angle
KR200436104Y1 (en) Formwork insert fixture
KR200306744Y1 (en) Concrete form fixing tool for underground breast wall
KR20080072170A (en) Formwork Pipe Fixtures
KR200411727Y1 (en) Fixing member for lifting box
KR20150101282A (en) Fixing structure of wall and construction for using fastener
KR20060116928A (en) Building Stone Fixture
KR102307075B1 (en) Precast-concrete structure fixed full thread bolt and it&#39;s anchor construction method
KR200193191Y1 (en) Fixtures for construction angle
JP5179117B2 (en) Scaffold wall mounting hardware

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

Patent event code: PA01091R01D

Comment text: Patent Application

Patent event date: 20091007

PA0201 Request for examination
PG1501 Laying open of application
E902 Notification of reason for refusal
PE0902 Notice of grounds for rejection

Comment text: Notification of reason for refusal

Patent event date: 20110628

Patent event code: PE09021S01D

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

Patent event code: PE07011S01D

Comment text: Decision to Grant Registration

Patent event date: 20120206

NORF Unpaid initial registration fee
PC1904 Unpaid initial registration fee